Pek.Pemasangan Bouwplank 230.22 Pek. Galian Tanah Pondasi Kedalaman pondasi 1.25 Area galian 1.96 Volume galian 2.45 M3 Jumlah 90 Unit Total Galian 220.5 M3 Pek. Urugan Pasir Bwh.Pondasi Volume urugan 0.196 M3 Jumlah 90 Unit Total urugan 17.64 M3 Pek. Cor Lantai Kerja 1 : 3 : 5 Volume lt. kerja 0.098 M3 Jumlah 90 Unit Total cor 8.82 M3 Pek. Cor Pondasi Plat Setempat 1:2:3 Volume plat 0.392 M3 Jumlah 90 Unit Total cor 35.28 M3 Pek. Cor pedestal pondasi 25/40 Vol_pedestal 0.1 M3 Jumlah 90 Unit Total cor 9 M3 Pek. Cor Sloof Beton Bertulang 1:2:3 25x30 Luas tampang 0.075 M2 Panjang sloof 654.2674 M' Volume 49.070055 M3 Pek. Rabat Keliling di Plester Luas rabat 164.5501 M2 149.8653 Pek. Pas Bata Parit 1/2 Bata Luas tampang 0.1248 M2 Panjang parit 230.22 M' Volume 28.731456 M3 Pek. Urugan Bekas Galian Volume galian 220.5 M3 Volume pondasi 44.28 M3 Vol_urugan bekas galian 176.22 M3 Pek. Cor Kolom 25/40 50.4 M3 Lt. 1 Luas tampang 0.1 M2 Tinggi kolom 3.7 M1 Banyak kolom 72 Unit Volume 26.64 M3 Lt. 2 Luas tampang 0.1 M2

Upload: sondraraharja

Post on 14-Jul-2016

78 views

Category:

Documents


11 download

DESCRIPTION

RAB

TRANSCRIPT

Page 1: Rab Rkb Mda at-thaha

Pek.Pemasangan Bouwplank 230.22

Pek. Galian Tanah PondasiKedalaman pondasi 1.25Area galian 1.96Volume galian 2.45 M3Jumlah 90 UnitTotal Galian 220.5 M3

Pek. Urugan Pasir Bwh.PondasiVolume urugan 0.196 M3Jumlah 90 UnitTotal urugan 17.64 M3

Pek. Cor Lantai Kerja 1 : 3 : 5 Volume lt. kerja 0.098 M3Jumlah 90 UnitTotal cor 8.82 M3

Pek. Cor Pondasi Plat Setempat 1:2:3Volume plat 0.392 M3Jumlah 90 UnitTotal cor 35.28 M3

Pek. Cor pedestal pondasi 25/40Vol_pedestal 0.1 M3Jumlah 90 UnitTotal cor 9 M3

Pek. Cor Sloof Beton Bertulang 1:2:3 25x30Luas tampang 0.075 M2Panjang sloof 654.2674 M'Volume 49.070055 M3

Pek. Rabat Keliling di PlesterLuas rabat 164.5501 M2 149.8653

Pek. Pas Bata Parit 1/2 BataLuas tampang 0.1248 M2Panjang parit 230.22 M'Volume 28.731456 M3

Pek. Urugan Bekas GalianVolume galian 220.5 M3Volume pondasi 44.28 M3Vol_urugan bekas galian 176.22 M3

Pek. Cor Kolom 25/40 50.4 M3Lt. 1 Luas tampang 0.1 M2

Tinggi kolom 3.7 M1Banyak kolom 72 UnitVolume 26.64 M3

Lt. 2 Luas tampang 0.1 M2

Page 2: Rab Rkb Mda at-thaha

Tinggi kolom 3.3 M1Banyak kolom 72 UnitVolume 23.76 M3

Pek. Cor Kolom Praktis 15/15Luas tampang 0.0225 M2Tinggi kolom 3 M1Banyak kolom 22 UnitVolume 1.485 M3

Pek. Cor Kolom 25/25 8.75 M3Lt. 1 Luas tampang 0.0625 M2

Tinggi kolom 3.7 M1Banyak kolom 20 UnitVolume 4.625 M3

Lt. 2 Luas tampang 0.0625 M2Tinggi kolom 3.3 M1Banyak kolom 20 UnitVolume 4.125 M3

Pek. Balok Lantai 20x40Luas tampang 0.08 M2Panjang balok 776.6854 M'Volume 62.134832 M3

Pek. Ring Balok 15x20Luas tampang 0.03 M2Panjang balok 287.8035 M'Volume 8.634105 M3

Pek. Pas. Dinding bata 1 : 3Luas dinding 112.44 M2

Pek. Pas. Dinding 1 : 4Luas dinding 695.9778 M2 1276.1023 165.89

Pek. Pas. Listplank Papan 135.912 M2Pas.Atap Metal (Metal Roof) 1642.20217 M2 1154.8669 0.8660254038Pas.Perabung 95.93 M' 267.3219 0.8660254038Pek. Pas. Jurai Luar 35.2951643 M' 33.2766 0.9428090416Pek. Pas. Jurai Dalam 16.9949579 M' 16.023 0.9428090416Pek. Bola Bola Atap 12.1244 M'

