data ars condotel jogja (qty) r uun

22
Hal 1 dari 22 RESUME CONDOTEL JOGJA SPH No. Uraian sat vol GFA (m2) Total SPH II PEKERJAAN ARSITEKTUR A ARSITEKTUR BAWAH PEKERJAAN PASANGAN DINDING ls. 1 8,938 - PEKERJAAN PELAPIS DINDING ls. 1 8,938 - PEKERJAAN PELAPIS LANTAI ls. 1 8,938 - PEKERJAAN FINISHING PLAFOND ls. 1 8,938 - PEKERJAAN PINTU DAN JENDELA ls. 1 8,938 - PEKERJAAN SANITARY ls. 1 8,938 - PEKERJAAN LAIN-LAIN ls. 1 8,938 - SUB TOTAL ARSITEKTUR BAWAH 8,938 - B ARSITEKTUR ATAS 1 LANTAI DASAR PEKERJAAN PASANGAN DINDING ls. 1 8,938 PEKERJAAN PELAPIS DINDING ls. 1 8,938 PEKERJAAN PELAPIS LANTAI ls. 1 8,938 PEKERJAAN FINISHING PLAFOND ls. 1 8,938 PEKERJAAN PINTU DAN JENDELA ls. 1 8,938 PEKERJAAN SANITARY ls. 1 8,938 PEKERJAAN LAIN-LAIN ls. 1 8,938 2 LANTAI 1 S/D 3 3 PEKERJAAN PASANGAN DINDING ls. 1 15,494 PEKERJAAN PELAPIS DINDING ls. 1 15,494 PEKERJAAN PELAPIS LANTAI ls. 1 15,494 PEKERJAAN FINISHING PLAFOND ls. 1 15,494 PEKERJAAN PINTU DAN JENDELA ls. 1 15,494 PEKERJAAN SANITARY ls. 1 15,494

Upload: u2naidos

Post on 28-Nov-2015

82 views

Category:

