interim payment no 14-final

135
KERAJAAN MALAYSIA JABATAN KERJA RAYA BAYARAN INTERIM NO.14 PERUNTUKAN PEMBANGUNAN: MAKSUD : BUTIRAN TAJUK KERJA : : CADANGAN MEREKA, MEMBINA DAN MENYIAPKAN KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM NAMA DAN ALAMAT KONTRAKTOR : AP&F CONSTRUCTION No 258, Jalan Macalistar, 41200 Klang, Selangor Darul Ehsan. NO. KONTRAK : 2722/2010-2011-1/01 HARGA ASAL KONTRAK : : RM JUMLAH BERSIH TAMBAHAN/POTONGAN RM HARGA BARU KONTRAK : RM A. BUTIR-BUTIR BAYARAN DAN POTONGAN 1. TARIKH PENILAIAN : 2. TEMPOH KONTRAK :1st August 2010 - 1st Februari 2012 3. NILAI KERJA DILAKSANAKAN DAN AMAUN-AMAUN LAIN YANG KENA BAYAR * RM 4. NILAI BERSIH KERJA SEMASA RM 5. POTONGAN a. Bayaran Balik Wang Pendahuluan i) Amaun Terkumpul RM - RM 120,344,352.36 ii) Amaun Terdahulu (bayaran 1 - 10 ) RM 120,344,352.36 iii) Amaun Semasa RM 120,344,352.36 b. Akaun Deposit Wang Jaminan Perlaksanaan (Amaun Terdahulu) RM - c. Gantirugi Tertentu Dan Ditetapkan @ RM 20,700.00/hari RM - d. Potongan lain jika ada RM - Jumlah Potongan RM 120,344,352.36 RM BAYARAN YANG DISYORKAN RM ………………………………...…….…………… (Pegawai Pengesyor) Tarikh : …………………………………………. B PERAKUAN BAYARAN 1. Bayaran Interim a) Kepada Kontraktor Utama RM - b) Kepada Subkontraktor/Penerima Hak RM - (Seperti di Lampiran A) Jumlah Bayaran Interim RM - RM 2. Kredit Akaun Deposit Wang Jaminan Perlaksanaan (10% dari Bayaran Disyorkan sehingga 5% harga kontrak) RM JUMLAH RM BAYARAN DIPERAKUKAN RM (RINGGIT MALAYSIA: ) Adalah disahkan bahawa semua peraturan kewangan dan kehendak di bawah Kontrak telah dipatuhi Tarikh : ……………………………………………. ………………………………………..…… 1 Jumlah amaun yang dibayar dibawah Perakuan ini ialah (Untuk diisi oleh Pegawai yang menyediakan baucer. Sesalinan perakuan hendaklah dikembalikan kepada Jurukur Bahan/Wakil Pegawai Penguasa) 2 Bayaran wang pendahuluan yang telah dikeluarkan (Untuk diisi oleh Jurukur Bahan/Wakil Pegawai Penguasa) (Pegawai Penguasa)

Upload: ceek-hanif

Post on 03-Dec-2014

127 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Interim Payment No 14-Final

KERAJAAN MALAYSIAJABATAN KERJA RAYA

BAYARAN INTERIM NO.14

PERUNTUKAN PEMBANGUNAN: MAKSUD : BUTIRAN :

TAJUK KERJA : : CADANGAN MEREKA, MEMBINA DAN MENYIAPKAN KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM

NAMA DAN ALAMAT KONTRAKTOR : AP&F CONSTRUCTIONNo 258, Jalan Macalistar,41200 Klang, Selangor Darul Ehsan.

NO. KONTRAK : 2722/2010-2011-1/01

HARGA ASAL KONTRAK : : RM 125,548,966.00

JUMLAH BERSIH TAMBAHAN/POTONGAN RM -

HARGA BARU KONTRAK : RM 125,548,966.00

A. BUTIR-BUTIR BAYARAN DAN POTONGAN

1. TARIKH PENILAIAN :

2. TEMPOH KONTRAK :1st August 2010 - 1st Februari 2012

3. NILAI KERJA DILAKSANAKAN DAN AMAUN-AMAUN LAIN YANG KENA BAYAR * RM 126,621,800.67

4. NILAI BERSIH KERJA SEMASA RM 126,621,800.67

5. POTONGAN

a. Bayaran Balik Wang Pendahuluani) Amaun Terkumpul RM - RM 120,344,352.36 ii) Amaun Terdahulu (bayaran 1 - 10 ) RM 120,344,352.36 iii) Amaun Semasa RM 120,344,352.36

b. Akaun Deposit Wang Jaminan Perlaksanaan (Amaun Terdahulu) RM -

c. Gantirugi Tertentu Dan Ditetapkan @ RM 20,700.00/hari RM -

d. Potongan lain jika ada RM - Jumlah Potongan RM 120,344,352.36 RM 120,344,352.36

BAYARAN YANG DISYORKAN RM 6,277,448.31

………………………………...…….……………

(Pegawai Pengesyor)

Tarikh : ………………………………………….

B PERAKUAN BAYARAN

1. Bayaran Interima) Kepada Kontraktor Utama RM - b) Kepada Subkontraktor/Penerima Hak RM -

(Seperti di Lampiran A)Jumlah Bayaran Interim RM - RM -

2. Kredit Akaun Deposit Wang Jaminan Perlaksanaan (10% dari Bayaran Disyorkan sehingga 5% harga kontrak) RM 6,277,448.31

JUMLAH RM -

BAYARAN DIPERAKUKAN RM -

(RINGGIT MALAYSIA: )

Adalah disahkan bahawa semua peraturan kewangan dan kehendak di bawah Kontrak telah dipatuhi

Tarikh : ……………………………………………. ………………………………………..……

1 Jumlah amaun yang dibayar dibawah Perakuan ini ialah (Untuk diisi oleh Pegawai yang menyediakan baucer. Sesalinan perakuan hendaklah dikembalikan kepada Jurukur Bahan/Wakil Pegawai Penguasa)

2 Bayaran wang pendahuluan yang telah dikeluarkan (Untuk diisi oleh Jurukur Bahan/Wakil Pegawai Penguasa)

(Pegawai Penguasa)

Page 2: Interim Payment No 14-Final

3 Bayaran semula Wang Pendahuluan sehingga kini4 Jumlah Wang Jaminan Yang Perlu Ditahan* Termasuk Barang Tak Pasang, Pelarasan Turun Naik Harga, Tuntutan Bayaran Tambahan yang diluluskan

Page 3: Interim Payment No 14-Final

Kompleks Belia dan Sukan Daerah Johor Bahru, Johor

KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR.Interim Payment No. 14

Date of Valuation : % work done

AmountITEM DESCRIPTION

AMOUNT prev. current To date

(RM) % % %

SUMMARY

1.0 PRELIMINARIES 7,105,760.00 100% 0% 100% 7,105,760.00

2.0 PILING WORKS 5,768,517.00 100% 0% 100% 5,768,517.00

3.0 BUILDING WORKS

3.1 Blok Pentadbiran 4,446,900.00 100% 0% 100% 4,446,900.00

3.2 Blok Akademik 5,929,200.00 100% 0% 100% 5,929,200.00

3.3 Dewan Serbaguna & Astaka 1,536,848.00 100% 0% 100% 1,536,848.00

3.4 Perpustakaan 2,001,105.00 100% 0% 100% 2,001,105.00

3.5 Kantin 533,628.00 100% 0% 100% 533,628.00

3.6 Surau 79,056.00 100% 0% 100% 79,056.00

3.7 Stadium 35,819,133.80 100% 0% 100% 35,819,133.80

3.8 Kolam Renang 91,112.00 100% 0% 100% 91,112.00

4.0 M&E SERVICES 17,063,960.90 100% 0% 100% 17,063,960.90

5.0 EXTERNAL WORKS 45,173,744.70 100% 0% 100% 45,173,744.70

TOTAL BUILDERS WORKS 125,548,965.40 100% 125,548,965.40

MATERIAL ON SITE 579,313.98

Variation order

APK 1 281,485.00 100% 0% 100% 281,485.00

APK 2 9,239.80 100% 0% 100% 9,239.80

APK 3 74,436.49 100% 0% 100% 74,436.49

APK 4 10,000.00 0% 100% 100% 10,000.00

APK 5 118,360.00 0% 100% 100% 118,360.00

(please refer Lampiran B)

TOTAL AMOUNT 126,621,800.67

……………………………………………………..

