cadangan kerja-kerja konservasi bangunan rumah …

50
CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH NO. 69, BANDAR BAHARU LEPAT LABU, KUALA LUMPUR NO. KONTRAK: T/KPKKW/JWN/P0/05/2010 LAPORAN KONSERVASI BULANAN JANUARI 2010 (01HB JANUARI – 31HB JANUARI 2010) DISEDIAKAN UNTUK : JABATAN WARISAN NEGARA KEMENTERIAN PELANCONGAN, SENI DAN BUDAYA BANGUNAN SULTAN ABDUL SAMAD JALAN RAJA 50450 KUALA LUMPUR DISEDIAKAN OLEH : ARAS MAJU CONSTRUCTION BANDAR TASIK PERMAISURI 50450 KUALA LUMPUR Commented [jwn1]: Font Style = Arial + Bold + Huruf Besar Font Size = 20 Commented [jwn2]: Font Style = Arial + Bold + Huruf Besar Font Size = 16 Commented [jwn3]: Font Style = Arial + Bold + Huruf Besar Font Size = 12 Commented [jwn4]: 8.8cm x 12.6cm (Foto 3R) Commented [jwn5]: Font Style = Arial + Bold + Huruf Besar Font Size = 12 Commented [jwn6]: Font Style = Arial + Bold + Huruf Besar Font Size = 14 Commented [jwn7]: Font Style = Arial + Bold + Huruf Besar Font Size = 12 Commented [jwn8]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Upload: others

Post on 30-Oct-2021

18 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH NO. 69, BANDAR BAHARU

LEPAT LABU, KUALA LUMPUR NO. KONTRAK: T/KPKKW/JWN/P0/05/2010

LAPORAN KONSERVASI BULANAN

JANUARI 2010

(01HB JANUARI – 31HB JANUARI 2010)

DISEDIAKAN UNTUK :

JABATAN WARISAN NEGARA KEMENTERIAN PELANCONGAN, SENI DAN BUDAYA

BANGUNAN SULTAN ABDUL SAMAD JALAN RAJA

50450 KUALA LUMPUR

DISEDIAKAN OLEH :

ARAS MAJU CONSTRUCTION BANDAR TASIK PERMAISURI

50450 KUALA LUMPUR

Commented [jwn1]: Font Style = Arial + Bold + Huruf Besar Font Size = 20

Commented [jwn2]: Font Style = Arial + Bold + Huruf Besar Font Size = 16

Commented [jwn3]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [jwn4]: 8.8cm x 12.6cm (Foto 3R)

Commented [jwn5]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [jwn6]: Font Style = Arial + Bold + Huruf Besar Font Size = 14

Commented [jwn7]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [jwn8]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Page 2: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

ISI KANDUNGAN MUKA SURAT

1.0 Ringkasan Projek 1 - 5 2.0 Carta Organisasi 6 - 7 3.0 Kemajuan Program Kerja Keseluruhan 8

3.1 Jadual Kemajuan Kerja 9 - 10 3.2 Ringkasan Kemajuan Kerja 11 - 13

4.0 Bahan Binaan Di Tapak 14 - 15 5.0 Tatacara Kerja 16 - 17 6.0 Jadual Tenaga Kerja 18 - 19 7.0 Jadual Catatan Cuaca 20 - 21 8.0 Kemajuan Bayaran Interim 22 - 23 9.0 Semakan Surat 24

9.1 Senarai Semak Surat Menyurat Keluar 25 9.2 Senarai Semak Surat Menyurat Masuk 26

10.0 Dokumentasi Bergambar 27 - 35

10.1 Gambar Sebelum, Semasa Dan Selepas 10.2 Gambar Aktiviti Kerja Di Tapak

11.0 Pelan 36 - 37 12.0 Lampiran 38 - 48

Commented [jwn9]: Font Style = Arial + Bold + Huruf Besar Font Size = 16

Commented [jwn10]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 14

Page 3: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

No.

