ARDHMILLENIA SDN. BHD. ARDHMILLENIA SDN. BHD. (531422 (531422-D) D) ARDHMILLENIA SDN. BHD. ARDHMILLENIA SDN. BHD. (531422 (531422-D) D) Lot 27-3A, Block C, Jalan Tasik Prima 5/1, Prima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. Tel. : 603 – 8065 5731 Fax: 603 8065 1731 (www.ardhmillenia.com)

Upload: lamtram

Post on 06-Feb-2018

277 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

ARDHMILLENIA SDN. BHD.ARDHMILLENIA SDN. BHD.(531422(531422--D)D)

ARDHMILLENIA SDN. BHD.ARDHMILLENIA SDN. BHD.(531422(531422--D)D)

Lot 27-3A, Block C, Jalan Tasik Prima 5/1, Prima Biz Hub, Taman Tasik Prima,47150 Puchong, Selangor.

Tel. : 603 – 8065 5731 Fax: 603 – 8065 1731 (www.ardhmillenia.com)

Page 2: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Contents

Our Company

Our Services

Our Expertise

Our Experiences

Environmental Quality Monitoring

Our Clients

Our Team

Our Organization

Certificates

Our Company

Our Services

Our Expertise

Our Experiences

Environmental Quality Monitoring

Our Clients

Our Team

Our Organization

Certificates

Page i

Page 3: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our CompanyARDHMILLENIA is one of the local leading environmentalconsultancy firms offering independent environmentalmanagement services.

We have been involved in extensive project managementin relation to natural resources management, infrastructureactivities, urban development projects and industries inMalaysia.

Our consultants have hands-on experiences andexpertise in managing the environmental challenges facedby industries.

ARDHMILLENIA is capable of supervising and arrangingquality assured baseline monitoring programmes and theanalysis of environmental samples. We also have therequired data interpretation skills for the accuratequantification of environmental impacts.

ARDHMILLENIA is well acquainted with Malaysianenvironmental legislation, regulation, guidelines andprocedures. Due to the perfect combination of expertsand high skilled personnel, the company is widely knownfor its well-versed knowledge in aspects that it discussedand for its very high quality of output for each project that ithas undertook. Thus, due to this and some localexperiences, the company has very good and closeprofessional relationship with the Department ofEnvironment (DOE).

ARDHMILLENIA has successfully assisted various keyinfrastructure projects in the Federal GovernmentAdministrative Centre, PUTRAJAYA.

Presently, we are being engaged by the SNUI JV for theMonitoring, Auditing & Supervision of the PahangSelangor Raw Water Transfer (PSRWT) Project.

ARDHMILLENIA is one of the local leading environmentalconsultancy firms offering independent environmentalmanagement services.

We have been involved in extensive project managementin relation to natural resources management, infrastructureactivities, urban development projects and industries inMalaysia.

Our consultants have hands-on experiences andexpertise in managing the environmental challenges facedby industries.

ARDHMILLENIA is capable of supervising and arrangingquality assured baseline monitoring programmes and theanalysis of environmental samples. We also have therequired data interpretation skills for the accuratequantification of environmental impacts.

ARDHMILLENIA is well acquainted with Malaysianenvironmental legislation, regulation, guidelines andprocedures. Due to the perfect combination of expertsand high skilled personnel, the company is widely knownfor its well-versed knowledge in aspects that it discussedand for its very high quality of output for each project that ithas undertook. Thus, due to this and some localexperiences, the company has very good and closeprofessional relationship with the Department ofEnvironment (DOE).

ARDHMILLENIA has successfully assisted various keyinfrastructure projects in the Federal GovernmentAdministrative Centre, PUTRAJAYA.

Presently, we are being engaged by the SNUI JV for theMonitoring, Auditing & Supervision of the PahangSelangor Raw Water Transfer (PSRWT) Project.

Page 1

Page 4: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Background Company Name : ARDHMILLENIA SDN. BHD.

Registration No. : 531422-D

Registration Date: 21st May 2002

Place Of Registration : Kuala Lumpur

Operation Address : Lot 27-3A, Block C, Jalan Tasik Prima 5/1,Prima Biz Hub, Taman Tasik Prima,47150 Puchong, Selangor.

Registration : New DOE EIA Consultant (C0139), NREBSarawak, ENSEARCH and MOF (Pengauditan & Pensijilan –Kod 221709).

Hand phone : Ahmad Sani h/p : 012 – 316 2610

Mohd Nizam h/p : 019 – 373 1165

E-mail : [email protected]

Website : www.ardhmillenia.com

Authorized Capital: RM 100,000.00

Paid-up Capital : RM 100,000.00

Bank : Malayan Banking Berhad, Bandar Puteri, Puchong

Account No. : 562889000360

Nature Of Business: Environmental Consultancy

Ownership : 100% Bumiputra

Company Name : ARDHMILLENIA SDN. BHD.

Registration No. : 531422-D

Registration Date: 21st May 2002

Place Of Registration : Kuala Lumpur

Operation Address : Lot 27-3A, Block C, Jalan Tasik Prima 5/1,Prima Biz Hub, Taman Tasik Prima,47150 Puchong, Selangor.

Registration : New DOE EIA Consultant (C0139), NREBSarawak, ENSEARCH and MOF (Pengauditan & Pensijilan –Kod 221709).

Hand phone : Ahmad Sani h/p : 012 – 316 2610

Mohd Nizam h/p : 019 – 373 1165

E-mail : [email protected]

Website : www.ardhmillenia.com

Authorized Capital: RM 100,000.00

Paid-up Capital : RM 100,000.00

Bank : Malayan Banking Berhad, Bandar Puteri, Puchong

Account No. : 562889000360

Nature Of Business: Environmental Consultancy

Ownership : 100% Bumiputra

Page 2

Page 5: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our ServicesARDHMILLENIA is a practical and cost-effective source formeeting the environmental challenges faced by industries.

You can depend on our immediate response in actions andpunctuality in our deliverables and services.

We have pools of multi-disciplines academic background which willpromote and advance the science and profession of all aspects ofenvironmental practices. We offer solutions for your environmentalproblems.

ARDHMILLENIA will strive for continual improvement.

ARDHMILLENIA will recommend the Best Management Practice(BMP) available currently.

The following address and contact numbers are always available foryour further clarification and explanation:

ARDHMILLENIA SDN. BHD. (531422 D),Lot 27-3A, Block C, Jalan Tasik Prima 5/1,

Prima Biz Hub, Taman Tasik Prima,47150 Puchong, Selangor.

Tel. : 603 – 8065 5731 Fax: 603 – 8065 1731Sani h/p : 012 – 316 2610 Nizam h/p : 019 – 373 1165

E-mail: [email protected]

Website : www.ardhmillenia.com

ARDHMILLENIA is a practical and cost-effective source formeeting the environmental challenges faced by industries.

You can depend on our immediate response in actions andpunctuality in our deliverables and services.

We have pools of multi-disciplines academic background which willpromote and advance the science and profession of all aspects ofenvironmental practices. We offer solutions for your environmentalproblems.

ARDHMILLENIA will strive for continual improvement.

ARDHMILLENIA will recommend the Best Management Practice(BMP) available currently.

The following address and contact numbers are always available foryour further clarification and explanation:

ARDHMILLENIA SDN. BHD. (531422 D),Lot 27-3A, Block C, Jalan Tasik Prima 5/1,

Prima Biz Hub, Taman Tasik Prima,47150 Puchong, Selangor.

Tel. : 603 – 8065 5731 Fax: 603 – 8065 1731Sani h/p : 012 – 316 2610 Nizam h/p : 019 – 373 1165

E-mail: [email protected]

Website : www.ardhmillenia.com

Page 3

Page 6: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our ExpertisePreliminary Environmental Impact Assessment (PEIA) ;

Environmental Management Plan (EMP) ;

Environmental Management Report (EMR) ;

Environmental Management Compliance Plan (EMCP) ;

Environmental Monitoring and Auditing Report (EMAR) ;

Environmental Site Assessment (ESA) ;

Site Suitability Study (SSS)/Preliminary Site Assessment ;

Project Closure Plan (PCP) ;

ISO 14000 Compliance Auditing ;

Environmental Officer Attachment ;

Environmental Surveillance (ES) ;

Environmental Technical Report ;

Preliminary Site Assessment ;

Erosion and Sedimentation Control Plan (ESCP) ;

Universal Soil Loss Equation (USLE) ;

Environmental Baseline Studies ;

Thermal Air Dispersion Modelling ;

Noise Modelling ;

Quantitative Risk Assessment ;

Emergency Response Plan (ERP) ;

Telemetry Online Monitoring ; and

GIS Application Development.

Preliminary Environmental Impact Assessment (PEIA) ;

Environmental Management Plan (EMP) ;

Environmental Management Report (EMR) ;

Environmental Management Compliance Plan (EMCP) ;

Environmental Monitoring and Auditing Report (EMAR) ;

Environmental Site Assessment (ESA) ;

Site Suitability Study (SSS)/Preliminary Site Assessment ;

Project Closure Plan (PCP) ;

ISO 14000 Compliance Auditing ;

Environmental Officer Attachment ;

Environmental Surveillance (ES) ;

Environmental Technical Report ;

Preliminary Site Assessment ;

Erosion and Sedimentation Control Plan (ESCP) ;

Universal Soil Loss Equation (USLE) ;

Environmental Baseline Studies ;

Thermal Air Dispersion Modelling ;

Noise Modelling ;

Quantitative Risk Assessment ;

Emergency Response Plan (ERP) ;

Telemetry Online Monitoring ; and

GIS Application Development.

Page 4

Page 7: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences:EIA Consultancy

No Projects Year

1. Environmental Screening Study of the Proposed Northport-Westport Link for HSS Integrated S/B. The study consisted of acomprehensive data review, site inspection and reconnaissance surveys of selected key locations of potentially significantenvironmental concern along the proposed alignment of the link.Responsisbility: Identifying sensitive fishery areas within the project vicinity, liaising with government departments & assistingin report production.

Jul. 1996

2. Ballast Water Risk Assessment desktop study on all main ports in Malaysia and Thailand for Queensland Port Authority. Todetermine the risk associated with foreign marine species (eg. unicellular organisms such as toxic dinoflagellates & cholerabacteria) can be introduced through ship’s ballast water.

Nov.1996

3. Phase I Environmental Site Assessment & Limited Phase II at Sriram Industrial Enterprise Limited (SIEL) Hyderabad, India forEmerson Electric Co.

Dec.1996

4. Preliminary Environmental Review for a proposed large alumina refinery in Bintulu, Sarawak for Comalco Aluminiam Limited. Jan.1997

5. Phase I Environmental Site Assessment at National Starch & Chemical (Thailand) Limited, Province of Kalasin, Thailand forUnilever.

Mar.1997

6. Env. Screening Study for a Proposed Newsprint Mill for Malaysian Newsprint Industries S/B. The study focused on sites in N.Sembilan, Pahang & Selangor with emphasis on gas, water, nearest port and existing roads for transportation. Responsibility:Identifying sensitive fishery areas downstream & reviewing existing water quality status of rivers nearby to the screen sites.

Jan.1998

7. Preliminary Site Assessment for Proposed Silver Bird Factory in Nilai, N. Sembilan & Technical Environmental Report on theExisting Silver Bird Factory at K. Lumpur for Silver Bird Group Bhd.

Aug.2001

8. Preliminary EIA for the Development of 200 acres Shrimp Mariculture (Tiger Prawn) at the Sg Dedap, Mukim Bukit Meriam,Kuala Muda, Kedah for MAX AQUATIC S/B.

May2004

Preliminary EIA for the Development of 200 acres Shrimp Mariculture (Tiger Prawn) at the Sg Dedap, Mukim Bukit Meriam,Kuala Muda, Kedah for MAX AQUATIC S/B.

May2004

9. Preliminary EIA for the “Cadangan Membina Dan Menyiapkan Kem Batalion 4 Pasukan Gerakan Am Semenyih Dan SebuahBalai Polis Di Atas P.T. 3821, Mukim Semenyih, Daerah Hulu Langat, Selangor” for PEMBINAAN BLT S/B.

Feb 2006

10 EIA for Crushing Plant for PROPOSED DEVELOPMENT ON LOTS 202, 236, 403, 516, 711, 712, 713, 714, 715, 761, 765,980, 981, 982 & 983, Mukim 11, Daerah Barat Daya, Penang for SOUTHDOWNS CORPORATION SDN BHD.

Sept.2006

11 EIA for Proposed Scheduled Waste Off-Site Facility at Kawasan Perindustrian Kundang, Rawang, Selangor for IOTPETROLEUM SDN BHD.

July 2007

12 PEIA for “Cadangan Merekabentuk, Membina & Menyiapkan Kem Ke 93 Depoh Pusat Peluru Di Mempaga, Bentong, Pahanguntuk Kementerian Pertahanan M’sia” for TARGET RESOURCES S/B.

Dec.2007

13 PEIA for the Proposed Housing & Commercial Development at Bukit Serai, Mukim Rawang, Daerah Gombak, S’gor forPERUNDING ARZEC.

Oct.2008

14 Cdg. Merekabentuk, Membina & Menyiapkan Projek Akuakultur Estet Udang Laut Dikawasan Tmn Kekal PengeluaranMakanan–Zon Industri Akuakultur, Kg. Tg. Batu, Nenasi, Pekan, Pahang.

Oct.2008

15 PEIA for the Proposed Sand Dredging Off the Coast of Pulau Ketam, S’ngor for JAY TEE HYDRO. Dec 08

16 PEIA for the Proposed 1,000Ha Integrated Shrimp Aquaculture Park (iSHARP) in Setiu, Terengganu For BLUE ARCHIPELAGOBERHAD.

Jan2009

17 PEIA for the Proposed Sand Dredging Off the Coast of Tg. Piandang, Perak for JAY TEE HYDRO. Mar 09

18 PEIA for “PERMOHONAN MENDAPATKAN LESEN MELOMBONG PASIR DI BAWAH SEKSYEN 4, AKTA PELANTARBENUA 1966 (DISEMAK 1972) DI KAWASAN LEPAS PANTAI NEGERI SELANGOR.”

APRIL2009

19 Laporan Penilaian Kesan Alam Sekitar (EIA) untuk “Permohonan Kebenaran Merancang Bagi Cadangan Pelan SusunaturMengikut Kanun Tanah Negara Untuk : A) Penyerahan Dan Pemberimilikan Semula Di Bawah Seksyen 204 D DaripadaPertanian Kepada Perdagangan Hotel / Resort; C) Pecah Sempadan PT 1462 HS (D) 140 (Lot Baru 2047); PEKAN TELUKDATAI, DAERAH LANGKAWI, KEDAH DARUL AMAN “for the Teluk Datai Resorts Sdn. Bhd ”.

January2011

Page 5

Page 8: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences: ContinueEIA Consultancy

No Projects Year

20. Cadangan Pindaan Kepada Kebenaran Merancang Yang Telah Diluluskan No.JPB/PM2986(LB[JPB/KM/2988/A]Bertarikh 8-3-2001 Di Atas Lot 1530 – 1538, 1598 – 1802, 1804, 1807, Hingga Lot 1821(Lot Lama 202, 236, 403, 516, 711, 712, 713, 714, 715, 761, 765, 980, 981, 982, & 983) Mukim 11, Daerah Barat Daya,Jalan Teluk Kumbar, Pulau Pinang. Untuk Tetuan TPPT SDN BHD.

