  • CAWANGAN SENGGARA FASILITI BANGUNAN

    PENYAMPAI :- Ir. Haji Abu Harith bin Haji Shamsuddin

    Ketua Penolong Pengarah Kanan

    BAHAGIAN PENGURUSAN PORTFOLIO

    28 OKTOBER 2015

    1

  • 2 C a w a n g a n S e n g g a r a F a s i l i t i B a n g u n a n

    C

    O

    N

    T

    E

    N

    T

    S

    TOTAL ASSET MANAGEMENT MODEL

    ISSUES AND FINDINGS

    NEW APPROACH IN MAINTENANCE

    EXAMPLES OF RATING BY COMPONENTS

    WAY FORWARD

    CONCLUSIONS

    1

    2

    3

    4

    5

    6

  • TOTAL ASSET MANAGEMENT

    MODEL LI

    FE C

    YC

    LE A

    SS

    ET

    3

  • C a w a n g a n S e n g g a r a F a s i l i t i B a n g u n a n

    ISSUES :-PAPER CUTTINGS

    4

  • C a w a n g a n S e n g g a r a F a s i l i t i B a n g u n a n

    Berita Harian_14 Okt 2014

    The Star_13 Okt 2014

    Berita Harian_2 Okt 2014

    TheSun_13 Okt 2014

    5

  • 2010

    2011

    6

    35% 32%

    35%

    53%

    17% 17%

    12% 8%

    24% 27%

    30%

    10%

    25% 23% 23%

    29%

    2011 2012 2013 2014

    Penemuan Kecacatan keseluruhan Mengikut

    Disiplin Tahun 2011, 2012, 2013 & 2014

    Arkitek Awam Elektrik Mekanikal

    11%

    89%

    15%

    85%

    9%

    91%

    12%

    88%

    Reka bentuk Pembinaan

    Penemuan Kecacatan Keseluruhan Mengikut Isu

    Tahun 2011, 2012, 2013 & 2014

    2011 2012 2013 2014

  • Distribution of the defects with the highest numbers in architectural followed by mechanical.(Building Condition Maintenance Assessment System-IKRAM Report Jan 2011) --7

  • 8

    Status of 96 Stadiums-Nov 2011

    56%

    41%

    3%

    Functionability

    Safety

    Maintainability

    0.2% 3.1%

    96.8%

    Design

    Construction

    Maintenance

    C a w a n g a n S e n g g a r a F a s i l i t i B a n g u n a n

  • C a w a n g a n S e n g g a r a F a s i l i t i B a n g u n a n

    NEW APPROACH ON MAINTENANCE

    Total Asset Management

    Integrated Facility Management

    Comprehensive Planned Preventive

    Maintenance

    Corrective Maintenance

    Current Practices

    Good Practices

    Managing Crisis

    Managing Asset

    Managing User

    Business/Return of Investment

    Facilities Management and

    Maintenance (FMM)

    Technical Specification 2014

    Section 1-General 7.0 FCA

    9

  • Skala Rating

    Gred Skala pemeriksaan Huraian

    1 Sangat baik Tiada Kecacatan, keadaan aset sangat baik dan boleh berfungsi dengan baik

    2 Baik Terdapat kecacatan / kerosakan minor, keadaan aset baik dan boleh berfungsi dengan baik

    3 Sederhana Terdapat kecacatan / kerosakan major, keadaan aset sederhana dan masih lagi boleh berfungsi tetapi perlu dipantau

    4 Kritikal Keadaan aset kritikal, aset tidak dapat berfungsi mengikut tahap perkhidmatan dipersetujui

    5 Sangat Kritikal Keadaan aset sangat kritikal, elemen tidak berfungsi atau risiko yang boleh menyebabkan kecelakaan dan /atau kecederaan

    Keutamaan Skala Penilaian Huraian

    Normal 1 Tiada tanda kecacatan; komponen / elemen disenggara dengan baik

    Rutin 2 Kerosakan/kecacatan perlu dipantau, dibaiki dan diganti untuk mengelakkan kecacatan / kerosakan yang lebih serius

    Pembaikan 3 Kerosakan / kecacatan memerlukan pembaikan major, perlu dibaiki dan diganti

    Pemulihan 4 Kerosakan / kecacatan serius, keperluan pembaikan yang mendesak, perlu segera dan serta merta

    Penggantian 5 Elemen/struktur tidak berfungsi/ memerlukan pemeriksaan terperinci pakar

    Penilaian Keadaan

    Bangunan

    Keutamaan

    Pembaikian

    BUILDING PHYSICAL CONDITION & MAINTENANCE

    OPERATIONAL PRIORITY RATING

    10

  • BUILDING CONDITION ASSESSMENT RATING SYSTEM (BCARS)

