Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
1 CADANGAN PEMBINAAN SEMULA DAN MENAIKTARAF
SEKOLAH DAIF MENGGUNAKAN KAEDAH
INSDUSTRIALISED BUILDING SYSTEM (IBS) DI
SEMENANJUNG MALAYSIA (FASA 1) TAHUN 2018 BAGI
NEGERI KELANTAN. PAKEJ 1 (PASIR MAS/TANAH
MERAH) - SEKOLAH KEBANGSAAN BUKIT PERAH
Supply and Install Lightweight Steel
Truss Truecore 1.0mm TCT, Mild Steel
Work, Roofing, Insulation,
Accessories, Material & Price
Yusri Maju Sdn Bhd 2018 RM 315,690.63
2 CADANGAN PEMBINAAN SEMULA DAN MENAIKTARAF
SEKOLAH DAIF MENGGUNAKAN KAEDAH
INSDUSTRIALISED BUILDING SYSTEM (IBS) DI
SEMENANJUNG MALAYSIA (FASA 1) TAHUN 2018 BAGI
NEGERI KELANTAN. PAKEJ 1 (PASIR MAS/TANAH
MERAH) - SEKOLAH KEBANGSAAN BUKIT GADING
Supply and Install Lightweight Steel
Truss Truecore 1.0mm TCT, Mild Steel
Work, Roofing, Insulation,
Accessories, Material & Price
Yusri Maju Sdn Bhd 2018 RM 354,474.44
3 CADANGAN PEMBINAAN SEMULA DAN MENAIKTARAF
SEKOLAH DAIF MENGGUNAKAN KAEDAH
INSDUSTRIALISED BUILDING SYSTEM (IBS) DI
SEMENANJUNG MALAYSIA (FASA 1) TAHUN 2018 BAGI
NEGERI KELANTAN. PAKEJ 1 (PASIR MAS/TANAH
MERAH) - SEKOLAH KEBANGSAAN RANTAU PANJANG
Supply and Install Lightweight Steel
Truss Truecore 1.0mm TCT, Mild Steel
Work, Roofing, Insulation,
Accessories, Material & Price
Yusri Maju Sdn Bhd 2018 RM 304,058.19
4 CADANGAN PEMBINAAN SEMULA DAN MENAIKTARAF
SEKOLAH DAIF MENGGUNAKAN KAEDAH
INSDUSTRIALISED BUILDING SYSTEM (IBS) DI
SEMENANJUNG MALAYSIA (FASA 1) TAHUN 2018 BAGI
NEGERI KELANTAN. PAKEJ 1 (PASIR MAS/TANAH
MERAH) - SEKOLAH KEBANGSAAN KEDONDONG
Supply and Install Lightweight Steel
Truss Truecore 1.0mm TCT, Mild Steel
Work, Roofing, Insulation,
Accessories, Material & Price
Yusri Maju Sdn Bhd 2018 RM 98,576.93
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (GOVERNMENT SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
10 KERJA-KERJA PASCA BANJIR DI MAKTAB RENDAH
SAINS MARA (MRSM) KUALA KRAI, KELANTAN
Light Weight Truss and Metal Deck Cengal Jati Sdn Bhd 2016 RM 298,400.00
11 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
BARU BLOK 8 SERTA KERJA – KERJA BERKAITAN DI
KOMPLEKS SUK, KOTA BHARU, KELANTAN
Mild Steel Truss and Accessories PWC Bina / Binajaya
Enterprise
2016 RM 254,800.00
12 CADANGAN MEMBINA DAN MENYIAPKAN
BANGUNAN BAGI INSTITUTE OF OCEAN & EARTH
SCIENCES ( IOES UM BACHOCK )
Light Weight Truss and Metal Deck Kelcare Engineering
Consultant Sdn Bhd
2016 RM 318,300.00
13 CADANGAN MEMBINA DAN MENYIAPKAN 1 UNIT
DEWAN SEMAI BAKTI ( JENIS A ) DI FELDA CHIKU 5 GUA
MUSANG KELANTAN
Smart Truss System Terasalana Sdn Bhd 2015 87,000.00RM
14 CADANGAN MEMBINA DAN MENYIAPKAN 1 UNIT
DEWAN SEMAI BAKTI ( JENIS A ) DI FELDA ARING 1 GUA
MUSANG KELANTAN
Smart Truss System Perniagaan Bumi Maju 2015 90,300.00RM
15 CADANGAN PERLAKSANAN PROJEK PEMBAIKAN
STRUKTUR BANGUNAN SERTA KERJA – KERJA LAIN
BERKAITAN BAGI SEKOLAH KERAJAAN DIBAWAH PAKEJ
RANGSANGAN KHAS ( PRK ) UNTUK KEMENTERIAN
PELAJAR MALASYIA ( SEK KEB KADOK ( BLOK – B )
Light Weight Truss and Roof Tiles AMZ Berkat Engineering
Construction
2014 61,800.00RM
16 BANGUNAN PENCAWANG PEMBAHAGIAN UTAMA (
PPU ) UNTUK TNB, GUA MUSANG, KELANTAN
Light Weight Truss and Metal Deck 2014 78,000.00RM
17 TANDAS BALAI ISLAM LUNDANG, KOTA BHARU,
KELANTAN
Light Weight Truss and Metal Deck Balai Islam Kelantan 2013 86,000.00RM
18 SEKOLAH KEBANGSAAN TANAH MERAH 1- BANGUNAN
PENDIDIKAN KHAS, TANAH MERAH, KELANTAN.
Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2013 283,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (GOVERNMENT SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
19 KLINIK KESIHATAN PAHI, KUALA KRAI, KELANTAN. Light Weight Truss and Metal Deck Jabatan Kesihatan Malaysia 2013 72,000.00RM
20 KEM BATALION 8, PGA PENGKALAN CHEPA, KELANTAN Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2013 338,000.00RM
21 PRA SEKOLAH, PAUH SEMBILAN, BACHOK, KELANTAN. Light Weight Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2013 67,000.00RM
22 RUMAH KAKITANGAN & SEMI D, FELDA KEMAHANG,
TANAH MERAH, KELANTAN.
Light Weight Truss and Roof Tiles SBJ Binaraya Sdn Bhd 2013 428,000.00RM
23 SEKOLAH MENENGAH TEKNIK BESUT, TERENGGANU Light Weight Truss and Roof Tiles Jabatan Kerja Raya (JKR) 2013 169,000.00RM
24 KOLEJ MATRIKULASI, MUKIM MERBAU DAERAH PASIR
PUTEH, KELANTAN.
Light Weight Truss and Roof Tiles Jabatan Kerja Raya (JKR) 2013 434,000.00RM
25 BANGUNAN PENCAWANG PEMBAHAGIA UTAMA
(PPU), 33/11Kv, MUKIM KETIL, GUA MUSANG,
KELANTAN.
Light Weight Truss and Roof Tiles Jabatan Kerja Raya (JKR) 2013 368,000.00RM
26 WALKWAY SEKOLAH MENENGAH SAINS SETIU, SETIU,
TERENGGANU
Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2013 72,000.00RM
27 BENGKEL FAKULTI SAINS BUMI UNIVERSITI MALAYSIA
KELANTAN (KAMPUS JELI).
Light Weight Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2013 227,000.00RM
28 MASJID CHERANG, KOTA BHARU, KELANTAN. Light Weight Truss and Metal Deck 2013 204,000.00RM
29 CADANGAN PEMBANGUNAN BERCAMPUR RUMAH
MAMPU MILIK (RMM) DI ATAS PECAHAN PT1511,
DAERAH TUMPAT, JAJAHAN TUMPAT, KELANTAN.
Light Weight Truss and Roof Tiles SBJ Binaraya Sdn Bhd 2012 757,000.00RM
30 SETOR ISTANA DI ISTANA BALAI BESAR, KOTA BHARU,
KELANTAN.
Light Weight Truss and Metal Deck Jabatan Pembangunan
Persekutuan (JPP)
2012 57,000.00RM
31 PRA SEKOLAH SEK. KEB. SRI MELOR, KOTA BHARU,
KELANTAN.
Light Weight Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2012 67,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (GOVERNMENT SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
32 PRA SEKOLAH SEK. KEB. PAUH SEMBILAN, BACHOK,
KELANTAN.
Light Weight Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2012 67,000.00RM
33 PRA SEKOLAH SEK. KEB. SRI AMAN, PASIR PUTEH,
KELANTAN.
Light Weight Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2012 67,000.00RM
34 PRA SEKOLAH SEK. KEB. KEM DESA PAHLAWAN, KOK
LANAS, KELANTAN.
