tajuk sebutharga : pembekalan, penghantaran, · pdf filesebutharga solid works : kejuruteraan...
TRANSCRIPT
No. Sebutharga : FAMA/BSH 134/2014 (B)
Tarikh Panggilan : 02 JULAI 2014
Tarikh Tutup : 04 JULAI 2014
1 3 Lesen *
Pembekal perlu
memberikan
version terkini
semasa installasi
2
1 Lesen *
Pembekal perlu
memberikan
version terkini
semasa installasi3 2 User
4 3 User
Tarikh Tutup : jam 12:00 tengahari
Nama Syarikat : Cop Syarikat :
Alamat : Tarikh :
No. Tel : Email :
Latihan System Administration
JUMLAH BESAR (RM)
Harga (RM)
LEMBAGA PEMASARAN PERTANIAN PERSEKUTUAN
Solid Works Enterprise PDM 2013 Lisen
• An Intergrated CAD Client that support working
with all files types, including enhanced
management and previewing of many CAD formats
• Engineering & Product Data Management
• Engineering WOrklofw control and approval
• Product revision controland audit trial
• Rule based approval and access security control
• Intergrated with ERP
BORANG SEBUTHARGA 'B'
Latihan Software untuk End User
Bil. Butiran
PEMBEKALAN, PENGHANTARAN, PENGUJIAN, PENTAULIAHAN DAN
PENYELENGGARAAN PERISIAN SOLID WORKS ENTERPRISER PDM
2013 LICENSE DI LEMBAGA PEMASARAN PERTANIAN PERSEKUTUAN
(FAMA)
Tajuk Sebutharga :
Kuantiti
MS SQL Database System
email sebutharga kepada : [email protected]
SEBUTHARGA SOLID WORKS : KEJURUTERAAN Page 1
BAHAGIAN III
SEBUT HARGA PEMBEKALAN, PENGHANTARAN, PENGUJIAN, PENTAULIAHAN DAN PENYELENGGARAAN PERISIAN SOLID
WORKS ENTERPRISER PDM 2013 LICENSE DI LEMBAGA PEMASARAN PERTANIAN PERSEKUTUAN (FAMA)
No Lesen Kuantiti Cadangan Penyebutharga
1 Solid Works Enterprise PDM 2013
Lisen
An Intergrated CAD Client that
support working with all files types, including enhanced management and previewing of
many CAD formats
Engineering & Product Data
Management
Engineering WOrklofw control
and approval
Product revision controland
audit trial
Rule based approval and access
security control
Intergrated with ERP
3 Lisen * Pembekal perlu memberikan
version terkini semasa installasi
2 MS SQL Database System 1 Lisen * Pembekal perlu memberikan version terkini semasa installasi
3 Latihan System Administration 2 User
4 Latihan Software untuk End User 3 User
Page 2 of 8
UAT PEMATUHAN SPESIFIKASI
BIL SPESIFIKASI UMUM PEMATUHAN (Y/T) CADANGAN/KETERANGAN
1 Business requirement Study (BRS)
2 System Installation and Core Team Training
3 CAD Data and Office Documentation Managemenat
4 Data Model Migration and loading
5 UAT Documentation
6 System Functional Testing
7 Tranfer of Technology
Page 3 of 8
JADUAL PEMATUHAN SYARAT-SYARAT JIKA DIPILIH
BIL SPESIFIKASI UMUM YA TIDAK CADANGAN/KETERANGAN
1 Pembekal dikehendaki memberi hak milik source code kepada
SUKNS (Due to Seksyen 26(3) Akta Hakcipta 1987, "Copyright
conferred by section 11 shall vest initially in the Government,
Government organizations or internationally body and not in
the author)
2 Pembekal dikehendaki menandatangani Surat Setuju Terima
dan perjanjian kontrak berasaskan spesifikasi Sebut Harga
dan rundingan antara kedua-dua pihak (jika ada) bagi
memastikan kelancaran projek
Page 4 of 8
Lampiran A3
FORM C – EXPERIENCE RECORD
Particulars of all projects completed within the last five years
DESCRIPTION &
LOCATION OF CONTRACT/
PROJECT
CLIENT
NAME & ADDRESS
S.O./
CONSULTANT IN-CHARGE
CONTRACT VALUE IN
RINGGIT
DATE OF
COMMENCEMENT
CONTRACT
DATE FOR COMPLETION
ACTUAL
DATE OF COMPLETION
As Main Contractor
*As Sub-Contractor
Important Notes: (1) The Completion Certificate for each project completed and listed above must be submitted together with the tender. (2)* Value of work undertaken in the capacity of a sub-contractor to the main contractor of the project stated.
A Certified copy of the sub-contract agreement must be submitted together with the tender.
(3)**The Contract date for completion shall include any approved Extension of Time.
Lampiran A4 FORM D – LIST OF CURRENT CONTRACTS
The Quotation is to insert below the particulars of all projects currently undertaken by him NAME &
DESCRIPTION OF PROJECTS
*
JKR OR JPS
CONTRACT NOS. OR
NAME OF
EMPLOYER
NAME AND
ADDRESS OF PROJECT
ENGINEER
CONTRACT
VALUE (RM)
DATE OF
COMMENCE-MENT
COMPLETION
PERIOD ** (WEEKS)
PROGRESS OF WORKS
DATE
SCHEDULE
ACTUAL
* If the Quotation has no current project the word ‘NIL’ shall be inserted. ** A completion period shall include any approved extension of time.
Page 6 of 8
Lampiran A5 FORM E – TECHNICAL STAFF
(Details of technical staff employed at the time of tender)
* NAME & I/C
NO.
AGE **PROFESSIONAL
/ACADEMIC
QUALIFICATION
YEAR
QUALIFIED
DATE OF EMPLOYMENT POST HELD/
PRESENT
DUTIES
PAST EXPERIENCE
(POST HELD, NAME OF
PROJECT,EMPLOYER’S
NAME AND PERIOD OF EMPLOYEE ETC.
* A Copy of EPF statement ‘A’ for every staff for the last month of contribution shall be submitted ** A copy of certificate of qualification or membership of Professional Bodies shall be submitted.
LAMPIRAN E
PENGALAMAN PENYEBUT HARGA (SEKTOR AWAM & SWASTA)
LOKASI & ALAMAT KLIEN NAMA & JAWATAN PEGAWAI YG DIHUBUNGI & NO. TELEFON
PENGALAMAN
Page 8 of 8
LAMPIRAN F
MAKLUMAT ‘REGIONAL OFFICE’ PENYEBUT HARGA
Negeri/ Lokasi Nama & Alamat ‘Regional Office’