Presented by: Dato’ Ir. Dr. Ismail bin Mohamed Taib Managing Director, Jambatan Kedua Sdn Bhd SUSTAINABLE DESIGN & CONSTRUCTION 7 th MARCH 2012 JAMBATAN KEDUA SDN BHD. LEMBAGA LEBUHRAYA MALAYSIA KERAJAAN MALAYSIA THE SECOND PENANG BRIDGE PROJECT BRIEFING & INDUSTRIAL TRAINING PLACEMENT UNIVERSITI TEKNOLOGI MALAYSIA (UTM), SKUDAI, JOHOR

Upload: hacong

Post on 07-Feb-2018

302 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

Presented by: Dato’ Ir. Dr. Ismail bin Mohamed Taib Managing Director, Jambatan Kedua Sdn Bhd

SUSTAINABLE

DESIGN & CONSTRUCTION

7th MARCH 2012

JAMBATAN KEDUA SDN BHD.

LEMBAGA LEBUHRAYA MALAYSIA

KERAJAAN MALAYSIA

THE SECOND PENANG BRIDGE

PROJECT BRIEFING & INDUSTRIAL TRAINING PLACEMENT UNIVERSITI TEKNOLOGI MALAYSIA (UTM), SKUDAI, JOHOR

Page 2: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Project Introduction

Project Details Sustainable Development

i. Social Progress

ii. Economic Activity

iii.Environmental Responsibility

Site Progress Photographs

Content

Page 3: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Project

Introduction

Page 4: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

o Jambatan Kedua Sdn Bhd (JKSB), a wholly-owned company of the

Minister of Finance, Incorporated (MoF Inc.) was appointed as the

concessionaire for the Second Penang Bridge Project in August 2008.

o JKSB is responsible for the design, construction, management,

operation and maintenance of the bridge.

o The Second Penang Bridge which connects Batu Kawan on the

Mainland and Batu Maung on the island when completed by

September 2013 will be the longest in South-East Asia with the total

length over water of 16.9km. The total estimated construction cost is

RM 4.5 billion.

Introduction

Page 5: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

9+000.

10+000.

11+000.

12+000. 13+000. 14+000.

15+000.

16+000.

0.

1+000. 2+000.

3+000. 4+000. 5+000. 6+000.

7+000.

8+000.

17+000.

18+000.

19+000.

20+000.

21+000.

22+000.

23+000.

PULAU

JEREJAK

PULAU

AMAN

PENANG

ISLAND

(Batu Maung)

NAVIGATIONAL

SPAN

MAIN LAND

(Batu Kawan)

Existing Penang Bridge Legend: Existing Penang Bridge

North South Expressway (PLUS)

Package 1&2

Package 3

Marine Bridge

Land Expressway

8.4 km

Second Penang Bridge

Project Alignment

Page 6: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

PLAZA TOL PB2X

PLAZA TOL PLUS

LEBUHRAYA UTARA SELATAN

PERSIMPANGAN BATU KAWAN

PERSIMPANGAN CLOVERLEAF

BATU KAWAN

SECOND PENANG BRIDGE

EXISTING PENANG BRIDGE

Project Alignment (View from Batu Kawan)

Page 7: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Project Details

Page 8: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Work Packages Diagram

Package 3B,3C,3D,3E, 3F & 3G

Conventional Contract

Package 1 : Main Navigation Span & Substructure & Foundation Works for Approach Spans. Package 2: Superstructure Works of Approach Spans.

Package 3A:

Conventional

Contract

Design & Build

Integrated Toll System

Page 9: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

9+

000.

10+000.

11+000.

12+000. 13+000. 14+000.

15+

000.

16+

000.

0.

1+000. 2+

000.

3+000. 4+000. 5+000. 6+000.

7+

000.

8+

000.

17+

000.

18+

000.

19+

000.

20+

000.

21+000.

22+000.

23+000.

PULAU

JEREJAK

PULAU

AMAN

PENANG ISLAND

(BATU MAUNG)

MAIN NAVIGATIONAL SPAN

BATU MAUNG INTERCHANGE

BATU KAWAN EXPRESSWAYS

BATU KAWAN TRUMPET

INTERCHANGE

MAIN LAND

(BATU KAWAN)

PACKAGE 3A

PACKAGE 3C

P24-P27

P292

P0

Work Packages Layout

PB2X TOLL PLAZA PLUS TOLL

PLAZA

Page 10: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Summary of Progress – 29 February 2012

PAKEJ DESCRIPTION CONTRACTOR COST

(RM MIL.) START FINISH

PHYSICAL PROGRESS %

SCH % ACT %

1 Main Navigation Span And

Substructure And Foundation Works For Approach Spans

CHEC Construction (M)

