rag 121 sains persekitaran 1a(e)
Post on 15-Nov-2014
112 Views
Preview:
TRANSCRIPT
04/08/23 1
RAG 121 ENVIRONMENTAL SCIENCE 1LECTURE 1
©Assoc.Prof. Ar. Dr. Abdul Majid IsmailGBI:INTRODUCTION - SUSTAINABLE DEVELOPMENT ISSUES, GREEN BUILDING INDEX & HUMAN SKILLS
“KEMAHIRAN INSANIAH” Website:
http://www.hbp.usm.my/ventilation
04/08/23 2
LECTURE 1 INTRODUCTION
Firman Allah “Berlakulah kerosakan (bencana) di
daratan dan di lautan oleh kerana usaha manusia sendiri, sehingga Allah menimpakan pada mereka sebahagian azab daripada perbuatan mereka itu, agar mereka kembali ke jalan yang benar (bertaubat).”
…( Surah Ar Rum ayat 41)
04/08/23 3
LECTURE 1 INTRODUCTION
Allah says “Mischief has appeared on land and sea
because of (the need) that the hands of men have earned that (Allah) may give them a taste of some of their deeds: in order that they may turn back (from Evil)”
…( Surah Al Room verse 41)
04/08/23 4
HOW BEAUTIFUL IS OUR EARTH
“EARTH IS OUR FRIEND NOT ENEMY”
04/08/23 5
THE DISTRUCTION IS SO DIVASTATING
GOD’S RECIPROCATION IS REGARDLESS WHO & WHERE
04/08/23 6
SUSTAINABLE DEVELOPMENT
“Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs.”
Brundtland Commission report of 1987
04/08/23 7
WHY SUSTAINABLE DEVELOPMENT?
Urban Population expected to grow by between40% to 50% by 2030 from 70% to 80% of Total Population. The way we plan our Cities will be a Key component of a sustainable future24% of Urban Home Energy consumption is from the use of the Car to & from work31% of Urban Home Energy consumption is from the use of the Car for after workMalaysia will become a Net Importer of Energy by 2010. How we design our homes will reflect how much energy they require to run.
04/08/23 8
“Architects , developers & politicians are just like land greedy giant”
drawing by Malcom Wells
04/08/23 9
(PLANNER & ARCHITECT)
1. NATURAL (GOD’S CREATION)
2. MAN MADE
MAN / HUMAN
LEADER / KHALIPH
EARTH / NATURE
HEALTH / WELLBEING
OUTDOOR ENVIRONMENT(OUTDOOR CLIMATE)
INDOOR ENVIRONMENT(INDOOR CLIMATE)
(ARCHITECT & ENGINEER)
1. CLOSED (100% ACTIVE)
2. OPEN (100% PASSIVE)
3. HYBRID (ACTIVE + PASSIVE
ENVIRONMENTAL SCIENCE
DEVELOPMENT
NEGATIVE EFFECT POSITIVE EFFECT
BEHAVIOUR & ATTITUDE
(CONTROL / MANAGE)
CYCLE, ECOLOGY, CLIMATE, WEATHER
04/08/23 10
GLOBAL ENVIRONMENTAL ISUES
MELTING OF ARCTIC (THE NORTH & SOUTH POLES)
04/08/23 11
+ 1°C
+ 2°C
+ 3°C
+ 4°C
+ 5°C
+ 6°C
Arctic is melting
Coral Reefs dying
