  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    1/8

    8

    MODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADIMODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADI 2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKAN2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKANDENGAN MODUL HARD TANKDENGAN MODUL HARD TANK

    3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN(DURASI : 9 JAM)(DURASI : 9 JAM)

    4. INSTALASI SPAR (TOWING)4. INSTALASI SPAR (TOWING)

    OPERASI UPENDING (MEMBALIKKAN POSISI)OPERASI UPENDING (MEMBAL IKKAN POSISI) 5. INSTALASI DECK5. INSTALASI DECK

  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    2/8

    9

    SPAR PLATFORM YANG TELAH BEROPERASISPAR PLATFORM YANG TELAH BEROPERASI InstalasiInstalasi An jung an Anjungan MinyakMinyak LepasLepas PantaiPantai

    • Link ke file WMN (?)

    transportasi sparbuoy

    FPSO(Floating Production, Storage and Offloading)

    PRINSIP STABILITASPRINSIP STABILITAS

    • Pada benda terapung bekerja gaya berat dangaya apung – Keseimbangan Statik F i = 0

    • 3 Kondisi Keseimbang Statik: – Stabil: Selalu kembali ke posisi awal

    – Netral: Dapat berhenti pada segala posisi

    – Tidak stabil: Tidak kembali ke posisi awal

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    • Berat (massa) benda terapung = berat(massa) zat cair yang dipindahkan

    • Volume bagian benda yang tenggelambergantung dari rapat massa zat cair ( ρ)ρ air laut = 1025 kg/m3

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    • Gaya gravitasi:G = m ship g =W ship

    • Gaya apung (buoyancy):B = ρ water Vdisplaced

    • Berat Benda Terapung:Wship = water Vdisplaced

  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    3/8

    10

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    • Titik Pusat Gravitasi (G)

    Titik kerja gaya gravitasi (berat) struktur terapung.Disebut juga Titik BeratGaya ke arah bawah.

    • Titik Pusat Gaya Apung (B)Titik kerja gaya apung dari bagian struktur di bawah air. Gaya ke arah atas

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    • Titik Pusat Gravity (G):

    – Bergantung dari distribusi massa kapal – G tetap (tidak berubah posisi) bila kapal bergerak

    • Titik Pusat Gaya Apung (B): – B dapat berubah posisi bila kapal bergerak

    Bergantung dari luas & bentuk bidang basah

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    G

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    MOMENMOMEN

    • Arah putaran momenbergantung pada posisi Gdan B, dua macammoment: – Righting moment :

    mengembalikan kapal padaposisi semula (tegak)

    – Upsetting moment :cenderung menyebabkankapal terbalik

    • Besar righting moment : – RM = W * GZ (kg-m)

    – GZ: lengan momen (m)

    TITIKTITIK METACENTERMETACENTER

    • Definisi:Titik perpotonganantara garis kerjagaya apung bilakapal dimiringkandengan sudut kecil

  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    4/8

    11

    • Tinggi Metacenter

    (GM) – Jarak dari Titik

    Gravitasi ke TitikMetacenter

    GZ = GM*sin φ

    TITIKTITIK METACENTERMETACENTER TITIKTITIK METACENTERMETACENTER

    • Hubungan G dan M – G dibawah M: kapal stabil – G = M: kapal netral – G diatas M: kapal tidak stabil

    STABILSTABIL TIDAK STABILTIDAK STABIL

    T

    L

    BH

    ∀=

    =∀

    g

    H B L

    ρ W

    H

    T

    D ∀=

    =∀

    g

    H D

    ρ

    π

    W

    41 2

    Contoh Stabilitas Struktur Terapung

    Klik di Sini

    PIPA PENYALURPIPA PENYALUR

    BAWAH LAUTBAWAH LAUT

    (Subsea Pipeline)

  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    5/8

    12

    SUBSEA PIPELINEUBSEA PIPELINE

    PIPA PENYALUR BAWAH LAUTIPA PENYALUR BAWAH LAUT

    PENDAHULUANENDAHULUAN

    PERMINTAAN AKANMINYAK GAS BUMI

    YANG SEMAKINMENINGKATMEMBERIKANDAMPAKPERKEMBANGANYANG CUKUPSIGNIFIKAN PADAPROYEK-PROYEKKONSTRUKSI LEPASPANTAI

    PIPA BAWAH LAUTIPA BAWAH LAUT – SUBSEA PIPELINEUBSEA PIPELINE

    Next

    REKAYASA PIPA PENYALUREKAYASA PIPA PENYALUR

    SUBSEA PIPELINE ENGINEERINGUBSEA PIPELINE ENGINEERING

    Pipeline(Pipa Penyalur)

