adtec pre no.17 jan 09

70
LAPORAN KEMAJUAN PROJEK NO.17 ‘JANUARI 2009’ PROJEK ADTEC TAIPING KEMENTERIAN SUMBER MANUSIA JABATAN KERJA RAYA MALAYSIA KAMALBINA SDN. BHD PEMILIK PEGARAH PROJEK KONTRAKTOR R&B

Upload: arkam-munaaim-phd-peng-intpe

Post on 12-Aug-2015

417 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Adtec Pre No.17   Jan 09

LAPORAN KEMAJUAN PROJEK NO.17

‘JANUARI 2009’

PROJEK ADTEC TAIPING

KEMENTERIAN SUMBER MANUSIA

JABATAN KERJA RAYA MALAYSIA

KAMALBINA SDN. BHD

PEMILIK

PEGARAH PROJEK

KONTRAKTOR R&B

Page 2: Adtec Pre No.17   Jan 09

ADTEC TAIPING

LOKASI PROJEK

Page 3: Adtec Pre No.17   Jan 09

BANGUNAN PENTADBIRAN

BENGKEL TEK. MAKLUMAT& JAMIN KUALITI

DEWAN BESAR

PUSAT SUMBER

DEWAN KULIAH

LOBI UTAMA

KAFETERIA

MIKRO ELEKTRONIK

KOMPOSIT PLASTIK

M&E PLANT ROOM

1

TNB SUB

STATION

SERAMIK

M&E PLANT ROOM

2

GARAJ KENDERAAN

ASRAMA LELAKIASRAMA PEREMPUAN

DEWANMAKAN

SURAU

KELAS F

KELAS G

KUARTERSB, C, C&D

PELAN TAPAK ADTEC TAIPING

Page 4: Adtec Pre No.17   Jan 09

KEMAJUAN KERJA FIZIKAL

JADUAL : 60.55%SEBENAR : 58.46%KESELURUHAN : -2.09% (-3 HARI @LEWAT )

Jumlah Hari (Kontrak) : 729 hari

Jumlah Hari Terpakai : 604 hari

Baki Hari Tinggal : 125 hari

TARIKH LAPORAN : 08 JAN 2009

Page 5: Adtec Pre No.17   Jan 09

KEMAJUAN KERJA KEWANGAN

JADUAL : 64.16%SEBENAR : 59.42%KESELURUHAN : -4.74% (-16 HARI@LEWAT

)

TARIKH LAPORAN : 08 JAN 2009

Page 6: Adtec Pre No.17   Jan 09

Graf Kemajuan Kerja Keseluruhan Sehingga 8/1/2009

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Bulan

Pera

tus

%

% Kem. Fizikal J adual % Kem. Fizikal Sebenar

% Kem. Kewangan J adual % Kem. Kewangan Sebenar

% Kem. Fizikal J adual 0.00 0.48 1.04 2.56 4.19 6.12 7.70 9.98 13.53 18.44 20.82 23.34 26.09 29.06 30.76 33.81 36.84 41.32 43.00 47.08 60.55 74.17 87.80 98.95 100.00

% Kem. Fizikal Sebenar 0.00 2.59 5.28 7.56 9.30 11.64 13.12 15.62 18.74 22.53 26.73 29.56 32.40 35.71 37.09 41.47 45.77 46.74 50.89 55.19 58.46

% Kem. Kewangan J adual 0.00 0.94 2.05 3.93 5.77 8.92 10.71 13.46 17.45 22.24 25.62 27.75 31.15 34.56 35.93 39.26 42.63 45.59 48.62 52.35 64.16 77.62 89.39 99.09 100.00

% Kem. Kewangan Sebenar 0.00 3.97 6.30 13.91 15.50 17.58 17.26 19.52 22.30 25.93 30.26 32.79 35.32 38.47 38.97 43.62 47.34 48.16 52.42 56.36 59.42

16-05-07 25-06-07 24-07-07 20-08-07 13-09-07 18-10-07 09-11-07 05-12-07 12-01-08 21-02-08 27-03-08 15-04-08 29-05-08 08-07-08 15-07-08 22-08-08 19-09-08 28-10-08 14-11-08 04-12-08 08-01-09 15-02-09 15-03-09 15-04-09 13-05-09

