sabah, malaysia warta kerajaan · dalam bentuk dan kandungan yang sesuai dan wajar bagi tujuan...
TRANSCRIPT
Jil. LXVIII] [No. 46KOTA KINABALU, KHAMIS, 14 NOVEMBER 2013
Kenyataan-kenyataan berikut adalah diterbitkan atas perintah Tuan YangTerutama Yang di-Pertua Negeri untuk Makluman Umum.
TAN SRI DATUK SERI PANGLIMA HAJI SUKARTI BIN WAKIMAN,Setiausaha Kerajaan Negeri.
SABAH, MALAYSIA
Warta KerajaanDiterbitkan dengan kuasa
No. 824 [No. SPANS: KP. 800-1/19/4/4
KENAIKAN PANGKAT
Suruhanjaya Perkhidmatan Awam Negeri Sabah telah meluluskan kenaikan pangkatsecara hakiki Encik Mohd. Salleh bin Abbas ke jawatan Pemelihara Hutan Gred G44 mulai25 Julai 2013.
[No. SPANS: KP. 800-1/19/4/4
Suruhanjaya Perkhidmatan Awam Negeri Sabah telah meluluskan kenaikan pangkatsecara hakiki Encik Samit bin Abd. Sani ke jawatan Pemelihara Hutan Gred G44 mulai 25Julai 2013.
_______
No. 825 [No. SPANS: P. 018653/189
PELANTIKAN PEGAWAI SEDANG BERKHIDMAT
Suruhanjaya Perkhidmatan Awam Negeri Sabah telah meluluskan pelantikan pegawaisedang berkhidmat Puan Debra binti Epun @ George secara percubaan 1 - 3 tahun kejawatan tetap Pegawai Veterinar, Gred G41 mulai 1 Mac 2013 sebagai pertukaran darijawatan Penolong Veterinar Gred G27.
WARTA KERAJAAN NEGERI SABAH 14 November 20132,402
No. 826 [No. KKT&P: 400-14/2 Jld. 5 (18)
SIJIL KETUA AUDIT NEGARA MENGENAI PENYATA KEWANGANLEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR
BAGI TAHUN BERAKHIR 31 DISEMBER 2011
Penyata Kewangan Lembaga Pembangunan Perumahan dan Bandar dan Kumpulanbagi tahun berakhir 31 Disember 2011 telah diaudit oleh wakil saya. Pihak pengurusanbertanggungjawab terhadap Penyata Kewangan ini. Tanggungjawab saya adalah mengauditdan memberi pendapat terhadap Penyata Kewangan tersebut.
2. Pengauditan telah dilaksanakan mengikut Akta Audit 1957 dan berpandukan piawaianpengauditan yang diluluskan. Piawaian tersebut menghendaki pengauditan dirancang dandilaksanakan untuk mendapat kepastian yang munasabah sama ada Penyata Kewanganadalah bebas daripada kesilapan atau ketinggalan yang ketara. Pengauditan itu termasukmemeriksa rekod secara semak uji, menyemak bukti yang menyokong angka dan memastikanpendedahan yang mencukupi dalam Penyata Kewangan. Penilaian juga dibuat terhadapprinsip perakaunan yang digunakan, unjuran signifikan oleh pengurusan dan persembahanPenyata Kewangan secara keseluruhan. Saya percaya pengauditan yang dilaksanakanmemberi asas yang munasabah terhadap pendapat saya.
3. Kecuali apa yang dinyatakan dalam Laporan Ketua Audit Negara pada pendapat sayaPenyata Kewangan ini memberi gambaran yang benar dan saksama terhadap kedudukankewangan Lembaga Pembangunan Perumahan dan Bandar pada 31 Disember 2011, hasiloperasi dan aliran tunainya untuk tahun tersebut berdasarkan piawaian perakaunan yangdiluluskan.
4. Saya telah mempertimbangkan, Penyata Kewangan dan Laporan Juruaudit bagi semuasubsidiari yang tidak diaudit oleh saya seperti yang dinyatakan dalam nota kepada PenyataKewangan disatukan. Saya berpuas hati bahawa Penyata Kewangan berkenaan yang telahdisatukan dengan Penyata Kewangan Lembaga Pembangunan Perumahan dan Bandar adalahdalam bentuk dan kandungan yang sesuai dan wajar bagi tujuan penyediaan PenyataKewangan Disatukan. Saya juga telah menerima maklumat dan penjelasan yang memuaskansebagaimana yang dikehendaki bagi tujuan tersebut.
5. Kecuali seperti yang dinyatakan dalam Laporan Ketua Audit Negara, Laporan Juruauditmengenai Penyata Kewangan subsidiari berkenaan tidak mengandungi sebarang pemerhatianyang boleh menjejaskan Penyata Kewangan Disatukan.
PATIMAH BINTI RAMUJI,b.p. Ketua Audit Negara,
Malaysia.
Kota Kinabalu.
Bertarikh: 8 Oktober 2012.
WARTA KERAJAAN NEGERI SABAH 2,40314 November 2013
LAPORAN KETUA AUDIT NEGARA MENGENAI PENYATA KEWANGANLEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR
BAGI TAHUN BERAKHIR 31 DISEMBER 2011
Laporan Ketua Audit Negara ini hendaklah dibaca bersama-sama dengan Sijil Ketua AuditNegara bagi menyokong pendapat Audit terhadap Penyata Kewangan tersebut.
2. Pemerhatian Audit terhadap Penyata Kewangan adalah seperti berikut:
2.1 Pelbagai Penghutang
Syarikat Sri Sathanas Sdn. Bhd. telah pun dibubarkan sejak tahun 2004 tetapibaki hutang syarikat tersebut yang berjumlah RM0.35 juta masih diambil kiradalam Penyata Kewangan LPPB. Ini menyebabkan amaun Pelbagai Penghutangtidak menunjukkan kedudukan sebenar.
2.2 Hutang Kepada Syarikat Subsidiari
LPPB tidak menyediakan Peruntukan Hutang Ragu terhadap hutang 3 buahsyarikat subsidiari berjumlah RM9.32 juta yang tidak menunjukkan pergerakanmelebihi 3 tahun dan keupayaan syarikat membayar balik agak diragui. Selainitu, Sijil Juruaudit bagi Supernesa Sdn. Bhd. dan Superpanel (S) Sdn. Bhd. jugatelah menyentuh keupayaan berterusan bagi 2 subsidiari LPPB tersebut. ManakalaSijil Penafian diberikan kepada Kuala Menggatal Development Corporation Sdn.Bhd.
3. Langkah-langkah pembetulan yang sewajarnya hendaklah diambil oleh pihakpengurusan Lembaga Pembangunan Perumahan dan Bandar untuk meningkatkan lagiakauntabiliti awam.
PATIMAH BINTI RAMUJI,b.p. Ketua Audit Negara,
Malaysia.
Kota Kinabalu.
Bertarikh: 8 Oktober 2012.
WARTA KERAJAAN NEGERI SABAH 14 November 20132,404
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
STATEMENT BY THE CHAIRMAN AND GENERAL MANAGER
In our opinion, the financial statements set out on pages 2,406 to 2,426 are drawn upso as to give a true and fair view of the state of affairs of the Authority as at 31st December,2011 and of the results of its operations and cash flows for the year ended on that date.
On behalf of the Board,
DATUK RUBIN BALANG
(Chairman)
HAJJAH ROSNANI BINTI ASMAT
(General Manager)
Kota Kinabalu.
Date: 11th June, 2012.
WARTA KERAJAAN NEGERI SABAH 2,40514 November 2013
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
STATUTORY DECLARATION
I, CHIN SU ME, the officer primarily responsible for the financial management of LembagaPembangunan Perumahan dan Bandar (Housing and Town Development Authority),do solemnly and sincerely declare that the financial statements set out on pages 2,406 to2,426 are, to the best of my knowledge and belief, correct, and I make this solemn declarationconscientiously believing the same to be true and by virtue of the provisions of the StatutoryDeclarations Act, 1960.
Subscribed and solemnly declared bythe abovenamed CHIN SU ME at }Kota Kinabalu in the State of Sabah CHIN SU ME
on 11th June, 2012.
Before me,
DATUK CLAUDIUS ROMAN, J.P.,Pesuruhjaya Sumpah,
Malaysia.
Kota Kinabalu.
WARTA KERAJAAN NEGERI SABAH 14 November 20132,406
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
BALANCE SHEET AT 31ST DECEMBER, 2011
Note 2011 2010RM RM
PROPERTY, PLANT AND EQUIPMENT 3 14,860,422 16,016,209INVESTMENTS IN SUBSIDIARIES ... 4 7,417,689 7,417,689HOUSING DEBTORS ... ... ... 5 28,758,315 25,780,063
51,036,426 49,213,961
CURRENT ASSETS
Housing debtors ... ... ... 5 12,616,373 9,997,883Inventories of unsold houses ... 6 19,581,545 28,059,166Development properties ... ... 42,206,852 17,760,423Other receivables, deposits and
prepayments ... ... ... ... 7 19,981,439 12,410,612Amount due from subsidiaries ... 8 9,325,084 8,935,769Fixed deposits ... ... ... 9 55,689,169 57,446,509Cash and bank balances ... ... 7,448,603 12,780,943
166,849,065 147,391,305
CURRENT LIABILITIES
Trade payables ... ... ... 10 8,111,935 5,801,491Other payables and accruals ... 61,255,837 48,109,335Provision ... ... ... ... 11 2,781,347 3,577,387Housing deposits ... ... ... 100,126 2,013,973State Government loans ... ... 12 13,136,687 17,868,886Federal Government loans ... ... 13 19,897,889 18,571,344Government trust funds ... ... 14 12,337,255 9,116,452
117,621,076 105,058,868
NET CURRENT ASSETS ... ... 49,227,989 42,332,437
100,264,415 91,546,398
WARTA KERAJAAN NEGERI SABAH 2,40714 November 2013
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
BALANCE SHEET AT 31ST DECEMBER, 2011 - (cont.)
Note 2011 2010RM RM
FINANCED BY:
ACCUMULATED FUNDS ... ... 68,255,689 58,985,311
LONG TERM AND DEFERRED
LIABILITIES
State Government loans ... ... 12 18,424,087 18,418,787Federal Government loans ... ... 13 13,584,639 14,142,300
32,008,726 32,561,087
100,264,415 91,546,398
WARTA KERAJAAN NEGERI SABAH 14 November 20132,408
REVENUE ... ... ... ... ... 15 32,134,387 22,483,547
Cost of sales ... ... ... ... - -
GROSS PROFIT ... ... ... ... 32,134,387 22,483,547Other operating income ... ... 12,248,167 10,576,448Administrative expenses ... ... (36,218,040) (23,870,661)
OPERATING PROFIT ... ... ... 16 8,164,514 9,189,334
Interest income ... ... ... ... 2,892,909 1,600,552Interest expense ... ... ... (1,366,602) (1,178,414)
PROFIT BEFORE TAXATION ... ... 9,690,821 9,611,472
Tax expense ... ... ... ... 17 (420,443) (57,623)
NET PROFIT OF THE YEAR ... ... 9,270,378 9,553,849
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
INCOME STATEMENT FOR THE YEAR ENDED 31ST DECEMBER, 2011
Note 2011 2010RM RM
WARTA KERAJAAN NEGERI SABAH 2,40914 November 2013
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
STATEMENT OF CHANGES IN EQUITY FOR THE YEAR ENDED
31ST DECEMBER, 2011
Accumulated funds
RM
At 1st January 2010 ... ... ... ... ... 49,431,462
Net profit for the year ... ... ... ... 9,553,849
At 31st December 2010 ... ... ... ... ... 58,985,311
Net profit for the year ... ... ... ... ... 9,270,378
At 31st December 2011 ... ... ... ... ... 68,255,689
WARTA KERAJAAN NEGERI SABAH 14 November 20132,410
CASH FLOWS FROM OPERATING ACTIVITIES
Profit before taxation ... ... ... ... ... 9,690,821 9,611,472Adjustments for:
Depreciation ... ... ... ... ... ... 1,379,590 1,462,264Gain on disposal of property, plant and
equipment ... ... ... ... ... (180,319) (168)Interest expense ... ... ... ... ... 1,366,602 1,178,414Interest income ... ... ... ... ... (2,892,909) (1,600,552)Government loan converted to grant ... ... (5,738,554) (5,312,187)
Operating profit before working capital changes 3,625,231 5,339,243(Increase)/Decrease in working capital:
Housing debtors ... ... ... ... ... (5,596,743) 3,956,544Inventories of unsold houses ... ... ... 8,477,621 2,068,471Development properties ... ... ... ... (24,446,429) 1,282,502Trade and other receivables ... ... ... (7,587,271) 5,557,978Amount due from subsidiaries ... ... ... (389,314) (486,497)Trade and other payables ... ... ... 13,221,252 4,962,677
Cash generated from operations ... ... ... (12,695,653) 22,680,918
Interest paid ... ... ... ... ... ... (60,254) (60,518)Income tax paid ... ... ... ... ... (404,000) (57,623)
N E T C A S H G E N E R A T E D F R O M/(U S E D I N)OPERATING ACTIVITIES ... ... ... ... (13,159,907) 22,562,777
CASH FLOWS FROM INVESTING ACTIVITIES
Interest received ... ... ... ... ... 2,892,909 1,600,552Proceeds from disposal of property, plant and
equipment ... ... ... ... ... ... 199,755 200Purchase of property, plant and equipment ... (243,240) (3,335,254)
CASH (USED IN)/GENERATED FROM INVESTINGACTIVITIES ... ... ... ... ... ... 2,849,424 (1,734,502)
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
CASH FLOW STATEMENT FOR THE YEAR ENDED
31ST DECEMBER, 2011
2011 2010RM RM
WARTA KERAJAAN NEGERI SABAH 2,41114 November 2013
CASH FLOWS FROM FINANCING ACTIVITIES
Drawdown of State Government loans ... - 213,544Drawdown of State Government trust funds ... 3,220,803 -Repayment of Government trust funds... ... - (324,455)
CASH USED IN FINANCING ACTIVITIES ... ... 3,220,803 (110,911)
NET INCREASE/(DECREASE) IN CASH AND CASH EQUIVALENTS ... ... ... ... ... (7,089,680) 20,717,364
C A S H A N D C A S H E Q U I V A L E N T S A TBEGINNING OF THE YEAR ... ... ... 64,227,452 43,510,088
CASH AND CASH EQUIVALENTS AT END OFTHE YEAR ... ... ... ... ... ... 57,137,772 64,227,452
CASH AND CASH EQUIVALENTS COMPRISE:Cash and bank balances ... ... ... ... 7,448,603 12,780,943
Fixed deposits ... ... ... ... ... 55,689,169 57,446,509
Less: Deposits pledged ... ... ... ... (6,000,000) (6,000,000)
57,137,772 64,227,452
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
CASH FLOW STATEMENT FOR THE YEAR ENDED
31ST DECEMBER, 2011 - (cont.)
2011 2010RM RM
WARTA KERAJAAN NEGERI SABAH 14 November 20132,412
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011
1. PRINCIPAL ACTIVITIES
The Authority is a State-owned agency and is governed by the Housing and TownDevelopment Authority Enactment, 1981. The principal activities of the Authority areto develop low cost housing and township projects. There has been no significant changein the nature of these activities during the financial year.
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
The following accounting policies are adopted by the Authority and are consistent withthose adopted in the previous years.
(a) Basis of accounting
The financial statements of the Authority are prepared on the historical costbasis and in compliance with applicable approved accounting standards inMalaysia.
(b) Property, plant and equipment
Property, plant and equipment are stated at cost or valuation less accumulateddepreciation and impairment losses, if any.
(c) Depreciation
The straight line method is used to write-off the cost of the following assets overthe term of their estimated useful lives at the following principal annual rates:
Long term leasehold land over 50 yearsBuildings 2%Motor vehicles 20%Office furniture, fittings and equipment 10% - 20%Renovation 10%Computer Software 20%
(d) Impairment
The carrying amounts of the Authority’s assets, other than inventories andfinancial assets (other than investments in subsidiaries), are reviewed at eachbalance sheet date to determine whether there is any indication of impairment. Ifany such indication exists, the asset’s recoverable amount is estimated. Animpairment loss is recognised whenever the carrying amount of an asset or thecash-generating unit to which it belongs exceeds its recoverable amount.Impairment losses are recognised in the income statement, unless the asset iscarried at a revalued amount, in which case the impairment loss is charged toequity.
