PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBA DI JALAN SERI GAMBUT DAERAH KUALA L SELANGOR DARUL EH BILL NO.1 - PRELIMINARIES AND GENERAL ITEMS (All Quantities Are Provisional Except Lump Sum Items) Item Description Unit Qty Rate 1.1 CONTRACTUAL REQUIREMENTS 1.1.1 Performance Bond L.S - - 1.1.2 Insurances 1.1.2.1 and Damage to Properties L.S - - 1.1.2.2 SOCSO/Workmen Compensation Insurance L.S - - 1.2 S.O'S REQUIREMENTS 1.2.1 Equipments for use by the S.O's and Staff 1.2.1.1 Provision and maintenance of office equipments as listed in the specification. a) 2 nos. computer nos. 2 b) 2 nos. printer nos. 2 c) 2 nos. premix thermometer nos. 2 d) 4 pair Safety Boot. nos. 4 e) 2 nos. Pacer nos. 2 1.2.1.2 Provide 3G handphone nos. 1 1.2.2 Miscellaneous 1.2.2.1 Project sign boards nos. 1 shown in the drawing. 1.2.2.2 L.S - - soft copy. 1.2.2.3 Provide and update the Works Programe using Master L.S - - Works Breakdown Structure (WBS) etc. including supply of software. 1.2.2.4 L.S - - the specification. 1.2.2.5 L.S - - during construction and temporary works. 1.2.2.6 Clearing up of site on completion. L.S - - 1.2.2.7 Preparation document tender L.S - - To Collection Page BQ1 1/1 a)Bankers/Insurance/Financial Institution Guarantee*or b)Performance Guarantee Sum Insurance of the Works including Against Personal Provide,erect and maintain 1nos project signboard as Progress photograph (within contract period) Programme to produce Crical Path Method (CPM) and As- built drawing including periodic updating as Allow for maintenance of existing road and service

Upload: vani2620

Post on 23-Jan-2016

48 views

Category:

Documents


2 download

DESCRIPTION

projek

TRANSCRIPT

Page 1: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN

DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

SELANGOR DARUL EHSAN

BILL NO.1 - PRELIMINARIES AND GENERAL ITEMS

(All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate Amount (RM)

1.1 CONTRACTUAL REQUIREMENTS

1.1.1 Performance Bond

L.S - -

1.1.2 Insurances

1.1.2.1 Insurance of the Works including Against Personal Injuriesand Damage to Properties L.S - -

1.1.2.2 SOCSO/Workmen Compensation Insurance L.S - -

1.2 S.O'S REQUIREMENTS

1.2.1 Equipments for use by the S.O's and Staff

1.2.1.1 Provision and maintenance of office equipments as

listed in the specification.

a) 2 nos. computer nos. 2

b) 2 nos. printer nos. 2

c) 2 nos. premix thermometer nos. 2

d) 4 pair Safety Boot. nos. 4

e) 2 nos. Pacer nos. 2

1.2.1.2 Provide 3G handphone nos. 1

1.2.2 Miscellaneous

1.2.2.1 Project sign boards

Provide,erect and maintain 1nos project signboard as shown nos. 1

shown in the drawing.

1.2.2.2 Progress photograph (within contract period) including L.S - -

soft copy.

1.2.2.3 Provide and update the Works Programe using Master L.S - -

Programme to produce Crical Path Method (CPM) and Works

Works Breakdown Structure (WBS) etc. including supply

of software.

1.2.2.4 As- built drawing including periodic updating as specified in L.S - -

the specification.

1.2.2.5 Allow for maintenance of existing road and service road L.S - -

during construction and temporary works.

