    TOC.CW.LA1.S01.1

    TABLE OF CONSTRUCT

    Construct : S01 Computer Security Measures

    Aspect : LA1.S01.1 Apply Correct Security Procedures Using Antivirus

    Instrument : Demonstration

    MARK CRITERIA EVIDENCE NOTE

    2

    1. Choose antivirussoftware to beused.

    Write the name ofthe antivirussoftware.

    CompletedACF.CW.LA1.S01.1.

    Use any antivirussoftware available e.g.Kaspersky, McAfee

    Virus Scan, NortonAntivirus, Trend MicroPC-Cillin, Dr Solomon,AVG, etc.

    Scan area can bespecific folder, floppydisk, or flash memory.

    Candidate can printscreen the scansummary.

    If no virus is detected,criterion four isconsidered done. WriteNo action taken.

    Values:

    Confident

    Responsible

    2

    2. Start the antivirussoftware andselect area to bescanned.

    State the areaselected.

    2

    3. Scan the selectedarea.

    Copy scansummary.

    2

    4. Choose and applyany or all of thefollowing whenvirus is detected delete/remove,clean/heal,quarantine/moveto vault.

    State action taken

    8 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    2/27

    TOC.CW.LA1.S01.2

    TABLE OF CONSTRUCT

    Construct : S01 Computer Security MeasuresAspect : LA1.S01.2 Apply Correct Security Procedures Using Anti-Spyware

    Instrument : Demonstration

    MARK CRITERIA EVIDENCE NOTE

    2

    1. Choose anti-spyware softwareto be used.

    Write the name of

    the anti-spywaresoftware.

    CompletedACF.CW.LA1.S01.2

    Suggested anti-spyware software:Lavasoft Ad-Aware SEPersonal.

    Print screen can beused to display scansummary.

    If no spyware isdetected, criterion fouris considered done.Write No action taken.

    Values:

    Confident

    Responsible

    2

    2. Start the anti-spyware softwareand choose a scanmode.

    State the scanmode selected.

    2

    3. Scan the selectedarea.

    Copy scan

    summary.

    2

    4. Choose and applyany of the followingwhen spyware isdetected -remove/quarantinethe identifiedobject(s).

    State the actiontaken.

    8 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    3/27

    TOC.CW.LA1.AS02.1

    TABLE OF CONSTRUCT

    Construct : S02 Impact of ICT on Society

    Aspect : LA1.S02.1 Locate and present information on impact of ICT on society

    Instrument : Verbal Presentation

    MARK CRITERIA EVIDENCE NOTE

    1

    1. Locate informationfrom more than onesource.

    Write the number ofsources referred.

    CompletedACF.CW.LA1.S01.2

    Suggested anti-spyware software:Lavasoft Ad-Aware SE

    Personal.

    Print screen can beused to display scansummary.

    If no spyware isdetected, criterion fouris considered done.Write No actiontaken.

    Values:

    Confident

    Responsible

    2

    2. Present theinformation in 5 to 10slides.

    Write the number ofslides used.

    5

    3. Presentation includes:

    a. Topic

    b. Content

    c. Conclusion

    d. Sources ofreference

    Submit a soft copy orhard copy of thepresentation.

    2

    4. Displaycooperation.

    a. Write thenames of groupmembers.

    b. Verbal

    verification fromgroup membersOR assessorsobservation.

    10 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    4/27

    TOC.CW.LA2.S03.1

    TABLE OF CONSTRUCT

    Construct : S03 PC Assembling

    Aspect : LA2.S03.1 Assemble the components of a PC

    Instrument : Demonstration

    MARK CRITERIA EVIDENCE NOTE

    2

    1. Fix the processor

    correctly.Write processorspecification.

    CompletedACF.CW.LA2.S03.1

    CAUTION:

    Assessor must makesure that the processoris properly fixed by thecandidate to avoidpermanent damage to it.

    Installation of floppydrive OR optical drive isrequired if and only ifthey come with the PC.

    Candidates must

    connect all necessarycables.

    Values:

    Accurate

    Confident

    Responsible

    2

    2. Fix the RAMcorrectly.

    Write RAM capacity.