WARTA KERAJAAN NEGERI SABAH 2,41314 November 2013
The recoverable amount is the greater of the asset’s net selling price and itsvalue in use. In assessing value in use, estimated future cash flows are discountedto their present value using a pre-tax discount rate that reflects current marketassessments of the time value of money and the risks specific to the asset. For anasset that does not generate largely independent cash inflows, the recoverableamount is determined for the cash-generating unit to which the asset belongs.
An impairment loss in respect of goodwill is not reversed unless the loss wascaused by a specific external event of an exceptional nature that is not expected torecur and subsequent external events have occurred that reverse the effect of thatevent.
In respect of other assets, an impairment loss is reversed if there has been a changein the estimates used to determine the recoverable amount.
An impairment loss is reversed only to the extent that the asset’s carrying amountdoes not exceed the carrying amount that would have been determined, netof depreciation or amortisation, if no impairment loss had been recognised. Thereversal is recognised in the income statement, unless it reverses an impairmentloss on a revalued asset, in which case it is taken to equity.
(e) Development properties
Land and development expenditure whereby significant development work hasbeen undertaken and is expected to be completed within the normal operatingcycle are classified as development properties. Development properties arestated at cost plus attributable profits less foreseeable losses, net of progressbillings. Cost includes cost of land, all direct building cost, and other relateddevelopment expenditure incurred during the period of development.
(f) Inventories of unsold houses
Inventories of unsold houses are stated at the lower of cost and net realisablevalue. Costs include apportioned land cost and development expenditureincurred.
(g) Revenue
(i) Property development
Profit from property development is recognised using the percentageof completion method. Where foreseeable losses are anticipated, fullprovision for these losses is made in the financial statements.
(ii) Developed properties
Profit on developed properties is recognised when transfer of risks andrewards has been completed.
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,414
(iii) Privatised projects
Profit on privatised projects is recognised on an accrual basis based onstipulated fixed schedule.
(iv) Rental income
Rental income is recognised on an accrual basis.
(v) Interest income
Interest income is recognised in the income statement as it accrues, takinginto account the effective yield on the asset.
(vi) Dividend Income
Dividend income is recognised when the right to receive payment isestablished.
(h) Interest on borrowings
Interest on borrowings is charged against income and no part of the interest istreated as an inherent part of the total cost of property development.
(i) Provisions
A provision is recognised when it is probable that an outflow of resourcesembodying economic benefits will be required to settle a present obligation (legalor constructive) as a result of a past event and a reliable estimate can be made of theamount.
(i) Provision for repairs and maintenance on completed projects
Provision for repairs and maintenance is made at 5% of cost for low costhousing projects and 3% for all other projects upon their completion.
(j) Employee benefits
(i) Short term benefits
Wages, salaries, paid leave and sick leave, bonus and non-monetarybenefits are recognised in the year in which associated services are renderedby employees of the Authority.
(ii) Defined contribution plans
Obligations for contributions to defined contribution plans are recognisedas an expense in the income statement as incurred. Other retirement benefitsare charged against income as and when paid.
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
WARTA KERAJAAN NEGERI SABAH 2,41514 November 2013
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
(k) Government trust funds
Grants and Trust Funds received from the Federal and State Governments for thedevelopment of specific projects are utilised to meet the cost of developingthose projects. At the completion of the project, any excess Trust Fund isrefundable to the respective governments, while shortfalls are to be recoveredand shown as a debit balance in the respective fund.
(l) Investments
Long term investments in subsidiaries are stated at cost in the Authority, lessimpairment loss where applicable.
(m) Taxation
Tax on the profit or loss for the year comprises current and deferred tax. Incometax is recognised in the income statement except to the extent that it relates to itemsrecognised directly in equity, in which case it is recognised in equity.
Current tax expense is the expected tax payable on the taxable income for the year,using tax rates enacted or substantially enacted at the balance sheet date, and anyadjustment to tax payable in respect of previous years.
Deferred tax is provided, using the liability method, on temporary differencesarising between the tax bases of assets and liabilities and their carrying amounts inthe financial statements. The amount of deferred tax provided is based on theexpected manner of realisation or settlement of the carrying amount of assets andliabilities, using tax rates enacted or substantially enacted at the balance sheet date.
A deferred tax asset is recognised only to the extent that it is probable that futuretaxable profits will be available against which the asset can be utilised.
(n) Cash and cash equivalents
Cash and cash equivalents consist of cash on hand, balances and deposits withbanks. For the purpose of the cash flow statement, cash and cash equivalents arepresented net of bank overdrafts and pledged deposits.
(o) Receivables
Receivables are carried at anticipated realisable value. Bad debts are duly writtenoff. An estimate is made for doubtful debts based on a review of all outstandingamounts at the year end.
(p) Payables
Payables are stated at cost which is the fair value of the consideration to be paid inthe future for goods and services rendered.
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,416
Cos
tA
t 1st
Jan
uary
, 201
1...
......
4,99
5,17
310
,438
,308
4,64
9,80
54,
231,
129
24,3
14,4
15A
dditi
ons
......
......
...25
0-
-24
2,99
024
3,24
0T
rans
fers
......
......
...(2
8,48
7)-
--
(28,
487)
Dis
posa
ls...
......
......
--
(639
,798
)-
(639
,798
)
At 3
1st D
ecem
ber,
2011
......
4,96
6,93
610
,438
,308
4,01
0,00
74,
474,
119
23,8
89,3
70
Dep
reci
atio
nA
t 1st
Jan
uary
, 201
1...
......
422,
894
3,03
5,23
52,
201,
376
2,63
8,70
18,
298,
206
Cha
rge
for
the
year
......
...99
,334
208,
766
724,
454
347,
036
1,37
9,59
0T
rans
fers
......
......
...(9
,055
)-
--
(9,0
55)
Dis
posa
ls...
......
......
--
(639
,793
)-
(639
,793
)
At 3
1st D
ecem
ber,
2011
......
513,
173
3,24
4,00
12,
286,
037
2,98
5,73
79,
028,
948
Net
Boo
k V
alue
At 3
1st D
ecem
ber,
2011
......
4,45
3,76
37,
194,
307
1,72
3,97
01,
488,
382
14,8
60,4
22
At 3
1st D
ecem
ber,
2010
......
4,57
2,27
97,
403,
073
2,44
8,42
91,
592,
428
16,0
16,2
09
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent A
utho
rity
)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
3.P R
OPE
RT
Y, P
LA
NT
AN
D E
QU
IPM
EN
T
Lon
g te
rmle
aseh
old
land
Mot
orve
hicl
esT
otal
Off
ice
furn
itur
e,fi
ttin
gs a
ndeq
uipm
ent,
and
reno
vati
on
Bui
ldin
gs
RM
RM
RM
RM
RM
WARTA KERAJAAN NEGERI SABAH 2,41714 November 2013
Dep
reci
atio
n
Cha
rge
for t
he y
ear e
nded
31s
t Dec
embe
r,20
10...
......
......
130,
456
208,
766
800,
811
322,
231
1,46
2,26
4
(a)
Titl
e to
cer
tain
bui
ldin
gs o
f the
Aut
hori
ty w
ith c
ost o
f RM
8,84
1,23
0 (2
010
: RM
8,84
1,23
0) h
as y
et to
be
issu
ed.
(b)
Cer
tain
long
term
leas
ehol
d la
nd o
f the
Aut
hori
ty a
re c
harg
ed to
fina
ncia
l ins
titut
ion
as s
ecur
ities
for b
anki
ng fa
cilit
ies
gran
ted
toco
ntra
ctor
s co
stin
g R
M18
,100
,000
(20
10 :
RM
Nil)
.
4.I N
VE
STM
EN
TS
IN S
UB
SID
IAR
IES
2011
2010
RM
RM
Unq
uote
d sh
ares
at c
ost
......
......
......
......
......
10,0
06,0
3010
,006
,030
Les
s: A
llow
ance
for d
imin
utio
n in
val
ue...
......
......
......
...(2
,588
,341
)(2
,588
,341
)
RM
7,41
7,68
9R
M7,
417,
689
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent A
utho
rity
)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
3.P R
OPE
RT
Y, P
LA
NT
AN
D E
QU
IPM
EN
T -
(con
t.)L
ong
term
leas
ehol
dla
ndM
otor
vehi
cles
Tot
alB
uild
ings
RM
RM
RM
RM
RM
Off
ice
furn
itur
e,fi
ttin
gs a
ndeq
uipm
ent,
and
reno
vati
on
WARTA KERAJAAN NEGERI SABAH 14 November 20132,418
The
pri
ncip
al a
ctiv
ities
of
the
subs
idia
ries
, the
ir p
lace
s of
inco
rpor
atio
n an
d th
e in
tere
st o
f L
emba
ga P
emba
ngun
an P
erum
ahan
dan
Ban
dar a
re a
s fo
llow
s:
Eff
ecti
veC
ount
ry o
fO
wne
rshi
pN
ame
of C
ompa
nyP
rinc
ipal
Act
ivit
ies
Inco
rpor
atio
nIn
tere
sts
2011
2010
%%
Kua
la M
engg
atal
Prop
erty
dev
elop
men
tM
alay
sia
9595
D
evel
opm
ent
C
orpo
ratio
n Sd
n. B
hd.
Supe
rnes
a Sd
n. B
hd.
Con
stru
ctio
n w
ork
unde
r co
ntra
ct a
ndM
alay
sia
100
100
prop
erty
dev
elop
men
t
Supe
rpan
el (
Saba
h) S
dn. B
hd.
Hol
ding
of
prop
erti
es f
or r
enta
l,M
alay
sia
100
100
pro
vis
ion
of
con
trac
t w
orks
and
rela
ted
serv
ices
and
insu
ranc
e ag
ency
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
4.I N
VE
STM
EN
TS
IN S
UB
SID
IAR
IES
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 2,41914 November 2013
5.H
OU
SIN
G D
EB
TO
RS
2011
2010
Non
-Cur
rent
RM
RM
Low
cos
t hou
sing
......
......
......
......
......
......
11,7
46,3
856,
573,
555
Low
cos
t sho
phou
ses
......
......
......
......
......
...1,
037,
633
1,86
2,80
5C
omm
erci
al h
ousi
ng...
......
......
......
......
......
9,05
0,89
710
,228
,354
Com
mer
cial
sho
phou
ses
......
......
......
......
......
1,51
7,87
31,
768,
338
Con
dom
iniu
m/f
lats
......
......
......
......
......
...5,
405,
527
5,34
7,01
1
28,7
58,3
1525
,780
,063
Cur
rent
Low
cos
t hou
sing
......
......
......
......
......
......
12,6
16,3
739,
997,
883
RM
41,3
74,6
88R
M35
,777
,946
6.I N
VE
NT
OR
IES
OF
UN
SOL
D H
OU
SES
Inve
ntor
ies
of u
nsol
d ho
uses
of
RM
7,58
4,43
1 (2
010
: RM
12,5
59,1
00)
are
carr
ied
at n
et r
ealis
able
val
ue.
7.O
TH
ER
RE
CE
IVA
BL
ES,
DE
POSI
TS
AN
D P
RE
PAY
ME
NT
S
2011
2010
RM
RM
Oth
er re
ceiv
able
s, d
epos
its a
nd p
repa
ymen
ts...
......
......
......
28,3
47,7
5020
,776
,923
Les
s: A
llow
ance
for d
oubt
ful d
ebts
......
......
......
......
...(8
,366
,311
)(8
,366
,311
)
RM
19,9
81,4
39R
M12
,410
,612
Incl
uded
in
othe
r re
ceiv
able
s, d
epos
its a
nd p
repa
ymen
ts o
f th
e A
utho
rity
are
loa
ns t
o em
ploy
ees
amou
ntin
g to
RM
14,0
09 (
2010
:R
M23
,267
).
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,420
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
8.A
MO
UN
T D
UE F
RO
M S
UB
SID
IAR
IES
The
am
ount
due
from
sub
sidi
arie
s is
uns
ecur
ed, i
nter
est f
ree
and
repa
yabl
e on
dem
and.
9.F I
XE
D D
EPO
SIT
S20
1120
10R
MR
M
Dep
osits
are
pla
ced
with
Lic
ense
d ba
nks.
.....
......
......
......
55,6
89,1
6957
,446
,509
Incl
uded
in th
e fi
xed
depo
sits
is a
n am
ount
of R
M6,
000,
000
(201
0 : R
M6,
000,
000)
of t
he A
utho
rity
hel
d on
lien
by
a lic
ense
d ba
nk fo
rth
e ov
erdr
aft f
acili
ties
of th
e A
utho
rity
.
10.
TR
AD
E P
AY
AB
LE
S
Incl
uded
in tr
ade
paya
bles
of t
he A
utho
rity
is re
tent
ion
sum
of R
M5,
177,
030
(201
0 : R
M4,
700,
983)
.
11.
P RO
VIS
ION
Rep
air
and
mai
nten
ance
RM
Bal
ance
at 1
st J
anua
ry, 2
011
......
......
......
......
......
......
...3,
577,
387
Prov
isio
n m
ade
duri
ng th
e ye
ar...
......
......
......
......
......
......
376,
685
Prov
isio
n us
ed d
urin
g th
e ye
ar...
......
......
......
......
......
......
(331
,738
)Pr
ovis
ion
reve
rsed
dur
ing
the
year
......
......
......
......
......
......
...(8
40,9
87)
Bal
ance
at 3
1st D
ecem
ber,
2011
......
......
......
......
......
......
...R
M2,
781,
347
WARTA KERAJAAN NEGERI SABAH 2,42114 November 2013
12.
STA
TE
GO
VE
RN
ME
NT
LO
AN
S
2011
2010
RM
RM
Stat
e G
over
nmen
t loa
ns -
unse
cure
dC
urre
nt...
......
......
......
......
......
...13
,136
,687
17,8
68,8
86N
on-c
urre
nt...
......
......
......
......
......
...18
,424
,087
18,4
18,7
87
RM
31,5
60,7
74R
M36
,287
,673
Ter
ms
and
debt
s re
paym
ent s
ched
ule
Und
er1
to 2
2 to
5O
ver
5T
otal
1 ye
arye
ars
year
sye
ars
RM
RM
RM
RM
RM
2011
Uns
ecur
ed S
tate
Gov
ernm
ent l
oans
-fix
ed ra
te 4
%...
......
...R
M31
,560
,774
RM
13,1
36,6
87R
M61
0,18
0R
M1,
980,
926
RM
15,8
32,9
81
2010
Uns
ecur
ed S
tate
Gov
ernm
ent l
oans
-fix
ed ra
te 4
%...
......
...R
M36
,287
,673
RM
17,8
68,8
86R
M46
8,89
0R
M1,
861,
516
RM
16,0
88,3
81
Stat
e G
over
nmen
t has
agr
eed
to c
onve
rt th
e go
vern
men
t loa
n to
gra
nt a
mou
ntin
g to
RM
Nil
(201
0 : R
M23
,071
,421
). A
n am
ount
of
RM
5,73
8,55
4 (2
010
: RM
5,31
2,18
7) h
as b
een
conv
erte
d du
ring
the
fina
ncia
l yea
r.
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH
13.
FED
ER
AL
GO
VE
RN
ME
NT
LO
AN
S
2011
2010
RM
RM
Fede
ral G
over
nmen
t loa
ns -
uns
ecur
edC
urre
nt...
......
......
......
......
......
...19
,897
,889
18,5
71,3
44N
on-c
urre
nt...
......
......
......
......
......
...13
,584
,639
14,1
42,3
00
RM
33,4
82,5
28R
M32
,713
,644
Ter
ms
and
debt
s re
paym
ent s
ched
ule
The
loan
s in
tere
st is
pay
able
as
follo
ws:
Loa
ns f
or c
ondo
min
ium
s...
......
......
......
4.0
% to
7.5
% p
er a
nnum
Loa
ns fo
r all
othe
r hou
sing
pro
ject
s...
......
......
4.0%
per
ann
um
Und
er1
to 2
2 to
5O
ver
5T
otal
1 ye
arye
ars
year
sye
ars
RM
RM
RM
RM
RM
2011
Uns
ecur
ed F
eder
al G
over
nmen
t loa
ns...
RM
33,4
82,5
28R
M19
,897
,889
RM
585,
036
RM
1,93
4,54
7R
M11
,065
,056
2010
Uns
ecur
ed F
eder
al G
over
nmen
t loa
ns...
RM
32,7
13,6
44R
M18
,571
,344
RM
557,
661
RM
1,84
3,21
8R
M11
,741
,421
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
14 November 20132,422
WARTA KERAJAAN NEGERI SABAH 2,42314 November 2013
14.
GO
VE
RN
ME
NT
TR
UST
FU
ND
S20
1120
10R
MR
M
Stat
e G
over
nmen
t Hou
sing
Fun
d...