1.2.2.6 Clearing up of site on completion. L.S - -

1.2.2.7 Preparation document tender L.S - -

To Collection

Page BQ1 1/1

a)Bankers/Insurance/Financial Institution Guarantee*or b)Performance Guarantee Sum *

Page 2: Projek Bukit Perah

MEMBINA JALAN MASUK KE TAPAK CADANGAN "SANITARY LANDFILL"DI MUKIM

TANJUNG DUA BELAS , DAERAH KUALA LANGAT , SELANGOR DARUL EHSAN

NO KONTRAK :JKR/SEL/651/2009

TARIKH NILAIAN : 28.04.2009

BAYARAN KEM. : NO. 1

Item Description Unit Qty Rate Amount

total brought forward -

1.8 Contractor's office. Accomodation, stores and workshops

1.8.1 L.S - - 5,000.00

1.8.2 L.S - - 1,400.00

1.10 Survey instruments and chainmen( Specification section 1 clause 1.19)

L.S - - 5,000.00

1.12 Water & Electricity supply

(Specification section 1 clause 1.22)

Provide and maintain water, lighting and electricity for the works L.S - - 5,000.00

1.13 Vehicle for the S.O

1.13.1 Provide two (2) numbers of vehicle (Type E)

L.S - - 200,000.00

1.13.2 Provision of fuel and maintenance for the vehicle L.S - - 14,000.00

1.13.4 Provision two (2) numbers of motocycle L.S - - 10,000.00

1.13.5 Provision of fuel and maintenance for motocycle L.S - - 7,000.00

To Collection 247,400.00

Page BQ1 2/3

Establish and remove on completion contractor's site office, workmen accommodation , stores and workshop, etc as per specification section 1 clause 1.17

Maintenance of contractor,s site office, workmen accommodation, stores and workshop for duration of the works

Provision and maintenance af survey instruments for the duration of the works as per specification section 1 - appendix 1E

Provide and maintain the following vehicles for the use of S.O and the S.O's staffs as per specification section 1 clause 1.16 - Appendix 1C.All vehicles shall be reverted to the Government at the Contract Period

All vehicles shall be reverted back to the Government at the end of contract period

Page 3: Projek Bukit Perah

MEMBINA JALAN MASUK KE TAPAK CADANGAN "SANITARY LANDFILL"DI MUKIM

TANJUNG DUA BELAS , DAERAH KUALA LANGAT , SELANGOR DARUL EHSAN

NO KONTRAK :JKR/SEL/651/2009

TARIKH NILAIAN : 28.04.2009

BAYARAN KEM. : NO. 1

Item Description Unit Qty Rate Amount

total brought forward 247,400.00

1.14 Project signboard1.14.1 nos 1 ### 3,000.00

1.15 Photographic record of works

(Specification section 1 cluse 1.24)

1.15.1 Preparation of 10 nos monthly prograss reports L.S - 1,000.00

1.15.2 L.S - 2,000.00

1.16 As-built drawings and microfilming

(specification section 1 clause 1.25)

1.16.1 Submit as-built drawings, microfilm of the works and computer soft copy L.S - 5,000.00

(Specification section 1 clause 1.25)

1.18 Access to and within site

1.18.1 L.S - 10,000.00

1.18.2 L.S - 2,500.00

1.19 Mobilisation and Demobilisation1.19.1 L.S - 30,000.00

1.20 Constraction Industry Development Board (CIDB) levy

1.20.1 L.S - 42,500.00

( 0.00125% of the Total Contarct Cost)

1.21 Clearing of site

(Specification section 1 clause 1.26)

Provide ,erect and maintain 1 nos project signboard as shown on the drawings as per specification section 1 clause 1.23

Provide colour progress photographs comprising of 36 nos of negative plus 10 nos 3R size prints from each negative for each reporting month

Provide and maintenance of access to and within site for works and removel on completion as per clause 1.33 of the special provision to the general specification

Allow for maintenance of existing road and service road during constraction & temporary works

Provide for mobilitation and demobilitation of all constractional plants and equipment necessary for the completion of the works as per clause 1.34 of the special provision to the general specification

Include payment for levy to Lembaga Pembangunan Industri Pembinaan Malaysia under part VII of the LPIP Act 1994 and the Constraction Industry (Levy Collection ) Regulation 1996