Documents


3 download

DESCRIPTION

ef

TRANSCRIPT

Page 1: DATA ARS Condotel Jogja (Qty) R UUN

Hal 1 dari 22

RESUME CONDOTEL JOGJA

SPH

No. Uraian sat vol GFA (m2) Total SPH

II PEKERJAAN ARSITEKTUR

A ARSITEKTUR BAWAHPEKERJAAN PASANGAN DINDING ls. 1 8,938 -

PEKERJAAN PELAPIS DINDING ls. 1 8,938 -

PEKERJAAN PELAPIS LANTAI ls. 1 8,938 -

PEKERJAAN FINISHING PLAFOND ls. 1 8,938 -

PEKERJAAN PINTU DAN JENDELA ls. 1 8,938 -

PEKERJAAN SANITARY ls. 1 8,938 -

PEKERJAAN LAIN-LAIN ls. 1 8,938 -

SUB TOTAL ARSITEKTUR BAWAH 8,938 -

B ARSITEKTUR ATAS1 LANTAI DASAR

PEKERJAAN PASANGAN DINDING ls. 1 8,938

PEKERJAAN PELAPIS DINDING ls. 1 8,938

PEKERJAAN PELAPIS LANTAI ls. 1 8,938

PEKERJAAN FINISHING PLAFOND ls. 1 8,938

PEKERJAAN PINTU DAN JENDELA ls. 1 8,938

PEKERJAAN SANITARY ls. 1 8,938

PEKERJAAN LAIN-LAIN ls. 1 8,938

2 LANTAI 1 S/D 3 3

PEKERJAAN PASANGAN DINDING ls. 1 15,494

PEKERJAAN PELAPIS DINDING ls. 1 15,494

PEKERJAAN PELAPIS LANTAI ls. 1 15,494

PEKERJAAN FINISHING PLAFOND ls. 1 15,494

PEKERJAAN PINTU DAN JENDELA ls. 1 15,494

PEKERJAAN SANITARY ls. 1 15,494

Page 2: DATA ARS Condotel Jogja (Qty) R UUN

Hal 2 dari 22

SPH

No. Uraian sat vol GFA (m2) Total SPH

PEKERJAAN LAIN-LAIN ls. 1 15,494

3 LANTAI ATAPPEKERJAAN PASANGAN DINDING ls. 1 478

PEKERJAAN PELAPIS DINDING ls. 1 478

PEKERJAAN PELAPIS LANTAI ls. 1 478

PEKERJAAN FINISHING PLAFOND ls. 1 478

PEKERJAAN PINTU DAN JENDELA ls. 1 478

PEKERJAAN SANITARY ls. 1 478

PEKERJAAN LAIN-LAIN ls. 1 478

SUB TOTAL ARSITEKTUR ATAS -

C PEKERJAANFACADEPEKERJAAN FAÇADE

SUB TOTAL FAÇADE -

D PEKERJAAN LANDSCAPELANDSCAPE LANTAI DASARLANDSCAPE LANTAI ATAP

SUB TOTAL LANDSCAPE -

TOTAL PEKERJAAN ARSITEKTUR -

SUMMARY PEK ARSITEKTURPEKERJAAN PASANGAN DINDING ls. 1 -

PEKERJAAN PELAPIS DINDING ls. 1 -

PEKERJAAN PELAPIS LANTAI ls. 1 -

PEKERJAAN FINISHING PLAFOND ls. 1 -

PEKERJAAN PINTU DAN JENDELA ls. 1 -

PEKERJAAN SANITARY ls. 1 -

Page 3: DATA ARS Condotel Jogja (Qty) R UUN

Hal 3 dari 22

SPH

No. Uraian sat vol GFA (m2) Total SPH

PEKERJAAN LAIN-LAIN ls. 1 -

- -

Page 4: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt Basement - 4 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

PEKERJAAN ARSITEKTUR LANTAI SEMI BASEMENT

PEKERJAAN PASANGAN DINDING

1 Pekerjaan pemasangan bata merah adukan 1:5, pada :Dinding Luar m2 - - Dinding Dalam m2 298.22 -

2 Pekerjaan pemasangan bata merah adukan 1:2, pada :Dinding Toilet m2 53.69 -

3Dinding Luar m2 - - Dinding Dalam m2 596.45 -

4Dinding Toilet m2 107.39 -

PEKERJAAN PELAPIS DINDING

1

Area Parkir & R. Panel/ME m2 678.23 -

2

Area Parkir & R. Panel/ME m2 490.54 - R Accounting, Kasir, R. Filling Cabinet m2 - - R. Tunggu sopir m2 - - R sekitar Lift m2 - - R. Musholla, tempat wudhu m2 - - R engineering, workshop storage m2 - - R. Tangga m2 - -

3

Dinding Toilet dan T Wudhu m2 91.88 -

4

Dinding lift m2 58.57 - PEKERJAAN PELAPIS LANTAI

1 Floor Hardener 1:5 , pada :Area Parkir / Drive Way m2 735.12 - Ramp m2 70.86 - Ruang Panel/Genset m2 25.51 -

2

R Accounting, Kasir, R. Filling Cabinet m2 161.84 -

Plesteran & acian dinding adukan 1:5, pada :

Plesteran & acian dinding adukan 1:2, pada :

Dinding finish cat minyak setinggi 150cm, ex Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Dinding sisi dalam finish cat acrylic emulsion paint ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Homogeneous Tile 300x300 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogeneous Tile600x600 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogenous tile 600 x 600 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Page 5: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt Basement - 5 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

R. Tunggu sopir m2 - - R sekitar Lift m2 - - R. Musholla, tempat wudhu - R engineering, workshop storage - R. Tangga -

2

R toilet m2 16.26 -

3

R Accounting, Kasir, R. Filling Cabinet m' 205.80 - R. Tunggu sopir m' - - R sekitar Lift m' - - R. Musholla, tempat wudhu m' - - R engineering, workshop storage m' - - R. Tangga m' - -

4

R. Tangga as 12-13 m' 22.50 - R. Tangga utama m' 14.00 -

5 Siku pada rampRamp m2 70.86 -

6 Tanggulan wudhu m1 6.53

7

Toilet dan tempat wudhu m2 25.37 -

PEKERJAAN FINISHING PLAFOND

1

Area Parkir / Drive Way m2 825.39 - Finishing bawah Lantai Tangga m2 24.40 - Ruang Panel/Genset m2 25.51 -

2

Toilet m2 16.26 -

Homogenous tile 300 x 300 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Plint Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

step nosing Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Waterproofing lantai coating cement based, termasuk perimeter dinding setinggi 20cm pada:

Exposed concrete, termasuk finish cat acrylic emultion paint Ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Calsiboard 6mm Ex. Eternit Gresik atau setara termasuk finish cat Ex. Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Page 6: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt Basement - 6 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

3

R Accounting, Kasir, R. Filling Cabinet m2 165.52 - R. Tunggu sopir m2 - - R sekitar Lift m2 - - R. Musholla, tempat wudhu m2 - - R engineering, workshop storage m2 - -