......
......
......
......
34,2
7634
,276
Stat
e Fu
nd fo
r New
Tow
nshi
p...
......
......
......
......
1,27
3,94
41,
134,
843
Stat
e G
over
nmen
t Sub
sidi
es F
und
......
......
......
......
...2,
677,
918
2,67
7,91
8St
ate
Gov
ernm
ent A
genc
y Fu
nds
......
......
......
......
...3,
138,
460
3,26
9,41
5St
ate
Rev
olvi
ng F
und
(SPP
)...
......
......
......
......
...5,
212,
657
2,00
0,00
0
RM
12,3
37,2
55R
M9,
116,
452
15.
RE
VE
NU
E
2011
2010
RM
RM
Prof
it fr
om p
riva
tised
pro
ject
s...
......
......
......
......
33,3
39,0
7420
,242
,891
Prof
it/(L
oss)
from
sal
es o
f com
plet
ed p
rope
rtie
s...
......
......
......
(1,2
04,6
87)
2,24
0,65
6
RM
32,1
34,3
87R
M22
,483
,547
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,424
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
16.
OPE
RA
TIN
G P
RO
FIT
Ope
rati
ng p
rofi
t is
arri
ved
at a
fter
cre
diti
ng:
2011
2010
RM
RM
Gai
n on
dis
posa
l of
prop
erty
, pla
nt a
nd e
quip
men
t...
......
......
...18
0,31
916
8M
anag
emen
t fee
s...
......
......
......
......
......
521,
271
1,24
3,29
3R
enta
l inc
ome
......
......
......
......
......
......
3,75
9,39
02,
705,
411
Gov
ernm
ent l
oan
conv
erte
d to
gra
nt...
......
......
......
......
5,73
8,55
45,
312,
187
and
afte
r ch
argi
ng:
2011
2010
RM
RM
Aud
itors
’ re
mun
erat
ion
......
......
......
......
......
18,2
6523
,163
Boa
rd m
embe
rs’
rem
uner
atio
n-
othe
r em
olum
ents
......
......
......
......
......
...24
5,15
031
3,70
0-
stud
y to
ur...
......
......
......
......
......
...16
0,07
918
7,47
6D
epre
ciat
ion
......
......
......
......
......
......
1,37
9,59
01,
462,
264
WARTA KERAJAAN NEGERI SABAH 2,42514 November 2013
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
17.
TA
X E
XPE
NSE
2011
2010
RM
RM
Cur
rent
tax
expe
nse
......
......
......
......
......
...28
2,33
257
,623
Tax
atio
n un
ders
tate
d...
......
......
......
......
......
138,
111
-
420,
443
57,6
23
Rec
onci
liat
ion
of e
ffec
tive
tax
rate
:
Prof
it be
fore
taxa
tion
......
......
......
......
......
...9,
690,
821
9,61
1,47
2
Inco
me
tax
usin
g M
alay
sia
tax
rate
......
......
......
......
...2,
422,
705
2,40
2,86
8T
ax e
xem
pt in
com
e...
......
......
......
......
......
(6,3
20,3
26)
(2,2
06,2
32)
Non
-ded
uctib
le e
xpen
ses
- ot
hers
......
......
......
......
...4,
346,
628
247,
425
Una
bsor
bed
capi
tal a
llow
ance
now
util
ised
......
......
......
...(1
66,6
75)
(386
,438
)
282,
332
57,6
23
Tax
atio
n un
ders
tate
d...
......
......
......
......
......
138,
111
-
Tax
exp
ense
......
......
......
......
......
......
420,
443
57,6
23
WARTA KERAJAAN NEGERI SABAH 14 November 20132,426
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
18.
EM
PLO
YE
ES
INFO
RM
AT
ION
2011
2010
RM
RM
Staf
f cos
ts...
......
......
......
......
......
...11
,369
,735
11,2
44,3
66
Incl
uded
in st
aff c
osts
of t
he A
utho
rity
is E
mpl
oyee
s Pro
vide
nt F
und
and
othe
r ret
irem
ent b
enef
its o
f RM
946,
816
(201
0 : R
M92
8,66
1).
The
num
ber
of e
mpl
oyee
s of
the
Aut
hori
ty (
excl
udin
g di
rect
ors)
at t
he e
nd o
f th
e ye
ar w
as 1
90 (
2010
: 19
0) r
espe
ctiv
ely.
19.
CO
NT
ING
EN
T L
IAB
ILIT
IES
The
Aut
hori
ty h
as e
xecu
ted
a th
ird
part
y ch
arge
ove
r its
dev
elop
men
t pr
oper
ties
in f
avou
r of
the
fin
anci
al i
nstit
utio
ns f
or b
anki
ngfa
cilit
ies
gran
ted
to d
evel
oper
s an
d co
ntra
ctor
s am
ount
ing
to R
M17
2,42
0,74
1 (2
010
: RM
98,3
86,3
68).
20.
CO
MPA
RA
TIV
E F
IGU
RE
S
Cer
tain
com
para
tive
figu
res
in th
e fi
nanc
ial s
tate
men
ts o
f the
Aut
hori
ty h
ave
been
recl
assi
fied
to c
onfo
rm w
ith th
e pr
esen
tatio
n in
the
curr
ent f
inan
cial
yea
r.
WARTA KERAJAAN NEGERI SABAH 2,42714 November 2013
Lampiran A
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
STATEMENT OF INCOME AND EXPENDITURE FOR THE YEAR ENDED31ST DECEMBER, 2011
2011 2010RM RM
INCOME
RevenueProfit from privatised projects ... ... ... ... 33,339,074 20,242,891Profit/(Loss) from developed properties ... ... (1,204,687) 2,240,656
32,134,387 22,483,547
Other Operating IncomeGain on disposal of property, plant and equipment 180,319 168Management fees ... ... ... ... ... ... 521,271 1,243,293Other income ... ... ... ... ... ... ... 2,048,633 1,315,389Rental income ... ... ... ... ... ... 3,759,390 2,705,411Government loan converted to grant ... ... ... 5,738,554 5,312,187
12,248,167 10,576,448
Interest IncomeInterest charged to housing debtors ... ... ... 995,027 728,757Interest on advances/loans to contractors ... ... 2,942 -Interest on fixed deposits and current accounts ... 1,894,940 871,795
2,892,909 1,600,552
47,275,463 34,660,547
LESS: EXPENDITURE
Administrative Expenses
Staff Costs
Education ... ... ... ... ... ... ... 48,758 267,303Employees’ Provident Fund contributions ... ... 522,738 531,400Medical expenses ... ... ... ... ... ... 1,102,674 997,961Others ... ... ... ... ... ... ... ... 9,959 36,565Pension ... ... ... ... ... ... ... ... 424,078 397,261Salaries, allowance, overtime and bonus ... ... 8,988,541 8,946,366SOCSO contributions ... ... ... ... ... 32,853 30,763Welfare and recreation ... ... ... ... ... 240,134 36,747
11,369,735 11,244,366
WARTA KERAJAAN NEGERI SABAH 14 November 20132,428
Lampiran A
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
STATEMENT OF INCOME AND EXPENDITURE FOR THE YEAR ENDED31ST DECEMBER, 2011 - (cont.)
2011 2010RM RM
Depreciation
Buildings ... ... ... ... ... ... ... 208,766 208,766Long term leasehold land ... ... ... ... ... 99,334 130,456Motor vehicles ... ... ... ... ... ... 724,454 800,811Office furniture, fittings, equipment and renovation ... 347,036 322,231
1,379,590 1,462,264
Other Operating Expenses
Advertising and promotion ... ... ... ... 6,928 1,849Auditors’ remuneration ... ... ... ... ... 18,265 23,163Bank charges ... ... ... ... ... ... ... 4,451 4,142Board members’ remuneration- other emoluments ... ... ... ... ... ... 245,150 313,700- study tour ... ... ... ... ... ... ... 160,079 187,476Electricity and water ... ... ... ... ... 65,237 32,010Insurance ... ... ... ... ... ... ... 225,759 274,092Land premium and other charges ... ... ... 1,120,617 245,318Provision for land premium ... ... ... ... 16,699,740 4,824,000Other administrative and establishment expenses ... 672,351 775,936Post completed projects ... ... ... ... ... - 699,448Printing and stationery ... ... ... ... ... 135,341 192,096Professional and consultancy fee ... ... ... 232,022 163,190Repair and maintenance- general housing ... ... ... ... ... ... 2,828,821 2,396,625- motor vehicle ... ... ... ... ... ... 138,843 130,633- office, furniture and equipment ... ... ... 311,085 361,823Telephone and postage ... ... ... ... ... 77,145 75,740Travelling and accommodation ... ... ... ... 316,478 329,636Vehicle running expenses ... ... ... ... ... 210,403 133,154
23,468,715 11,164,031
36,218,040 23,870,661
WARTA KERAJAAN NEGERI SABAH 2,42914 November 2013
Interest Expense
Interest on State and Federal loans ... ... ... 1,306,348 1,117,896Interest on bank overdraft ... ... ... ... ... 60,254 60,518
1,366,602 1,178,414
Tax Expense ... ... ... ... ... ... ... 420,443 57,623
38,005,084 25,106,698
Net profit for the year... ... ... ... ... ... RM9,270,378 RM9,553,849
Lampiran A
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
STATEMENT OF INCOME AND EXPENDITURE FOR THE YEAR ENDED31ST DECEMBER, 2011 - (cont.)
2011 2010RM RM
WARTA KERAJAAN NEGERI SABAH 14 November 20132,430
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
AND ITS SUBSIDIARIES
STATEMENT BY THE CHAIRMAN AND GENERAL MANAGER
In our opinion, the financial statements set out on pages 2,432 to 2,465 are drawn upso as to give a true and fair view of the state of affairs of the Authority as at 31st December,2011 and of the results of its operations and cash flows for the year ended on that date.
On behalf of the Board,
DATUK RUBIN BALANG
(Chairman)
HAJJAH ROSNANI BINTI ASMAT
(General Manager)
Kota Kinabalu.
Date: 11th June, 2012.
WARTA KERAJAAN NEGERI SABAH 2,43114 November 2013
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
AND ITS SUBSIDIARIES
STATUTORY DECLARATION
I, CHIN SU ME, the officer primarily responsible for the financial management of LembagaPembangunan Perumahan dan Bandar (Housing and Town Development Authority),do solemnly and sincerely declare that the financial statements set out on pages 2,432 to2,465 are, to the best of my knowledge and belief, correct, and I make this solemn declarationconscientiously believing the same to be true and by virtue of the provisions of the StatutoryDeclarations Act, 1960.
Subscribed and solemnly declared bythe abovenamed CHIN SU ME at }Kota Kinabalu in the State of Sabah CHIN SU ME
on 11th June, 2012.
Before me,
DATUK CLAUDIUS ROMAN, J.P.,Pesuruhjaya Sumpah,
Malaysia.
Kota Kinabalu.
WARTA KERAJAAN NEGERI SABAH 14 November 20132,432
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
BA
LA
NC
E S
HE
ET A
T 3
1ST D
EC
EM
BE
R, 2
011
Gro
upA
utho
rity
Not
e20
1120
1020
1120
10R
MR
MR
MR
M
P RO
PER
TY
, PL
AN
T A
ND
EQ
UIP
ME
NT
321
,754
,491
23,3
26,2
9914
,860
,422
16,0
16,2
09I N
VE
STM
EN
TS
IN S
UB
SID
IAR
IES
...4
--
7,41
7,68
97,
417,
689
LA
ND
HE
LD
FO
R P
RO
PE
RT
YD
EV
EL
OPM
EN
T...
...5
4,61
4,08
24,
614,
082
--
HO
USI
NG
DE
BT
OR
S...
......
628
,758
,315
25,7
80,0
6328
,758
,315
25,7
80,0
63
55,1
26,8
8853
,720
,444
51,0
36,4
2649
,213
,961
CU
RR
EN
T A
SSE
TS
Hou
sing
deb
tors
......
...6
12,6
16,3
739,
997,
883
12,6
16,3
739,
997,
883
Inve
ntor
ies
of u
nsol
d ho
uses
...7
20,2
58,2
3528
,735
,858
19,5
81,5
4528
,059
,166
Dev
elop
men
t pro
pert
ies
......
42,2
06,8
5217
,760
,423
42,2
06,8
5217
,760
,423
Tra
de re
ceiv
able
s...
......
819
,876
,394
21,2
90,9
38-
-O
ther
re
ceiv
able
s,
depo
sits
an
dpr
epay
men
ts...
......
...9
21,8
90,9
0513
,602
,763
19,9
81,4
3912
,410
,612
Am
ount
due
fro
m s
ubsi
diar
ies
...10
--
9,32
5,08
48,
935,
769
Am
ount
due
from
a c
ontra
ct c
usto
mer
1157
8,62
6-
--
Am
ount
due
fro
m a
dir
ecto
r...
1261
,476
58,4
76-
-T
ax r
ecov
erab
le...
......
13,1
3913
,139
--
Fixe
d de
posi
ts...
......
1357
,680
,056
60,2
65,2
6955
,689
,169
57,4
46,5
09C
ash
and
bank
bal
ance
s...
...7,
844,
263
13,0
46,3
617,
448,
603
12,7
80,9
43
164,
771,
108
164,
771,
108
166,
849,
065
147,
391,
305
WARTA KERAJAAN NEGERI SABAH 2,43314 November 2013
CU
RR
EN
T L
IAB
ILIT
IES
Tra
de p
ayab
les
......
...14
20,3
69,2
8918
,017
,231
8,11
1,93
55,
801,
491
Oth
er p
ayab
les
and
accr
uals
...66
,674
,444
53,2
52,3
6361
,255
,837
48,1
09,3
35A
mou
nt d
ue to
con
trac
t cus
tom
ers
1126
,179
458,
423
--
Am
ount
due
to a
dir
ecto
r...
...12
400
800
--
Prov
isio
n...
......
...15
2,78
1,34
73,
577,
387
2,78
1,34
73,
577,
387
Hou
sing
dep
osits
......
...10
0,12
62,
013,
973
100,
126
2,01
3,97
3B
ank
over
draf
ts...
......
1674
7,01
339
6,78
7-
-H
ire
purc
hase
liab
ilitie
s...
...17
24,4
1310
8,37
9-
-St
ate
Gov
ernm
ent l
oans
......
1813
,136
,687
17,8
68,8
8613
,136
,687
17,8
68,8
86Fe
dera
l Gov
ernm
ent l
oans
......
1919
,897
,889
18,5
71,3
4419
,897
,889
18,5
71,3
44G
over
nmen
t tru
st f
unds
......
2012
,337
,255
9,11
6,45
212
,337
,255
9,11
6,45
2
Tax
atio
n...
......
......
608,
189
673,
215
--
136,
703,
231
124,
055,
240
117,
621,
076
105,
058,
868
NE
T C
UR
RE
NT A
SSE
TS
......
46,3
23,0
8840
,715
,868
49,2
27,9
8942
,332
,437
101,
449,
976
94,4
36,3
1210
0,26
4,41
591
,546
,398
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
BA
LA
NC
E S
HE
ET A
T 3
1ST D
EC
EM
BE
R, 2
011
- (c
ont.)
Gro
upA
utho
rity
Not
e20
1120
1020
1120
10R
MR
MR
MR
M
WARTA KERAJAAN NEGERI SABAH 14 November 20132,434
FIN
AN
CE
D B
Y:
AC
CU
MU
LA
TE
D F
UN
DS
......
69,4
45,2
9861
,816
,748
68,2
55,6
8958
,985
,311
MIN
OR
ITY
SH
AR
EH
OL
DE
RS’
INT
ER
EST
21(4
,048
)34
,064
--
LO
NG
TE
RM
AN
D D
EF
ER
RE
D
LIA
BIL
ITIE
S
Hir
e pu
rcha
se li
abili
ties
......
17-
24,4
13-
-
Stat
e G
over
nmen
t loa
ns...
...18
18,4
24,0
8718
,418
,787
18,4
24,0
8718
,418
,787
Fede
ral G
over
nmen
t loa
ns...
...19
13,5
84,6
3914
,142
,300
13,5
84,6
3914
,142
,300
Def
erre
d ta
x lia
bilit
y...
......
22-
--
-
32,0
08,7
2632
,585
,500
32,0
08,7
2632
,561
,087
101,
449,
976
94,4
36,3
1210
0,26
4,41
591
,546
,398
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
BA
LA
NC
E S
HE
ET A
T 3
1ST D
EC
EM
BE
R, 2
011
- (c
ont.)