Amazon rainforest drying out
Many coastal cities could beflooded
Increase in climate refugees
Global Wipe Out
CLIMATE CHANGE
04/08/23 12
NATIONAL ENVIRONMENTAL ISUES
“THE QUALITY OF OUR NATIONAL ENVIRONMENT IS DEGRADING DUE TO UNCONTROLLED DEVELOPMENT / (UNSUSTANABLE DEVELOPMENT PRACTICES) ”
POSSIBLE CAUSES:HUMAN FACTOR (ATTITUDE)
04/08/23 13
NO POSITIVE ATTITUDE SUCH AS:RESPONSIBLE (BERTANGGUNGJAWAB)THRUSTWORTHY (AMANAH)LIKE WELFARE WORKS (SUKA KEBAJIKAN)COSIDERATE (BERTIMBANGRASA)GENEROUS (PEMURAH)WORK WITH OTHERS (BERKERJASAMA)TOLERABLE (BERTOLAK ANSUR)NOT SELFISH (TIDAK BERSIKAP
MEMENTINGKAN DIRI SENDIRI)NOT GREEDY (TIDAK TAMAK)NOT EGOIST (TIDAK EGO)NOT ARROGANT (TIDAK SOMBONG)NOT STINGY (TIDAK (BAKHIL) -
(MAXIMISING PROFIT)
04/08/23 14
LACK OF CONTROL & NEGATIVE ATTITUDE
(POLLUTED / DIRTY)
DISTURBANCES(BAD SMELL, UNWANTED SCIENERY)(DISEASE OUTBREAK, INJURY, DEATH,
UNCOMFORTABLE, NOISY & DISTRUCTION OF PROPERTIES ETC.)
PROPER ENVIRONMENTAL MANAGEMENT(GBI – SM4) & 7 KI
(SUSTAINABLE PLANNING & MANAGEMENT, HUMAN SKILLS)
04/08/23 15
CURRENT ISSUESAPPARENT INCREASED IN AIR TEMPERATURE MEAN DAY TEMPERATURE RISED UP FROM
320C TO 400C THE HOT CONDITION REMAIN TILL LATE
NIGHTFREQUENT OCCURANCE OF FLASH FLOODGROUND & BUILDINGS ON FIREHAZE (AIR QUALITY)GROUND SETTLEMENT, LAND SLIDE (BUILDINGS CRACK)PROBLEMS OF BAD SMELL/TOXIC & POLLUTION
04/08/23 16
PROBLEMS OF STORM & EXTREME WIND CONDITIONS (2003, 2007 & 2008)
04/08/23 17
PROBLEMS OF GROUND SETTLEMENT
04/08/23 18
EXAMPLES OF LATEST LAND SLIDE:
20 NOV 2003 – HOUSE OF GENERAL (B) TAN SERI ISMAIL OMAR – DISTRUCTION OF PROPERTY & DEATH
MEI 2006 – LAND SLIDE AT KAMPUNG PASIR ULU KELANG - DISTRUCTION OF PROPERTY & DEATH
04/08/23 19
KOTA KINABALU
27 Jun 2006 – NEWLY REPAIRED ROAD, COLLAPSED PARTLY FALL ON HOUSES
04/08/23 20
LAND SLIDE AT BUKIT ANTARABANGSA
6 DECEMBER 2008, 16
BUNGALOWS DISTROYED, 4 DEAD IN A LAND SLIDE AT TAMAN BUKIT MEWAH & TAMAN BUKIT UTAMA
04/08/23 21
NATURAL DISASTER OR HUMAN ERROR?
ROOF OF STADIUM SULTAN MIZAN COLLAPSED 3 JUN 09
JAYA SUPERMARKET IN PETALING JAYA COLLAPSED 29 MAY 09
04/08/23 22
HAZE IN PENANG ISLAND (2003/06)
04/08/23 23
FRESH WATER SUPPLY (SCARE / DEGRADING IN QUALITY):SOURCE OF FRESH WATER -
DISTURBEDEXCESSIVE CLEARING OF FORESTDESTRUCTION OF FOREST & HILLS
(WATER CATCHMENT AREA)TOO MANY HARD SURFACES WITHOUT
TURFING & GROUND COVERPOLLUTED WATER MIXED UP WITH
FRESH WATER.