    2

    3. Install the powersupply unit correctly.

    Write power (W) andvoltage (V) of unit.

    2

    4. Install the hard disk

    correctly.Write hard diskcapacity.

    2

    5. Install the floppy driveAND/OR optical drivecorrectly.

    Write drive(s)installed.

    1

    6. Boot up the computersuccessfully.

    2

    7. Check BIOS setup.

    a. Hard diskdetected

    b. Floppy driveAND/ORoptical drivedetected

    13 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    5/27

    TABLE OF CONSTRUCT

    Construct : S04 Software InstallationAspect : LA2.S04.1 Install operating system, application software and utility program

    Instrument : Demonstration

    MARK CRITERIA EVIDENCE NOTE

    3

    1. Install anoperating system.

    Write the name ofthe operatingsystem installed.

    CompletedACF.CW.LA1.S01.2

    Suggested anti-spyware software:Lavasoft Ad-Aware SE

    Personal.

    Print screen can beused to display scansummary.

    If no spyware isdetected, criterion fouris considered done.Write No action taken.

    Values: Confident

    Responsible

    3

    2. Install applicationsoftware.

    Write the name ofthe applicationsoftware installed.

    3

    3. Install a utilityprogram.

    Write the name ofthe utility programinstalled.

    9 TOTAL MARK

    -

    TOC.CW.LA2.SO4.1

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    6/27

    TOC.CW.LA2.S05.1

    TABLE OF CONSTRUCT

    Construct : S05 Current and Future Development of Open Source Software and LatestDevelopment in ICT

    Aspect :LA2.S05.1

    Explain the latest open source software available and the latestdevelopment in ICT

    Instrument : Written Assignment

    MARK CRITERIA EVIDENCE NOTE

    4

    1. Explain the latest open

    source OSa. Meaning

    b. TWO examples

    Written Assignment

    Candidate works in

    groups of 2 to 4 toconduct study AND/ORfor discussion.

    Written assignmentMUST be doneindividually.

    Refer toWAF.CW.LA2.S05.1.

    Suggested duration:

    2 to 4 weeks

    Values:

    Appreciate

    Cooperate

    Confident

    4

    2. Explain the latest opensource applicationsoftware

    a. Meaning

    b. TWO examples

    4

    3. Explain the latestdevelopment in ICT

    a. ONE hardware

    b. ONE software

    4

    4. Explain pervasivecomputing

    a. Meaning

    b. TWO examples

    2

    Follow required writtenassignment format:

    a. content format

    b. document format

    2

    Display cooperation.a. Write the names

    of groupmembers.

    b. Verbal verificationfrom groupmembers orassessorsobservation.

    20 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    7/27

    WAF.CW.LA2.S05.1

    WRITTEN ASSIGNMENT FORMAT

    LEARNING AREA: COMPUTER SYSTEM

    Construct : S05 Current and Future Development of Open Source Software andLatest Development in ICT

    Aspect :LA2.S05.1

    Explain the latest open source software available and the latestdevelopment in ICT

    Instrument : Written Assignment

    Instruction:

    Work in groups of two to four to find information and discuss on the latest open source softwareavailable and the latest development in ICT. Complete this written assignment individually.

    You are given two to four weeks to complete this assignment.

    Content Format

    1.0 Introduction

    (meaning of open source software, hardware, software, etc)

    2.0 The Latest Open Source Operating System (OS)

    2.1 Meaning of open source OS

    2.2 Examples of open source OS

    (explain two examples)

    3.0 The Latest Open Source Application Software

    3.1 Meaning of open source application software3.2 Examples of open source application software

    (explain two examples)

    4.0 The Latest Development in ICT

    4.1 Hardware

    (state specification OR special features of ONE hardware and compare it to previousmodel(s))

    4.2 Software

    (state year/date of release, special features of ONE software and compare it toprevious version(s))

    5.0 Pervasive Computing

    5.1 Meaning of pervasive computing

    5.2 Examples of pervasive computing

    (explain two examples)

    6.0 Conclusion

    Reference

    (give at least two sources of reference)