Sdn Bhd 2,200 8 Nov 08 24-Jul-13 89.57 92.68

2 Superstructure Works of

Approach Spans UEM Builders

Bhd 1,550 8 Jun 09 8-Sep-13 57.42 57.98

3A Batu Maung Interchange Cergas Murni Sdn

Bhd 152.7 19 May 10 13-Dec-12 50.78 47.42

3B Batu Kawan Expressways IJM Construction

Sdn Bhd 349.9 28 Jun 10 8-Sep-13 45.04 44.30

3C Batu Kawan Trumpet

Interchange HRA Teguh Sdn

Bhd 67.3 19 May 10 15-Apr-13 53.67 45.79

3D Toll Plaza And Related Works S.U Citra Bina Sdn

Bhd 79.8 15-Nov-11 14-Jul-13 1.17 3.89

3E Toll Collection System - - 30 Apr 12 30 Jul 13 - -

3F Traffic Control An Surveillance

System - - 30 May 12 8 Sep 13 - -

3G M&E Works for P3A & 3C - - 30 Jun 12 8 Sep 13 - -

Total 4.5

billion 8 Nov 08 8 Sep 13

70.87 73.42

Variance +2.55

Page 11: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Length of Bridge Over Water 16.9km

Length of Expressway 7.1km

Lane Configuration Dual 2 lanes traffic + emergency lane + 1 motorcycle lane each direction.

Main Navigation Span

Approach Span

•Substructure

•Superstructure

Cast in-situ Cable-Stayed Bridge

P24 to P27 = 117.5m + 240m + 117.5m

= 475m.

Height Clearance: 30m

Navigation Channel: 150m

P0 to P24 = 24 span x 55m

= 1,320m.

P27 to P292 = 265 span x 55m

= 14,575m.

Height Clearance :

• Low Piers: 6m

• High Piers: 6m to 21.6m

Pre-cast Prestressed Segmental Box Girder

= 8,092 nos.

Design Features

240 m 30 m 117.5 m

117.5 m

Navigation Channel

150 m

p24

p25 p26

p27

Page 12: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Comparison between Second &

Existing Penang Bridge

Existing Penang Bridge

Year built: 1982

Overall length : 13.5 km

Length over water: 8.4 km

Type of bridge:

- Main Navigation Span

Cable-stayed concrete girder bridge

- Approach Span Beam and slab deck bridge

Main Navigation Span 107.5m + 225m + 107.5m

Main Navigation Span Ship Protection

Man-made island

Approach spans length 40m each span

Speed limit 80 km/h

Second Penang Bridge

Year built: 2008

Overall length : 24 km

Length over water: 16.9 km

Type of bridge:

- Main Navigation Span

Cable-stayed concrete girder bridge

- Approach Span Box girder bridge

Main Navigation Span 117.5m + 240m + 117.5m

Main Navigation Span Ship Protection

Steel Fender system

Approach spans length 55m each span

Speed limit 80 km/h

Page 13: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Comparison between Second &

Existing Penang Bridge

Existing Penang Bridge

No dedicated motorcycle lane

Traffic Loading to UK BS 153, 45 units HB guided along centreline of carriageway

Seismic design: 475 year event -Ground peak acceleration: 0.075 g 2500 year event - no collapse

Structural concrete design to CP110: 1972

No specific durability requirements

Normal concrete

Second Penang Bridge

2-lane dual carriageway with dedicated 3m motorcycle lane

Traffic Loading to UK BD 37/2001, 45 units HB unguided

Seismic design: 475 year event -Ground peak acceleration: 0.1773 g 2500 year event - no collapse -Ground peak acceleration: 0.3261 g

Structural concrete design to BS 5400: 2006

Durability requirements to latest Eurocodes

High performance concrete: RCPT less than 800 Coulombs for 56 days

Page 14: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Comparison between Second &

Existing Penang Bridge

Existing Penang Bridge

Design Concrete Strength: Spun pile : 50 N/mm2 Pile cap : 30 N/mm2 Pylon : 40 N/mm2 I-Beam : 40 N/mm2 Slab : 30 N/mm2

Expansion joint at every 5 spans (200 m)

Degree of compaction for earth embankment: 95 % : 0.75m below formation level 90 % : remainder

Settlement criteria for earth embankment: 367 mm in 5 years

Pavement IRI Index: Not specified

Type of Bearing used: Laminated Rubber Bearing

Second Penang Bridge

Design Concrete Strength: Spun pile : 80 N/mm2 Pile cap : 40 N/mm2 Pylon : 50 N/mm2 Box girder : 55 N/mm2

Expansion joint at every 5 or 6 spans (275m or 330m)

Degree of compaction for earth embankment: 100%

Settlement criteria for earth embankment: 50 mm in 20 years

Pavement IRI Index: 2m/km

Type of Bearing used: High Damping Rubber Bearing (HDRB)

Page 15: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Sustainable

Development

1. Social Progress

2. Economic Activity

3. Environmental Responsibility

Page 16: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Sustainable development is an enduring balanced approach to

social progress , economic activity and environmental responsibility.

