*keterangan bahan/ dokumen jenis bahan/ …reg.upm.edu.my/eiso/docs/2012102415015509 borang... ·...

3
OPERASI PERKHIDMATAN SOKONGAN PEJABAT PEMBANGUNAN DAN PENGURUSAN ASET Kod Dokumen: OPR/PPPA/BR09 BORANG KELULUSAN BAHAN/DOKUMEN PROJEK (Untuk Diisi oleh Kontraktor) NO. SEMAKAN : 00 NO. ISU : 02 TARIKH KUAT KUASA : 03/01/2011 Projek : *KETERANGAN BAHAN/ DOKUMEN JENIS BAHAN/ DOKUMEN JENAMA CATATAN *Sila rujuk lampiran .......................................... Tandatangan Pemohon Nama : Tarikh : PERAKUAN WAKIL PEGAWAI PENGUASA Diluluskan Tidak diluluskan Nyatakan sebab : ................................................................................................................................... ………………………………………………………………………………………………. ………………………………………………………………………………………………. ........................................ Tandatangan Cop atau Nama : Tarikh: UNTUK KEGUNAAN PEJABAT SAHAJA Ulasan Pegawai Penguasa/Pengurus Projek ................................................................................................................................................................................ ................................................................................................................................................................................ ................................................................................................................................................................................

Upload: vothien

Post on 15-Apr-2018

261 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: *KETERANGAN BAHAN/ DOKUMEN JENIS BAHAN/ …reg.upm.edu.my/eISO/docs/2012102415015509 BORANG... · UNTUK KEGUNAAN PEJABAT SAHAJA Ulasan Pegawai Penguasa/Pengurus Projek

OPERASI PERKHIDMATAN SOKONGAN

PEJABAT PEMBANGUNAN DAN PENGURUSAN ASET

Kod Dokumen: OPR/PPPA/BR09

BORANG KELULUSAN BAHAN/DOKUMEN PROJEK (Untuk Diisi oleh Kontraktor)

NO. SEMAKAN : 00 NO. ISU : 02 TARIKH KUAT KUASA : 03/01/2011

Projek

:

*KETERANGAN BAHAN/ DOKUMEN

JENIS BAHAN/ DOKUMEN JENAMA CATATAN

*Sila rujuk lampiran

..........................................

Tandatangan Pemohon

Nama :

Tarikh :

PERAKUAN WAKIL PEGAWAI PENGUASA

Diluluskan

Tidak diluluskan

Nyatakan sebab : ...................................................................................................................................

……………………………………………………………………………………………….

……………………………………………………………………………………………….

........................................

Tandatangan

Cop atau Nama :

Tarikh:

UNTUK KEGUNAAN PEJABAT SAHAJA

Ulasan Pegawai Penguasa/Pengurus Projek

................................................................................................................................................................................

................................................................................................................................................................................

................................................................................................................................................................................

Page 2: *KETERANGAN BAHAN/ DOKUMEN JENIS BAHAN/ …reg.upm.edu.my/eISO/docs/2012102415015509 BORANG... · UNTUK KEGUNAAN PEJABAT SAHAJA Ulasan Pegawai Penguasa/Pengurus Projek

LAMPIRAN

SENARAI SEMAK BAHAN UNTUK KELULUSAN DAN KAEDAH KERA

(METHOD STATEMENT)

