GAMBAR BENDA KERJA TURNING (7101) Panjang benda kerja : 300 mm Lebar benda kerja : 150 mm Skala kotak : 5 x 5 (mm)

Upload: ichallbrantakan2396

Post on 15-Apr-2017

126 views

Category:

Engineering


11 download

TRANSCRIPT

Page 1: Laporan lab cts

GAMBAR BENDA KERJA TURNING (7101)

Panjang benda kerja : 300 mmLebar benda kerja : 150 mm

Skala kotak : 5 x 5 (mm)

PROGRAM TURNING (PEMBUATAN BENDA KERJA/7101)

Page 2: Laporan lab cts

NO. G X Z

Page 3: Laporan lab cts

000 63 0 0,8.010 64 0 3.020 62 75. 0.030 01 80. 5.040 85. 0050 10.060 90. 5.070 10.080 95. 0090 100. 10.

0100 105. 5.0110 110. 10.0120 115. 5.0130 125. 10.0140 115. 15.0150 20.0160 110.0170 25.0180 100. 30.0190 35.0200 95.0210 100. 45.0220 95. 50.0230 90. 45.0240 50.0250 85.0260 80. 60.0270 75.0280 40.0290 80.0300 45.0310 90. 35.0320 30.0330 95.0340 25.0350 105. 20.0360 100. 15.0370 95. 20.0380 90. 15.0390 20.0400 85. 15.0410 25.0420 80. 30.0430 75. 25.0440 00450 80. 5.0460 62 -75. 00470 01 -80. 5.0480 -85. 00490 10.0500 -90. 5.

Page 4: Laporan lab cts

0510 10.0520 -95. 00530 -100. 10.0540 -105. 5.0550 -110. 10.0560 -115. 5.0570 -125. 10.0580 -115. 15.0590 20.0600 -110.0610 25.0620 -100. 30.0630 35.0640 -95.0650 -100. 45.0660 -95. 50.0670 -90. 45.0680 50.0690 -85.0700 -80. 60.0710 -75.0720 40.0730 -80.0740 45.0750 -90. 35.0760 30.0770 -95.0780 25.0790 -105. 20.0800 -100. 15.0810 -95. 20.0820 -90. 15.0830 20.0840 -85. 15.0850 25.0860 -80. 30.0870 -75. 25.0880 00890 -80. 5.0900 650910 62 75. 00920 01 -75.0930 300.0940 75.0950 00960 66 68

GAMBAR BENDA KERJA HASIL PROGRAM PEMBUBUTAN (0101)

Page 5: Laporan lab cts

PROGRAM PEMBUBUTAN BENDA KERJA (0101)

No. G/M X Z0000 G54 0 300.

Page 6: Laporan lab cts

0010 G590020 T0101 G92 S1500 F80 M03 M080030 G00 72,5. 20040 G01 72,5. -195.0050 77.0060 G00 77. 2.0070 70.0080 G01 70. -195.0090 72,5.0100 G00 72,5. 2.0110 67,5.0120 G01 67,5. -175.0130 70,5.0140 G00 70,5. 2.0150 65.0160 G01 65. -170.0170 67,5.0180 G00 67,5. 2.0190 62,5.0200 G84 55. -150.

P0=0 P2=-15. D0=500 D2=500 D3=25000210 G00 57,5. 2.0220 G01 57,5. -135.0230 60.0240 G00 60. 2.0250 55.0260 G01 55. -130.0270 57,5. 2.0280 G00 52,5. 2.0290 G01 52,5. -140.0300 55.0310 G00 55. 2.0320 50.0330 G01 50. -130.0340 52,5.0350 G00 52,5. 2.0360 47,5. 2.0370 G01 47,5. -120.0380 50.0390 G00 50. 2.0400 45.0410 G01 45. -115.0420 47,5.0430 G00 100. 100.0440 T0202 S2500 F400450 G00 0 00460 G01 42. 00470 45. -3.0480 -112.0490 50. -125.0500 -130.

Page 7: Laporan lab cts

0510 55. -145.0520 -150.0530 65. -165.0540 -170.0550 70. -185.0560 -195.0570 77.0580 G00 100. 100.0590 G53 G560600 M30

GAMBAR BENDA KERJA HASIL PEMBUBUTAN PROGRAM 0111

Page 8: Laporan lab cts

PROGRAM PEMBUBUTAN BENDA KERJA (0111)

No. G/M X Z0000 G54 0 300.