Actual Physical 58.46%

Actual Financial

59.42%

Page 7: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 96.48% 63.63% - 32.85%

JAN 09’ 98.98% 65.52% - 33.46%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 41.23%

FIRE FIGHTING 100.00% 15.85%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - DEWAN BESAR

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 21.87%

SUBMAIN CABLE 100.00% 76.86%

DB 100.00% 0.00%

LUMINAIRE 100.00% 0.00%

MAIN S/BOARD 100.00% 0.00%

LPS NA NA

PA 100.00% 4.65%

SMATV 100.00% 17.63%

CCTV NA NA

ICT 100.00% 12.65%

Page 8: Adtec Pre No.17   Jan 09

DEWAN BESAR

Page 9: Adtec Pre No.17   Jan 09

DEWAN BESAR

Page 10: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 88.19% 75.93% -12.26%

JAN 09’ 93.25% 78.68% -14.57%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – LOBI

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 34.87%

SUBMAIN CABLE 100.00% 90.00%

DB 100.00% 0.00%

LUMINAIRE 100.00% 0.00%

MAIN S/BOARD NA NA

LPS NA NA

PA NA NA

SMATV NA NA

CCTV 100.00% 0.00%

ICT NA NA

Page 11: Adtec Pre No.17   Jan 09

LOBI UTAMA

Page 12: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 66.43% 64.09% -2.34%

JAN 09’ 73.49% 66.39% -7.10%

MECHANICAL PLANNED

ACTUAL

AIR COND 27.78% 74.50%

FIRE FIGHTING 7.73% 44.64%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMA

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 15.98%

SUBMAIN CABLE 56.25% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 68.63% 6.36%

PA 0.00% 1.13%

SMATV NA NA

CCTV NA NA

ICT 87.16% 12.43%

Page 13: Adtec Pre No.17   Jan 09

DEWAN KULIAH UTAMA

Page 14: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 77.77% 79.99% 2.22%

JAN 09’ 84.29% 84.41% 0.12%

MECHANICAL PLANNED

ACTUAL

AIR COND 53.14% 79.23%

FIRE FIGHTING 20.20% 87.69%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 54.76%

SUBMAIN CABLE 100.00% 88.87%

DB 100.00% 0.00%

LUMINAIRE 100.00% 0.00%

MAIN S/BOARD 100.00% 0.00%

LPS 87.53% 74.87%

PA 100.00% 2.53%

SMATV 98.41% 32.43%

CCTV NA NA

ICT 18.66% 5.42%

Page 15: Adtec Pre No.17   Jan 09

PUSAT SUMBER / PERPUSTAKAAN

Page 16: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 74.06% 76.86% 2.80%

JAN 09’ 82.12% 77.52% -4.60%

MECHANICAL PLANNED

ACTUAL

AIR COND 38.59% 57.68%

FIRE FIGHTING 38.79% 32.97%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & PENGURUSAN SUMBER

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 65.76%

SUBMAIN CABLE 100.00% 79.76%

DB 28.57% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 16.67% 25.87%

LPS 64.21% 55.82%

PA 97.25% 18.30%

SMATV 78.64% 27.76%

CCTV 2.36% 4.54%

ICT 47.46% 1.23%

Page 17: Adtec Pre No.17   Jan 09

BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER

Page 18: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 68.75% 88.90% 20.15%

JAN 09’ 72.24% 89.11% 16.88%

MECHANICAL PLANNED

ACTUAL

AIR COND 0.00% 43.00%

FIRE FIGHTING 12.65% 24.86%

KITCHEN EQUIP. 0.00% 0.00%

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - KAFETARIA

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 50.00% 79.65%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD NA NA

LPS 39.17% 1.19%

PA 16.36% 14.65%

SMATV 33.53% 12.54%

CCTV NA NA

ICT 0.00% 67.65%

Page 19: Adtec Pre No.17   Jan 09

KAFETERIA

Page 20: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 75.87% 83.53% 7.66%