    Piping

    PENDAHULUANENDAHULUAN

    Pipaipa bawahawah lautaut

    Pipaipa di i daratarat

    REKAYASA PIPA BAWAH LAUT

    PotonganPotongan MelintangMelintang PipaPipa• Pipa• Selimut Anti Korosi

    – FBE – Adhesive – Polypropelene

    • Selimut Beton

    SUBSEA PIPELINE ENGINEERINGUBSEA PIPELINE ENGINEERING

    PEMILIHAN RUTE PIPAEMILIHAN RUTE PIPA

    Rute jalur pipa yang dipilih adalah:

    Teraman, termudah cara instalasinya, & terpendek jarakrutenya

  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    6/8

    13

    WALL THICKNESSALL THICKNESS

    KETEBALAN DINDING PIPA)KETEBALAN DINDING PIPA)

    ( )2i o

    t

    P P Dt SMYS k η − ⋅=

    ⋅ ⋅ ⋅

    SYARAT TEKANAN INTERNALYARAT TEKANAN INTERNAL

    ••DnVDnV 19811981

    •• ASME B31.4 & B31.8 ASME B31.4 & B 31.8

    S PD

    t ⋅

    =2

    y E S σ ⋅⋅= 72.0

    APLIKASI SELIMUT BETON

    SELIMUT BETONSELIMUT BETON Analisanalisa Bentanganentangan Bebasebas Pipaipa Free Span)Free Span)

    Free span dapat t erjadi sebagai konsekuensi dari pemasangan pipa didasar laut yang tidak rata, terjadi erosi dan scouring

    Analisanalisa Free Spanree Span

    KONTUR DASAR LAUTONTUR DASAR LAUT

    Analisanalisa Free Spanree Span

    Anal isa din amis (VIV, vor tex i ndu ced v ibr atio n)

    dinamisinamis

  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    7/8

    14

    ANalisaNalisa Free Spanree Span

    Vortex shedding frequencyVortex shedding frequency

    tot

    t v D

    V S f =

    dinamisinamis TerlihatTerlihat span yangspan yang menggantungmenggantung butuhbutuh supportsupport segerasegera

    REMEDIASI FREESPAN PADA PIPAEMEDIASI FREESPAN PADA PIPA

    Span yangSpan yang telahtelah diberidiberi support rock dumpingsupport rock dumping

    REMEDIASI FREESPAN PADA PIPAEMEDIASI FREESPAN PADA PIPA

    • PIPE LAYING - LAY BARGE METHOD (S-LAY & J-LAY) – Pengelasan pipa di atas Barge – High Cost (lay barge daily rate) – Open Sea (lokasi laut terbuka) – Laut Relatif Dalam

    • RENTIS – TOWING METHOD – Pengelasan pipa di darat ditarik ke laut – Relatif lebih murah dibanding cara konvensional – Cocok untuk lokasi tertutup (i.e di dalam dermaga)

    • REEL BARGE METHOD – Metode horisontal & vertikal

    METODE PEMASANGAN PIPA BAWAH LAUTETODE PEMASANGAN PIPA BAWAH LAUT

    INSTALASI PIPA BAWAH LAUT PIPELAYING)NSTALASI PIPA BAWAH LAUT PIPELAYING) METODE PIPE LAYING KONVENSIONAL)ETODE PIPE LAYING KONVENSIONAL)

    MODEL SODEL S -LAYAY

  • 8/20/2019 Instalasi Pipa Di Bawah Laut

    8/8

    MODEL SODEL S -LAYAY

    METODE PIPE LAYING KONVENSIONAL)ETODE PIPE LAYING KONVENSIONAL) KAPAL INSTALASI PIPA GENERASI PERTAMAAPAL INSTALASI PIPA GENERASI PERTAMA

    Next

    METODE INSTALASI LAYBARGE JETODE INSTALASI LAYBARGE J -LAY)AY)

    JJ --LAYLAY

    METODE INSTALASI REEL BARGEETODE INSTALASI REEL BARGE

    PREPRE --TRENCHINGTRENCHING

    – Penggalian Sebelum pipa di gelar – Kondisi tanah yang keras

    POST TRENCHING

    – Penggalian setelah pipa digelar – Kondisi tanah lunak

    METODE PENANAMAN PIPA BAWAH LAUTETODE PENANAMAN PIPA BAWAH LAUTPOST TRENCHING

    POST TRENCHINGOST TRENCHING