June2011

21. Cadangan Projek Pembangunan Kompleks Akuakultur Selinsing di atas Tanah Seluas 300 Ekar di Wilayah Kalumpang, MukimSelinsing, Daerah Kerian, Negeri Perak Darul Ridzuan untuk Tetuan HANNAN CORPORATION SDN BHD.

July 2011

Environmental Management Plan (EMP)No Projects Year

1 Precinct 9, Putrajaya for KEKAL KAYANGAN SDN. BHD. Oct. 1997

2 Granite Processing Factory in Negeri Sembilan for PRIME GRANITE (M) S/B. Jan. 1998

3 Precinct 11, Putrajaya for PEREMBA MALAYSIA SDN. BHD. Apr. 1998

4 Prime Minister’s Residence, Putrajaya for SETIA PUTRAJAYA SDN. BHD. Jun 1998

5 “Cadangan Pembinaan 4 Blok Rumah Pangsa Kos Rendah Di Atas P.T. No. 1312 dan 1313, Seluas 12,57Ekar, Precinct 9, Putrajaya” for WAWASAN BERSATU S/B.

Apr. 1999

6 Proposed Design, Construction & Completion of Wastewater Treatment Plant (STP2 Module 1) At Precinct5, Putrajaya (Phase 1b-Package WW9) for PEREMBA CONSTRUCTION S/B.

Nov. 2000Proposed Design, Construction & Completion of Wastewater Treatment Plant (STP2 Module 1) At Precinct5, Putrajaya (Phase 1b-Package WW9) for PEREMBA CONSTRUCTION S/B.

7 “Projek Menaiktaraf Jln B20 dan Jln-Jln Di Bandar Baru Nilai Sbg Eastern Access ke KLIA (Pkg 1b – 1) forKONSORTIUM BINA PURI – PANZANA (NILAI) S/B

Dec. 2000

8 Proposed Development Of Landed Parcels (18R1, 18R3, 18R5 & 18R7) for PUTRAJAYA HOMES S/B. Apr. 2003

9 “Projek Menaiktaraf Jalan Duta, Jalan Kuching & Jalan2Hubungan Lain, Kuala Lumpur” for AHMAD ZAKIRESOURCES BHD.

Jun 2003

10 Cdn. Pembangunan Balai Bomba & Penyelamat, DiAtas PT9030, P. 14, Putrajaya for VISAGE ARCHITECT Aug 2003

11 Cdn. Pembangunan Taman Botani, Di Sebhg. Lot PT. 111, P. 1, Putrajaya for WAWASAN BERSATU S/B Sept 2003

12 Cadangan Pembangunan Kediaman Di Atas PT 17765HS) Dan Termasuk Tanah Kerajaan Seluas 3.618Ekar, Mukim Labu, N. Sembilan for GOODROAD ENGINEERING S/B.

Sept 2004

13 Pembangunan Di Atas Penempatan Orang Asli Air Kuning, Seluas 273 Ekar, Bukit Cerakah, Seksyen U11,Bandaraya Shah Alam, Selangor for LEBAR DAUN DEVELOPMENT S/B.

Apr. 2005

14 Upgrading of Federal Route 6 from Balik Pulau ke Bayan Lepas, Penang, Package 2B from Teluk Kumbarto Pekan Genting for BULKERS CORPORATION.

May 2005

15 Construction of T-Beam Design Bridge Across Sg Muda Between Kedah & Seb. Perai Utara for LEJADIINFRA S/B

May 2005

16 Precinct 8 Phase 2 Development for PUTRAJAYA HOMES SDN. BHD. Dec 2005

17 Proposed “Pembangunan Tapak Kekal Pameran Pertanian Negara, Di atas Lot 2008 danLot 1858, MukimDengkil, Daerah Sepang, Selangor “ for UEM CONSTRUCTION SDN BHD.

Jan 2006

18 Projek Naiktaraf Jalan Jitra Melalui Kodiang, Kedah ke Arau, Perlis (PAKEJ 2 – CH.4+500.000 toCH.17+500.000) for AHMAD ZAKI SDN. BHD.

Feb 2006

19 Projek Tapak Pelupusan Pulau Burung Level III, Seberang Perai Selatan for IDAMAN BERSIH S/B. Feb 2006

20 Proposed Housing & Commercial Development, Lots 202, 236, 403, 516, 71 - 715, 761, 765, 980- 983,Mukim 11, Daerah BaratDaya P.PINANG for SOUTHDOWN CORPORATION S/B

May 2006

21 Upgrading of Maktab Pegawai Polis DiRaja M’sia, Kuala Kubu Bharu, Selangor for PEMBINAAN BLT S/B August 06

Page 6

Page 9: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences: ContinueEnvironmental Management Plan (EMP)

No Projects Year

22 “Membina dan Menyiapkan Bangunan Tambahan Maktab PDRM Kuala Kubu Bharu, Selangor : Pakej 1& 2 ”for JAYA HARICON S/B and HAKIKAT ENGINEERING S/B.

April/May2007

23 Malaysian Agro-Exposition Park Serdang (MAEPS),Phase 2, Serdang, Selangor for UEM CONSTRUCTION May 2007

24 “Cadangan Merekabentuk, Membina & Menyiapkan Kem Ke 93 Depoh Pusat Peluru Di Mempaga, Bentong,Pahang untuk Kem. Pertahanan M’sia” for TARGET RESOURCES S/B.

Jun 2008

25 “Projek Menaiktaraf Laluan Persekutuan 149 Dari Simpang Empat ke Persimpangan Tol Bukit Tambun,Seberang Perai Selatan, Pulau Pinang” for UMPAN JAYA S/B.

Jan 2009

26 Detailed EMP for Pahang-Selangor Raw Water Transfer Project, Lot 1-1, Water Transfer Tunnel andRelated Works for SHIMIZU-NISHIMITSU-UEMB-IJM JOINT VENTURE.

February2009

27 Membina Jalan Baru dari Kg.Seri Gemas Ke Pekan Palong Melalui Kg. Londoh, Daerah Tampin, NegeriSembilan for KMUDAIE ENGINEERING S/B.

Mar 2009

28 ”Projek Naiktaraf Jalan Sg. Timun (N116) Rembau, N. Sembilan” for M.Y.A CONSTRUCTION S/B Jun 2009

29 Kerja Pembaikan Tanah Runtuh Dan Pengukuhan Cerun Di Taman Bukit Mewah, Bukit Antarabangsa, UluKelang, Selangor (Pakej 1 - 4) for MTD CONSTRUCTION S/B.

Jun 2009

30 Membina & Menyiapkan Sebuah Jeti Di Pulau Bidong, Kuala Terengganu, Terengganu for SHIMBina S/B. July 2009

31 “Menaiktaraf Jalan Dari Seremban Ke Kuala Pilah, Negeri Sembilan (Dari Simpang Senawang – Bukit Putus)(Ch: 0.00 – Ch: 2100.00)”

Jan2010

32 Proposed B4000 Housing Development At Kampung Mentiri, Mengkubau, Negara Brunei Darussalam forUEM Builders Berhad.

May 2010

33 “Kerja-Kerja Membuang Kelodak Dan Mendalamkan Sg. Simpang Kanan Serta Kerja-Kerja Lain YangBerkaitan Di Daerah Batu Pahat, Johor (Ch 11700.00 Until Ch 29700.00)” for Maha Persada Sdn Bhd

May2010

34 “Projek Kompleks Kerja Raya 2(Kkr2), Jalan Sultan Salahuddin, Kuala Lumpur” for Ahmad Zaki Sdn Bhd Oct2010

35 The Proposed Construction And Completion Of One Hundred (100) Units Of Houses, Five (5) Units OfManagement Quarters, Amenities, Fifty Two (52) Animal Production Units (Apu), Fodder Plot And OtherAssociated Facilities And Infrastructure Works For The Development Of Besut Setiu Agropolitan (Bsa)Project, Panchur Bederu, Setiu, Terengganu Darul Iman For Pembinaan Spk Sdn Bhd (Pspksb).

35 The Proposed Construction And Completion Of One Hundred (100) Units Of Houses, Five (5) Units OfManagement Quarters, Amenities, Fifty Two (52) Animal Production Units (Apu), Fodder Plot And OtherAssociated Facilities And Infrastructure Works For The Development Of Besut Setiu Agropolitan (Bsa)Project, Panchur Bederu, Setiu, Terengganu Darul Iman For Pembinaan Spk Sdn Bhd (Pspksb).

Oct2010

36 Proposed Alor Pongsu Interchange At Km 181 North South Expressway for T & T Konsult Sdn Bhd Jan2011

37 “Projek Membina Jalan Baru Dari Kg Chennah Ke Kg Esok Jelebu, Negeri Sembilan” for MYA ConstructionSdn Bhd

Jan2011

38 Proposed Housing and Commercial Development On Lots 202, 236, 403, 516, 711, 712, 713, 714, 715,761, 765, 980, 981, 982, 983, Mukim 11, Daerah Barat Daya, Pulau Pinang .

April 2010

39 Pilot Scheme to Build 4000 Houses Within 48 Months for The National Housing Scheme or BruneiDarussalam.

April 2010

40 Cadangan Projek Menaik taraf Jalan Sungai Timun (N116), Daerah Rembau, Negeri Sembilan DarulKhusus

June2009

41 Projek Menaik taraf Jalan Lenggeng-Berang (N30) Seremban, Negeri Sembilan Darul Khusus April 2010

42 Cadangan Pembangunan Taman Perindustrian Makanan Halal Pasir Mas Fasal Di atas Lot PT 9942 DiGual Tambun, Mukim Apam, Daerah Gual Periok, Jajahan Pasir Mas, Kelantan

Nov2010

43 Lot 1-3A: Semantan Intake, Pumping Station & Related Work July2010

44 Lot 1-3B: Semantan Pipeline & Related Works Jan2011

45 Pahang Selangor Raw Water Transfer Project : Lot 1-2, Kelau Dam and Related Works April 2011

Page 7

Page 10: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences:Environmental Management Report (EMR)

No Projects Year1. CADANGAN PEMBANGUNAN 316 UNIT RUMAH TERES 2 & 2 ½ TINGKAT PRECINCT 9, PUTRAJAYA AUG 992. CADANGAN PEMBANGUNAN 684 UNIT PANGSAPURI, PARCEL 8 , PRECINCT 9, PUTRAJAYA” JULY 003. CADANGAN PEMBANGUNAN DI PRESINT 9, PUTRAJAYA FOR SETIA PUTRAJAYA YG. MENGANDUNGI: I) 263

UNIT RUMAH TERES 2 TINGKAT II) 56 UNIT RUMAH BERKEMBAR III) 6 UNIT KEDAI/PEJABAT 3 TINGKATJULY 01

4. CADANGAN PEMBANGUNAN 3 BLOK PANGSAPURI, 344 UNIT, PRECINCT 9, PUTRAJAYA. JULY 015. CADANGAN PEMBANGUNAN 7 BLOK KONDOMINIUM PARCEL C2 (480 UNIT) P.9, PUTRAJAYA. JULY 016. PROPOSED DESIGN, CONSTRUCTION & COMPLETION OF OFFICE BUILDING AND EXTERNAL WORKS FOR

GOVERNMENT BUILDING AT LOT 2G5 & 2G6, PRECINCT 2, PUTRAJAYA FOR SUNWAY CONSTRUCTION.AUG 01

7 CADANGAN MEMBINA DAN MENYIAPKAN PEMBANGUNAN SEKOLAH RENDAH (FASA 2) & KERJA-KERJABERKAITAN DI ATAS P.T. 2388, PRESINT 16, PUTRAJAYA FOR AFCA SDN BHD.

SEPT 01

8. CADANGAN MEMBINA DAN MENYIAPKAN PEMBANGUNAN SEKOLAH RENDAH DAN KERJA-KERJA BERKAITANDENGANNYA DI ATAS PT. 7359, PRESINT 8, PUTRAJAYA FOR ATSA ARCHITECTS S/B.

SEPT 01

9. CDN PEMBANGUNAN PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN, PUTRAJAYA – PRECINCT 18 – JALAN,PERPARITAN, UTILITI DAN LANDSKAP FOR PUTRAJAYA HOLDINGS SDN BHD.

MAY 02

10 CDN PENDIRIAN BANGUNAN DARI : 12 UNIT KEDAI PEJABAT DI ATAS P.T. 1454 – 1464 KEPADA SEBUAHKOMPLEKS KEDAI PEJABAT 4 TINGKAT, P. 9, PUTRAJAYA, FOR SETIA PUTRAJAYA”

JUNE 02

11 CADANGAN PEMBANGUNAN 146 UNIT RUMAH BERANGKAI 2 TINGKAT DI PRESINT 16, PUTRAJAYA JUNE 0212 PERMOHONAN KEBENARAN MERANCANG BAGI SPINE ROAD & LOCAL RD. P. 15, PUTRAJAYA. JULY 0213 CADANGAN MEMBINA 8 BLOK PANGSAPURI KERAJAAN, PARCEL 18R12, PRESINT 18, PUTRAJAYA. AUG. 0213 CADANGAN MEMBINA 8 BLOK PANGSAPURI KERAJAAN, PARCEL 18R12, PRESINT 18, PUTRAJAYA. AUG. 0214 CADANGAN MEMBINA 4 BLOK PANGSAPURI KERAJAAN, PARCEL 18R13, PRESINT 18, PUTRAJAYA. SEPT 0215 CADANGAN MEMBINA 3 BLOK PANGSAPURI KERAJAAN, PARCEL 18R10, PRESINT 18, PUTRAJAYA. OCT. 0216 CADANGAN MEMBINA 9 BLOK PANGSAPURI KERAJAAN, PARCEL 18R11, PRESINT 18, PUTRAJAYA. NOV. 0217 CADANGAN MEMBINA 6 BLOK PANGSAPURI KERAJAAN, PARCEL 18R8, PRESINT 18, PUTRAJAYA. NOV. 0218 CADANGAN MEMBINA 2 BLOK PANGSAPURI KERAJAAN, PARCEL 18R9, PRESINT 18, PUTRAJAYA. DEC. 0219 CADANGAN MEMBINA 22 UNIT RUMAH BERKEMBAR 2-TKT, ZON 10B, PRESINT 11, PUTRAJAYA. JAN. 0320 CADANGAN MEMBINA 4 BLOK PANGSAPURI KERAJAAN, PARCEL 18R4, PRESINT 18, PUTRAJAYA. FEB. 0321 CADANGAN MEMBINA 50 UNIT RUMAH TERES 2-TKT, ZON 9A, PRESINT 11, PUTRAJAYA. MAR. 0322 CADANGAN PEMBANGUNAN JALAN, PERPARITAN, UTILITI & LANDSKAP PRESINT 16, PUTRAJAYA. MAY 0323 CADANGAN MEMBINA PERUMAHAN KERAJAAN, PARCEL 18R3, P. 18, PUTRAJAYA. JULY 0324 CADANGAN PEMBANGUNAN PERUMAHAN KERAJAAN PARCEL 18R7, PRESINT 18, PUTRAJAYA. JULY 0325 CADANGAN PEMBANGUNAN TMN. BOTANI DI ATAS SEBHG. LOT PT. 111, PRESINT 1, PUTRAJAYA.. SEPT 0326 CADANGAN PEMBANGUNAN 100 UNIT PERUMAHAN KERAJAAN ZON 13B FASA 3 P11, PUTRAJAYA. NOV 0327 CDN. PEMBANGUNAN 206 UNIT SEMI-D UNTUK KERAJAAN ZON 9B & 9D, FASA 3 P11, PUTRAJAYA. NOV 0328 CADANGAN PEMBANGUNAN 514 UNIT APARTMENT KERAJAAN ZON 12C FASA 3 P. 11, PUTRAJAYA. DEC 0329 CADANGAN PEMBANGUNAN PERUMAHAN AWAM PARCEL 18R5, PRESINT 18, PUTRAJAYA. JAN 0430 CDN. PEMBANGUNAN PANGSAPURI KERAJAAN PARCEL 5R1, 5R3, 5R4 & 5R6, P. 5, PUTRAJAYA. MAR 0431 CADANGAN PEMBINAAN SEBATANG MONOPOLE BERBENTUK POKOK SETINGGI 150 KAKI & PEMASANGAN