(Signature of Quantity Surveyor )

Date: ……………………

Page 4: Interim Payment No 14-Final

CONTRACT NO: STATEMENT OF PRICE VARIATION CALCULATION IN ACCORDANCE LAMPIRAN AWITH THE SPECIAL PROVISION OF THE CONDITIONS OF CONTRACT INCLUDED IN RECOMMENDATION FOR PROGRESS PAYMENT NO. 8

PROJECT :DATE OF VALUATION : 7-Apr-11

Value of Work Done To Date

Category of buildings Total Preliminaries Applicable Applicable Effective Base Current Fluctuation Increase Increase Total increase(relevant categories builder's & item based value of value of value of index Index factor decrease up to decrease to

shall ignored) in actual cost work done work done work done (+) / (-) for the previous + carried toor current previous for the July. '08 Jul. '10 month month progress

prices month month paymentcertificate

(A) (B) (C) (D) (E) (F) (H) (J) (K) (L) (M) (N)

(D - E) *Recovery Factor x (J - H)/H (F x K) (L + M)

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

1) Single Storey 38,059,777.80 38,059,777.80 28,080,849.75 9,978,928.05 100.00 103.10 0.016120 160,860.32 - 160,860.32 2) 2 - 4 Storey R.C Building with flat roof3) 2 - 4 Storey R.C Building with 12,377,205.00 12,377,205.00 9,871,838.75 2,505,366.25 100.00 99.00 -0.004800 (12,025.76) - (12,025.76)

pitched roof4) 5 Storey and above R.C

(accom. building)5) 5 Storey and above R.C Office Building6) Timber Building7) Timber Piling8) Reinforced Concrete Piling9) External works 45,173,744.70 45,173,744.70 9,645,478.93 35,528,265.78 100.00 101.05 0.004620 164,140.59 - 164,140.59

TOTAL (RM) 312,975.15 - 312,975.15

Notes:* Recovery Factor

1) Single Storey 0.522) 2 - 4 Storey R.C Building with flat roof 0.483) 2 - 4 Storey R.C Building with 0.48

pitched roof4) 5 Storey and above R.C 0.46

(accom. building)5) 5 Storey and above R.C Office Building 0.466) Timber Building 0.557) Timber Piling 0.458) Reinforced Concrete Piling 0.309) External works 0.44

BASE INDEX MONTH / YEAR : JULY 2008

MONTH / YEAR CURRENT INDEX APPLICABLE : JULY 2010

Page 5: Interim Payment No 14-Final

PROJECT : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

SUMMARY VARIATION ORDERS

Progress Claim : 13

V.O. Description to date

1. Variation Order 1 ADDITIONAL WORK FOR AIR-COND. 281,485.00 100% 0% 100% 281,485.00

2. Variation Order 2 ADDITIONAL WORK FOR ROAD AND CAR PARK 9,239.80 90% 10% 100% 9,239.80

3. Variation Order 3 74,436.49 90% 10% 100% 74,436.49

4. Variation Order 4 FOUNTAIN DESIGN 10,000.00 0% 100% 100% 10,000.00

5 Variation Order 5 GATE 118,360.00 0% 100% 100% 118,360.00

Total Variation Order (RM) = 493,521.29 493,521.29

AP&F V. O. Amount (RM)

previous work done

current work done

Certified Amount (RM)

SECTION J - TNB SUB-STATION (DOUBLE CHAMBER) (ALL PROVISIONAL)

Page 6: Interim Payment No 14-Final

Material On Site-6

PROJECT : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

MATERIAL ON SITE

Item Description Unit Quantity Rate (RM)

1. Cement bag 200.00 15.00 3,000.00

2. Steel Wire Mesh A9 - 100 pcs m2 1,320 17.00 22,440.00

3. Steel Wire Mesh A7 - 500 pcs m2 6,600 10.05 66,330.00

4. Steel Wire Mesh A6.5 - 200 pcs m2 2,640 9.50 25,080.00

5. Steel Wire Mesh B7 - 150 pcs m2 1,980 15.05 29,799.00

6. Reinforcement Bar - R6 ( 7 tonne) kg 7,000 2.00 14,000.00

7. - 8mm dia. kg 1,000 3.00 3,000.00

8. - 10mm dia kg 1,000 2.70 2,700.00

1. Cement bag 250.00 15.00 3,750.00

2. Steel Wire Mesh A9 - 150 pcs m2 1,980 17.00 33,660.00

3. Steel Wire Mesh A7 - 550 pcs m2 7,260 10.05 72,963.00

4. Steel Wire Mesh A6.5 - 300 pcs m2 3,960 9.50 37,620.00

5. Steel Wire Mesh B7 - 170 pcs m2 2,244 15.05 33,772.20

6. Reinforcement Bar - R6 ( 5 tonne) kg 5,000 2.00 10,000.00

7. - 8mm dia. kg 1,500 3.00 4,500.00

8. - 10mm dia kg 1,500 2.70 4,050.00

1. Cement bag 300.00 15.00 4,500.00

2. Steel Wire Mesh A9 - 150 pcs m2 1,650 17.00 28,050.00

3. Steel Wire Mesh A7 - 550 pcs m2 7,920 10.05 79,596.00

4. Steel Wire Mesh A6.5 - 300 pcs m2 4,620 9.50 43,890.00

5. Steel Wire Mesh B7 - 170 pcs m2 2,640 15.05 39,732.00

6. Reinforcement Bar - R6 ( 5 tonne) kg 5,500 2.00 11,000.00

7. - 8mm dia. kg 2,500 3.00 7,500.00

8. - 10mm dia kg 2,500 2.70 6,750.00

1. Cement bag 500.00 15.00 7,500.00

2. Reinforcement Bar - R6 ( 7 tonne) kg 7,000 2.00 14,000.00

3. - 8mm dia. kg 5,000 3.00 15,000.00

4. - 10mm dia kg 5,000 2.70 13,500.00

1. Cement bag 400.00 15.00 6,000.00

Total Amount (RM) = 643,682.20

Total Amount for 90% Material On Site (RM) = 579,313.98

Total Amount to be paid (RM) = 579,313.98

Total Amount (RM)

Page 7: Interim Payment No 14-Final

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

BILL PART A :PRELIMINARIES INTERIM PAYMENT No.10

Item Description COST (RM)

(RM) Initial Recurring Completion

1 Law, Regulation And Requirements 100,000.00 100,000.00 100% 100,000.00

2 150,000.00 150,000.00 100% 0% 100% 150,000.00

3 903,000.00 903,000.00 100% 903,000.00

4 Insurance of works 903,000.00 903,000.00 100% 903,000.00

5 Performance Bond -

6 Site Management Cost 6,500.00 6,500.00 100% 0% 100% 6,500.00

7 Setting Out 47,500.00 47,500.00 100% 0% 100% 47,500.00

8 Planning and Scheduling 6,500.00 6,500.00 100% 6,500.00

9 Progress Report 6,000.00 6,000.00 100% 0% 100% 6,000.00

10 Progress Photograph 7,000.00 7,000.00 100% 0% 100% 7,000.00

11 Project Diary 4,000.00 4,000.00 100% 0% 100% 4,000.00

12 Safeguarding the Works 30,000.00 30,000.00 100% 0% 100% 30,000.00

13 Contractor's Plant 91,000.00 91,000.00 100% 91,000.00

14 Shop Drawing 21,500.00 21,500.00 100% 0% 100% 21,500.00

15 Site Office 30,500.00 10,000.00 100% 10,000.00 19,500.00 100% 0% 100% 19,500.00 1,000.00 100% 100% 200% 2,000.00

16 Telephone 14,000.00 3,000.00 100% 3,000.00 8,000.00 100% 0% 100% 8,000.00 3,000.00 100% 100% 200% 6,000.00

17 Facsimile Transceiver 10,500.00 1,000.00 100% 1,000.00 8,500.00 100% 0% 100% 8,500.00 1,000.00 100% 100% 200% 2,000.00

18 Safety Boots 6,500.00 6,500.00 100% 6,500.00

19 Safety Helmets 6,500.00 6,500.00 100% 6,500.00

20 Raincoats 3,500.00 3,500.00 100% 3,500.00

21 Mobile Phone 3,577.00 577.00 100% 577.00 3,000.00 100% 0% 100% 3,000.00

22 Site Vehicles - PROTON WAJA 1.6 (A) 31,577.00 31,577.00 100% 31,577.00 100%

23 Site Vehicles - HONDA EX5 110cc 5,000.00 3,000.00 100% 3,000.00 2,000.00 100% 0% 100% 2,000.00

24 Provision of Notebook For The S.O 5,500.00 5,500.00 100% 5,500.00

25 Digital Still Camera and Digital Video Camera 2,423.00 2,423.00 100% 2,423.00

26 Desktop/Personal Computer 5,500.00 5,500.00 100% 5,500.00

27 Photo Copier Machine 11,500.00 5,000.00 100% 5,000.00 6,500.00 100% 0% 100% 6,500.00

28 Temporary Building 21,577.00 10,000.00 100% 10,000.00 10,577.00 100% 0% 100% 10,577.00 1,000.00 100% 0% 100% 1,000.00

29 Temporary Lighting and Power 290,000.00 10,000.00 100% 10,000.00 273,000.00 100% 0% 100% 273,000.00 7,000.00 100% 0% 100% 7,000.00

30 Temporary Water Supply 290,000.00 10,000.00 100% 10,000.00 273,000.00 100% 0% 100% 273,000.00 7,000.00 100% 0% 100% 7,000.00

31 Plant and Machinery 801,500.00 100,000.00 100% 100,000.00 601,500.00 100% 0% 100% 601,500.00 100,000.00 100% 0% 100% 100,000.00

32 Project Signboard 2,077.00 2,077.00 100% 2,077.00

Total Amount %

workdone Total Workdone

(RM)%

workdone%

workdone%

workdoneTotal Workdone

(RM)%

workdone%

workdone%

workdoneTotal Workdone

(RM)

Responsibilities of Contractor for NSC and/or Nominated SupplierInsurance againts Personal Injuries and Damages to Property

Page 8: Interim Payment No 14-Final

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

BILL PART A :PRELIMINARIES INTERIM PAYMENT No.10

Item Description COST (RM)

(RM) Initial Recurring Completion

Total Amount %

workdone Total Workdone

(RM)%

workdone%

workdone%

workdoneTotal Workdone

(RM)%

workdone%

workdone%

workdoneTotal Workdone

(RM)

33 Wash Trough 32,000.00 32,000.00 100% 32,000.00

34 Desilting 32,000.00 32,000.00 100% 32,000.00

35 Existing Services, Facilities And Public In The Vicinity 51,500.00 51,500.00 100% 0% 100% 51,500.00

36 Maintenance of Existing Drains 52,000.00 52,000.00 100% 0% 100% 52,000.00

37 Damage to Existing Roads, Paths, Etc. 23,000.00 23,000.00 100% 23,000.00

38 Acccess and Temporary Roads 61,577.00 10,000.00 100% 10,000.00 41,577.00 100% 0% 100% 41,577.00 10,000.00 100% 0% 100% 10,000.00

39 Temporary Hoarding and Gantries 880,000.00 100,000.00 100% 100,000.00 680,000.00 100% 0% 100% 680,000.00 100,000.00 100% 0% 100% 100,000.00

