1 | Page Project Cadangan Menaiktaraf Persimpangan Bukit Tumbuh Ke Lapangan Terbang Sultan Mahmud, Seberang Takir, Kuala Terengganu, Terengganu Darul Iman FLYOVER TRAFFIC DIVERSION PROPOSAL CLIENT : Jabatan Kerja Raya CONTRACTOR : Wan Manan SDN. BHD. CONSULTANT : Mesh Engineers SDH. BHD. PREPARED BY : Muhammad Shukri bin Saharin REVIEWED BY : Mohd Faizal bin Ramli DATE : 10 / 04 / 16 DOCUMENT REVISION : Rev A

Upload: shukri

Post on 10-Jul-2016

26 views

Category:

Documents


4 download

DESCRIPTION

Proposal traffic diversion

TRANSCRIPT

Page 1: Traffic Diversion Proposal v3

1 | P a g e

Project Cadangan Menaiktaraf Persimpangan Bukit Tumbuh

Ke Lapangan Terbang Sultan Mahmud, Seberang Takir, Kuala Terengganu, Terengganu Darul Iman

FLYOVER

TRAFFIC DIVERSION PROPOSAL

CLIENT : Jabatan Kerja Raya CONTRACTOR : Wan Manan SDN. BHD. CONSULTANT : Mesh Engineers SDH. BHD.

PREPARED BY : Muhammad Shukri bin Saharin REVIEWED BY : Mohd Faizal bin Ramli DATE : 10 / 04 / 16 DOCUMENT REVISION : Rev A

Page 2: Traffic Diversion Proposal v3

2 | P a g e

TABLE OF CONTENTS

1 Purpose ..................................................................................................................................... 3

2 Flyover Traffic Management ...................................................................................................... 3

3 Location of Traffic Diversion Works ............................................................................................ 4

4 Scope of Works .......................................................................................................................... 9

5 Appendix B – Photos Location .................................................................................................. 10

Page 3: Traffic Diversion Proposal v3

3 | P a g e

1 Purpose

The purpose of this report is to document the locations and scope of works for the temporary road

diversions for the Flyover Bridge project.

2 Flyover Traffic Management

The Flyover construction project will close down traffic lanes along Jalan Tengku Mizan as part of the

construction works over a period of 2 years duration. During this time, two lanes of traffic (direction

to Kuala Terengganu city) and one lane of traffic (direction to Gong Badak), will be closed for

construction purposes during abutment, piers, launching of beams and deck slab work. As a result,

temporary traffic diversions are required to reduce the traffic congestion thru this intersection until

the flyover construction is completed.

Page 4: Traffic Diversion Proposal v3

4 | P a g e

3 Location of Traffic Diversion Works

Overall Plan

Page 5: Traffic Diversion Proposal v3

5 | P a g e

Temporary Road Diversion 1

Diversion from Caltex Petrol Station to Intersection of Jalan Bukit Tumboh and Jalan Tengku

Ampuan Bariah heading to Kuala Terengganu Sultan Mahmud airport - This reduces left turn traffic

at the flyover intersection and will help to relieve congestion during flyover construction along Jalan

Tengku Mizan when only 1 lane is operational.

Page 6: Traffic Diversion Proposal v3

6 | P a g e

Temporary Road Diversion 2

The purpose of temporary road diversion 2 is to focus alternative road Jalan Tengku Mizan from Kota

Bharu heading Seberang Takir/ Kuala Terengganu Airport.

Diversion starting from junction caltex through Jalan Bukit Tumboh to access Kampung area – This

temporary diversion provides access to Kampung area, the alternative route will end when arriving

at a crossroad Jalan Tengku Ampuan Bariah.

This alternative route will reduce congestion that happened at existing route Jalan Tengku Mizan

from Kota Bharu heading Seberang Takir/ Kuala Terengganu Sultan Mahmud Airport during

construction of flyover.

Page 7: Traffic Diversion Proposal v3

7 | P a g e

Temporary Road Diversion 3

The temporary road diversions 3 is to focus on alternative road of Jalan Tengku Mizan from Kota

Bharu to make the u-turn through the village roads

The purpose is to reduce the stress to light vehicle road users who want to make a U-turn when it

clashed with a traffic jam caused by the work of flyover. This is due because existing U-turn is far

away from the work area and help road user who want make U-turn save time

Diversion to access Jalan Bukit Tumboh – This temporary diversion is for light vehicles to do U-Turn

before the Flyover construction and also to upgrade Jalan Bukit Tumboh road for after Road C Ramp

construction.