    Document Format

    cover pageo Candidates details

    o Title: The latest Open Source Software Available and the Latest Development in ICT

    page margin - top, bottom, left, and right: 1, paper size - A4

    line spacing - 1.5 lines

    typeface - Times New Roman, font size- - 12 pts (content), and14 pts for title/heading

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    8/27

    number of pages - 3 to 10

    TOC.CW.LA3.S06.1

    TABLE OF CONSTRUCT

    Construct : S06 Network Facilities Setup

    Aspect : LA3.S06.1 Crimp and Test UTP Cables

    Instrument : Demonstration

    MARK CRITERIA EVIDENCE NOTE

    2

    1. Crimp a Straight Cable

    Skin off the cable jacket.

    Untwist and straighten eachwire.

    Arrange the wires according tothe 568B wiring schematic orderfor both ends.

    Cut and insert the wires into aRJ45 connector.

    Crimp the cable using acrimping tool.

    (assessment done on final product)

    Crimped

    straight andcrossed cables.

    At least 1 meter of UTPcable is recommended.

    Candidate may refer tothe wiring schematicmanual in the LearningModule.

    The cables must belabelled and kept in asafe place

    Values:

    Precise

    Confident

    Abide

    2

    2. Check the straight cable iscrimped successfully using acable tester.

    2

    3. Crimp a Crossed Cable

    Skin off the cable jacket.

    Untwist and straighten eachwire.

    Arrange the wires according to

    the 568A wiring schematic orderfor one end AND 568B wiringschematic order for the otherend.

    Cut and insert the wires into aRJ45 connector.

    Crimp the cable using crimpingtool.

    (assessment done on final product)

    2

    4 Check the crossed cable iscrimped successfully using acable tester.

    8 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    9/27

    TOC.CW.LA3.S06.2

    TABLE OF CONSTRUCT

    MARK CRITERIA EVIDENCE NOTE

    2

    1. Set an IP Address.

    Write the IP address.

    CompletedACF.CW.LA3.S06.2

    IP Address and Subnet

    Mask given by theassessor.

    Values:

    accurate

    confident

    responsible

    abide

    2

    2. Set a Subnet Mask.

    Write the subnetmask.

    1

    3. Choose anothercomputer to test theconfiguration.

    Write the IP address ofthe computer.

    3

    4. Ping the othercomputer.

    Copy the ping result.

    8 TOTAL MARK

    -

    Construct : S06 Network Facilities Setup

    Aspect : LA3.S06.2 Configure and Test Network Connection

    Instrument : Demonstration

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    10/27

    TOC.CW.LA3.S07.1

    TABLE OF CONSTRUCT

    MARK CRITERIA EVIDENCE NOTE

    8

    1. Describe Mobile

    Computing

    a. definition

    b. specifications,services, frequencies

    Written Assignment

    Candidates work in

    groups of 2 to 4 toconduct the study andfor discussion.

    Written assignmentmust be doneindividually.

    Suggested duration:2 to 4 weeks

    Refer to WrittenAssignment Format inWAF.CW.LA3.S07.1

    Values:

    cooperate

    responsible

    abide

    4

    2. Describe InternetTechnology andServices

    a. VoIP

    b. BLOG

    8

    3. Describe types ofnetwork

    a. PAN,

    b. VPN,

    c. WLAN,

    d. WIMAX

    2

    4. Follow required writtenassignment format:

    content format

    document format

    2

    5. Display cooperation.

    a. Write the namesof group members.

    b. Verbalverification fromgroup members orassessorsobservation

    24 TOTAL MARK

    -

    Construct : S07 Current and Future Development in Networks and Communications.

    Aspect : LA3.S07.1 Describe the Latest Development in Networks and Communications

    Instrument : Written Assignment

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    11/27

    WAF.CW.LA3.S07.1

    WRITTEN ASSIGNMENT FORMAT

    LEARNING AREA: COMPUTER NETWORKS AND COMMUNICATIONS

    Construct : S07 Current and Future Development in Networks and Communications

    Aspect : LA3.S07.1 Describe the Latest Development in Networks and Communications

    Instrument : Written Assignment

    Instruction:

    Work in groups of two to four to find information and discuss on the latest development inNetworks and Communications. Complete this written assignment individually.