04/08/23 24
TREES AND VEGETATION ARE NATURAL AGENT IN LOWERING DOWN AIR TEMPERATURE, FILTERING SOLAR HEAT & DILUTING AIR
POLLUTION
04/08/23 25
GROUND & BUSH FIRE
04/08/23 26
FLASH FLOOD IN KUALA LUMPUR (2001 & 2007)
04/08/23 27
FLASH FLOOD IN KUALA LUMPUR (2001 & 2007)
11 JUN 2007
04/08/23 28
PROBLEMS OF FLASH FLOOD (2003)
KUALA LUMPUR 10 JUNE 2003 (Source: Utusan Malaysia 11/6/2003)
04/08/23 29
FLOOD IN JOHORE (2007)
13 JANUARY 2007
04/08/23 30
FLOOD IN THE EAST COAST (KOTA BAHARU, DEC 2004)
04/08/23 31
PROBLEMS OF WASTE DISPOSAL (DOMESTIC & INDUSTRIAL) SOLID WASTE – COLLECTION & DISPOSAL
HIGH DENSITY HOUSING (FLATS – LOCATION OF RUBBISH CHUTE / DUMP & RESIDENT’S ATTITUDE)
LIQUID WASTE – SANITARY & TOXIC PROCESSING TANKS / OXIDATION PONDS – NOT
FUNCTIONING PROPERLY, UNSUITABLE LOCATION EFFLUENT FROM (PIG FARM) DISCHARGED INTO
RIVERS WITHOUT PROPER TREATMENT ( JE EPIDEMICS & SMELL POLLUTION)
OIL SPILL OIL SPILL IN TOURIST SPOTS & FISH SANCTUARY
04/08/23 32
PROBLEMS OF WASTE DISPOSAL
16,000 TON RUBBISH PER DAY / 800 GRAM PER PERSON
04/08/23 33
TRADITIONAL DUMPING OF SOLID WASTE
04/08/23 34
PROBLEMS OF WASTE COLLECTION SYSTEM
YEAR 2000 THERE ARE 230 WASTE DISPOSAL CENTRES
NOW LEFT WITH 170 (112 IN PENINSULA MALAYSIA)
80% WILL BE CLOSED BY THE YEAR 2010
04/08/23 35
WATER & AIR POLLUTION
04/08/23 36
EXAMPLE: RIVER POLLUTION (PENANG ISLAND)
04/08/23 37
EXAMPLE: RIVER POLLUTION (PENANG ISLAND)
04/08/23 38
EXAMPLE: RIVER POLLUTION (SELANGOR)
04/08/23 39
CAUSES OF POLLUTION
04/08/23 40
STATUS OF THE MAIN NATIONAL ENVIRONMENTAL COMPONENTS (WATER,
AIR, FOREST & BEACHES)
WATER (MOST IMPORTANT – MOST POLLUTED)USES DOMESTIC USE (DRINKING, WASHING,
COOKING, BATHING) INDUSTRY & PUBLIC USE (IRRIGATION,
FISHERY, PROCESSING, ELECTRIC)
WATER MANAGEMENT (FRESH WATER & WASTE WATER) “PUBLIC HEALTH ENGINEERING” “SANITARY ENGINEERING”
04/08/23 41
WATER - 45% BODY WEIGHT CONTENT
RMK5 (1991-95), RM2,467 BILLION FOR WATER SUPPLY PROJECTS
CONSUMPTION – 5 MILLION LITRE WATER PER DAY – REQUIRE ANOTHER 400 TREATMENT PLANTS
FUTURE WATER CONSUMPTION: DOMESTIC AND INDUSTRY – 2.6 BILLION M3 ,
5.8 BILLION M3 IN THE YEAR 2020 AGRICULTURE - 9 BILLION M3 , 13.2 BILLION
M3 IN THE YEAR 2020
04/08/23 42
MAIN REASONS FOR THE DECLINING QUALITY OF WATER RESOURCES
LOGGING & FOREST CLEARING
CHANGE OF LAND USE
WASTE DISPOSAL
ACID RAIN
DEVELOPMENT IN THE HIGHLAND AREA (WATER CATCHMENT AREA)
04/08/23 43
WATER QUALITY STANDARDpH = 6.5 UP TO 8.5
CONSERVATION OF WATER RESOURCESWATER RECYCLINGUSED OF RAIN WATER FROM ROOFSREDUCTION OF WATER LOSSES –
REPLACING LEAKING & OLD PIPESEDUCATION (CHANGE THE LAVISH
ATTITUDE)
04/08/23 44
SIGN OF POLLUTIONS
FREQUENT OCCURRENCE OF FLASH FLOODS IN MAJOR CITIES (KL ETC) – UNCONTROLLED DEVELOPMENT PROCESS : EXAMPLES; CUTTING OF HILL LAND IN KLANG VELLY
AREA & CAMERON HLD. – EROSION – SEDIMENTATION OF MUD IN KLANG RIVER.