PERALATAN TELEKOMUNIKASI SELULAR, PRECINT 6, PUTRAJAYA.APRIL 04

32 CDN. PEMBANGUNAN 1 BLOK 3 TKT MENGANDUNGI 12 UNIT KEDAI PEJABAT ZON 9C, P. 11, PUTRAJAYA. MAY 0433 CADANGAN PEMBANGUNAN KEMUDAHAN ‘PARK & RIDE’ DI ATAS SEBAHAGIAN P.T. 114, P. 13, PUTRAJAYA. JULY 04

Page 8

Page 11: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences: ContinueEnvironmental Management Report (EMR)

No Projects Year34 CDN. PEMBANGUNAN 94 UNIT PERUMAHAN AWAM, PARCEL 18R1, P.18, PUTRAJAYA. AUG 0435 CDN. MEMBINA WET MIX CONCRETE BATCHING PLANT LOT 5R2, P.5, PUTRAJAYA. OCT 0436 CDN. MEMBINA & MENYIAPKAN 3 TINGKAT PUSAT AUTOMOBIL DAN 2 ARAS BAWAH TANAH DI ATAS

PT 4708 DAN KERJA2 BERKAITAN DI PRESINT 11, PUTRAJAYAJUN 05

37 CDN. PEMBANGUNAN MENARA PEJABAT KERAJAAN LOT 4G6 & 4G11, P. 4, PUTRAJAYA. JUN 0538 GOVERNMENT OFFICE BUILDING & EXTERNAL WORKS AT 4G8 - 411, P. 4, PUTRAJAYA. JUN 0539 490 UNIT RUMAH PANGSAPURI TERMASUK SEBUAH PIAZZA/TEMPAT LETAK KERETA 2 TKT., SURAU

DAN DEWAN SERBAGUNA, PARCEL 15-12A, P. 15, PUTRAJAYA.JUN 05

40 8 BLOK APARTMEN (PARCEL 15-12B) –810 UNIT, SEBUAH SURAU DAN DEWAN SERBAGUNA,LETAKKERETA BERTINGKAT DI ATAS PLOT NO. 9850, P. 15.

JUN 05

41 303 UNIT RUMAH TERES 2 TINGKAT SELUAS 32.1 EKAR, P.15, PUTRAJAYA. JUN 0542 PANGSAPURI KERAJAAN MENGANDUNGI :-I. 5 BLOK PANGSAPURI (379 UNIT) II. DEWAN SERBAGUNA

III. 2 SUB BESMEN IV. HENTIAN BAS & TEKSI, 6R8, P. 6, PUTRAJAYA.JULY 05

43 DEVELOPMENT OF OFFICE BUILDING ON LOT 5G2, PRECINCT 5, PUTRAJAYA. SEPT 0544 PEMBANGUNAN 4 BLOK KEDAI PEJABAT 3 & 4 TKT (26’ X 85’) ZON 5, P. 11, PUTRAJAYA. JAN 0645 PERUMAHAN KERAJAAN DI ATAS PLOT 5R10, 9.755 EKAR, PRESINT 5, PUTRAJAYA . APR 0646 CDN. PEMBANGUNAN 8 UNIT KEDAI/PEJABAT 3-4 TKT, PLOT 9294, P 15, PUTRAJAYA. MAY 06

47 SEBUAH PEJABAT JUALAN DAN RUMAH CONTOH UNTUK PROJEK PANGSAPURI KOS SEDERHANARENDAH DI ATAS LOT PT4287 ZON 8C PRECINCT 11 FASA 2, PUTRAJAYA

MAY 06

4848 43 UNIT RUMAH SESEBUAH (JENIS E), FASA 15-3 DI ATAS PLOT 9517 HINGGA 9522, 9543 HINGGA 9547DAN 9774 HINGGA 9805 SELUAS 7.89 EKAR, P. 15.

JUN 06

49 316 UNIT RUMAH BERKEMBAR 2 TINGKAT SELUAS 52.39 EKAR, P.15, PUTRAJAYA. JUN 0650 CDN. PEMBANGUNAN 3 BLOK PANGSAPURI KERAJAAN MENGANDUNGI 362 UNIT KEDIAMAN BESERTA

3 ARAS LETAK KERETA (LOT 5R7), P. 5, PUTRAJAYA.JUN 06

51 CADANGAN PEMBANGUNAN 200 UNIT RUMAH BERKEMBAR 2 TINGKAT SELUAS 37.96 EKAR DI ATASSEBAHAGIAN PT 1 & PT 50, PRESINT 15, PUTRAJAYA..

JUN 06

52 PEMBANGUNAN 21 UNIT RUMAH SESEBUAH (JENIS E), FASA 15-6 DAN 15-7, 8.94 EKAR DAN 45 UNITRUMAH SESEBUAH (JENIS D), FASA 15-11, 16.47 EKAR, P. 15, PUTRAJAYA.

JULY 06

53 PEMBANGUNAN 226 UNIT (ZON 12E) DAN 250 UNIT (ZON 12F), PANGSAPURI KOS SEDERHANA DI ATASPT6924 DAN PT6925, PRESINT 11, PUTRAJAYA.

JULY 06

54 PEMBANGUNAN 130 UNIT RUMAH KEMBAR 2 TKT, 18.445 EKAR, P. 15, PUTRAJAYA. AUG 06

55 CADANGAN PEMBANGUNAN 452 UNIT RUMAH TERES 2 TINGKAT, P. 15, PUTRAJAYA. AUG 06

56 PEMBANGUNAN KEDIAMAN 76 UNIT RUMAH TERES 2 & 21/2 TKT 5R8 & 40 UNIT RUMAH TERES 2 & 21/2TKT 5R9, PRESINT 5, PUTRAJAYA.

AUG 06

57 PEMBANGUNAN BANGUNAN PENCAWANG MASUK UTAMA (132/33/11KV) DAN PONDOK PENGAWALLOT PT 7529, P. 2, PUTRAJAYA UNTUK TENAGA NASIONAL BERHAD”.

FEB 07

58 PENDIRIAN BANGUNAN BAGI GEREJA KATOLIK (5V7), PRESINT 5, PUTRAJAYA UNTUK TETUANTITULAR ROMAN CATHOLIC ARCHBISHOP OF KUALA LUMPUR

FEB 07

59 CANAL DESILTING AT PRECINCT 18, CORE ISLAND, PUTRAJAYA. AUG 07

60 PENDIRIAN BANGUNAN KOMERSIAL KEDAI & SHOWROOM 3-4 TINGKAT DENGAN 1 ARAS BESMENDAN KEDAI PEJABAT 3 TINGKAT(24’x 75’) DI ATAS PLOT P8C1 (CANTUMAN PLOT 8C1,8C2,TAMANPENGHUBUNG DAN REZAB PARIT) P.8 (FASA 2), PUTRAJAYA.

AUG 07

Page 9

Page 12: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

No Projects Year61 EXCESS EARTH TRANSPORT FROM BOULEVARD SQUARE DEV. LOT 3C6, P. 3, TO PRECINCT 19,

PUTRAJAYA FOR AWANGSABINA S/B.JUNE 2008

62 CDN. PEMBANGUNAN PEJABAT-KOMMERSIL 10 TINGKAT BESERTA 3 TKT. BASEMEN, DI ATAS PLOT 2C10 (PT7551), PRESINT 2, WILAYAH PERSEKUTUAN PUTRAJAYA” FOR PUTRAJAYA HOLDINGS S/B

AUG 2008

63 “CDN. PEMBANGUNAN 119 UNIT APARTMENT DAN KEMUDAHAN2 AWAM YANG MENGANDUNGI: BLOK A1 (8 UNIT/3TINGKAT) ; BLOK A2 (8 UNIT/3 TKT) ; BLOK A3 (8 UNIT/3 TKT) ; BLOK A4 (8 UNIT/3 TKT) ; BLOK B1 (44 UNIT/ 10 TKT) ;BLOK B2 (43 UNIT/10 TKT) DI ATAS PT NO. 9849, SELUAS 4.72 EKAR, P. 15, PUTRAJAYA FOR SETIA PUTRAJAYADEVELOPMENT S/B.

AUG 2008

64 CADANGAN MEMBINA DAN MENYIAPKAN KOMPLEKS SEKOLAH MENGANDUNGI SEBUAH SEKOLAH MENENGAHKEBANGSAAN DAN SEBUAH SEKOLAH KEBANGSAAN DI ATAS PLOT 12953 DAN PLOT 12956, PRESINT 5, WILAYAHPERSEKUTUAN PUTRAJAYA UNTUK KEMENTERIAN PELAJARAN M’SIA.

SEPT.2008

65 CDN. MEMBINA DAN MENYIAPKAN BANGUNAN PEJABAT DAN PERDAGANGAN DI ATAS PT 7546 (LOT 2C5), PRESINT2, PUTRAJAYA” FOR PUTRAJAYA HOLDINGS S/B

MAY 2009

66 “CDN. PEMBANGUNAN KOMPLEKS KERAJAAN FASA 1 MENGANDUNGI 1 BLOK PEJABAT 13 TKT, 1 BLOK PEJABAT 11TKT, 3 BLOK PEJABAT 8 TKT, 2 BLOK PEJABAT 6 TKT, 1 AUDITORIUM 4 TKT, ARAS PIAZZA 1 TKT, ARAS LALUAN DANTEMPAT LETAK KERETA 1 TKT, ARAS BASEMEN 2 TKT, DAN JEJAMBAT DARI PARCEL F KE STESEN LRT DIATASPARCEL F, PRESINT 1, PUTRAJAYA” FOR PUTRAJAYA HOLDINGS S/B.

MAY 2009

67 “CDN. PEMBANGUNAN 858 UNIT 6 BLOK PANGSAPURI - PARCEL 15-13, P. 15, PUTRAJAYA” FOR SETIA PUTRAJAYADEVELOPMENT S/B.

MAY 2009

68 CDN. MEREKABENTUK, MEMBINA, MENYIAPKAN & MENTAULIAH LOJI RAWATAN KUMBAHAN ENAPCEMARBERPUSAT “SEWAGE TREATMENT PLANT” STP 2 – MODULE 2 DI PRESINT 5, PUTRAJAYA” FOR SYARIKATPERMODALAN KEBANGSAAN (SPK) BERHAD.

JUNE 2009

69 PERMOHONAN KEBENARAN MERANCANG BAGI PENDIRIAN BANGUNAN UNTUK CADANGAN MEMBINA DANMENYIAPKAN SEBUAH SEKOLAH KEBANGSAAAN 18 BILIK DARJAH DAN LAIN-LAIN KKEMUDAHAN DI ATAS PLOT12138 (17KA4) DAN DI ATAS SEBAHAGIAN PLOT 12137 (17KA4), PRESINT 17, WILAYAH PERSEKUTUAN PUTRAJAYAUNTUK TETUAN KEMENTERIAN PELAJARAN MALAYSIA.

MARCH2010

Our Experiences: ContinueEnvironmental Management Report (EMR)

PERMOHONAN KEBENARAN MERANCANG BAGI PENDIRIAN BANGUNAN UNTUK CADANGAN MEMBINA DANMENYIAPKAN SEBUAH SEKOLAH KEBANGSAAAN 18 BILIK DARJAH DAN LAIN-LAIN KKEMUDAHAN DI ATAS PLOT12138 (17KA4) DAN DI ATAS SEBAHAGIAN PLOT 12137 (17KA4), PRESINT 17, WILAYAH PERSEKUTUAN PUTRAJAYAUNTUK TETUAN KEMENTERIAN PELAJARAN MALAYSIA.

MARCH2010

70 PERMOHONAN KELULUSAN MERANCANG BAGI PENDIRIAN BANGUNAN UNTUK CADANGAN PEMBANGUNANPERUMAHAN AWAM YANG MENGANDUNGI 38 UNIT RUMAH BERKEMBAR 2 TINGKAT (12 UNIT JENIS A DAN 16 UNITJENIS B) DI ATAS LOT PT 5827-PT 5864, ZON 9B, FASA 2, PRESINT 11, PUTRAJAYA UNTUK TETUAN PUTRAJAYAHOMES SDN BHD

JULY2010

71 CADANGAN PEMBANGUNAN RUMAH PANGSA MAMPU MILIK 560 UNIT (ZON 12E) SELUAS 3.152 EKAR DI ATAS PT6924 DAN (ZON 12F) SELUAS 3.482 EKAR DI ATAS PT 6925 YANG MENGANDUNGI SURAU, DEWAN, RUMAH SAMPAHDAN RUMAH PENCAWANG TNB PRESINT 11, PUTRAJAYA WILAYAH PERSEKUTUAN.

NOV2010

72 PERMOHONAN KEBENARAN MERANCANG BAGI PENDIRIAN BANGUNAN UNTUK CADANGAN PEMBANGUNANPEJABAT KEDUTAAN BRUNEI, DI ATAS LOT PT 11755 (PLAT C6), DIPLOMATIC ENCLAVE, PRECINT 15, PUTRAJAYA,WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK SURUHANJAYA KEDUTAAN TINGGI BRUNEI DARUSSALAM

MAY 2011

73 PERMOHONAN KEBENARAN MERANCANG BAGI PENDIRIAN BANGUNAN SEMENTARA RUMAH CONTOH SERTAPEJABAT JUALAN PARCEL 15-13 (880 UNIT), DI ATAS SEBAHAGIAN P.T. NO. 9181 SELUAS 11.039 EKAR, PRECINT 15,WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TETUAN PUTRAJAYA HOLDINGS SDN. BHD. (SHOW UNIT)

JUNE 2011

74 PERMOHONAN KEBENARAN MERANCANG BAGI PENDIRIAN BANGUNAN SEMENTARA RUMAH CONTOH SERTAPEJABAT JUALAN PARCEL 15-13 (880 UNIT), DI ATAS SEBAHAGIAN P.T. NO. 9181 SELUAS 11.039 EKAR, PRECINT 15,WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TETUAN PUTRAJAYA HOLDINGS SDN. BHD. (HOUSING)

JUNE 2011

75 PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 127 UNITRUMAH TERES 2 TINGKAT FASA 2 (ZON 9B) UNTUK : 61 UNIT RUMAH TERES JENIS A, 57 UNIT RUMAH TERES JENISB, 4 UNIT RUMAH TERES JENIS C, 4 UNIT RUMAH TERES JENIS D, 8 UNIT RUMAH TERES JENIS E, DIATAS PT 5072 –PT 5087, PT 5089 – PT 5703 – PT 5722, PT 5724 – PT 5734, PT 5745 – PT 5763, PT 5765 – PT 5768, PT 5916 – PT 5927,PT 5929 – PT 5948 BESERTA KAWASAN-KAWASAN LAPANG DI ATAS PT 5702, PT 5723, PT 5764, PT 5949, PT 5088,DAN PT 5744, PRESINT 11 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TETUAN PUTRAJAYA HOMES SDN BHD.