40 Temporary Scaffolding and staging 880,000.00 100,000.00 100% 100,000.00 680,000.00 100% 0% 100% 680,000.00 100,000.00 100% 0% 100% 100,000.00

41 Mosquito prevention 31,500.00 31,500.00 100% 0% 100% 31,500.00

42 First Aid Kit 2,577.00 1,000.00 100% 1,000.00 1,577.00 100% 0% 100% 1,577.00

43 Safety of Site 12,000.00 6,000.00 100% 6,000.00 6,000.00 100% 0% 100% 6,000.00

44 Keeping Site Dry 12,000.00 6,000.00 100% 6,000.00 6,000.00 100% 0% 100% 6,000.00

45 Security 23,280.00 23,280.00 100% 0% 100% 23,280.00

46 Clearing Away Equipment, Etc. 10,300.00 3,000.00 100% 3,000.00 5,300.00 100% 0% 100% 5,300.00 2,000.00 100% 0% 100% 2,000.00

47 Cleaning up Site 11,500.00 6,500.00 100% 0% 100% 6,500.00 5,000.00 100% 0% 100% 5,000.00

48 As Built Drawings 6,500.00 6,500.00 100% 0% 100% 6,500.00

49 Procedure for Inspection Prior to Handover of the Works 13,000.00 13,000.00 100% 0% 100% 13,000.00

50 Final Cleaning 33,000.00 33,000.00 100% 0% 100% 33,000.00

51 Mock-Up Unit ### 221,459.00 100% 221,459.00 664,377.00 100% 0% 100% 664,377.00 221,459.00 100% 0% 100% 221,459.00

52 Local And Other Authorities Notices And Fees 13,000.00 6,500.00 100% 6,500.00 6,500.00 100% 0% 100% 6,500.00

TOTAL TO FINAL SUMMARY : ### 2,760,613.00 100% 2,760,613.00 ### 100% 3,727,688.00 617,459.00 101% 622,459.00

Initial Cost : RM 2,760,613.00

Recurring Cost : RM 3,727,688.00

Final Cost : RM 622,459.00

TOTAL PRELIMINARIES TO SUMMARY : RM 7,110,760.00

breakdown/prelim/pda/1/1/12

Page 9: Interim Payment No 14-Final

Page 9

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QTY RATE AMOUNT prev. Curr. To Date DUE

(RM) (RM)

GENERALLY

A

B

C

D

E

F

G

H

TO COLLECTION - -

The Contractor shall visit the site to determine the exact condition

and nature of works to be undertaken.

The Bills Of Quantities shall be read incojointly with the Drawings, Specification, Preambles and the Conditions of Contract Set in Tender Documents

The prices for works shall include all necessary works as described in Specification, Drawings, Preambles and the Conditions of Contract. No lack of information shall be entertained.

Prices for piles shall include for casting them either on or of site and all necessary formwork including forming necessary recess etc. reinforcement, lifting tongles, pile shoes or extension base plate and extension cap plates all as described.

Prices for handling, transporting, pitching and driving of piles shall be deemed to include the provision of all necessary piling equipment and other plant on site and dismantling and removing the same on completion of the piling work.

Piling shall commence from platform level. Prices for driving shall include for moving of pile frames about the site, raising or lowering them and re-driving of heaved piles.

Prices for testing of piles shall be deemed to include the provision

of all pile testing equipment on site and dismantling and removing

the same on completion of the piling work.

The Contractor shall take note that notwithstanding to term of

Conditions of Contract, the quantities of piling works in this bill are

'PROVISIONAL' and subject to re-measurement unless specified

as Lump Sum or any otherwise stated. The payment shall be

based on quantity of piles driven and valued in accordance to note

hereunder.

Page 10: Interim Payment No 14-Final

Page 10

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

PREAMBLES

B

C

D

E

F

G

TO COLLECTION - -

DEVIATION FROM THE STANDARD METHOD OF MEASUREMENT

The method of measurement for the Piling Works is generally not in accordance with Clause 39 to 45 in Page 20 to 22 of the SMM.

The rate for pay length of the pile shall be deemed to include the initial and extension piles notwithstanding whether the pile is driven in singly or cluster, labour and materials for jointing between the initial and extension piles, shoeing, pointing and wastage. The rate shall also deemed to include for piling on flat or sloping ground including all necessary modifications to piling frame to accommodate stiff or any gradient of slope.

The type of pile driving equipment to be used for this buildings is of the Drop Hammer System all to specialist's design and to the approval of the Engineer / S.O. and Local Authorities.

For supply, deliver, handle, unload, transport and pitch shall be measured for the full approved pitch length.

For driving it shall be measured from the toe of the piles when

driven to the cut of level.

The rate of every items of piling works shall include working in

whatever platform levels irrespective of either at ground or

formation or reduce level

Preliminary Test Pile shall be part of working piles and shall be installed all in accordance to the specification and as shown in the drawing. Pile point for test drive shall be determined by the Engineer / S.O.

Page 11: Interim Payment No 14-Final

Page 11

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

BRIEF SPECIFICATION

A All piles shall comply the following requirements

B

C

a. First cycle = Incremental loading to working load of pile

b. Second cycle = Incremental loading to twice working load of pile

D

E

Unless otherwise stated the design, materials and workmanship for

the precast concrete piles shall comply with the relevant Clauses

of BS 8004: 1986 and BS 8110: 1985

Maintain load test has to be carried out in Two (2) cycles. The test

load for each cycles has to be maintained for 24 hours. The test

load shall be as follows:

The Contractor shall provide approved dolly to drive to the required

cut off levels when instructed by the Engineer/S.O

All Spun Pile to be 350mm diameter with working capacity of 65tons and driven to set. All reinforced concrete pile which driven to set shall have working capacity of 30tons and all friction piles shall have working capacity 15tons and driven to 24m depth.

Page 12: Interim Payment No 14-Final

Page 12

TO COLLECTION - -

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

MOBILIZATION AND SITE ORGANISATION

A

LumpSum 900,000.00 100% 0% 100% 900,000.00

B

LumpSum 300,000.00 100% 0% 100% 300,000.00

C

LumpSum 50,000.00 90% 10% 100% 50,000.00

D

LumpSum 30,000.00 90% 10% 100% 30,000.00

E

LumpSum 35,000.00 80% 20% 100% 35,000.00

J

LumpSum -

Allow for the provision of all necessary piling equipments, plants, tools and ancillary equipment and for their transportation to site, handling, assembling, erecting, dismantling and removal on completion.

Allow for moving and handling Drop Hammer operated piling equipments about the site as often and whenever necessary for the execution for the whole piling operations including any excavation and filling required for moving.

It is the obligation of the Contractor before commencement and after the completion of the Piling Works but before casting the pile caps, to engage a Licensed Surveyor to set out the correct alignment and eccentricity of each pile strictly in accordance with Structural Engineer's Layout Drawings or any other layout drawings deemed necessary and subsequently issued by the Engineer during the progress of Piling Works.

Allow for submission of four (4) sets of setting out and as-built drawings from Licensed Surveyor inclusive of one (1) softcopy in Auto-Cad programme.

Allow for the submission of records of all piles in quadruplicate copies duly signed by the Contractor and Engineer's representative and delivered to the Engineer as the work proceeds.

In the event that deviation from the correct alignment does occur and eccentricity of any such pile does not confirm to that shown in the said drawings, the rectification of such pile will have to be carried out by the Contractor at his own cost and to entire satisfaction of the Engineer/S.O.

Page 13: Interim Payment No 14-Final

Page 13

TO COLLECTION 1,315,000.00 1,315,000.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 1/1/5....................................... - -

From Page No. 1/2/5 ....................................... - -

From Page No. 1/3/5 ....................................... - -

From Page No. 1/4/5 ....................................... 1,315,000.00 1,315,000.00

Page 14: Interim Payment No 14-Final

Page 14

TOTAL CARRIED TO SUMMARY 1,315,000.00 0% 0% 100% 1,315,000.00

BILL NO. 2 - BLOK PENTADBIRAN

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 300 900.00 270,000.00 80% 20% 100% 270,000.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 2 900.00 1,800.00 80% 20% 100% 1,800.00

C 350mm Diameter extension pile in 12.00m length No 521 860.00 448,060.00 80% 20% 100% 448,060.00

D350mm Diameter extension preliminary test pile in 12.00m length.

No 4 860.00 3,440.00 80% 20% 100% 3,440.00

E 350mm Diameter extension pile in 9.00m length. No 300 700.00 210,000.00 80% 20% 100% 210,000.00

F350mm Diameter extension preliminary test pile in 9.00m length.

No 2 700.00 1,400.00 80% 20% 100% 1,400.00

350mm Diameter extension preliminary test pile in 6.00m length.No - 500.00 - -

G No. 300 12.00 3,600.00 80% 20% 100% 3,600.00

H No. 2 12.00 24.00 80% 20% 100% 24.00

J No. 521 12.00 6,252.00 80% 20% 100% 6,252.00

K No. 4 12.00 48.00 80% 20% 100% 48.00

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Handle, transport and pitch for precast conrete spun piles as described :-

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

Page 15: Interim Payment No 14-Final

Page 15

TO COLLECTION 944,624.00 944,624.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 300 8.70 2,610.00 80% 20% 100% 2,610.00

B No. 2 8.70 17.40 80% 20% 100% 17.40

350mm Diameter extension preliminary test pile in 6.00m length.No - 7.00 - 0% 0% 0% -

Drive only for precast conrete spun piles as described :-

C M 3,600 8.80 31,680.00 80% 20% 100% 31,680.00

D M 24 8.80 211.20 80% 20% 100% 211.20

E M 6,252 8.80 55,017.60 80% 20% 100% 55,017.60

F M 48 8.80 422.40 80% 20% 100% 422.40

G M 2,700 8.80 23,760.00 80% 20% 100% 23,760.00

H M 18 8.80 158.40 80% 20% 100% 158.40

350mm Diameter extension preliminary test pile in 6.00m length.No - 8.80 - 80% 20% 100% -

J

No. 900 21.40 19,260.00 80% 20% 100% 19,260.00

K Ditto, for preliminary test piles No. 6 21.40 128.40 80% 20% 100% 128.40

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

Page 16: Interim Payment No 14-Final

Page 16

TO COLLECTION 133,265.40 133,265.40

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 300 30.00 9,000.00 80% 20% 100% 9,000.00

B

No. 300 50.00 15,000.00 80% 20% 100% 15,000.00

Testing of Piles

C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 80% 20% 100% 7,300.00

PDA Test

D

No. 1 800.00 800.00 80% 20% 100% 800.00

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 17: Interim Payment No 14-Final

Page 17

TO COLLECTION 32,100.00 32,100.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING

A 300mm x 300mm initial pile in 12.00m length. No 215 680.00 146,200.00 80% 20% 100% 146,200.00

B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 80% 20% 100% 680.00

C 300mm x 300mm extension pile in 12.00m length No 215 680.00 146,200.00 80% 20% 100% 146,200.00

D300mm x 300mm extension preliminary test pile in 12.00m length.