    CONTOH UNTUK JKR WP LABUAN-KANTIN

    Jadual Keadaan Bangunan (JKB)

    NO. ELEMENTAL /

    KOMPONEN KECACATAN/KEROSAKAN

    BCARS

    Penilaian

    Keadaan

    [a]

    Penilaian

    Keutamaan

    Kerosakan

    [b]

    Analisis

    Matrik [c]

    (a x b)

    No. Helaian

    Kecacatan

    Kod

    Indikasi

    Kecacatan

    1 Talang Hujan Pokok Tumpang 4 3 12 001 A1

    2 Talang Hujan Pokok Tumpang 4 3 12 002 A2

    3 Talang Hujan Pokok Tumpang 4 3 12 003 A3

    4 Tingkap ram Pecah 3 5 15 004 A4

    5 Tingkap ram Pecah 3 5 15 005 A5

    6 Talang hujan Dipenuhi daun-daun

    kering 4 3 12 006 A6

    7 Fascia board Berkulat dan reput 4 5 20 007 A7

    8 Talang Hujan Pokok tumpang 4 3 12 008 A8

    9 Fascia board Berkulat dan reput 4 5 20 009 A9

    10 Talang Hujan Flashing kelopek 4 5 20 010 A10

    11 Talang Hujan Pokok tumpang 4 3 12 011 A11

    12 Fascia board Reput dan hampir

    tanggal 5 5 25 012 A12

    13 Talang Hujan Dipenuhi daun-daun

    kering 3 3 9 013 A13

    14 Fascia board Berkulat dan reput 3 5 15 014 A14

    15 Siling kayu reput 5 5 25 015 A15 Jumlah Markah [d] ( of c) 1004

    Bilangan Kecacatan/kerosakan [e] 61

    Jumlah Skor (d/e) 16.46

    Rating keseluruhan Bangunan Kritikal

    Skala

    Keutamaan Kerosakan / Kecacatan

    5 4 3 2 1

    Tah

    ap K

    ead

    aan

    B

    angu

    nan

    5 25 20 15 10 5

    4 20 16 12 8 4

    3 15 12 9 6 3

    2 10 8 6 4 2

    1 5 4 3 2 1

    Rating Keadaan / kondisi Matrik Tindakan Skor

    A Sangat Baik Penyenggaraan berjadual 1 hingga 5

    B Baik Penyenggaraan Condition Based 6 hingga 10

    C Sederhana Pembaikan 11 hingga 15

    D Kritikal Pemulihan 16 hingga 20

    E Sangat Kritikal Penggantian 21 hingga 25

    Merujuk kepada jenis

    kerosakan/kecacatan

    dalam Garis Panduan

    Matriks Analisis

    Pengisian BCARS dan

    Penarafan

    Building Rating

    FCA RATING OF BUILDING

    11

    http://images.search.yahoo.com/images/view;_ylt=A2KJkIftIetPSmwAZcqJzbkF;_ylu=X3oDMTBlMTQ4cGxyBHNlYwNzcgRzbGsDaW1n?back=http://images.search.yahoo.com/search/images?p=building+inspection+photos&phrase=1&fr=yfp-t-548&fr2=piv-web&tab=organic&ri=66&w=346&h=346&imgurl=rixbuildinginspections.com.au/~rixbld/wp-content/uploads/2011/11/Fotolia_30367550_XS.jpg&rurl=http://rixbuildinginspections.com.au/building-and-pest-agreements/&size=36+KB&name=...+Rix+Building+Inspections+-+Rix+Building+&+Pest+Property+Inspection&p=building+inspection+photos&oid=6e5d32bbedcdadc04334cace45913629&fr2=piv-web&fr=yfp-t-548&tt=...+Rix+Building+Inspections+-+Rix+Building+&+Pest+Property+Inspection&b=61&ni=84&no=66&ts=&tab=organic&sigr=122ff1t9v&sigb=13t7n64qd&sigi=12oth4ob9&.crumb=Xm40/zqzzyvhttp://images.search.yahoo.com/images/view;_ylt=A2KJke7qIetP0F0A8YiJzbkF;_ylu=X3oDMTBlMTQ4cGxyBHNlYwNzcgRzbGsDaW1n?back=http://images.search.yahoo.com/search/images?p=building+inspection+photos&phrase=1&fr=yfp-t-548&fr2=piv-web&tab=organic&ri=53&w=570&h=771&imgurl=www.activeinksoftware.com/demos/sol-BuildingInspection.gif&rurl=http://activeink.net/gallery3.htm&size=930.3+KB&name=Building+Inspection+Form.&p=building+inspection+photos&oid=d08f3afd364e2c3dd02b0e637b3eeb24&fr2=piv-web&fr=yfp-t-548&tt=Building+Inspection+Form.&b=31&ni=84&no=53&ts=&tab=organic&sigr=111fjbp0q&sigb=13t3mq05v&sigi=11q89chll&.crumb=Xm40/zqzzyvhttp://images.search.yahoo.com/images/view;_ylt=A2KJkK3ON.tPpHUA7F6JzbkF;_ylu=X3oDMTBlMTQ4cGxyBHNlYwNzcgRzbGsDaW1n?back=http://images.search.yahoo.com/search/images?p=building+inspection+photos&n=30&ei=utf-8&y=Search&fr=yfp-t-548&tab=organic&ri=27&w=333&h=500&imgurl=www.atampahomeinspector.com/system/files/userfiles/new_construction_hard_hat.jpg&rurl=http://www.atampahomeinspector.com/new-construction-home-inspections-tampa-riverview.html&size=21.5+KB&name=New+Construction+Home+Inspections+|+WAYPOINT+Property+Inspection&p=building+inspection+photos&oid=cd2ca8e6ca8dacec078d398b7a08ba12&fr2=&fr=yfp-t-548&tt=New+Construction+Home+Inspections+|+WAYPOINT+Property+Inspection&b=0&ni=112&no=27&ts=&tab=organic&sigr=12pis9q2g&sigb=13vhd3lf5&sigi=12g8326p5&.crumb=Xm40/zqzzyv