Pek. Pas. Plafond Plywood 1775.002 M2Pek. Pas. Plafond Piri-piri 267.3219 M2

Pek. Urugan Tanah Bawah Lantai 242.587958 M3Pek. Urugan Pasir Bawah Lantai 69.310845 M3Pek. Cor Lantai Kerja 1 : 3 : 5 69.310845 M3Pek.Pas. Lantai Keramik 30 x 30 1775.002 M3

Page 3: Rab Rkb Mda at-thaha
Page 4: Rab Rkb Mda at-thaha

1333.52543308.676742 0.5 135.295164316.9949579

2 1.41421356 2.82842712

0.35355339sudut = 19.4712206

451

Page 5: Rab Rkb Mda at-thaha

HARGA SATUAN BAHAN & UPAH (HSBU)

PROYEK : PEMBANGUNAN RUANG KELAS BARU (RKB)

LOKASI : DESA TALONTAM, KAB. KUANTAN SINGINGI

No. U R A I A N SATUANHARGA UPAH/ BAHAN

(Rp)(1) (2) (3) (4)

UPAH ;1 P e k e r j a org/hr 51,660.00 2 Tukang batu org/hr 63,140.00 3 Tukang kayu org/hr 63,140.00 4 Tukang cat org/hr 63,140.00 5 Tukang besi org/hr 63,140.00 6 Kepala tukang org/hr 68,880.00 7 M a n d o r org/hr 68,880.00

BAHAN ;1 Zak 55,000.00 2 Batu Bata Uk. Bh 220.00 3 Batu Bata Uk. Bh 500.00 4 Pasir urug M3 70,400.00 5 Pasir Pasang M3 95,000.00 6 Pasir Cor M3 87,500.00 7 Kerikil M3 120,000.00 8 Besi Dia. 6 @ Panjang 6 Btg 8,000.00 9 Besi Dia. 10 @ Panjang 12 Btg 55,000.00

10 Besi Dia. 12 @ Panjang 12 Btg 115,000.00 11 Kawat Beton Kg 17,000.00 12 Paku Kayu 1" Kg 10,000.00 13 Paku Kayu 1½" Kg 15,000.00 14 Paku Kayu 2" Kg 17,000.00 15 Cat kayu dasar Kg 18,850.00 16 Cat dinding setara avian Kg 25,000.00 17 Cat dinding Weathershield Kg 77,504.00 18 Cat dasar Kg 10,000.00 19 Cat dasar alkali Kg 25,200.00 20 Plamur Kg 22,579.20 21 Amplas Lbr 5,000.00 22 Keramik Lantai 40x40 cm Bh 89,040.00 23 Keramik Dinding 20x25 ex Roman type W25535 Bh 67,500.00 24 Kloset Duduk Bh 750,000.00 25 Bak Fiber Kap. 1 M3 Bh 188,100.00 26 Keran Air Bh 183,150.00 27 Seal Tape Bh 55,000.00 28 Floor Drain Bh 192,500.00 29 Pipa Pvc tipe aw 3/4" M 20,000.00 30 Pipa Pvc tipe aw 3" M 20,000.00 31 Semen Warna Kg 83,000.00 32 Kayu Perancah (Begisting) M3 800,000.00 33 Kayu 2 x 20 M3 1,250,000.00 34 Kayu 4/6 M3 1,250,000.00 35 Multipleks 9 mm Lbr 102,500.00 36 Dolken Kayu Gelam Ø 8 - 10/4 m Btg 20,000.00

Semen Padang (Portland Cement) @ 50 Kg

Page 6: Rab Rkb Mda at-thaha

No. U R A I A N SATUANHARGA UPAH/ BAHAN

(Rp)(1) (2) (3) (4)

37 Gypsum 9 MM (120 x 240) Lbr 65,000.00 38 Sekrup Kg 25,000.00 39 Scafolding (sewa) Unit 17,500.00

Pekanbaru, September 2006CV. ARYA TECHNO CONSULTANT

Elyu Hasrial, STDirektur

Page 7: Rab Rkb Mda at-thaha

380000 / Truk diesel350000 / Truk diesel480000 / Truk diesel

20000 / Btg 0.02 62.50 1,250,000.00 12500 / Btg 0.01 104.17 1,302,083.33

Page 8: Rab Rkb Mda at-thaha
Page 9: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 9

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

1 1 M3 Timbunan tanah dibawah lantaiUPAH

P e k e r j a 0.30 OH 51,660.00 15,498.00 M a n d o r 0.01 OH 68,880.00 688.80

16,186.80 BAHAN

Tanah Urug 1.20 71,500.00 85,800.00 85,800.00

JUMLAH 101,986.80

2 1 M3 Galian tanah biasa UPAH

P e k e r j a 0.735 OH 51,660.00 37,970.10 M a n d o r 0.073 OH 68,880.00 5,028.24