Page 8: Traffic Diversion Proposal v3

8 | P a g e

Temporary Road Diversion 4

The purpose temporary road diversion 4 is to help vehicle who live around Kampung Bukit Tunggal

via alternative route that are provide to reduce the congestion that will occur at the intersection

Gong Kijang-Jalan Tengku Mizan after vehicle encounter a traffic jam after passing through the

flyover work area from Jalan Tengku Mizan to Kota Bharu.

Diversion from Jalan Tengku Mizan to Jalan Bukit Tumboh - To access Kampung area and divert

traffic off main road and relieve intersection ahead of traffic.

Page 9: Traffic Diversion Proposal v3

9 | P a g e

4 Scope of Works

No. Item 1 Temporary Drainages

1.1 Provide earth drains/ channels along the temporary road including maintenance during construction period as approved and directed by the S.O.

2. Pavement

2.1 Preparation of formation as specified and as directed by the S.O. for receiving temporary road pavement.

2.2 Crushed rock aggregate 350mm thick as roadbase material complying with grading limits as per Standard Specifications.

2.3 Bituminous Tack Coat (RS-1K)

2.4 Asphaltic concrete wearing course (AC14) 50mm thick including maintenance during construction period.

3. Temporary Road Markings

3.1 Yellow road line paint marking as shown in the Drawings or as directed by the S.O. and as specified including maintenance during the construction period.

a) 100mm width Edge line b) 100mm width Centre line

Items not listed in Bill of Quantities

4. New Speed Bumps

5. New Permanent signage a) Direction signs

6. New Temporary signage a) Speed Signs b) Detour signs

Scope of Works per location (Approximate Length only)

Resurface/Wearing Course

2m Road Widening (1m each side)

Full Roadworks

Diversion 1 500m 500m -

Diversion 2 900m - -

Diversion 3 175m 600m -

Diversion 4 - - 150m

Page 10: Traffic Diversion Proposal v3

10 | P a g e

5 Appendix B – Photos Location

Page 11: Traffic Diversion Proposal v3

11 | P a g e

Page 12: Traffic Diversion Proposal v3

12 | P a g e

Temporary Diversion 1

Photo 1 (P1) – Start of Temporary Diversion 1, resurface and edge and central linemarking, signage

at intersection noting detours and directions.

Photo 2 (P2) – 1m width road widening both lanes, resurface and edge and central linemarking

Page 13: Traffic Diversion Proposal v3

13 | P a g e

Photo 3 (P3) – 1m road widening both lanes, resurface and edge and central linemarking, Temporary

Earth Drain (100m) left hand side

Photo 4 (P4) – End of Temporary Diversion 1, resurface and edge, central and intersection

linemarking.

Page 14: Traffic Diversion Proposal v3

14 | P a g e

Temporary Road Diversion 2

Photo 5 (P5) – Start of Temporary Diversion 2, widen road to 5m width, resurface and edge and

central linemarking.

Photo 6 (P6) – Widen road to 5m width, resurface and edge and central linemarking.

Page 15: Traffic Diversion Proposal v3

15 | P a g e

Photo 7 (P7) - Widen road to 5m width, resurface and edge and central linemarking.

Photo 8 (P8) – resurface and edge linemarking only.

Page 16: Traffic Diversion Proposal v3

16 | P a g e

Photo 9 (P9) - Resurface and edge linemarking only.

Photo 10 (P10) – End of Temporary Diversion 2, resurface, edge and intersection linemarking only.

Page 17: Traffic Diversion Proposal v3

17 | P a g e

Temporary Road Diversion 3

Photo 11 (P11) – Start Temporary Road Diversion 3 – Resurface road, edge and central linemarking.

Warning sign regarding upcoming tunnel height.

Photo 12 (P12) – Resurface road, slow sign approaching tunnel, edge and intersection linemarking.

Detour direction sign at approaching intersection.

Page 18: Traffic Diversion Proposal v3

18 | P a g e

Photo 13 (P13) – 1m road widening both lanes, edge linemarking only.

Photo 14 (P14) – 1m road widening both lanes, edge linemarking. New Roadworks diversion back to

main road. Intersection, Edge linemarking. Direction signage required.

Page 19: Traffic Diversion Proposal v3

19 | P a g e

Temporary Road Diversion 4

Photo 15 (P15) - New Roadworks diversion from main road to kampung area. Full roadworks

required. Intersection, Edge linemarking and direction signage required.