presentation [compatibility mode]
TRANSCRIPT
![Page 1: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/1.jpg)
CADANGAN PEMBANGUNAN SKIM HIDRO KECIL
DI BAWAH
PROGRAM PEMBANGUNAN JANAKUASA KECIL TENAGA YANG BOLEH DIPERBAHARU(SMALL RENEWABLE ENERGY POWER PROGRAMME - SREP)
MINI HYDRO POWER PLANT
![Page 2: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/2.jpg)
PENGENALAN KEPADA SREP
PROGRAM PEMBANGUNAN JANAKUASA KECIL TENAGA YANG BOLEH
DIPERBAHARUI (SREP)
PROGRAM SREP :
• KAPASITI MAKSIMUM DIBENARKAN : 10 MW
• TEMPOH LESEN MAKSIMUM : 21 TAHUN
• CADANGAN TARIFF : 14 HINGGA 17 SEN/KWH
• OBJEKTIF :
• TENAGA YANG BOLEH DIPERBAHARUI (RENEWABLE ENERGY) SEBAGAISUMBER TENAGA KE-LIMA DI BAWAH POLISI KEPELBAGAIAN BAHAN APINEGARA
• TARGET :
• RMK8 (2001-2005)- 5% ATAU 500MW PENJANAAN TENAGA ELEKTRIKNEGARA DARIPADA SUMBER TENAGA YANG BOLEH DIPERBAHARUI
• RMK9 (2006 – 2010) – 350MW
![Page 3: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/3.jpg)
PENGENALAN KEPADA SREP
PROGRAM PEMBANGUNAN JANAKUASA KECIL TENAGA YANG BOLEH
DIPERBAHARUI (SREP)
• NOTA :
• SUMBER TENAGA YANG BOLEH DIPERBAHARUI (RENEWABLE ENERGY)
•BIOJISIM (BIOMASS)
•BIOGAS
•SISA BUANGAN PEPEJAL (MUNICIPAL WASTE)
•SOLAR
•ANGIN
•MINI HYDRO
• NOTA :
• DASAR KEPELBAGAIAN BAHAN API NEGARA
•MINYAK
•ARANG BATU
•HIDRO (EMPANGAN BESAR)
•GAS
•TENAGA YANG BOLEH DIPERBAHARUI (RENEWABLE ENERGY)
![Page 4: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/4.jpg)
WEIR & INTAKEPIPELINE
KONSEP PEMBANGUNAN PROJEK
“RUN -OFF RIVER MINI HYDRO”
PENSTOCK
POWERHOUSE
TRANSMISSION LINE
![Page 5: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/5.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
Contoh Struktur Empangan Kecil dan Alur Masuk (Weir & Water Intake)
![Page 6: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/6.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI
Contoh Pemasangan Paip Tekanan Rendah dan/atau Paip Tekanan Tinggi (Penstock & Pipe)
![Page 7: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/7.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI
Contoh Rumah Janakuasa (Powerhouse)
![Page 8: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/8.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
Contoh Peralatan Penjanaan Elektrik (Electrical Generation Equipment)
Tarbin Dan Janakuasa (Turbine & Generator)
![Page 9: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/9.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
Contoh Peralatan Penjanaan Elektrik (Electrical Generation Equipment)
Main Inlet Valve (MIV) Nozzle
Deflector Hydraulic
![Page 10: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/10.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
Contoh Panel Kawalan dan Instrumentasi (Control & Instrumentation Panel)
![Page 11: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/11.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
Contoh Penyuisan, Alatubah dan Talian Penghantaran(Switchgear, Power Transformer & Transmission Line)
![Page 12: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/12.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI.
OPERASI DAN PENYELENGGARAAN (OPERATION & MAINTENANCE)
![Page 13: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/13.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
Kelebihan Dan Kebaikan Skim Hidro Kecil.
i. Skim Tenaga Hidro Kecilmenggunakan sumber asli iaitu airsungai dan ianya adalah sentiasaberkekalan jika kawasan tadahansumber asal tidak diganggu.
ii. Ia adalah sumber tenaga yangbersih iaitu tidak menghasilkansebarang pencemaran udara ataupenghasilan kesan gas rumah hijau
iv. Ia adalah sumber tenaga tempatandan pembangunannya bolehmengaktifkan pembangunankawasan setempat.
v. Walaupun ia mempunyai kospembangunan yang tinggi, tetapisangat ekonomi dalam jangkapanjang.penghasilan kesan gas rumah hijau
(greenhouse gas effect)
iii. Skim tenaga hidro kecil mempunyaitahap teknologi yang lengkap dantelah dipraktikkan penggunaan dankebolehupayaannya di seluruh dunia.Ia juga mempunyai tahap kecekapanpenukaran yang tinggi (high level ofenergy conversion efficiency).
sangat ekonomi dalam jangkapanjang.