PEKERJAAN PINTU DAN JENDELA

1

…… unit -

2

R Accounting PKJ1 1000x2100 unit 1.00 - R. Kasir PK1 1000x2100 unit 1.00 - R. Filling Cabinet PK1 1000x2100 unit 1.00 - R. Tunggu sopir PKJ1 1000x2100 unit 1.00 - R. Samping Lift PK1 1000x2100 unit 1.00 - R. EHK PK2 800x2100 unit 1.00 - R. Cleaning Storage PK2 800x2100 unit 1.00 - R. Chemical storage PK2 800x2100 unit 1.00 - R. Bawah tangga PK1 1000x2100 unit 1.00 - R. Toilet/tempat wudhu PK2 800x2100 unit 2.00 - R. Engineering PK1 1000x2100 unit 1.00 - R. workshop storage PK1 1000x2100 unit 1.00 -

P lipat R panel PBL 2640X2100 unit 1.00 - P single, R tangga PB1 1000X2100 unit 1.00 - P shaft PS1 700X1200 unit 3.00 -

PEKERJAAN SANITARY

LADIES TOILET

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 1.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 1.00 - Kran air TOTO TIPE T23 BQ13N unit 1.00 - Tissue holder unit 1.00 -

GENT TOILET

Gypsum Board 9mm Ex. Jayaboard atau setara termasuk finish cat Ex.Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Pengadaan & Pemasangan Pintu Jendela alumunium termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Pengadaan & Pemasangan Pintu Kayu dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Pengadaan & Pemasangan Pintu Besi dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery:

Pengadaan dan pemasangan sanitary termasuk aksesories sesuai gambar dan spesifikasi, pada :

Page 7: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt Basement - 7 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 1.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 1.00 - Kran air TOTO TIPE T23 BQ13N unit 1.00 - Tissue holder unit 1.00 -

R WUDHU PRIA DAN WANITA

Floor Drain EX. TOTO TIPE TX1BV1 unit 2.00 - Sink Tap TOTO TIPE T23 BQ13N unit 8.00 -

PEKERJAAN LAIN-LAIN

Railing tangga as 5-6 m' 5.10 - Railingtangga as 12-13 m' 7.40 -

Grille Ramp m' 13.40 -

Toilet Ladies m2 1.00 - Toilet Gent m2 1.00 -

Parkir unit 17.00 -

Pekerjaan Garis

Area parkir m' 230.74 -

Area parkir unit 64.00 -

Sub Total Pekerjaan Arsitektur Lantai Basement - Dipindahkan ke Rekapitulasi Pekerjaan Arsitektur

Pekerjaan Railing Pipa Baja 2" Fin. Zincromate dan cat duco. ∅Termasuk perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Grille Ramp lebar 300mm Fin. Zincromate dan cat minyak. Termasuk perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Mirror with aluminium edge , Termasuk finishing, perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Car Stopper ukuran 900 mm x 150 mm, car whell stopper beton bare Termasuk finishing, perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Corner Guard besi siku ukuran 50.5.5 tinggi 100 cm Termasuk finishing, perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Page 8: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt.GF - 8 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

PEKERJAAN ARSITEKTUR LANTAI GROND FLOOR

PEKERJAAN PASANGAN DINDING

1 Pekerjaan pemasangan bata merah adukan 1:5, pada :Dinding Luar m2 592.42 - Dinding Dalam m2 533.74 -

2 Pekerjaan pemasangan bata merah adukan 1:2, pada :Dinding Toilet m2 114.46 -

3Dinding Luar m2 - - Dinding Dalam m2 2,017.05 -

4Dinding Toilet m2 228.92 -

PEKERJAAN PELAPIS DINDING

1

Lobby, Resepsionis m2 2,002.65 - Luggage, bar, back office & manager m2 - - R sekitar Lift m2 - - R. Restaurant m2 - - R Toilet samping tangga 12-13 m2 - - R. Tangga as 12-13 m2 - - R. Cost Control m2 - - R. Longue & coffe shop m2 - - R. Bussiness Center m2 - - R Tangga utama m2 - - R. toilet samping tangga utama m2 - - R. Meeting m2 - - R. Kitchen m2 - - Ruang chef m2 - - Ruang F&B m2 - - R Storage (3 ruang) m2 - -

2

Dinding Toilet samping tangga as 12-13 m2 158.28 - Dinding Toilet samping tangga utama m2 - -

3

Dinding lift m2 14.67 -

PEKERJAAN PELAPIS LANTAI

1

Plesteran & acian dinding adukan 1:5, pada :

Plesteran & acian dinding adukan 1:2, pada :

Dinding sisi dalam finish cat acrylic emulsion paint ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Homogeneous Tile 300x300 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogeneous Tile600x600 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogenous tile 300 x 300 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Page 9: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt.GF - 9 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