JULY 2010

76 CADANGAN PEMBANGUNAN PERUMAHAN AWAM YANG MENGANDUNGI 37 UNIT RUMAH TERES 2 TINGKAT (17 UNITJENIS A, 4 UNIT JENIS B, 4 UNIT JENIS C DAN 9 UNIT JENIS D) DI ATAS LOT PT5769-PT5775, PT5777-PT5782, PT5784-PT5807, ZON 9A, FASA 2, PRECINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA FOR PUTRAJAYA HONMES SDN BHD

JULY 2010

Page 10

Page 13: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

No Projects Year67 PERMOHONAN KEBENARAN MERANCANG BAGI PENDIRIAN BANGUNAN KE ATAS CADANGAN PEMBANGUNAN 25

UNIT KEDAI PEJABAT 2 TINGKAT DAN 4 UNIT KEDAI PEJABAT 3 TINGKAT TERMASUK 1 UNIT RUMAH SAMPAH DAN 2UNIT ‘SUB-COMPACT’ SERTA KAWASAN HIJAU DAN RIZAB JALAN 15.0M DI ATAS PLOT 8NC2 (PT 13143), PRESINT 8,WILAYAH PERSEKUTUAN PUTRAJAYA.

FEB 2011

68 NOISE AND VIBRATION MONITORING RAPID KL JAN 2011

69 ENVIRONMENTAL AUDIT REPORT (EAR 10) KEM MEMPAGA, DAERAH BENTONG. MAC 2011

70 ENVIRONMENTAL MONITORING REPORT KOTA DAMANSARA JAN 2011

71 ENVIRONMENTAL MONITORING REPORT SOUTH QUAY APR 2011

Our Experiences: ContinueEnvironmental Management Report (EMR)

Environmental Management Compliance Plan (EMCP)No Projects Year

1 Proposed Design, Construction & Completion of Main Building & External Works for Government Buildings at Lot2G1, Pre. 2, Putrajaya for BTD – SUNCON JV.

Jan. 2000

2 Proposed Construction & Completion of B/F Interchange and the Remaining Works at Road R1F, Putrajaya forPEMBINAAN TAJRI S/B.

June 2000

3 Cadangan Membina dan Menyiapkan Pembangunan Kompleks Kejiranan Di Atas Lot PT. 2493, 2498, 2499 danSebahagian Lot PT. 2497, Presint 16, Putrajaya for AHMAD ZAKI S/B

Nov. 2000

4 Proposed Design, Construction, Completion, Testing & Commissioning of Block E14 & E15 at Parcel E, Putrajayafor PERKASA SUTERA-BINA PURI JV

Dec. 2000

Page 11

Proposed Design, Construction, Completion, Testing & Commissioning of Block E14 & E15 at Parcel E, Putrajayafor PERKASA SUTERA-BINA PURI JV

5 Cadangan Membina & Menyiapkan Surau P. 16, Putrajaya for RINCO CORPORATION S/B Feb 01

6 Cadangan Membina Sebuah Pasar Kejiranan P. 16, Putrajaya for IDRIS HJ. SALLEH S/B. Mar 01

7 Proposed Design, Construction & Completion of Office Building and External Works for Government Building, Lot2G5 & 2G6, Precinct 2, Putrajaya for SUNWAY CONSTRUCTION

June 2001

8 Proposed Construction & Completion of The Common Utility Trench Package Remainder of Precinct 4, Putrajaya forNS CONSTRUCTION S/B (NESCON).

Aug. 2001

9 Proposed Construction and Completion Of Bulk Earthworks and Main Drainage Works (Package EW400B) AtPrecinct 5 & 6 PUTRAJAYA for BIRACO SDN BHD.

Feb. 2002

10 Proposed Construction and Completion of Taman Putra Perdana (Phase 2A), Precinct 1, Wilayah PersekutuanPutrajaya for RISDA SEMAIAN & LANDSKAP S/B

Aug. 2002

11 Proposed Construction and Completion of Landscape Works at Town Square, Park P4 & P5 at Diplomatic Enclave,Precinct 15, PUTRAJAYA for GEOSTRENGTH ENGINEERING S/B.

Aug. 2002

12 Construction and Completion of The Piling and Sub-Structure Works – Package 1, For The Proposed Alam WarisanProject, Precinct 5, PUTRAJAYA for IJM CONSTRUCTION S/B

Oct. 2002

13 Cadangan Menyiapkan Kerja-Kerja Landskap Untuk Taman Oval, Taman P1, P2 Dan P3 Untuk KawasanDiplomatik, Presint 15, Putrajaya for DEKON SDN BHD.

Nov. 2002

14 Construction and Completion of 22 Units Government Bungalows Type GC3, GD6, GD7 and GD8 at Phase 1A,Precinct 10, Putrajaya for MAJUTERA S/B.

Nov. 2002

15 Cadangan Membina & Menyiapkan Penjajaran Semula Jalan B15 (Lama) Dari SKVE Ke Terminal SimpananMinyak Lembah Kelang Di Presint 11, Putrajaya for BUMIHIWAY S/B

June 2003

16 Proposed Construction and Completion of Temporary Works for the Merdeka 2003 Celebration, Putrajaya forBUMIHIWAY S/B.

June 2003

17 Planting & Maintaining of Forest Species Works Inclusive of Infrastructural & Landscaping Works at Taman RimbaAlam, P.14 & 15, Putrajaya for KEMBANG SERANTAU S/B

June 2003

Page 14: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences: continueEnvironmental Management Compliance Plan (EMCP)

No Projects Year

18 Cadangan Pembangunan 12 Blok Pangsapuri Kerajaan Mengandungi 1373 Unit Kediaman Di Atas Parcel 18R12 &R13, Presint 18, PUTRAJAYA” for KUALA IBAI – PRINSIPTEK JV.

June2003

19 Proposed Construction and Completion of Roadworks, Utilities and Landscape for the Local Road and Spine Road,Precinct 15, PUTRAJAYA for INDERA DEV. & CONSTRUCTION S/B

Sept2003

20 Proposed Construction & Completion of Roadworks, Utilities and Landscape for the Connector Roads, P. 18,Putrajaya for LION PACIFIC S/B.

Oct2003

21 Construction and Completion of The Super-Structure Works – Package 2 & 3, For The Proposed Alam WarisanProject At Precinct 5, Putrajaya for IJM CONSTRUCTION S/B

Nov2003

22 Pembangunan Sebuah Masjid, ‘Kiblat Walk’ & Kerja2 Berkaitan Dengannya, P. 3, Putrajaya for AHMAD ZAKI S/B. May 04

23 Proposed 390 Unit Apartment, Phase 4D1-D2 (Parcel C5-C6), P. 8, Putrajaya for PUTRAJAYA PROPERTIES S/B. Jun 04

24 Proposed Engineering, Procurement, Construction and Commissioning Of Stage 1 COGEN/DCS Annex Plan, AtPrecinct 1, Putrajaya for PTT – OLEA JV.

July2004

25 Pembangunan Jabatan Peguam Negara Yg Mengandungi 16 Tkt Menara Pejabat Beserta 7-10 Tkt Podium pejabat,di atas Plot 4G7, P. 4, Putrajaya for ROAD BUILDERS(M) S/B.

Dec2004

26 Proposed Engineering, Procurement, Construction and Commissioning Of Stage 2 COGEN/DCS Annex Plan, AtPrecinct 1, Putrajaya for PTT – OLEA JV.

Jan2006

27 Proposed Construction And Operation Wet Mix Concrete Batching Plant On Lot 5R 2, P. 5, PUTRAJAYA for C.I.READYMIX SDN BHD.

Sept2006

28 Construction and Completion of Piling Works at Plot No. 9850, Seluas 10.34 Ekar, Presint 15, Putrajaya” for KKINFOBUILD SDN BHD.

Dec2006

29 “Cadangan Pembangunan Sebuah Bangunan Pencawang Masuk Utama (132/33/11kv) Di Atas Lot Pt 7529, Presint2, Putrajaya” for KOMPASBINA S/B.

Aug.2007

30 Construction, Rectification and Completion of Remaining Works for 94 Unit Terraces, On Sub-Precinct 14-10,Putrajaya for PRINSIPTEK (M) S/B.

Aug.2007

31 Boulevard Square Development Consisting of 2 Office Blocks ( 15 & 10 Storeys), Atrium, Cafeteria & 2 Levels ofBasement Carparks on Lot 3C6, P. 3, Putrajaya for AWANGSA BINA S/B.

June2008

32 IRAQI Embassy & Official Residence at the Diplomatic Enclave, P.15, Putrajaya for SEROJA YAKIN S/B Mar 09

33 The Proposed Design, construction and Completion of Government Office Building and External Works at Lot 445,Precint 4, Federal Government Administrative Centre, Wilayah Persekutuan Putrajaya

Nov

2010

34 PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 127 UNIT RUMAHTERES 2 TINGKAT FASA 2 (ZON 9B) UNTUK : 61 UNIT RUMAH TERES JENIS A, 57 UNIT RUMAH TERES JENIS B, 4 UNITRUMAH TERES JENIS C, 4 UNIT RUMAH TERES JENIS D, 8 UNIT RUMAH TERES JENIS E, DIATAS PT 5072 – PT 5087, PT5089 – PT 5703 – PT 5722, PT 5724 – PT 5734, PT 5745 – PT 5763, PT 5765 – PT 5768, PT 5916 – PT 5927, PT 5929 – PT 5948BESERTA KAWASAN-KAWASAN LAPANG DI ATAS PT 5702, PT 5723, PT 5764, PT 5949, PT 5088, DAN PT 5744, PRESINT 11WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TETUAN PUTRAJAYA HOMES SDN BHD.

JULY2010

35 “CDN. PEMBANGUNAN 119 UNIT APARTMENT DAN KEMUDAHAN2 AWAM YANG MENGANDUNGI: BLOK A1 (8 UNIT/3TINGKAT) ; BLOK A2 (8 UNIT/3 TKT) ; BLOK A3 (8 UNIT/3 TKT) ; BLOK A4 (8 UNIT/3 TKT) ; BLOK B1 (44 UNIT/ 10 TKT) ; BLOKB2 (43 UNIT/10 TKT) DI ATAS PT NO. 9849, SELUAS 4.72 EKAR, P. 15, PUTRAJAYA FOR SETIA PUTRAJAYA DEVELOPMENTS/B.

AUG2008

Page 12

Page 15: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences:Project Closure Plan (PCP)

No Projects Year1. Concrete Batching Plant For Parcel C & D, Precinct 1, Putrajaya. May 1999

2. Prime Minister’s Residence, Putrajaya for Setia Putrajaya Sdn. Bhd. Jun 1999

3. Road Works R 8A & WW 6, Putrajaya. Jun 1999

4. Parcel C, Precinct 1, Putrajaya. Dec. 99

5. Road MC 01 & MD, Precinct 16, Putrajaya. July 2000

6. Construction & Completion of B/F Interchange and the Remaining Works at Road R1F,Putrajaya for PEMBINAAN TAJRI S/B.

Dec.2001

7. Membina dan Menyiapkan Pembangunan Kompleks Kejiranan Di Atas Lot P.T. 2493,2498, 2499 dan Sebahagian Lot P.T. 2497, Presint 16, Putrajaya for AHMAD ZAKI S/B.

April2002

8. Design, Construction & Completion of Main Building and External Works for GovernmentBuildings at Lot 2G1, Precinct 2, Putrajaya for BTD – SUNCON JV.

April2002

9. Membina dan Menyiapkan Sebuah Surau dan Kerja-Kerja Lain Yang Berkaitan Di AtasSebahagian Lot P.T. 2505, Presint 16, Putrajaya for RINCO CORPORATION S/B.

April2002

10 Membina Sebuah Pasar Kejiranan Di Atas Lot P.T. 2496, P. 16, Putrajaya for IDRIS HJ.SALLEH S/B.

April2002

11 Construction and Completion of Taman Putra Perdana (Phase 2A), Precinct 1, WilayahPersekutuan Putrajaya for RSSB.

July2003

12 Design, Construction and Completion of Block E14 & E15 (Commercial Centre) at Parcel E,Putrajaya for PERKASA SUTERA-BINA PURI JV.

July2003

Page 13

12 Design, Construction and Completion of Block E14 & E15 (Commercial Centre) at Parcel E,Putrajaya for PERKASA SUTERA-BINA PURI JV.

July2003

13 Construction and Completion of Temporary Works for the Merdeka 2003 Celebration,Putrajaya for BUMIHIWAY S/B.

Aug2003

14 The Construction and Completion of The Piling and Sub-Structure Works – Package 1, ForThe Proposed Alam Warisan Project, P. 5, Putrajaya for IJM CONSTRUCTION S/B.

Nov2003

15 Construction of a Concrete Batching Plant at the Core Island,4R1& 4R2, Precinct 4,Putrajaya for SUPERMIX CONCRETE(M)S/B

Jan2005

16 Landscape Works for the Oval Park, Park P1, P2 & P3, P. 15, Putrajaya for DEKON S/B. Mar 2005

17 Membina & Menyiapkan Penjajaran Semula Jalan B15 (Lama) Dari SKVE Ke TerminalSimpanan Minyak Lembah Kelang Di Presint 11, Putrajaya for BUMIHIWAY S/B

Dec2005

18 Engineering, Procurement, Construction & Commissioning of Stage 1 COGEN/DCS AnnexPlan, Precinct 1, Putrajaya for PTT – OLEA JV

Feb2006

19 Engineering, Procurement, Construction & Commissioning of Stage 2 COGEN/DCS AnnexPlan, Precinct 1, Putrajaya for PTT – OLEA JV

Dec2006

20 The Malaysian Agro-Exposition Park Serdang (MAEPS), Phase 2, Serdang, Selangor forUEM CONSTRUCTION S/B.

July2008

21 Government Apartment at Parcel R12 & R13, Precinct 18, Putrajaya for PRINSIPTEK S/B. Oct. 2007

22 Modification for Non-stop Through Traffic Between Ipoh(S) & Jelapang (Pkg. 5) for UEMBUILDERS.

Jan.2009

23 Pembangunan Jabatan Peguam Negara Yg Mengandungi 16 Tkt Menara Pejabat Beserta7-10 Tkt Podium Pejabat, di atas Plot 4G7, P. 4, Putrajaya for ROAD BUILDERS(M) S/B.

Feb.2009

Page 16: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences:Environmental Monitoring, Auditing & Surveillance

No Projects Year1. Independent Environmental Monitoring & Auditing (EMA) of the Kuala Lumpur International Airport (KLIA) Jul 95-Dec 97

2. Design, Construction & Completion of Main Building & External Works for Government Buildings at Lot2G1, P. 2, Putrajaya for BTD-SUNCON JV.