![Page 14: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/14.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
RUN-OFF-RIVER MINI HYDRO TNB DI SEMENANJUNG MALAYSIA
DESK STUDY
![Page 15: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/15.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
RUN-OFF-RIVER MINI HYDROS- TNB (SEDIA ADA)
# Stesen Mini Hidro KVA
KEDAH
• Sg.Chepir,Sik Kedah 96
• Sg.Kupang,Baling Kedah 216
• Sg.Mahang,Kedah 460
• Sg.Mempelam,Kulim Kedah 350
• Sg.Tawar Besar,Baling Kedah 540
KELANTAN
# Stesen Mini Hidro KVA
PAHANG
• Sg.Keshar,Bentong Pahang 290
• Sg.Benus,Bentong Pahang 200
• Sg.perdak,Bentong Pahang 330
• Sg.Pertang,Raub Pahang 330
• Sg.Sempam,Raub Pahang 1250
• Sg.Sia,Raub Pahang 510
• Sg.Ulu Dong,Raub Pahang 550KELANTAN
• Sg.Lata Tunggil,Kuala Krai Kelantan 630
• Sg Rek,Kuala Krai Kelantan 270
• Sg.Renyok,Jeli Kelantan 1600
• Sg.Sok,Kuala Krai Kelantan 580
NEGERI SEMBILAN
• Sg.Kongkoi,Jelebu N.Sembilan 75
• Sg.Ulu Dong,Raub Pahang 550
![Page 16: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/16.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
RUN-OFF-RIVER MINI HYDROS- TNB (SEDIA ADA)
# Stesen Mini Hidro KVA
PERAK
• Sg.Asap,Kuala Kangsar Perak 110
• Sg.Bil,Tg Malim Perak 255
• Sg.Bintang,Selama Perak 600
• Sg.Chempias,Kuala Kangsar Perak 130
• Sg.Gebul,Kuala Kangsar Perak 120
• Sg.Guar,Kuala Kangsar Perak 200
• Sg.Kenas Kuala Kangsar Perak 485
# Stesen Mini Hidro KVA
SELANGOR
• Sg Kerling, Kuala Kubu Baru, Selangor 900
• Sg Ulu Langat, Panson, Selangor 2200
TERENGGANU
• Sg Brang, Kuala Berang, Terengganu 436
• Sg Cheralak, Dungun, Terengganu 480
• Sg Kemia, Jertih, Terengganu 490• Sg.Kenas Kuala Kangsar Perak 485
• Sg.Kinjang,Tapah Perak 325
• Sg.Lawin,Grik Perak 285
• Sg.Tebing Tinggi,Selama Perak 170
• Sg.Temelong,Lenggong Perak 825
• Sg Kemia, Jertih, Terengganu 490
• Sg La, Jertih, Terengganu 200
• Sg Tersat, Kuala Brang, Terengganu 500
![Page 17: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/17.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI
RUN-OFF-RIVER MINI HYDROS
STESEN JANAKUASA MINI HIDRO YANG DIBANGUNKAN DI BAWAHPROGRAM SREP DI SEMENANJUNG MALAYSIA
1) MINI HIDRO SG PERTING, BENTONG, PAHANG (4 MW)
2) MINI HIDRO SG KERLING, KERLING, SELANGOR (2.2 MW)2) MINI HIDRO SG KERLING, KERLING, SELANGOR (2.2 MW)
3) MINI HIDRO SG REK, KUALA KRAI, KELANTAN (2.8 MW)
STESEN JANAKUASA HIDRO KECIL (BUKAN PROGRAM SREP)
1) HIDRO KECIL SG KENERONG, JELI, KELANTAN (20 MW)
![Page 18: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/18.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
RUN-OFF-RIVER MINI HYDROS
KAJIAN AWALAN UNTUK MENGENALPASTI POTENSI PEMBANGUNAN MINI HIDRO BAGI 14 LOKASI DI NEGERI PERAK DARUL RIDZUAN,
MALAYSIA
(PRELIMINARY STUDIES 0F MINI HYDRO POTENTIAL FOR 14 SITES IN THE STATE OF
PERAK, MALAYSIA)
DESK STUDY
![Page 19: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/19.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI
PRELIMINARY DATA FOR DESK STUDY
# Cadangan Lokasi ProjekAnggaran Kapasiti Permulaan (MW)
1 Sg Korbu, Sungai Siput, Perak 8.3
2 Sg Sungkai, Sungkai, Perak 7.5
3 Sg Slim, Slim River, Perak 4.4
4 Sg Kampar, Kampar, Perak 5.7
5 Sg Rui, Hulu Perak, Perak 5.0
6 Sg Bintang, Selama, Perak 3.06 Sg Bintang, Selama, Perak 3.0
7 Sg Dipang, Kampar, Perak 5.0