Gro
upA
utho
rity
Not
e20
1120
1020
1120
10R
MR
MR
MR
M
WARTA KERAJAAN NEGERI SABAH 2,43514 November 2013
RE
VE
NU
E...
......
......
2338
,597
,413
27,0
20,8
2632
,134
,387
22,4
83,5
47
Cos
t of s
ales
......
......
(5,8
96,2
11)
(4,4
00,1
52)
--
GR
OSS
PR
OFI
T...
......
...32
,701
,202
22,6
20,6
7432
,134
,387
22,4
83,5
47O
ther
ope
ratin
g in
com
e...
...12
,658
,103
10,4
66,8
7912
,248
,167
10,5
76,4
48A
dmin
istr
ativ
e ex
pens
es...
...(3
8,81
7,55
3)(2
6,32
0,80
0)(3
6,21
8,04
0)(2
3,87
0,66
1)
OPE
RA
TIN
G P
RO
FIT
......
...24
6,54
1,75
26,
766,
753
8,16
4,51
49,
189,
334
Inte
rest
inco
me
......
......
2,89
2,90
91,
600,
552
2,89
2,90
91,
600,
552
Inte
rest
exp
ense
......
...(1
,411
,780
)(1
,222
,168
)(1
,366
,602
)(1
,178
,414
)
P RO
FIT B
EFO
RE T
AX
AT
ION
......
8,02
2,88
17,
145,
137
9,69
0,82
19,
611,
472
Tax
exp
ense
......
......
25(4
32,4
43)
(33,
159)
(420
,443
)(5
7,62
3)
P RO
FIT A
FTE
R T
AX
AT
ION
......
7,59
0,43
87,
111,
978
9,27
0,37
89,
553,
849
Min
ority
inte
rest
s...
......
2138
,112
40,1
64-
-
NE
T P
RO
FIT
OF
TH
E Y
EA
R...
...7,
628,
550
7,15
2,14
29,
270,
378
9,55
3,84
9
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
INC
OM
E S
TA
TE
ME
NT
S FO
R T
HE Y
EA
R E
ND
ED
31S
T D
EC
EM
BE
R, 2
011
- (c
ont.)
Gro
upA
utho
rity
Not
e20
1120
1020
1120
10R
MR
MR
MR
M
WARTA KERAJAAN NEGERI SABAH 14 November 20132,436
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
CO
NSO
LID
AT
ED
ST
AT
EM
EN
T O
F C
HA
NG
ES
IN E
QU
ITY
FO
R T
HE Y
EA
R E
ND
ED
31S
T D
EC
EM
BE
R,
2011
Gro
upA
ccum
ulat
ed fu
nds
RM
At
1st
Janu
ary
2010
......
......
......
......
54,6
64,6
06
Net
pro
fit f
or th
e ye
ar...
......
......
......
...7,
152,
142
At
31st
Dec
embe
r 20
10...
......
......
......
...61
,816
,748
Net
pro
fit f
or th
e ye
ar...
......
......
......
...7,
628,
550
At
31st
Dec
embe
r 20
11...
......
......
......
...69
,445
,298
WARTA KERAJAAN NEGERI SABAH 2,43714 November 2013
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
S TA
TE
ME
NT O
F C
HA
NG
ES
IN E
QU
ITY
FO
R T
HE Y
EA
R E
ND
ED
31S
T D
EC
EM
BE
R,
2010
Aut
hori
tyA
ccum
ulat
ed fu
nds
RM
At
1st
Janu
ary
2009
......
......
......
......
49,4
31,4
62
Net
pro
fit f
or th
e ye
ar...
......
......
......
...9,
553,
849
At
31st
Dec
embe
r 20
09...
......
......
......
...58
,985
,311
Net
pro
fit f
or th
e ye
ar...
......
......
......
...9,
270,
378
At
31st
Dec
embe
r 20
10...
......
......
......
...68
,255
,689
WARTA KERAJAAN NEGERI SABAH 14 November 20132,438
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
CA
SH F
LO
W S
TA
TE
ME
NT F
OR
TH
E Y
EA
R E
ND
ED
31S
T D
EC
EM
BE
R,
2011
Gro
upA
utho
rity
2011
2010
2011
2010
RM
RM
RM
RM
CA
SH F
LO
WS
FRO
M O
PER
AT
ING
AC
TIV
ITIE
S
Prof
it be
fore
taxa
tion
......
......
...8,
022,
881
7,14
5,13
79,
690,
821
9,61
1,47
2A
djus
tmen
ts fo
r:A
llow
ance
for d
imin
utio
n in
val
ue...
...-
--
-A
llow
ance
for
dou
btfu
l deb
ts...
......
--
--
Dep
reci
atio
n...
......
......
...1,
536,
233
1,65
1,10
61,
379,
590
1,46
2,26
4G
ain
on
dis
po
sal
of
pro
per
ty,
pla
nt
and
equi
pmen
t...
......
......
...(5
09,8
96)
(64,
367)
(180
,319
)(1
68)
Gov
ernm
ent l
oan
conv
erte
d to
gra
nt...
...(5
,738
,554
)(5
,312
,187
)(5
,738
,554
)(5
,312
,187
)In
tere
st e
xpen
se...
......
......
1,41
1,78
01,
222,
168
1,36
6,60
21,
178,
414
Inte
rest
inco
me
......
......
...(2
,973
,268
)(1
,616
,284
)(2
,892
,909
)(1
,600
,552
)Pl
ant a
nd e
quip
men
t wri
tten
off
......
...-
4,09
7-
-
Ope
ratin
g pr
ofit
befo
re w
orki
ng c
apita
l cha
nges
1,74
9,17
63,
029,
670
3,62
5,23
15,
339,
243
(Inc
reas
e)/D
ecre
ase
in w
orki
ng c
apita
l:H
ousi
ng d
ebto
rs...
......
......
(5,5
96,7
43)
3,95
6,54
4(5
,596
,743
)3,
956,
544
Inve
ntor
ies
of u
nsol
d ho
uses
......
...8,
477,
621
2,06
8,47
18,
477,
621
2,06
8,47
1D
evel
opm
ent p
rope
rtie
s...
......
...(2
4,44
6,42
9)1,
282,
502
(24,
446,
429)
1,28
2,50
2A
mou
nt d
ue fr
om a
con
trac
t cus
tom
ers
...(5
78,6
26)
--
-A
mou
nt d
ue f
rom
sub
sidi
arie
s...
......
--
(389
,314
)(4
86,4
97)
Tra
de a
nd o
ther
rec
eiva
bles
......
...(6
,890
,042
)9,
691,
300
(7,5
87,2
71)
5,55
7,97
8A
mou
nt d
ue to
a c
ontr
act c
usto
mer
s...
...(4
32,2
44)
(466
,408
)-
-T
rade
and
oth
er p
ayab
les
......
...13
,535
,046
8,38
1,98
613
,221
,252
4,96
2,67
7
WARTA KERAJAAN NEGERI SABAH 2,43914 November 2013
Cas
h (u
sed
in)/
gene
rate
d fr
om o
pera
tions
......
(14,
182,
241)
27,9
44,0
65(1
2,69
5,65
3)22
,680
,918
Inte
rest
pai
d...
......
......
...(1
05,4
32)
(104
,272
)(6
0,25
4)(6
0,51
8)In
com
e ta
x pa
id...
......
......
(481
,025
)(8
5,53
8)(4
04,0
00)
(57,
623)
NE
T C
AS
H G
EN
ER
AT
ED
FR
OM
/(U
SE
D I
N)
OPE
RA
TIN
G A
CT
IVIT
IES
......
......
(14,
768,
698)
27,7
54,2
55(1
3,15
9,90
7)22
,562
,777
CA
SH F
LO
WS
FRO
M IN
VE
STIN
G A
CT
IVIT
IES
Inte
rest
rece
ived
......
......
...2,
973,
268
1,61
6,28
42,
892,
909
1,60
0,55
2Pr
ocee
ds f
rom
dis
posa
l of
prop
erty
, pla
nt a
ndeq
uipm
ent
......
......
......
799,
755
64,4
0019
9,75
520
0Pu
rcha
se o
f pr
oper
ty, p
lant
and
equ
ipm
ent
...(2
54,2
86)
(9,7
77,4
27)
(243
,240
)(3
,335
,254
)
NE
T C
AS
H (
US
ED
IN
)/G
EN
ER
AT
ED
FR
OM
INV
EST
ING
AC
TIV
ITIE
S...
......
...3,
518,
737
(8,0
96,7
43)
2,84
9,42
4(1
,734
,502
)
CA
SH F
LO
WS
FRO
M F
INA
NC
ING
AC
TIV
ITIE
S
Inte
rest
pai
d...
......
......
...-
--
-D
raw
dow
n of
Sta
te G
over
nmen
t loa
ns...
-21
3,54
4-
213,
544
Dra
wdo
wn
of S
tate
Gov
ernm
ent t
rust
fun
ds...
3,22
0,80
3-
Rep
aym
ent o
f G
over
nmen
t tru
st f
unds
......
-(3
24,4
55)
-(3
24,4
55)
(108
,379
)(1
07,2
73)
--
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
CA
SH F
LO
W S
TA
TE
ME
NT F
OR
TH
E Y
EA
R E
ND
ED
31S
T D
EC
EM
BE
R,
2011
- (
cont
.)
Gro
upA
utho
rity
2011
2010
2011
2010
RM
RM
RM
RM
WARTA KERAJAAN NEGERI SABAH 14 November 20132,440
NET
CA
SH G
ENER
ATE
D F
RO
M/(U
SED
IN) F
INA
NC
ING
AC
TIV
ITIE
S...
......
......
...3,
112,
424
(218
,184
)3,
220,
803
(110
,911
)
NE
T IN
CR
EA
SE/(
DE
CR
EA
SE) I
N C
ASH
AN
D C
ASH
EQ
UIV
AL
EN
TS
......
......
...(8
,137
,537
)19
,439
,328
(7,0
89,6
80)
20,7
17,3
64
CA
SH
AN
D C
AS
H E
QU
IVA
LE
NT
S A
TB
EG
INN
ING
OF
TH
E Y
EA
R...
......
...66
,064
,843
46,6
25,5
1564
,227
,452
43,5
10,0
88
CA
SH
AN
D C
AS
H E
QU
IVA
LE
NT
S A
T E
ND
OF
TH
E Y
EA
R...
......
......
...57
,927
,306
66,0
64,8
4357
,137
,772
64,2
27,4
52
CA
SH A
ND
CA
SH E
QU
IVA
LE
NT
S C
OM
PRIS
E:
Cas
h an
d ba
nk b
alan
ces
......
......
7,84
4,26
313
,046
,361
7,44
8,60
312
,780
,943
Fixe
d de
posi
ts...
......
......
57,6
80,0
5660
,265
,269
55,6
89,1
6957
,446
,509
Les
s: D
epos
its p
ledg
ed...
......
...(6
,850
,000
)(6
,850
,000
)(6
,000
,000
)(6
,000
,000
)
50,8
30,0
5653
,415
,269
57,1
37,7
7264
,227
,452
Ban
k ov
erdr
afts
......
......
...(7
47,0
13)
(396
,787
)-
-
57,9
27,3
0666
,064
,843
57,1
37,7
7264
,227
,452
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
AN
D I
TS
SUB
SID
IAR
IES
CA
SH F
LO
W S
TA
TE
ME
NT F
OR
TH
E Y
EA
R E
ND
ED
31S
T D
EC
EM
BE
R,
2011
- (
cont
.)
Gro
upA
utho
rity
2011
2010
2011
2010
RM
RM
RM
RM
WARTA KERAJAAN NEGERI SABAH 2,44114 November 2013
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
AND ITS SUBSIDIARIES
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011
1. PRINCIPAL ACTIVITIES
The Authority is a State-owned agency and is governed by the Housing and TownDevelopment Authority Enactment, 1981. The principal activities of the Authority areto develop low cost housing and township projects, whilst the principal activities of thesubsidiaries are stated in Note 4. There has been no significant change in the nature ofthese activities during the financial year.
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
The following accounting policies are adopted by the Group and the Authority and areconsistent with those adopted in the previous years.
(a) Basis of accounting
The financial statements of the Group and the Authority are prepared on thehistorical cost basis and in compliance with applicable approved accountingstandards in Malaysia.
(b) Basis of consolidation
Subsidiaries are those enterprise controlled by the Authority. Control exists whenthe authority has the power, directly or indirectly, to govern the financial andoperating policies of an enterprise so as to obtain benefits from its activities. Thefinancial statements of subsidiaries are included in the consolidated financialstatements from the date that control effectively commences until the date thatcontrol effectively ceases. Subsidiaries are consolidated using the acquisitionmethod of accounting.
Under acquisition method of accounting, the results of subsidiaries acquired ordisposed of during the year are included from the date of acquisition or up to thedate of disposal. At the date of acquisition, the fair values of the subsidiaries’ netassets are determined and these values are reflected in the Group financialstatements. The difference between acquisition cost and the fair value of thesubsidiaries’ net assets is reflected as goodwill or negative goodwill as appropriate.
Intragroup transactions and balances and the result unrealised profits are eliminatedon consolidation. Unrealised losses resulting from intragroup transactions are alsoeliminated unless cost cannot be recovered.
(c) Property, plant and equipment
Property, plant and equipment are stated at cost or valuation less accumulateddepreciation and impairment losses, if any.
The Group revalues its property comprising land and building every 5 years and atshorter intervals whenever the fair value of the revalued assets is expected to differmaterially from their carrying value.
WARTA KERAJAAN NEGERI SABAH 14 November 20132,442
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
Surpluses arising from revaluation are dealt with in the property revaluation reserve account.Any deficit arising is offset against the revaluation reserve to the extent of a previousincrease for the same property. In all other cases, a decrease in carrying amount ischarged to the income statement.
Property, plant and equipment retired from active use and held for disposal arestated at the carrying amount at the date when the asset is retired from active use,less impairment losses, if any.
(d) Depreciation
The straight line method is used to write off the cost of the following assets overthe term of their estimated useful lives at the following principal annual rates:
Long term leasehold land over 50 yearsBuildings 2%Motor vehicles 20%Plant and machinery 20%Office furniture, fittings and equipment 10% - 20%Renovation 10%Computer Software 20%
A long term leasehold land of the Group with an unexpired lease period of 75years at year end is not amortised. The non-amortisation does not have a materialeffect on the financial statements.
(e) Impairment
The carrying amounts of the Group’s assets, other than inventories and financialassets (other than investments in subsidiaries), are reviewed at each balance sheetdate to determine whether there is any indication of impairment. If any suchindication exists, the asset’s recoverable amount is estimated. An impairment lossis recognised whenever the carrying amount of an asset or the cash-generatingunit to which it belongs exceeds its recoverable amount. Impairment losses arerecognised in the income statement, unless the asset is carried at a revalued amount,in which case the impairment loss is charged to equity.
The recoverable amount is the greater of the asset’s net selling price and its valuein use. In assessing value in use, estimated future cash flows are discounted totheir present value using a pre-tax discount rate that reflects current marketassessments of the time value of money and the risks specific to the asset. For anasset that does not generate largely independent cash inflows, the recoverableamount is determined for the cash-generating unit to which the asset belongs.
WARTA KERAJAAN NEGERI SABAH 2,44314 November 2013
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
An impairment loss in respect of goodwill is not reversed unless the loss wascaused by a specific external event of an exceptional nature that is not expected torecur and subsequent external events have occurred that reverse the effect of thatevent.
In respect of other assets, an impairment loss is reversed if there has been a changein the estimates used to determine the recoverable amount.
An impairment loss is reversed only to the extent that the asset’s carrying amountdoes not exceed the carrying amount that would have been determined, net ofdepreciation or amortisation, if no impairment loss had been recognised. Thereversal is recognised in the income statement, unless it reverses an impairmentloss on a revalued asset, in which case it is taken to equity.
(f) Investment properties
Investment properties are treated as long term investments and are stated at cost.An allowance is made when the directors are of the view that there is a diminutionin their value which is other than temporary.
(g) Development properties
Land and development expenditure whereby significant development work hasbeen undertaken and is expected to be completed within the normal operatingcycle are classified as development properties. Development properties are statedat cost plus attributable profits less foreseeable losses, net of progress billings.Cost includes cost of land, all direct building cost, and other related developmentexpenditure incurred during the period of development.
(h) Inventories of unsold houses
Inventories of unsold houses are stated at the lower of cost and net realisable value.Costs include apportioned land cost and development expenditure incurred.
(i) Revenue
(i) Property development
Profit from property development is recognised using the percentage ofcompletion method. Where foreseeable losses are anticipated, full provisionfor these losses is made in the financial statements.