Feb. 2000 -Mar. 2002

3. Construction of B/F Interchange & Remaining Works at Road R1F, Putrajaya for PEMBINAAN TAJRI S/B Jul 00 - Nov01

4. Membina & Menyiapkan Kompleks Kejiranan Di Atas Lot PT. 2493, 2498, 2499 & Sebahagian P.T.2497, Presint 16, Putrajaya for AHMAD ZAKI S/B.

Dec. 2000 -Jan. 2002

5. Construction of Block E14 & E15 at Parcel E, Putrajaya for PERKASA SUTERA – BINA PURI JV. Dec 00 -Nov02

6. Projek Menaiktaraf Jln B20 & Jln-Jln Di Bandar Baru Nilai Sbg Eastern Access ke KLIA (Package 1B – 1)Konsortium Bina Puri – Panzana (Nilai) S/B.

Jan. 2001 -Dec. 2001

7. Quarterly Env Compliance Audit for the Sg. Selangor Phase 3(SSP3) Project. Dec 00- Jun 02

8. Mermbina & Menyiapkan Surau Di Atas Lot PT 2505, P. 16, Putrajaya for RINCO CORPORATION S/B. Mac. 2001

9. Membina Sebuah Pasar Kejiranan Di Atas Lot PT 2496, Presint 16, Putrajaya for IDRIS HJ. SALLEH S/B Apr. 2001

10 Construction & Completion of Office Building & External Works for Gov.Building, Lot 2G5 & 2G6, P. 2Putrajaya for SUNWAY CONSTRUCTION.

Jul. 2001-Sep. 2003

11 Bulk Earthworks & Main Drainage Works (EW400B) At P. 5 & 6, PUTRAJAYA for BIRACO S/B. Mar02 -Apr03

11 Construction of Taman Putra Perdana (Phase 2A), Precinct 1, Wilayah Persekutuan Putrajaya for RSSB. Sept02 -Aug03

13 Construction & Completion of Landscape Works at Town Square, Park P4 & P5 at Diplomatic Enclave,P. 15, Putrajaya for GEOSTRENGTH ENGINEERING

Sept. 2002 -Jul 2004

14 Construction & Completion of The Piling and Sub-Structure Works – Package 1, For The Proposed AlamWarisan Project At P. 5, Putrajaya for IJM.

Nov. 2002 -June 2003

Construction & Completion of The Piling and Sub-Structure Works – Package 1, For The Proposed AlamWarisan Project At P. 5, Putrajaya for IJM.

Nov. 2002 -June 2003

15 Kerja2 Landskap Taman Oval, Taman P1, P2 & P3 untuk Kawasan Diplomatik, P. 15, Putrajaya forDEKON S/B.

Dec. 2002-Nov 2003

16 Construction and Completion of 22 Units Government Bungalows Type GC3, GD6, GD7 and GD8 atPhase 1A, Precinct 10, Putrajaya for MAJUTERA S/B.

Dec. 2002-May 2004

17 Penjajaran Semula Jln B15 (Lama) Dari SKVE Ke KVDT P. 11, Putrajaya for BUMIHIGHWAY S/B. Jun03 –Sept05

18 Construction & Completion of Roadwork, Utilities & Landscape for Local & Spine Rd, P. 15,PUTRAJAYA for INDERA DEV. & CONSTRUCT. S/B

Oct 2003 -Dec 2004

19 Roadworks, Utilities & Landscape for the Connector Roads, P. 18, Putrajaya for LION PACIFIC S/B. Nov 03-Sep04

20 Construction & Completion of The Super-Structure Works – Package 2, the Proposed Alam WarisanProject At Precinct 5, Putrajaya for IJM CONST. S/B

Nov 2003 -May 2005

21 Projek Menaiktaraf Jalan Duta, Jln Kuching Dan Jln-Jln Hubungan Lain, Kuala Lumpur for AZSB. July 03 -Oct 06

22 Construction Of Stage 1 & 2 COGEN/DCS Annex Plan, At P. 1, Putrajaya for PTT – OLEA JV. Jul04 - Nov06

23 Precinct 9 Developments, PUTRAJAYA for SETIA PUTRAJAYA SDN BHD. Dec98– Dec07

24 Planting & Maintaining of Forest Species Works Inclusive of Infrastructural & Landscaping, Tmn RimbaAlam, P. 14 & 15, Putrajaya for KEMBANG SERANTAU S/B

June 2003 –Dec. 2008

25 804 Unit, 8 Blocks Government Apartment at Parcel R12 and 570 Unit, 4 Blocks Government Apartmentat Parcel R13, Precinct 18, Putrajaya for PRINSIPTEK JV.

July 2003 –Aug. 2007

26 Pembangunan Masjid, ‘Kiblat Walk’ Dan Kerja-Kerja Berkaitan Dengannya, P. 3, Putrajaya for AZSB. Jun04 –Feb 09

27 390 Unit Apartment, Phase 4D1-D2 (Parcel C5-C6), Precinct 8, Putrajaya for PUTRAJAYAPROPERTIES S/B.

June 2004 –July 2005

Page 14

Page 17: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

No Projects Year28 Precinct 15 Mixed Developments, PUTRAJAYA for SETIA PUTRAJAYA SDN BHD. Jul 04 - Present

29 Pembangunan Jabatan Peguam Negara Yg Mengandungi 16 Tkt Menara Pejabat Beserta 7-10 TktPodium pejabat, di atas Plot 4G7, P. 4, Putrajaya for ROAD BUILDERS(M) S/B.

Dec 2004 –Jan. 2009

30 Construction of The Super-Structure Works – Package 2 & 3, For The Alam Warisan Project At P. 5,Putrajaya for IJM CONST. S/B.

Oct. 2005 –Jan 2009

31 Projek Menaiktaraf Jalan Pintas Kuantan (Kuantan Bypass) Pahang for ROADBUILDERS(M) S/B. Jan 05 - Jan 08

32 Projek Menaiktaraf Laluan Persekutuan 6 Dari Bayan Lepas ke Balik Pulau, Pulau Pinang. Pakej 2B – DariTeluk Kumbar ke Pekan Genting.

April 2005 -April 2008

33 Menaiktaraf Jalan Jitra Melalui Kodiang, Kedah ke Arau, Perlis. Pakej 2 : CH 4500 to CH 17500 for AZSB. Sept 05 – Jan09

34 Housing & Commercial Development On Lots 202, 236, 403, 516, 711-715, 761, 765, 980-983, Mukim 11,Daerah BaratDaya P. PINANG for SOUTHDOWN CORPORATION S/B.

May 2006 –June 2007

35 Trans Eastern Kedah Interland Highway, Package B : Dari Pedu ke Sg. Chapar dan Dari Sg. Sok Ke Weng(Segment D : CH. 70900 – CH. 80300)

Oct 2006 –Present

36 Trans Eastern Kedah Interland Highway, Package B : Dari Pedu ke Sg. Chapar dan Dari Sg. Sok Ke Weng(Segment B : CH. 51600 to CH. 60200)

Jan 2007 –Present

37 Trans Eastern Kedah Interland Highway, Package B : Dari Pedu ke Sg. Chapar dan Dari Sg. Sok Ke Weng(Segment A : CH. 45000 to CH. 51600)

Jan 2007 –Present

38 Modification for Non-stop Through Traffic Between Ipoh (s) and Jelapang – Perak for UEMB. Jan 07 – Feb 09

39 Trans Eastern Kedah Interland Highway, Package B : Dari Pedu ke Sg. Chapar dan Dari Sg. Sok Ke Weng(Segment E : CH. 80300 - CH. 88900)“

April 2007 -Present

Our Experiences: ContinueEnvironmental Monitoring, Auditing & Surveillance

Trans Eastern Kedah Interland Highway, Package B : Dari Pedu ke Sg. Chapar dan Dari Sg. Sok Ke Weng(Segment E : CH. 80300 - CH. 88900)“

April 2007 -Present

40 “Membina dan Menyiapkan Bangunan Tambahan Maktab Pegawai Polis Di Raja Malaysia Kuala KubuBharu, Selangor : Pakej 1 ” for JAYA HARICON S/B.

April 2007 -Present

41 Malaysian Agro-Exposition Park Serdang (MAEPS),Phase 2, Serdang, Selangor for UEM CONST. S/B. May 07 –Jul 08

42 “Membina dan Menyiapkan Bangunan Tambahan Maktab Pegawai Polis Di Raja Malaysia Kuala KubuBharu, Selangor : Pakej 2 ” for HAKIKAT ENGINEERING S/B.

May 2007 –Mar. 2009

43 Completion of Remaining Works for 94 Unit Terraces, Sub-Precinct 14-10, Putrajaya for PRINSIPTEK S/B. Aug 07 –Jun 08

44 Boulevard Square Dev. Consisting of 2 Office Blocks ( 15 & 10 Storeys), Atrium, Cafeteria & 2 Levels ofBasement Carparks on Lot 3C6, P. 3, Putrajaya for AWANGSA BINA S/B.

June 2008 -Present

45 Pembinaan Pusat Herba Biotek (Fasa 2) Di Mukim Batu Talam, Raub, Pahang for PRISMA SIMFONI S/B Jan. 08 - Present

46 “Kem Ke 93 Depoh Pusat Peluru Di Mempaga, Bentong, Pahang” for TARGET RESOURCES S/B. Jun 08 - Present

47 Pembinaan Pagar & Jalan Keselamatan Sempadan M’sia – Thailand Dari TS29/190 Hingga TS32 DiDurian Burong, Daerah Padang Terap, Kedah.

Oct 2008 -Present

48 Construction of MAHB Corporate Office on Lot 79, KLIA, Sepang for TARGET RESOURCES S/B. Sept 08 – Present

49 Membina Jalan Baru dari Kg.Seri Gemas Ke Pekan Palong Melalui Kg. Londoh, Daerah Tampin, N.Sembilan for KMUDAIE ENGINEERING S/B.

April 2009 -Present

50 IRAQI Embassy & Official Residence at the Diplomatic Enclave, P.15, Putrajaya for SEROJA YAKIN S/B. April 09 - Todate

51 Kerja Pembaikan Tanah Runtuh Dan Pengukuhan Cerun Di Taman Bukit Mewah, Bukit Antarabangsa, UluKelang, Selangor (Pakej 1 - 4) for MTD CONSTRUCTION S/B.

Jun 2009 -Present

52 Pahang-Selangor Raw Water Transfer Project, Lot 1-1, Water Transfer Tunnel and Related Works forSHIMIZU-NISHIMITSU-UEMB-IJM JOINT VENTURE.

June 2009 -Present

53 ”Projek Naiktaraf Jalan Sg. Timun (N116) Rembau, N. Sembilan” for M.Y.A CONSTRUCTION S/B Jul. 09 - Present

54 “Projek Menaiktaraf Laluan Persekutuan 149 Dari Simpang Empat ke Persimpangan Tol Bukit Tambun,Seberang Perai Selatan, Pulau Pinang” for UMPAN JAYA S/B.

July 2009 -Present

Page 15

Page 18: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

55 CADANGAN PEMBANGUNAN PERUMAHAN DAN KEMUDAHAN AWAM DI ATAS LOT PT 6594 & PT 6595, JALAN 3270A DAN19/70A DI TAMAN SRI HARTAMAS BANDARAYA KUALA LUMPUR UNTUK TETUAN SUNWAY D’MONT KIARA SDN BHD

-FOR AWANGSABINA SDN BHD

APR2010

56 CADANGAN PEMBANGUNAN 1 BLOK KONDOMINIUM 10 TINGKAT YANG MENGANDUNGI 40 UNIT KEDIAMAN BASEMENTEMPAT LETAK KERETA 2 TINGKAT KEMUDAHAN KOLAM RENANG DAN REKREASI DI ATAS LOT 15, JALAN AMPANG HILIRSEKSYEN 89 MUKIM AMPANG UNTUK TETUAN KATANA DEVELOPEMENT SDN BHD-FOR AWANGSABINA SDN BHD

APR2010

57 CADANGAN PEMBANGUNAN RUMAH BANDAR 3 TINGKAT BERJUMLAH 180 UNIT , DI ATAS LOT PT 20258 MUKIM BATUWILAYAH PERSEKUTUAN” UNTUK SYARIKAT PERMODALAN KEBANGSAAN BERHAD-FOR AWANGSABINA SDN BHD

APR2010

58 PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 127 UNIT RUMAHTERES 2 TINGKAT FASA 2 (ZON 9B) UNTUK : 61 UNIT RUMAH TERES JENIS A, 57 UNIT RUMAH TERES JENIS B, 4 UNITRUMAH TERES JENIS C, 4 UNIT RUMAH TERES JENIS D, 8 UNIT RUMAH TERES JENIS E, DIATAS PT 5072 – PT 5087, PT 5089– PT 5703 – PT 5722, PT 5724 – PT 5734, PT 5745 – PT 5763, PT 5765 – PT 5768, PT 5916 – PT 5927, PT 5929 – PT 5948BESERTA KAWASAN-KAWASAN LAPANG DI ATAS PT 5702, PT 5723, PT 5764, PT 5949, PT 5088, DAN PT 5744, PRESINT 11WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TETUAN PUTRAJAYA HOMES SDN BHD.

JULY2010

59 “CDN. PEMBANGUNAN 119 UNIT APARTMENT DAN KEMUDAHAN2 AWAM YANG MENGANDUNGI: BLOK A1 (8 UNIT/3TINGKAT) ; BLOK A2 (8 UNIT/3 TKT) ; BLOK A3 (8 UNIT/3 TKT) ; BLOK A4 (8 UNIT/3 TKT) ; BLOK B1 (44 UNIT/ 10 TKT) ; BLOK B2(43 UNIT/10 TKT) DI ATAS PT NO. 9849, SELUAS 4.72 EKAR, P. 15, PUTRAJAYA FOR SETIA PUTRAJAYA DEVELOPMENT S/B.