Light Weight Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2012 67,000.00RM
35 SEK. KEB. KADOK, KOTA BHARU, KELANTAN. Light Weight Truss and Roof Tiles Jabatan Kerja Raya (JKR) 2012 187,000.00RM
36 CADANGAN MEMBINA DAN MENYIAPKAN KOMPLEKS
MAHKAMAH SYARIAH NEGERI KELANTAN DI MUKIM
KOTA, JAJAHAN KOTA BHARU, KELANTAN.
Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2012 535,000.00RM
37 CADANGAN MEMBINA DAN MENYIAPKAN RUMAH
KAKITANGAN JENIS C1, D1,DAN RUMAH BERKEMBAR
JENIS E1 DAN LAIN - LAIN KERJA YANG BERKAITAN DI
FELDA KEMAHANG 1, 2 & 4 TANAH MERAH, KELANTAN.
Light Weight Truss and Roof Tiles SBJ Binaraya Sdn Bhd 2012 428,000.00RM
38 SEKOLAH MAAHAD TAHFIZ, BANGGOL CHICHA, PASIR
MAS, KELANTAN.
Light Weight Truss and Roof Tiles Kementerian Pelajaran
Malaysia (KPM)
2012 187,000.00RM
39 CADANGAN MEMBINA DAN MENYIAPKAN KOLEJ
MATRIKULASI KELANTAN, DI ATAS SEBAHAGIAN LOT
3317 (80 EKAR) MUKIM MERBAU DAERAH PASIR PUTEH,
KELANTAN.
Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2012 346,000.00RM
40 TABUNG HAJI, KOTA BHARU, KELANTAN. Light Weight Truss and Metal Deck Tabung Haji 2012 186,000.00RM
41 KEM BATTALLON 8, PGA PENGKALAN CHEPA, KOTA
BHARU, KELANTAN.
Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2012 396,000.00RM
42 CADANGAN MEREKABENTUK DAN MEMBINA RUMAH
MESRA 1 MALAYSIA UNTUK SYKT. PERUMAHAN
NEGARA BERHAD (SPNB).
Light Weight Truss and Metal Deck Syarikat Permodalan
Nasional Berhad (SPNB)
2012 3,280,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (GOVERNMENT SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
43 KEDAI & PASAR JELAWAT, BACHOK, KELANTAN. Light Weight Truss and Metal Deck Majlis Bachok 2012 278,000.00RM
44 BENGKEL KURSUS VOKASIONAL, SEK. MEN. KEB.
VOKASIONAL PENGKALAN CHEPA, KOTA BHARU,
KELANTAN.
Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2012 168,000.00RM
45 PUSAT SUMBER PDG. BALOH (B), PASIR AKAR, BESUT,
TERENGGANU.
Light Weight Truss and Metal Deck Jabatan Kerja Raya (JKR) 2012 427,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (GOVERNMENT SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
1 CADANGAN MEMBINA DAN MENYIAPKAN 10 UNIT
KEDAI & PEJABAT 3 TINGKAT KEPADA 10 UNIT KEDAI &
PEJABAT 2 TINGKAT DI ATAS LOT 616 - LOT 620 & LOT
631 - LOT 635, MUKIM BANDAR KECIL RANTAU
PANJANG, DAERAH PASIR MAS, KELANTAN DARUL
NAIM
Supply and Install Lightweight Steel
Truss, Insulation, Metal Deck And
Accessories Works
Eastect Builder Sdn. Bhd 2018 RM 106,719.10
2 CADANGAN TAMBAHAN DAN PINDAAN KEPADA 20
UNIT RUMAH 2 TINGKAT DIJADIKAN KEPADA RUMAH 1
TINGKAT MENGIKUT KELULUSAN MPK BIL : (56) DLM
MPK/R/B:PB/3/2003-B JLD 3 BERTARIKH 24 NOV 2008,
DI ATAS NO LOT 110676 - LOT 110695 (LOT LAMA 2425
DAN 2696), BATU 11, LORONG SERI MAHKOTA PERMAI
18, JALAN KUANTAN- GAMBANG, MUKIM KUALA
KUANTAN , DAERAH KUANTAN, PAHANG DARUL