  • OUTPUT OF FCA

    Standard Rating - Condition/ Building Condition

    Schedule Maintenance Activity

    Cost Estimation

    Waste Management (Schedule and Construction )

    12

  • 13

    EXAMPLE OF RATING BY COMPONENTS

    No. Helaian Kecacatan 091 Aras Aras 1

    Lokasi Ruang Legar ((R12)

    Elemen / Komponen Lantai

    Kondisi Keutamaan Matrik Warna

    2 1 2 2

    Keterangan Kecacatan / Kerosakan

    Lantai berkeadaan baik

    Punca Kecacatan / Kerosakan

    Tiada

    No. Helaian Kecacatan 092 Aras Aras 1

    Lokasi Ruang Legar ((R12)

    Elemen / Komponen Siling

    Kondisi Keutamaan Matrik Warna

    3 5 15 15

    Keterangan Kecacatan / Kerosakan

    Kemasan siling berkulat

    Punca Kecacatan / Kerosakan

    Terdapat ruapan air dari ruang 'air cond' di atas

    kemasan siling

    HELAIAN KECACATAN / KEROSAKAN - BLOK UTAMA JABATAN KIMIA (ARAS SATU)

    PENEMUAN

    PENEMUAN

  • 14

    EXAMPLE OF RATING BY COMPONENT

    No. Helaian Kecacatan 092 Aras Aras 1

    Lokasi Ruang Legar ((R12)

    Elemen / Komponen Siling

    Kondisi Keutamaan Matrik Warna

    3 5 15 15

    Keterangan Kecacatan / Kerosakan

    Kemasan siling berkulat

    Punca Kecacatan / Kerosakan

    Terdapat ruapan air dari ruang 'air cond' di atas

    kemasan siling

    PENEMUAN

    No. Helaian Kecacatan 094 Aras Aras 1

    Lokasi Ruang Legar ((R12)

    Elemen / Komponen Siling

    Kondisi Keutamaan Matrik Warna

    5 5 25 25

    Keterangan Kecacatan / Kerosakan

    Kemasan siling tertanggal

    Punca Kecacatan / Kerosakan

    Terdapat pemasangan lampu 'downlight' di atas

    kemasan siling yang tidak sempurna

    PENEMUAN

  • Elemen Sinki

    Kecacatan Tumbuhan Liar / tumpang

    Punca /sebab

    Penyebaran biji benih oleh burung/angin/ faktor persekitaran / Penyenggaraan tidak sempurna

    Elemen Talang Hujan

    Kecacatan Tumbuhan Liar / tumpang

    Punca /sebab

    Penyebaran biji benih oleh burung/angin/ faktor persekitaran / Penyenggaraan tidak sempurna 15

    ELEMENTAL /

    KOMPONEN KECACATAN/KEROSAKAN

    BCARS

    Penilaian

    Keadaan

    [a]

    Penilaian

    Keutamaan

    Kerosakan

    [b]

    Analisis

    Matrik [c]

    (a x b)

    Talang Hujan Pokok Tumpang 4 3 12

    ELEMENTAL /

    KOMPONEN KECACATAN/KEROSAKAN

    BCARS

    Penilaian

    Keadaan

    [a]