42,998.34 BAHAN

N/A - -

JUMLAH 42,998.34

3 1 M3 Urugan kembali bekas galianUPAH

P e k e r j a 0.75 OH 51,660.00 38,745.00 M a n d o r 0.03 OH 68,880.00 1,722.00

40,467.00 BAHAN

N/A - -

JUMLAH 40,467.00

4 1 M3 Urugan pasir bawah pondasiUPAH

P e k e r j a 0.30 OH 51,660.00 15,498.00 M a n d o r 0.01 OH 68,880.00 688.80

16,186.80 BAHAN

Pasir Urug 1.2 70,400.00 84,480.00 84,480.00

JUMLAH 100,666.80

5 1 M3 Beton 1 : 3 : 5 Lantai KerjaUPAH

Tukang Batu 0.25 OH 63,140.00 15,785.00 Kepala Tukang 0.03 OH 68,880.00 1,722.00 P e k e r j a 1.65 OH 51,660.00 85,239.00 M a n d o r 0.08 OH 68,880.00 5,510.40

108,256.40 BAHAN

Semen Padang (Portland Cement) @ 50 Kg 4.36 Zak 55,000.00 239,800.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

M3

M3

Page 10: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 10

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Kerikil 0.87 120,000.00 104,400.00

Pasir Cor 0.52 87,500.00 45,500.00 389,700.00

JUMLAH 497,956.40

6 1 Kg Pembesian Besi BetonUPAH

Tukang Besi 0.01 OH 63,140.00 441.98 P e k e r j a 0.01 OH 51,660.00 361.62 Kepala Tukang 0.0007 OH 68,880.00 48.22 M a n d o r 0.0003 OH 68,880.00 20.66

872.48 BAHAN

Besi beton U-24 1.05 Kg 16,500.00 17,325.00 Kawat Beton 0.02 Kg 17,000.00 255.00

17,580.00 PERALATAN

Peralatan Specer 1.00 Ls 1,000.00 1,000.00 1,000.00

JUMLAH 19,452.48

7 1 M2 Bekisiting Kolom PersegiUPAH

P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04

40,053.72 BAHAN

Balok Kayu Bekisting 0.02 1,250,000.00 18,750.00

Papan Kayu Bekisting 0.04 1,250,000.00 50,000.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 2.00 Btg 20,000.00 40,000.00

151,425.00 JUMLAH 191,478.72

8 1 M2 Bekisiting BalokUPAH

P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04

40,053.72 BAHAN

Balok Kayu Bekisting 0.02 M3 1,250,000.00 22,500.00 Papan Kayu Bekisting 0.04 M3 1,250,000.00 50,000.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 2.00 Btg 20,000.00 40,000.00

M3

M3

M3

M3

Page 11: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 11

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

155,175.00 JUMLAH 195,228.72

9 1 M2 Bekisiting Pelat LantaiUPAH

P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04

40,053.72 BAHAN

Balok Kayu Bekisting 0.02 M3 1,250,000.00 18,750.00 Papan Kayu Bekisting 0.04 M3 1,250,000.00 50,000.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 6.00 Btg 20,000.00 120,000.00

231,425.00 JUMLAH 271,478.72

10 1 M2 Bekisiting TanggaUPAH

P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04

40,053.72 BAHAN

Balok Kayu Bekisting 0.03 M3 1,250,000.00 37,500.00 Papan Kayu Bekisting 0.02 M3 1,250,000.00 18,750.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 2.00 Btg 20,000.00 40,000.00

138,925.00 JUMLAH 178,978.72

11 Campuran Beton K-350 Slump 12 Cm +/- 2UPAH

Tukang Batu 0.25 OH 63,140.00 15,785.00 Kepala Tukang 0.03 OH 68,880.00 1,722.00 P e k e r j a 1.65 OH 51,660.00 85,239.00 M a n d o r 0.08 OH 68,880.00 5,510.40

108,256.40 BAHAN

Semen Padang (Portland Cement) @ 50 Kg 7.20 Zak 55,000.00 396,000.00 Kerikil 0.87 M3 120,000.00 104,400.00 Pasir Cor 0.52 M3 87,500.00 45,500.00

545,900.00 JUMLAH 654,156.40

12 Campuran Beton K-250 Slump 12 Cm +/- 2UPAH

Page 12: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 12

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Tukang Batu 0.25 OH 63,140.00 15,785.00 Kepala Tukang 0.03 OH 68,880.00 1,722.00 P e k e r j a 1.65 OH 51,660.00 85,239.00 M a n d o r 0.08 OH 68,880.00 5,510.40

108,256.40 BAHAN

Semen Padang (Portland Cement) @ 50 Kg 6.80 Zak 55,000.00 374,000.00 Kerikil 0.87 M3 120,000.00 104,400.00 Pasir Cor 0.52 M3 87,500.00 45,500.00

523,900.00 JUMLAH 632,156.40

13 1 M3 Pekerjaan beton bertulang 1 PC : 2 PS : 3 KRUPAH

Tukang Batu 0.35 OH 63,140.00 22,099.00 Kepala Tukang 0.04 OH 68,880.00 2,410.80 P e k e r j a 2.00 OH 51,660.00 103,320.00 M a n d o r 1.00 OH 68,880.00 68,880.00