No 1 680.00 680.00 80% 20% 100% 680.00

Handle, transport and pitch for precast conrete piles as described:

E No. 215 12.00 2,580.00 80% 20% 100% 2,580.00

F No. 1 12.00 12.00 80% 20% 100% 12.00

G No. 215 12.00 2,580.00 80% 20% 100% 2,580.00

H No. 1 12.00 12.00 80% 20% 100% 12.00

Supply, deliver and unload on site precast reinforced concrete pile (Grade 45) as specified :

300mm x 300mm initial pile, driving singly / cluster pile in 12.00m length

300mm x 300mm initial preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 12.00m length

Page 18: Interim Payment No 14-Final

Page 18

TO COLLECTION 298,944.00 298,944.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

Drive only friction piles to a depth of 24m as described:

A M 3,100 8.80 27,280.00 80% 20% 100% 27,280.00

B M 24 8.80 211.20 80% 20% 100% 211.20

C M 3,100 8.80 27,280.00 80% 20% 100% 27,280.00

D M 24 8.80 211.20 80% 20% 100% 211.20

-------------------------------------------

E

No 215 21.40 4,601.00 80% 20% 100% 4,601.00

F Ditto, preliminary test pile No 1 21.40 21.40 80% 20% 100% 21.40

G

No. 192 22.30 4,281.60 80% 20% 100% 4,281.60

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

300mm x 300mm initial pile, driving singly / cluster pile in 12.00m length

300mm x 300mm initial preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension, driving singly / cluster pile in 12.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 12.00m length

1200mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1200mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in head and base of piles.

Cutt off head of pile and remove surplus length off site 300mm x 300mm precast reinforced concrete pile and strip off 1000mm length of head for and including binding exposed reinforcement rods to reinforcement in pile cap.

Page 19: Interim Payment No 14-Final

Page 19

TO COLLECTION 63,886.40 63,886.40

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

Testing of Piles

A Test to 300mm x 300mm RC pile No. Rate Only

PDA Test

B

No. 4 800.00 3,200.00 80% 20% 100% 3,200.00

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 30 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 20: Interim Payment No 14-Final

Page 20

TO COLLECTION 3,200.00 3,200.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 2/1/7 ....................................... 944,624.00 944,624.00

From Page No. 2/2/7 ....................................... 133,265.40 133,265.40

From Page No. 2/3/7 ....................................... 32,100.00 32,100.00

From Page No. 2/4/7 ....................................... 298,944.00 298,944.00

From Page No. 2/5/7 ....................................... 63,886.40 63,886.40

From Page No. 2/6/7 ....................................... 3,200.00 3,200.00

Page 21: Interim Payment No 14-Final

Page 21

TOTAL CARRIED TO SUMMARY 1,476,019.80 1,476,019.80

BILL NO. 3 - BLOK AKADEMIK

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 425 900.00 382,500.00 90% 10% 100% 382,500.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 2 900.00 1,800.00 90% 10% 100% 1,800.00

C 350mm Diameter extension pile in 12.00m length No 425 900.00 382,500.00 90% 10% 100% 382,500.00

D350mm Diameter extension preliminary test pile in 12.00m length.

No 4 900.00 3,600.00 90% 10% 100% 3,600.00

E 350mm Diameter extension pile in 9.00m length. No 365 700.00 255,500.00 90% 10% 100% 255,500.00

F350mm Diameter extension preliminary test pile in 9.00m length.

No 2 700.00 1,400.00 90% 10% 100% 1,400.00

350mm Diameter extension pile in 6.00m length. No - 500.00 - 0% 0% 0% -

G No. 425 12.00 5,100.00 90% 10% 100% 5,100.00

H No. 2 12.00 24.00 90% 10% 100% 24.00

J No. 425 12.00 5,100.00 90% 10% 100% 5,100.00

K No. 4 12.00 48.00 90% 10% 100% 48.00

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Handle, transport and pitch for precast conrete spun piles as described :-

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

Page 22: Interim Payment No 14-Final

Page 22

TO COLLECTION 1,037,572.00 1,037,572.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 365 8.70 3,175.50 90% 10% 100% 3,175.50

B No. 2 8.70 17.40 90% 10% 100% 17.40

350mm Diameter extension pile in 6.00m length. No - 7.00 - 90% 10% 100% -

Drive only for precast conrete spun piles as described :-

C M 5,100 8.80 44,880.00 90% 10% 100% 44,880.00

D M 24 8.80 211.20 90% 10% 100% 211.20

E M 5,100 8.80 44,880.00 90% 10% 100% 44,880.00

F M 48 8.80 422.40 90% 10% 100% 422.40

G M 3,285 8.80 28,908.00 90% 10% 100% 28,908.00

H M 18 8.80 158.40 90% 10% 100% 158.40

350mm Diameter extension pile in 6.00m length. No - 8.80 - 90% 10% 100% -

J

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

Page 23: Interim Payment No 14-Final

Page 23

No. 1,275 21.40 27,285.00 90% 10% 100% 27,285.00

K Ditto, for preliminary test piles No. 6 21.40 128.40 90% 10% 100% 128.40

TO COLLECTION 150,066.30 150,066.30

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 243 30.00 7,290.00 90% 10% 100% 7,290.00

B

No. 243 50.00 12,150.00 90% 10% 100% 12,150.00

Testing of Piles

C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 90% 10% 100% 7,300.00

PDA Test

D

No. 1 800.00 800.00 90% 10% 100% 800.00

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 24: Interim Payment No 14-Final

Page 24

TO COLLECTION 27,540.00 27,540.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING

A 300mm x 300mm initial pile in 12.00m length. No 143 680.00 97,240.00 90% 10% 100% 97,240.00

B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 90% 10% 100% 680.00

C 300mm x 300mm extension pile in 12.00m length No 143 648.40 92,721.20 90% 10% 100% 92,721.20

D300mm x 300mm extension preliminary test pile in 12.00m length.

No 1 648.40 648.40 90% 10% 100% 648.40

Handle, transport and pitch for precast conrete piles as described:

E No. 143 12.00 1,716.00 90% 10% 100% 1,716.00

F No. 1 12.00 12.00 90% 10% 100% 12.00

G No. 143 12.00 1,716.00 90% 10% 100% 1,716.00

H No. 1 12.00 12.00 90% 10% 100% 12.00

Supply, deliver and unload on site precast reinforced concrete pile (Grade 45) as specified :

300mm x 300mm initial pile, driving singly / cluster pile in 12.00m length

300mm x 300mm initial preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 12.00m length

Page 25: Interim Payment No 14-Final

Page 25

TO COLLECTION 194,745.60 194,745.60

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

Drive only friction piles to a depth of 24m as described:

A M 1,716 8.80 15,100.80 90% 10% 100% 15,100.80

B M 12 8.80 105.60 90% 10% 100% 105.60

C M 1,716 8.80 15,100.80 90% 10% 100% 15,100.80

D M 12 8.80 105.60 90% 10% 100% 105.60

-------------------------------------------

E

No 143 21.40 3,060.20 90% 10% 100% 3,060.20

F Ditto, preliminary test pile No 1 21.40 21.40 90% 10% 100% 21.40

G

No. 144 22.30 3,211.20 90% 10% 100% 3,211.20

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

300mm x 300mm initial pile, driving singly / cluster pile in 12.00m length

300mm x 300mm initial preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension, driving singly / cluster pile in 12.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 12.00m length

1200mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1200mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in head and base of piles.

Cutt off head of pile and remove surplus length off site 300mm x 300mm precast reinforced concrete pile and strip off 1000mm length of head for and including binding exposed reinforcement rods to reinforcement in pile cap.

Page 26: Interim Payment No 14-Final

Page 26

TO COLLECTION 36,705.60 36,705.60

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

Testing of Piles

A Test to 300mm x 300mm RC pile No. 1 4,850.00 4,850.00 90% 10% 100% 4,850.00

PDA Test

B

No. 3 800.00 2,400.00 90% 10% 100% 2,400.00

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 30 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 27: Interim Payment No 14-Final

Page 27

TO COLLECTION 7,250.00 7,250.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 3/1/7 ....................................... 1,037,572.00 1,037,572.00

From Page No. 3/2/7 ....................................... 150,066.30 150,066.30

From Page No. 3/3/7 ....................................... 27,540.00 27,540.00

From Page No. 3/4/7 ....................................... 194,745.60 194,745.60

From Page No. 3/5/7 ....................................... 36,705.60 36,705.60

From Page No. 3/6/7 ....................................... 7,250.00 7,250.00

Page 28: Interim Payment No 14-Final

Page 28

TOTAL CARRIED TO SUMMARY 1,453,879.50 1,453,879.50

BILL NO. 4 - DEWAN SERBAGUNA

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 78 900.00 70,200.00 90% 10% 100% 70,200.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 156 900.00 140,400.00 90% 10% 100% 140,400.00

D350mm Diameter extension preliminary test pile in 12.00m length.