JULY2010

60 CADANGAN PEMBANGUNAN KEDIAMAN (80 UNIT RUMAH SESEBUAH – ZERO LOT BOUNDARY 3 TINGKAT) SECARA STRATADIATAS LOT 53136 (PN 31780), LOT 53137 (PN 31781) DAN LOT 53138 (PN 31799), JALAN PJU 3/31, SEKSYEN 12, SUNWAYDAMANSARA, MUKIM SUNGAI BULOH, DAERAH PETALING SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANANKEMAJUAN NEGERI SELANGOR-FOR AWANGSABINA SDN BHD

OCT2010

61 THE PROPOSED CONSTRUCTION AND COMPLETION OF TWO HUNDRED THIRTEEN(213) UNITS OF HOUSES, TEN (10)UNITS MANAGEMENT QUARTERS, AMENITIES AND INFRASTRUCTURES WORKS FOR DEVELOPMENT OF PEKANAGROPOLITAN PROJECT (PAP) AT KAWASAN 2, TANJUNG BATU, MUKIM BEBAR IN THE DISTRICT OF PEKAN, PAHANGDARUL MAKMURFOR PEMBINAAN SPK SDN BHD

OCT2010

62 CONSTRUCTION AND COMPLETION OF ONE HUNDRED (100) UNITS OF HOUSES, FIVE (5) UNITS OF MANAGEMENTQUARTERS, AMENITIES, FIFTY TWO (52) ANIMAL PRODUCTION UNITS (APU), FODDER PLOT & OTHER ASSOCIATEDFACILITIES AND INFRASTRUCTURE WORKS FOR THE DEVELOPMENT OF BESUT SETIU AGROPOLITAN (BSA) PROJECT,PANCHUR BEDERU, SETIU, TERENGGANU DARUL IMANFOR PEMBINAAN SPK SDN BHD

OCT2010

Our Experiences: ContinueEnvironmental Monitoring, Auditing & Surveillance

62 CONSTRUCTION AND COMPLETION OF ONE HUNDRED (100) UNITS OF HOUSES, FIVE (5) UNITS OF MANAGEMENTQUARTERS, AMENITIES, FIFTY TWO (52) ANIMAL PRODUCTION UNITS (APU), FODDER PLOT & OTHER ASSOCIATEDFACILITIES AND INFRASTRUCTURE WORKS FOR THE DEVELOPMENT OF BESUT SETIU AGROPOLITAN (BSA) PROJECT,PANCHUR BEDERU, SETIU, TERENGGANU DARUL IMANFOR PEMBINAAN SPK SDN BHD

OCT2010

63 “PROJEK MEMBINA JALAN BARU DARI KG CHENNAH KE KG ESOK JELEBU, NEGERI SEMBILAN” FOR MYA CONSTRUCTIONSDN BHD

JAN2011

64 NEXIS BUSINESS CENTRE, KOTA DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.-FOR AWANGSABINA SDN BHD

JAN 2011

65 NOISE AND VIBRATION MONITORING FOR RAPID KL JAN2011

Page 16

Page 19: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Experiences:No Projects Year1 Pahang-Selangor Raw Water Transfer Project, Lot 1-1, Water Transfer Tunnel and Related Works for SHIMIZU-

NISHIMITSU-UEMB-IJM JOINT VENTURE.Feb. 2009

2 Lot 1-3A: Semantan Intake Pumping Station & Related Works. July 2010

3 Lot 1-3B: Semantan Pipeline & Related Works Jan 2011

4 Environmental Response Plan (Revision 1) Kelau Dam Apr 2011

No Projects Year1 COLLECTION PROCESSING PACKAGING CENTRE (CPPC) & STAFF QUARTERS ON PART OF LOT 451

MUKIM ULU TELOM, DAERAH CAMERON HIGHLANDS, PAHANG FOR CAMERON FRESH FARM S/B.May 2007

2 SUPP. EIA FOR “CADANGAN MEMBINA SEBUAH GUDANG PEMBUNGKUSAN SAYURAN DI ATASSEBAHAGIAN LOT 451, LEMBAH BERTAM, MUKIM ULU TELOM, DAERAH CAMERON HIGHLANDS,PAHANG” FOR CAMERON FRESH FARM S/B.

July 2007

3 “CADANGAN MEMBINA 1 BLOK BANGUNAN 1 & 2 TINGKAT BESERTA 15 UNIT RUANG PERNIAGAAN,1 UNIT SURAU, 1 UNIT GELANGGANG FUTSAL & TEMPAT MELETAK KERETA DI ATAS SEBHG LOT PT19, BANDAR KOTA SERIEMAS, DAERAH SEREMBAN, N. SEMBILAN” FOR J & A ASSOCIATES S/B.

NOV2007

4 “CADANGAN MEMBINA DAN MENYIAPKAN 13 UNIT VILLA KORPORAT (1 & 2 TINGKAT) DI ATASSEBAHAGIAN LOT 41 & 510, PEKAN MORIB SEKSYEN 1 DAN DI ATAS SEBAHAGIAN LOT 2508, MUKIMMORIB, BANDAR PERANGINAN SERI BAYU MORIB, DAERAH KUALA LANGAT, SELANGOR DARULEHSAN“FOR J & A ASSOCIATES S/B.

JAN

2008

Emergency Response Plan (ERP)

Erosion and Sedimentation Control Plan (ESCP).

No Projects Year1 “Membina dan Menyiapkan Bangunan Tambahan Maktab Pegawai Polis Di Raja Malaysia Kuala Kubu Bharu,

Selangor : Pakej 1 ” for JAYA HARICON S/B.Apr.07 –Apr. 09

2 Environmental Management Plan(EMP), Monitoring and Closure Audit for The Proposed Construction andCompletion of One Hundred(100) units of Houses, Five Unit of Management Quarters, Amenities, Fifty TwoAnimal Production Units, Fodder Plot and other Associated Facilities and Infrastructure Works for TheDevelopment of Besut Setiu Agropolitan(BSA Project), Panchur Bederu, Setiu, Terengganu FOR PEMBINAANSPK SDN BHD

Apr 2007 -Present

3 “Membina dan Menyiapkan Bangunan Tambahan Maktab Pegawai Polis Di Raja Malaysia Kuala Kubu Bharu,Selangor : Pakej 2 ” for HAKIKAT ENGINEERING S/B.

May 07 –Mar. 09

4 Construction Of Double Tracking Railroad, Bridge & Structural Works etc. for PACKAGE III : Batang Padang toGemas Negeri Sembilan for LOH & LOH – PASV JV.

Oct. 08 -Present

5 Pahang-Selangor Raw Water Transfer Project, Lot 1-1, Water Transfer Tunnel and Related Works forSHIMIZU-NISHIMITSU-UEMB-IJM JOINT VENTURE.

Jun. 09 -Present

4 “CADANGAN MEMBINA DAN MENYIAPKAN 13 UNIT VILLA KORPORAT (1 & 2 TINGKAT) DI ATASSEBAHAGIAN LOT 41 & 510, PEKAN MORIB SEKSYEN 1 DAN DI ATAS SEBAHAGIAN LOT 2508, MUKIMMORIB, BANDAR PERANGINAN SERI BAYU MORIB, DAERAH KUALA LANGAT, SELANGOR DARULEHSAN“FOR J & A ASSOCIATES S/B.

JAN

2008

5 LOT 1-3A: SEMANTAN INTAKE PUMPING STATION & RELATED WORKS. JULY2010

6 LOT 1-3B: SEMANTAN PIPELINE & RELATED WORKS. JAN 2011

Page 17

Environmental Officer Attachment

Page 20: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Environmental Site Assessment (ESA)No Projects Year1 Environmental Site Compliance Audit for ”Projek Pembangunan Jeti Di Negeri Terengganu(Pakej 1) For Jeti

Pasir Air, Pulau Lang Tengah ; Jeti Pasir Panjang, Pulau Perhentian Kecil ; Jeti Teluk Aur, Pulau PerhentianKecil ; Jeti Teluk Kalong, Pulau Redang ; and Jeti Teluk Pauh, Pulau Perhentian Besar.

Aug. 07– Aug 08

Our Experiences: ContinueEnvironmental Officer Attachment

No Projects Year6 Lot 1-3A: Semantan Intake, Pumping Station & Related Work

LOH AND LOH CONSTRUCTIONJuly 2010 –

Present

7 Hulu Terengganu Hydroelectric Dam for LOH AND LOH CONSTRUCTION SDN BHD Oct 2010 -Present

8 Environmental Management Plan (EMP), Environmental Monitoring Report (EMR), Environmental AuditReport (EAR) and Project Closure Plan (PCP) for Construction and Completion Of Two Hundred Thirteen(213) Units of Houses, Ten (10) Units Of Management Quarters, Amenities And Infrastructure Works For TheDevelopment Of Pekan Agropolitan Project (PAP) At Kawasan 2, Tanjung Batu, Mukim Bebar In The DistrictOf Pekan, Pahang Darul Makmur for PEMBINAAN SPK SDN BHD

Nov 2010 -Present

9 Lot 1-3B: Semantan Pipeline & Related Works for IJM – JAKS JOINT VENTURE Jan 2011 -Present

10 Pahang Selangor Raw Water Transfer Project : Lot 1-2, Kelau Dam and Related Works for LOH AND LOHCONSTRUCTION

April 2011 -Present

Environmental Site Compliance Audit for ”Projek Pembangunan Jeti Di Negeri Terengganu(Pakej 1) For JetiPasir Air, Pulau Lang Tengah ; Jeti Pasir Panjang, Pulau Perhentian Kecil ; Jeti Teluk Aur, Pulau PerhentianKecil ; Jeti Teluk Kalong, Pulau Redang ; and Jeti Teluk Pauh, Pulau Perhentian Besar.

Page 18

Page 21: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Environmental QualityMonitoringScope Of Works

A) WATER QUALITY SAMPLING AND ANALYSIS- Water samples for Std A parameters (EQA,1974), NH3N, E.coli and Oil & Grease.- River and Drinking Water Sampling & Analysis.- Groundwater Monitoring.- Wastewater Quality Study & Monitoring.

B) AMBIENT AIR QUALITY MONITORING (24 hours)- Air quality sampling and analysis for parameters TSP, PM10, NO2, SO2 & CO.- Measurement of Relative Humidity, Wind Velocity & Wind Direction and Air

Temperature.- Stack Emission Testing.

C) NOISE MEASUREMENT (24 hours)- Noise measurement for parameters Lmin, Lmax, Leq, L10, L50 & L90.- Vibration and Sound Monitoring.

Page 19

C) NOISE MEASUREMENT (24 hours)- Noise measurement for parameters Lmin, Lmax, Leq, L10, L50 & L90.- Vibration and Sound Monitoring.

All the above will be sent to SAMM accredited laboratory.

Page 22: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

DESCRIPTION OF SAMPLING/ ANALYSIS METHODSPARAMETERS SAMPLING

DURATIONSAMPLING METHODOLOGY

WATER QUALITY MONITORING

ph Value In-situ Sampling Method: Direct measurementApparatus: Portable pH Meter, Mettler Toledo-MP230K

Dissolved Oxygen (DO) In-situ Sampling Method: Direct measurementApparatus: Dissolved Oxygen Meter, Hanna (H14193)

NOISE MEASUREMENT

Noise In-situReading

Sampling Method: Direct measurements using SoundLevel Meter Type 1, Parameter to be recorded are Leq,Lmin, Lmax, L10, L50, and L90.Apparatus: Quest 1900 Precision Sound Level Meter.

AMBIENT AIR QUALITY

Total SuspendedParticulate (TSP)

24 hours Sampling Method: Air sample will be collected on apre-weight filter paper using High Volume Sampler. Themass concentration is computed by measuring themass off collected particulate and the volume of airsampled.Apparatus : High Volume Sampler: GFA Filters: Analytical Balance

Sampling Method: Air sample will be collected on apre-weight filter paper using High Volume Sampler. Themass concentration is computed by measuring themass off collected particulate and the volume of airsampled.Apparatus : High Volume Sampler: GFA Filters: Analytical Balance

Nitrogen Dioxide 24 hours Sampling Method: NO2 is trapped in absorbingreagent (CDR) using air metering device and analysedby Griess-Saltzman Reaction Method.Apparatus : Air Metering Device,: Impingers with absorbing reagents: Spectrophotometer

Sulphur Dioxide 24 hours Sampling Method: SO2 is trapped in absorbing reagent(TCM) using air metering device and analysed byTCM/Pararosaniline method.Apparatus : Air Metering Device,: Impingers with absorbing reagents: Spectrophotometer

Carbon Monoxide 24 hours Sampling Method: Diffusion SamplingApparatus: Gastec Passive Dosi-Tube for CO

Wind Velocity DirectReading

Sampling Method: Direct measurementApparatus: Anemometer, Model AM 4202

Relative Humidity DirectReading

Sampling Method: Direct measurementApparatus: G.H Zeal Limited, ZEAL Digital ThermoHygro, Model P2540 (20/95% Relative Humidity and50/70 Deg.C).

Air Temperature DirectReading

Sampling Method: Direct measurementApparatus: G.H Zeal Limited, ZEAL Digital ThermoHygro, Model P2540 (20/95% Relative Humidity and50/70 Deg.C).

Page 20

Page 23: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Clients WAWASAN BERSATU S/B.

SETIA PUTRAJAYA S/B.

SUNWAY CONSTRUCTION BERHAD.

PEMBINAAN TAJRI S/B.

AHMAD ZAKI S/B.

PEREMBA CONSTRUCTION S/B.

LEJADI INFRA S/B.

PERKASA SUTERA-BINA PURI JV.

RINCO CORPORATION S/B.

IDRIS HJ. SALLEH S/B.

NESCON S/B.

AF CONSULTANT ARCHITECTS S/B.

ATSA ARCHITECTS S/B.

VISAGE ARCHITECTS

SILVERBIRD GROUP BERHAD.

BIRACO S/B.

PROPERTY MANAGEMENT DIVISION,PUTRAJAYA HOLDINGS S/B.

PUTRA PERDANA DEVELOPMENT S/B.

RISDA SEMAIAN DAN LANDSKAP S/B

GEOSTRENGTH ENGINEERING S/B.

IJM CONSTRUCTION S/B.

DEKON S/B.

MAJUTERA S/B.

PEREMBAJAYA HOLDINGS S/B.

BUMIHIWAY (M) S/B.

KEMBANG SERANTAU S/B.

KUALA IBAI – PRINSIPTEK JV.

AHMAD ZAKI RESOURCES BERHAD.

INDERA DEVELOPMENT & CONST. S/B.

LION PACIFIC S/B.

MAX AQUATIC S/B.

KUMPULAN LEBAR DAUN BERHAD.

PTT - OLEA JV.

SEROJA YAKIN S/B.

JURUTERA PERUNDING GEA (M) S/B.

ROAD BUILDER (M) S/B.

SUPERMIX CONCRETE(M)S/B.

PUTRAJAYA PROPERTIES S/B.

ASIASPACE INFRASTRUCTURE NETWORK S/B.

GOODROAD ENGINEERING S/B.

BULKERS CORPORATION S/B.

KONSORTIUM BINA PURI – PANZANA (NILAI)

PERUNDING AZIZ, AZALI & TEE S/B.

MAUNSELL SHARMA & ZAKARIA S/B.

ROAD BUILDER (M) HOLDINGS BHD (RBHB).

IDAMAN BERSIH S/B.

UEM CONSTRUCTION S/B.

PEMBINAAN BLT S/B.

MACRONAMIC S/B.

C.I. REAYMIX S/B.

JAYA HARICON S/B.

KOMPASBINA S/B.

K K INFOBUILT S/B.

JURUTERA PERUNDING WIBAWA.

HAKIKAT ENGINEERING S/B.

IOT PETROLEUM S/B.

KONSORTIUM UEM BUILDERS – PELANGI WIRA JV.

CAMERON FRESH FARM S/B.

JOSU ENGINEERING CONSTRUCTION S/B.

NIK JAI ASSOCIATES S/B.

J & A ASSOCIATES S/B.

TARGET RESOURCES S/B.

PRISMA SIMFONI S/B.

AWANGSA BINA S/B.

PERUNDING ARZEC.

LOH & LOH – PASB JV.

GSM ALAMSUTRIA S/B.

JAY TEE HYDRO.

BLUE ARCHIPELAGO BERHAD.

UMPAN JAYA S/B.

SHIMIZU-NISHIMATSU-UEMB-IJM JOINT VENTURE.

KMUDAIE ENGINEERING S/B.

M.Y.A CONSTRUCTION S/B.

SYARIKAT PERMODALAN KEBANGSAAN (SPK) BERHAD.

MTD CONSTRUCTION S/B.

SHIM Bina S/B.