Social

Environment Economic

Sustainable

Sustainable Development

Sustainable

Page 17: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Contributing Toward Sustainable

Development

• The new route is anticipated to promote economic and social integration throughout the northern region .

• High standards of environmental protection are incorporated into the project while flora and fauna are closely monitored to avoid changes to the sensitive marine environment.

• The construction of the bridge engaged the regional construction

industry, pioneered high standards of quality and safety as well as initiated local employment programme to promote transfer of technology.

• IBS concept and minimal maintenance approach are introduced in the planning, design and construction of the bridge to promote sustainable development.

Factors that encompass sustainable development in the Second Penang Bridge project include:

Page 18: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

1. Social Progress

i. Stakeholder communication and

involvement

ii. Occupational Safety

iii. Public Road Safety

iv. Bridge Optimization

v. Bridge Durability

Page 19: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Stakeholder Communication and Involvement

Project Organization Chart

Page 20: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Monthly Coordination meetings are held regularly with MHA and government agencies to solve project issues and to ensure compliance with regulatory bodies requirements.

• The public, factory owners, and other local authorities are informed well in advance of any disruptions caused by construction activities through meetings and correspondences.

• I-supervision is being implemented to monitor the construction progress at site and for public to view via JKSB website.

Stakeholder Communication and Involvement

I-Supervision

• Ministry of Finance, Unit Kerjasama Awam Swasta (UKAS), Ministry of Works (JKR) and Malaysian Highway Authority (MHA) are notified on the status of the project on regular basis.

Page 21: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Occupational Safety

• Safety measures are implemented which include detailed planning of construction activities, safety training, inspections by safety officers and health checks.

• A well balanced training/ penalty/ award system is utilized to keep all management staff and workers up to date with the latest HSE standards and to ensure their compliance.

• Lost time injury (LTI) achieved is 0.24 per million hours, which is very minor with only 2 cases at 8.3 million hours. According to OSHA International Standard, the LTI shall not be more than 5 cases in every 1 million hours.

Page 22: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• The Second Penang Bridge will be controlled and managed by a central traffic control and monitoring and Closed Circuit Television (CCTV) during operation. The main use of CCTV is to monitor the traffic flow and detecting traffic problems.

• Minconsult Sdn Bhd (C&S Consultant) has been

appointed as the Road Safety Auditor to ensure that the Second Penang Bridge is in compliance with the Stage I to IV Safety Audit in ‘Guideline for Safety Audit of Roads in Malaysia”.

Public Road Safety

• Proposed Implementation of Multi-Lane Free Flow (MLFF) system will reduce traffic congestion at toll plazas as the system allows free flow high speed toll system. However, the MLFF system which was originally scheduled to be implemented in year 2013 has been temporarily deferred by the government

Page 23: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Standard Guardrails with level TL3 is upgraded to level TL4 at strategic locations to ensure that in the event of accident, heavy vehicles are contained.

• Motorcycle lane is separated from the main lane by NJB to protect vulnerable motorcyclist.

Public Road Safety

Cont’d

Thrie Beam Guardrails

NJB

Page 24: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

a) Bored Pile

i) 2.0m dia. Bored Pile for Cable-Stayed Bridge Easily adapted to the various load and soil

requirements due to large variety in dia. and construction techniques

Enable the immediate in-situ evaluation of drilled soil layers to revise foundation length due to changed soil

conditions Achieved required capacity of 25 Meganewton (MN) at

120m depth (8m socketed into bedrock)

ii) 1.5m dia. Bored Pile for P283 – P292 80 nos of piles installed at average 85m depth.

4 nos of piles per pilecap. This section contains huge amount of mud and seabed

is exposed during low tide while the water level is just about 1m during high tide. Therefore, it is not

practical to use spun piles as huge amount of mud need to be dredged prior to installation works using

barge. As a solution, Bored Pile design is adopted which was

installed via temporary platform.

Advantages of different types of foundation

Bridge Optimization

Page 25: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

b) 1.5m dia. Steel pile for approach bridge Have high load-carrying capacity for a

given weight of pile, which can reduce nos of piles per pilecap.

Driven to 80m length and cause little ground displacement

Easy to splice 6 – 8 nos of pile per pilecap.

c) 1m dia. Spun pile for low-level bridge Prefabrication allows 65m length with no

joint Efficient mass to strength ratio Piles can withstand high tension forces 10 – 12 piles per pilecap.