No 2 900.00 1,800.00 90% 10% 100% 1,800.00

E 350mm Diameter extension pile in 9.00m length. No 78 700.00 54,600.00 90% 10% 100% 54,600.00

F350mm Diameter extension preliminary test pile in 9.00m length.

No 1 700.00 700.00 90% 10% 100% 700.00

G No. 78 12.00 936.00 90% 10% 100% 936.00

H No. 1 12.00 12.00 90% 10% 100% 12.00

J No. 156 12.00 1,872.00 90% 10% 100% 1,872.00

K No. 2 12.00 24.00 90% 10% 100% 24.00

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Handle, transport and pitch for precast conrete spun piles as described :-

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

Page 29: Interim Payment No 14-Final

Page 29

TO COLLECTION 271,444.00 271,444.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 78 8.70 678.60 90% 10% 100% 678.60

B No. 1 8.70 8.70 90% 10% 100% 8.70

Drive only for precast conrete spun piles as described :-

C M 936 8.80 8,236.80 90% 10% 100% 8,236.80

D M 12 8.80 105.60 90% 10% 100% 105.60

E M 1,872 8.80 16,473.60 90% 10% 100% 16,473.60

F M 24 8.80 211.20 90% 10% 100% 211.20

G M 702 8.80 6,177.60 90% 10% 100% 6,177.60

H M 9 8.80 79.20 90% 10% 100% 79.20

J

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

Page 30: Interim Payment No 14-Final

Page 30

No. 234 21.40 5,007.60 90% 10% 100% 5,007.60

K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20

TO COLLECTION 37,043.10 37,043.10

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 79 30.00 2,370.00 90% 10% 100% 2,370.00

B

No. 79 46.00 3,634.00 90% 10% 100% 3,634.00

Testing of Piles

C Test to 350mm diameter spun pile No. Rate Only

PDA Test

D

No. 1 800.00 800.00 90% 10% 100% 800.00

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 31: Interim Payment No 14-Final

Page 31

TO COLLECTION 6,804.00 6,804.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 4/1/4 ....................................... 271,444.00 271,444.00

From Page No. 4/2/4 ....................................... 37,043.10 37,043.10

From Page No. 4/3/4 ....................................... 6,804.00 6,804.00

Page 32: Interim Payment No 14-Final

Page 32

TOTAL CARRIED TO SUMMARY 315,291.10 315,291.10

BILL NO. 5 - PERPUSTAKAAN

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 29 900.00 26,100.00 85% 15% 100% 26,100.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 85% 15% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 58 900.00 52,200.00 85% 15% 100% 52,200.00

D350mm Diameter extension preliminary test pile in 12.00m length.

No 2 900.00 1,800.00 85% 15% 100% 1,800.00

E 350mm Diameter extension pile in 9.00m length. No 29 700.00 20,300.00 85% 15% 100% 20,300.00

F350mm Diameter extension preliminary test pile in 9.00m length.

No 1 700.00 700.00 85% 15% 100% 700.00

G No. 29 12.00 348.00 85% 15% 100% 348.00

H No. 1 12.00 12.00 85% 15% 100% 12.00

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Handle, transport and pitch for precast conrete spun piles as described :-

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

Page 33: Interim Payment No 14-Final

Page 33

J No. 58 12.00 696.00 85% 15% 100% 696.00

K No. 2 12.00 24.00 85% 15% 100% 24.00

TO COLLECTION 103,080.00 103,080.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 29 8.70 252.30 85% 15% 100% 252.30

B No. 1 8.70 8.70 85% 15% 100% 8.70

Drive only for precast conrete spun piles as described :-

C M 348 8.80 3,062.40 85% 15% 100% 3,062.40

D M 12 8.80 105.60 85% 15% 100% 105.60

E M 696 8.80 6,124.80 85% 15% 100% 6,124.80

F M 24 8.80 211.20 85% 15% 100% 211.20

G M 261 8.80 2,296.80 85% 15% 100% 2,296.80

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

Page 34: Interim Payment No 14-Final

Page 34

H M 9 8.80 79.20 85% 15% 100% 79.20

J

No. 87 21.40 1,861.80 85% 15% 100% 1,861.80

K Ditto, for preliminary test piles No. 3 21.40 64.20 85% 15% 100% 64.20

TO COLLECTION 14,067.00 14,067.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 30 30.00 900.00 85% 15% 100% 900.00

B

No. 30 50.00 1,500.00 85% 15% 100% 1,500.00

Testing of Piles

C Test to 350mm diameter spun pile No. Rate Only

PDA Test

D

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 35: Interim Payment No 14-Final

Page 35

No. 1 800.00 800.00 85% 15% 100% 800.00

TO COLLECTION 3,200.00 3,200.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 5/1/4 ....................................... 103,080.00 103,080.00

From Page No. 5/2/4 ....................................... 14,067.00 14,067.00

From Page No. 5/3/4 ....................................... 3,200.00 3,200.00

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 36: Interim Payment No 14-Final

Page 36

TOTAL CARRIED TO SUMMARY 120,347.00 120,347.00

BILL NO. 6 - KANTIN

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 86 900.00 77,400.00 85% 15% 100% 77,400.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 85% 15% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 172 900.00 154,800.00 85% 15% 100% 154,800.00

D350mm Diameter extension preliminary test pile in 12.00m length.

No 2 900.00 1,800.00 85% 15% 100% 1,800.00

E 350mm Diameter extension pile in 9.00m length. No 86 700.00 60,200.00 85% 15% 100% 60,200.00

F350mm Diameter extension preliminary test pile in 9.00m length.

No 1 700.00 700.00 85% 15% 100% 700.00

350mm Diameter extension pile in 6.00m length. No - 500.00 - 0% 0% 0% -

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Handle, transport and pitch for precast conrete spun piles as described :-

Page 37: Interim Payment No 14-Final

Page 37

G No. 86 12.00 1,032.00 85% 15% 100% 1,032.00

H No. 1 12.00 12.00 85% 15% 100% 12.00

J No. 172 12.00 2,064.00 85% 15% 100% 2,064.00

K No. 2 12.00 24.00 85% 15% 100% 24.00

TO COLLECTION 298,932.00 298,932.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 86 8.70 748.20 85% 15% 100% 748.20

B No. 1 8.70 8.70 85% 15% 100% 8.70

350mm Diameter extension pile in 6.00m length. No - 7.00 - 0% 0% 0% -

Drive only for precast conrete spun piles as described :-

C M 1,032 8.80 9,081.60 85% 15% 100% 9,081.60

D M 12 8.80 105.60 85% 15% 100% 105.60

E M 2,064 8.80 18,163.20 85% 15% 100% 18,163.20

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

Page 38: Interim Payment No 14-Final

Page 38

F M 24 8.80 211.20 85% 15% 100% 211.20

G M 774 8.80 6,811.20 85% 15% 100% 6,811.20

H M 9 8.80 79.20 85% 15% 100% 79.20

350mm Diameter extension pile in 6.00m length. No - 8.80 - 0% 0% 0% -

J

No. 258 21.40 5,521.20 85% 15% 100% 5,521.20

K Ditto, for preliminary test piles No. 3 21.40 64.20 85% 15% 100% 64.20

TO COLLECTION 40,794.30 40,794.30

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 87 30.00 2,610.00 85% 15% 100% 2,610.00

B

No. 87 50.00 4,350.00 85% 15% 100% 4,350.00

Testing of Piles

C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 85% 15% 100% 7,300.00

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Page 39: Interim Payment No 14-Final

Page 39

PDA Test

D

No. 1 800.00 800.00 85% 15% 100% 800.00

TO COLLECTION 15,060.00 15,060.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 6/1/4 ....................................... 298,932.00 298,932.00

From Page No. 6/2/4 ....................................... 40,794.30 40,794.30

From Page No. 6/3/4 ....................................... 15,060.00 15,060.00

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 40: Interim Payment No 14-Final

Page 40

TOTAL CARRIED TO SUMMARY 354,786.30 354,786.30

BILL NO. 7 - SURAU

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 117 900.00 105,300.00 90% 10% 100% 105,300.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 234 900.00 210,600.00 90% 10% 100% 210,600.00

D350mm Diameter extension preliminary test pile in 12.00m length.

No 2 900.00 1,800.00 90% 10% 100% 1,800.00

E 350mm Diameter extension pile in 9.00m length. No 117 700.00 81,900.00 90% 10% 100% 81,900.00

F350mm Diameter extension preliminary test pile in 9.00m length.