196,709.80 BAHAN

Semen Padang (Portland Cement) @ 50 Kg 6.72 Zak 55,000.00 369,600.00 Kerikil 0.54 M3 120,000.00 64,800.00 Pasir Cor 0.81 M3 87,500.00 70,875.00

505,275.00 JUMLAH 701,984.80

14 1 M2 Pasangan Dinding Bata PC 1 : Psr. 2 (1/2 Bata)UPAH

P e k e r j a 0.32 OH 51,660.00 16,531.20 Tukang Batu 0.10 OH 63,140.00 6,314.00 Kepala Tukang 0.01 OH 68,880.00 688.80 M a n d o r 0.02 OH 68,880.00 1,033.20

24,567.20 BAHAN

Batu Bata Besar 70.00 Bh 500.00 35,000.00 Semen Padang (Portland Cement) @ 50 Kg 0.38 Zak 55,000.00 20,845.00 Pasir Pasang 0.04 M3 95,000.00 3,610.00

59,455.00 PERALATAN

Alat Bantu 1.00 Ls 2,100.56 2,100.56 2,100.56

JUMLAH 86,122.76

15 1 M2 Pasangan Dinding Bata PC 1 : Psr. 4 (1/2 Bata)UPAH

P e k e r j a 0.32 OH 51,660.00 16,531.20 Tukang Batu 0.10 OH 63,140.00 6,314.00 Kepala Tukang 0.01 OH 68,880.00 688.80 M a n d o r 0.02 OH 68,880.00 1,033.20

24,567.20 BAHAN

Page 13: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 13

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Batu Bata Besar 70.00 Bh 500.00 35,000.00 Semen Padang (Portland Cement) @ 50 Kg 0.23 Zak 55,000.00 12,650.00 Pasir Pasang 0.04 M3 95,000.00 4,085.00

51,735.00 PERALATAN

Alat Bantu 1.00 Ls 1,907.56 1,907.56 1,907.56

JUMLAH 78,209.76

16 1 M3 Beton Kolom Praktis 11/11 82.64 UPAH

P e k e r j a 4.96 OH 51,660.00 256,165.29 Tukang Batu 1.65 OH 63,140.00 104,363.64 Tukang Kayu 1.65 OH 63,140.00 104,363.64 Tukang Besi 1.65 OH 63,140.00 104,363.64 Kepala Tukang 0.50 OH 68,880.00 34,155.37 M a n d o r 0.25 OH 68,880.00 17,077.69

620,489.26 BAHAN

Papan Kayu Bekisting 0.17 M3 1,250,000.00 206,611.57 Paku 0.83 Kg 17,000.00 14,049.59 Besi beton U-24 247.93 Kg 16,500.00 4,090,909.09 Kawat Beton 37.19 Kg 17,000.00 632,231.40 Semen Padang (Portland Cement) @ 50 Kg 6.61 Zak 55,000.00 363,636.36 Pasir Cor 0.50 Zak 87,500.00 43,388.43 Kerikil 0.74 Zak 120,000.00 89,256.20

5,440,082.64 PERALATAN

Alat Bantu 1.00 Ls 7,500.00 7,500.00 7,500.00

JUMLAH 6,068,071.90

17 1 M3 Beton Kolom Praktis 10/15 66.67 UPAH

P e k e r j a 4.00 OH 51,660.00 206,640.00 Tukang Batu 1.33 OH 63,140.00 84,186.67 Tukang Kayu 1.33 OH 63,140.00 84,186.67 Tukang Besi 1.33 OH 63,140.00 84,186.67 Kepala Tukang 0.40 OH 68,880.00 27,552.00 M a n d o r 0.20 OH 68,880.00 13,776.00

500,528.00 BAHAN

Papan Kayu Bekisting 0.13 M3 1,250,000.00 166,666.67 Paku 0.67 Kg 17,000.00 11,333.33 Besi beton U-24 200.00 Kg 16,500.00 3,300,000.00 Kawat Beton 30.00 Kg 17,000.00 510,000.00 Semen Padang (Portland Cement) @ 50 Kg 5.33 Zak 55,000.00 293,333.33 Pasir Cor 0.40 Zak 87,500.00 35,000.00 Kerikil 0.60 Zak 120,000.00 72,000.00

4,388,333.33 PERALATAN

Page 14: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 14

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Alat Bantu 1.00 Ls 7,500.00 7,500.00 7,500.00

JUMLAH 4,896,361.33

18 1 M2 Plesteran + Acian PC 1 : Psr.2. T. 25 mmUPAH

P e k e r j a 0.30 OH 51,660.00 15,498.00 Tukang Batu 0.20 OH 63,140.00 12,628.00 Kepala Tukang 0.02 OH 68,880.00 1,377.60 M a n d o r 0.01 OH 68,880.00 895.44