Bridge Optimization

Advantages of different types of foundation – Cont’d

Page 26: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Precast Concrete Shells are used as a formwork for the second layer casting and permanently incorporated into the pile cap

6 pieces of Precast Concrete Shells are required for each pilecap

Pilecap Construction

Total of 3,468 nos of Precast Concrete Shell are used

Precast Concrete Shells are adopted for:

• Minimisation of temporary works (no cofferdams).

• Minimisation of insitu works

• Speed of construction

• Better surface finishing work

Bridge Optimization

Page 27: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Pile caps, Columns and Crossheads are designed as reinforced concrete structures

• Total no of Piers – 289 nos at Approach Spans

• The sections and shapes of the pile caps, columns and crossheads are designed to enhance constructability, optimise cost and still aesthetically pleasing.

• The pier are cast in one complete operation using reusable steel formwork

Substructure at the Approach Span – Pilecap, Columns and Crossheads

Bridge Optimization

Page 28: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• The precast segmental box girder is designed as a continuous single twin box of 14.08m width, 4.0m length and 3.20m depth structure with match cast joints, multiple shear keys and prestressing tendons.

• The design has been highly optimized to minimize weight such that it does not require special heavy lifting equipment. Segments weight between 69 to 100 ton.

• Hybrid pre-stressing encompassing both external and internal prestressing for design economy.

• The design of the segments is identical which allows the same formwork to be repeatedly used.

• The depth is maintained constant to present aesthetically consistent soffit line.

Superstructure at the Approach Span – Segmental Box Girder

Bridge Optimization

Page 29: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• PERI formwork system is used for the construction of pylon and piers which are more than 8m height.

• It is a self-climbing formwork that once set up as a desired-shaped wall to be built, it

ascends continually to the height of the structure.

• Each lift will be 4m ~ 5m height • Working platform will be provided at the top of the formwork system • PERI Formwork system

provides high speed of erection (works’ execution speed increases) and as a result, rapid completion of the project

• There is no need to dismantling or re-assembling for every lift.

PERI Formwork

Bridge Optimization

Page 30: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

View of Completed Piers View of Completed SBG

• Cathodic protection system and special coating are applied to the tubular steel piles for protection against corrosion.

• High strength concrete with Ground Granular Blastfurnace Slag (GGBS) and Pulverised Fuel Ash (PFA) are used for the pilecap, pier column, crosshead and SBG. This will

prevent sulphate and chloride attack that can cause corrosion to the reinforcement bar.

• Concrete cover was designed to latest Eurocode: pilecap (75 mm), pier column (65mm),

crosshead (60 mm) to protect the reinforcement bar against corrosion.

Bridge Durability

The Second Penang Bridge is designed to have an operational lifespan of 120 years. For this project,

Tubular Steel Piles

Page 31: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Cont’d

Bridge Durability

• Silane coating is applied to precast concrete spun piles, pilecap and pier concrete surface to further reduce the water and salt uptake that can cause corrosion to the embedded reinforcing steel.

• Structural Health Monitoring System (SHMS) shall be used for preventive maintenance to

assess the state of health (e.g., damage) of the structures. It improves safety and reliability of the bridge by detecting damage before it reaches a critical state.

Applying Silane coating to RC Shell and Pier column

Typical SHMS at a cable-stayed bridge

Page 32: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Bridge Durability

Stay Cables

The stay cable will be provided with protection against corrosion by means of 3 barriers: i) The first barrier is hot dip galvanising that covers the full length of the individual steel

wires. ii) The second barrier (internal barrier) consists of High Density Polyethylene (HDPE)

sheaths around the individual strands and that the intermediate medium fills the space between the individual sheath and the galvanized strand.

iii) The third barrier (external barrier) is the outer casing which consist of HDPE sheath around the group of strands.

The stay cables consists of the Parallel Strand System (PSS) made up of parallel individually polyethylene coated seven-wire strands, placed inside an external polyethylene stay pipe.

First Barrier

Second Barrier Third Barrier

Typical PSS cables

Page 33: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Bridge Durability

• Design life of stay cables is 60 years and designed to be replaceable. For non-replacement components (such as cable saddle) the design life is 125 years.

• For the anchorage components which are accessible for maintenance operation in-situ, the corrosion protection system have a design life of 25 years. After this period of 25 years, if necessary, the protection system will be renewed in-situ at regular intervals of 15 years corresponding to the maintenance operations.

Stay Cables – cont’d

Anchorage Cable Saddle

‘V’ Shaped Strand Holes

Page 34: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• The Employer’s Requirement (ER) requires no damage criteria for a 500 years return period. In addition to this, a requirement of ‘no collapse’ criteria for the most credible earthquake (2500 years return period) was also introduced.