No 1 700.00 700.00 90% 10% 100% 700.00

350mm Diameter extension pile in 6.00m length. No - 500.00 - 90% 10% 100% -

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Page 41: Interim Payment No 14-Final

Page 41

G No. 117 12.00 1,404.00 90% 10% 100% 1,404.00

H No. 1 12.00 12.00 90% 10% 100% 12.00

J No. 234 12.00 2,808.00 90% 10% 100% 2,808.00

K No. 2 12.00 24.00 90% 10% 100% 24.00

TO COLLECTION 405,448.00 405,448.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 117 8.70 1,017.90 90% 10% 100% 1,017.90

B No. 1 8.70 8.70 90% 10% 100% 8.70

350mm Diameter extension pile in 6.00m length. No - 7.00 - 90% 10% 100% -

Drive only for precast conrete spun piles as described :-

C M 1,404 8.80 12,355.20 90% 10% 100% 12,355.20

D M 12 8.80 105.60 90% 10% 100% 105.60

Handle, transport and pitch for precast conrete spun piles as described :-

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

Page 42: Interim Payment No 14-Final

Page 42

E M 2,808 8.80 24,710.40 90% 10% 100% 24,710.40

F M 24 8.80 211.20 90% 10% 100% 211.20

G M 1,053 8.80 9,266.40 90% 10% 100% 9,266.40

H M 9 8.80 79.20 90% 10% 100% 79.20

350mm Diameter extension pile in 6.00m length. No - 8.80 - 90% 10% 100% -

J

No. 351 21.40 7,511.40 90% 10% 100% 7,511.40

K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20

TO COLLECTION 55,330.20 55,330.20

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 118 30.00 3,540.00 90% 10% 100% 3,540.00

B

No. 118 50.00 5,900.00 90% 10% 100% 5,900.00

Testing of Piles

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Page 43: Interim Payment No 14-Final

Page 43

C Test to 350mm diameter spun pile No. 7,300.00 Rate Only 90% 10% 100% 0.00

PDA Test

D

No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 10,240.00 10,240.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 7/1/4 ....................................... 405,448.00 405,448.00

From Page No. 7/2/4 ....................................... 55,330.20 55,330.20

From Page No. 7/3/4 ....................................... 10,240.00 10,240.00

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 44: Interim Payment No 14-Final

Page 44

TOTAL CARRIED TO SUMMARY 471,018.20 471,018.20

BILL NO. 8 -STADIUM

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING

A 300mm x 300mm initial pile in 12.00m length. No 23 680.00 15,640.00 90% 10% 100% 15,640.00

B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 90% 10% 100% 680.00

C 300mm x 300mm extension pile in 12.00m length No 47 648.40 30,474.80 90% 10% 100% 30,474.80

D300mm x 300mm extension preliminary test pile in 12.00m length.

No 1 648.40 648.40 90% 10% 100% 648.40

C 300mm x 300mm extension pile in 9.00m length No 23 585.00 13,455.00 90% 10% 100% 13,455.00

D300mm x 300mm extension preliminary test pile in 9.00m length.

No 1 585.00 585.00 90% 10% 100% 585.00

Supply, deliver and unload on site precast reinforced concrete pile (Grade 45) as specified :

Page 45: Interim Payment No 14-Final

Page 45

300mm x 300mm extension preliminary test pile in 9.00m length.

Handle, transport and pitch for precast conrete piles as described:

E No. 23 12.00 276.00 90% 10% 100% 276.00

F No. 1 12.00 12.00 90% 10% 100% 12.00

G No. 47 12.00 564.00 90% 10% 100% 564.00

H No. 1 12.00 12.00 90% 10% 100% 12.00

G No. 23 10.00 230.00 90% 10% 100% 230.00

H No. 1 10.00 10.00 90% 10% 100% 10.00

TO COLLECTION 62,587.20 62,587.20

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

Drive only for precast concrete piles as described:

A M 276 8.80 2,428.80 90% 10% 100% 2,428.80

B M 12 8.80 105.60 90% 10% 100% 105.60

C M 564 8.80 4,963.20 90% 10% 100% 4,963.20

D M 12 8.80 105.60 90% 10% 100% 105.60

C M 207 8.80 1,821.60 90% 10% 100% 1,821.60

300mm x 300mm initial pile, driving singly / cluster pile in 12.00m length

300mm x 300mm initial preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension pile, driving singly / cluster pile in 9.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 9.00m length

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

300mm x 300mm initial pile, driving singly / cluster pile in 12.00m length

300mm x 300mm initial preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension, driving singly / cluster pile in 12.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 12.00m length

300mm x 300mm extension, driving singly / cluster pile in 9.00m length

Page 46: Interim Payment No 14-Final

Page 46

D M 9 8.80 79.20 90% 10% 100% 79.20

-------------------------------------------

E

No 23 21.40 492.20 90% 10% 100% 492.20

F Ditto, preliminary test pile No 1 21.40 21.40 90% 10% 100% 21.40

G

No. 24 22.30 535.20 90% 10% 100% 535.20

TO COLLECTION 10,552.80 10,552.80

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

Testing of Piles

A Test to 300mm x 300mm RC pile No. Rate Only

PDA Test

B

300mm x 300mm extension, driving singly / cluster pile in 9.00m length

300mm x 300mm extension preliminary test pile, driving singly / cluster pile in 9.00m length

1200mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1200mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in head and base of piles.

Cutt off head of pile and remove surplus length off site 300mm x 300mm precast reinforced concrete pile and strip off 1000mm length of head for and including binding exposed reinforcement rods to reinforcement in pile cap.

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 60 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 47: Interim Payment No 14-Final

Page 47

No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 800.00 800.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 900.00 - 0% 0% 0% -

B 350mm Diameter initial preliminary test pile in 12.00m length. No 900.00 - 0% 0% 0% -

C 350mm Diameter extension pile in 12.00m length No 900.00 - 0% 0% 0% -

D350mm Diameter extension preliminary test pile in 12.00m length.

No 900.00 - 0% 0% 0% -

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Page 48: Interim Payment No 14-Final

Page 48

E 350mm Diameter extension pile in 9.00m length. No 700.00 - 0% 0% 0% -

F350mm Diameter extension preliminary test pile in 9.00m length.

No 700.00 - 0% 0% 0% -

G No. 12.00 - 0% 0% 0% -

H No. 12.00 - 0% 0% 0% -

J No. 12.00 - 0% 0% 0% -

K No. 12.00 - 0% 0% 0% -

TO COLLECTION - -

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 8.70 - 0% 0% 0% -

B No. 8.70 - 0% 0% 0% -

Drive only for precast conrete spun piles as described :-

C M 8.80 - 0% 0% 0% -

Handle, transport and pitch for precast conrete spun piles as described :-

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

Page 49: Interim Payment No 14-Final

Page 49

D M 8.80 - 0% 0% 0% -

E M 8.80 - 0% 0% 0% -

F M 8.80 - 0% 0% 0% -

G M 8.80 - 0% 0% 0% -

H M 8.80 - 0% 0% 0% -

J

No. 21.40 - 0% 0% 0% -

K Ditto, for preliminary test piles No. 21.40 - 0% 0% 0% -

TO COLLECTION - -

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 30.00 - 0% 0% 0% -

B

No. 50.00 - 0% 0% 0% -

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Page 50: Interim Payment No 14-Final

Page 50

Testing of Piles

C Test to 350mm diameter spun pile No. 7,300.00 - 100% 0% 100% -

PDA Test

D

No. 800.00 - 0% 0% 0% -

TO COLLECTION - -

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 8/1/4 ....................................... 62,587.20 62,587.20

From Page No. 8/2/4 ....................................... 10,552.80 10,552.80

From Page No. 8/3/4 ....................................... 800.00 800.00

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 51: Interim Payment No 14-Final

Page 51

- -

- -

- -

TOTAL CARRIED TO SUMMARY 73,940.00 73,940.00

BILL NO. 9 - KOLAM RENANG

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A 350mm Diameter initial pile in 12.00m length. No 47 900.00 42,300.00 90% 10% 100% 42,300.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING

Supply, deliver and unload on site precast reinforced concrete spun pile (Grade 60) as specified :-

Page 52: Interim Payment No 14-Final

Page 52

C 350mm Diameter extension pile in 12.00m length No 94 860.00 80,840.00 90% 10% 100% 80,840.00

D350mm Diameter extension preliminary test pile in 12.00m length.

No 2 860.00 1,720.00 90% 10% 100% 1,720.00

E 350mm Diameter extension pile in 9.00m length. No 47 700.00 32,900.00 90% 10% 100% 32,900.00

F350mm Diameter extension preliminary test pile in 9.00m length.

No 1 700.00 700.00 90% 10% 100% 700.00

G No. 47 12.00 564.00 90% 10% 100% 564.00

H No. 1 12.00 12.00 90% 10% 100% 12.00

J No. 94 12.00 1,128.00 90% 10% 100% 1,128.00

K No. 2 12.00 24.00 90% 10% 100% 24.00

TO COLLECTION 161,088.00 161,088.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A No. 47 8.70 408.90 90% 10% 100% 408.90

B No. 1 8.70 8.70 90% 10% 100% 8.70

Handle, transport and pitch for precast conrete spun piles as described :-

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as described :- (Cont'd)

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

Page 53: Interim Payment No 14-Final

Page 53

Drive only for precast conrete spun piles as described :-

C M 564 8.80 4,963.20 90% 10% 100% 4,963.20

D M 12 8.80 105.60 90% 10% 100% 105.60

E M 1,128 8.80 9,926.40 90% 10% 100% 9,926.40

F M 24 8.80 211.20 90% 10% 100% 211.20

G M 423 8.80 3,722.40 90% 10% 100% 3,722.40

H M 9 8.80 79.20 90% 10% 100% 79.20

J

No. 141 21.40 3,017.40 90% 10% 100% 3,017.40

K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20

TO COLLECTION 22,507.20 22,507.20

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

A

No. 48 30.00 1,440.00 90% 10% 100% 1,440.00

B

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

350mm Diameter initial pile, driving singly / cluster in 12.00m length

350mm Diameter initial preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 12.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 12.00m length

350mm Diameter extension pile, driving singly / cluster in 9.00m length

350mm Diameter extension preliminary test pile, driving singly / cluster in 9.00m length

1100mm x 20mm (Overall) fillet weld connection between chamfered edges of head cap and base 1100mm girth including 30mm diameter mild steel centring bar 160mm long, inserting in and including forming 80mm deep mortices in 'head and base of piles.

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN PILING (CONT'D)

Cutt off head of pile and remove surplus length off site 350mm precast reinforced concrete spun pile and strip off 1000mm length of head for and including binding expose reinforcement rods to reinforcement in pile cap.