8 Sg Raya, Kampar, Perak 4.0
9 Sg Behrang, Behrang, Perak 2.0
10 Sg Senoi Oi, Kinta, Perak 3.0
11 Sg Bil, Slim, Perak 3.0
12 Sg Rambong, Selama, Perak 5.0
13 Sg Perak, Kuala Kangsar, Perak (cdrh) 8.0
14 Sg Perak, Lengging. Perak (knrg) 10.0
![Page 20: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/20.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI
OUTCOME OF PRELIMINARY STUDIES ( DESK STUDY )
# Cadangan Lokasi Projek Kapasiti (MW)
1 Sg Korbu, Sungai Siput, Perak 8.20
2 Sg Sungkai, Sungkai, Perak 8.20
3 Sg Slim, Slim River, Perak 4.50
4 Sg Kampar, Kampar, Perak 4.70
5 Sg Rui, Hulu Perak, Perak 2.80
6 Sg Bintang, Selama, Perak 3.10
7 Sg Dipang, Kampar, Perak 3.10
8 Sg Raya, Kampar, Perak 2.90
9 Sg Behrang, Behrang, Perak 1.00
10 Sg Senoi Oi, Kinta, Perak 1.80
11 Sg Bil, Slim, Perak 0.70
12 Sg Rambong, Selama, Perak 0.10
13 Sg Perak, Kuala Kangsar, Perak (cdrh) 3.00
14 Sg Perak, Lengging. Perak (knrg) 1.60
![Page 21: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/21.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI
TABULATION OF TECHNICAL DETAILS CORRESPONDING TO MI NI HYDRO SITE
![Page 22: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/22.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
RUN-OFF-RIVER MINI HYDROS
JANGKAMASA DAN PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDROCADANGAN PEMBANGUNAN MINI HIDRO
![Page 23: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/23.jpg)
JANGKAAN JANGKA-MASA PERMOHONAN SREP
Bulan
# AKTIVITI 1 2 3 4 5 6 7 8 9 10 11 12
1 PERMOHONAN CADANGAN PROJEK
i) Penyediaan kertas kerja, Maklumat Teknikal & Komers il
ii) Borang permohonan SREP
iii) Lukisan teknikal & skemetik
2 UNIT PERANCANG EKONOMI NEGERI (UPEN)
I)) Surat kebenaran UPEN Negeri
3 SURUHANJAYA TENAGA
i) Memproses permohonan & Salinan kepada TNB
ii) Salinan kepada TNB & Surat kepada pemaju
4 TENAGA NASIONAL BERHAD (TNB)
i) Kick-off-Meeting & Lawatan Tapak
ii) Persetujuan TNB - PEMAJU - ST
5 SCORE (KeTTHA)
i) Mesyuarat kelulusan
ii) Surat Kelulusan KeTTHA
6 UNIT PERANCANG EKONOMI NEGERI (UPEN)
i) Penyediaan dokumen
ii) Kelulusan tapak projek
7 PERJANJIAN JUAL-BELI TENAGA (TNB)
i) Kajian Sistem (System Study)
ii) Persetujuan Tariff & Penyediaan dokumen
iii) REPA (TNB - PEMAJU
8 PEMBIAYAAN DAN PEMBANGUNAN PROJEK 2 TAHUN
![Page 24: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/24.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO
A Kajian Analisa Hidroloji - Desk Study
Analisa Hidroloji untuk :
i) Mendapatkan Flow Duration Curve
ii) Mendapatkan Energy Curve
iii)Mendapatkan Power curve
Analisa menggunakan :
i) Peta topo, peta isohyet
ii) Maklumat Average Annual Runoffii) Maklumat Average Annual Runoff
Objektif : Laporan Potensi Projek
ANNUAL HYDROGRAPH FLOW DURATION CURVE
![Page 25: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/25.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO
B Lawatan Tapak Awalan
(Preliminary Site Visit)
Mendapatkan maklumat fizikal tapak
i) Lokasi fizikal sebenar, rupabumi
ii) Laluan masuk
iii) Lokasi empangan alur masuk
iv) Lokasi rumah janakuasa
v) Laluan paip, talian penghantaran
SALUR TERBUKA & PAIP PAIP TEKANAN RENDAH & PENSTOCK
v) Laluan paip, talian penghantaran
vi) Penempatan & maklumat beban
v) Gambar lokasi & tapak
Berdasarkan kepada :
Peralatan GPS, Peta topo, makluman
Objektif :
