Page 1: Presentation [Compatibility Mode]

CADANGAN PEMBANGUNAN SKIM HIDRO KECIL

DI BAWAH

PROGRAM PEMBANGUNAN JANAKUASA KECIL TENAGA YANG BOLEH DIPERBAHARU(SMALL RENEWABLE ENERGY POWER PROGRAMME - SREP)

MINI HYDRO POWER PLANT

Page 2: Presentation [Compatibility Mode]

PENGENALAN KEPADA SREP

PROGRAM PEMBANGUNAN JANAKUASA KECIL TENAGA YANG BOLEH

DIPERBAHARUI (SREP)

PROGRAM SREP :

• KAPASITI MAKSIMUM DIBENARKAN : 10 MW

• TEMPOH LESEN MAKSIMUM : 21 TAHUN

• CADANGAN TARIFF : 14 HINGGA 17 SEN/KWH

• OBJEKTIF :

• TENAGA YANG BOLEH DIPERBAHARUI (RENEWABLE ENERGY) SEBAGAISUMBER TENAGA KE-LIMA DI BAWAH POLISI KEPELBAGAIAN BAHAN APINEGARA

• TARGET :

• RMK8 (2001-2005)- 5% ATAU 500MW PENJANAAN TENAGA ELEKTRIKNEGARA DARIPADA SUMBER TENAGA YANG BOLEH DIPERBAHARUI

• RMK9 (2006 – 2010) – 350MW

Page 3: Presentation [Compatibility Mode]

PENGENALAN KEPADA SREP

PROGRAM PEMBANGUNAN JANAKUASA KECIL TENAGA YANG BOLEH

DIPERBAHARUI (SREP)

• NOTA :

• SUMBER TENAGA YANG BOLEH DIPERBAHARUI (RENEWABLE ENERGY)

•BIOJISIM (BIOMASS)

•BIOGAS

•SISA BUANGAN PEPEJAL (MUNICIPAL WASTE)

•SOLAR

•ANGIN

•MINI HYDRO

• NOTA :

• DASAR KEPELBAGAIAN BAHAN API NEGARA

•MINYAK

•ARANG BATU

•HIDRO (EMPANGAN BESAR)

•GAS

•TENAGA YANG BOLEH DIPERBAHARUI (RENEWABLE ENERGY)

Page 4: Presentation [Compatibility Mode]

WEIR & INTAKEPIPELINE

KONSEP PEMBANGUNAN PROJEK

“RUN -OFF RIVER MINI HYDRO”

PENSTOCK

POWERHOUSE

TRANSMISSION LINE

Page 5: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

Contoh Struktur Empangan Kecil dan Alur Masuk (Weir & Water Intake)

Page 6: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI

Contoh Pemasangan Paip Tekanan Rendah dan/atau Paip Tekanan Tinggi (Penstock & Pipe)

Page 7: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI

Contoh Rumah Janakuasa (Powerhouse)

Page 8: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

Contoh Peralatan Penjanaan Elektrik (Electrical Generation Equipment)

Tarbin Dan Janakuasa (Turbine & Generator)

Page 9: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

Contoh Peralatan Penjanaan Elektrik (Electrical Generation Equipment)

Main Inlet Valve (MIV) Nozzle

Deflector Hydraulic

Page 10: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

Contoh Panel Kawalan dan Instrumentasi (Control & Instrumentation Panel)

Page 11: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

Contoh Penyuisan, Alatubah dan Talian Penghantaran(Switchgear, Power Transformer & Transmission Line)

Page 12: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI.

OPERASI DAN PENYELENGGARAAN (OPERATION & MAINTENANCE)

Page 13: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

Kelebihan Dan Kebaikan Skim Hidro Kecil.

i. Skim Tenaga Hidro Kecilmenggunakan sumber asli iaitu airsungai dan ianya adalah sentiasaberkekalan jika kawasan tadahansumber asal tidak diganggu.

ii. Ia adalah sumber tenaga yangbersih iaitu tidak menghasilkansebarang pencemaran udara ataupenghasilan kesan gas rumah hijau

iv. Ia adalah sumber tenaga tempatandan pembangunannya bolehmengaktifkan pembangunankawasan setempat.

v. Walaupun ia mempunyai kospembangunan yang tinggi, tetapisangat ekonomi dalam jangkapanjang.penghasilan kesan gas rumah hijau

(greenhouse gas effect)

iii. Skim tenaga hidro kecil mempunyaitahap teknologi yang lengkap dantelah dipraktikkan penggunaan dankebolehupayaannya di seluruh dunia.Ia juga mempunyai tahap kecekapanpenukaran yang tinggi (high level ofenergy conversion efficiency).

sangat ekonomi dalam jangkapanjang.