30,399.04 BAHAN

Semen Padang (Portland Cement) @ 50 Kg 0.31 Zak 55,000.00 17,050.00 Pasir Pasang 0.01 M3 95,000.00 1,235.00

18,285.00 PERALATAN

Alat Bantu 1.00 Ls 486.84 486.84 486.84

JUMLAH 49,170.88

19 1 M2 Plesteran + Acian PC 1 : Psr.4 T. 25 mmUPAH

P e k e r j a 0.30 OH 51,660.00 15,498.00 Tukang Batu 0.20 OH 63,140.00 12,628.00 Kepala Tukang 0.02 OH 68,880.00 1,377.60 M a n d o r 0.01 OH 68,880.00 895.44

30,399.04 BAHAN

Semen Padang (Portland Cement) @ 50 Kg 0.19 Zak 55,000.00 10,428.00 Pasir Pasang 0.04 M3 95,000.00 3,610.00

14,038.00 PERALATAN

Alat Bantu 1.00 Ls 444.37 444.37 444.37

JUMLAH 44,881.41

20 1 M2 Lantai keramik Tile 40x40 type 44035 ALEXA GRIGIO (F/CT/02)UPAH

P e k e r j a 0.62 OH 51,660.00 32,029.20 Tukang Batu 0.35 OH 63,140.00 22,099.00 Kepala Tukang 0.04 OH 68,880.00 2,410.80 M a n d o r 0.04 OH 68,880.00 2,686.32

59,225.32 BAHAN

Keramik Lantai 40x40 cm 1.05 M2 89,040.00 93,670.08 Semen Padang (Portland Cement) @ 50 Kg 0.23 Zak 55,000.00 12,540.00 Pasir Pasang 0.04 M3 95,000.00 3,990.00 Semen Warna 1.50 Kg 83,000.00 124,500.00

234,700.08 PERALATAN

Alat Bantu 1.00 Ls 2,939.25 2,939.25

Page 15: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 15

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

2,939.25 JUMLAH 296,864.65

21 1 M2 Lantai keramik Tile 20x20 type G227058 VENERE CREAM ( F/CT/ 14) UPAH

P e k e r j a 0.62 OH 51,660.00 32,029.20 Tukang Batu 0.35 OH 63,140.00 22,099.00 Kepala Tukang 0.04 OH 68,880.00 2,410.80 M a n d o r 0.04 OH 68,880.00 2,686.32

59,225.32 BAHAN

Keramik Lantai 40x40 cm 1.05 M2 89,040.00 93,670.08 Semen Padang (Portland Cement) @ 50 Kg 0.23 Zak 55,000.00 12,540.00 Pasir Pasang 0.04 M3 95,000.00 3,990.00 Semen Warna 1.50 Kg 83,000.00 124,500.00

234,700.08 PERALATAN

Alat Bantu 1.00 Ls 2,939.25 2,939.25 2,939.25

JUMLAH 296,864.65

22 1 M1 Skirting keramik Tile 10/30-40 UPAH

P e k e r j a 0.09 OH 51,660.00 4,649.40 Tukang Batu 0.09 OH 63,140.00 5,682.60 Kepala Tukang 0.01 OH 68,880.00 619.92 M a n d o r 0.00 OH 68,880.00 309.96

11,261.88 BAHAN

Keramik potongan uk. 10 x30-40 1.03 M1 22,260.00 22,816.50 Semen Padang (Portland Cement) @ 50 Kg 0.03 Zak 55,000.00 1,815.00 Pasir Pasang 0.00 M3 95,000.00 304.00 Semen Warna 0.10 Kg 83,000.00 8,300.00

33,235.50 PERALATAN

Alat Bantu 1.00 Ls 1,112.43 1,112.43 1,112.43

JUMLAH 45,609.81

23 1 M2 Pasangan Dinding Keramik 20/25 type W25535UPAH

P e k e r j a 0.62 OH 51,660.00 32,029.20 Tukang Batu 0.45 OH 63,140.00 28,413.00 Kepala Tukang 0.05 OH 68,880.00 3,099.60 M a n d o r 0.03 OH 68,880.00 2,066.40

65,608.20 BAHAN

Keramik Dinding 20x25 ex Roman type W25535 1.00 M2 67,500.00 67,500.00 Semen Padang (Portland Cement) @ 50 Kg 0.19 Zak 55,000.00 10,230.00 Pasir Pasang 0.02 M3 95,000.00 1,710.00 Semen Warna 1.50 Kg 83,000.00 124,500.00

Page 16: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 16

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

203,940.00 PERALATAN

Alat Bantu 1.00 Ls 2,695.48 2,695.48 2,695.48

JUMLAH 272,243.68

24 1 m2 / Pengecatan dinding dalam UPAH

P e k e r j a 0.02 OH 51,660.00 1,033.20 Tukang Cat 0.06 OH 63,140.00 3,977.82 Kepala Tukang 0.01 OH 68,880.00 433.94 M a n d o r 0.00 OH 68,880.00 172.20

5,617.16 BAHAN

Plamur 0.10 kg 22,579.20 2,257.92 Cat dasar 0.10 kg 10,000.00 1,000.00 Cat dinding setara avian 0.26 kg 25,000.00 6,500.00