JAN 09’ 79.02% 84.02% 5.01%

MECHANICAL PLANNED

ACTUAL

AIR COND 23.57% 66.78%

FIRE FIGHTING 27.70% 33.67%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI MAKLUMAT

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 62.65%

SUBMAIN CABLE 42.86% 28.96%

DB 0.00% 2.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 70.13% 52.65%

PA 77.09% 32.65%

SMATV 81.24% 27.54%

CCTV 30.77% 33.65%

ICT 18.50% 7.53%

Page 21: Adtec Pre No.17   Jan 09

BENGKEL TEKNOLOGI MAKLUMAT

Page 22: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 67.06% 84.11% 17.06%

JAN 09’ 68.69% 86.03% 17.33%

MECHANICAL PLANNED

ACTUAL

AIR COND 11.35% 64.16%

FIRE FIGHTING 20.14% 50.54%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 47.85%

DUST CONTROL NA NA

PROCESS COOLING

0.00% 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 67.43%

SUBMAIN CABLE 0.00% 78.87%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 42.64% 52.87%

PA 0.00% 22.54%

SMATV NA NA

CCTV 0.00% 28.64%

ICT 0.00% 17.54%

Page 23: Adtec Pre No.17   Jan 09

BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)

Page 24: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 67.85% 80.57% 12.73%

JAN 09’ 71.23% 83.64% 12.41%

MECHANICAL PLANNED

ACTUAL

AIR COND 14.75% 56.54%

FIRE FIGHTING 15.26% 58.27%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 56.64%

DUST CONTROL 0.00% 23.76%

PROCESS COOLING

0.00 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 76.00%

SUBMAIN CABLE 0.00% 53.76%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 2.00%

LPS 38.74% 55.87%

PA 0.00% 23.75%

SMATV NA NA

CCTV 0.00% 29.76%

ICT 0.00% 13.43%

Page 25: Adtec Pre No.17   Jan 09

BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)

Page 26: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 68.02% 79.88% 11.86%

JAN 09’ 71.02% 79.96% 8.84%

MECHANICAL PLANNED

ACTUAL

AIR COND 3.41% 43.14%

FIRE FIGHTING 17.84% 53.54%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 57.62%

DUST CONTROL 0.00% 25.76%

PROCESS COOLING

0.00% 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 65.64%

SUBMAIN CABLE 0.00% 84.78%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 35.83% 56.98%

PA 0.00% 19.64%

SMATV NA NA

CCTV 0.00% 32.65%

ICT 0.00% 17.84%

Page 27: Adtec Pre No.17   Jan 09

BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)

Page 28: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 70.13% 73.47% 3.35%

JAN 09’ 77.16% 77.74% 0.58%

MECHANICAL PLANNED

ACTUAL

AIR COND 6.16% 53.26%

FIRE FIGHTING 16.68% 35.74%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 17.14% 12.00%

DUST CONTROL 6.56% 16.76%

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN KUALITI

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 71.43% 67.45%

SUBMAIN CABLE 0.00% 79.65%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 2.00%

LPS 40.33% 63.75%

PA 17.55% 27.43%

SMATV 19.51% 22.31%

CCTV 9.64% 29.64%

ICT 5.05% 13.56%

Page 29: Adtec Pre No.17   Jan 09

BENGKEL KEJ. JAMINAN KUALITI

Page 30: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 68.59% 77.02% 8.07%

JAN 09’ 72.73% 78.27% 5.54%

MECHANICAL PLANNED

ACTUAL

AIR COND 0.00% 65.87%

FIRE FIGHTING 7.77% 35.36%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 34.76%

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO ELEKTRONIK

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 17.86% 45.76%

SUBMAIN CABLE 0.00% 12.87%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 35.43% 55.75%

PA 0.00% 23.75%

SMATV 0.00% 24.05%

CCTV 10.44% 26.75%

ICT 0.00% 8.65%

Page 31: Adtec Pre No.17   Jan 09

BENGKEL MIKRO ELEKTRONIK

Page 32: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 74.99% 95.35% 20.37%