WASTE POLLUTION (WASTE DISPOSAL FROM PALM OIL & RUBBER MILLS, EFFLUENT DISCHARGED FROM ANIMAL FARMS AND FACTORIES) 1976 – 42 RIVERS ARE CATEGORISED AS
POLLUTED 16 ARE HIGHLY PULLUTED (SG.PINANG)
04/08/23 45
i) INDUSTRIAL WASTE WATER (CLOROFORM, BIFENIL, PLUMBUM ETC.)
STEEL INDUSTRIES – 29% TEXTILE INDUSTRIES – 15 % GAS INDUSTRIES – 14% ASBESTOST FACTORIES – 9%
ii) HUMAN & ANIMAL WASTE WATER (EFFLUENT & SANITATION WATER)
DISCHARGED DIRECTLY INTO WATER SOURCES INCOMPLETE PROCESSING OVERFLOW INTO FRESH WATER SOURCES
DURING HEAVY RAIN LEAKED PIPES AND CROSSINGS
04/08/23 46
CONTROL OF WATER QUALITY (AKTA KUALITI ALAM SEKITAR 1974 PINDAAN 1985)
WATER IS BEING CONTROLLED BY ITS CEMICAL, BIOLOGICAL, PHYSICAL CHARACTERISTIC & ITS CONTENT. (REVERSE OSMOSIS, ELECTRO-DYLISIS, CARBON ABSORPTION & CHEMICAL REACTION)WASTE DISPOSAL MUST BE FILTERED FIRST BEFORE DISPOSED INTO RIVERS OR WATER COURSES.CATCHMENT AREA & ITS SURROUNDING MUST BE PROTECTED FROM BEING CLEARED.ALL DOMESTIC WASTE WATER, FACTORIES & ANIMAL FARMS – CHANNELED INTO ANY TREATMENT PLANTS, CLEANED - DISPOSED.
04/08/23 47
PROBLEMS TO BEACH & COAST
“COASTAL ECOSYSTEM ARE BEING DISTURBED & DISTROYED”COAST OF THE PENINSULAR 2,300KM IN LENGTH.30% SETTLEMENTS CONCENTARTED ALONG THE COAST.CAUSES OF DISTURBANCES: MINING FISHING AQUACULTURE INDUSTRIES PETROLEUM SHIPPING AGRICULTURE HOUSING
04/08/23 48
DISTRUCTIONCORAL REEFS: MOST OF THE ISLANDS ALONG THE EAST
COAST HAVE BEAUTIFUL CORAL REEFS. FUNCTION – WAVE BREAKER, FISHING (10 –
25%) DAMAGED BY:
SUSPENSION (CLOUDINESS) FOREST CLEARING. (CLOUDINESS LIMITS SOLAR RADIATION FOR THE CORAL MICRO ORGANIASM TO GROW).