R. Tangga as 12-13 m2 17.96 - R Tangga utama m2 19.94 -

2

Lobby, Resepsionis m2 193.65 - Luggage, bar, back office & manager m2 - - R sekitar Lift m2 - - R. Restaurant m2 - - R. Cost Control m2 - - R. Longue & coffe shop m2 - - R. Bussiness Center m2 - - R. Kitchen m2 - - Ruang chef m2 - - Ruang F&B m2 - - R Storage (3 ruang) m2 - -

1

toilet m2 29.96 -

1

lobby, function room m2 554.65 -

2

R. Tangga as 12-13 m' 15.75 - R Tangga utama m' 15.15 -

3

Lobby, Resepsionis m2 446.82 - Luggage, bar, back office & manager m2 - - R sekitar Lift m2R. Restaurant m2R. Cost Control m2R. Longue & coffe shop m2R. Bussiness Center m2R. Kitchen m2Ruang chef m2Ruang F&B m2R Storage (3 ruang) m2

3

Homogenous tile 600 x 600 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Homogenous tile 300x300 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Homogenous tile 800x800 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Plint Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Plint Homogenous tile 100 x 600 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

step nosing Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Page 10: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt.GF - 10 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

R. Tangga as 12-13 m' 23.40 - R Tangga utama m' 33.00 -

4 Carpet tile, pada:Meeting Room m2 143.53 -

5

Toilet as 11-12 m2 38.98 - Toilet as 5-6 m2 - -

PEKERJAAN FINISHING PLAFOND

1

…… m2 -

2

Toilet samping tangga as 12-13 m2 29.96 - Toilet samping tangga utama m2 - -

3

Lobby, Resepsionis m2 891.83 - Luggage, bar, back office & manager m2 - - R sekitar Lift m2 - - R. Restaurant m2 - - R. Cost Control m2 - - R. Longue & coffe shop m2 - - R. Bussiness Center m2 - - R. Kitchen m2 - - Ruang chef m2 - - Ruang F&B m2 - - R Storage (3 ruang) m2 - -

PEKERJAAN PINTU DAN JENDELA

1

Lobby, Resepsionis, frameless PU1 1600x2500 unit 1.00 - R. Longue & coffe shop, frameless FL 1000X2100

2

Waterproofing lantai coating cement based, termasuk perimeter dinding setinggi 20cm pada:

Exposed concrete, termasuk finish cat acrylic emultion paint Ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Calsiboard 6mm Ex. Eternit Gresik atau setara termasuk finish cat Ex. Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Gypsum Board 9mm Ex. Jayaboard atau setara termasuk finish cat Ex.Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Pengadaan & Pemasangan Pintu Jendela alumunium termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Pengadaan & Pemasangan Pintu Kayu dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Page 11: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt.GF - 11 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

Luggage, bar, back office & manager PK1 1000x2100 unit 3.00 - R sekitar Lift PK1 1000x2100 unit 1.00 - R. Restaurant tdk ada unit - - R Toilet samping tangga 12-13 PK2 800x2100 unit 4.00 - R. Tangga as 12-13 besi unit 1.00 - R. Cost Control PK1 1000x2100 unit 1.00 - R. Longue & coffe shop kaca unit 1.00 - R. Bussiness Center tdk ada unit - - R Tangga utama tdk ada unit - - R. toilet samping tangga utama PK2 800x2100 unit 1.00 - R. Meeting PK3 1500x2100 unit 3.00 - R. Kitchen PK3 1500x2100 unit 1.00 - Ruang chef PK1 1000x2100 unit 1.00 - Ruang F&B PK1 1000x2100 unit 1.00 - R Storage (3 ruang) PK1 1000x2100 unit 3.00 -

3

P single, R tangga PB1 1000X2100 unit 1.00 - P shaft PS1 700X1200 unit 8.00 -

4 Removable partisiR meeting RP 6700X3200 unit 2.00 -

5 Pekerjaan dinding dalam kaca pada:R. Longue & Coffee shop Clear tempered t= 10mm m2 20.10 - R. Back office & manager Clear tempered t= 10mm m2 9.66 -

6 Pekerjaan dinding luar kaca pada:R. Lobby & resepsionis Clear tempered t= 10mm m2 56.54 - R. Restaurant Clear tempered t= 10mm m2 82.50 - R. Belakang area lift Clear tempered t= 10mm m2 14.40 - R. Longue & Coffee shop Clear tempered t= 10mm m2 33.00 -