JAN 09’ 80.19% 96.63% 16.44%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 90.00%

SUBMAIN CABLE 100.00% 90.00%

DB 100.00% 75.00%

LUMINAIRE 0.00% 65.00%

MAIN S/BOARD 71.43% 0.00%

LPS 75.01% 0.00%

PA NA NA

SMATV 66.12% 37.53%

CCTV 52.44% 12.65%

ICT 100.00% 57.76%

Page 33: Adtec Pre No.17   Jan 09

KUARTERS KELAS ‘B’

Page 34: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 67.99% 96.06% 28.07%

JAN 09’ 81.59% 96.76% 15.16%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 90.48% 90.00%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 75.00%

LUMINAIRE 0.00% 65.00%

MAIN S/BOARD 0.00% 0.00%

LPS 56.21% 0.00%

PA NA NA

SMATV 31.94% 42.53%

CCTV NA NA

ICT 74.38% 17.85%

Page 35: Adtec Pre No.17   Jan 09

KUARTERS KELAS ‘C’

Page 36: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 64.72% 95.45% 30.73%

JAN 09’ 69.32% 96.38% 27.06%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 90.00%

SUBMAIN CABLE 91.67% 90.00%

DB 0.00% 75.00%

LUMINAIRE 0.00% 65.00%

MAIN S/BOARD 0.00% 0.00%

LPS 76.69% 0.00%

PA NA NA

SMATV 63.36% 42.86%

CCTV NA NA

ICT 100.00% 65.65%

Page 37: Adtec Pre No.17   Jan 09

KUARTERS KELAS ‘C’ + ‘D’

Page 38: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 70.42% 89.51% 19.09%

JAN 09’ 73.69% 91.08% 17.39%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 70.48% 90.00%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 80.00%

MAIN S/BOARD 0.00% 0.00%

LPS 88.27% 43.58%

PA NA NA

SMATV 93.03% 55.64%

CCTV NA NA

ICT 100.00% 33.12%

Page 39: Adtec Pre No.17   Jan 09

KUARTERS KELAS ‘F’ ( 4 TINGKAT )

Page 40: Adtec Pre No.17   Jan 09

KUARTERS KELAS ‘F’ ( 5 TINGKAT )

Page 41: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 71.62% 92.42% 20.80%

JAN 09’ 73.24% 92.63% 19.39%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G (1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 77.14% 90.00%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 90.00%

MAIN S/BOARD 0.00% 0.00%

LPS 97.10% 56.32%

PA NA NA

SMATV 97.10% 56.32%

CCTV NA NA

ICT 100.00% 29.36%

Page 42: Adtec Pre No.17   Jan 09

KUARTERS KELAS ‘G’ ( 5 TINGKAT )

Page 43: Adtec Pre No.17   Jan 09

KUARTERS KELAS ‘G’ ( 4 TINGKAT )

Page 44: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 93.89% 92.14% -1.75%

JAN 09’ 96.42% 94.87% -1.55%

MECHANICAL PLANNED

ACTUAL

AIR COND 80.00% 85.00%

FIRE FIGHTING 48.65% 39.65%

KITCHEN EQUIP. 0.00% 0.00%

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 78.76%

SUBMAIN CABLE 100.00% 5.87%

DB 100.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 100.00% 0.00%

LPS 100.00% 0.00%

PA 100.00% 8.53%

SMATV 100.00% 58.65%

CCTV NA NA

ICT 100.00% 0.00%

Page 45: Adtec Pre No.17   Jan 09

DEWAN MAKAN

Page 46: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 76.37% 89.04% 12.68%

JAN 09’ 81.74% 91.05% 9.30%

MECHANICAL PLANNED

ACTUAL

AIR COND 50.00% 12.34%

FIRE FIGHTING 38.16% 67.75%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & B

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 39.29% 80.43%

SUBMAIN CABLE 0.00% 25.97%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 60.27% 32.87%