MAKMUR
Supply and Install Lightweight Steel
Truss And Accessories
Lee & Yong Aluminium
Sdn. Bhd
2018 RM 116,065.26
3 CADANGAN PEMBINAAN RUMAH KAKITANGAN,
PEJABAT DAN SETOR BAJA YANG TERLIBAT DENGAN
BANJIR YANG MENGANDUNGI 1 UNIT RUMAH
SESEBUAH 1 TINGKAT (C1), 2 UNIT RUMAH SESEBUAH 1
TINGKAT (D1) 14 UNIT RUMAH BERKEMBAR 1 TINGKAT
(E1), 1 UNIT PEJABAT 1 TINGKAT 2 UNIT SETOR BAJA 1
TINGKAT, 1 UNIT PENCAWANG TNB 1 TINGKAT DI
FELDA CHIKU 7, MUKIM RELAI, DAERAH CHIKU,
JAJAHAN GUA MUSANG, NEGERI KELANTAN UNTUK
TETUAN LEMBAGA KEMAJUAN TANAH PERSEKUTUAN
(FELDA)
Supply and Install Lightweight Steel
Truss And Accessories
AZS Venture 2018 RM 273,391.17
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
4 CADANGAN PEMBINAAN RUMAH KAKITANGAN, PEJABAT
DAN SETOR BAJA YANG TERLIBAT DENGAN BANJIR YANG
MENGANDUNGI 1 UNIT RUMAH SESEBUAH 1 TINGKAT
(C1), 2 UNIT RUMAH SESEBUAH 1 TINGKAT (D1), 14 UNIT
RUMAH BERKEMBAR 1 TINGKAT (E1) ,1 UNIT PEJABAT 1
TINGKAT, 2 UNIT SETOR BAJA 1 TINGKAT , 1UNIT
PENCAWANG TNB 1 TINGKAT DI FELDA CHIKU 7, MUKIM
RELAI, DAERAH CHIKU, JAJAHAN GUA MUSANG, NEGERI
KELANTAN UNTUK TETUAN LEMBAGA KEMAJUAN TANAH
PERSEKUTUAN (FELDA)
Supply and Install Lightweight Steel
Truss And Accessories
Mizan Grand Intertraders
Sdn. Bhd
2018 RM 126,855.70
5 CADANGAN MEMBINA & MENYIAPKAN 19 UNIT
RUMAH KEDIAMAN BANGLO (BATU) 1 TINGKAT YANG
MENGANDUNGI 10 UNIT JENIS A,8 UNIT JENIS B, DAN 1
UNIT JENIS C, DI ATAS LOT PT 12051 - PT 12069, MUKIM
MAKA, DAERAH KUSIAL, JAJAHAN TANAH MERAH
UNTUK TETUAN KESEDAR DAGANG SDN. BHD.
Supply and Install Lightweight Steel
Truss And Accessories
Sg. Sok Trading 2018 RM 91,492.80
6 CADANGAN MEMBINA 2 UNIT RUMAH BANGLO
SETINGKAT & 20 UNIT RUMAH BERKEMBAR SETINGKAT
DI ATAS LOT 2298, MUKIM SUNGAI KARANG, DAERAH
KUANTAN, PAHANG DARUL MAKMUR
Supply and Install Lightweight Steel
Truss And Accessories
CL Machineries Sdn. Bhd 2018 RM 149,223.60
7 CADANGAN MEMBINA DAN MENYIAPKAN 135 UNIT
RUMAH TERES 1 TINGKAT DI BATU MENGKEBANG,
KUALA KRAI , KELANTAN.
Supply and Install Lightweight Steel
Truss And Accessories
Real Development Sdn.
Bhd
2018 RM 654,957.25
8 CADANGAN MEMBINA DAN MENYIAPKAN 1 UNIT
KEDIAMAN 2 TINGKAT DI ATAS LOT 14086 MUKIM KETIL
DAERAH GALAS JAJAHAN KUALA KRAI, KELANTAN.
Supply and Install Lightweight Steel
Truss, Metal Deck, Insulation, Strip
Ceiling , Aluminium Composite Panel
And Accessories
Sebastian Concept 2018 RM 75,410.04
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
9 CADANGAN MEMBINA DAN MENYIAPKAN 150 UNIT
RUMAH TERES 1 TINGKAT, 1 UNIT DEWAN SERBAGUNA
DAN TADIKA 1 TINGKAT, 1 UNIT SURAU 1 TINGKAT DAN
LAIN-LAIN BERKAITAN DENGANNYA BAGI
PERUMAHAN RAKYAT (PPR) DI ATAS PT 639, LOT 16259
DAN LOT 16530, MUKIM TEPI SUNGAI, JAJAHAN JELI,
KELANTAN UNTUK KEMENTERIAN KESEJAHTERAAN
BANDAR, PERUMAHAN DAN KERAJAAN TEMPATAN.