PEKERJAAN SANITARY

A. TOILET SAMPING TANGGA AS 12-13

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 4.00 - Shower Spray EX. TOTO TIPE TX 403 SECR unit 4.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 5.00 -

unit 3.00 - Meja beton wastafel lapis Granit 600x100 m' 3.42 - Paper Holder EX. TOTO TIPE TS 116 R unit 4.00 - Hand Dryer EX. TOTO TIPE HD 4000 M unit 1.00 - Tissue holder unit sdh -

B. TOILET SAMPING TANGGA AS 5-6

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 1.00 - Shower Spray EX. TOTO TIPE TX 403 SECR unit 1.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 1.00 -

unit 1.00 - Meja beton wastafel lapis Granit 600x100 m' 1.25 - Paper Holder EX. TOTO TIPE TS 116 R unit 1.00 - Hand Dryer EX. TOTO TIPE HD 4000 M unit 1.00 - Tissue holder unit sdh -

Pengadaan & Pemasangan Pintu Besi dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery:

Pengadaan dan pemasangan sanitary termasuk aksesories sesuai gambar dan spesifikasi, pada :

Counter Lavatory EX. TOTO TIPE LW 651 J / TX 101 LB

Counter Lavatory EX. TOTO TIPE LW 651 J / TX 101 LB

Page 12: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt.GF - 12 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

PEKERJAAN LAIN-LAIN

Railing tangga as 5-6 m' 14.26 - Railingtangga as 12-13 m' 13.30 -

Railing luar R. Longue & Coffee shop m' 15.02 -

Grille Ramp m' 6.70 -

Toilet samping tangga as 5-6 m2 3.42 #REF! #REF!Toilet samping tangga as 12-13 m2 1.00 #REF! #REF!

Sub Total Pekerjaan Arsitektur Lantai Basement #REF! Dipindahkan ke Rekapitulasi Pekerjaan Arsitektur

Pekerjaan Railing Pipa Baja 2" Fin. Zincromate dan cat duco. Termasuk ∅perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Railing kaca rangka Stainless Steel. Termasuk tinggi 1000mm material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Grille Ramp lebar 300mm Fin. Zincromate dan cat minyak. Termasuk perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Mirror with aluminium edge , Termasuk finishing, perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Page 13: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. 1 - 13 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

PEKERJAAN ARSITEKTUR LANTAI 1

PEKERJAAN PASANGAN DINDING

1 Pekerjaan pemasangan bata merah adukan 1:5, pada :Dinding Luar m2 671.23 - Dinding Dalam m2 1,130.42 -

2 Pekerjaan pemasangan bata merah adukan 1:2, pada :Dinding Toilet m2 497.04 -

3Dinding Luar m2 - - Dinding Dalam m2 3,357.11 -

4Dinding Toilet m2 1,033.20 -

PEKERJAAN PELAPIS DINDING

1

Selasar hotel m2 2,935.01 - R sekitar Lift m2 - - R. Unit hotel m2 - - R Toilet unit hotel m2 - - R. Tangga as 12-13 m2 - - R Tangga utama m2 - - R. HK Storage m2 - -

2

Dinding Toilet unit hotel m2 1,033.20 -

3

Dinding lift m2 14.67 -

PEKERJAAN PELAPIS LANTAI

1

R. Tangga as 12-13 m2 17.96 - R Tangga utama m2 19.94 - R. Panel m2 4.06 -

2

Selasar hotel m2 743.83 - R sekitar Lift m2 - - R. Unit hotel m2 - -

Plesteran & acian dinding adukan 1:5, pada :

Plesteran & acian dinding adukan 1:2, pada :

Dinding sisi dalam finish cat acrylic emulsion paint ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Homogeneous Tile 300x300 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogeneous Tile600x600 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogenous tile 300 x 300 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Homogenous tile 600 x 600 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Page 14: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. 1 - 14 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

R. HK Storage m2 - -

1

toilet m2 142.60 -

2

R. Tangga as 12-13 m' 15.75 - R Tangga utama m' 15.15 -

3

Selasar hotel m2 1,050.95 - R sekitar Lift m2 - - R. Unit hotel m2 - R. HK Storage m2 -

3

R. Tangga as 12-13 m' 23.40 - R Tangga utama m' 33.00

4

Toilet unit family m2 282.40 - Toilet unit smart m2 - -

PEKERJAAN FINISHING PLAFOND

1

R. panel m2 4.06 -

2

Toilet unit hotel m2 142.60 -

Homogenous tile 300x300 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Plint Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Plint Homogenous tile 100 x 600 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

step nosing Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Waterproofing lantai coating cement based, termasuk perimeter dinding setinggi 20cm pada:

Exposed concrete, termasuk finish cat acrylic emultion paint Ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Calsiboard 6mm Ex. Eternit Gresik atau setara termasuk finish cat Ex. Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Page 15: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. 1 - 15 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