    You are given two to four weeks to complete this assignment.

    Content format

    1.0 Introduction

    (Computer Networks and Communications)

    2.0 Mobile Computing

    2.1 Definition

    2.2 Specification, services, and frequencies of Mobile Computing(based on one product e.g. PDA, 3G mobile phone)

    3.0 Internet Technology and Services

    3.1 VoIP

    3.2 BLOG

    4.0 Types of network.

    4.1 PAN

    4.2 VPN

    4.3 WLAN

    4.4 WIMAX

    5.0 Conclusion

    (Computer Networks and Communications)

    Reference

    (give at least two sources of reference)

    Document Format (use Word Processor)

    cover page

    o Candidates details

    o Title: The Latest Development in Networks and Communications

    page margin - top, bottom, left, and right: 1, paper size - A4 line spacing: 1.5 lines

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    12/27

    typeface - Times New Roman, font size - 12 pts (content), 14 pts for title/heading

    number of pages - 3 to 10

    TOC.CW.LA4.S08.1

    TABLE OF CONSTRUCTConstruct : S08 Multimedia Development

    Aspect : LA4.S08.1 Apply All The Phases Of Multimedia Production To Produce AnInteractive Educational Multimedia Project.

    Instrument : Project

    MARK CRITERIA EVIDENCE NOTE

    3

    1. Analysis Phase

    Write the project title,objective and targetaudience.

    CompletedRF.CW.LA4.S08.1

    and a soft copy of theproduct.

    The multimedia productmust be interactive,educational and includeall five multimedia

    elements.

    Choose any topic fromany subjects taught inschool:

    ICT

    Bahasa Malaysia

    Bahasa Inggeris

    Mathematics

    Science, etc

    Authoring Tools: Tool book

    Presentation s/w

    Web editor

    Values:

    Creative

    Integrity

    Responsible

    22. Design Phase

    Sketch storyboard.

    1

    3. Implementation Phase

    Develop a multimediaproject based on thestoryboard using anauthoring tool.

    Write the name of theauthoring tool used.

    2

    4. Testing Phase

    Test the developedmultimedia product.

    Complete the checklist.

    7

    5. Evaluation Phase

    Ask assessor to evaluatethe developed multimediaproduct.

    a. Content

    match the projectobjective(s)

    b. Interface

    user friendly

    interactive

    c.Navigation

    all links/buttonsfunctioningcorrectly

    d. MultimediaElements

    text

    graphic

    audio

    videoc. animation

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    13/27

    1

    6. Publishing Phase

    Submit a softcopy of themultimedia product.

    Write the storage mediumused and name of themain file or folder.

    16 TOTAL MARK

    RF.CW.LA4.S08.1

    REPORT FORM

    LEARNING AREA : MULTIMEDIA

    Name of Candidate

    IC No

    Index No

    Construct : S08 Multimedia Development

    Aspect : LA4.S08.1 Apply All The Phases Of Multimedia Production To Produce AnInteractive Educational Multimedia Project.

    Instrument : Project

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    14/27

    -

    1. ANALYSIS PHASE

    Project Title

    Objective(s)

    Target Audience

    2. DESIGN PHASE (attach storyboard if space provided not enough)

    3. IMPLEMENTATION PHASE

    Authoring tool

    4. TESTING PHASE

    CHECKLIST FORM

    Items YES NO

    A Content

    Match the project goal

    B Interface

    User-friendly

    Interactive

    C

    Navigation

    All links/buttons functioning correctly

    5. EVALUATION PHASE

    (to be carried out by the assessor using ACF.CW.LA4.S08.1)

    6. PUBLISHING PHASE

    Storage Medium

    Main File/Folder Name

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    15/27

    Candidates Signature

    ------------------------------

    TOC.CW.LA4.S09.1

    TABLE OF CONSTRUCT

    Construct : S09 Current and Future Development of Multimedia

    Aspect : LA4.S09.1 Gather Examples of Immersive Multimedia In Education, Business orEntertainment