• Detail design checking by Independent Checking

Engineer (ICE) indicated that spun piles at the approach bridge of Package 1 could only cater for the 500 years return period earthquake. No plastic hinge forms as required for ‘no collapse’ criteria of 2500 years return period.

High Damping Rubber Bearing (HDRB)

HDRB –Section

Bridge Durability

Page 35: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Considering the current progress of works, it was decided that a change of bridge bearing system shall be the best solution. The original Pot Bearing system is replaced with High Damping Rubber Bearing to provide an effective seismic isolation system.

• Elastomeric bearing have a low embodied energy per m² of the bridge deck.

High Damping Rubber Bearing (HDRB) – cont’d

Bridge Durability

HDRB testing - Shear Test for 104 mm

displacement

Page 36: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

HDRB was designed by Tun Abdul Razak Research Centre (TARRC) at Brickendonbury, United Kingdom, a laboratory of the Malaysian Rubber Board (MRB).

High Damping Rubber Bearing (HDRB) – cont’d

Bridge articulation for a 6 span module

Bridge Durability

Page 37: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

HDRB provides a simple and economical isolation system. It possesses the low horizontal stiffness needed and is capable of safely withstanding the large horizontal displacements imposed during an earthquake. The bearing was designed to meet two sets of action as per below:

o SLS non-seismic actions – conformance with BS5400

o SLS non-seismic actions simultaneous with a 2500-year return period seismic event – conformance with EN15129

High Damping Rubber Bearing (HDRB) – cont’d

Bridge Durability

Page 38: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

2. Economic Activity

i. Local construction employment

ii. Usage of Local Materials

iii.Vocational Training

iv.Regional Economic Development

Page 39: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Package % of Works

Package 2 30%

Package 3A 60%

Package 3B 30%

Package 3C 60%

Local Construction Employment

• Conventional Form of Contract is adopted for Package 3 (Land Expressway Portion), to give the opportunity for local / ‘Bumiputera’ Contractor / Consultant to participate in such prestigious project and to expose them in managing and executing mega project.

• To promote Bumiputera Contractors participation in the project, certain percentage of works has been allocated:

Economic Activity

Page 40: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Usage of Local Material

• The use of HDRB for the bridge bearing system promotes natural rubber; abundantly produced in Malaysia.

• Except for the cable-stayed saddle and anchorage, and steel fender, all

other construction materials are obtained locally.

• The usage of local materials provides great advantage to the project in terms of supplier availability and cost as well as economic contribution to the nation.

Economic Activity

Page 41: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Vocational Training

• To promote transfer of technology, an employment programme is initiated to train local people in order to meet the skill level requirement of the project. This include employing local engineers, technicians, consultants and construction workers.

• Weekly educational visits by Government

authorities, private sectors and universities as part of the programme to expose them in the construction aspects of the mega project.

Site visit by University Students

• Young Engineers Scheme (YES) programme is introduced in Package 2 Contract to give opportunity to young engineers to get exposure in the mega-scale construction project.

• JKSB has planned for the involvement of 100 students from the local high institution to participate in the industrial training programme in the year 2012.

Economic Activity

Page 42: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

The bridge is expected to reduce traffic volume on the First Penang Bridge by

20%.

The bridge provides an alternative route to road users who commute daily

between Penang Island and the Mainland.

The future Juru Bypass and Jelas Expressway will be linked to the Second

Penang Bridge via the trumpet interchange at KM154 of PLUS Expressway thus

improving the traffic flow to and from Penang Island.

The route will provide high standard direct link between Penang and Mainland,

resulting in improved logistic processes, hence improving the overall efficiency

of the local economics, with resultant benefits to the populations of the

Southern area of Penang Island and Mainland.

The bridge will serve as a catalyst for development to the state as a

transportation hub for the northern region.

The route will become major passage for the movement of goods to Penang

ports and the international airport in which will facilitate economic activity and

also promote regional tourism industry.

Economic Activity

Page 43: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

It will spur the economic growth at Batu Kawan and surrounding area.

It wil also contribute to accelerate economic transformation under the Northern

Corridor Economic Region (NCER).

It will result to the increase of property values in Batu Kawan area.

Factories and Plants development in the Batu Kawan area by PDC will provide employment opportunities for the locals.

JKSB is also in the process of appointing Malaysian Institute of Economic

Research (MIER) to conduct Economic Impact Study on the construction Second

Penang Bridge.

Economic Activity

Page 44: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

3. Environmental

Responsibility

i. High Environmental Standards

ii. Minimal Impact on water flow

iii. Green Building Technology

iv. Reducing the Impact of Dredging

v. Flora and Fauna Monitoring

vi. Habitat Creation

Page 45: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

i. High Environmental Standards

Environmental Responsibility

• Various environmental consultants were appointed to conduct a comprehensive

monitoring regime through Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and the Fisheries Impact Assessment (FIA).

