LAPORAN KEMAJUAN PROJEK NO.23

‘JULAI 2009’

PROJEK ADTEC TAIPING

KEMENTERIAN SUMBER MANUSIA

JABATAN KERJA RAYA MALAYSIA

KAMALBINA SDN. BHD

PEMILIK

PEGARAH PROJEK

KONTRAKTOR R&B

ADTEC TAIPING

LOKASI PROJEK

BANGUNAN PENTADBIRAN

BENGKEL TEK. MAKLUMAT& JAMIN KUALITI

DEWAN BESAR

PUSAT SUMBER

DEWAN KULIAH

LOBI UTAMA

KAFETERIA

MIKRO ELEKTRONIK

KOMPOSIT PLASTIK

M&E PLANT ROOM

1

TNB SUB

STATION

SERAMIK

M&E PLANT ROOM

2

GARAJ KENDERAAN

ASRAMA LELAKIASRAMA PEREMPUAN

DEWANMAKAN

SURAU

KELAS F

KELAS G

KUARTERSB, C, C&D

PELAN TAPAK ADTEC TAIPING

KEMAJUAN KERJA FIZIKAL

JADUAL : 95.18 %SEBENAR : 95.42 %KESELURUHAN : 0.24 %

TARIKH LAPORAN : 10 JULAI 2009

KEMAJUAN KERJA KEWANGAN

JADUAL : 94.99 %SEBENAR : 94.97 %KESELURUHAN : -0.02 %

TARIKH LAPORAN : 10 JULAI 2009

Graf Kemajuan Kerja Fizikal Sehingga 10/7/2009 (EOT 1)

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Bulan

Per

atu

s %

% Kem. Fizikal J adual Asal

% Kem. Fizikal Sebenar

% Kem. Fizikal J adual EOT NO.1

% Kem. Fizikal J adual Asal 0.00 0.48 1.04 2.56 4.19 6.12 7.70 9.98 13.53 18.44 20.82 23.34 26.09 29.06 30.76 33.81 36.84 41.32 43.00 47.08 60.55 70.88 84.22 99.14 100.00

% Kem. Fizikal Sebenar 0.00 2.59 5.28 7.56 9.30 11.64 13.12 15.62 18.74 22.53 26.73 29.56 32.40 35.71 37.09 41.47 45.77 46.74 50.89 55.19 58.46 67.03 68.03 73.45 80.28 87.59 95.42

% Kem. Fizikal J adual EOT NO.1 0.00 2.59 5.28 7.56 9.30 11.64 13.12 15.62 18.74 22.53 26.73 29.56 32.40 35.71 37.09 41.47 45.77 46.74 50.89 55.19 58.46 67.03 68.03 73.45 79.69 85.16 95.18 100.00

16-05-

07

25-06-

07

24-07-

07

20-08-

07

13-09-

07

18-10-

07

09-11-

07

05-12-

07

12-01-

08

21-02-

08

27-03-

08

15-04-

08

29-05-

08

08-07-

08

15-07-

08

22-08-

08

19-09-

08

28-10-

0814-11-08

04-12-

08

08-01-

09

12-02-

09

11-03-

09

15-04-

09

16-05-

09

12-06-

09

10-07-

09

13-08-

09

% Kem. Fiz ikal Jadual EO T 95.18%

% Kem. Fiz ikal Sebenar 95.42%

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 94.21% 96.74% 2.53%

JULAI 09’ 98.28% 99.36% 1.08%

MECHANICAL PLANNED

ACTUAL

AIR COND 98.46% 100.00%

FIRE FIGHTING 92.70% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - DEWAN BESAR

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS NA NA

PA 100.00% 93.51%

SMATV 100.00% 99.29%

CCTV NA NA

ICT 100.00% 99.25%

DEWAN BESAR

DEWAN BESAR

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 99.68% 99.72% 0.04%

JULAI 09’ 99.95% 100.00% 0.05%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – LOBI

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 98.80% 100.00%

SUBMAIN CABLE 97.69% 100.00%

DB 75.00% 100.00%

LUMINAIRE 94.22% 100.00%

MAIN S/BOARD NA NA

LPS NA NA

PA NA NA

SMATV NA NA

CCTV 100.00% 98.70%

ICT NA NA

LOBI UTAMA

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 98.54% 98.19% -0.35%

JULAI 09’ 99.93% 99.94% 0.01%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING 90.81% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMABANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 75.00% 100.00%

LUMINAIRE 99.82% 100.00%

MAIN S/BOARD 75.00% 100.00%

LPS 98.84% 98.00%

PA 84.88% 93.10%

SMATV NA NA

CCTV NA NA

ICT 90.38% 99.00%

DEWAN KULIAH UTAMA

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 97.50% 98.54% 1.04%

JULAI 09’ 99.42% 99.83% 0.42%

MECHANICAL PLANNED

ACTUAL

AIR COND 98.33% 100.00%

FIRE FIGHTING 84.79% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 98.77% 100.00%