    Instrument : Scrapbook

    MARK CRITERIA EVIDENCE NOTE

    2

    1. Front cover includes

    a. topic

    b. name of candidate

    CompletedRF.CW.LA4.S09.1

    AND

    Scrapbook

    Candidate compilesarticles, pictures,drawings from differenttypes of sources such

    as newspapers,magazines, Internet,etc into a scrapbookbased on any of thefollowing:

    ImmersiveMultimedia inEducation

    ImmersiveMultimedia inBusiness

    Immersive

    Multimedia in

    22. Scrapbook contains at

    least SIX pagesexcluding front andback covers.

    2

    3. Collections are relevantto the topic chosen.

    2

    4. State source and/or

    date in the scrapbook.

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    16/27

    Entertainment

    Scrapbook must bedone individually.

    Values:

    creative

    responsible

    appreciate

    2

    5. SubmitRF.CW.LA4.S09.1

    10 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    17/27

    RF.CW.LA4.S09.1

    REPORT FORM

    LEARNING AREA : MULTIMEDIA

    Name of Candidate

    IC No

    Index No

    Construct : S11 Current And Future Development Of Multimedia

    Aspect :LA5.S11.1

    Gather Examples of Immersive Multimedia In Education, BusinessOr Entertainment

    Instrument : Scrapbook

    Activity Log (record all activities carried out in compiling the scrapbook)

    Date Activity Remarks

    Candidates Signature

    ------------------------------

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    18/27

    TOC.CW.LA5.S10.1

    TABLE OF CONSTRUCT

    Construct : S10 Program Development

    Aspect : LA5.S10.1 Apply Program Development Phases To Develop A Problem-SolvingProgram

    Instrument : Practical Session

    MARK CRITERIA EVIDENCE NOTE

    4

    1. Problem Analysis

    a. Write theproblem statement.

    List all the required

    input itemsc. Write the expected

    output.

    d. Write the formula to beused.

    CompletedRF.CW.LA5.S10.1

    ANDSubmitted program.

    Duration of practicalsession: 2 periods

    Choose any of the

    suggested projects (referto APPENDIX B) orpropose a new project.

    Submit

    executable fileand/or

    project file andform(s).

    During evaluation,assessor runs thecandidates program to

    validate the output in 4(b)using the data in 4(a).

    Values:

    1. Accurate

    2. Confident

    3. Responsible

    4. Abide

    6

    2. Program Design

    a. Write thepseudocode.

    OR

    Draw the flowchart.

    b. Sketch theuser interface designfor input.

    c. Sketch theuser interface designfor output.

    2

    3. Coding

    Develop a program basedon (1) and (2).

    Write the name of theproject file.

    6

    4. Testing and Debugging

    a. State the testdata used for eachinput item listed in 1(b).

    b. Write theoutput based on 4(a)

    c. Compile the program.

    Write down the name ofthe executable file.

    2 5. Documentation

    Submit report and soft

    20 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    19/27

    RF.CW.LA5.S10.1

    REPORT FORM

    LEARNING AREA : PROGRAMMING

    Name of Candidate

    IC NoIndex No

    Construct : S10 Program Development

    Aspect : LA5.S10.1 Apply Program Development Phases To Develop A Problem-SolvingProgram

    Instrument : Practical Session

    Assessment : 1 / 2 / 3 / _

    1. Problem Analysis

    a. ProblemStatement

    b. Required Input

    c. ExpectedOutput

    d. Formula Used

    2. Program Design

    a. Pseudocode

    OR Flowchart

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    20/27

    b. User InterfaceDesign for Input

    c. User InterfaceDesign for Output

    3. Coding

    (refer to program submitted)

    Project File Name: __________________

    4. Testing and Debugging

    a. State the dataused for each inputitem listed in 1(b).