CONSESSIONAIRE / PROJECT MANAGER

JAMBATAN KEDUA Sdn. Bhd.

ERE CONSULTING GROUP Sdn. Bhd.

INDEPENDENT EIA AUDITOR

Package 1, 2 & 3

PACKAGE 1

UEM Builders Bhd.

PACKAGE 2

CHEC Construction (M) Sdn. Bhd.

EIA & EMP

DR. Nik &

Associates Sdn

Bhd.

R-SYNC Tech.

Resources

Sdn. Bhd.

DREDGING AND DISPOSAL OF

SPOIL MATERIAL

Cergas Murni Sdn Bhd

PACKAGE 3A PACKAGE 3B PACKAGE 3C

CSK

Murni

Services

Environmental

Science

IJM Corporation Berhad

HRA Teguh Sdn Bhd

Design & Build

YES Enviro

Services

Sdn. Bhd.

CSK

Murni

Services

FANLI Marine & Consultancy Sdn Bhd

INDEPENDENT FIA CONSULTANT

EIA & EMP EIA & EMP EIA & EMP EIA & EMP

PACKAGE 3D

S.U. Citra Bina Sdn Bhd

Enviro

Sustain

Consult

EIA & EMP

Conventional

Page 46: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

i. High Environmental Standards – cont’d

• Most of the bridge sections including tubular steel piles, precast spun piles, reinforcement caging, precast shell and Segmental Box Girder are IBS components that are prefabricated on land to reduce the amount of time spent at the bridging line and the risk of damaging or polluting the marine environment.

Precast Spun Piles

Precast Shell

Segmental Box Girder

Reinforcement Caging

Environmental Responsibility

Page 47: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

The steel fender system was adopted due to its environmental friendliness, cost saving and shorter construction period.

Total pilecap : 4 nos Pilecap size (P25 & P26): 48.1m x 17.5m x 6m Pilecap size (P24 & P27): 42.7m x 10.6m x 4m

Steel Fender System

MAIN NAVIGATION SPANS Substructure

Environmental Responsibility

ii. Minimal Impact On Water Flow

Page 48: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Steel Fender Man-made Island

i) Easy to construct, hence shorter construction period

i) Difficult to construct & much longer construction period

ii) Compact thus does not restrict the navigation passageway

ii) Restrict navigation passageway

iii) Low impact on the environment and existing hydrological condition due to its relatively small size

iii) Occupy larger water area restricting flow tidal

Steel Fender System

Environmental Responsibility

ii. Minimal Impact On Water Flow – cont’d

Page 49: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• The design is based on requirements of 80% of IBS and 80% of Green Building Index.

• A green building concept is introduced to save water, energy and material.

• The landscaping and the exterior look of the Toll Plaza are designed in such a way that the trespassing light is eliminated by plants and shaded area.

• Rain water from the roof of the building is harvested to supplement the conventional water supply. The natural light is maximized for the intermediate floors to minimize the usage of electricity. High efficiency windows and insulation in walls, ceilings and floors are used for the benefit of better temperature control.

• Construction work is currently in progress.

Proposed Toll Plaza & Administrative Building Complex

Environmental Responsibility

iii. Green Building Technology

PB2X Toll Plaza

PLUS Toll Plaza

Page 50: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

PULAU JEREJAK

PULAU AMAN

TRUMPET INTERCHANGE AT Km 154 NSE

PULAU PINANG

NAVIGATIONAL SPAN

BATU MAUNG DIRECTIONAL RAMPS

RSA

PENANG SECOND CROSSING BRIDGE TOLL PLAZA PLUS TOLL

PLAZA (EXIT)

9+000.

10+000.

11+000.12+000. 13+000. 14+000.

15+000.

16+000.

0.

1+000. 2+000.

3+000. 4+000. 5+000. 6+000.

7+000.

8+000.

17+000.

18+000.

19+000.

20+000.

21+000.

22+000.

23+000.

BATU MAUNG TEMPORARY JETTY

PROPOSED

PROPOSED

PROPOSED

PROPOSED

PROPOSED

MAINLAND (BATU KAWAN)

LEGEND

Dredging works for 270m width Temporary Navigational Channel Total volume 14 million m³ of Dredged Materials

MATERIAL STORAGE YARD

BATU KAWAN TEMPORARY JTTY

BUKIT TAMBUN TEMPORARY FABRICATION

YARD

Dredged material disposal to Pulau Kendi

Environmental Responsibility

iv. Reducing the impact of dredging

Dredging Location

The dredging activities have to be carried out due to shallow water conditions at major portions of the bridge alignment which affect the barges movement for piling, pier and launching activities.

