    PENYERAHAN DAN PENILAIAN TUGASAN

    ASSIGNMENT SUBMISSION AND ASSESSMENT

    _________________________________________________________________________

    KOD KURSUS /COURSE CODE: CBPM4103

    TAJUK KURSUS /COURSE TITLE: IT PROJECT MANAGEMENT

    SEMESTER /SEMESTER : JAN 2013

    _________________________________________________________________________

    ARAHAN KEPADA PELAJAR /INSTRUCTIONS TO STUDENTS

    1. Tugasan ini mengandungi SATU (1) soalan sahaja yang disediakan dalam bahasa modul bercetak

    kursus ini. / This assignment contains only ONE (1) question that is set in the language of the

    printed module for the course.

    2. Jawab dalam Bahasa Melayu atau Bahasa Inggeris. / Answer in MalayorEnglish.

    3. Muat turunkan templat tugasan versi bahasa yang berkenaan daripada MyVLE untuk

    penyediaan dan penyerahan tugasan anda. Tugasan anda hendaklah ditaip dengan

    menggunakan Times New Roman fon saiz 12 dan langkau 1.5. baris/ Download the language

    version of the assignmenttemplate concerned from the MyVLE for preparation and submission

    of your assignment. Your assignment should be typed using 12 point Times New Roman font and

    1.5 line spacing.

  • 7/29/2019 Pengurusan Projek It

    2/4

    PENILAIAN / EVALUATION

    Tugasan ini menyumbang sehingga 40% daripada jumlah markah kursus berkenaan dan akan dinilai

    berdasarkan kepada Rubrik yang dilampirkan. / This assignment accounts for40%of the total marksfor the course and shall be assessed based on the Rubrics attached.

    Anda akan diberikan maklum balas tentang tugasan ini sebelum Peperiksaan Akhir Semester

    bermula / You would be given feedback on the assignment before the Final Semester Examination

    commences.

    PLAGIARISME: POTONGAN MARKAH / PLAGIARISM: MARKS DEDUCTION

    Amaran: Tugasan yang diserahkan, secara automatik, akan disemak untuk menentukan kadar

    pertindihan. Jika plagiarisme dikesan, markah akan dipotong seperti berikut: / Warning: The

    submitted assignment will automatically undergo a similarity check. If plagiarism is detected, marks

    would be deducted as follows:

    Tugasan dengan pertindihan kandungan antara 10 - 30%: potongan 20% daripada jumlah

    markah yang diperoleh.

    Tugasan dengan pertindihan kandungan antara 31 - 50%: potongan 40% daripada jumlah

    markah yang diperoleh.

    Tugasan dengan pertindihan kandunganlebih daripada 50%: Markah sifar akan diberikan.

    Assignments with 10 - 30 % overlap with others: 20% deduction from the total marks scored.

    Assignments with 31 - 50 % overlap with others: 40% deduction from the total marks scored.

    Assignments with more than 50% overlap with others:Zero markwould be given.

  • 7/29/2019 Pengurusan Projek It

    3/4

    LAMPIRAN / ATTACHMENT

    RUBRIK TUGASAN / ASSIGNMENT RUBRICS

    Criteria Weight Poor(0 Mark)

    Weak(1 Mark)

    Moderate(2 Marks)

    Good(3 Marks)

    Excellent(4 Marks)

    Total Marks(Max)

    a. Justify, why doyou think IT projectestimation can be achallenging task?

    1.25 Wrong answergiven

    Poor justification

    Contained factualerrors

    Basic/Minimaljustification with noexamples

    Good justification butit can be improvedfurther

    Adequate exampleswere given

    In depth justification withexcellent examples

    The facts are coherent andclearly presented

    5

    b. Discuss thebenefits of goodproject estimationand causes of poorproject estimation.

    2.5 Wrong answergiven Poor discussion

    Contained factualerrors

    Basic/Minimaldiscussion with noexamples

    Good discussion thatare related to thescenario but it can beimproved further

    Adequate exampleswere given

    OR Excellentdiscussion but there isspace to add morescope/answers

    In depth discussion withexcellent examples

    The facts are coherent andclearly presented

    10

    c. Discuss theimpact, if anorganization estimatetoo low or perhapstoo high.

    2.5 Wrong answergiven Poor discussion

    Contained factualerrors

    Basic/Minimaldiscussion with noexamples

    Good discussion thatare related to thescenario but it can beimproved further

    Adequate exampleswere given

    OR Excellentdiscussion but there isspace to add morescope/answers

    In depth discussion withexcellent examples

    The facts are coherent andclearly presented

    10

    d. Discussadvantages and

    3.75 Wrong answergiven Poor discussion Basic/Minimaldiscussion with no Good discussion thatare related to the In depth discussion withexcellent examples 15

  • 7/29/2019 Pengurusan Projek It

    4/4

    disadvantages usingLines of Codes,Function Point andConstructive CostModel in projectestimation.

    Contained factualerrors

    examples scenario but it can beimproved further

    Adequate exampleswere given

    OR Excellentdiscussion but there is

    space to add morescope/answers

    The facts are coherent andclearly presented

    Points/ Marks 10 40