PA 49.93% 17.74%

SMATV 38.80% 43.53%

CCTV 18.72% 21.65%

ICT 81.53% 7.32%

Page 47: Adtec Pre No.17   Jan 09

ASRAMA LELAKI A & B

Page 48: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 65.45% 90.09% 24.63%

JAN 09’ 72.72% 93.81% 21.09%

MECHANICAL PLANNED

ACTUAL

AIR COND 0.00% 12.43%

FIRE FIGHTING 21.14% 68.94%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & D

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 55.95% 90.56%

SUBMAIN CABLE 0.00% 32.87%

DB 0.00% 0.00%

LUMINAIRE 0.00% 45.87%

MAIN S/BOARD 0.00% 0.00%

LPS 51.58% 32.53%

PA 0.00% 21.43%

SMATV 0.00% 42.56%

CCTV 0.00% 24.65%

ICT 0.08% 16.54%

Page 49: Adtec Pre No.17   Jan 09

ASRAMA PEREMPUAN C & D

Page 50: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 63.83% 71.39% 7.57%

JAN 09’ 74.66% 78.73% 4.07%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 0.00% 0.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - SURAU

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 16.89%

SUBMAIN CABLE 0.00% 90.00%

DB NA NA

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 32.45% 34.93%

PA 0.00% 3.25%

SMATV NA NA

CCTV NA NA

ICT NA NA

Page 51: Adtec Pre No.17   Jan 09

SURAU

Page 52: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

JAN 09’ 79.98% 87.62% 7.64%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 0.00% 0.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - ASTAKA

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 90.00%

SUBMAIN CABLE 100.00% 90.00%

DB 85.71% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 50.00% 0.00%

LPS 59.67% 0.00%

PA 100.00% 1.91%

SMATV NA NA

CCTV NA NA

ICT NA NA

Page 53: Adtec Pre No.17   Jan 09

BANGUNAN SOKONGAN

ASTAKA

Page 54: Adtec Pre No.17   Jan 09

MONTH PLANNED ACTUAL AHEAD / DELAY

JAN 09’ 73.27% 88.10% 14.83%

MECHANICAL PLANNED

ACTUAL

AIR COND 89.98% 60.96%

FIRE FIGHTING 2.78% 0.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. 0.00% 0.00%

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 87.76%

SUBMAIN CABLE 100.00% 0.00%

DB 100.00% 0.00%

LUMINAIRE 0.00% 15.00%

MAIN S/BOARD 87.50% 35.67%

LPS NA NA

PA NA NA

SMATV NA NA

CCTV NA NA

ICT NA NA

Page 55: Adtec Pre No.17   Jan 09

BANGUNAN SOKONGAN

M&E PLANT ROOM - BENGKEL

Page 56: Adtec Pre No.17   Jan 09

BANGUNAN SOKONGAN

M&E PLANT ROOM – PUSAT SUMBER

Page 57: Adtec Pre No.17   Jan 09

PEMBINAAN PINTU MASUK UTAMA

Page 58: Adtec Pre No.17   Jan 09

BANGUNAN SOKONGAN

GARAJ KENDERAAN

Page 59: Adtec Pre No.17   Jan 09

ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK

Page 60: Adtec Pre No.17   Jan 09

WAKAF

Page 61: Adtec Pre No.17   Jan 09

LALUAN BERBUMBUNG

Page 62: Adtec Pre No.17   Jan 09

OPEN PLAZA

Page 63: Adtec Pre No.17   Jan 09

KERJA INFRA – JALAN UTAMA

Page 64: Adtec Pre No.17   Jan 09

GELANGGANG PERMAINAN - FUTSAL

Page 65: Adtec Pre No.17   Jan 09

COATED CHAIN LINK FENCING

Page 66: Adtec Pre No.17   Jan 09

M&E INSTALLATION

Page 67: Adtec Pre No.17   Jan 09

M&E INSTALLATION

Page 68: Adtec Pre No.17   Jan 09

M&E INSTALLATION

Page 69: Adtec Pre No.17   Jan 09

M&E INSTALLATION

Page 70: Adtec Pre No.17   Jan 09

• SEKIAN TERIMA KASIH