    Input item (s) Input data

    c. Write the outputbased on the inputdata in 4(a)

    Output item(s) Actual Output

    e. Name of theexecutable file

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    21/27

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    22/27

    RF.CW.LA5.S11.1

    REPORT FORM

    LEARNING AREA : PROGRAMMING

    Name of Candidate

    IC No

    Index No

    Construct : S11 Current And Future Development Of The Latest ProgrammingLanguages

    Aspect : LA5.S11.1 Find Out The Latest Programming Languages

    Instrument : Report

    Name of LatestProgrammingLanguage

    1. 2.

    Developer

    Year Developed

    Purpose

    Platform

    (OS)

    Approach

    Translator used

    Special features

    (optional)

    Source ofReference

    Candidates Signature

    ------------------------------

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    23/27

    TOC.CW.LA6.S12 1

    TABLE OF CONSTRUCT

    Construct : S12 Database Development

    Aspect : LA6.S12.1 Develop A Database ProjectInstrument : Practical Session

    MARK CRITERIA EVIDENCE NOTE

    21. State the project

    title and the objective(s)of the project.

    CompletedRF.CW.LA6.S12.1

    AND

    soft copy of thedatabase project

    Duration of practical session:2 periods

    Choose any of the suggested

    projects in APPENDIX C orpropose a new project.

    Draw a line to show therelationship between bothtables.

    Example:

    TABLE 1 TABLE 2

    Field name

    .

    1:M

    or

    M:N

    or

    1:1

    Field name

    .

    Values:

    accurate

    confident

    responsible

    8

    2. Create all therequired tables.

    a. Name eachtable.

    b. State thefield names foreach table.

    c. State theprimary key(s).

    d. Relate thetables.

    Draw a line to

    show therelationship.

    23. Create a form for

    each table.

    2 4. Enter data into the

    tables.

    2 5. Create a query

    from two tables.

    2

    6. Create a reportbased on the querycreated.

    2

    7. Submit the reportform and a soft copy ofthe developed databaseproject.

    20 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    24/27

    RF.CW.LA6.S12.1

    REPORT FORM

    LEARNING AREA : INFORMATION SYSTEM

    Name of Candidate

    IC No

    Index No

    Construct : S12 Database Development

    Aspect : LA6.S12.1 Develop A Database Project

    Instrument : Practical Session

    Assessment : 1 / 2 / 3 / _1. Project title

    Objective(s)

    2. Table 1 Table 2

    Table name

    Field names

    Primary key

    The relationshipbetween bothtables.

    3. Name of forms

    4. Number of records entered

    Table ________________ Table ___________________

    5. Criteria used for query

    Field Name:

    Criteria:

    6. Name of report

    7. Name of file

    Candidates Signature

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    25/27

    ------------------------------

    TOC.CW.LA6.S13.1

    TABLE OF CONSTRUCT

    Construct : S13 Current And Future Developments In Information Systems

    Aspect : LA6.S13.1 Find Out Current Developments In Computer Information Systems.

    Instrument : Report

    MARK CRITERIA EVIDENCE NOTE

    2

    1. Define web-based

    application.

    CompletedRF.CW.LA6.S13.1

    Report must be doneindividually.

    Suggested duration: 2weeks

    Values:

    cooperate

    responsible

    22. Give an example of web-

    based application.

    State the function of theapplication.

    1

    3. Name a programminglanguage used to developweb-based application.

    14. Name a DBMS used in

    web-based application.

    2/05. State an advantage of

    web-based applicationcompared to non web-based application.

    16. State a vulnerability of

    web-based application.

    1 7. State source of reference.

    10 TOTAL MARK

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    26/27

    RF.CW.LA6.S13.1

    REPORT FORM

    LEARNING AREA : INFORMATION SYSTEM

    Name of Candidate

    IC No

    Index No

    Construct : S13 Current And Future Developments In Information Systems

    Aspect : LA6.S13.1 Find Out Current Developments In Computer Information Systems.

    Instrument : Report

    Definition of web-basedapplication

    An example of web-based application

    Function of theapplication

    An example of aprogramming languageused to develop web-based application.

    An example of a DBMSused in the web-basedapplication.

    An advantage of web-based application(compared to non web-based application)

    A vulnerability of web-based application

    Source of Reference

    Candidates Signature

    -

  • 7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah

    27/27

    ------------------------------