9,757.92 JUMLAH 15,375.08

25 1 m2 / Pengecatan dinding luar UPAH

P e k e r j a 0.02 OH 51,660.00 1,033.20 Tukang Cat 0.06 OH 63,140.00 3,977.82 Kepala Tukang 0.01 OH 68,880.00 433.94 M a n d o r 0.00 OH 68,880.00 172.20

5,617.16 BAHAN

Plamur 0.10 kg 22,579.20 2,257.92 Cat dasar Alkali 0.10 kg 25,200.00 2,520.00 Cat dinding Weathershield 0.26 kg 77,504.00 20,151.04 Amplas 0.25 lbr 5,000.00

24,928.96 PERALATAN

Alat Bantu 1.00 Ls 3,054.61 3,054.61 3,054.61

JUMLAH 33,600.74

Page 17: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:28 17

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 18: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 18

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 19: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 19

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 20: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 20

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 21: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 21

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 22: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 22

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 23: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 23

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 24: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 24

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 25: Rab Rkb Mda at-thaha

Last Printed :03/17/2016_07:51:29 25

DAFTAR ANALISA HARGA SATUAN

NO URAIAN PEKERJAAN KUANTITAS

(1) (2) (3) (4) (5)

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 26: Rab Rkb Mda at-thaha

Printed : 03/17/2016,07:51:29 310360874.xls Page 26

RENCANA ANGGARAN BIAYA (RAB)

PROYEK : PEMBANGUNAN FASILITAS PENDIDIKAN MDA AT-THAHA

PEKERJAAN : PEMBANGUNAN GEDUNG 22 RUANG KELAS BARU (RKB)

HARGA JUMLAH

NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA

(Rp) (Rp)

A B C D E F

I PEK. PERSIAPAN

1 Pek.Pemasangan Bouwplank 230.220 M' 8,204.00 1,888,724.88

Jumlah 1,888,724.88

II PEK. PONDASI

1 Pek. Galian Tanah Pondasi 220.500 M3 40,239.67 8,872,847.25

2 Pek. Urugan Pasir Bwh.Pondasi 17.640 M3 243,897.63 4,302,354.26

3 Pek. Cor Lantai Kerja 1 : 3 : 5 8.820 M3 2,380,837.49 20,998,986.63

4 Pek. Cor Pondasi Plat Setempat 1:2:3 35.280 M3 233,336.41 8,232,108.46

5 Pek. Cor pedestal pondasi 25/40 9.000 M3 6,318,374.15 56,865,367.35

6 Pek. Cor Sloof Beton Bertulang 1:2:3 25x30 49.070 M3 1,567,782.30 76,931,163.79

7 Pek. Rabat Keliling di Plester 164.550 M2 145,142.51 23,883,214.36

8 Pek. Pas Bata Parit 1/2 Bata 28.731 M3 276,537.45 7,945,323.62

9 Pek. Urugan Bekas Galian 176.220 M3 13,297.36 2,343,260.91

Jumlah 210,374,626.64

III. PEK. STRUKTUR

1 Pek. Cor Kolom 25/40 50.400 M3 1,590,989.95 80,185,893.73

2 Pek. Cor Kolom Praktis 15/15 1.485 M3 2,569,808.00 3,816,164.88

3 Pek. Cor Kolom 25/25 8.750 M3 1,790,707.67 15,668,692.12

4 Pek. Balok Lantai 20x40 62.135 M3 6,691,088.09 415,749,634.46

5 Pek. Ring Balok 15x20 8.634 M3 6,691,088.09 57,771,557.15

573,191,942.33

IV. PEK. DINDING

1 Pek. Pas. Dinding bata 1 : 3 112.440 M3 365,456.00 41,091,872.64

2 Pek. Pas. Dinding 1 : 4 1,276.102 M3 332,763.00 424,639,629.65

Jumlah 465,731,502.29

V. PEKERJAAN KOZEN

1 Pek. Pas.Kozen Pintu & Jendela 82.642 M3 2,964,260.00 244,973,585.73

2 Pek. Pas. Sopi-Sopi 4.000 Unit 162,500.00 650,000.00

Page 27: Rab Rkb Mda at-thaha

Printed : 03/17/2016,07:51:29 310360874.xls Page 27

RENCANA ANGGARAN BIAYA (RAB)

PROYEK : PEMBANGUNAN FASILITAS PENDIDIKAN MDA AT-THAHA

PEKERJAAN : PEMBANGUNAN GEDUNG 22 RUANG KELAS BARU (RKB)

HARGA JUMLAH

NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA

(Rp) (Rp)