Page 14: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

RUN-OFF-RIVER MINI HYDRO TNB DI SEMENANJUNG MALAYSIA

DESK STUDY

Page 15: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

RUN-OFF-RIVER MINI HYDROS- TNB (SEDIA ADA)

# Stesen Mini Hidro KVA

KEDAH

• Sg.Chepir,Sik Kedah 96

• Sg.Kupang,Baling Kedah 216

• Sg.Mahang,Kedah 460

• Sg.Mempelam,Kulim Kedah 350

• Sg.Tawar Besar,Baling Kedah 540

KELANTAN

# Stesen Mini Hidro KVA

PAHANG

• Sg.Keshar,Bentong Pahang 290

• Sg.Benus,Bentong Pahang 200

• Sg.perdak,Bentong Pahang 330

• Sg.Pertang,Raub Pahang 330

• Sg.Sempam,Raub Pahang 1250

• Sg.Sia,Raub Pahang 510

• Sg.Ulu Dong,Raub Pahang 550KELANTAN

• Sg.Lata Tunggil,Kuala Krai Kelantan 630

• Sg Rek,Kuala Krai Kelantan 270

• Sg.Renyok,Jeli Kelantan 1600

• Sg.Sok,Kuala Krai Kelantan 580

NEGERI SEMBILAN

• Sg.Kongkoi,Jelebu N.Sembilan 75

• Sg.Ulu Dong,Raub Pahang 550

Page 16: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

RUN-OFF-RIVER MINI HYDROS- TNB (SEDIA ADA)

# Stesen Mini Hidro KVA

PERAK

• Sg.Asap,Kuala Kangsar Perak 110

• Sg.Bil,Tg Malim Perak 255

• Sg.Bintang,Selama Perak 600

• Sg.Chempias,Kuala Kangsar Perak 130

• Sg.Gebul,Kuala Kangsar Perak 120

• Sg.Guar,Kuala Kangsar Perak 200

• Sg.Kenas Kuala Kangsar Perak 485

# Stesen Mini Hidro KVA

SELANGOR

• Sg Kerling, Kuala Kubu Baru, Selangor 900

• Sg Ulu Langat, Panson, Selangor 2200

TERENGGANU

• Sg Brang, Kuala Berang, Terengganu 436

• Sg Cheralak, Dungun, Terengganu 480

• Sg Kemia, Jertih, Terengganu 490• Sg.Kenas Kuala Kangsar Perak 485

• Sg.Kinjang,Tapah Perak 325

• Sg.Lawin,Grik Perak 285

• Sg.Tebing Tinggi,Selama Perak 170

• Sg.Temelong,Lenggong Perak 825

• Sg Kemia, Jertih, Terengganu 490

• Sg La, Jertih, Terengganu 200

• Sg Tersat, Kuala Brang, Terengganu 500

Page 17: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI

RUN-OFF-RIVER MINI HYDROS

STESEN JANAKUASA MINI HIDRO YANG DIBANGUNKAN DI BAWAHPROGRAM SREP DI SEMENANJUNG MALAYSIA

1) MINI HIDRO SG PERTING, BENTONG, PAHANG (4 MW)

2) MINI HIDRO SG KERLING, KERLING, SELANGOR (2.2 MW)2) MINI HIDRO SG KERLING, KERLING, SELANGOR (2.2 MW)

3) MINI HIDRO SG REK, KUALA KRAI, KELANTAN (2.8 MW)

STESEN JANAKUASA HIDRO KECIL (BUKAN PROGRAM SREP)

1) HIDRO KECIL SG KENERONG, JELI, KELANTAN (20 MW)

Page 18: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

RUN-OFF-RIVER MINI HYDROS

KAJIAN AWALAN UNTUK MENGENALPASTI POTENSI PEMBANGUNAN MINI HIDRO BAGI 14 LOKASI DI NEGERI PERAK DARUL RIDZUAN,

MALAYSIA

(PRELIMINARY STUDIES 0F MINI HYDRO POTENTIAL FOR 14 SITES IN THE STATE OF

PERAK, MALAYSIA)