Profit from property development undertaken by another developer on theGroup’s and Authority’s land is recognised using the percentage ofcompletion method determined on the proportion of value of developmentunits sold against total saleable value and is calculated based on the Group’sand Authority’s entitlement on properties sold by the developer.
WARTA KERAJAAN NEGERI SABAH 14 November 20132,444
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
(ii) Developed properties
Profit on developed properties is recognised when transfer of risks andrewards has been completed.
(iii) Privatised projects
Profit on privatised projects is recognised on an accrual basis based onstipulated fixed schedule.
(iv) Construction contracts
Revenue from fixed price construction contracts is recognised on thepercentage of completion method measured by reference to the percentageof contract costs incurred to date to estimated total contract costs.
When the outcome of a construction contract cannot be estimated reliably,revenue is recognised only to the extent of contract costs incurred that isprobable to be recoverable and contract costs are recognised as an expensein the period in which they are incurred.
An expected loss on a contract is recognised immediately in the incomestatement.
(v) Rental income and net insurance commission
Rental income is recognised on an accrual basis and net insurance commissionis recognised when services are rendered.
(vi) Interest income and net insurance commission
Interest income is recognised in the income statement as it accrues, takinginto account effective yield on the asset.
(vii) Dividend income
Dividend income is recognised when the right to receive payment isestablished.
(viii) Project entitlements
The entitlements, pursuant to the agreement entered with the joint venturepartners, are recognised on accrual basis based on stipulated fixed schedule.
(j) Interest on borrowings
Interest on borrowings is charged against income and no part of the interest istreated as an inherent part of the total cost of property development.
WARTA KERAJAAN NEGERI SABAH 2,44514 November 2013
(k) Provisions
A provision is recognised when it is probable that an outflow of resources embodyingeconomic benefits will be required to settle a present obligation (legal or constructive)as a result of a past event and a reliable estimate can be made of the amount.
(i) Provision for repairs and maintenance on completed projects
Provision for repairs and maintenance is made at 5% of cost for low costhousing projects and 3% for all other projects upon their completion.
(l) Employee benefits
(i) Short term benefits
Wages, salaries, paid leave and sick leave, bonus and non-monetary benefitsare recognised in the year in which associated services are rendered byemployees of the Group and of the Authority.
(ii) Defined contribution plans
Obligations for contributions to defined contribution plans are recognisedas an expense in the income statement as incurred. Other retirement benefitsare charged against income as and when paid.
(m) Government trust funds
Grants and Trust Funds received from the Federal and State Governments for thedevelopment of specific projects are utilised to meet the cost of developing thoseprojects. At the completion of the project, any excess Trust Fund is refundable tothe respective governments, while shortfalls are to be recovered and shown as adebit balance in the respective fund.
(n) Investments
Long term investments in subsidiaries are stated at cost in the Authority, lessimpairment loss where applicable.
(o) Income tax
Tax on the profit or loss for the year comprises current and deferred tax. Incometax is recognised in the income statement except to the extent that it relates to itemsrecognised directly in equity, in which case it is recognised in equity.
Current tax expense is the expected tax payable on the taxable income for the year,using tax rates enacted or substantially enacted at the balance sheet date, and anyadjustment to tax payable in respect of previous years.
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,446
Deferred tax is provided, using the liability method, on temporary differences arisingbetween the tax bases of assets and liabilities and their carrying amounts in thefinancial statements. The amount of deferred tax provided is based on the expectedmanner of realisation or settlement of the carrying amount of assets and liabilities,using tax rates enacted or substantially enacted at the balance sheet date.
A deferred tax asset is recognised only to the extent that it is probable that futuretaxable profits will be available against which the asset can be utilised.
(p) Cash and cash equivalents
Cash and cash equivalents consist of cash on hand, balances and deposits withbanks. For the purpose of the cash flow statement, cash and cash equivalents arepresented net of bank overdrafts and pledged deposits.
(q) Land held for property development
Land held for property development consist of land or such portions thereof onwhich no development activities have been carried out or where developmentactivities are not expected to be completed within the Company’s normal operatingcycle of 2 to 3 years. Such land is classified as non-current asset and is stated at costless accumulated impairment losses.
Land held for property development is reclassified as property development costsat the point when development activities have commenced and where it can bedemonstrated that the development activities can be within the Company’s normaloperating cycle of 2 to 3 years.
Cost of land held for property development comprise cost associated with theacquisition of land and all cost incurred subsequent to the acquisition but prior toreclassification to property development costs on activities necessary to preparethe land for its intended use.
Cost associated with the acquisition of land includes the purchase price of the land,professional fee, stamp duties, commissions, conversion fees and other relevantlevies.
(r) Hire purchase liabilities
The cost of property, plant and equipment acquired under hire purchase agreementis capitalised under property, plant and equipment and the corresponding obligationsare taken up as liabilities. Hire purchase interest is taken up in the income statementon a sum-of-digits basis over the period of the hire purchase agreement.
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
WARTA KERAJAAN NEGERI SABAH 2,44714 November 2013
(s) Amount due to contract customers
Amount due to contract customers on construction contracts is stated at cost plusattributable profits less foreseeable losses and less progress billings. Cost includesall direct construction costs and other related costs. Where progress billings exceedthe aggregate amount due from contract customers plus attributable profits lessforeseeable losses, the net credit balance on all such contracts is shown under currentliabilities as amount due to contract customers.
(t) Receivables
Receivables are carried at anticipated realisable value. Bad debts are duly writtenoff. An estimate is made for doubtful debts based on a review of all outstandingamounts at the year end.
(u) Payables
Payables are stated at cost which is the fair value of the consideration to be paid inthe future for goods and services rendered.
LEMBAGA PEMBANGUNAN PERUMAHAN DAN BANDAR(Housing and Town Development Authority)
NOTES TO THE FINANCIAL STATEMENTS - 31ST DECEMBER, 2011 - (cont.)
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - (cont.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,448
Cos
t/V
alua
tion
At 1
st J
anua
ry, 2
011
......
......
...22
,190
,060
5,39
5,72
65,
055,
889
32,6
41,6
75A
dditi
ons
......
......
......
...25
04,
819
249,
217
254,
286
Tra
nsfe
rs...
......
......
......
(28,
487)
--
(28,
487)
Dis
posa
ls...
......
......
......
(300
,000
)(6
39,7
98)
-(9
39,7
98)
At 3
1st D
ecem
ber,
2011
......
......
21,8
61,8
234,
760,
747
5,06
2,71
731
,927
,676
Dep
reci
atio
nA
t 1st
Jan
uary
, 201
1...
......
......
3,48
9,89
62,
750,
377
3,07
5,10
39,
315,
376
Cha
rge
for
the
year
......
......
...31
2,96
780
5,73
741
7,52
91,
536,
233
Tra
nsfe
rs...
......
......
......
(9,0
55)
--
(9,0
55)
Dis
posa
ls...
......
......
......
(29,
576)
(639
,793
)-
(669
,369
)
At 3
1st D
ecem
ber,
2011
......
......
3,76
4,23
22,
916,
321
3,49
2,63
210
,173
,185
Net
Boo
k V
alue
At 3
1st D
ecem
ber,
2011
......
......
18,0
97,5
911,
844,
426
1,81
2,47
421
,754
,491
At 3
1st D
ecem
ber,
2010
......
......
18,7
00,1
642,
645,
349
1,98
0,78
623
,326
,299
Dep
reci
atio
nC
harg
e fo
r the
yea
r end
ed 3
1st D
ecem
ber,
2010
...34
4,08
991
3,13
039
3,88
71,
651,
106
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent A
utho
rity
)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
3.P R
OPE
RT
Y, P
LA
NT
AN
D E
QU
IPM
EN
TM
otor
vehi
cles
,pl
ant a
ndm
achi
nery
Tot
al
Off
ice
furn
itur
e,fi
ttin
gs a
ndeq
uipm
ent,
and
reno
vati
on
Lan
d an
dB
uild
ings
RM
RM
RM
RM
Gro
up
WARTA KERAJAAN NEGERI SABAH 2,44914 November 2013
Cos
t/V
alua
tion
At 1
st J
anua
ry, 2
011
......
......
...30
0,00
011
,451
,752
10,4
38,3
0822
,190
,060
Add
ition
s...
......
......
......
-25
0-
250
Dis
posa
ls...
......
......
......
(300
,000
)-
-(3
00,0
00)
Tra
nsfe
rs...
......
......
......
-(2
8,48
7)-
(28,
487)
At 3
1st D
ecem
ber,
2011
......
......
-11
,423
,515
10,4
38,3
0821
,861
,823
Dep
reci
atio
nA
t 1st
Jan
uary
, 201
1...
......
......
25,3
5142
9,31
03,
035,
235
3,48
9,89
6C
harg
e fo
r th
e ye
ar...
......
......
4,22
599
,976
208,
766
312,
967
Dis
posa
ls...
......
......
......
(29,
576)
--
(29,
576)
Tra
nsfe
rs...
......
......
......
-(9
,055
)-
(9,0
55)
At 3
1st D
ecem
ber,
2011
......
......
-52
0,23
13,
244,
001
3,76
4,23
2
Net
Boo
k V
alue
At 3
1st D
ecem
ber,
2011
......
......
-10
,903
,284
7,19
4,30
718
,097
,591
At 3
1st D
ecem
ber,
2010
......
......
274,
649
11,0
22,4
427,
403,
073
18,7
00,1
64
Dep
reci
atio
nC
harg
e fo
r the
yea
r end
ed 3
1st D
ecem
ber,
2010
...4,
225
131,
068
207,
591
342,
885
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent A
utho
rity
)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
3.P R
OPE
RT
Y, P
LA
NT
AN
D E
QU
IPM
EN
T -
(con
t.)
Lan
d an
d bu
ildi
ngs
Lon
g te
rmle
aseh
old
land
Tot
alB
uild
ings
Lon
g te
rmle
aseh
old
land
RM
RM
RM
RM
Gro
up
At v
alua
tion
<
----
----
-- A
t cos
t --
----
----
>
WARTA KERAJAAN NEGERI SABAH 14 November 20132,450
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent A
utho
rity
)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
3.P R
OPE
RT
Y, P
LA
NT
AN
D E
QU
IPM
EN
T -
(con
t.)
Lon
g te
rmle
aseh
old
land
Mot
orve
hicl
esT
otal
Off
ice
furn
itur
e,fi
ttin
gs a
ndeq
uipm
ent,
and
reno
vati
on
Bui
ldin
gs
RM
RM
RM
RM
RM
Cos
tA
t 1st
Jan
uary
, 201
1...
......
4,99
5,17
310
,438
,308
4,64
9,80
54,
231,
129
24,3
14,4
15A
dditi
ons
......
......
...25
0-
-24
2,99
024
3,24
0T
rans
fers
......
......
...(2
8,48
7)-
--
(28,
487)
Dis
posa
ls...
......
......
--
(639
,798
)-
(639
,798
)
At 3
1st D
ecem
ber,
2011
......
4,96
6,93
610
,438
,308
4,01
0,00
74,
474,
119
23,8
89,3
70
Dep
reci
atio
nA
t 1st
Jan
uary
, 201
1...
......
422,
894
3,03
5,23
52,
201,
376
2,63
8,70
18,
298,
206
Cha
rge
for
the
year
......
...99
,334
208,
766
724,
454
347,
036
1,37
9,59
0T
rans
fers
......
......
...(9
,055
)-
--
(9,0
55)
Dis
posa
ls...
......
......
--
(639
,793
)-
(639
,793
)
At 3
1st D
ecem
ber,
2011
......
513,
173
3,24
4,00
12,
286,
037
2,98
5,73
79,
028,
948
Net
Boo
k V
alue
At 3
1st D
ecem
ber,
2011
......
4,45
3,76
37,
194,
307
1,72
3,97
01,
488,
382
14,8
60,4
22
At 3
1st D
ecem
ber,
2010
......
4,57
2,27
97,
403,
073
2,44
8,42
91,
592,
428
16,0
16,2
09
Dep
reci
atio
nC
harg
e fo
r the
yea
r end
ed 3
1st D
ecem
ber,
2010
......
......
...13
0,45
620
8,76
680
0,81
132
2,23
11,
462,
264
WARTA KERAJAAN NEGERI SABAH 2,45114 November 2013
(a)
Titl
e to
cer
tain
bui
ldin
gs o
f the
Aut
hori
ty w
ith c
ost o
f RM
8,84
1,23
0 (2
010
: RM
8,84
1,23
0) h
as y
et to
be
issu
ed.
(b)
Cer
tain
long
term
leas
ehol
d la
nd o
f the
Gro
up a
nd A
utho
rity
are
cha
rged
to fi
nanc
ial i
nstit
utio
n as
sec
uriti
es fo
r ban
king
faci
litie
sgr
ante
d to
con
trac
tors
cos
ting
RM
18,1
00,0
00 (
2010
: R
M48
,134
).
(c)
Mot
or v
ehic
les
of th
e G
roup
with
net
boo
k va
lue
of R
M90
,050
(201
0 : R
M10
9,46
4) is
acq
uire
d un
der h
ire
purc
hase
arr
ange
men
t.
4.I N
VE
STM
EN
TS
IN S
UB
SID
IAR
IES
Aut
hori
ty
2011
2010
RM
RM
Unq
uote
d sh
ares
at c
ost
......
......
......
......
......
10,0
06,0
3010
,006
,030
Les
s: A
llow
ance
for d
imin
utio
n in
val
ue...
......
......
......
...(2
,588
,341
)(2
,588
,341
)
RM
7,41
7,68
9R
M7,
417,
689
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
3.P R
OPE
RT
Y, P
LA
NT
AN
D E
QU
IPM
EN
T -
(con
t.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,452
The
pri
ncip
al a
ctiv
ities
of
the
subs
idia
ries
, the
ir p
lace
s of
inco
rpor
atio
n an
d th
e in
tere
st o
f L
emba
ga P
emba
ngun
an P
erum
ahan
dan
Ban
dar a
re a
s fo
llow
s:
Eff
ecti
veC
ount
ry o
fO
wne
rshi
pN
ame
of C
ompa
nyP
rinc
ipal
Act
ivit
ies
Inco
rpor
atio
nIn
tere
sts
2011
2010
%%
Kua
la M
engg
atal
Prop
erty
Dev
elop
men
tM
alay
sia
9595
D
evel
opm
ent
C
orpo
ratio
n Sd
n. B
hd.*
Supe
rnes
a Sd
n. B
hd.
Con
stru
ctio
n w
ork
unde
r co
ntra
ct a
ndM
alay
sia
100
100
prop
erty
dev
elop
men
t
Supe
rpan
el (
Saba
h) S
dn. B
hd.
Hol
ding
of
prop
erti
es f
or r
enta
l,M
alay
sia
100
100
pro
vis
ion
of
con
trac
t w
orks
and
rela
ted
serv
ices
and
insu
ranc
e ag
ency
*T
he a
udite
d fi
nanc
ial s
tate
men
ts a
s at
31
Dec
embe
r 201
1 is
not
ava
ilabl
e an
d th
e fi
nanc
ial s
tate
men
ts o
f thi
s su
bsid
iary
has
bee
nco
nsol
idat
ed b
ased
on
fina
l una
udite
d fi
nanc
ial s
tate
men
ts.
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
4.I N
VE
STM
EN
TS
IN S
UB
SID
IAR
IES
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 2,45314 November 2013
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
5.L
AN
D H
EL
D F
OR
PR
OPE
RT
Y D
EV
EL
OPM
EN
TG
roup
2011
2010
RM
RM
Lea
seho
ld la
nd, a
t cos
t...
......
......
......
......
......
3,73
6,00
93,
736,
009
Dev
elop
men
t exp
endi
ture
......
......
......
......
......
878,
073
878,
073
RM
4,61
4,08
2R
M4,
614,
082
6.H
OU
SIN
G D
EB
TO
RS
Gro
up a
nd A
utho
rity
2011
2010
Non
-Cur
rent
RM
RM
Low
cos
t hou
sing
......
......
......
......
......
......
11,7
46,3
856,
573,
555
Low
cos
t sho
phou
ses
......
......
......
......
......
...1,
037,
633
1,86
2,80
5C
omm
erci
al h
ousi
ng...
......
......
......
......
......
9,05
0,89
710
,228
,354
Com
mer
cial
sho
phou
ses
......
......
......
......
......
1,51
7,87
31,
768,
338
Con
dom
iniu
m/f
lats
......
......
......
......
......
...5,
405,
527
5,34
7,01
1
28,7
58,3
1525
,780
,063
Cur
rent
Low
cos
t hou
sing
......
......
......
......
......
......