EXAMPLE PULAU REDANG
04/08/23 49
MANGROVETHE STATUS OF MANGROVE FOREST: 113,384 HECTRE, ALONG SELANGOR &
JOHOR COASTLINES (87%). DAMAGED BY:
COASTAL FISHING ACTIVITIES WASTE DISPOSAL. CHANGE OF LAND USE. UNCONTROLLED LOGGING.
EXAMPLES: KUANTAN, CENDERING
RECLAIMATION OF MANGROVE SWAMP
04/08/23 50
EXAMPLE:SELANGOR
35% CHANGED INTO AGRICULTURE PULAU PINANG
JELUTUNG & BATU FERRINGHI – SOLID WASTE DISPOSED DIRECTLY INTO THE SEA (ABNDONED IN 2003)
BALIK PULAU – OIL EROSION (100M PER YEAR) BATU MAUNG - ORGANIC MATERIALS FROM PIG
FARMSKELANG & PULAU PINANG HARBOUR
OIL SPILLOVERALL COASTLINES
COASTAL FISHERY
04/08/23 51
AIR / WIND QUALITY (N2=78%, O2=21%, Ar=1%, CO2=0.003%)
IMPORTANT (QUALITY & QUANTITY) FOR: RESPIRATION (FRESH AIR) VENTILATION (MOVING AIR / WIND)
BASIC LIVING REQUIREMENTS GROWING OF PLANTS GROWING OF ANIMALS MADIUM OF OTHER ELEMENTS (LIGHT AND
HEAT) DETERMINANTS IN THE FORMATION OF
WHETHER AND CLIMATE (TEMPERATURE, WATER VAPOUR, FLOW PATTERN AND SPEED & RADIATION)
04/08/23 52
DEMOLISHION OF HILLS (USM)
04/08/23 53
DEFINITION OF AIR POLLUTION
“ AIR POLLUTION MEANS CONTAMINATION BY ONE OR MORE CONTAMINANTS OR ITS COMBINATIONS IN THE AIR, WITHIN A SPECIFIC QUANTITY & DURATION THAT CAN OR TEND TO CAUSE DISTURBANCES”
04/08/23 54
EFFECT OF AIR POLLUTON: DESEASE OUTBREAKS DESTRUCTION, DEFECT TO HUMAN &
PLANTS DISTURBANCES IN ENJOYING LIFE DISTURBANCES IN VIEWING DESTRUCTION OF ENVIRONMENTAL
ELEMENTS EXAMPLES:
GLOOMY CONDITION IN KELANG VELLY (HAZE) THICK SMOKE CONTAINING SULPHUR & NITROGEN
OXIDE EFFECTS:
EYE, NOSE & THROAT DESEASES.CLEAN AIR STANDARD: (1PPM) – 1 CUBIC UNIT POLLUTANTS GAS CONTAIN IN 1
MILLION CUBIC UNIT OF A SIMILAR AIR (g/m3)
04/08/23 55
TYPES OF AIR POLLUTION:
TYPES ELEMENTS EXAMPLES
1. PARTICLES SOLID
LIQUID
ASH, SMOKE, FOG, FLYING ASH
MIST, SPRAY, FOG
2. ORGANIC GASES
HIDROCARBON
ALDIHIDE
KETON
HEXANE, BENZANE, METANE, BUTANE, CLORINATED HIDROCARBON
FORMALDEHIDE
ACETONE, ALCOHOL
3. INORGANIC GASES
CARBON OXIDE
NITROGEN OXIDE
SULPHUR OXIDE
OTHERS
CO, CO2
NO2, NITRIC OXSIDE
SO2, SO3
H2S, HF, AMONIA
04/08/23 56
1. PARTICLES: BURNING OF FUELS – COAL, PETROL, DISEL –
CARS, POWER STATIONS. INDUSTRIAL PROCESSES – GRINDING,
MELTING, DRYING & BREAKING – RICE HUSK, QUARRY.