Page 51: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

-3.5m ACD

Sea Bed Level

Sea Water

Level

-3.0m ACD

1:5 1:5

1:5

Viaducts

60m 170m 40m

270m

Note:

National Geodetic Vertical Datum (NGVD)

Admiralty Chart Datum (ACD)

(+0.00 NGVD = +1.72m ACD)

C L

Main Dredged Channel

(MDC)

Barges Navigation

Channel (BNC)

Cross Section of Main Dredged Channel

iv. Reducing the impact of dredging – cont’d

Environmental Responsibility

Page 52: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• In total, 14 million m³ of material was dredged from the seabed in the Penang Strait. Dredging was done carefully and spillage was minimised to avoid suspended sediment that could shade and potentially endanger the marine life.

Silt curtain was erected and maintained properly

Dredging Work

Environmental Responsibility

iv. Reducing the impact of dredging – cont’d

Page 53: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Sampling Points for the Monitoring Study

Location of Ambient Environmental Monitoring

Station

Location of Water Quality Sampling Works

Environmental Monitoring and Auditing (EMA)

Base line data have been established by the respective Package 1 and 2 contractors as referenced data for EMA for dredging and offshore disposal of spoils, piling, construction machineries and equipment during the Construction Phase of the Penang Second Bridge.

53

Environmental Responsibility

iv. Reducing the impact of dredging – cont’d

Page 54: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Package 1: EMA Consultant

R- Sync Technical Resources Sdn Bhd is appointed as the EMA Consultant for the monitoring of dredging and offshore disposal of spoils during construction phase. The Scope of works cover:

o TSS mapping via satellite imagery o Marine water quality monitoring at disposal site o Marine water quality monitoring along transportation on route o Composition of dredged materials o Bathymetric survey at disposal site o Final Environmental Audit

Monitoring equipment used during dredging:

o Split Hopper Sensor o Draft Sensor o Automatic Identification System (AIS) integrated with Garmin GPS Receiver

(Model GPSMAP 76 CSx)

Environmental Responsibility

iv. Reducing the impact of dredging – cont’d

Page 55: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Package 1 : Location of Water Quality Sampling by R-Sync Sdn Bhd

Environmental Responsibility

iv. Reducing the impact of dredging – cont’d

Water Quality sampling location at disposal route

Disposal Area

Page 56: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Result of Water Quality Sampling by R-Sync Sdn Bhd

Environmental Responsibility

iv. Reducing the impact of dredging – cont’d

All sampling locations generally recorded a decrease in TSS level compared to the level. This shows that the spoil disposal activities are being carried out in a proper manner as recommended in the EIA report.

April 2009 – January 2012

Page 57: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

v. Flora & Fauna Monitoring

• Marine flora and fauna are monitored throughout the construction phase to reduce demands and complaints from fishermen and fish farmers who ostensibly incurred losses as a result of the bridge construction.

• To ensure the aquatic life is not effected by the construction of Second Penang Bridge, Fanli Marine & Consultancy Ptd. Ltd. (Fanli) is appointed by JKSB as an Independent Consultant to monitor the Fisheries Impact Assessment (FIA) for this project. Fanli had earlier completed the base line study in 2007 for the Fisheries Department.

Environmental Responsibility

Overview Fisheries Industry in Penang There are 17 fishing villages on the island and 14

fishing landing point on the main land. In 2007, marine fisheries catch in Penang

amounted to 37,774 tonnes worth RM 218.9 million.

The industry provides livelihood to nearly 3,193 fulltime fishermen.

Page 58: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Fisheries Location

v. Flora & Fauna Monitoring – cont’d

Environmental Responsibility

Location of Cage Culture & Cockle Farms

Location of Fisheries Landing Points

Page 59: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Independent Consultant of Fisheries Impact Assessment (FIA)

Fanli scope of works cover:

o Reconnaissance assessments of the water quality at areas of fisheries and aquaculture importance.

o Reconnaissance assessments of the marine and fisheries resources including:

Environmental Responsibility

• Monitored at 1m below surface

• Readings were collected every minute for at least 10 minutes

v. Flora & Fauna Monitoring – cont’d

Aquatic Environment Benthic fauna diversity and distribution Coral reef health

Fisheries and Aquaculture Fisheries landings and value Aquaculture activities and production

Page 60: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Result of Water Quality in the fisheries landing point

• Generally, most parameters were recorded within suitable range for marine environment and fisheries purposes

1st Sampling 2nd Sampling

Salinity (ppt) level at Study Area

Temperature (°C) levels at Study Area

Dissolved Oxygen (mg/L) levels at Study

Area

Environmental Responsibility

v. Flora & Fauna Monitoring – cont’d

Page 61: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

vi. Habitat Creation

Research by Lund University in Sweden has discovered that the Oresund Bridge connecting Denmark and Sweden has improved the Marine Environment in 10 years since it was built.