12,6
16,3
739,
997,
883
RM
41,3
74,6
88R
M35
,777
,946
WARTA KERAJAAN NEGERI SABAH 14 November 20132,454
7.IN
VE
NT
OR
IES
OF
UN
SOL
D H
OU
SES
Gro
up a
nd A
utho
rity
Inve
ntor
ies
of u
nsol
d ho
uses
of
RM
7,58
4,43
1 (2
010
: RM
12,5
59,1
00)
are
carr
ied
at n
et r
ealis
able
val
ue.
8.T
RA
DE R
EC
EIV
AB
LE
SG
roup
2011
2010
RM
RM
Tra
de re
ceiv
able
s...
......
......
......
......
......
...21
,796
,050
23,2
10,5
94
Les
s: A
llow
ance
for d
oubt
ful
debt
s...
......
......
......
......
(1,9
19,6
56)
(1,9
19,6
56)
RM
19,8
76,3
94R
M21
,290
,938
Incl
uded
in tr
ade
rece
ivab
les
of th
e G
roup
are
ret
entio
n m
onie
s of
RM
7,69
7,63
2 (2
010
: RM
7,69
7,63
2)
9.O
TH
ER
RE
CE
IVA
BL
ES,
DE
POSI
TS
AN
D P
RE
PAY
ME
NT
SG
roup
Aut
hori
ty20
1120
1020
1120
10R
MR
MR
MR
MO
ther
rece
ivab
les,
dep
osits
and
pre
paym
ents
......
31,4
51,9
0523
,163
,763
28,3
47,7
5020
,776
,923
Les
s: A
llow
ance
for d
oubt
ful d
ebts
......
......
(9,5
61,0
00)
(9,5
61,0
00)
(8,3
66,3
11)
(8,3
66,3
11)
RM
21,8
90,9
05R
M13
,602
,763
RM
19,9
81,4
39R
M12
,410
,612
Incl
uded
in
othe
r re
ceiv
able
s, d
epos
its a
nd p
repa
ymen
ts o
f th
e G
roup
and
of
the
Aut
hori
ty a
re l
oans
to
empl
oyee
s am
ount
ing
toR
M14
,009
(20
10 :
RM
23,2
67).L
EM
BA
GA
PE
MB
AN
GU
NA
N P
ER
UM
AH
AN
DA
N B
AN
DA
R(H
ousi
ng a
nd T
own
Dev
elop
men
t A
utho
rity
)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 2,45514 November 2013
10.
AM
OU
NT D
UE F
RO
M S
UB
SID
IAR
IES
Aut
hori
ty
The
am
ount
due
from
sub
sidi
arie
s is
uns
ecur
ed, i
nter
est f
ree
and
repa
yabl
e on
dem
and.
11.
AM
OU
NT D
UE
FR
OM
/(TO
) CO
NT
RA
CT C
UST
OM
ER
SG
roup
2011
2010
RM
RM
Con
trac
t cos
t inc
urre
d to
dat
e...
......
......
......
......
...12
3,70
9,60
211
7,85
2,60
0
Add
: A
ttrib
utab
le p
rofi
ts...
......
......
......
......
...5,
782,
255
5,31
8,00
9
129,
491,
857
123,
170,
669
Les
s: P
rogr
ess
billi
ngs
......
......
......
......
......
...(1
28,9
39,4
10)
(123
,629
,092
)
RM
552,
447
(RM
458,
423)
12.
AM
OU
NT D
UE
FR
OM
/(TO
) A D
IRE
CT
OR
Gro
up
The
am
ount
due
from
/(to
) a d
irec
tor i
s un
secu
red,
inte
rest
free
and
repa
yabl
e on
dem
and.
The
am
ount
ow
ing
is to
be
settl
ed in
cas
h.
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,456
13.
FIX
ED
DE
POSI
TS
Gro
upA
utho
rity
2011
2010
2011
2010
RM
RM
RM
RM
Dep
osits
are
pla
ced
with
:L
icen
sed
bank
s...
......
......
...R
M57
,680
,056
RM
60,2
65,2
69R
M55
,689
,169
RM
57,4
46,5
09
Incl
uded
in th
e fi
xed
depo
sits
are
:
(a)
an a
mou
nt o
f RM
850,
000
(201
0 : R
M85
0,00
0) o
f the
Gro
up h
eld
unde
r lie
n by
lice
nsed
ban
ks to
sec
ure
the
over
draf
t and
ban
kgu
aran
tee
faci
litie
s gr
ante
d to
the
subs
idia
ries
(see
Not
e 16
).
(b)
a am
ount
of
RM
6,00
0,00
0 (2
010
: R
M6,
000,
000)
of
the
Gro
up a
nd o
f th
e A
utho
rity
hel
d on
lie
n by
a l
icen
sed
bank
for
the
over
draf
t fac
ilitie
s to
the
Aut
hori
ty.
14.
TR
AD
E P
AY
AB
LE
S
Gro
up a
nd A
utho
rity
Incl
uded
in tr
ade
paya
bles
of t
he G
roup
and
of t
he A
utho
rity
is re
tent
ion
sum
of R
M11
,163
,179
(201
0 : R
M11
,163
,132
) and
RM
5,17
7,03
0(2
010
: RM
4,70
0,98
3) r
espe
ctiv
ely.
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 2,45714 November 2013
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
15.
P RO
VIS
ION
Gro
up a
nd A
utho
rity
Rep
air
and
mai
nten
ance
2011
2010
RM
RM
Bal
ance
at 1
st J
anua
ry, 2
011
......
......
......
......
...3,
577,
387
4,41
2,76
4Pr
ovis
ion
mad
e du
ring
the
year
......
......
......
......
...37
6,68
520
6,37
5Pr
ovis
ion
used
dur
ing
the
year
......
......
......
......
...(3
31,7
38)
(166
,722
)Pr
ovis
ion
reve
rsed
dur
ing
the
year
......
......
......
......
...(8
40,9
87)
(875
,030
)
Bal
ance
at 3
1st D
ecem
ber,
2011
......
......
......
......
...R
M2,
781,
347
RM
3,57
7,38
7
16.
BA
NK
OV
ER
DR
AFT
The
ban
k ov
erdr
aft o
f the
Gro
up b
ears
inte
rest
rate
at 1
% (2
010
: 1%
) abo
ve b
ase
lend
ing
rate
per
ann
um a
nd is
secu
red
by w
ay o
f fix
edde
posi
ts o
f R
M85
0,00
0 (2
010
: RM
850,
000
held
on
lien
by a
lice
nsed
ban
k (s
ee N
ote
13).
WARTA KERAJAAN NEGERI SABAH 14 November 20132,458
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
17.
HIR
E P
UR
CH
ASE
LIA
BIL
ITIE
S
Hir
e pu
rcha
se li
abili
ties
of th
e G
roup
is p
ayab
le a
s fo
llow
s:
Pay
men
tsIn
tere
stP
rinc
ipal
Pay
men
tsIn
tere
stP
rinc
ipal
G
roup
2011
2011
2011
2010
2010
2010
RM
RM
RM
RM
RM
RM
Les
s th
an o
ne y
ear
25,1
3872
524
,413
113,
424
5,04
510
8,37
9
Bet
wee
n on
e an
d fi
ve y
ears
--
-25
,138
725
24,4
13
25,1
3872
524
,413
138,
562
5,77
013
2,79
2
18.
S TA
TE
GO
VE
RN
ME
NT
LO
AN
S
Gro
up a
nd A
utho
rity
2011
2010
RM
RM
Stat
e G
over
nmen
t loa
ns -
unse
cure
dC
urre
nt...
......
......
......
......
......
...13
,136
,687
17,8
68,8
86N
on-c
urre
nt...
......
......
......
......
......
...18
,424
,087
18,4
18,7
87
RM
31,5
60,7
74R
M36
,287
,673
WARTA KERAJAAN NEGERI SABAH 2,45914 November 2013
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
Ter
ms
and
debt
s re
paym
ent s
ched
ule
Und
er1
to 2
2 to
5O
ver
5T
otal
1 ye
arye
ars
year
sye
ars
RM
RM
RM
RM
RM
2010
Uns
ecur
ed S
tate
Gov
ernm
ent l
oans
-fix
ed ra
te 4
%...
......
...R
M31
,560
,774
RM
13,1
36,6
87R
M61
0,18
0R
M1,
980,
926
RM
15,8
32,9
81
2009
Uns
ecur
ed S
tate
Gov
ernm
ent l
oans
-fix
ed ra
te 4
%...
......
...R
M36
,287
,673
RM
17,8
68,8
86R
M46
8,89
0R
M1,
861,
516
RM
16,0
88,3
81
Stat
e G
over
nmen
t has
agr
eed
to c
onve
rt th
e go
vern
men
t loa
n to
gra
nt a
mou
ntin
g to
RM
Nil
(201
0 : R
M23
,071
,421
). A
n am
ount
of
RM
5,73
8,55
4 (2
010
: RM
5,31
2,18
7) h
as b
een
conv
erte
d du
ring
the
fina
ncia
l yea
r.
19.
F ED
ER
AL
GO
VE
RN
ME
NT
LO
AN
S
Gro
up a
nd A
utho
rity
2011
2010
RM
RM
Fede
ral G
over
nmen
t loa
ns -
uns
ecur
edC
urre
nt...
......
......
......
......
......
...19
,897
,889
18,5
71,3
44N
on-c
urre
nt...
......
......
......
......
......
...13
,584
,639
14,1
42,3
00
RM
33,4
82,5
28R
M32
,713
,644
18.
STA
TE
GO
VE
RN
ME
NT
LO
AN
S - (
cont
.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,460
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
Ter
ms
and
debt
s re
paym
ent s
ched
ule
The
loan
s in
tere
st is
pay
able
as
follo
ws:
Loa
ns f
or c
ondo
min
ium
s...
......
......
......
4.0
% to
7.5
% p
er a
nnum
Loa
ns fo
r all
othe
r hou
sing
pro
ject
s...
......
......
4.0%
per
ann
um
Und
er1
to 2
2 to
5O
ver
5T
otal
1 ye
arye
ars
year
sye
ars
RM
RM
RM
RM
RM
2010
Uns
ecur
ed F
eder
al G
over
nmen
t loa
ns...
RM
33,4
82,5
28R
M19
,897
,889
RM
585,
036
RM
1,93
4,54
7R
M11
,065
,056
2009
Uns
ecur
ed F
eder
al G
over
nmen
t loa
ns...
RM
32,7
13,6
44R
M18
,571
,344
RM
557,
661
RM
1,84
3,21
8R
M11
,741
,421
20.
GO
VE
RN
ME
NT
TR
UST
FU
ND
SG
roup
and
Aut
hori
ty20
1120
10R
MR
M
Stat
e G
over
nmen
t Hou
sing
Fun
d...
......
......
......
......
34,2
7634
,276
Stat
e Fu
nd fo
r New
Tow
nshi
p...
......
......
......
......
1,27
3,94
41,
134,
843
Stat
e G
over
nmen
t Sub
sidi
es F
und
......
......
......
......
...2,
677,
918
2,67
7,91
8St
ate
Gov
ernm
ent A
genc
y Fu
nds
......
......
......
......
...3,
138,
460
3,26
9,41
5St
ate
Rev
olvi
ng F
und
(SPP
)...
......
......
......
......
...5,
212,
657
2,00
0,00
0R
M12
,337
,255
RM
9,11
6,45
2
19.
FED
ER
AL
GO
VE
RN
ME
NT
LO
AN
S - (
cont
.)
WARTA KERAJAAN NEGERI SABAH 2,46114 November 2013
21.
MIN
OR
ITY
SH
AR
EH
OL
DE
RS’
INT
ER
EST
Thi
s co
nsis
ts o
f the
min
ority
sha
reho
lder
s’ p
ropo
rtio
n of
sha
re c
apita
l and
rese
rve
of a
sub
sidi
ary.
22.
DE
FER
RE
D T
AX
LIA
BIL
ITY
Gro
up20
1120
10R
MR
MA
t 1st
Jan
uary
......
......
......
......
......
...-
12,8
03R
ecog
nise
d in
inco
me
stat
emen
t (N
ote
25)
......
......
......
...-
(12,
803)
At 3
1st D
ecem
ber
......
......
......
......
......
...-
-
The
reco
gnis
ed d
efer
red
tax
liabi
lity
aris
es fr
om e
xces
s of
cap
ital a
llow
ance
s ov
er d
epre
ciat
ion.
23.
RE
VE
NU
EG
roup
Aut
hori
ty20
1120
1020
1120
10R
MR
MR
MR
MPr
ofit
from
pri
vatis
ed p
roje
cts
......
......
33,3
39,0
7420
,242
,891
33,3
39,0
7420
,242
,891
Prof
it fr
om s
ales
of c
ompl
eted
pro
pert
ies.
.....
...(1
,204
,687
)2,
240,
656
(1,2
04,6
87)
2,24
0,65
6Sa
les
of p
rope
rtie
s an
d de
velo
pmen
t lan
d...
......
6,42
7,45
94,
526,
726
--
Insu
ranc
e co
mm
issi
on in
com
e...
......
......
29,2
153,
998
--
Scra
p m
etal
com
mis
sion
......
......
......
6,35
26,
555
--
RM
38,5
97,4
13R
M27
,020
,826
RM
32,1
34,3
87R
M22
,483
,547
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,462
24.
OPE
RA
TIN
G P
RO
FIT
Gro
upA
utho
rity
2011
2010
2011
2010
RM
RM
RM
RM
Ope
rati
ng p
rofi
t is
arri
ved
at a
fter
cre
diti
ng:
Gai
n on
dis
posa
l of
prop
erty
, pla
nt a
nd e
quip
men
t...
509,
896
64,3
6718
0,31
916
8G
over
nmen
t loa
n co
nver
ted
to g
rant
......
......
5,73
8,55
45,
312,
187
5,73
8,55
45,
312,
187
Inte
rest
inco
me
......
......
......
...2,
973,
268
1,61
6,28
42,
892,
909
1,60
0,55
2M
anag
emen
t fee
s...
......
......
......
521,
271
1,32
3,29
352
1,27
11,
243,
293
Ren
tal i
ncom
e...
......
......
......
3,75
9,39
02,
715,
911
3,75
9,39
02,
705,
411
and
afte
r ch
argi
ng:
Aud
itors
’ re
mun
erat
ion
......
......
...34
,265
39,1
6318
,265
23,1
63B
oard
mem
bers
’ re
mun
erat
ion
-ot
her
emol
umen
ts...
......
......
...24
5,15
031
3,70
024
5,15
031
3,70
0-
stud
y to
ur...
......
......
......
160,
079
187,
476
160,
079
187,
476
Dep
reci
atio
n...
......
......
......
1,53
6,23
31,
651,
106
1,37
9,59
01,
462,
264
Dir
ecto
rs’ r
emun
erat
ion
-fe
es...
......
......
......
...13
5,40
017
4,00
0-
--
Em
ploy
ees’
Pro
vide
nt F
und
cont
ribu
tions
......
7,20
07,
200
--
-ot
her
emol
umen
ts...
......
......
...32
9,43
225
9,86
9-
-In
tere
st e
xpen
se...
......
......
......
1,41
1,78
01,
222,
168
1,36
6,60
21,
178,
414
Plan
t and
equ
ipm
ent w
ritte
n of
f...
......
...-
4,90
7-
-R
enta
l exp
ense
......
......
......
...13
8,99
013
8,99
0-
-
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 2,46314 November 2013
25.
TA
X E
XPE
NSE
Gro
upA
utho
rity
2011
2010
2011
2010
RM
RM
RM
RM
Cur
rent
taxa
tion
-C
urre
nt y
ear
......
......
......
...29
4,33
260
,423
420,
443
57,6
23-
Und
er/(
Ove
r) p
rovi
sion
in p
revi
ous
year
......
138,
111
(14,
461)
--
-R
ever
sal o
f te
mpo
rary
dif
fere
nces
(Not
e 22
)...
...-
(12,
803)
--
RM
432,
443
RM
33,1
59R
M42
0,44
3R
M57
,623
Rec
onci
liat
ion
of e
ffec
tive
tax
rate
:
Prof
it be
fore
taxa
tion
......
......
......
8,02
2,88
17,
345,
137
9,69
0,82
19,
611,
472
Inco
me
tax
usin
g M
alay
sia
tax
rate
......
......
2,05
1,12
61,
909,
557
2,42
2,70
52,
402,
868
Tax
exe
mpt
inco
me
......
......
......
(6,3
86,2
41)
(2,2
19,0
32)
(6,3
20,3
26)
(2,2
06,2
32)
Non
-ded
uctib
le e
xpen
ses
......