DESK STUDY

Page 19: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI

PRELIMINARY DATA FOR DESK STUDY

# Cadangan Lokasi ProjekAnggaran Kapasiti Permulaan (MW)

1 Sg Korbu, Sungai Siput, Perak 8.3

2 Sg Sungkai, Sungkai, Perak 7.5

3 Sg Slim, Slim River, Perak 4.4

4 Sg Kampar, Kampar, Perak 5.7

5 Sg Rui, Hulu Perak, Perak 5.0

6 Sg Bintang, Selama, Perak 3.06 Sg Bintang, Selama, Perak 3.0

7 Sg Dipang, Kampar, Perak 5.0

8 Sg Raya, Kampar, Perak 4.0

9 Sg Behrang, Behrang, Perak 2.0

10 Sg Senoi Oi, Kinta, Perak 3.0

11 Sg Bil, Slim, Perak 3.0

12 Sg Rambong, Selama, Perak 5.0

13 Sg Perak, Kuala Kangsar, Perak (cdrh) 8.0

14 Sg Perak, Lengging. Perak (knrg) 10.0

Page 20: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI

OUTCOME OF PRELIMINARY STUDIES ( DESK STUDY )

# Cadangan Lokasi Projek Kapasiti (MW)

1 Sg Korbu, Sungai Siput, Perak 8.20

2 Sg Sungkai, Sungkai, Perak 8.20

3 Sg Slim, Slim River, Perak 4.50

4 Sg Kampar, Kampar, Perak 4.70

5 Sg Rui, Hulu Perak, Perak 2.80

6 Sg Bintang, Selama, Perak 3.10

7 Sg Dipang, Kampar, Perak 3.10

8 Sg Raya, Kampar, Perak 2.90

9 Sg Behrang, Behrang, Perak 1.00

10 Sg Senoi Oi, Kinta, Perak 1.80

11 Sg Bil, Slim, Perak 0.70

12 Sg Rambong, Selama, Perak 0.10

13 Sg Perak, Kuala Kangsar, Perak (cdrh) 3.00

14 Sg Perak, Lengging. Perak (knrg) 1.60

Page 21: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN TENAGA KECIL YANG BOLEH DIPERBAHARUI

TABULATION OF TECHNICAL DETAILS CORRESPONDING TO MI NI HYDRO SITE

Page 22: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

RUN-OFF-RIVER MINI HYDROS

JANGKAMASA DAN PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDROCADANGAN PEMBANGUNAN MINI HIDRO

Page 23: Presentation [Compatibility Mode]

JANGKAAN JANGKA-MASA PERMOHONAN SREP

Bulan

# AKTIVITI 1 2 3 4 5 6 7 8 9 10 11 12

1 PERMOHONAN CADANGAN PROJEK

i) Penyediaan kertas kerja, Maklumat Teknikal & Komers il

ii) Borang permohonan SREP

iii) Lukisan teknikal & skemetik

2 UNIT PERANCANG EKONOMI NEGERI (UPEN)

I)) Surat kebenaran UPEN Negeri

3 SURUHANJAYA TENAGA

i) Memproses permohonan & Salinan kepada TNB

ii) Salinan kepada TNB & Surat kepada pemaju

4 TENAGA NASIONAL BERHAD (TNB)

i) Kick-off-Meeting & Lawatan Tapak

ii) Persetujuan TNB - PEMAJU - ST

5 SCORE (KeTTHA)

i) Mesyuarat kelulusan

ii) Surat Kelulusan KeTTHA

6 UNIT PERANCANG EKONOMI NEGERI (UPEN)

i) Penyediaan dokumen

ii) Kelulusan tapak projek

7 PERJANJIAN JUAL-BELI TENAGA (TNB)

i) Kajian Sistem (System Study)

ii) Persetujuan Tariff & Penyediaan dokumen

iii) REPA (TNB - PEMAJU

8 PEMBIAYAAN DAN PEMBANGUNAN PROJEK 2 TAHUN

Page 24: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO

A Kajian Analisa Hidroloji - Desk Study

Analisa Hidroloji untuk :

i) Mendapatkan Flow Duration Curve

ii) Mendapatkan Energy Curve

iii)Mendapatkan Power curve

Analisa menggunakan :

i) Peta topo, peta isohyet

ii) Maklumat Average Annual Runoffii) Maklumat Average Annual Runoff

Objektif : Laporan Potensi Projek

ANNUAL HYDROGRAPH FLOW DURATION CURVE

Page 25: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO

B Lawatan Tapak Awalan

(Preliminary Site Visit)

Mendapatkan maklumat fizikal tapak

i) Lokasi fizikal sebenar, rupabumi

ii) Laluan masuk

iii) Lokasi empangan alur masuk

iv) Lokasi rumah janakuasa

v) Laluan paip, talian penghantaran

SALUR TERBUKA & PAIP PAIP TEKANAN RENDAH & PENSTOCK

v) Laluan paip, talian penghantaran

vi) Penempatan & maklumat beban

v) Gambar lokasi & tapak

Berdasarkan kepada :