Page 4: Projek Bukit Perah

1.21.1 Clear the site on completion of the works L.S - 5,000.00

To Collection 348,400.00

Page BQ1 3/3

Page 5: Projek Bukit Perah

Page BQ1 1/1

Page 6: Projek Bukit Perah

0%

0%

0%

0%

0%

0%

0%

0%

Page BQ1 2/3

Total Work Done (%)

Page 7: Projek Bukit Perah

0%

0%

0%

0%

0%

0%

0%

0%

Total Work Done (%)

Page 8: Projek Bukit Perah

0%

Page BQ1 3/3

Page 9: Projek Bukit Perah

Page BQ1 1/1

Page 10: Projek Bukit Perah

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page BQ1 2/3

Amount Claim (RM)

Page 11: Projek Bukit Perah

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Amount Claim (RM)

Page 12: Projek Bukit Perah

0.00

0.00

Page BQ1 3/3

Page 13: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN DI JALAN SERI GAMBUT DAERAH KUALA LANGAT SELANGOR DARUL EHSAN

BILL NO.2 - TRAFFIC MANAGEMENT(All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate (RM) Amount (RM)

2.0 TRAFFIC MANAGEMENT

2.0.1

a) Kurangkan Laju nos 4

b) Pembinaan Di Hadapan nos 4

c) Awas nos 4

d) Kon nos 50

e) Blinkers including Batteries nos 12

2.0.2 Traffic Controller / Flagmen ( 3 persons) complete with

red and green flag during contruction. L/Sum

To Collection

Page BQ2 1/1

(JALAN BUKIT PERAH AND JALAN BUKIT PERAH 1)

Supply temporary sign board during construction for

'Traffic Management Plan' including

installation ,storage ,replacement ,shifting within the

work area and removel upon completion of the work as

shown in the drawing and / or a directed by the S.O

All items to be follow accordance to Arahan Teknik (Jalan) 2C/85

Page 14: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

BILL NO.2 - TRAFFIC MANAGEMENT(All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate (RM) Amount (RM)

2.1 TRAFFIC MANAGEMENT

(JALAN SERI GAMBUT)

2.1.1

a) Kurangkan Laju nos 4

b) Pembinaan Di Hadapan nos 4

c) Awas nos 4

d) Kon nos 50

e) Blinkers including Batteries nos 12

2.1.2 Traffic Controller / Flagmen ( 3 persons) complete withred and green flag during contruction. L/Sum

To Collection -

Page BQ 2/2

Supply temporary sign board during construction for

'Traffic Management Plan' including

installation ,storage ,replacement ,shifting within the

work area and removel upon completion of the work as

shown in the drawing and / or a directed by the S.O

All items to be follow accordance to Arahan Teknik (Jalan) 2C/85

Page 15: Projek Bukit Perah

Page BQ2 1/1

Page 16: Projek Bukit Perah

Page BQ 2/2

Page 17: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

BILL NO.3 - Treatment To Existing Road Pavement And Resurface Road Premix.(All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate (RM) Amount (RM)

3.0RESURFACE ROAD PREMIX(JALAN BUKIT PERAH AND JALAN BUKIT PERAH 1)

3.0.1

a) Mechanical Paverb) Tandem Rollerc) Pneumatic Rollerd) Motorist Sprayere) Backpusherf) Mobilazation and Demobilization.

3.0.2 The contractor shall provide all equipment and whatever necessary to cleaning and removing all debrisdebris of existing pavement and disposal all debris tosite as directed by S.O's.

Regulation

To regulate the undulating and depression areas asdirected by S'O's.

Surfacing

the rate of 2 meter sq. per liter as per standard spesification specifications and directed by the S.O's.

Supply ,spread and compact 'Aspahaltic ConcreteWearing Course' premix (ACWC -20mm) 50mm thick (compact) as per standard specification and directedby the S.O's.