*Jika Berkaitan

BIDANG ARKITEK

1) Kemasan Lantai – Tiles, Granite, Jubin, Epoxy, Timber

2) Kemasan Dinding – Wall Paper, Timber Panel, Pebble

Wash, Cladding

3) Jenis Siling, Kemasan dan Dekorasi

4) Warna dan jenis cat

5) Ironmongeries

6) Penggunaan Stainless Steel

7) Pintu dan tingkap, termasuk frame dan cermin

8) Fitting - kipas, lampu louvers, fix cabinet dll

9) Sanitary Ware

10) Perabot – Warna dan materials

11) Bumbung – trusses, system dan roof materials +

gutters

12) Insulation

13) Water proofing

14) Susunatur, jenis, system dan warna pavers

AWAM

1) Damp Proof Membrane

2) Sewerage Pipe

3) Sewerage Manhole

4) Severage Manhole Cover

5) Pipe Culvert

6) Water Reticulation

7) Lift Water Stop

8) Water Proofing Membrane

9) Roof Trusses

10) Premix

11) Road Furniture Signage

12) Road Paint

13) Road Drain Brick

14) Mild Steel Grating at Roadside Drain

15) Fire Hydrant

16) Bulk Meter

BIDANG ELEKTRIK

1) Fuse Switchgears

2) Isolators

3) Contractors

4) 11Kv Metal-enclose Switchgear

5) Generators Sets

6) Transformer

7) Structured Cabling System c/w Accessories

8) Cables

9) G.I Conduits & High Impact PVC Conduits

10) Busduct / Trunking System / Cable Management

System

11) Switches

12) Switch Socket Outlet

13) Lamp Holder

14) Earting System & Accessories

15) Lighting Protection System

16) Ballast For Fluorescent Luminaires / PLC

17) Electonic Ballast

18) Ignitor For HPL

19) Capacitor For Fluorescent Luminaires

20) Capacitor For HPSL/Metal Halide

21) Capacitor For AC Motors

22) Fluorescent Luminaires

23) Emergency Light & Luminous Sign

24) Fans (Orbit/Auto, Ceiling, Wall)

25) HPSV & Tubular Fluorescent Lamp Switchboard

26) Street Lantern

27) L.V Switchboard / Consumer Unit

28) Surge Protective Device

29) Protection Relays

30) Capacitors For P.F Correction

31) Circuit Breaker (ACB, MCCB, MCB)

32) Residual Current Device (RCD)

Page 3: *KETERANGAN BAHAN/ DOKUMEN JENIS BAHAN/ …reg.upm.edu.my/eISO/docs/2012102415015509 BORANG... · UNTUK KEGUNAAN PEJABAT SAHAJA Ulasan Pegawai Penguasa/Pengurus Projek

MEKANIKAL

1) Air Conditioning System

a. Split Unit/ Multi Split

-Indoor and Outdoor

-Switch/ D.O.L Starter

-Refrigerant Piping

-Insulation

-Water Pump

b. Central System (Air Cool Package)

-Condensing Unit (Outdoor)

-Air Handling Unit /Fan Coil Unit (Indoor)

-Starter Control Panel (Electrical Accessories)

-Air Filter

-Acoustics Insulation

-Refrigerant Pipe

-Condensate Drain

-Ducting (Supply and Return)

-Insulation c/w Aluminium Foil (Ducting)

-Valves

-Fire Damper

-Grilles (Supply and Return)

-Access Door

-Filter

-Fresh Air Grill

-Fittings

-Control Panel

c. Central (Chiller-Air Cooled/Water Cooled)

-Chiller

-Water Pump

-Air Handling/ Fan Coil Unit

-Ventilation Fans

-Ducting c/w insulation, aluminium foil/ others

-Pipe (Chilled/Cold Water Pipe)

-Pressure Gauge

-Termometer

-Grilles (Supply/ Return/ Others)

-Fire Damper

-Termostats

-Valves and Fitting

-Control Panel

-Acoustics Insulation

2) Fire Protection System

a. Hose Reel System

-Duty Pump

-Standby Pump

-Pipe

-Control Panel (c/w Electrical Accessories)

-Pressure Gauge

-Pressure Switch

-Automatic Air Release Valve

-Fitting (Check Valve, Gate Valve, Ball Valve,

Globe Valve, Strainer, Flexible Joint)

-Tank

-Hose Set (Drum, Rubber Hose, Nozzle, Valve, etc)

-Cable c/w conduit

b. Fire Alarm System

-Main Fire Alarm System

-Smoke Detector

-Heat Detector

-Break Glass

-Alarm Bell

-Battery Charger

-Battery

-Cable c/w conduit

c. Portable Fire Extinguisher

-ABC Dry Powder

-CO2

d. CO2 System/ Fixed System

-Control Panel

-Smoke Detector

-Heat Detector

-Alarm Bell

-Battery

-Manual Key Switch

-Flashing Light

-Fire Curtain c/w Solenoid Release

-Pipe c/w Fitting

-Cable c/w Conduit

e. Sprinkler System

-Pump Duty

-Pump Standby

-Jockey Pump

-Control Panel

-Control Panel

-Pressure Gauge

-Orifice Valve

-Fitting ( Check Valve, Strainer, Flexible

Connection, Gate Valve, Control Panel)

-Sprinkler Pipe

-Tank

-Cable c/w Conduit

3) Lift System

-Lif

-Motors

-Vibration Fans

-Panel

-Others Parts