Butiran Catatan

1.0 Ringkasan Projek

Sila sertakan :-

Nama :

Alamat :

No. Tel :

1.1 Pemilik

1.2 Agensi Perlaksana

1.3 Arkitek

1.4 Juru Ukur Bahan

1.5 Jurutera Sivil dan Struktur

1.6 Jurutera Mekanikal dan Elektrikal

1.7 Kontraktor

1.8 Tarikh Milik Tapak

1.9 Tarikh Siap Kerja

1.10Jumlah Kontrak

1.11No. Kontrak

1.12Polisi Insurans

2.0

Carta Organisasi

Sila sertakan :- Nama : Jawatan : Alamat : No. Tel :

Gam. Pasport Terkini (Warna) :

2.1 Pengarah Projek

2.2 Penasihat/ Penyelidik/Konservator

2.3 Pengurus Projek

2.4 Arkitek

2.5 QS

2.6 C & S

2.7 M & E

2.8 Eksekutif Projek

2.9 Co-Ordinator Projek

2.10 Pentadbiran

2.11 Sub-Kontraktor

3.0

Kemajuan Program Kerja Keseluruhan

3.1 Jadual Kemajuan Kerja

I. Menggunakan kertas A3

II. Mempunyai muka surat

3.1.1 Perkara

3.1.2 Huraian

3.1.2.1 Persediaan Awal

3.1.2.2 Jumlah Kecil

3.1.2.3 Jumlah Keseluruhan

1

Commented [j11]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 12

Page 4: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

No.

Butiran Catatan

3.1.3 Kemajuan

3.1.3.1 Dirancang

3.1.3.2 Sebenar

3.1.4.2 Dirancang

3.1.4.3 Sebenar

3.1.4.4 Perbezaan

3.2 Ringkasan Kemajuan Kerja

3.2.1 Nombor

3.2.2 Perkara

3.2.3 Kerja Dirancang (%)

3.2.4 Kerja Terlaksana (%)

3.2.5 Beza Kerja Terlaksana & Dirancang

4.0 Bahan Binaan Di Tapak

4.1 Bilangan Nombor

4.2 Jenis Bahan

4.3 Kuantiti

5.0 Tatacara Kerja

5.1 Jenis Kerja

5.2 Keterangan Kerja

5.2.1 Komponen

5.2.2 Lokasi

6.0 Jadual Tenaga Kerja

6.1 Tarikh

6.2 Bilangan (Nombor)

6.3 Jenis Pekerjaan

6.4 Bilangan Mengikut Hari

7.0 Jadual Catatan Cuaca - Hendaklah dibuat mengikut bulan

8.0 Kemajuan Bayaran Interim

8.1 Tajuk

8.2 No. Kontrak

8.3 Harga

8.4 Bilangan

8.5 Tuntutan Bayaran No.

8.6 Tuntutan

8.6.1 Tarikh

8.6.2 Jumlah

8.7 Jumlah Pembayaran

8.7.1 Tarikh

8.7.2 Diperakui (RM)

8.7.3 Wang Tahanan

8.7.4 Diterima (RM)

8.7.5 Jumlah Diperakui

2

Commented [j12]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 12

Page 5: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

No.

Butiran Catatan

8.7.6 Peratus Siap Kerja Mengikut Bayaran (%)

8.7.7 Jumlah Wang Tahanan

8.7.8 Jumlah Penerimaan

9.0 Semakan Surat

9.1 Senarai Semak Surat Menyurat Keluar

9.1.1 Bilangan (Nombor)

9.1.2 Perkara

9.1.3 Rujukan Pejabat

9.1.4 Kepada

9.1.5 Tarikh

9.1.6 Tindakan

9.2 Senarai Semak Surat Menyurat Masuk

9.2.1 Bilangan (Nombor)

9.2.2 Perkara

9.2.3 Rujukan Pejabat

9.2.4 Daripada

9.2.5 Tarikh

9.2.6 Tindakan

10 Dokumentasi Bergambar

I. Sila sertakan gambar pada 4 tampak dan perspektif

II. Tarikh III. Sertakan kapsyen pada setiap gambar

Gambar mesti selari dengan kerja di tapak

IV. Sediakan key lokasi V. Tetapkan 5 lokasi gambar yang boleh

menggambarkan progress kerja

10.1 Gambar Sebelum Dan Semasa

10.2 Gambar Aktiviti Kerja Di Tapak

11 Pelan

12 Lampiran I. Architect Instruction II. Surat-surat analisis dan

III. Surat-menyurat daripada agensi pelaksana mahupun pemilik

IV. Teknikal dan dokumentasi

3

Commented [j13]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 12

Page 6: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

1.0 Ringkasan Projek

4

Commented [jwn14]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 7: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur _______________________________________________________________________