NATURAL PEROCESSES – VOLCENO ERUPTION, DESERT WINDS, FOREST FIRE.
EFFECTS: BECOME “NUCLEI” CONDENSATION – CLOUDS &
SNOW. REDUCE VIEWING DISTANCE. EFFECT TO LIVING – ORGANISM. REDUCES TOTAL SOLAR RADIATION. TO HUMAN – CANCER, TOXIC, POISONOUS TO ELEMENTS - SURFACE DESTRUCTION,
RUSTING, DIRTY.
04/08/23 57
2. ORGANIC & INORGANIC GASSES : CARBON OXIDE
CO MORE HARMFUL – ODOURLESS, COLOURLESS, LONG LIFE SPAN.
EFFECT CHANGES PHYSIOLOGICAL SYSTEM POISONOUS
& SUFFOCATION.
SULPHUR OXSIDE MOST QUANTITY & DANGEROUS SORE THROAT. PRODUCT OF BURNING COAL & ACID FACTORY.
EFFECT DELAY IN DRYING OF PAINTWORK, BLEACHING OF
COLOUR.
04/08/23 58
ACID RAIN SULPHUR OXIDE & NITROGEN OXIDE CHANGES TO
ACID AT CLOUD LEVEL + WATER VAPOUR. (pH 2.0 – 6.0)
EFFECT DAMAGES TO BUILDING. DAMAGES TO PLANTS. DISTURBANCES TO ANIMAL. REDUCES WATER QUALITY.
SMELL & NOISE POLLUTION BAD SMELL
OXIDATION PONDS POLLUTED RIVER & STREAM (EXAMPLE – SMELL OF
PIG EFFLUENT) NOISE
DOE 1992 – MALAYSIA IS ONE OF THE NOISIEST COUNTRY (55dB)
04/08/23 59
CLIMATIC CHANGEURBAN CLIMATE (HEAT ISLAND)GLASS/GREEN HOUSE EFFECT
AVERAGE TEMPERATURE INCREASES BY 1 DEG.C AFTER 10 YEARS.
SOURCE:HIGH RATE OF POLLUTIONTOO MANY HARD SURFACESLESSER TREE & GREEN AREATRAFIC CONGESTIONTOO MANY DESTRUCTION
04/08/23 60
CONTROL:ENVIRONMENTAL QUALITY ACT 1974 –
INSUFFICIENT TO CONTROL THE WHOLE ENVIRONMENT.
CONTROL & PREVENT POLLUTION AT SOURCE
“ENVIRONMENTAL IMPACT ASSESMENT (EIA) TO IMPROVE PLANNING & APPROVAL OF DEVELOPMENT PROJECTS.
IMPLEMENTATION OF “GREEN BUILDING INDEX (GBI)”
EVALUATION MADE IN 1992 NEED TO BE IMPLEMENTED IMMEDIATELY.
04/08/23 61
METHOD OF CONTROL: PROTECT WATER CATCHMENT AREA PREVENT DEFORESTRATION FILTER ALL WASTE DISPOSAL INTEGRATED WASTE DISPOSAL SYSTEM CONTROL BY EVERY MINISTRIES CHECK EMMISSION TO AIR BY:
FILTERATION, ADSORPTION, ABSORPTION CONVERSION (BY CHEMICAL ACTION)
EXAMPLE – ABSORPTION USING LIQUID SPRAY TO THE POLLUTED AIR.
04/08/23 62
THE SUCCESS OF ENVIRONMENTAL CONTROL / MANAGEMENT IN ORDER TO ACHIEVE SUSTANABLE DEVELOPMENT DEPENDS ON ATTITUDEALL MUST BE AWAREALL MUST TAKE ACTIONNATIONAL & INTERNATIONAL
PROBLEMS“RIO DECLARATION” (AGENDA 21)?
“LANGKAWI DECLARATION” ?
“SOUTH AFRICA DECLARATION”?
top related