    Penilaian

    Keutamaan

    Kerosakan

    [b]

    Analisis

    Matrik [c]

    (a x b)

    Sinki Pokok Tumpang 4 3 12

  • Elemen Tiang

    Kecacatan Pecah

    Punca /sebab

    Terdapat kesan tiang dipecahkan akibat daripada kerja-kerja pemasangan saluran paip hawa dingin. Kerja-kerja plaster semula tidak dilakukan setelah kerja pemasangan paip aircond dilakukan/ Kualiti kerja tidak kemas

    Elemen Siling

    Kecacatan Tanda lembap

    Punca /sebab

    Terdapat tompokan lembap ini adalah disebabkan oleh kebocoran dari paip GVC yang yang telah karat dari atas siling./Tiada penyenggaraan 16

    ELEMENTAL /

    KOMPONEN KECACATAN/KEROSAKAN

    BCARS

    Penilaian

    Keadaan

    [a]

    Penilaian

    Keutamaan

    Kerosakan

    [b]

    Analisis

    Matrik [c]

    (a x b)

    Piping Penghawa

    Dingin

    Pemecahan Struktur

    Tiang yang tidak

    dilaksanakan dengan

    kemas

    4 4 16

    ELEMENTAL /

    KOMPONEN KECACATAN/KEROSAKAN

    BCARS

    Penilaian

    Keadaan

    [a]

    Penilaian

    Keutamaan

    Kerosakan

    [b]

    Analisis

    Matrik [c]

    (a x b)

    Siling

    Kebocoran yang

    disebabkan oleh paip

    air bocor dan

    menyebabkan ianya

    meresap ke siling

    4 4 16

  • Elemen Siling

    Kecacatan Melendut / lembap dan berkulat

    Punca /sebab

    Kebocoran pada sambungan sistem perpaipan yang telah lama

    17

    Elemen Siling

    Kecacatan Melendut

    Punca /sebab Dawai pengikat panel siling putus/tidak cukup, bebanan dari lampu kerana diletak di atas siling secara terus dan tidak mempunyai penggantung sendiri. Keadaan ini boleh menyebabkan risiko keselamatan kepada pengguna pejabat.

    ELEMENTAL /

    KOMPONEN KECACATAN/KEROSAKAN

    BCARS

    Penilaian

    Keadaan

    [a]

    Penilaian

    Keutamaan

    Kerosakan

    [b]

    Analisis

    Matrik [c]

    (a x b)

    Siling

    Kebocoran yang

    disebabkan oleh paip

    air bocor dan

    menyebabkan ianya

    meresap ke siling

    5 5 25

    ELEMENTAL /

    KOMPONEN KECACATAN/KEROSAKAN

    BCARS

    Penilaian

    Keadaan

    [a]

    Penilaian

    Keutamaan

    Kerosakan

    [b]

    Analisis

    Matrik [c]

    (a x b)

    Siling

    Dawai pengikat panel

    yang tidak mencukupi

    atau telah putus.

    5 5 25

  • WAY FORWARD

    Rating Keadaan / kondisi Matrik Tindakan Skor

    A Sangat Baik Penyenggaraan berjadual 1 hingga 4

    B Baik Penyenggaraan Condition Based 5 hingga 8

    C Sederhana Pembaikan 9 hingga 12

    D Kritikal Pemulihan 13 hingga 16

    E Sangat Kritikal Penggantian 17 hingga 20 18

    GIS:-Allow integration of

    spatial and non spatial data

    for decision making

  • Timely Maintenance

    Maximum level of functional condition when asset is new or after refurbishment or renewal

    Good Level

    Just

    tolerable

    Intolerable

    Arrows showing Deterioration

    REPAIR 1 REPAIR 2 REPAIR 2 REPAIR 1

    Zero Functional

    Level

    New Life

    Begins

    THE NON-SMART WAY

    Infrequent maintenance and repairs

    letting functional level dropping too

    low

    Life Span with fast

    deterioration

    Life Span with low

    deterioration

    Renewed Life Begins

    THE SMART WAY

    Frequent maintenance and repairs

    keeping functional level always

    above the Good Level

    Figure 15 : Effects of Timely Maintenance and Repair

    Source:- KC Leong (2004) The Essence of Asset Management- A Guide UNDP-TUGI

    A & B

    C

    D & E

    50 YEARS

    19

  • 1.Value for money

    2.Improved functionality, reliability, safety of facilities

    3.Cost saving of operation & maintenance

    4.Sustainability & competitiveness

    Asset Management Best Practices

    promising

    20

  • 21