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Page 54: Interim Payment No 14-Final

Page 54

No. 48 50.00 2,400.00 90% 10% 100% 2,400.00

Testing of Piles

C Test to 350mm diameter spun pile No. Rate Only

PDA Test

D

No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 4,640.00 4,640.00

WORKDONE (QTY) AMOUNTITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 9/1/4 ....................................... 161,088.00 161,088.00

From Page No. 9/2/4 ....................................... 22,507.20 22,507.20

Reinforced conrete Grade 35 cap to cover head of 350mm diameter precast concrete spun pile all to the approval of Engineer/S.O. and to include associated excavation works, formwork, mild steel plate and necessary reinforcements and welding works

Provide the necessary kentlegde, jack and dial gauges for the application and release of the Test Load. The rate shall include all supervision and labour, watching and lighting and removal of kentledge and equipment on completion for 2 cycles (twice working load of 130 Tonnes for both Preliminary Test Pile and Working Piles)

Provide all necessary equipments, supervision and labour for carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's / S.O.'s approval.

Page 55: Interim Payment No 14-Final

Page 55

From Page No. 9/3/4 ....................................... 4,640.00 4,640.00

TOTAL CARRIED TO SUMMARY 188,235.20 188,235.20

A.FINAL SUMMARY

BILL NO. DESCRIPTION PAGEWORKDONE (QTY) AMOUNT

RATE (RM) AMOUNT(RM) prev. Current To Date DUE

1.0 PRELIMINARIES AND PREAMBLES 1/5/5 1,315,000.00 0% 0% 100% 1,315,000.00

2.0 BLOK PENTADBIRAN 2/7/7 1,476,019.80 0% 0% 100% 1,476,019.80

3.0 BLOK AKADEMIK 3/7/7 1,453,879.50 0% 0% 100% 1,453,879.50

Page 56: Interim Payment No 14-Final

Page 56

4.0 DEWAN SERBAGUNA 4/4/4 315,291.10 0% 0% 100% 315,291.10

5.0 PERPUSTAKAAN 5/4/4 120,347.00 0% 0% 100% 120,347.00

6.0 KANTIN 6/4/4 354,786.30 0% 0% 100% 354,786.30

7.0 SURAU 7/4/4 471,018.20 0% 0% 100% 471,018.20

8.0 STADIUM 8/4/4 73,940.00 0% 0% 100% 73,940.00

9.0 KOLAM RENANG 9/4/4 188,235.20 0% 0% 100% 188,235.20

TOTAL TENDER SUM CARRIED TO FORM OF TENDER 5,768,517.10 100% 5,768,517.10

:: ::

::

Page 57: Interim Payment No 14-Final

3/1

BREAKDOWN FOR BLOK PENTADBIRAN

work done %ITEM DESCRIPTION UNIT QTY RATE AMOUNT % % % Total Workdone

(RM) (RM) prev. current to date (RM)