RINGKASAN PROJEK PEMILIK : Tuan Marban bin Tuan Londeh No. Tel : 03 21671234 Lot 888, Jalan Huru Hara No. Fax : 03 2167 2345 50000 Bandar Baru Lepat Labu Kuala Lumpur AGENSI PELAKSANA : Jabatan Warisan Negara No. Tel : 03 2167 5100 Tingkat 1, 2 dan 10, Menara Chulan No. Fax : 03 2171 6028 Jalan Conlay Off Jalan Raja Chulan 50450 Kuala Lumpur ARKITEK : Luncai Arkitek Sdn. Sdn. No. Tel : 03 2166 4567 55A, Jalan Lebuh Mat Labuh No. Fax : 03 2166 5678 Bukit Uda dan Dara

43200 Cheras Kuala Lumpur JURUUKUR BAHAN : Marban Konsultant No. Tel : 03 2166 1567 Jalan 1/108B, Jalan Haru Biru No. Fax : 03 2166 2567 50001 Bandar Cinta Berahi Kuala Lumpur JURUUKUR SIVIL DAN `: Faizal Naem Constultant No. Tel : 03 2188 6998 STRUKTUR 133A, Jalan 10/42A No. Fax : 03 2188 6969 Taman Sejahtera 50400 Segambut Kuala Lumpur JURUTERA MEKANIKAL : Jiwa Merdeka Consultant Sdn. Bhd. No. Tel : 03 2178 6688 DAN ELEKTRIKAL Lot 99B, Jalan Bulan Gerhana No. Fax : 03 2178 8989 50002 Bandar Baru Batu Belah Kuala Lumpur KONTRAKTOR : Sigaibuluh Construction No. Tel : 03 2160 4577 Lot 7377, Jalan Marban 1 No. Fax : 03 2160 7577 50450 Bandar Baru Buluh Minyak

Kuala lumpur TARIKH MILIK TAPAK : TEMPOH KONTRAK : TARIKH SIAP KERJA : JUMLAH KONTRAK : NO. KONTRAK : POLISI INSURAN :

5

Commented [jwn15]: Font Style = Arial + Bold + Huruf Besar dan Underline Font Size = 12

Commented [jwn16]: Font Style = Arial + Bold + Huruf Besar Font Size = 10

Page 8: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

2.0 Carta Organisasi

6

Commented [jwn17]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 9: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

CARTA ORGANISASI

SIGAIBULUH CONSTRUCTION

Gambar Pasport

PENGARAH PROJEK

Nama : No. Tel :

Gambar Pasport

PENGURUS PROJEK

Nama :

No. Tel :

Gambar Pasport

EKSEKUTIF PROJEK

Nama :

No. Tel :

Co-Ordinator Projek

Nama :

No. Tel :

Gambar Pasport

Gambar Pasport

PENTADBIRAN

Nama : No. Tel :

Gambar Pasport

ARKITEK

Nama : No. Tel :

Gambar Pasport

C & S

Nama : No. Tel :

QS

Nama : No. Tel :

Gambar Pasport

Gambar Pasport

M & E

Nama : No. Tel :

SUB- KONTRAKTOR

Nama : No. Tel :

Gambar Pasport

Gambar Pasport

PENASIHAT

Nama : No. Tel :

Commented [jwn18]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [jwn19]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Page 10: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

3.0 Kemajuan Program Kerja Keseluruhan

3.1 Jadual Kemajuan Kerja

3.2 Ringkasan Kemajuan Kerja

8

Commented [j20]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Commented [j21]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 20

Page 11: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

3.1 Jadual Kemajuan Kerja

9

Commented [jwn22]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 12: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

3.1 JADUAL KEMAJUAN KERJA

Item

Description

Progress

Overall

Planned

Actual

Weightage

%

Planned

Actual

%

Diff. %

A 1.

PRELIMINARIES Contract Requirement & Management

Sub Total

B 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

Pembersihan Keseluruhan Tapak dan Bangunan Kerja-kerja Meroboh Baikpulih Struktur Banguan Lantai, kaki Lima dan Longkang Kerja-kerja Meroboh Dinding Pintu dan tingkap Tangga Luar dan Dalam Bangunan Bumbung Siling Tiang dan Alas Tiang Mekanikal dan Elektrikal Infrastruktur dan Pagar Rawatan Anai-Anai Mengikis dan Mengecat Jalan Masuk dan Parking Kerja-kerja Arkitektual

Sub Total

TOTAL

KERJA DIRANCANG : KERJA TERLARANG : BEZA PERLAKSANA KERJA ( % ) : BEZA PERLAKSANA KERJA ( HARI ) : DISAHKAN OLEH : …………………………….. (PERUNDING)

10

Commented [j23]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [j24]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Page 13: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

3.2 Ringkasan Kemajuan Kerja

11

Commented [jwn25]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 14: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

3.2 RINGKASAN KEMAJUAN KERJA

NO.