SUBMAIN CABLE 96.40% 100.00%

DB 85.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 85.00% 100.00%

LPS 93.29% 98.29%

PA 91.27% 94.22%

SMATV 100.00% 99.63%

CCTV NA NA

ICT 28.81% 81.00%

PUSAT SUMBER / PERPUSTAKAAN

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 96.42% 96.51% 0.09%

JULAI 09’ 99.37% 99.66% 0.29%

MECHANICAL PLANNED

ACTUAL

AIR COND 95.34% 100.00%

FIRE FIGHTING 92.57% 87.38%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & PENGURUSAN SUMBERBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 99.00%

SUBMAIN CABLE 100.00% 100.00%

DB 85.00% 100.00%

LUMINAIRE 96.42% 98.00%

MAIN S/BOARD 75.00% 100.00%

LPS 87.80% 96.95%

PA 21.28% 91.07%

SMATV 100.00% 99.57%

CCTV 100.00% 99.90%

ICT 78.44% 92.00%

BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 99.58% 99.23% -0.35%

JULAI 09’ 100.00% 99.85% -0.15%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING 78.00% 100.00%

KITCHEN EQUIP. 83.70% 92.00%

LPG INSTALL. 82.56% 90.00%

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - KAFETARIA

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD NA NA

LPS 100.00% 93.78%

PA 100.00% 92.30%

SMATV 100.00% 99.43%

CCTV NA NA

ICT 0.00% 100.00%

KAFETERIA

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 98.05% 98.01% -0.05%

JULAI 09’ 99.85% 99.70% -0.15%

MECHANICAL PLANNED

ACTUAL

AIR COND 94.61% 100.00%

FIRE FIGHTING 83.25% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI MAKLUMATBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00 % 100.00 %

SUBMAIN CABLE 100.00 % 100.00%

DB 100.00 % 100.00%

LUMINAIRE 100.00 % 100.00%

MAIN S/BOARD 75.00% 100.00%

LPS 100.00% 98.22%

PA 100.00% 95.30%

SMATV 100.00% 99.79%

CCTV 100.00% 99.30%

ICT 89.88% 82.28%

BENGKEL TEKNOLOGI MAKLUMAT

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 98.42% 98.30% -0.12%

JULAI 09’ 99.99% 99.61% -0.38%

MECHANICAL PLANNED

ACTUAL

AIR COND 98.20% 100.00%

FIRE FIGHTING 90.15% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 93.26% 95.00%

DUST CONTROL NA NA

PROCESS COOLING

91.12% 39.45%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 75.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 75.00% 95.00%

LPS 100.00% 98.22%

PA 98.80% 95.87%

SMATV 76.76% 98.87%

CCTV 100.00% 99.32%

ICT 97.03% 81.86%

BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 98.46% 98.41% -0.05%

JULAI 09’ 99.87% 99.64% -0.23%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING 89.89% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 93.26% 95.00%

DUST CONTROL 87.72% 96.58%

PROCESS COOLING

91.30% 22.05%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 96.25%

PA 100.00% 94.94%

SMATV 79.29% 98.24%

CCTV 100.00% 99.20%

ICT 97.00% 80.81%

BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 97.15% 97.14% -0.02%

JULAI 09’ 99.20% 99.60% 0.40%

MECHANICAL PLANNED

ACTUAL

AIR COND 96.66% 100.00%

FIRE FIGHTING 86.34% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 93.26% 95.00%

DUST CONTROL 92.74% 95.59%

PROCESS COOLING

47.25% 39.45%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 99.29% 100.00%

DB 78.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 85.00% 100.00%

LPS 100.00% 98.05%

PA 100.00% 95.15%

SMATV 77.45% 97.54%

CCTV 100.00% 99.34%

ICT 100.00% 82.44%

BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 96.50% 96.99% 0.48%

JULAI 09’ 98.70% 99.63% 0.94%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING 81.58% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 93.26% 95.00%

DUST CONTROL 58.90% 96.91%

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN KUALITIBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 98.98% 100.00%

SUBMAIN CABLE 97.49% 100.00%

DB 97.48% 100.00%

LUMINAIRE 89.27% 100.00%

MAIN S/BOARD 85.25% 100.00%

LPS 89.22% 97.89%

PA 88.09% 93.93%

SMATV 100.00% 98.97%

CCTV 100.00% 99.00%

ICT 15.65% 81.61%

BENGKEL KEJ. JAMINAN KUALITI

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 95.58% 95.59% 0.01%

JULAI 09’ 98.23% 98.62% 0.39%

MECHANICAL PLANNED

ACTUAL

AIR COND 97.16% 100.00%

FIRE FIGHTING 80.91% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 93.26% 95.00%