A B C D E F

3 Pek. Cat Menie Kozen 768.267 M2 5,005.00 3,845,174.28

4 Pek. Pas Angker Kozen 4,383.965 Bh 1,300.00 5,699,154.81

5 Pek. Cor Neut Kozen 0.000 M3 546,309.40 0.00

Jumlah 255,167,914.81

VI. PEK. RANGKA ATAP

1 Pek. Pas. Kuda - Kuda Utama 27.426 M3 1,749,800.00 47,989,318.39

2 Pek. Pas. Gording 24.528 M3 1,704,300.00 41,803,572.25

3 Pek. Pas. Baut Kuda-Kuda 148.692 Bh 9,750.00 1,449,746.82

4 Pek. Pas. Plat Strip 306.795 Bh 9,750.00 2,991,249.77

5 Pek. Residu Rangka Atap 904.095 M2 2,572.70 2,325,963.96

6 Pek. Pas. Listplank Papan 72.210 M2 44,954.00 3,246,128.34

Jumlah 99,805,979.54

VII. PEK. PENUTUP ATAP

1 1,642.202 M2 59,313.02 97,403,969.40

2 Pas.Perabung 95.930 M` 31,195.22 2,992,557.91

3 Pek. Pas. Jurai Luar 35.295 M' 34,513.10 1,218,145.42

4 Pek. Pas. Jurai Dalam M' 34,513.10 0.00

5 Pek. Bola Bola Atap 12.124 M' 22,005.46 266,802.96

Jumlah 101,881,475.69

VIII. PEK. PLESTERAN

1 Pek. Plesteran 1 : 3 224.880 M2 19,563.70 4,399,484.86

2 Pek. Plesteran Dinding 1 : 4 1,391.956 M2 18,352.10 25,545,308.37

3 Pek. Afwerking Bid. Beton 1 : 3 232.122 M2 19,563.70 4,541,157.79

Jumlah 34,485,951.01

IX. PEK. PLAFOND

1 Pas. Rangka Plafond 21.874 M3 1,292,200.00 28,266,202.95

2 Pek. Pas. Plafond Plywood 1,775.002 M2 25,291.50 44,892,463.08

3 Pek. Pas. Plafond Piri-piri 267.322 M2 44,850.00 11,989,387.22

4 Pek. Pas. List Plafond 740.558 M` 2,782.00 2,060,231.77

Jumlah 87,208,285.01

Pas.Atap Metal (Metal Roof)

Page 28: Rab Rkb Mda at-thaha

Printed : 03/17/2016,07:51:29 310360874.xls Page 28

RENCANA ANGGARAN BIAYA (RAB)

PROYEK : PEMBANGUNAN FASILITAS PENDIDIKAN MDA AT-THAHA

PEKERJAAN : PEMBANGUNAN GEDUNG 22 RUANG KELAS BARU (RKB)

HARGA JUMLAH

NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA

(Rp) (Rp)

A B C D E F

X. PEK. LANTAI

1 Pek. Urugan Tanah Bawah Lantai 242.588 M3 44,940.00 10,901,902.81

2 Pek. Urugan Pasir Bawah Lantai 69.311 M3 120,540.00 8,354,729.26

3 Pek. Cor Lantai Kerja 1 : 3 : 5 69.311 M3 588,333.20 40,777,871.23

4 Pek.Pas. Lantai Keramik 30 x 30 1,775.002 M2 73,605.00 130,649,022.21

Jumlah 190,683,525.51

XI. PEK. PINTU & JENDELA

1 Pek. Pas. Pintu Panel Kayu 8.653 M2 224,055.00 1,938,787.53

2 Pas. Jendela Kaca Rangka 74.238 M2 175,500.00 13,028,694.76

3 Pek. Pas. Jalusi Kayu 10.486 M3 1,471,275.00 15,427,450.29

Jumlah 30,394,932.58

XII. PEK. ALAT PENGGANTUNG

1 Pek. Pas. Kunci Tanam 2 Slaag 14.000 Bh 163,800.00 2,293,200.00

2 Pek. Pas. Engsel 4" 70.000 Bh 16,900.00 1,183,000.00

3 Pek. Pas. Engsel 3" 840.000 Bh 15,600.00 13,104,000.00

4 Pek. Pas. Garendel Jendela 840.000 Bh 9,750.00 8,190,000.00

5 Pek. Pas. Garendel Pintu 56.000 Bh 7,800.00 436,800.00

6 Pek. Pas. Hak Angin Jendela 840.000 Bh 16,250.00 13,650,000.00

7Pek. Pas. Handle Jendela 420.000 Bh 9,750.00 4,095,000.00

Jumlah 42,952,000.00

XIII. PEK. LISTRIK

1 Pas. Titik Lampu 100.000 Titik 104,000.00 10,400,000.00

2 Pas Stop Kontak 10.000 Bh 15,600.00 156,000.00

3 Pas. Sakelar Tunggal 10.000 Bh 15,600.00 156,000.00

4 Pas. Sakelar Ganda 10.000 Bh 15,600.00 156,000.00

5 Pas. Lampu TL 40 W 50.000 Bh 104,000.00 5,200,000.00

6 Pas. Lampu Philips Essensial 14 W 30.000 Bh 39,000.00 1,170,000.00

7 Pas. MCB ( Zakering khas ) 4A 1.000 Bh 65,000.00 65,000.00

` Jumlah 17,303,000.00

Page 29: Rab Rkb Mda at-thaha

Printed : 03/17/2016,07:51:29 310360874.xls Page 29

RENCANA ANGGARAN BIAYA (RAB)