PERKARA

KERJA

DIRANCANG (%)

KERJA

TERLAKSANA (%)

BEZA KERJA TERLAKSANA

DAN DIRANCANG (%)

NAMA PROJEK…..

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

KERJA-KERJA AWALAN PENYELIDIKAN DAN DOKUMENTASI MENANGGAL DAN MEROBOH DINDING SILING BUMBUNG LANTAI PINTU TINGKAP ANTI-TERMITE KERJA LUAR BANGUNAN WANG PERUNTUKAN SEMENTARA

TARIKH BERAKHIR : KERJ DIRANCANG : BEZA TERLAKSANA : BEZA PERLAKSANA KERJA ( % ) : BEZA PERLAKSANA KERJA ( HARI ) : DISAHKAN OLEH : ……………………………. (PENYELIA PROJEK)

12

Commented [jwn26]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [j27]: Font Style = Arial + Huruf Besar Font Size = 12

Commented [j28]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Page 15: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

13

Page 16: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

4.0 Bahan Binaan Di Tapak

14

Commented [j29]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 17: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

4.0 BAHAN BINAAN DI TAPAK

BIL.

JENIS BAHAN

KUANTITI

15

Commented [j30]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [j31]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Page 18: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

5.0 Tatacara Kerja

16

Commented [jwn32]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 19: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

5.0 TATACARA KERJA JENIS KERJA : KETERANGAN KERJA :- Kompenan : Seluruh permukaan kayu sediada Lokasi : 1. Tebar Layar ( Bahagian kanan dan kiri ) TATACARA KERJA : 1. 2. 3.

17

Commented [jwn33]: Font Style = Arial + Bold + Huruf besar Font Size = 12

Commented [jwn34]: Font Style = Arial + Bold + Huruf besar Font Size = 12

Page 20: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

6.0 Jadual Tenaga Kerja

18

Commented [jwn35]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 21: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur

6.0 JADUAL TENAGA KERJA TARIKH : HINGGA

NO.

JENIS

PEKERJAAN

BILANGAN MENGIKUT HARI

1 2 3 4 5 6 7 8 9 10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

1 Pegawai Projek

2 Eksekutif Projek

3 Pentadbiran

4 Ejen Tapak

5 Tukang Kayu

6 Pekerja Am

7 Mandur 8 Tukang

Paip

9 Tukang Cat

10 Tukang Kikir

11 Tukang Lepa

12 Arkeologi 13 Kawalan

Serangga

JUMLAH

19

Commented [jwn36]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Page 22: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

7.0 Jadual Catatan Cuaca

20

Commented [jwn37]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 23: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

REKOD CUACA BULANAN DI TAPAK PROJEK

NAMA PROJEK : Kerja-kerja Baikpulih Tugu Negara Kuching, Kuching, Sarawak KONTRAKTOR : Kelapa Laut Enterprise, Jalan Mata Kucing, 12300 Sarikei, Sarawak BULAN : Januari 2009

PETUNJUK:

Cuaca Baik

Hujan JUMLAH JAM YANG TERGENDALA AKIBAT HUJAN: Dari 1 Jan 2009 hingga 30 Jan 2009 jam.

21

1 Jan 2009 2 Jan 2009 3 Jan 2009 5 Jan 2009 5 Jan 2009

6 Jan 2009 7 Jan 2009 8 Jan 2009 9 Jan 2009 10 Jan 2009

11 Jan 2009 12 Jan 2009 13 Jan 2009 14 Jan 2009 15 Jan 2009

16 Jan 2009 17 Jan 2009 18 Jan 2009 19 Jan 2009

24 Jan 2009 23 Jan 2009 22 Jan 2009 21 Jan 2009

20 Jan 2009

25 Jan 2009

27 Jan 2009 26 Jan 2009 30 Jan 2009 29 Jan 2009 28 Jan 2009

Commented [j38]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Page 24: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

8.0 Kemajuan Bayaran Interim

22

Commented [jwn39]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 25: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

8.0 KEMAJUAN BAYARAN INTERIM

TAJUK : No. KONTRAK : HARGA :

BIL. TUNTUTAN

BAYARAN NO.