Supply and Install Lightweight Steel
Truss And Accessories
Dikar Alam Sdn. Bhd 2018 RM 263,192.00
10 CADANGAN MEMBINA DAN MENYIAPKAN 19 UNIT
RUMAH TERES (BATU) 1 TINGKAT DI ATAS LOT NO PT
4817- PT 4835, MUKIM GUAL NERING, DAERAH RANTAU
PANJANG , JAJAHAN PASIR MAS, KELANTAN.
Supply and Install Lightweight Steel
Truss, Roofing, Insulation And
Accessories
KPJ Development Sdn. Bhd 2018 RM 199,555.20
11 CADANGAN MEMBINA & MENYIAPKAN 1 UNIT
BANGUNAN KEDAI & PEJABAT 3 TINGKAT DI ATAS LOT
PT 750, 4 UNIT BANGUNAN KEDAI & PEJABAT 2
TINGKAT DI ATAS LOT PT 751 - PT 754, 9 UNIT RUMAH
TERES 1 TINGKAT DI ATAS LOT PT 755 - PT 763, 2 UNIT
RUMAH BERKEMBAR 1 TINGKAT DI ATAS LOT PT 764 &
PT 765, 2 UNIT RUMAH KEDIAMAN 1 TINGKAT DI ATAS
LOT PT 766 & PT 767, MUKIM SELEHONG SELATAN,
DAERAH TERBOK, JAJAHAN TUMPAT, KELANTAN
DARUL NAIM
Supply and Install Lightweight Steel
Truss, Roofing, Insulation And
Accessories
B.T Venture Sdn. Bhd 2018 RM 116,416.60
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
12 CADANGAN MEMBINA DAN MENYIAPKAN 3 BLOK
BANGUNAN BENGKEL TAMBAHAN DAN UBAHSUAI 2
BLOK BENGKEL SEDIADA SERTA KEMUDAHAN
BERKAITAN DI ATAS TAPAK KOLEJ VOKASIONAL
SEDIADA (SEBAHAGIAN LOT 3206), MUKIM REPEK,
DAERAH REPEK, JAJAHAN BACHOK, KELANTAN.
Supply and Install Light Weight Steel
Truss, Insualation And Accessories.
FIAS Associates Sdn. Bhd 2018 RM 186,646.50
13 CADANGAN MEMBINA DAN MENYIAPKAN 5 UNIT
KEDIAMAN BANGLO SETINGKAT DI MUKIM DEWAN,
DAERAH LABOK, JAJAHAN MACHANG, KELANTAN
Supply and Install Light Weight Steel
Truss And Accessories.
Cahaya Decoration 2018 RM 63,410.50
14 CADANGAN MEMBINA & MENYIAPKAN 19 UNIT
RUMAH TERES (BATU) 1 TINGKAT DI ATAS LOT NO PT
4817- PT 4835, MUKIM GUAL NERING, DAERAH RANTAU
PANJANG, JAJAHAN PASIR MAS, KELANTAN.
Supply and Install Light Weight Steel
Truss, Roofing And Accessories.
KPJ Development Sdn. Bhd 2018 RM 174,243.60
15 CADANGAN MEMBINA DAN MENYIAPKAN 36 UNIT
RUMAH BERKEMBAR 2 TINGKAT JENIS A, B DAN C DI
KUBANG KUALA TERENGGANU, TERENGGANU.
Supply and Install LIghtweight Steel
Truss And Accessories
Pancaran Ilham
Engineering Sdn. Bhd
2018 RM 245,349.60
16 CADANGAN PINDAAN KE ATAS FASA 4-17 UNIT
KEDAI/PEJABAT 2 TINGKAT DI ATAS LOT PT 1575- PT
1591 KEPADA :- I) BLOK A 28 UNIT KEDIAMAN
APARTMENT 4 TINGKAT BERSERTA TEMPAT LETAK
KENDERAAN BASEMENT DAN PEJABAT PENGURUSAN
DI ATAS LOT PT 1575- PT 1583. II) BLOK B 28 UNIT
KEDIAMAN APARTMENT 4 TINGKAT BESERTA TEMPAT
LETAK KENDERAAN BASEMENT DAN PEJABAT
PENGURUSAN DI ATAS LOT 1584- PT 1591, WAKAF CHE
YEH, MUKIM PINTU GENG, DAERAH KOTA BHARU,
KELANTAN.