Page 9: Laporan lab cts

0010 G590020 T0101 G92 S1500 F80 M03 M080030 G00 150. 2.0040 G84 65. -225.

P0=0 P2=-5. D0=500 D2=500 D3=25000050 G00 130. 2.0060 G84 55. -170.

P0=0 P2=-3. D0=500 D2=500 D3=25000070 G00 110. 2.0080 G84 40. -115.

P0=0 P2=-5. D0=500 D2=500 D3=25000090 G00 80. 2.0100 G84 30. -70.

P0=0 P2=-10 D0=500 D2=500 D3=25000110 G00 60. 2.0120 G84 20. -45.

P0=0 P2=-10. D0=500 D2=500 D3=25000130 G00 40. 2.0140 G84 0 0

P0=0 P2=-10. D0=500 D2=500 D3=25000150 G00 100. 100.0160 T0202 S2500 F400170 G00 0 00180 G03 20. -10.

I=0 K=-10.0190 G01 20. -45.0200 G02 30. -50.

I=5. K=00210 G01 30. -70.0220 G02 40. -75.

I=5. K=00230 G01 40. -115.0240 G03 55. -123,5.

I=0 K=-7,5.0250 G01 55. -170.0260 G03 65. -175.

I=0 K=-5.0270 G01 65. -210.0280 G00 100. 100.0290 G53 G560300 M30

GAMBAR BENDA KERJA MILLING (7101)

Page 10: Laporan lab cts

PROGRAM MILLING (PEMBUATAN BENDA KERJA/7101)

Page 11: Laporan lab cts

No. G X Y

Page 12: Laporan lab cts

0000 G63 1. 00010 G64 -40. -45.0020 G62 0 100.0030 G01 -5. 105.0040 5. 110.0050 -5. 125.0060 130.0070 0 135.0080 5. 130.0090 10. 140.0100 15. 125.0110 10. 115.0120 15.0130 20. 130.0140 25. 125.0150 30. 140.0160 40. 115.0170 45. 125.0180 150.0190 65.0200 155.0210 70.0220 145.0230 55.0240 125.0250 60. 115.0260 70. 140.0270 75. 125.0280 80. 130.0290 85. 115.0300 90.0310 85. 125.0320 90. 140.0330 95. 130.0340 100. 135.0350 105. 130.0360 125.0370 95. 110.0380 105. 105.0390 100. 100.0400 80.0410 G03 80. 110.

I=0 J=5.0420 G01 60. 110.0430 50. 120.0440 40. 110.0450 20.0460 G03 20. 100.

I=0 J=-5.0470 G01 0 100.0480 G62 0 0

Page 13: Laporan lab cts

0490 G01 -5. -5.0500 5. -10.0510 -5. -25.0520 15.0530 10. -15.0540 15.0550 20. -30.0560 25. -25.0570 30. -40.0580 40. -15.0590 45. -25.0600 -45.0610 30.0620 -55.0630 35.0640 -50.0650 55.0660 -25.0670 60. -15.0680 70. -40.0690 75. -25.0700 80. -30.0710 85. -15.0720 90.0730 85. -25.0740 105.0750 95. -10.0760 105. -5.0770 100. 00780 80.0790 G02 80. -10.

I=0 J=-5.0800 G01 60. -10.0810 50. -20.0820 40. -10.0830 20.0840 G02 20. 0

I=0 J=50850 G01 0 00860 G650870 G62 -25. 00880 G01 125. 00890 100.0900 -25.0910 00920 G66 G68

GAMBAR BENDA KERJA PROGRAM 0101

Page 14: Laporan lab cts

PROGRAM MILLING (O1O1)

Page 15: Laporan lab cts

No. G X Y Z0000 G54 0 00010 G590020 T0101 G92 S1200 F80 M03 M040030 G00 20. 5. 2.0040 G01 20. 5. -3.0050 15. 10.0060 15.0070 10. 20.0080 5. 15.0090 30.0100 10.0110 5. 35.0120 15. 40.0130 45.0140 20.0150 25. 35.0160 30.0170 G03 35. 20.

I=10. J=00180 30.