TUNTUTAN TUNTUTAN

TARIKH JUMLAH TARIKH DIPERAKUI

(RM) WANG

TAHANAN DITERIMA

(RM)

JUMLAH DIPERAKUI

PERATUS SIAP KERJA MENGIKUT BAYARAN (%)

JUMLAH WANG TAHANAN

JUMLAH PENERIMAAN

23

Commented [j40]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [j41]: Font Style = Arial + Bold + Huruf Besar Font Size = 10

Page 26: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

9. 0 Semakan Surat

9.1 Senarai Semak Surat Menyurat Keluar

9.2 Senarai Semak Surat Menyurat Masuk

24

Commented [j42]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Commented [j43]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 20

Page 27: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

9.0 LAMPIRAN

9.1 SENARAI SEMAK SURAT MENYURAT (KELUAR)

Bil.

Perkara

Rujukan Pejabat

Kepada

Tarikh

Tindakan

1.

2.

3.

4.

5.

6.

7.

25

Commented [jwn44]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [j45]: Font Style = Arial + Bold + Huruf Besar Font Size = 10

Page 28: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

9.0 LAMPIRAN 9.2 SENARAI SEMAK SURAT MENYURAT (MASUK)

Bil.

Perkara

Rujukan Pejabat

Kepada

Tarikh

Tindakan

1.

2.

3.

4.

5.

6.

7.

26

Commented [jwn46]: Font Style = Arial + Bold + Huruf Besar Font Size = 12

Commented [j47]: Font Style = Arial + Bold + Huruf Besar Font Size = 10

Page 29: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

10.0 Dokumentasi Bergambar

10.1 Gambar Sebelum, Semasa dan Selepas

10.2 Gambar Aktiviti Kerja Di Tapak

27

Commented [j48]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Commented [j49]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 20

Page 30: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

28

Page 31: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

29

Page 32: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

30

Page 33: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

31

Page 34: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

32

Page 35: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

33

Page 36: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

34

Page 37: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

35

Page 38: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

11. Pelan

36

Commented [jwn50]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 39: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

37

Page 40: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur

12. Lampiran

38

Commented [jwn51]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24

Page 41: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

39

Page 42: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

40

Page 43: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

41

Page 44: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

42

Page 45: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

43

Page 46: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

44

Page 47: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

45

Page 48: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

46

Page 49: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

47

Page 50: CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH …

DIARI TAPAK BINA

NAMA SYARIKAT (Alamat Lengkap/No. Tel/Fax)

No. Dokumen:

No. Rujukan:

Nama Projek: No. Tender:

Hari: Tarikh:

PERKERJA DI TAPAK:

JAWATAN BIL. MASA

JAWATAN BIL. MASA

AM PM AM PM

Pengarah Projek Operator Mesin Pengorek

Pengurus Projek Operator Jengkaut

Jurutera Tapak Operator Jentolak

Pegawai Keselamatan Operator Mesin Penggiling

Penyelia Tapak Pemandu Lori

Juru Ukur Tanah Tukang Cerucuk

Juru Ukur Bahan Penarik Rantai

Arkitek Tukang Cat

Jurutera Mekanikal/Elektrikal Tukang Atap

Kerani Am Tukang Jubin

Tukang Lepa Tukang Kayu/ Tukanng Ukir

Tukang Paip Tukang Batu

Juruelektrik Tukang Besi

Jurukimpal Tukang Bata

Tukang Kaca Tukang Kayu

Mekanik Am Pengawal Keselamatan

Operator Kren Pekerja Am

JUMLAH PEKERJA DI

TAPAK:

JUMLAH PEKERJA DI

TAPAK:

PERALATAN ATAU MESIN DI TAPAK:

PERALATAN BIL. MASA

PERALATAN BIL. MASA

AM PM AM PM

Kren Menara Mesin Pembentuk Besi

Mesin Pengorek Mesin Pemotong/Pencanai

Temdem Roller Generator

Jengkaut Penyembur Air

Jentolak Kompresor

Trak Penyendat Pam Air

Trak Pengangkut DLL

Mesin Penggaul Konkrit DLL

JUMLAH PERALATAN DI

TAPAK:

JUMLAH PERALATAN DI

TAPAK:

AKTIVITI/ KERJA DI TAPAK

BIL. AKTIVITI YANG DIJALANKAN

ULASAN: DARIPADA: PEGAWAI PENGUASA/PEGAWAI PROJEK/PERUNDING

DISEDIAKAN OLEH:

(COP T/TANGAN

KONTRAKTOR)

DISAHKAN OLEH:

(COP T/TANGAN

PERUNDING)

DISEMAK OLEH:

(T/TANGAN PEGAWAI

PENGUSA/WAKIL)

CARTA CUACA:

HUJAN PANAS

48