WAWASAN BERSATU S/B.

SETIA PUTRAJAYA S/B.

SUNWAY CONSTRUCTION BERHAD.

PEMBINAAN TAJRI S/B.

AHMAD ZAKI S/B.

PEREMBA CONSTRUCTION S/B.

LEJADI INFRA S/B.

PERKASA SUTERA-BINA PURI JV.

RINCO CORPORATION S/B.

IDRIS HJ. SALLEH S/B.

NESCON S/B.

AF CONSULTANT ARCHITECTS S/B.

ATSA ARCHITECTS S/B.

VISAGE ARCHITECTS

SILVERBIRD GROUP BERHAD.

BIRACO S/B.

PROPERTY MANAGEMENT DIVISION,PUTRAJAYA HOLDINGS S/B.

PUTRA PERDANA DEVELOPMENT S/B.

RISDA SEMAIAN DAN LANDSKAP S/B

GEOSTRENGTH ENGINEERING S/B.

IJM CONSTRUCTION S/B.

DEKON S/B.

MAJUTERA S/B.

PEREMBAJAYA HOLDINGS S/B.

BUMIHIWAY (M) S/B.

KEMBANG SERANTAU S/B.

KUALA IBAI – PRINSIPTEK JV.

AHMAD ZAKI RESOURCES BERHAD.

INDERA DEVELOPMENT & CONST. S/B.

LION PACIFIC S/B.

MAX AQUATIC S/B.

KUMPULAN LEBAR DAUN BERHAD.

PTT - OLEA JV.

SEROJA YAKIN S/B.

JURUTERA PERUNDING GEA (M) S/B.

ROAD BUILDER (M) S/B.

SUPERMIX CONCRETE(M)S/B.

PUTRAJAYA PROPERTIES S/B.

Page 17

ASIASPACE INFRASTRUCTURE NETWORK S/B.

GOODROAD ENGINEERING S/B.

BULKERS CORPORATION S/B.

KONSORTIUM BINA PURI – PANZANA (NILAI)

PERUNDING AZIZ, AZALI & TEE S/B.

MAUNSELL SHARMA & ZAKARIA S/B.

ROAD BUILDER (M) HOLDINGS BHD (RBHB).

IDAMAN BERSIH S/B.

UEM CONSTRUCTION S/B.

PEMBINAAN BLT S/B.

MACRONAMIC S/B.

C.I. REAYMIX S/B.

JAYA HARICON S/B.

KOMPASBINA S/B.

K K INFOBUILT S/B.

JURUTERA PERUNDING WIBAWA.

HAKIKAT ENGINEERING S/B.

IOT PETROLEUM S/B.

KONSORTIUM UEM BUILDERS – PELANGI WIRA JV.

CAMERON FRESH FARM S/B.

JOSU ENGINEERING CONSTRUCTION S/B.

NIK JAI ASSOCIATES S/B.

J & A ASSOCIATES S/B.

TARGET RESOURCES S/B.

PRISMA SIMFONI S/B.

AWANGSA BINA S/B.

PERUNDING ARZEC.

LOH & LOH – PASB JV.

GSM ALAMSUTRIA S/B.

JAY TEE HYDRO.

BLUE ARCHIPELAGO BERHAD.

UMPAN JAYA S/B.

SHIMIZU-NISHIMATSU-UEMB-IJM JOINT VENTURE.

KMUDAIE ENGINEERING S/B.

M.Y.A CONSTRUCTION S/B.

SYARIKAT PERMODALAN KEBANGSAAN (SPK) BERHAD.

MTD CONSTRUCTION S/B.

SHIM Bina S/B.

Page 21

Page 24: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Our Team Ahmad Sani Ahmad Shukoor

Prior to joining ARDHMILLENIA, Ahmad Sani was employed by GUNUNG-GANANGCorporation S/B as a Senior Environmental Scientist, Putra Perdana Construction asan Environmental Officer followed by Enviros Malaysia S/B (previously known asAspinwall Clouston), Dames & Moore (M) S/B and T & T Konsult S/B as anEnvironmental Scientist.

He had detailed knowledge in the field of Environmental Impact Assessment (EIA),Environmental Management Plan (EMP), Emergency Response Plan (ERP),Environmental Monitoring & Auditing (EM & A) and Environmental ManagementSystem (EMS). He was involved in ERP for the Gelugor Power Station, Penang andPutrajaya Development ; PEIA for Proposed Development on Lot 378, Hulu Kelang,Selangor and Proposed International Multicultural 6-Star Resort at Pulau Langkawi,Kedah ; EMP for Putrajaya Developments [Precinct 9, 11, Prime Minister’s Residence& Wastewater Treatment Plant (STP2) At Precinct 5] and also Prime Granite (M) SdnBhd for a granite processing factory in Negeri Sembilan ; and EM & A of the KualaLumpur International Airport (KLIA) construction phase, July 1995 - December 1997.He was also a member of the Gunung-Ganang Corporation Sdn Bhd, IndependentEnvironmental Audit Team (IEAT) to carry out quarterly environmental complianceaudit for the Sungai Selangor Phase 3 (SSP3) Project (Dec. 2000 – Jun. 2002) on theenvironmental protection and management activities of the Syarikat Pengeluar AirSungai Selangor Sdn Bhd (SPLASH). His other project experience includes Phase 1 &Phase 2 Environmental Site Assessment and Environmental Screening Studies inHyderabad, India and Kalasin, Thailand.

He had attended various courses which includes ISO 14000 Advanced EnvironmentalManagement System Auditors Course, ISO 14000 Identifying Environmental Aspects& Impacts organized by Sirim Training Services Sdn Bhd and also NIOSH Safety &Health Officer Course. He is a registered EIA Consultant with DOE (C0139). He wasalso formerly working for the Department of Fisheries Malaysia in the management ofMarine Parks and Protected Areas. He has detailed knowledge and experience inmarine/fishery ecosystems, coral reef surveys and scuba diving training.

Mohd Nizam Abu BakarNizam had served in various organizations before joining ARDHMILLENIA. Amongstthe organizations in which he served as the key person in environmental managementare, Precinct 10 Sdn. Bhd, Putrajaya Holdings S/B, Percon Corporation, Departmentof Environment and Asiatic Development Berhad. He was also a member of theGunung-Ganang Corporation Sdn Bhd, Independent Environmental Audit Team(IEAT) to carry out quarterly environmental compliance audit for the Sungai SelangorPhase 3 (SSP3) Project.

He had vast experience and exposure in the area of Environmental Management andinvolved in various important decision making process. Amongst them are being theHead of DOE of Negeri Sembilan, responsible in evaluating the Environmental ImpactAssessment (EIA), setting up the Environmental Management Unit (EMU) of PutrajayaHoldings S/B and also compilation of the Putrajaya Environmental ManagementGuidelines, 1998. Nizam also holds several certifications from professional bodiessuch as NIOSH, ENSEARCH and Institute of Environmental Management andAssessment (IEMA). He is a registered Assistant EIA Consultant with DOE (AC0808).He has attended various courses locally and internationally which includes ISO 14000Advanced Environmental Management System Auditors Course, ISO 14000Identifying Environmental Aspects & Impacts organized by Sirim Training Servicesand Environmental Management and Assessment by CEMP, Aberdeen, Scotland.

Ahmad Sani Ahmad ShukoorPrior to joining ARDHMILLENIA, Ahmad Sani was employed by GUNUNG-GANANGCorporation S/B as a Senior Environmental Scientist, Putra Perdana Construction asan Environmental Officer followed by Enviros Malaysia S/B (previously known asAspinwall Clouston), Dames & Moore (M) S/B and T & T Konsult S/B as anEnvironmental Scientist.

He had detailed knowledge in the field of Environmental Impact Assessment (EIA),Environmental Management Plan (EMP), Emergency Response Plan (ERP),Environmental Monitoring & Auditing (EM & A) and Environmental ManagementSystem (EMS). He was involved in ERP for the Gelugor Power Station, Penang andPutrajaya Development ; PEIA for Proposed Development on Lot 378, Hulu Kelang,Selangor and Proposed International Multicultural 6-Star Resort at Pulau Langkawi,Kedah ; EMP for Putrajaya Developments [Precinct 9, 11, Prime Minister’s Residence& Wastewater Treatment Plant (STP2) At Precinct 5] and also Prime Granite (M) SdnBhd for a granite processing factory in Negeri Sembilan ; and EM & A of the KualaLumpur International Airport (KLIA) construction phase, July 1995 - December 1997.He was also a member of the Gunung-Ganang Corporation Sdn Bhd, IndependentEnvironmental Audit Team (IEAT) to carry out quarterly environmental complianceaudit for the Sungai Selangor Phase 3 (SSP3) Project (Dec. 2000 – Jun. 2002) on theenvironmental protection and management activities of the Syarikat Pengeluar AirSungai Selangor Sdn Bhd (SPLASH). His other project experience includes Phase 1 &Phase 2 Environmental Site Assessment and Environmental Screening Studies inHyderabad, India and Kalasin, Thailand.

He had attended various courses which includes ISO 14000 Advanced EnvironmentalManagement System Auditors Course, ISO 14000 Identifying Environmental Aspects& Impacts organized by Sirim Training Services Sdn Bhd and also NIOSH Safety &Health Officer Course. He is a registered EIA Consultant with DOE (C0139). He wasalso formerly working for the Department of Fisheries Malaysia in the management ofMarine Parks and Protected Areas. He has detailed knowledge and experience inmarine/fishery ecosystems, coral reef surveys and scuba diving training.

Mohd Nizam Abu BakarNizam had served in various organizations before joining ARDHMILLENIA. Amongstthe organizations in which he served as the key person in environmental managementare, Precinct 10 Sdn. Bhd, Putrajaya Holdings S/B, Percon Corporation, Departmentof Environment and Asiatic Development Berhad. He was also a member of theGunung-Ganang Corporation Sdn Bhd, Independent Environmental Audit Team(IEAT) to carry out quarterly environmental compliance audit for the Sungai SelangorPhase 3 (SSP3) Project.

He had vast experience and exposure in the area of Environmental Management andinvolved in various important decision making process. Amongst them are being theHead of DOE of Negeri Sembilan, responsible in evaluating the Environmental ImpactAssessment (EIA), setting up the Environmental Management Unit (EMU) of PutrajayaHoldings S/B and also compilation of the Putrajaya Environmental ManagementGuidelines, 1998. Nizam also holds several certifications from professional bodiessuch as NIOSH, ENSEARCH and Institute of Environmental Management andAssessment (IEMA). He is a registered Assistant EIA Consultant with DOE (AC0808).He has attended various courses locally and internationally which includes ISO 14000Advanced Environmental Management System Auditors Course, ISO 14000Identifying Environmental Aspects & Impacts organized by Sirim Training Servicesand Environmental Management and Assessment by CEMP, Aberdeen, Scotland.

Page 22

Page 25: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Anis Farhana Binti KamarulzamanShe joins ARDHMILLENIA as an Environmental Scientist in November 2007. Sheholds a degree in Environmental Science and Management from University Malaya.She is heading the EIA Section which also covers, Environmental Management Plan(EMP), Environmental Management Report (EMR), Environmental ManagementCompliance Plan (EMCP), Erosion & Sedimentation Control Plan (ESCP), UniversalSoil Loss Equation (USLE) and Project Closure Plan (PCP). She is a registeredAssistant EIA Consultant with DOE (AC0730).

Nor Faekah IsmailShe joins ARDHMILLENIA as an Environmental Engineer in July 2007. She holds adegree in Chemical-Bioprocess Engineering from Universiti Teknologi Malaysia. Sheis heading the Post-EIA Section which also covers managing Field Staffs,Environmental Monitoring & Auditing (EM&A) and Environmental Surveillance (ES).She is a registered Assistant EIA Consultant with DOE (AC0729).

Nur’izatul Hafinaz RajabShe joins ARDHMILLENIA as an Environmental Scientist in February 2008. Sheholds a degree in Environmental Science and Management from University Malaya,Kuala Lumpur. She is assisting other team members responsible especially in thefield of EIA, Environmental Management Plan and Environmental Management Report(EMR). She is a registered Assistant EIA Consultant with DOE (AC0727).

Mohd Shahrul SukaimiHe joins ARDHMILLENIA as an Environmental Scientist in June 2007. He holds adegree in Environmental Science from Universiti Putra Malaysia. He was formerly afield staff seconded as a Environmental Officer for “Projek Membina dan MenyiapkanBangunan Tambahan Maktab Pegawai Polis Di Raja Malaysia Kuala Kubu Bharu,Selangor : Pakej 1”. Currently, he is seconded Environmental Officer for the PahangSelangor Raw Water Transfer Project. He is a registered Assistant EIA Consultantwith DOE (AC0805).

Nurul Syahidah Binti Mohd IsaShe joins ARDHMILLENIA as an Environmental Engineer in July 2010. She holds adegree in Biotechnology- Biochemical Engineering from Universiti IslamAntarabangsa Malaysia (IIUM). She is assisting other team members especially in thefield of Environmental Auditing, Environmental Management Plan and EnvironmentalMonitoring Reports (EMR’s).

Siti Nazzirah Mustafa

She joins ARDHMILLENIA as an Environmental Scientist in August 2009. Sheholds a degree in Environmental Science and Management from UniversityMalaya. She is assisting other team members responsible especially in the field ofEnvironmental Auditing, Environmental Management Plan and EnvironmentalMonitoring Reports (EMR’s).

Our Team Continue Anis Farhana Binti Kamarulzaman

She joins ARDHMILLENIA as an Environmental Scientist in November 2007. Sheholds a degree in Environmental Science and Management from University Malaya.She is heading the EIA Section which also covers, Environmental Management Plan(EMP), Environmental Management Report (EMR), Environmental ManagementCompliance Plan (EMCP), Erosion & Sedimentation Control Plan (ESCP), UniversalSoil Loss Equation (USLE) and Project Closure Plan (PCP). She is a registeredAssistant EIA Consultant with DOE (AC0730).

Nor Faekah IsmailShe joins ARDHMILLENIA as an Environmental Engineer in July 2007. She holds adegree in Chemical-Bioprocess Engineering from Universiti Teknologi Malaysia. Sheis heading the Post-EIA Section which also covers managing Field Staffs,Environmental Monitoring & Auditing (EM&A) and Environmental Surveillance (ES).She is a registered Assistant EIA Consultant with DOE (AC0729).

Nur’izatul Hafinaz RajabShe joins ARDHMILLENIA as an Environmental Scientist in February 2008. Sheholds a degree in Environmental Science and Management from University Malaya,Kuala Lumpur. She is assisting other team members responsible especially in thefield of EIA, Environmental Management Plan and Environmental Management Report(EMR). She is a registered Assistant EIA Consultant with DOE (AC0727).

Mohd Shahrul SukaimiHe joins ARDHMILLENIA as an Environmental Scientist in June 2007. He holds adegree in Environmental Science from Universiti Putra Malaysia. He was formerly afield staff seconded as a Environmental Officer for “Projek Membina dan MenyiapkanBangunan Tambahan Maktab Pegawai Polis Di Raja Malaysia Kuala Kubu Bharu,Selangor : Pakej 1”. Currently, he is seconded Environmental Officer for the PahangSelangor Raw Water Transfer Project. He is a registered Assistant EIA Consultantwith DOE (AC0805).