PROYEK : PEMBANGUNAN FASILITAS PENDIDIKAN MDA AT-THAHA

PEKERJAAN : PEMBANGUNAN GEDUNG 22 RUANG KELAS BARU (RKB)

HARGA JUMLAH

NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA

(Rp) (Rp)

A B C D E F

XIV. PEK. PENGECATAN

1 Pek. Cat Air Dinding 2,783.911 M2 12,269.40 34,156,920.08

2 Pek.Cat Air Plafond Plywood 1,666.510 M2 12,269.40 20,447,075.34

3 Pek.Cat Minyak Kuzen Pintu Dan Jendela 136.645 M2 11,811.80 1,614,018.74

4 Pek.Cat Minyak Pintu dan Jendela 332.029 M2 11,811.80 3,921,858.42

5 Pek. Cat Minyak Jalusi Kayu 185.026 M3 11,811.80 2,185,492.20

6 Pek. Cat Minyak Listplank Papan 144.420 M2 11,811.80 1,705,860.16

7 Pek. Cat Minyak Piri - Piri 246.092 M2 11,811.80 2,906,789.49

Jumlah 66,938,014.41

Page 30: Rab Rkb Mda at-thaha

Printed : 03/17/2016_07:51:29 310360874.xls Page 30

REKAPITULASI ANGGARAN BIAYA

PROYEK : PEMBANGUNAN FASILITAS PENDIDIKAN MDA AT-THAHA

PEKERJAAN : PEMBANGUNAN GEDUNG 22 RUANG KELAS BARU (RKB)

JUMLAHNO URAIAN PEKERJAAN

A B F

I. PEKERJAAN PERSIAPAN 1,888,724.88

II. PEKERJAAN PONDASI 210,374,626.64

III. PEKERJAAN STRUKTUR 573,191,942.33

IV. PEKERJAAN DINDING 465,731,502.29

V. PEKERJAAN KOZEN 255,167,914.81

VI. PEKERJAAN RANGKA ATAP 99,805,979.54

VII. PEKERJAAN PENUTUP ATAP 101,881,475.69

VIII. PEKERJAAN PLESTERAN 34,485,951.01

IX. PEKERJAAN PLAFOND 87,208,285.01

X. PEKERJAAN LANTAI 190,683,525.51

XI PEKERJAAN PINTU & JENDELA 30,394,932.58

XII PEKERJAAN ALAT PENGGANTUNG 42,952,000.00

XIII PEKERJAAN LISTRIK 17,303,000.00

XIV. PEKERJAAN PENGECATAN 66,938,014.41

JUMLAH ………………………………………………………………………………………….. 2,178,007,874.71

DIBULATKAN ………………………………………………………………………………………. 2,178,008,000.00

Terbilang : Dua Milyard Seratus Tujuh Puluh Delapan Juta Delapan Ribu Rupiah.

PEKANBARU, 2008

KONSULTAN MANAJEMEN & CIVIL WORK

SONDRA RAHARJA, ST

ENGINEERING ESTIMATE

Page 31: Rab Rkb Mda at-thaha

ENGINEERING ESTIMATE (EE)

RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN :

PEMBANGUNAN FASILITAS PENDIDIKAN MDA AT-THAHA

PEKERJAAN :

PEMBANGUNAN GEDUNG 22 RUANG KELAS BARU

Page 32: Rab Rkb Mda at-thaha

6110002,178,008,000.00 <= angka

2 <= jumlah desimalb <="b" atau "saja"dua milyard seratus tujuh puluh delapan juta delapan ribu Dua milyard seratus tujuh puluh delapan juta delapan ribu 2,178,008,000 (2,178,008,000)Dua milyard seratus tujuh puluh delapan juta delapan ribu (2,178,008,000)

2178008000 000 Dua Milyard Seratus Tujuh Puluh Delapan Juta Delapan Ribu Rupiah.10000/100

2,178,008,000 Nama Range yang ada :2 2 NUMBER A1

178 78 NUMTEXT A1..A58 8 TEXT A50 0 \T B9

2 2178 88 80 0

0 01 700 00 0

dua milyard delapan ribu seratus tujuh puluh delapan

01 satu2 dua3 tiga4 empat5 lima6 enam7 tujuh8 delapan9 sembilan

10 sepuluh11 sebelas12 dua belas13 tiga belas14 empat belas15 lima belas16 enam belas17 tujuh belas18 delapan belas19 sembilan belas20 dua puluh

Page 33: Rab Rkb Mda at-thaha

30 tiga puluh40 empat puluh50 lima puluh60 enam puluh70 tujuh puluh80 delapan puluh90 sembilan puluh

Perhatian : Masukkan angka di sel A1Baca terbilangnya di sel A4 atau A5 atau A7 atau D10

Page 34: Rab Rkb Mda at-thaha

Dua Milyard Seratus Tujuh Puluh Delapan Juta Delapan Ribu Rupiah.