1 Substructure

Work Below Lowest Floor Finish L/S 1,001,900.00 100% 0% 100% 1,001,900.00

2 Superstructure

Frame L/S 299,900.00 100% 0% 100% 299,900.00

Upper Floors L/S 349,000.00 100% 0% 100% 349,000.00

Roof L/S 201,000.00 100% 0% 100% 201,000.00

Stairs L/S 245,500.00 100% 0% 100% 245,500.00

External Walls L/S 340,500.00 100% 0% 100% 340,500.00

Windows & External Doors L/S 300,600.00 100% 0% 100% 300,600.00

Internal Walls & Partitions L/S 203,400.00 100% 0% 100% 203,400.00

Internal Doors L/S 179,550.00 100% 0% 100% 179,550.00

3 Finishes

Internal Wall Finishes L/S 59,550.00 100% 0% 100% 59,550.00

Internal Floor Finishes L/S 50,000.00 100% 0% 100% 50,000.00

Internal Ceiling Finishes L/S 85,000.00 100% 0% 100% 85,000.00

External Finishes L/S 49,781.00 100% 0% 100% 49,781.00

Roof Finishes L/S 1,081,219.00 100% 0% 100% 1,081,219.00

Total Carried to FINAL SUMMARY 4,446,900.00 100% 4,446,900.00

breakdown/admin/pda/3(a)/3/12

Page 58: Interim Payment No 14-Final

4/1

BREAKDOWN FOR BLOK AKADEMIK

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Substructure

Work Below Lowest Floor Finish L/S 1,705,560.00 100% 0% 100% 1,705,560.00

2 Superstructure

Frame L/S 545,780.00 100% 0% 100% 545,780.00

Upper Floors L/S 395,380.00 100% 0% 100% 395,380.00

Roof L/S 345,880.00 100% 0% 100% 345,880.00

Stairs L/S 793,280.00 100% 0% 100% 793,280.00

External Walls L/S 492,280.00 100% 0% 100% 492,280.00

Windows & External Doors L/S 198,280.00 100% 0% 100% 198,280.00

Internal Walls & Partitions L/S 349,080.00 100% 0% 100% 349,080.00

Internal Doors L/S 495,200.00 100% 0% 100% 495,200.00

3 Finishes

Internal Wall Finishes L/S 100,200.00 100% 0% 100% 100,200.00

Internal Floor Finishes L/S 92,580.00 100% 0% 100% 92,580.00

Internal Ceiling Finishes L/S 115,280.00 100% 0% 100% 115,280.00

External Finishes L/S 205,280.00 100% 0% 100% 205,280.00

Roof Finishes L/S 95,140.00 100% 0% 100% 95,140.00

Total Carried to FINAL SUMMARY 5,929,200.00 100% 5,929,200.00

breakdown/academic/pda/3(b)/4/12

Page 59: Interim Payment No 14-Final

5/1

BREAKDOWN FOR DEWAN SERBAGUNA & ASTAKA

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Substructure

Work Below Lowest Floor Finish L/S 600,000.00 100% 0% 100% 600,000.00

2 Superstructure

Frame L/S 105,200.00 100% 0% 100% 105,200.00

Upper Floors L/S 90,000.00 100% 0% 100% 90,000.00

Roof L/S 80,000.00 100% 0% 100% 80,000.00

Stairs L/S 50,000.00 100% 0% 100% 50,000.00

External Walls L/S 100,000.00 100% 0% 100% 100,000.00

Windows & External Doors L/S 35,000.00 100% 0% 100% 35,000.00

Internal Walls & Partitions L/S 15,000.00 100% 0% 100% 15,000.00

Internal Doors L/S 20,000.00 100% 0% 100% 20,000.00

3 Finishes

Internal Wall Finishes L/S 30,000.00 100% 0% 100% 30,000.00

Internal Floor Finishes L/S 70,000.00 100% 0% 100% 70,000.00

Internal Ceiling Finishes L/S 60,000.00 100% 0% 100% 60,000.00

External Finishes L/S 181,648.60 100% 0% 100% 181,648.60

Roof Finishes L/S 100,000.00 100% 0% 100% 100,000.00

Total Carried to FINAL SUMMARY 1,536,848.60 100% 1,536,848.60

breakdown/hall/pda/3(c)/5/12

Page 60: Interim Payment No 14-Final

6/1

BREAKDOWN FOR PERPUSTAKAAN

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Substructure

Work Below Lowest Floor Finish L/S 1,131,814.00 100% 0% 100% 1,131,814.00

2 Superstructure

Frame L/S 98,407.00 100% 0% 100% 98,407.00

Upper Floors L/S 90,000.00 100% 0% 100% 90,000.00

Roof L/S 70,000.00 100% 0% 100% 70,000.00

Stairs L/S 30,000.00 100% 0% 100% 30,000.00

External Walls L/S 60,000.00 100% 0% 100% 60,000.00

Windows & External Doors L/S 40,000.00 100% 0% 100% 40,000.00

Internal Walls & Partitions L/S 48,407.00 100% 0% 100% 48,407.00

Internal Doors L/S 20,000.00 100% 0% 100% 20,000.00

3 Finishes

Internal Wall Finishes L/S 141,238.50 100% 0% 100% 141,238.50

Internal Floor Finishes L/S 91,238.50 100% 0% 100% 91,238.50

Internal Ceiling Finishes L/S 70,000.00 100% 0% 100% 70,000.00

External Finishes L/S 90,000.00 100% 0% 100% 90,000.00

Roof Finishes L/S 20,000.00 100% 0% 100% 20,000.00

Total Carried to FINAL SUMMARY 2,001,105.00 100% 2,001,105.00

breakdown/library/pda/3(d)/6/12

Page 61: Interim Payment No 14-Final

7/1

BREAKDOWN FOR KANTIN

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Substructure

Work Below Lowest Floor Finish L/S 233,628.00 100% 0% 100% 233,628.00

2 Superstructure

Frame L/S 95,000.00 100% 0% 100% 95,000.00

Upper Floors L/S - 0.00

Roof L/S 20,000.00 100% 0% 100% 20,000.00

Stairs L/S - 0.00

External Walls L/S 45,000.00 100% 0% 100% 45,000.00

Windows & External Doors L/S 9,500.00 100% 0% 100% 9,500.00

Internal Walls & Partitions L/S 10,000.00 100% 0% 100% 10,000.00

Internal Doors L/S 7,500.00 100% 0% 100% 7,500.00

3 Finishes

Internal Wall Finishes L/S 30,000.00 100% 0% 100% 30,000.00

Internal Floor Finishes L/S 10,000.00 100% 0% 100% 10,000.00

Internal Ceiling Finishes L/S 15,000.00 100% 0% 100% 15,000.00

External Finishes L/S 33,000.00 100% 0% 100% 33,000.00

Roof Finishes L/S 25,000.00 100% 0% 100% 25,000.00

Total Carried to FINAL SUMMARY 533,628.00 100% 533,628.00

breakdown/canteen/pda/3(e)/7/12

Page 62: Interim Payment No 14-Final

8/1

BREAKDOWN FOR SURAU

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Substructure

Work Below Lowest Floor Finish L/S 24,056.00 100% 0% 100% 24,056.00

2 Superstructure

Frame L/S 7,000.00 100% 0% 100% 7,000.00

Upper Floors L/S - 0.00

Roof L/S 6,000.00 100% 0% 100% 6,000.00

Stairs L/S - 0.00

External Walls L/S 5,700.00 100% 0% 100% 5,700.00

Windows & External Doors L/S 4,900.00 100% 0% 100% 4,900.00

Internal Walls & Partitions L/S 4,500.00 100% 0% 100% 4,500.00

Internal Doors L/S 3,700.00 100% 0% 100% 3,700.00

3 Finishes

Internal Wall Finishes L/S 5,000.00 100% 0% 100% 5,000.00

Internal Floor Finishes L/S 4,700.00 100% 0% 100% 4,700.00

Internal Ceiling Finishes L/S 4,000.00 100% 0% 100% 4,000.00

External Finishes L/S 5,500.00 100% 0% 100% 5,500.00

Roof Finishes L/S 4,000.00 100% 0% 100% 4,000.00

Total Carried to FINAL SUMMARY 79,056.00 100% 79,056.00

breakdown/surau/pda/3(f)/8/12

Page 63: Interim Payment No 14-Final

9/1

BREAKDOWN FOR STADIUM

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Substructure

Work Below Lowest Floor Finish L/S 7,757,520.00 100% 0% 100% 7,757,520.00

2 Superstructure

Frame L/S 7,457,520.00 100% 0% 100% 7,457,520.00

Upper Floors L/S 3,671,680.00 100% 0% 100% 3,671,680.00

Roof L/S 2,271,680.00 100% 0% 100% 2,271,680.00

Stairs L/S 1,671,680.00 100% 0% 100% 1,671,680.00

External Walls L/S 2,421,680.00 100% 0% 100% 2,421,680.00

Windows & External Doors L/S 871,680.00 100% 0% 100% 871,680.00

Internal Walls & Partitions L/S 71,680.00 100% 0% 100% 71,680.00

Internal Doors L/S 471,680.00 100% 0% 100% 471,680.00

3 Finishes

Internal Wall Finishes L/S 1,520,466.76 100% 0% 100% 1,520,466.76

Internal Floor Finishes L/S 2,020,466.76 100% 0% 100% 2,020,466.76

Internal Ceiling Finishes L/S 1,020,466.76 100% 0% 100% 1,020,466.76

External Finishes L/S 3,620,466.76 100% 0% 100% 3,620,466.76

Roof Finishes L/S 970,466.76 100% 0% 100% 970,466.76

Total Carried to FINAL SUMMARY 35,819,133.80 100% 35,819,133.80

breakdown/stadium/pda/3(g)/9/12

Page 64: Interim Payment No 14-Final

10/1

BREAKDOWN FOR KOLAM RENANG

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Substructure

Work Below Lowest Floor Finish L/S 19,501.00 100% 0% 100% 19,501.00

2 Superstructure

Frame L/S 7,476.00 100% 0% 100% 7,476.00

Upper Floors L/S - 0.00

Roof L/S 6,976.00 100% 0% 100% 6,976.00

Stairs L/S - 0.00

External Walls L/S 6,520.00 100% 0% 100% 6,520.00

Windows & External Doors L/S 6,520.00 100% 0% 100% 6,520.00

Internal Walls & Partitions L/S 9,020.00 100% 0% 100% 9,020.00

Internal Doors L/S 6,020.00 100% 0% 100% 6,020.00

3 Finishes

Internal Wall Finishes L/S 7,520.00 100% 0% 100% 7,520.00

Internal Floor Finishes L/S 9,020.00 100% 0% 100% 9,020.00

Internal Ceiling Finishes L/S - 0.00

External Finishes L/S 6,520.00 100% 0% 100% 6,520.00

Roof Finishes L/S 6,020.00 100% 0% 100% 6,020.00

Total Carried to FINAL SUMMARY 91,113.00 100% 91,113.00

breakdown/pool/pda/3(h)/10/12

Page 65: Interim Payment No 14-Final

11/1

BREAKDOWN FOR M&E SERVICES

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 Services

Sanitary Appliances L/S 179,624.09 100% 0% 100% 179,624.09

Plumbing Installation L/S 359,624.09 100% 0% 100% 359,624.09

Refuse Disposal L/S 288,624.09 100% 0% 100% 288,624.09

Air-cond & Ventilation System L/S 3,656,167.80 100% 0% 100% 3,656,167.80

Electrical Installation L/S 4,071,315.69 100% 0% 100% 4,071,315.69

Fire Protection Installation L/S 2,000,000.00 100% 0% 100% 2,000,000.00

Lift & Conveyor Installation L/S 721,000.00 100% 0% 100% 721,000.00

Communication Installation L/S 1,571,315.69 100% 0% 100% 1,571,315.69

Special Installation L/S 3,470,935.05 100% 0% 100% 3,470,935.05

Builder's Profit & Attendance on Services L/S 345,354.40 100% 0% 100% 345,354.40

L/S 400,000.00 100% 0% 100% 400,000.00

Total Carried to FINAL SUMMARY 17,063,960.90 100% 17,063,960.90

breakdown/services/pda/4(a-c)/11/12

Builder's Work in Connection With Services

Page 66: Interim Payment No 14-Final

12/1

BREAKDOWN FOR EXTERNAL WORKS

WORK DONE % ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)

prev current to date

1 External Works

Earthworks L/S 9,885,079.85 100% 0% 100% 9,885,079.85

Road Works and Carparks L/S 2,542,257.50 100% 0% 100% 2,542,257.50

Drainage Works L/S 1,527,253.50 100% 0% 100% 1,527,253.50

Sewerage Works including septic tank L/S 2,288,506.50 100% 0% 100% 2,288,506.50

Water Recticulation Works L/S 3,811,012.50 100% 0% 100% 3,811,012.50

Fencing and Gates L/S 1,781,004.50 100% 0% 100% 1,781,004.50

Landscape L/S 3,033,802.85 100% 0% 100% 3,033,802.85

Built-in Furniture L/S 20,304,827.50 100% 0% 100% 20,304,827.50

Total Carried to FINAL SUMMARY 45,173,744.70 100% 45,173,744.70

breakdown/ext.works/pda/5(a-h)/12/12

Page 67: Interim Payment No 14-Final

MATERIALS ON SITE

KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM

Interim Payment No : 06 Valuation Date : 7-Februari-11

Page 68: Interim Payment No 14-Final

KERAJAAN MALAYSIA

JABATAN KERJA RAYA

PERAKUAN BAYARAN INTERIM NO 6

TAJUK KERJA : KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR.

NAMA DAN ALAMAT : AP&F CONSTRUCTIONKONTRAKTOR No 258 , Jalan Macalister,

41200 Klang,Selangor Darul Ehsan.

NO. KONTRAK : 2722/2010-2011-1/01

PERAKUAN PERUNDING

Arkitek - Architects Quotes Jurukur Bahan - V-Build Properties Sdn. Bhd.

___________________________________________ _____________________________________________

COP & TANDATANGAN PERUNDING COP & TANDATANGAN PERUNDING

Tarikh: Tarikh:

Sivil & Struktur - SCIA Engineer Mekanikal & Elektrikal - Asia M&E

Consultants Sdn. Bhd.

___________________________________________ _____________________________________________

COP & TANDATANGAN PERUNDING COP & TANDATANGAN PERUNDING

Tarikh: Tarikh:

Kami dengan ini mengesahkan bahawa semua kerja - kerja yang telah disiapkan oleh kontraktor seperti yang dinyatakan di dalam Perakuan Bayaran Interim ini adalah mengikut dan mematuhi kehendak Kontrak, Lukisan dan Spesifikasi.

Page 69: Interim Payment No 14-Final

document.xls Attachment A

Page 69 of 70

UNIVERSITI MALAYSIA PAHANG (UMP) - FASA 1B

KONTRAKTOR UTAMA: PEMBINAAN JAYA ZIRA SDN. BHD.SUMMARY OF CERTIFIED PROGRESS CLAIM.

Item Particulars

A B C = B - A D E = D - B

Remarks

1 Progress Claim No. 1 4,681,570.00 25-Nov-09 4,681,570.00 26-Nov-09 1 4,213,413.00 9-Dec-09 13 Retention RM 468,157.00

2 Progress Claim No. 2 6,971,912.94 23-Dec-09 6,971,912.94 24-Dec-09 1 6,274,721.65 18-Jan-10 25 Retention RM 679,191.29

3 Progress Claim No. 3 2,848,745.39 25-Jan-10 2,848,745.39 29-Jan-10 4 2,563,870.85 19-Feb-10 21 Retention RM 284,874.54

4 Progress Claim No. 4 3,232,576.46 20-Feb-10 3,232,576.46 25-Feb-10 4 2,909,318.82 24-Mar-10 29 Retention RM 323,257.64

5 Progress Claim No. 5 2,713,741.56 25-Mar-10 2,713,741.56 30-Mar-09 1 2,442,367.40 8-Apr-10 8 Retention RM 271,374.16

6 Progress Claim No. 6 2,349,001.10 29-Apr-10 2,349,001.10 30-Apr-10 1 2,114,100.99 17-May-10 17 Retention RM 234,900.11

.

Total Amount: 22,797,547.45 - 22,797,547.45 - - 20,517,792.71 - -

Claim Amount (RM)

Certified Amount (RM)

Paid Amount (RM) Valuation

DateClaim

Certified Date

No of Days To Certified

Claims

Payments Received

Date

No of Days For

Payments Made

Page 70: Interim Payment No 14-Final

document.xls Attachment A

Page 70 of 70

UNIVERSITI MALAYSIA PAHANG (UMP) - FASA 1B

KONTRAKTOR UTAMA: PEMBINAAN JAYA ZIRA SDN. BHD.SUMMARY OF CERTIFIED PROGRESS CLAIM.

Item Particulars

A B C = B - A D E = D - B

Remarks Claim Amount (RM)

Certified Amount (RM)

Paid Amount (RM) Valuation

DateClaim

Certified Date

No of Days To Certified

Claims

Payments Received

Date

No of Days For

Payments Made