To Collection -

Page BQ3 1/1

TREATMENT TO EXISTING PAVEMENT AND RESURFACE ROAD PREMIX.

Preparation all machineries equipment for treatment to existing pavement and resurface road premix as per below :

Supply and spray 'bituminous emulsion tack coat' at the rate of

Page 18: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

BILL NO.3 - Treatment To Existing Road Pavement And Resurface Road Premix.(All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate (RM) Amount (RM)

3.1RESURFACE ROAD PREMIX(JALAN SERI GAMBUT)

3.1.1

a) Mechanical Paverb) Tandem Rollerc) Pneumatic Rollerd) Motorist Sprayere) Backpusherf) Mobilazation and Demobilization.

3.1.2 The contractor shall provide all equipment and whatever necessary to cleaning and removing all debrisdebris of existing pavement and disposal all debris tosite as directed by S.O's.

Regulation

To regulate the undulating and depression areas asdirected by S'O's.

Surfacing

the rate of 2 meter sq. per liter as per standard spesification specifications and directed by the S.O's.

Supply ,spread and compact 'Aspahaltic ConcreteWearing Course' premix (ACWC -20mm) 50mm thick (compact) as per standard specification and directedby the S.O's.

To Collection -

Page BQ3 2/2

TREATMENT TO EXISTING PAVEMENT AND RESURFACE ROAD PREMIX.

Preparation all machineries equipment for treatment to existing pavement and resurface road premix as per below :

Supply and spray 'bituminous emulsion tack coat' at the rate of

Page 19: Projek Bukit Perah

-

Page BQ3 1/1

Page 20: Projek Bukit Perah

-

Page BQ3 2/2

Page 21: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN

DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

SELANGOR DARUL EHSAN

BILL NO. 4 - CORING TEST (All Quantities Are Provisional Except Lump Sum Items)

Item Unit Qty Rate Amount (RM)

4.0 CORING TEST

4.1 Coring Test And Compaction Test. (Premix)

a) Preparing 'Coring' mesin and labour for

testing at site as directed by the S.O's.

Nos. 50

ii) 'Coring' Test - Jalan Seri Gambut Nos. 30

Nos. 50

iv) 'Density' Test (Premix) - Jalan Seri Gambut Nos. 30

To Collection

Page BQ4 1/1

i) 'Coring' Test - Jalan Bukit Perah And Jalan Bukit Perah 1

iii) 'Density' Test (Premix) - Jalan Bukit Perah And Jalan Bukit Perah 1

Page 22: Projek Bukit Perah

PROJEK :MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN

DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

BILL NO.5 - ROAD MARKING (All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate Amount (RM)

5.0 ROAD MARKING.

5.0.1 Supply all equipment,materials,machineries and labour for road marking lines 'Refectorized Thermoplastic' type 3.0mm thick.

i) Edge Line 150mm wide m

ii) Stop line 300mm wide m

iii) Centre Line 100mm wide m

5.0.2 Transverse Bar' 5.0mm thick.

5.1 ROAD MARKING.(JALAN SERI GAMBUT )

5.1.1 Supply all equipment,materials,machineries and labour for road marking lines 'Refectorized Thermoplastic' type 3.0mm thick.

i) Edge Line 150mm wide

ii) Stop line 300mm wide

iii) Centre Line 100mm wide

5.1.2 Transverse Bar' 5.0mm thick.

To Collection

Page BQ5 1/1

(JALAN BUKIT PERAH AND JALAN BUKIT PERAH 1)

m²m²m²

All items are accordance to Arahan Teknik (Jalan) 2D/85. .