......
...4,
528,
815
289,
999
4,34
6,62
824
7,42
5D
efer
red
tax
asse
ts n
ot re
cogn
ised
......
......
234,
612
--
-E
ffec
t of
defe
rred
tax
bene
fit n
ot r
ecog
nise
d...
...32
,695
453,
534
--
Eff
ect t
o ta
x lo
sses
now
util
ised
......
......
--
--
Una
bsor
bed
capi
tal a
llow
ance
now
util
ised
......
...(1
66,6
75)
(386
,438
)(1
66,6
75)
(386
,438
)
Oth
er it
ems.
.....
......
......
......
-97
,631
--
294,
332
47,6
2028
2,33
257
,623
Und
er/(
Ove
r) p
rovi
sion
in p
revi
ous
year
......
138,
111
(14,
461)
138,
111
-
Tax
exp
ense
......
......
......
...43
2,44
333
,159
420,
443
57,6
23
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH 14 November 20132,464
No
defe
rred
tax
asse
ts h
as b
een
reco
gnis
ed fo
r the
follo
win
g ite
ms:
Gro
up a
nd A
utho
rity
2011
2010
RM
RM
Una
bsor
bed
capi
tal a
llow
ance
s...
......
......
......
......
351,
500
279,
700
Unu
tilis
ed ta
x lo
sses
......
......
......
......
......
...3,
734,
500
3,15
9,00
0
4,08
6,00
03,
438,
700
The
ded
uctib
le te
mpo
rary
dif
fere
nces
, una
bsor
bed
capi
tal a
llow
ance
s an
d un
utili
sed
tax
loss
es d
o no
t exp
ire
unde
r cur
rent
tax
legi
sla-
tion.
Def
erre
d ta
x as
sets
hav
e no
t bee
n re
cogn
ised
in re
spec
t of t
hese
item
s be
caus
e it
is n
ot p
roba
ble
that
futu
re ta
xabl
e pr
ofit
will
be
avai
labl
e ag
ains
t whi
ch th
e G
roup
can
util
ise
the
bene
fits
.
26.
EM
PLO
YE
ES
INFO
RM
AT
ION
Gro
upA
utho
rity
2011
2010
2011
2010
RM
RM
RM
RM
Staf
f cos
ts...
......
......
......
12,6
19,7
1112
,472
,904
11,3
69,7
3511
,244
,366
Incl
uded
in s
taff
cos
ts o
f the
Gro
up a
nd o
f the
Aut
hori
ty is
Em
ploy
ees
Prov
iden
t Fun
d an
d ot
her r
etir
emen
t ben
efits
of R
M1,
045,
522
(201
0 : R
M1,
029,
064)
and
RM
946,
816
(201
0 : R
M92
8,66
1).
The
num
ber o
f em
ploy
ees
of th
e G
roup
and
of t
he A
utho
rity
(exc
ludi
ng d
irec
tors
) at t
he e
nd o
f the
yea
r was
220
(201
0 : 2
24) a
nd 1
90(2
010
: 190
) re
spec
tivel
y.
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
25.
TA
X E
XPE
NSE
- (c
ont.)
WARTA KERAJAAN NEGERI SABAH 2,46514 November 2013
27.
LIT
IGA
TIO
NS
(a)
In y
ear 2
008,
a la
nd o
wne
r has
file
d an
app
licat
ion
in th
e H
igh
Cou
rt fo
r an
inju
nctio
n ag
ains
t the
Gro
up fo
r spi
llage
or d
epos
itof
ear
th-f
ill m
ater
ials
ont
o he
r lan
d. A
ccor
ding
to th
e C
onse
nt O
rder
dat
ed 7
th F
ebru
ary,
201
1, th
e G
roup
has
to c
arry
out
and
com
plet
e al
l nec
essa
ry r
ectif
icat
ion
and/
or r
e-co
nstr
uctio
n w
orks
to th
e da
mag
ed d
eten
tion
pond
with
pro
per
wat
er d
isch
arge
outle
t. H
owev
er, t
he G
roup
has
yet
to a
ccou
nt fo
r the
cos
t in
its fi
nanc
ial s
tate
men
ts.
(b)
In y
ear 2
009,
a d
evel
oper
com
men
ced
lega
l act
ion
agai
nst t
he G
roup
for b
reac
h of
con
trac
t in
rega
rds
to th
e sa
les
and
purc
hase
of 6
par
cels
of
land
. The
Gro
up h
as f
iled
its d
efen
se w
ith th
e H
igh
Cou
rt. T
he d
ate
for
the
hear
ing
has
been
fix
ed b
y th
e H
igh
Cou
rt o
n 25
th a
nd 2
6th
Apr
il, 2
011.
The
dev
elop
er is
cla
imin
g da
mag
es fo
r RM
5,18
5,00
0. T
he G
roup
did
not
acc
ount
for a
nysu
ch a
mou
nt in
its
fina
ncia
l sta
tem
ents
.
(c)
On
5th
May
, 200
9, a
sub
-con
trac
tor
file
d a
clai
m in
reg
ards
to o
utst
andi
ng c
laim
s fo
r co
ntra
ct w
orks
, wro
ngfu
l ded
uctio
n of
Con
stru
ctio
n In
dust
ry D
evel
opm
ent B
oard
(CID
B) l
evy
and
refu
nd o
f liq
uida
ted
asce
rtai
ned
dam
ages
am
ount
ing
to R
M1,
065,
701.
A p
aym
ent a
mou
nted
to R
M70
3,42
6 w
as p
aid
to th
e su
b-co
ntra
ctor
on
2nd
June
, 200
9 an
d th
ere
still
hav
e a
bala
nce
of R
M36
2,27
5du
e to
the
sub-
cont
ract
or. T
he a
mou
nts
have
bee
n re
cogn
ised
acc
ordi
ngly
in th
e fi
nanc
ial s
tate
men
ts o
f th
e G
roup
.
(d)
On
16th
Aug
ust,
2010
, tw
o jo
int-
vent
ure
sub-
cont
ract
ors f
iled
a cl
aim
in re
gard
s to
the
mon
ies f
or w
ork
done
, pay
men
t mad
e fo
ran
d on
beh
alf o
f the
Gro
up a
nd fo
r whi
ch th
e G
roup
hav
e en
joye
d th
e be
nefi
ts. H
owev
er, t
he d
ate
for t
he a
rbitr
atio
n ha
s not
bee
nfi
xed
by th
e K
uala
Lum
pur
Reg
iona
l Cen
tre
For
Arb
itrat
ion.
The
join
t-ve
ntur
e su
b-co
ntra
ctor
s ar
e cl
aim
ing
the
paym
ent f
orw
ork
done
for
RM
6,66
3,59
2. T
he G
roup
did
not
acc
ount
for
any
suc
h am
ount
in it
s fi
nanc
ial s
tate
men
ts.
28.
CO
NT
ING
EN
T L
IAB
ILIT
IES
The
Gro
up a
nd th
e A
utho
rity
has
exe
cute
d a
thir
d pa
rty
char
ge o
ver i
ts d
evel
opm
ent p
rope
rtie
s in
favo
ur o
f the
fina
ncia
l ins
titut
ions
for
bank
ing
faci
litie
s gr
ante
d to
dev
elop
ers
and
cont
ract
ors
amou
ntin
g to
RM
172,
420,
741
(201
0 : R
M98
,386
,368
).
29.
CO
MPA
RA
TIV
E F
IGU
RE
S
Cer
tain
com
para
tive
figu
res i
n th
e fi
nanc
ial s
tate
men
ts o
f the
Gro
up a
nd A
utho
rity
hav
e be
en re
clas
sifi
ed to
con
form
with
the
pres
enta
tion
in th
e cu
rren
t fin
anci
al y
ear.
LE
MB
AG
A P
EM
BA
NG
UN
AN
PE
RU
MA
HA
N D
AN
BA
ND
AR
(Hou
sing
and
Tow
n D
evel
opm
ent
Aut
hori
ty)
NO
TE
S T
O T
HE F
INA
NC
IAL
ST
AT
EM
EN
TS
- 31S
T D
EC
EM
BE
R, 2
011
- (co
nt.)
WARTA KERAJAAN NEGERI SABAH
PUBLIC NOTICES
No. 827 [No. MdI/156/H/004/292/2013 (73504/289/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Jamain bin Sergan @ Jamain SergauNo. Kad Pengenalan: 741215-12-5985/H 0922906
Alamat: Kg. Labuan,Jalan Tamau,89150 Kota Belud, Sabah
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-94/1 tahun 2013
Tarikh Mesyuarat Am: 4 Disember 2013Waktu: 2.30 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 31 Oktober 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/292/2013 (73504/289/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Jamain bin Sergan @ Jamain SergauNRIC No.: 741215-12-5985/H 0922906
Address: Kg. Labuan,Jalan Tamau,89150 Kota Belud, Sabah
Description: -Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-94/1 of 2013
14 November 20132,466
WARTA KERAJAAN NEGERI SABAH
Date of General Meeting: 4th December, 2013
Time: 2.30 p.m.Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 31st October, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 828 [No. MdI/156/H/004/294/2013 (73504/291/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Hussin bin Abd. RashidNo. Kad Pengenalan: 600411-12-5529/H 0528037
Alamat: W. D. T. No. 114,88901 Kota Kinabalu, Sabah
Perihal: -Mahkamah: Mahkamah Tinggi, Kota Kinabalu
No. Kebankrapan: BKI29-339/4 tahun 2013Tarikh Mesyuarat Am: 4 Disember 2013
Waktu: 3.00 petangTempat: Jabatan Insolvensi Malaysia, Kota Kinabalu
Tarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 31 Oktober 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
2,46714 November 2013
WARTA KERAJAAN NEGERI SABAH
[No. MdI/156/H/004/294/2013 (73504/291/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Hussin bin Abd. Rashid
NRIC No.: 600411-12-5529/H 0528037
Address: W. D. T. No. 114,88901 Kota Kinabalu, Sabah
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-339/4 of 2013
Date of General Meeting: 4th December, 2013
Time: 3.00 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 31st October, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 829 [No. MdI/156/H/004/302/2013 (73504/299/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Mohd. Haffindi bin Kusnan @ Kuanan
No. Kad Pengenalan: 730920-12-5143/H 0842698Alamat: Jabatan Penjara, Penjara Pusat,
Peti Surat No. 11020,88811 Kota Kinabalu, Sabah
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-720/10 tahun 2012
Tarikh Mesyuarat Am: 4 Disember 2013
PUBLIC NOTICES - (cont.)
14 November 20132,468
WARTA KERAJAAN NEGERI SABAH
Waktu: 3.30 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 31 Oktober 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/302/2013 (73504/299/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Mohd. Haffindi bin Kusnan @ KuananNRIC No.: 730920-12-5143/H 0842698Address: Jabatan Penjara, Penjara Pusat,
P. O. Box No. 11020,88811 Kota Kinabalu, Sabah
Description: -
Court: High Court, Kota KinabaluBankruptcy Number: BKI29-720/10 of 2012
Date of General Meeting: 4th December, 2013Time: 3.30 p.m.
Place: Department of Insolvency Malaysia, Kota KinabaluDate of Order (if any) for Summary Administration (Section 106): -Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 31st October, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
2,46914 November 2013
WARTA KERAJAAN NEGERI SABAH
No. 830 [No. MdI/156/H/004/326/2013 (73504/317/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Tie Sing BingNo. Kad Pengenalan: 520529-13-5319/K 361344
Alamat: No. 28f, Lorong Green No. 1,KCLD, Jalan Tun Ahmad Zardi Adruce,93250 Kuching, Sarawak
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-410/6 tahun 2012
Tarikh Mesyuarat Am: 12 Disember 2013Waktu: 3.30 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 31 Oktober 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/326/2013 (73504/317/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Tie Sing Bing
NRIC No.: 520529-13-5319/K 361344
Address: No. 28f, Lorong Green No. 1,KCLD, Jalan Tun Ahmad Zardi Adruce,93250 Kuching, Sarawak
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-410/6 of 2012
Date of General Meeting: 12th December, 2013
PUBLIC NOTICES - (cont.)
14 November 20132,470
WARTA KERAJAAN NEGERI SABAH
Time: 3.30 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 31st October, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 831 [No. MdI/156/H/004/338/2013 (73504/337/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Rachel Thomas SeverinusNo. Kad Pengenalan: 830317-12-5614
Alamat: No. 28f, Lorong Green No. 1,KCLD, Jalan Tun Ahmad Zardi Adruce,93250 Kuching, Sarawak
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-410/6 tahun 2012
Tarikh Mesyuarat Am: 12 Disember 2013Waktu: 3.00 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 1 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
2,47114 November 2013
WARTA KERAJAAN NEGERI SABAH
[No. MdI/156/H/004/338/2013 (73504/337/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Rachel Thomas SeverinusNRIC No.: 830317-12-5614
Address: No. 28f, Lorong Green No. 1,KCLD, Jalan Tun Ahmad Zardi Adruce,93250 Kuching, Sarawak
Description: -
Court: High Court, Kota KinabaluBankruptcy Number: BKI29-410/6 of 2012
Date of General Meeting: 12th December, 2013Time: 3.00 p.m.
Place: Department of Insolvency Malaysia, Kota KinabaluDate of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 1st November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 832 [No. MdI/156/H/004/309/2013 (73504/305/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Tang Ting SiongNo. Kad Pengenalan: 651221-13-5531/K 0094176
Alamat: Lot 90, No. Rumah 31,Taman Seputeh, Jalan Damai,88300 Kota Kinabalu, Sabah
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-713/10 tahun 2012
Tarikh Mesyuarat Am: 12 Disember 2013
PUBLIC NOTICES - (cont.)
14 November 20132,472
WARTA KERAJAAN NEGERI SABAH
Waktu: 3.00 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 1 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/309/2013 (73504/305/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Tang Ting Siong
NRIC No.: 651221-13-5531/K 0094176
Address: Lot 90, House No. 31,Taman Seputeh, Damai Road,88300 Kota Kinabalu, Sabah
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-713/10 of 2012
Date of General Meeting: 12th December, 2013
Time: 3.00 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 1st November, 2013LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
2,47314 November 2013
WARTA KERAJAAN NEGERI SABAH
No. 833 [No. MdI/156/H/004/297/2013 (73504/294/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Rozlina binti ShamsudinNo. Kad Pengenalan: 791002-12-6058
Alamat: Peti Surat No. 141,Kampung Ranau,89107 Kota Marudu, Sabah
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-98/1 tahun 2013
Tarikh Mesyuarat Am: 13 Disember 2013Waktu: 2.30 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 1 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/297/2013 (73504/294/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Rozlina binti ShamsudinNRIC No.: 791002-12-6058
Address: P. O. Box No. 141,Kampung Ranau,89107 Kota Marudu, Sabah
Description: -Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-98/1 of 2013Date of General Meeting: 13th December, 2013
PUBLIC NOTICES - (cont.)
14 November 20132,474
WARTA KERAJAAN NEGERI SABAH
Time: 2.30 p.m.
Place: Department of Insolvency Malaysia, Kota KinabaluDate of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 1st November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 834 [No. MdI/156/H/004/298/2013 (73504/295/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Julbahari bin UjariNo. Kad Pengenalan: 720411-12-5525/H 0911724
Alamat: EF 89, Sabah Forest Industries Housing Complex,89850 Sipitang, Sabah
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-812/11 tahun 2012
Tarikh Mesyuarat Am: 13 Disember 2013Waktu: 3.00 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 1 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
2,47514 November 2013
WARTA KERAJAAN NEGERI SABAH
[No. MdI/156/H/004/298/2013 (73504/295/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Julbahari bin Ujari
NRIC No.: 720411-12-5525/H 0911724
Address: EF 89, Sabah Forest Industries Housing Complex,89850 Sipitang, Sabah
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-812/11 tahun 2012
Date of General Meeting: 13th December, 2013
Time: 3.00 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 1st November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 835 [No. MdI/156/H/004/299/2013 (73504/296/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Abdul Kadir bin ChinnaiyahNo. Kad Pengenalan: 560314-12-5187/H 0491215
Alamat: Pekan Lama,W. D. T. 90,89059 Kudat, Sabah
Perihal: -Mahkamah: Mahkamah Tinggi, Kota Kinabalu
No. Kebankrapan: BKI29-925/12 tahun 2012Tarikh Mesyuarat Am: 17 Disember 2013
PUBLIC NOTICES - (cont.)