Laporan kesesuaian & rekabentuk awalan
SALUR TERBUKA ‘LOW HEAD, LOW PRESSURE’
![Page 26: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/26.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO
C Penyediaan Cadangan Projek
Cadangan projek dikemukakan kepada:
i) Suruhanjaya Tenaga (Sekretariat)
ii) TNB
iii) Unit Perancang Ekonomi Negeri (UPEN)
Kertas Kerja Cadangan Meliputi :
i) Borang permohonan SREP
ii) Cadangan Teknikal & Komersil
iii) Rekabentuk konsep
D Lawatan Tapak
Lawatan Tapak oleh :
i) TNB
ii) Suruhanjaya Tenaga (ST)
iii) UPEN (jika perlu)
Tujuan :
i) Mesyuarat dan Pembentangan
ii) Meninjau lokasi & tapak projek
iii) Meninjau kesesuaian beban oleh TNB
iv) Lukisan skimetik berkaitan
Perbincangan & Mesyuarat awalan bersama UPEN, ST & TNB
Objektif :
Objektif :i) Kebenaran awalan / dasar dari UPEN
ii) Kertas cadangan lengkap
JANGKAMASA : 4 – 6 BULAN
JANGKAMASA : 1 - 2 BULAN JIKA MENDAPAT KELULUSAN AWAL DARI UPEN
iii) Meninjau kesesuaian beban oleh TNB dan lokasi penyambungtara
Objektif :
i) Kapasiti terpasang & penyambungtara
JANGKAMASA : 1 – 2 BULAN
PEMILIHAN PARAMETER PROJEK
![Page 27: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/27.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO
E Laporan Teknikal oleh TNB
Laporan disediakan oleh TNB
i) Kapasiti Terpasang yang besesuaian dengan beban setempat
ii) Persetujuan daripada pemaju
FKelulusan Kementerian Tenaga, Tenaga Hijau dan Air (KeTTHA)
Suruhanajaya Tenaga (ST) – Sekretariatakan membentangkan kepada SCORE:
i) Membentangkan cadangan projek
ii) Cadangan daripada pihak TNBiii) Makluman kepada ST
JANGKAMASA : 1 – 2 BULAN
ii) Cadangan daripada pihak TNB
SCORE akan :
i) Memberikan kelulusan dari KeTTHA
KeTTHA akan :
i) Mengeluarkan surat kelulusan – 24 bulan tempoh untuk menandatanganiREPA bersama TNB
JANGKAMASA : 1 – 2 BULAN
![Page 28: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/28.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO
G UNIT PERANCANG EKONOMI NEGERI
Cadangan projek dikemukakan kepada UPEN untuk:
i) Kelulusan Tapak Projek
ii) Terma, Syarat, Permit & Yuran
Merujuk kepada :
i) Lembaga Air
H Perjanjian Jual-Beli Tenaga (REPA)
Antara TNB dan Pemaju
Perlu dikemukakan :
i) Analisa sistem (System Study)
ii) Analisa Kewangan (Financial Analysis)
iii) Maklumat Syarikat / Pemaju
iv) Kertas kerja & borang berkaitan
Tujuan :ii) Jabatan Parit dan Saliran (JPS)
iii) Jabatan Hutan
iv) Pejabat Tanah & Daerah
v) Jabatan Alam Sekitar
vi) Lain-Lain Jabatan Berkaitan
JANGKA MASA : 3 – 5 BULAN
Tujuan :
i) Kebolehupayaan system
ii) Kadar tariff jual-beli
Kelulusan REPA – Pembinaan bermuladalam tempoh 24 bulan dari perjanjiandimeterai
JANGKA MASA : 3 – 6 BULAN
![Page 29: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/29.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO
I PEMBINAAN DAN OPERASI
i) Perunding Projek – Final Design
ii) Kelulusan Pembiayaan Projek
iii) Kontraktor
iv) Pembekal Peralatan
v) Pembinaan
Lain-Lain :Lain-Lain :
i) Lesen Penjanaan untuk 21 tahun
ii) Projek beroperasi
JANGKAMASA : 20 – 24 BULAN
![Page 30: Presentation [Compatibility Mode]](https://reader034.vdokumen.net/reader034/viewer/2022052118/551db5d04a795993108b47fa/html5/thumbnails/30.jpg)
PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN
TENAGA KECIL YANG BOLEH DIPERBAHARUI.
SEKIAN
TERIMA KASIHTERIMA KASIH