Supply and Install Light Weight Steel
Truss, Metal Deck And Accessories.
SBJ Binajaya Development
Sdn. Bhd
2018 RM 101,081.40
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
PROJECT LIST
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
17 CADANGAN MEMBINA DAN MENYIAPKAN 12 UNIT
RUMAH BANGLO YANG MENGANDUNGI 6 UNIT RUMAH
BANGLO 1 TINGKAT JENIS A DI ATAS LOT 805 - PT 810, 3
UNIT RUMAH BANGLO 1 TINGKAT JENIS B1 DI ATAS LOT
PT 799 - PT 801, 3 UNIT BANGLO 1 TINGKAT 1 TINGKAT
JENIS B2 DI ATAS LOT PT 802 - PT 804 MUKIM BANDAR
MACHANG, DAERAH MACHANG, JAJAHN MACHANG,
KELANTAN DARUL NAIM.
Supply and Install Lightweight Steel
Truss, Insulation and Accessories
Works
Yurbi Bina Sdn Bhd 2017 RM 176, 657.90
18 CADANGAN MEROBOH DAN MEMBINA SEMULA 1 UNIT
PASAR 2 TINGKAT DI ATAS LOT 1709, DI SIMPANG 3,
PENGKALAN CHEPA, KEMUMIN, KOTA BHARU
Supply and Install Lightweight Steel
Truss and Accessories Works
Marzuki Hardware Sdn Bhd 2017 RM 78, 122.85
19 CADANGAN MEMBINA DAN MENYIAPKAN 26 UNIT
RUMAH KEDAI 2 TINGKAT DI TAMAN KURNIA (FASA II)
KEMUMIN, KOTA BHARU, KELANTAN.
Supply and Install Lightweight Steel
Truss, Insulation and Accessories
Works
Megan Ekuiti Sdn Bhd 2017 RM 398, 280.80
20 INSTALLATION OF 3RD 90MVA 132/33 KV
TRANSFORMER AND 1 X 30 MVAR CAPASITOR BANK AT
PMU PANCHOR, KELANTAN.
Supply and Install LW Steel Truss,
Metal Deck Clip Lock, Metal Fascia
Cladding, Fascia Cladding Frame,
Metal Ceiling M-Clad, Ceiling Support
and All Accessories Works
FDZ Zaam Enterprise Sdn
Bhd
2017 RM 65, 161.70
21 1 UNIT SHOWROOM CEMERLANG RESIDENT, KOTA
BHARU, KELANTAN
Supply and Install V-Frame System
(Dry Wall)
SBJ Binajaya Develpoment
Sdn Bhd
2017 RM 116, 600.00
22 PEMULIHAN & PENINGKATAN KEM TENTERA DARAT DI
KEM BATALION KE-2, REJIMEN SEMPADAN, BATU
MELINTANG JELI, KELANTAN (PINTU GERBANG &
STESEN PAM MINYAK (POL))
Supply and Install MS Steel Truss,
Metal Roofing and All Accessories
Works
Mansashi Sdn Bhd 2017 RM 190, 008.18
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
23 CADANGAN MEMBINA DAN MENYIAPKAN 13 UNIT
RUMAH TERES (BATU) 2 TINGKAT DI ATAS LOT 3584 -
3596, MUKIM SALEHONG SELATAN, DAERAH TERBAK,
JAJAHAN TUMPAT, KELANTAN.
Supply and Install Light Weight Steel
Truss and Accessories Works.
SKT Construction Sdn Bhd 2017 RM 65, 082.50
24 CADANGAN MEMBINA DAN MENYIAPKAN 22 UNIT
RUMAH TERES SATU TINGKAT DI LOT PT 5576 HINGGA
PT 5583, LOT PT 5592 HINGGA PT 5597 & PT 5597 & PT
5608 HINGGA PT 5614, MUKIM MACHANG, DAERAH
ULU SAT, JAJAHAN MACHANG, KELANTAN.