14 November 20132,476
WARTA KERAJAAN NEGERI SABAH
Waktu: 9.30 pagi
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 4 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/299/2013 (73504/296/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Abdul Kadir bin Chinnaiyah
NRIC No.: 560314-12-5187/H 0491215
Address: Pekan Lama,W. D. T. 90,89059 Kudat, Sabah
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-925/12 of 2012
Date of General Meeting: 17th December, 2013
Time: 9.30 a.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 4th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
2,47714 November 2013
WARTA KERAJAAN NEGERI SABAH
No. 836 [No. MdI/156/H/004/300/2013 (73504/297/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Chua Li VeiNo. Kad Pengenalan: 740625-12-5529/H 0840655
Alamat: Kampung Malaka,89357 Inanam, Sabah
Perihal: -Mahkamah: Mahkamah Tinggi, Kota Kinabalu
No. Kebankrapan: BKI29-942/12 tahun 2012Tarikh Mesyuarat Am: 17 Disember 2013
Waktu: 10.00 pagiTempat: Jabatan Insolvensi Malaysia, Kota Kinabalu
Tarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 4 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/300/2013 (73504/297/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Chua Li Vei
NRIC No.: 740625-12-5529/H 0840655
Address: Kampung Malaka,89357 Inanam, Sabah
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-942/12 of 2012
Date of General Meeting: 17th December, 2013
Time: 10.00 a.m.
PUBLIC NOTICES - (cont.)
14 November 20132,478
WARTA KERAJAAN NEGERI SABAH
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 4th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 837 [No. MdI/156/H/004/310/2013 (73504/306/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Aremon NasirNo. Kad Pengenalan: 770215-12-5865/H 0936286
Alamat: Kg. Panatian,Jalan Taiwan,Peti Surat No. 166,89107 Kota Marudu, Sabah
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-975/12 tahun 2012
Tarikh Mesyuarat Am: 17 Disember 2013Waktu: 10.30 pagi
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 4 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
2,47914 November 2013
WARTA KERAJAAN NEGERI SABAH
[No. MdI/156/H/004/310/2013 (73504/306/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Aremon Nasir
NRIC No.: 770215-12-5865/H 0936286
Address: Kg. Panatian,Jalan Taiwan,P. O. Box No. 166,89107 Kota Marudu, Sabah
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-975/12 of 2012
Date of General Meeting: 17th December, 2013
Time: 10.30 a.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 4th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 838 [No. MdI/156/H/004/328/2013 (73504/319/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Zulfikar bin Isnani
No. Kad Pengenalan: 771215-12-5667/H 0968029Alamat: Peti Surat No. 87,
91308 Semporna, SabahPerihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-212/3 tahun 2013
Tarikh Mesyuarat Am: 17 Disember 2013
PUBLIC NOTICES - (cont.)
14 November 20132,480
WARTA KERAJAAN NEGERI SABAH
Waktu: 11.30 pagi
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 4 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/328/2013 (73504/319/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Zulfikar bin IsnaniNRIC No.: 771215-12-5667/H 0968029Address: P. O. Box No. 87,
91308 Semporna, Sabah
Description: -Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-212/3 tahun 2013Date of General Meeting: 17th December, 2013
Time: 11.30 a.m.Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 4th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
2,48114 November 2013
WARTA KERAJAAN NEGERI SABAH
No. 839 [No. MdI/156/H/004/316/2013 (73504/312/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Mat Salleh bin SuraNo. Kad Pengenalan: 590706-12-5693/H 0103652
Alamat: WPLBKM 0665,Jalan Penghulu Tuah,87000 Wilayah Persekutuan Labuan
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-31/12 tahun 2012
Tarikh Mesyuarat Am: 17 Disember 2013Waktu: 11.00 pagi
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 6 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/316/2013 (73504/312/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Mat Salleh bin Sura
NRIC No.: 590706-12-5693/H 0103652Address: WPLBKM 0665,
Jalan Penghulu Tuah,87000 Federal Territory of Labuan
Description: -
Court: High Court, Kota KinabaluBankruptcy Number: BKI29-31/12 of 2012
Date of General Meeting: 17th December, 2013
PUBLIC NOTICES - (cont.)
14 November 20132,482
WARTA KERAJAAN NEGERI SABAH
Time: 11.00 a.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 6th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 840 [No. MdI/156/H/004/329/2013 (73504/320/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Mohd. Dzul Azhar bin JulkalaniNo. Kad Pengenalan: 821221-12-5455
Alamat: Lot 206, Tingkat 2,Wisma Tun Fuad Stephens,Km. 2.4, Jalan Tuaran,89206 Kota Kinabalu
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-211/3 tahun 2013
Tarikh Mesyuarat Am: 17 Disember 2013Waktu: 12.00 tengah hari
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 6 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
2,48314 November 2013
WARTA KERAJAAN NEGERI SABAH
[No. MdI/156/H/004/329/2013 (73504/320/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Mohd. Dzul Azhar bin Julkalani
NRIC No.: 821221-12-5455Address: Lot 206, 2nd Floor,
Wisma Tun Fuad Stephens,Km. 2.4, Tuaran Road,89206 Kota Kinabalu
Description: -Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-211/3 of 2013Date of General Meeting: 17th December, 2013
Time: 12.00 noonPlace: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 6th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 841 [No. MdI/156/H/004/336/2013 (73504/327/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Mohd. Hensley Fadly bin Mohd. Nordin
No. Kad Pengenalan: 770108-12-5253Alamat: S-10, Peringkat 1,
Kg. Muhibbaharaya, Batu 41/2, Jalan Kuhara,91009 Tawau, Sabah
Perihal: -Mahkamah: Mahkamah Tinggi, Kota Kinabalu
No. Kebankrapan: BKI29-329/4 tahun 2013
PUBLIC NOTICES - (cont.)
14 November 20132,484
WARTA KERAJAAN NEGERI SABAH
Tarikh Mesyuarat Am: 17 Disember 2013
Waktu: 12.30 petangTempat: Jabatan Insolvensi Malaysia, Kota Kinabalu
Tarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 8 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/336/2013 (73504/327/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Mohd. Hensley Fadly bin Mohd. Nordin
NRIC No.: 770108-12-5253Address: S-10, Peringkat 1,
Kg. Muhibbaharaya, Mile 41/2, Kuhara Road,91009 Tawau, Sabah
Description: -
Court: High Court, Kota KinabaluBankruptcy Number: BKI29-329/4 of 2013
Date of General Meeting: 17th December, 2013Time: 12.30 p.m.
Place: Department of Insolvency Malaysia, Kota KinabaluDate of Order (if any) for Summary Administration (Section 106): -Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 8th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
2,48514 November 2013
WARTA KERAJAAN NEGERI SABAH
No. 842 [No. MdI/156/H/004/308/2013 (73504/304/2013)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Daniel PaminNo. Kad Pengenalan: 781026-12-5587
Alamat: No. 65, Lorong Bunga Bakawali,Taman Fortune Fasa 1,Jalan Penampang,88300 Kota Kinabalu, Sabah
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: BKI29-244/3 tahun 2013
Tarikh Mesyuarat Am: 19 Disember 2013Waktu: 2.30 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: 8 November 2013.LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/308/2013 (73504/304/2013)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Daniel Pamin
NRIC No.: 781026-12-5587
Address: No. 65, Lorong Bunga Bakawali,Taman Fortune Phase 1,Penampang Road,88300 Kota Kinabalu, Sabah
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: BKI29-244/3 of 2013
PUBLIC NOTICES - (cont.)
14 November 20132,486
WARTA KERAJAAN NEGERI SABAH
Date of General Meeting: 19th December, 2013
Time: 2.30 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: 8th November, 2013.LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 843 [No. MdI/156/H/004/193/2002 (73504/10/2002)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Ha Tung MeuNo. Kad Pengenalan: 450302-13-5583/K 317348
Alamat: Peti Surat No. 16367,88870 Kota Kinabalu
Perihal: -Mahkamah: Mahkamah Tinggi, Kota Kinabalu
No. Kebankrapan: K29-104 tahun 2001Tarikh Mesyuarat Am: 7 November 2013
Waktu: 2.30 petangTempat: Jabatan Insolvensi Malaysia, Kota Kinabalu
Tarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: -LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
2,48714 November 2013
WARTA KERAJAAN NEGERI SABAH
[No. MdI/156/H/004/193/2002 (73504/10/2002)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Ha Tung Meu
NRIC No.: 450302-13-5583/K 317348
Address: Peti Surat No. 16367,88870 Kota Kinabalu
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: K29-104 of 2001
Date of General Meeting: 7th November, 2013
Time: 2.30 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: -LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
No. 844 [No. MdI/156/H/004/206/2003 (73504/90/2003)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Wong Hee GuongNo. Kad Pengenalan: 430824-13-5152/K 312790
Alamat: Peti Surat No. 16367,88870 Kota Kinabalu
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: K29-106 tahun 2001
Tarikh Mesyuarat Am: 7 November 2013
PUBLIC NOTICES - (cont.)
14 November 20132,488
WARTA KERAJAAN NEGERI SABAH
Waktu: 2.30 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: -LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/206/2003 (73504/90/2003)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Wong Hee Guong
NRIC No.: 430824-13-5152/K 312790
Address: P. O. Box No. 16367,88870 Kota Kinabalu
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: K29-106 of 2001
Date of General Meeting: 7th November, 2013
Time: 2.30 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: -LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
2,48914 November 2013
WARTA KERAJAAN NEGERI SABAH
No. 845 [No. MdI/156/H/004/872/90 (73504/149/91)
AKTA KEBANKRAPAN, 1967
MESYUARAT AM
Nama Siberhutang: Wong Vui Khiong
No. Kad Pengenalan: 650615-12-5147/H 0629633Alamat: No. 205-1-16, Apartmen Seri Maju,
Menggatal,88820 Kota Kinabalu
Perihal: -
Mahkamah: Mahkamah Tinggi, Kota KinabaluNo. Kebankrapan: K872 tahun 1990
Tarikh Mesyuarat Am: 14 November 2013Waktu: 2.30 petang
Tempat: Jabatan Insolvensi Malaysia, Kota KinabaluTarikh Perintah (jika ada) bagi Pentadbiran Terus (Seksyen 106): -
Alamat:
Jabatan Insolvensi Malaysia,Cawangan Kota Kinabalu,Aras 5, Blok A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Tarikh: -LEO ANAK SAGA,
Pengarah Insolvensi Negeri,b.p. Ketua Pengarah Insolvensi, Malaysia.
[No. MdI/156/H/004/872/90 (73504/149/91)
BANKRUPTCY ACT, 1967
GENERAL MEETING
Debtor’s Name: Wong Vui Khiong
NRIC No.: 650615-12-5147/H 0629633
Address: No. 205-1-16, Seri Maju Apartment,Menggatal,88820 Kota Kinabalu
Description: -
Court: High Court, Kota Kinabalu
Bankruptcy Number: K872 of 1990
Date of General Meeting: 14th November, 2013
14 November 20132,490
WARTA KERAJAAN NEGERI SABAH
Time: 2.30 p.m.
Place: Department of Insolvency Malaysia, Kota Kinabalu
Date of Order (if any) for Summary Administration (Section 106): -
Address:
Department of Insolvency Malaysia,Kota Kinabalu Branch,Level 5, Block A,Kompleks Pentadbiran Kerajaan Persekutuan Sabah,Jalan Sulaman, Likas,88450 Kota Kinabalu, Sabah.
Dated: -LEO ANAK SAGA,
State Director of Insolvency,for Director-General of Insolvency, Malaysia.
_______
REPEATED NOTIFICATION
No. 774 [No. JKM. PHB. 600-2/3/166 (22)
ORDINAN PENGAMBILAN TANAH
Bab 69
ARAHAN DI BAWAH SEKSYEN 5
Bahawasanya Yang di-Pertua Negeri berpendapat bahawa mana-mana tanah yangdisebut dalam Pemberitahuan Warta No. 721/2013 hendaklah diambil, tetapi pengisytiharanserta-merta bagi maksud itu adalah tidak mungkin dapat dibuat sehingga kerja-kerjapengukuran disiapkan; oleh yang demikian, pada menjalankan kuasa yang diberikan
Bab 69kepadanya oleh seksyen 5 Ordinan Pengambilan Tanah, Yang di-Pertua Negeridengan ini mengarahkan bahawa pegawai yang diberi kuasa boleh melakukan apa-
apa kerja di atas tanah yang berkaitan dengan penggunaannya yang bagi maksud itulahtanah itu dicadangkan untuk diambil, iaitu Menaik Taraf Sistem Bekalan Air Daerah Beau-fort dan Kuala Penyu.
Bertarikh di Kota Kinabalu, pada 8 Oktober 2013.
Dengan Perintah Tuan Yang Terutama,
DATUK SERI PANGLIMA MUSA HJ. AMAN,Ketua Menteri Sabah.
2,49114 November 2013
WARTA KERAJAAN NEGERI SABAH
[No. JKM. PHB. 600-2/3/166 (22)
LAND ACQUISITION ORDINANCE
Cap. 69
DIRECTION UNDER SECTION 5
Whereas it appears to the Yang di-Pertua Negeri that the land referred to in GazetteNotification No. 721/2013 should be acquired, but that until surveying work is completed,it is not possible to make an immediate declaration to that effect; now, therefore, in
exercise of the powers conferred upon him by section 5 of the Land AcquisitionCap. 69
Ordinance, the Yang di-Pertua Negeri hereby directs that the authorised officersmay do any works on the land connected with the use, to which the land is intended to beput on its acquisition, to wit, the Upgrading of Water Supply System in Beaufort andKuala Penyu District.
Dated at Kota Kinabalu, this 8th day of October, 2013.
By His Excellency’s Command,
DATUK SERI PANGLIMA MUSA HJ. AMAN,Chief Minister of Sabah.
Kadar langganan berikut bagi Warta Kerajaan Negeri Sabah yang berkuat kuasamulai daripada 1 Januari 2013 adalah diterbitkan untuk makluman Umum:
KADAR LANGGANAN UNTUK TAHUN 2013
Warta Kerajaan termasuk tambahan-tambahan:- (Tidak termasuk Tambahan Tanda Perdagangan)
RMLangganan Tahunan di dalam Malaysia ... ... 120.00Langganan Tahunan di luar Malaysia ... ... ... 180.00Tambahan Tanda Perdagangan (untuk satu keluaran) 2.40
Sesuatu naskhah Warta Kerajaan, Tambahan-tambahan, RangUndang-undang, Laporan Dewan Undangan Negeri,Pekeliling dan lain-lain.
Tidak lebih daripada 8 muka ... ... ... ... 1.80
Tidak lebih 9 hingga 16 muka ... ... ... ... 2.40
Tidak lebih 17 hingga 32 muka ... ... ... ... 3.00
Tidak lebih 33 hingga 48 muka ... ... ... ... 3.60
Tidak lebih 49 hingga 64 muka ... ... ... ... 4.20
Tidak lebih 65 hingga 96 muka ... ... ... ... 5.40
REPEATED NOTIFICATION - (cont.)
14 November 20132,492
WARTA KERAJAAN NEGERI SABAH
Lebih daripada 96 muka ... ... ... ... ... 7.20 dan tambahRM1.20untuk setiap32 mukayang lebih.
Senaskhah Tahunan Tambahan Pertama dan Kedua sertaindeks 2012 (dijilid dengan Kulit Keras) ... ... RM 42.00
Kadar-kadar di atas adalah termasuk belanja Pos biasa (mel laut)
Pengiriman Wang hendaklah dialamatkan kepada Pencetak Kerajaan, JabatanCetak Kerajaan, Kota Kinabalu, Sabah. Cek dan Wang Pos hendaklah dibuatpembayarannya kepada Pencetak Kerajaan, Jabatan Cetak Kerajaan, dan dipalang“& Co”.
Untuk Makluman(1) Pelanggan bagi Warta Kerajaan Negeri dan terbitan-terbitan Kerajaan lain
seperti Laporan Tahunan, Laporan Jabatan dan sebagainya hendaklahdialamatkan kepada Pencetak Kerajaan, Jabatan Cetak Kerajaan, Km. 4, JalanTuaran, Beg Berkunci 2004, 88554 Kota Kinabalu.
(2) Pelanggan-pelanggan yang hendak mendapatkan Warta Kerajaan Persekutuanhendaklah memohon terus kepada Percetakan Nasional Malaysia Berhad, JalanChan Sow Lin, 50554 Kuala Lumpur.
RM
________________________________________________________________________DICETAK OLEH PENCETAK KERAJAAN,
DATUK HAJI SALSIDU BIN HAJI IBRAHIM, P.G.D.K., K.M.N., J.P., JABATAN CETAK KERAJAAN,SABAH, MALAYSIA.
2013.P.K. 0001 (L) - 2013
2,49314 November 2013