Peralatan GPS, Peta topo, makluman

Objektif :

Laporan kesesuaian & rekabentuk awalan

SALUR TERBUKA ‘LOW HEAD, LOW PRESSURE’

Page 26: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO

C Penyediaan Cadangan Projek

Cadangan projek dikemukakan kepada:

i) Suruhanjaya Tenaga (Sekretariat)

ii) TNB

iii) Unit Perancang Ekonomi Negeri (UPEN)

Kertas Kerja Cadangan Meliputi :

i) Borang permohonan SREP

ii) Cadangan Teknikal & Komersil

iii) Rekabentuk konsep

D Lawatan Tapak

Lawatan Tapak oleh :

i) TNB

ii) Suruhanjaya Tenaga (ST)

iii) UPEN (jika perlu)

Tujuan :

i) Mesyuarat dan Pembentangan

ii) Meninjau lokasi & tapak projek

iii) Meninjau kesesuaian beban oleh TNB

iv) Lukisan skimetik berkaitan

Perbincangan & Mesyuarat awalan bersama UPEN, ST & TNB

Objektif :

Objektif :i) Kebenaran awalan / dasar dari UPEN

ii) Kertas cadangan lengkap

JANGKAMASA : 4 – 6 BULAN

JANGKAMASA : 1 - 2 BULAN JIKA MENDAPAT KELULUSAN AWAL DARI UPEN

iii) Meninjau kesesuaian beban oleh TNB dan lokasi penyambungtara

Objektif :

i) Kapasiti terpasang & penyambungtara

JANGKAMASA : 1 – 2 BULAN

PEMILIHAN PARAMETER PROJEK

Page 27: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO

E Laporan Teknikal oleh TNB

Laporan disediakan oleh TNB

i) Kapasiti Terpasang yang besesuaian dengan beban setempat

ii) Persetujuan daripada pemaju

FKelulusan Kementerian Tenaga, Tenaga Hijau dan Air (KeTTHA)

Suruhanajaya Tenaga (ST) – Sekretariatakan membentangkan kepada SCORE:

i) Membentangkan cadangan projek

ii) Cadangan daripada pihak TNBiii) Makluman kepada ST

JANGKAMASA : 1 – 2 BULAN

ii) Cadangan daripada pihak TNB

SCORE akan :

i) Memberikan kelulusan dari KeTTHA

KeTTHA akan :

i) Mengeluarkan surat kelulusan – 24 bulan tempoh untuk menandatanganiREPA bersama TNB

JANGKAMASA : 1 – 2 BULAN

Page 28: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO

G UNIT PERANCANG EKONOMI NEGERI

Cadangan projek dikemukakan kepada UPEN untuk:

i) Kelulusan Tapak Projek

ii) Terma, Syarat, Permit & Yuran

Merujuk kepada :

i) Lembaga Air

H Perjanjian Jual-Beli Tenaga (REPA)

Antara TNB dan Pemaju

Perlu dikemukakan :

i) Analisa sistem (System Study)

ii) Analisa Kewangan (Financial Analysis)

iii) Maklumat Syarikat / Pemaju

iv) Kertas kerja & borang berkaitan

Tujuan :ii) Jabatan Parit dan Saliran (JPS)

iii) Jabatan Hutan

iv) Pejabat Tanah & Daerah

v) Jabatan Alam Sekitar

vi) Lain-Lain Jabatan Berkaitan

JANGKA MASA : 3 – 5 BULAN

Tujuan :

i) Kebolehupayaan system

ii) Kadar tariff jual-beli

Kelulusan REPA – Pembinaan bermuladalam tempoh 24 bulan dari perjanjiandimeterai

JANGKA MASA : 3 – 6 BULAN

Page 29: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

PROSES UNTUK CADANGAN PEMBANGUNAN MINI HIDRO

I PEMBINAAN DAN OPERASI

i) Perunding Projek – Final Design

ii) Kelulusan Pembiayaan Projek

iii) Kontraktor

iv) Pembekal Peralatan

v) Pembinaan

Lain-Lain :Lain-Lain :

i) Lesen Penjanaan untuk 21 tahun

ii) Projek beroperasi

JANGKAMASA : 20 – 24 BULAN

Page 30: Presentation [Compatibility Mode]

PEMBANGUNAN SKIM HIDRO KECIL DI BAWAH PROGRAM PEMBANGUNAN

TENAGA KECIL YANG BOLEH DIPERBAHARUI.

SEKIAN

TERIMA KASIHTERIMA KASIH