Supply and Install Light Weight Steel
Truss and Accessories Works.
Haji Ali Homes Sdn Bhd 2017 RM 107, 836.98
25 CADANGAN MEMBINA DAN MENYAIPKAN BANGUNAN
TAMBAHAN 3 TINGKAT UNTUK SMU (A) TAQADDUN
MAARIF, PASIR TUMBUH, KOTA BHARU, KELANTAN.
Supply and Install Lightweight Steel
Truss and Accessories Works
HR Green Resources Sdn
Bhd
2017 RM 54, 672.47
26 CADANGAN MEMBINA DAN MENYIAPKAN 16 UNIT
RUMAH TERES (BATU) 2 TINGKAT DI ATAS LOT PT 1620 -
PT 1635 MUKIM WAKAF DELIMA WAKAF BHARU,
JAJAHAN TUMPAT, KELANTAN.
Supply and Install Roofing and
Accessories Works
Reka Perdana Sdn Bhd 2017 RM 143, 000.00
27 CADANGAN MEMBINA DAN MENYIAPKAN 678 UNIT
RUMAH TERES 1 TINGKAT 164 UNIT RUMAH SESEBUAH
1 TINGKAT, 12 UNIT KEDAI 2 TINGKAT, 1 UNIT MASJID 1
TINGKAT DAN 2 UNIT PENCAWANG ELEKTRIK DI
DAERAH GUAL PERIOK, JAJAHAN PASIR MAS,
KELANTAN.
Design, Supply, Fabricate and Erect of
Lightweight Steel Roof Truss System
comprising of Steel Truss Component
and all Accessories Works
Dig - Cast Construction
Sdn Bhd
2017 RM 885, 800.00
28 CADANGAN PEMBANGUNAN PUSAT PEMPROSESAN
DAN PENGELUARAN PRODUK KENAF DI LOT 1099,
SAUJANA SETIU, MUKIM PANTAI, TERENGGANU
Supply and Install Mild Steel Works
and Trusses, Metal Deck, Metal
Cladding, Skylight, Insulation and
Other Accessories Works
Gold Yang Trading 2017 RM 1, 792, 452.85
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
PROJECT LIST
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
29 CADANGAN MEMBINA DAN MENYIAPKAN 4 UNIT
RUMAH BANGLO 1 TINGKAT (TYPE E) DI ATAS LOT 3047,
3057, 3058 & 3068, 18 UNIT RUMAH BANGLO 1 TINGKAT
(TYPE F) DI ATAS LO 3048 - 3056, 3059 - 3067, MUKIM
SALEHONG UTARA, DAERAH TERBOK, JAJAHAN
TUMPAT, KELANTAN
Supply and Install Lightweight Steel
Truss and Accessories Works
Aplikasi Cekal Sdn Bhd 2017 RM 188, 344.83
30 CADANGAN MEMBINA DAN MENYIAPKAN 20 UNIT
KEDAI PEJABAT 2 TINGKAT DI ATAS LOT PT 7121 - PT
7140, 103 UNIT RUMAH TERES MAMPU MILIK DI ATAS
LOT PT 7014 -PT 7116, 36 UNIT RUMAH SESEBUAH
SETINGKAT DI ATAS LOT PT 6685 - PT 6716 DAN LOT PT
7117 - PT 7120, 48 UNIT RUMAH BERKEMBAR
SETINGKAT DI ATAS LOT PT 6717- PT 6764, 95 UNIT
RUMAH TERES SETINGKAT 'TYPE A' DI ATAS LOT PT 6765
- PT 6859, 154 UNIT RUMAH TERES SETINGKAT ' TYPE B'
DI ATS LOT PT 6860 - PT 7013 SERTA KERJA-KERJA
BERKAITAN DI KAMPUNG BUKIT KELUANG, MUKIM
KELUANG, DAERAH BESUT, TERENGGANU
Supply and Install Light Weight Steel
Truss, Metal Deck, Insulation and
Accessories Works.