Page 23: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH DAN SEBAHAGIAN JALAN DI BUKIT PERAH 1 DAERAH KUALA LANGAT

BILL NO.5 - ROAD MARKING (All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate (RM) Amount (RM)

5.1 ROAD MARKING.(JALAN SERI GAMBUT )

5.1.1 Supply all equipment,materials,machineries and labour for road marking lines 'Refectorized Thermoplastic' type 3.0mm thick.

i) Edge Line 150mm wide

ii) Stop line 300mm wide

iii) Centre Line 100mm wide

5.1.2 Transverse Bar' 5.0mm thick.

To Collection -

Page BQ5 2/2

m²m²m²

All items are accordance to Arahan Teknik (Jalan) 2D/85. .

Page 24: Projek Bukit Perah

Page BQ5 2/2

Page 25: Projek Bukit Perah

Page BQ5 2/2

Page 26: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

BILL NO.6 - ROAD FURNITURE(All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate (RM) Amount (RM)

6.1

6.1.1 Installation of new standard traffic signs

a) RP 1 (BERHENTI) no 5b) WD 17 (AWAS) no 5c) ROAD JUNCTION ON THE LEFT AND RIGHT(WD.27a) no 6d) WD 39a or WD.39b (CHEVRON DELINEATOR) noe) WD 44 (CHEVRON) nof) WD.1 ( UNEVEN ROAD) no 8

To Summary -

Page BQ6 1/1

ROAD FURNITURE (JALAN BUKIT PERAH,JALAN BUKIT PERAH 1 AND JALAN SERI GAMBUT)

Supply and install standard reflectorised traffic signs(regulatory and warning signs) mounted on one tubulor steel post as shown in the drawings. Rate to including concrete base, welding and etc.

All to be follow accordance to Arahan Teknik (Jalan) 2C/85. Manual On Traffic Control Devices & Standard Traffic Signs.

Page 27: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH, SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

BILL NO.6 - ROAD FURNITURE(All Quantities Are Provisional Except Lump Sum Items)

Item Description Unit Qty Rate (RM) Amount (RM)

6.1

6.1.1 Installation of new standard traffic signs

a) RP 1 (BERHENTI) no 5b) WD 17 (AWAS) no 5c) ROAD JUNCTION ON THE LEFT AND RIGHT(WD.27a) no 6d) WD 39a or WD.39b (CHEVRON DELINEATOR) noe) WD 44 (CHEVRON) nof) WD.1 ( UNEVEN ROAD) no 8

To Summary -

Page BQ5 1/1

ROAD FURNITURE (JALAN BUKIT PERAH,JALAN BUKIT PERAH 1 AND JALAN SERI GAMBUT)

Supply and install standard reflectorised traffic signs(regulatory and warning signs) mounted on one tubulor steel post as shown in the drawings. Rate to including concrete base, welding and etc.

All to be follow accordance to Arahan Teknik (Jalan) 2C/85. Manual On Traffic Control Devices & Standard Traffic Signs.

Page 28: Projek Bukit Perah

PROJEK : MEMBAHARUMUKA UBIN JALAN DISEBAHAGIAN JALAN BUKIT PERAH,

SEBAHAGIAN JALAN DI BUKIT PERAH 1, DAN SEBAHAGIAN

DI JALAN SERI GAMBUT DAERAH KUALA LANGAT

SELANGOR DARUL EHSAN

SUMMARY OF BILL OF QUANTITIES

BILL DESCRIPTION PAGE NO. AMOUNT

NO. (RM)

1 PRELIMINARIES AND GENERAL ITEMS BQ 1 - 1/1

2 TRAFFIC MANAGEMENT BQ 2 - 1/1

3 TREATMENT TO EXISTING PAVEMENT AND BQ 3 - 1/1

RESURFACE ROAD PREMIX

4 CORING TEST BQ 4 - 1/1

5 ROAD MARKING BQ 5 - 1/1

6 ROAD FURNITURE BQ 6 - 1/1

TOTAL AMOUNT CARRIED TO FORM OF TENDER

RINGGT MALAYSIA :

DATE :

…………………………………………. ……………………………………….

( Signature of Contractor ) ( Signature of Witness )

Address : Address :

CONTRACT PERIOD : WEEKS