format laporan seismik 2d

1
LABORATORIUM GEOLOGI MINYAK DAN GAS BUMI PROGRAM STUDI TEKNIK GEOLOGI FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO Format Laporan Interpretasi Seismik 2D BAB I PENDAHULUAN (Maksud, Tujuan, Waktu Pelaksanaan Praktikum) BAB II DASAR TEORI BAB III METODOLOGI (Alat dan Baha, Data, Cara Kerja) BAB IV PEMBAHASAN (Interpretasi Horizon, Interpretasi Struktur Geologi, Time Structure Map. Velocity Analisis, Depth Structure Map, Analisis Model Stratigrafi, Analisis Model Struktur Geologi) BAN VI KESIMPULAN DAN SARAN Daftar Pustaka Lampiran (Lampiran Time Structure Map, Lampiran Velocity Analisis, Lampiran Depth Structure Map) Margin: Top 4cm, Left 4 cm, Right 3 cm, Bottom 3 cm, TNR, 12, spasi 1,5 Laporan dikumpul di Kenan, Sabtu, 9 Juni 2012 23.59

Upload: ronnie-tyrone

Post on 25-Oct-2015

15 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Format Laporan Seismik 2d

LABORATORIUM GEOLOGI MINYAK DAN GAS BUMI

PROGRAM STUDI TEKNIK GEOLOGI

FAKULTAS TEKNIK

UNIVERSITAS DIPONEGORO

Format Laporan Interpretasi Seismik 2D

BAB I PENDAHULUAN

(Maksud, Tujuan, Waktu Pelaksanaan Praktikum)

BAB II DASAR TEORI

BAB III METODOLOGI

(Alat dan Baha, Data, Cara Kerja)

BAB IV PEMBAHASAN

(Interpretasi Horizon, Interpretasi Struktur Geologi, Time Structure Map. Velocity

Analisis, Depth Structure Map, Analisis Model Stratigrafi, Analisis Model Struktur

Geologi)

BAN VI KESIMPULAN DAN SARAN

Daftar Pustaka

Lampiran

(Lampiran Time Structure Map, Lampiran Velocity Analisis, Lampiran Depth

Structure Map)

Margin: Top 4cm, Left 4 cm, Right 3 cm, Bottom 3 cm, TNR, 12, spasi 1,5

Laporan dikumpul di Kenan, Sabtu, 9 Juni 2012 23.59