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO ELEKTRONIKBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 99.00%

SUBMAIN CABLE 99.95% 100.00%

DB 96.10% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 99.48% 98.16%

PA 97.01% 94.88%

SMATV 100.00% 99.30%

CCTV 100.00% 98.91%

ICT 98.34% 92.94%

BENGKEL MIKRO ELEKTRONIK

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 100.00% 100.00% 0.00%

JULAI 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 97.60%

PA NA NA

SMATV 100.00% 98.74%

CCTV 100.00% 99.82%

ICT 100.00% 100.00%

KUARTERS KELAS ‘B’

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 100.00% 100.00% 0.00%

JULAI 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 97.66%

PA NA NA

SMATV 100.00% 98.55%

CCTV NA NA

ICT 100.00% 99.06%

KUARTERS KELAS ‘C’

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 100.00% 100.00% 0.00%

JULAI 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 90.00%

LPS 100.00% 97.96%

PA NA NA

SMATV 100.00% 98.74%

CCTV NA NA

ICT 100.00% 100.00%

KUARTERS KELAS ‘C’ + ‘D’

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 98.63% 98.85% 0.12%

JULAI 09’ 99.99% 100.00% 0.01%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 90.00%

LPS 99.02% 98.32%

PA NA NA

SMATV 100.00% 99.83%

CCTV NA NA

ICT 99.42% 99.34%

KUARTERS KELAS ‘F’ ( 4 TINGKAT )

KUARTERS KELAS ‘F’ ( 5 TINGKAT )

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 99.57% 99.58% 0.01%

JULAI 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G

(1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 98.32%

PA NA NA

SMATV 100.00% 99.83%

CCTV NA NA

ICT 100.00% 98.37%

KUARTERS KELAS ‘G’ ( 5 TINGKAT )

KUARTERS KELAS ‘G’ ( 4 TINGKAT )

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 99.83% 96.63% 0.01%

JULAI 09’ 99.82% 100.00% 0.18%

MECHANICAL PLANNED

ACTUAL

AIR COND 98.79% 100.00%

FIRE FIGHTING 78.92% 100.00%

KITCHEN EQUIP. 83.70% 92.00%

LPG INSTALL. 82.56% 90.00%

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 98.51%

PA 96.95% 95.23%

SMATV 100.00% 99.43%

CCTV NA NA

ICT 100.00% 100.00%

DEWAN MAKAN

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 99.39% 99.55% 0.16%

JULAI 09’ 99.97% 100.00% 0.03%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING 40.44% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & BBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 98.60%

PA 93.00% 96.06%

SMATV 99.82% 99.31%

CCTV 100.00% 99.78%

ICT 100.00% 99.43%

ASRAMA LELAKI A & B

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 99.44% 99.50% 0.06%

JULAI 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING 92.70% 100.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & DBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 97.77% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 98.69%

PA 94.38% 95.64%

SMATV 99.75% 99.31%

CCTV 100.00% 99.75%

ICT 100.00% 99.62%

ASRAMA PEREMPUAN C & D

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 96.94% 96.63% -0.31%

JULAI 09’ 98.50% 99.90% 1.40%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 100.00% 80.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - SURAU

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 85.00% 100.00%

LPS 99.32% 97.61%

PA 86.67% 92.79%

SMATV NA NA

CCTV NA NA

ICT NA NA

SURAU

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 99.99% 99.83% -0.16%

JULAI 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 100.00% 80.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - ASTAKA

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 96.60%

PA 98.28% 93.55%

SMATV NA NA

CCTV NA NA

ICT NA NA

BANGUNAN SOKONGAN

ASTAKA

MONTH PLANNED ACTUAL AHEAD / DELAY

JULAI 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 99.53%

FIRE FIGHTING 78.13% 99.22%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 96.52% 100.00%

MAIN S/BOARD 80.52% 100.00%

LPS NA NA

PA NA NA

SMATV NA NA

CCTV NA NA

ICT NA NA

BANGUNAN SOKONGAN

M&E PLANT ROOM – PUSAT SUMBER

BANGUNAN SOKONGAN

M&E PLANT ROOM - BENGKEL

DECORATIVE FENCE

BANGUNAN SOKONGAN

GARAJ KENDERAAN

ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK

RUMAH SAMPAH

LALUAN BERBUMBUNG

OPEN PLAZA

KERJA INFRA – JALAN UTAMA

GELANGGANG PERMAINAN

GELANGGANG PERMAINAN

PADANG PERMAINAN BOLA SEPAK

BENGKEL MIKRO - CLEANROON

M&E : AHU @ CLEAN ROOM

BENGKEL KEJ. BAHAN TERMAJU (SERAMIK) - EPOXY

PERABUT – PUSAT SUMBER

• SEKIAN TERIMA KASIH