3

Selasar hotel m2 743.83 - R sekitar Lift m2 - - R. Unit hotel m2 - - R. HK Storage m2 - -

PEKERJAAN PINTU DAN JENDELA

1

………. unit -

2

Pintu unit Hotel PK4 1000x2100 unit 40.00 - R Toilet PK2 800x2100 unit 40.00 - Pintu R sekitar Lift PK1 1000x2100 unit 1.00 - Pintu R. Panel PK2 800x2100 unit 1.00 - Pintu R. HK Storage PK1 1000x2100 unit 1.00 -

3

P single, R tangga PB1 1000X2100 unit 1.00 - P shaft (tiap unit hotel) PS1 700X1200 unit 17.00 -

4 Pekerjaan dinding dalam kaca pada:…………… tidak ada m2 -

5 Pekerjaan dinding luar kaca pada:…………… masuk item façade m2 -

PEKERJAAN SANITARY

A. Toilet Family Room

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 8.00 - Shower Spray EX. TOTO TIPE TX 403 SECR unit 8.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 8.00 -

unit 8.00 - Meja beton wastafel lapis Granit 600x100 m' 7.20 - Double Robe Hook EX. TOTO TIPE TX 704 AES unit 8.00 - Paper Holder EX. TOTO TIPE TS 116 R unit 8.00 - Tissue holder unit sdh #VALUE!Towek Rack unit 8.00 -

A. Toilet smart Room

Gypsum Board 9mm Ex. Jayaboard atau setara termasuk finish cat Ex.Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Pengadaan & Pemasangan Pintu Jendela alumunium termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Pengadaan & Pemasangan Pintu Kayu dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Pengadaan & Pemasangan Pintu Besi dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery:

Pengadaan dan pemasangan sanitary termasuk aksesories sesuai gambar dan spesifikasi, pada :

Counter Lavatory EX. TOTO TIPE LW 651 J / TX 101 LB

Page 16: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. 1 - 16 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 32.00 - Shower Spray EX. TOTO TIPE TX 403 SECR unit 32.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 32.00 -

unit 32.00 - Meja beton wastafel lapis Granit 600x100 m' 28.80 - Double Robe Hook EX. TOTO TIPE TX 704 AES unit 32.00 - Paper Holder EX. TOTO TIPE TS 116 R unit 32.00 - Tissue holder unit sdh #VALUE!Towek Rack unit 32.00 -

PEKERJAAN LAIN-LAIN

Railing tangga as 5-6 m' 12.56 - Railingtangga as 12-13 m' 12.10 -

Railing balkon unit Family m' 47.00 - Railing balkon unit Smart m' - -

Toilet Unit Family m2 6.40 - Toilet unit smart m2 25.60 -

Sub Total Pekerjaan Arsitektur Lantai Basement #VALUE! Dipindahkan ke Rekapitulasi Pekerjaan Arsitektur

Counter Lavatory EX. TOTO TIPE LW 651 J / TX 101 LB

Pekerjaan Railing Pipa Baja 2" Fin. Zincromate dan cat duco. Termasuk ∅perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Railing besi hollow finish cat duco tinggi 1000mm material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Mirror with aluminium edge , Termasuk finishing, perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Page 17: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. Atap - 17 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

PEKERJAAN ARSITEKTUR LANTAI ATAP

PEKERJAAN PASANGAN DINDING

1 Pekerjaan pemasangan bata merah adukan 1:5, pada :Dinding Luar m2 457.28 - Dinding Dalam m2 193.79 -

2 Pekerjaan pemasangan bata merah adukan 1:2, pada :Dinding Toilet m2 122.67 -

3Dinding Luar m2 914.57 - Dinding Dalam m2 387.58 -

4Dinding Toilet m2 245.34 -

PEKERJAAN PELAPIS DINDING

1

Dry Kitchen, Bar, R. Meeting m2 776.23 - R sekitar Lift m2 - - R. Marketing m2 - - R. Kantin m2 - - R. Tangga as 12-13 m2 - - Dinding Toilet as 6-7 m2 - - Dinding Toilet as 9-11 m2 - -

1 Dinding sisi LUAR finish cat

Dry Kitchen, Bar, R. Meeting m2 1,062.44 -

2

Dinding Toilet as 6-7 m2 347.06 - Dinding Toilet as 9-11 m2 - -

3

Dinding lift m2 14.67 -

PEKERJAAN PELAPIS LANTAI

1

R. Tangga as 12-13 m2 17.96 - R. Panel m2 4.06 -

Plesteran & acian dinding adukan 1:5, pada :

Plesteran & acian dinding adukan 1:2, pada :