Nurul Syahidah Binti Mohd IsaShe joins ARDHMILLENIA as an Environmental Engineer in July 2010. She holds adegree in Biotechnology- Biochemical Engineering from Universiti IslamAntarabangsa Malaysia (IIUM). She is assisting other team members especially in thefield of Environmental Auditing, Environmental Management Plan and EnvironmentalMonitoring Reports (EMR’s).

Siti Nazzirah Mustafa

She joins ARDHMILLENIA as an Environmental Scientist in August 2009. Sheholds a degree in Environmental Science and Management from UniversityMalaya. She is assisting other team members responsible especially in the field ofEnvironmental Auditing, Environmental Management Plan and EnvironmentalMonitoring Reports (EMR’s).

Page 23

Page 26: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Mohd Hairimi Mohd AliHe joins ARDHMILLENIA as an Environmental Scientist in February 2011.He holds a Masters in Social and Environmental Impact Assessment andDegree on Geography from Universiti Kebangsaan Malaysia. Currently, he’spreparing PEIA for the proposed Devolopment Of Teluk Datai ResortsLangkawi and Intergrated Shrimp Aquaculture At Kuala Gula, Perak.

Mohd Amin Bin WagimanHe joins ARDHMILLENIA as an Env. Engineer in May 2009. He holds adegree in Bio system Engineering Technology (Hons.) from Universiti KualaLumpur. He is assisting other team members responsible especially in thefield of Environmental Monitoring & Auditing and Environmental ManagementPlan. He is also a standby environmental Officer for “Projek MemperbaikiTanah Runtuh dan Pengukuhan Cerun Di Bukit Antarabangsa, Hulu Kelang,Selangor”.

Liyana Izwin Binti KhalidShe joins ARDHMILLENIA as an Environmental Scientist in August 2010.She holds a degree in Marine Science from Universiti Kebangsaan Malaysia(UKM). She is assisting other team members especially in the field ofEnvironmental Auditing, Environmental Management Plan andEnvironmental Monitoring Reports (EMR’s)

Ahmad Fahmi Bin Tajuddin

He joins ARDHMILLENIA as an Env. Engineer in August 2010. He holds adegree in Bio system Engineering Technology (Hons.) from University KualaLumpur. He is also assisting other team members especially in the field ofEnvironmental Auditing, Environmental Management Plan andEnvironmental Monitoring Reports (EMR’s). Currently, he is seconded as anEnvironmental Officer for the Pahang Selangor Raw Water Transfer Projectin Langat and Karak.

Noor Hazirah Binti Ahmad HairuddinShe joins ARDHMILLENIA as Env. Officer for Setiu Agropark Project inOctober 2010. She holds a master of science majoring EnvironmentalMonitoring and Evaluation from University Kebangsaan Malaysia.

Mohamad Zul Fahmi Bin ZulkifliHe joins ARDHMILLENIA as Env. Officer in March 2011. He holds a degreein Biochemical Biotechnology Engineering from International IslamicUniversity Malaysia. He is in charged for Project of Jalan Kampung Chennahke Kampung Esok, Jelebu, Negeri Sembilan .

Our Team Continue Mohd Hairimi Mohd Ali

He joins ARDHMILLENIA as an Environmental Scientist in February 2011.He holds a Masters in Social and Environmental Impact Assessment andDegree on Geography from Universiti Kebangsaan Malaysia. Currently, he’spreparing PEIA for the proposed Devolopment Of Teluk Datai ResortsLangkawi and Intergrated Shrimp Aquaculture At Kuala Gula, Perak.

Mohd Amin Bin WagimanHe joins ARDHMILLENIA as an Env. Engineer in May 2009. He holds adegree in Bio system Engineering Technology (Hons.) from Universiti KualaLumpur. He is assisting other team members responsible especially in thefield of Environmental Monitoring & Auditing and Environmental ManagementPlan. He is also a standby environmental Officer for “Projek MemperbaikiTanah Runtuh dan Pengukuhan Cerun Di Bukit Antarabangsa, Hulu Kelang,Selangor”.

Liyana Izwin Binti KhalidShe joins ARDHMILLENIA as an Environmental Scientist in August 2010.She holds a degree in Marine Science from Universiti Kebangsaan Malaysia(UKM). She is assisting other team members especially in the field ofEnvironmental Auditing, Environmental Management Plan andEnvironmental Monitoring Reports (EMR’s)

Ahmad Fahmi Bin Tajuddin

He joins ARDHMILLENIA as an Env. Engineer in August 2010. He holds adegree in Bio system Engineering Technology (Hons.) from University KualaLumpur. He is also assisting other team members especially in the field ofEnvironmental Auditing, Environmental Management Plan andEnvironmental Monitoring Reports (EMR’s). Currently, he is seconded as anEnvironmental Officer for the Pahang Selangor Raw Water Transfer Projectin Langat and Karak.

Noor Hazirah Binti Ahmad HairuddinShe joins ARDHMILLENIA as Env. Officer for Setiu Agropark Project inOctober 2010. She holds a master of science majoring EnvironmentalMonitoring and Evaluation from University Kebangsaan Malaysia.

Mohamad Zul Fahmi Bin ZulkifliHe joins ARDHMILLENIA as Env. Officer in March 2011. He holds a degreein Biochemical Biotechnology Engineering from International IslamicUniversity Malaysia. He is in charged for Project of Jalan Kampung Chennahke Kampung Esok, Jelebu, Negeri Sembilan .

Page 24

Page 27: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Nurul Aida Natasha Binti RusliShe joins ARDHMILLENIA as an Admin & Finance Executive sinceFebruary 2011. She holds a Diploma in Corporate Communication. She ishandling company’s financial, managing staff’s welfare and handling humanresources. She is maintaining accounts and prepare reports which show thefinancial impact to maintain company performance.

Muhd Aizat Bin KhalidHe joins ARDHMILLENIA as an Env. Engineer in May 2011. He holds a aBsc. (HONS) in Biology major in Environmental Biology from University ofScience Malaysia. He is Environmental Officer for the Pekan AgroparkProject.

Mohd Hairul Bin HamdanHe joins ARDHMILLENIA as an Environmental & Building Supervisor inNovember 2010. He holds a Diploma of Mechanical Engineering. He is oneof the survey team member for the company which is assist to complete theassignments.

Liyana Binti Ab AzizShe joins ARDHMILLENIA as an Environmental Officer on May 2011. Sheis holding Bsc. (HONS.) in Industrial Chemistry. She is an EnvironmentalOfficer for the Pahang Selangor Raw Water Transfer Project in Langat andKarak.

Mardiana Binti AbdullahShe joins ARDHMILLENIA as an Environmental Engineer on May 2011.She is holding Bsc. (HONS.)in Chemical Engineering major inEnvironmental Technology. She is assisting other team members especiallyin the field of Environmental Auditing, Environmental Management Plan andEnvironmental Monitoring Reports (EMR’s, EAR, ESCP and EPP).

Our Team Continue Nurul Aida Natasha Binti Rusli

She joins ARDHMILLENIA as an Admin & Finance Executive sinceFebruary 2011. She holds a Diploma in Corporate Communication. She ishandling company’s financial, managing staff’s welfare and handling humanresources. She is maintaining accounts and prepare reports which show thefinancial impact to maintain company performance.

Muhd Aizat Bin KhalidHe joins ARDHMILLENIA as an Env. Engineer in May 2011. He holds a aBsc. (HONS) in Biology major in Environmental Biology from University ofScience Malaysia. He is Environmental Officer for the Pekan AgroparkProject.

Mohd Hairul Bin HamdanHe joins ARDHMILLENIA as an Environmental & Building Supervisor inNovember 2010. He holds a Diploma of Mechanical Engineering. He is oneof the survey team member for the company which is assist to complete theassignments.

Liyana Binti Ab AzizShe joins ARDHMILLENIA as an Environmental Officer on May 2011. Sheis holding Bsc. (HONS.) in Industrial Chemistry. She is an EnvironmentalOfficer for the Pahang Selangor Raw Water Transfer Project in Langat andKarak.

Mardiana Binti AbdullahShe joins ARDHMILLENIA as an Environmental Engineer on May 2011.She is holding Bsc. (HONS.)in Chemical Engineering major inEnvironmental Technology. She is assisting other team members especiallyin the field of Environmental Auditing, Environmental Management Plan andEnvironmental Monitoring Reports (EMR’s, EAR, ESCP and EPP).

Page 25

Page 28: ARDHMILLENIA SDN. BHD. · PDF filePrima Biz Hub, Taman Tasik Prima, 47150 Puchong, Selangor. ðn Registration : ... (EIA) untuk ˝Permohonan Kebenaran Merancang Bagi Cadangan Pelan

Peter LouisPeter is an associate member to ARDHMILLENIA. His experience covers local as well asover sea and among countries he has served are USA, Singapore, Australia, NewZealand, United Kingdom and Pakistan. He has done extensive Environmental ImpactAssessments, Emergency Response Plans, Environmental Risk Assessment,Environmental Auditing & Monitoring, Environmental Management Plans, EnvironmentalManagement Systems and Environmental Training. His area of specialist are mainly innoise prediction modelling and thermal air dispersion modelling, and owns the ENM andAUSPLUME softwares respectively. He is also an expert in the area of risk assessmentmodelling and could offers various modelling options specific to clients need. Majorclients he has served previously were TNB Research, Petronas Carigali (M) S/B, AmcorCorporation, Genting Sanyen, Putrajaya Holdings S/B, Minolta Precision S/B andMatsushita Electric Motor S/B.

Dinesh NadarajahDinesh is also an associate member to ARDHMILLENIA and holds a Master Degree inenvironment related studies. His professional registration includes an EIA registeredIndividual with Department Of Environment (DOE), Registered Environmental Auditor withIEMA/EARA, Approved EMS ISO 14001 Trainer with SIRIM and Approved OHSAS18001, ISO 14001 & ISO 9001:2000 Trainer with Federation of Malaysian Manufacturers.Dinesh has served various Environment Consultancy firms locally and over sea andamongst them were Thailand, Indonesia, Brunei, New Zealand and USA.

His area of specialist are training & environmental auditing. He has conducted more than300 EHS Management related courses locally and over sea. He has assisted a fewmajor Clients to achieve ISO 14001certification with ‘0’ non compliances from the thirdparty certification bodies including Lloyds Register, DNV and AJA Certification Services.He is an also expert in Integrated ISO14001 & OHSAS 18001 Management Systemwhich he conducted in Pt Pratama Abadi, Indonesia. Dinesh has been conducting EIACompliance Audits since 1995 and has acted as Lead Auditors for various mega projectssuch as KLIA, Bakun Hydroelectric Dam & Sg. Selangor Phase 3 water scheme project.

Zulkornain Nayan

Zulkornain Nayan, a graduate in Geology from University of Nebraska, Lincoln is aregistered environmental consultant with the Department of Environment (DOE). (Reg.No. C0024). He started his environmental consultancy career with MAB EnvironmentalConsultants S/B in 1994. Over the stint of nearly 5 years with the company, hisinvolvement and experience cover a wide range of tasks and job scope from conductingsite investigation, environmental impact assessment (EIA), monitoring, reporting &presentation, post-EIA monitoring & compliance, public & regulatory liaison, projectmanagement, etc. Over the progression of his career with other companies, he wasinvolved in several key projects either in consultancy or environmental monitoring &compliance auditing such as Bakun Hydroelectric Dam, and Pahang-Selangor WaterTransfer and Sungai Selangor Phase 3 Water Supply Scheme (K. Kubu Baru Dam). Hehad also been involved in the first-of-its-kind in Malaysia, a Decommissioning andDisposal Project for a Long-Term (Radioactive) Storage Facility in the capacity ofundertaking a Radiological Impact Assessment of the project. Though currentlyZulkornain is employed with a biomass energy plant, a project registered with the CleanDevelopment Mechanism (CDM) of the UNFCCC (United Nations Framework on ClimaticChange), he is still very much involved in environmental impact assessment, monitoringand compliance auditing works.

Panel of SpecialistPeter LouisPeter is an associate member to ARDHMILLENIA. His experience covers local as well asover sea and among countries he has served are USA, Singapore, Australia, NewZealand, United Kingdom and Pakistan. He has done extensive Environmental ImpactAssessments, Emergency Response Plans, Environmental Risk Assessment,Environmental Auditing & Monitoring, Environmental Management Plans, EnvironmentalManagement Systems and Environmental Training. His area of specialist are mainly innoise prediction modelling and thermal air dispersion modelling, and owns the ENM andAUSPLUME softwares respectively. He is also an expert in the area of risk assessmentmodelling and could offers various modelling options specific to clients need. Majorclients he has served previously were TNB Research, Petronas Carigali (M) S/B, AmcorCorporation, Genting Sanyen, Putrajaya Holdings S/B, Minolta Precision S/B andMatsushita Electric Motor S/B.

Dinesh NadarajahDinesh is also an associate member to ARDHMILLENIA and holds a Master Degree inenvironment related studies. His professional registration includes an EIA registeredIndividual with Department Of Environment (DOE), Registered Environmental Auditor withIEMA/EARA, Approved EMS ISO 14001 Trainer with SIRIM and Approved OHSAS18001, ISO 14001 & ISO 9001:2000 Trainer with Federation of Malaysian Manufacturers.Dinesh has served various Environment Consultancy firms locally and over sea andamongst them were Thailand, Indonesia, Brunei, New Zealand and USA.

His area of specialist are training & environmental auditing. He has conducted more than300 EHS Management related courses locally and over sea. He has assisted a fewmajor Clients to achieve ISO 14001certification with ‘0’ non compliances from the thirdparty certification bodies including Lloyds Register, DNV and AJA Certification Services.He is an also expert in Integrated ISO14001 & OHSAS 18001 Management Systemwhich he conducted in Pt Pratama Abadi, Indonesia. Dinesh has been conducting EIACompliance Audits since 1995 and has acted as Lead Auditors for various mega projectssuch as KLIA, Bakun Hydroelectric Dam & Sg. Selangor Phase 3 water scheme project.

Zulkornain Nayan

Zulkornain Nayan, a graduate in Geology from University of Nebraska, Lincoln is aregistered environmental consultant with the Department of Environment (DOE). (Reg.No. C0024). He started his environmental consultancy career with MAB EnvironmentalConsultants S/B in 1994. Over the stint of nearly 5 years with the company, hisinvolvement and experience cover a wide range of tasks and job scope from conductingsite investigation, environmental impact assessment (EIA), monitoring, reporting &presentation, post-EIA monitoring & compliance, public & regulatory liaison, projectmanagement, etc. Over the progression of his career with other companies, he wasinvolved in several key projects either in consultancy or environmental monitoring &compliance auditing such as Bakun Hydroelectric Dam, and Pahang-Selangor WaterTransfer and Sungai Selangor Phase 3 Water Supply Scheme (K. Kubu Baru Dam). Hehad also been involved in the first-of-its-kind in Malaysia, a Decommissioning andDisposal Project for a Long-Term (Radioactive) Storage Facility in the capacity ofundertaking a Radiological Impact Assessment of the project. Though currentlyZulkornain is employed with a biomass energy plant, a project registered with the CleanDevelopment Mechanism (CDM) of the UNFCCC (United Nations Framework on ClimaticChange), he is still very much involved in environmental impact assessment, monitoringand compliance auditing works.

Page 26