I=0 J=5.0190 G01 30. 40.0200 35. 45.0210 40.0220 45. 40.0230 35.0240 50. 30.0250 55. 35.0260 25.0270 G03 60. 30.

I=5. J=00280 G01 70. 30.0290 35.0300 65. 40.0310 45.0320 55.0330 50. 50.0340 55. 55.0350 65.0360 60.0370 70. 65.0380 70.0390 60.0400 G03 55. 75.

I=0 J=5.0410 G01 55. 65.0420 50. 70.0430 45. 65.0440 60.0450 40. 55.

Page 16: Laporan lab cts

0460 35.0470 30. 60.0480 35. 70.0490 G03 35. 80.

I=0 J=5.0500 25. 70.

I=0 J=-10.0510 G01 25. 65.0520 20. 55.0530 15.0540 60.0550 5. 65.0560 10. 70.0570 5.0580 85.0590 10. 80.0600 15. 85.0610 90.0620 20. 95.0630 25. 85.0640 30. 90.0650 35.0660 40. 85.0670 50. 90.0680 95.0690 60. 90.0700 95.0710 65.0720 90.0730 75. 95.0740 90.0750 85.0760 90. 95.0770 95. 90.0780 80.0790 90. 75.0800 85. 80.0810 75.0820 85. 70.0830 90.0840 95. 65.0850 90. 60.0860 85.0870 75. 55.0880 85.0890 G02 85. 45.

I=0 J=-5.0900 G01 75. 45.0910 85. 40.0920 90.0930 95. 35.

Page 17: Laporan lab cts

0940 90. 30.0950 85.0960 75. 20.0970 85.0980 90. 25.0990 95. 20.1000 10.1010 90. 5.1020 85. 10.1030 75.1040 5.1050 65. 10.1060 5.1070 60.1080 10.1090 50. 5.1100 10.1110 40. 15.1120 35. 10.1130 30.1140 25. 10.1150 20. 5.1160 G53 G561170 M30

GAMBAR BENDA KERJA MILLING 0111

Page 18: Laporan lab cts

PROGRAM MILLING 0111

Page 19: Laporan lab cts

No. G X Y Z

Page 20: Laporan lab cts

0000 G54 0 00010 G590020 T0101 G92 S1200 F80 M04 0030 G00 35. 10. 2.0040 G01 35. 10. -3.0050 G02 35. 30.

I=0 J=10.0060 G01 50. 5.0070 65. 30.0080 G02 65. 10.

I=0 J=-10.0090 G03 85. 30.

I=0 J=20.0100 G01 75. 35.0110 85. 40.0120 G03 75. 50.

I=0 J=-5.0130 G01 95. 50.0140 G02 95. 40.

I=0 J=5.0150 G01 110. 50.0160 G02 120. 40.

I=-10. J=00170 G01 120. 50.0180 G03 110. 60.

I=0 J=-10.0190 G01 105. 65.0200 100. 60.0210 G02 90. 60.

I=5. J=00220 G01 100. 70.0230 G03 90. 70.

I=-5. J=00240 G01 85. 70.0250 G02 85. 60.

I=0 J=-5.0260 G01 75. 75.0270 65. 60.0280 G02 65. 80.

I=0 J=10.0290 G01 75. 90.0300 60. 95.0310 G02 45. 80.

I=-14 J=40320 40. 95.

I=4. J=14.0330 G01 25. 90.0340 35. 80.

Page 21: Laporan lab cts

0350 G02 35. 60.I=0 J=-10.

0360 G01 25. 75.0370 15. 60.0380 G02 15. 70.

I=0 J=5.0390 G01 10. 70.0400 G03 0 70.

I=-5. J=00410 G01 10. 60.0420 G02 0 60.

I=-5. J=00430 G01 -5. 65.0440 -10. 60.0450 G03 -20. 50.

I=0 J=-10.0460 G01 -20. 40.0470 G02 -10. 50.

I=10. J=00480 G01 5. 40.0490 G02 5. 50.

I=0 J=5.0500 G01 25. 50.0510 G03 15. 40.

I=0 J=-10.0520 G01 25. 35.0530 15. 30.0540 G03 35. 10.

I=20. J=00550 30

I=0 J=10.0560 G01 50. 5.0570 G53 G560580 M30