Dinding sisi dalam finish cat acrylic emulsion paint ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Homogeneous Tile 300x300 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogeneous Tile600x600 ex Indogress, termasuk screeding, bahan perekat semen pasir, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada:

Homogenous tile 300 x 300 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Page 18: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. Atap - 18 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

2

Dry Kitchen, Bar, R. Meeting m2 384.34 - R sekitar Lift m2 - - R. Marketing m2 - - R. Kantin m2 - -

1

toilet m2 53.93 -

2

R. Tangga as 12-13 m' 15.75 - R Tangga utama m' 15.15 -

3

Dry Kitchen, Bar, R. Meeting m2 261.33 - R sekitar Lift m2 - - R. Marketing m2 - R. Kantin m2 -

3

R. Tangga as 12-13 m' 23.40 -

4

Toilet as 6-7 m2 72.78 - Toilet as 9-11 m2 - -

5 Waterproofing , Membrane, termasuk perimeter dinding setinggi 20cm pada:

Atap R Lift m2 682.85 - Atap R Tangga m2 - - Atap R Meeting m2 - - Atap R Kantin+toilet m2 - - Landscape lantai atap m2 - -

- - PEKERJAAN FINISHING PLAFOND

1

R. Panel m2 4.03 -

Homogenous tile 600 x 600 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Homogenous tile 300x300 mm Ex. Indogress, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Plint Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Plint Homogenous tile 100 x 600 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

step nosing Homogenous tile 100 x 300 mm Ex. Granito, termasuk screeding 3,5 cm, bahan perekat Mortar Utama atau setara, naad (grout), expantion joint dan waste sesuai gambar & spesifikasi, pada :

Waterproofing lantai coating cement based, termasuk perimeter dinding setinggi 20cm pada:

Exposed concrete, termasuk finish cat acrylic emultion paint Ex. Dulux ICI atau setara sesuai gambar dan spesifikasi, pada :

Page 19: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. Atap - 19 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

R. Lift m2 14.56 - R. tangga m2 14.32 -

2

Toilet as 6-7 m2 384.34 - Toilet as 9-11 m2 - -

3

Dry Kitchen, Bar, R. Meeting m2 384.34 - R sekitar Lift m2 - - R. Marketing m2 - - R. Kantin m2 - -

PEKERJAAN PINTU DAN JENDELA

1

………. unit -

2

R. Dry Kitchen PK3 1500x2100 unit 1.00 - R. Meeting PK3 1500x2100 unit 2.00 - Pintu R sekitar Lift PK1 1000x2100 unit 1.00 - Pintu R. Panel PK2 800x2100 unit 1.00 - R. Marketing PK3 1500x2100 unit 1.00 - R Toilet PK2 800x2100 unit 6.00 - R JANITOR PK2A 1000x2100 unit 1.00 - R. Kantin PK3 1500x2100 unit 1.00 - LOKER UNIT 2.00 - R Toilet GESER PK2 800x2100 unit 4.00 -

3

P single, R tangga PB1 1000X2100 unit 1.00 - P shaft (tiap unit hotel) PS1 700X1200 unit 2.00 -

4 Pekerjaan dinding dalam kaca pada:…………… tidak ada m2 -

5 Pekerjaan dinding luar kaca pada:R. Meeting, R. Bar Clear tempered t= 10mm m2 88.45 -

6 Removable partisiR meeting RP 7700X3200 unit 1.00 -

Calsiboard 6mm Ex. Eternit Gresik atau setara termasuk finish cat Ex. Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Gypsum Board 9mm Ex. Jayaboard atau setara termasuk finish cat Ex.Dulux ICI atau setara, rangka dan penggantung, setting out, waste, mainhole, lubang bukaan untuk lampu dan pekerjaan ME yang menempel pada plafond sesuai gambar dan spesifikasi, pada :

Pengadaan & Pemasangan Pintu Jendela alumunium termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Pengadaan & Pemasangan Pintu Kayu dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery yang di perlukan sesuai gambar & spesifikasi, yaitu type :

Pengadaan & Pemasangan Pintu Besi dan Kusen termasuk bukaan, lintel, tali air, dan segala accessories dan Ironmongery:

Page 20: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Lt. Atap - 20 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

PEKERJAAN SANITARY

A. Toilet as 5-6

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 2.00 - Shower Spray EX. TOTO TIPE TX 403 SECR unit 2.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 2.00 -

unit 2.00 - Meja beton wastafel lapis Granit 600x100 m' 2.50 - Double Robe Hook EX. TOTO TIPE TX 704 AES unit 2.00 - Paper Holder EX. TOTO TIPE TS 116 R unit 2.00 - Tissue holder unit - Towek Rack unit 2.00 -