In the Second Penang Bridge, aquatic life such as algae and

fishes are found abundantly around the newly driven piles.

They become food for fish like the Longfin Bannerfish (Heniochus acumiratus), Rock Grouper (Epinephelus fasciatomaculosus) and White Cheeked Monocle Bream (Scolopsis vosmeri) and the local “udang lipan” (Stomatopod Crustacean).

According to Fanli’s 7th Quarter Monitoring Report, it shows that in terms of seabed productivity, highest macrobenthos (collection of organisms living in sea) densities were recorded during the study as compared to the previous monitoring events (Quarters 1st to 6th). This signifies that the study area is still highly productive. It has also benefited the fishermen.

It is evident that the construction of Second Penang Bridge

does not affect the marine environment of the surrounding area.

Environmental Responsibility

Page 62: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

o JKSB has issued ex-gratia payment amounting to RM 6.685 million to 3,011 fishermen, cockles breeders and aqua breeders on 24 October 2011 as part of the settlement to their claim of being affected by the construction of the Second Penang Bridge.

Ex-Gratia Payment to Fishermen

Page 63: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Learning From Good Practice

Contractor / Consultant

Role Signature Project

CHEC Construction (M) Sdn Bhd - subsidiary of China

Harbour Engineering Company Ltd (CHEC)

Main contractor for Main Navigation span and substructure for approach span.

• The Donghai Bridge, China 25.5km length over water cable-stayed bridge,

the second longest cross sea bridge in the world.

• The Sutong Bridge, China Cable stayed bridge with the longest main span

(1088m) in the world.

Highway Planning & Design Institute, China

Designer for CHEC Construction (M) Sdn Bhd

• The Sutong Bridge, China • The Hangzhou Gulf Bridge, China The world’s longest sea-crossing bridge (36km) • The Xihoumen Bridge, China The world’s second largest span suspension

bridge (1650m)

MMSB - Technical support

from AECOM Malaysia and AECOM Hong Kong

Submitting engineer for CHEC Construction

• Padma Multipurpose Bridge, Bangladesh

A 6.15 km long two-level steel-truss road and

rail bridge (AECOM)

Page 64: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Learning From Good Practice

Contractor / Consultant

Role Signature Project

ARUP Jururunding Sdn Bhd - Technical support

from ARUP Hong Kong

• Independent Checking Engineer for Package 1& 2

• Supervision Consultant for Package 3

• Stonecutter Bridge, Hong Kong Cable stayed bridge with the second longest main span

(1018m) in the world • Forth Replacement Crossing, Scotland, UK A 2.7 km cable-stayed bridge with three single column

towers, wind shielding and a single deck carrying two general lanes of traffic and hard shoulders in each direction

MINCO Independent Checking Engineer for Package 3

• Experience in 23 countries on the design of highways and infrastructures.

• Arch-Bridge crossing Wetland Lake, Putrajaya • Jalan Duta Interchange, Kuala Lumpur • New Klang Valley Tolled Expressway, Kuala Lumpur –

Tanjung Malim Expressway

Page 65: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

JKSB is committed to completing the Second Penang Bridge

with the highest quality, timely delivery, within the

budgeted cost and to contribute towards sustainable

development.

Conclusion

Page 66: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Progress

Photographs

Page 67: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 1

View of the Completed Low & High Piers from P069 (Towards Batu Maung)

Page 68: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 1

Construction of Main Span piers in progress

Page 69: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 1

P27 – Crossbeam construction in progress

P25 – Platform for Crossbeam construction in progress

Page 70: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 2

View of SBG launching from P267

Page 71: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

View of completed deck

Site Photographs – Package 2

Page 72: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 2

View of SBG casting yard

Page 73: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 3A

View of the overall progress of Package 3A

Page 74: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 3B

View of the construction of Cloverleaf Interchange and mainline towards island

Page 75: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

View of the construction works from Sg Tengah to Trumpet Interchange

Site Photographs – Package 3B

Page 76: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Site Photographs – Package 3C

Overall view of progress at Trumpet Interchange

Page 77: THE SECOND PENANG BRIDGE - Jambatan · PDF filePLAZA TOL PLUS LEBUHRAYA UTARA SELATAN ... (JKR) and Malaysian Highway Authority ... with the Stage I to IV Safety Audit in ‘Guideline

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Thank You

For Your Kind Attention

* JKSB acknowledges the assistance of CHEC & UEMB for the preparation of this presentation.