B. Toilet as 9-11

Coupled Toilet EX. TOTO TIPE CW 660-SW 660 unit 4.00 - Shower Spray EX. TOTO TIPE TX 403 SECR unit 4.00 - Floor Drain EX. TOTO TIPE TX1BV1 unit 9.00 -

unit 4.00 - Meja beton wastafel lapis Granit 600x100 m' 5.00 - Double Robe Hook EX. TOTO TIPE TX 704 AES unit 8.00 - Paper Holder EX. TOTO TIPE TS 116 R unit 8.00 - Tissue holder unit - Towek Rack unit 8.00 - URINOIR unit 2.00 - KRAN/SHOWER unit 4.00 -

C. JANITOR

Kran air TOTO TIPE T23 BQ13N unit 1.00 -

PEKERJAAN LAIN-LAIN

Railingtangga as 12-13 m' 17.24 -

Toilet as 5-6 m2 2.50 - Toilet as 12-13 m2 5.00 -

Sub Total Pekerjaan Arsitektur Lantai Basement - Dipindahkan ke Rekapitulasi Pekerjaan Arsitektur

Pengadaan dan pemasangan sanitary termasuk aksesories sesuai gambar dan spesifikasi, pada :

Counter Lavatory EX. TOTO TIPE LW 651 J / TX 101 LB

Counter Lavatory EX. TOTO TIPE LW 651 J / TX 101 LB

Pekerjaan Railing Pipa Baja 2" Fin. Zincromate dan cat duco. Termasuk ∅perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Pekerjaan Mirror with aluminium edge , Termasuk finishing, perkuatan struktur, material bantu sesuai gambar & spesifikasi, pada :

Page 21: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. facade - 21 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total (Rp) (Rp)

PEKERJAAN ARSITEKTUR FAÇADE

A TAMPAK DEPAN1 Alumunium composite panel Façade

ACP datar type 1A m2 152.96 ACP datar type 1B m2 153.75

ACP timbul type 1 m2 13.40 ACP timbul type 2 m2 30.59 ACP timbul type 3A m2 22.44 ACP timbul type 3B

2 GRC Profil t= 20mm m2

3 Rangka struktur pada ACP datasr type 1ARangka struktur pada ACP datasr type 1A m2GRC PROFIL m2 77.91

B TAMPAK SAMPING KIRIdari Lt. 1 dasar s/d Lt Roof

Profil beton Balkon m1 297.60 Plesteran dan acian dinding luar m2 1,196.78 Cat dinding luar m2 1,196.78 Curtain wall dinding tangga utama m2 -

C TAMPAK SAMPING KANANdari Lt. 1 dasar s/d Lt Roof

Profil beton Balkon m1 297.60 Plesteran dan acian dinding luar m2 1,196.78 Cat dinding luar m2 1,196.78 Curtain wall dinding tangga utama tidak ada m2 120.15

D TAMPAK BELAKANGdari Lt. 1 dasar s/d Lt Roof

Profil beton Balkon m1 - Plesteran dan acian dinding luar m2 199.38 Cat dinding luar m2 199.38 Curtain wall dinding tangga utama tidak ada m2 -

Sub Total Pekerjaan Arsitektur Lantai Basement - Dipindahkan ke Rekapitulasi Pekerjaan Arsitektur

Page 22: DATA ARS Condotel Jogja (Qty) R UUN

PT. JURUKUR BAHAN INDONESIA BILL NO. Landscape - 22 PROYEK HOTEL ASTON JAMBI

BILL OF QUANTITY CONDOTEL JOGJA PAKET PEKERJAAN ARSITEKTUR

No. Uraian Unit Quantity Harga Satuan Total

(Rp) (Rp)

PEKERJAAN LANDSCAPE

A LANDSCAPE LANTAI DASAR1 Pagar samping dan belakang

Pagar samping dan belakang, pasangan bata 1:5 tinggi 2m m2 391.52 Plesteran dan acian 1:5 dinding pagar m2 783.04 Cat dinding pagar m2 783.04 Pondasi pagar m3

2 Perkerasan lantai dasar.Paving block lantai dasar m2 136.10

3 Hardscape & softscape lantai dasarHardscape lantai dasar m2Softscape lantai dasar m2

B LANDSCAPE LANTAI ATAP

1 Drainase lantai atap area landscape lantai atap m22 Waterproofing lantai atap membrane m23 Hardscape lantai atap m24 Softscape lantai atap m2

Sub Total Pekerjaan Arsitektur Lantai Basement - Dipindahkan ke Rekapitulasi Pekerjaan Arsitektur