Semenanjung Teguh Sdn
Bhd
2017 RM 714, 439.10
31 CADANGAN MEMBINA DAN MENYIAPKAN 17 UNIT
RUMAH TERES 1 TINGKAT DI ATAS LOT PT 8968, PT 9001
AND PT 9002, MUKIM PASIR GANDA, DAERAH KUSIAL,
JAJAHAN TANAH MERAH, KELANTAN
Supply and Install Lightweight Steel
Truss and Accessories Works
Syarikat Sinadua Sdn Bhd 2017 90,815.61RM
32 CADANGAN PEMBANGUNAN PERUMAHAN YANG
MENGANDUNGI FASA 1 10 UNIT RUMAH BERKEMBAR 2
TINGKAT (40' X 80') DI ATAS LOT PT 149966, JALAN
TANJUNG LUMPUR,MUKIM KUANTAN, PAHANG.
Supply and Install Lightweight Steel
Truss, Metal Deck and Accessories
Works
Lee & Yong Aluminium Sdn
Bhd
2017 RM 174, 620.16
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
33 CADANGAN MEMBINA SESEBUAH BANGUNAN
SEMENTARA (WAREHOUSE) 1 TINGKAT BESERTA
MEZZENINE DI ATAS LOT 3224 (GRN 14938) & LOT 3225
(GRN 14939) MUKIM KEMASIK, DAERAH
KEMAMAN,TERENGGANU
Supply and Install C-Purlin Trusses,
Metal Decking, Insulation, Flashing,
Capping and Fascia Board
Foo Sang Construction Sdn
Bhd
2017 RM 149, 257.54
34 CADANGAN MEMBINA DAN MENYIAPKAN 7 UNIT
KEDAI PEJABAT (20' X 70') YANG MENGANDUNGI 2
UNIT KEDAI PEJABAT 2 TINGKAT DI ATAS PT 2424,
SERTA 20 UNIT RUMAH BERKEMBAR SETINGKAT DI
ATAS PT 2431 - PT 2450 MUKIM REPEK, DAERAH
MELAWI, JAJAHAN BACHOK, KELANTAN
Supply and Install Lightweight Steel
Truss, Fascia Board, Party Wall
Capping and Aluminium Foil
First Startegic Construction
Sdn Bhd
2017 RM 167, 706.84
35 CADANGAN MEMBINA DAN MENYIAPKAN 1 BLOK
KONDOMINIUM 23 TINGKAT YANG MENGANDUNGI 152
UNIT KONDOMINIUM JENIS A, 236 UNIT JENIS B, 8 UNIT
DUPLEX PENTHOUSE, 822 UNIT PARKIR KERETA
BERTINGKAT DAN LAIN-LAIN KEMUDAHAN DI ATAS
LOT PT 1446, 10 UNIT KEDAI PEJABAT 4 TINGKAT DI
ATAS LOT PT 1422 - PT 1431, 13 UNIT KEDAI PEJABAT 3
TINGKAT DI ATAS LOT PT 1432 - PT 1444DAN 298 UNIT
PARKIR KERETA, MUKIM KOTA, SEKSYEN 65, DAERAH
KOTA, JAJAHAN KOTA BHARU. KELANTAN.
Supply and Install Lightweight Steel
Truss and Accessories Works
BT Venture Sdn Bhd 2017 RM 127, 369.07
36 CADANGAN MEMBINA & MENYIAPKAN 6 UNIT RUMAH
BERKEMBAR 1 TINGKAT DI ATAS LOT PT 3039 & LOT PT
3040, PT 3041 & PT 3042, PT 3043 & PT 3044 MUKIM
MAHANG EAST (TIMUR) DAERAH KETEREH, JAJAHAN
KOTA BHARU, KELANTAN
Supply and Install Lightweight Steel
Truss and Accessories Works
Haji Ali Homes Sdn Bhd 2017 RM 50, 943.60
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
PROJECT LIST
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
37 CADANGAN MEMBINA DAN MENYIAPKAN 14 UNIT
RUMAH TERES 2 TINGKAT, MUKIM BANDAR GUA
MUSANG, DAERAH GALAS, JAJAHAN GUA MUSANG,
Supply and Install LW Steel Truss,
Metal Deck, Insulation and
Accessories Works
TYTK Construction Sdn Bhd 2017 RM 183, 230.65
38 PEMBINAAN BANGUNAN CANSELORI DAN GUNASAMA
UNIVERSITI MALAYSIA KELANTAN, KAMPUS BACHOK.
Supply and Install Ceiling, Lamp and
Aircond Grill Support
Wrosdee Resources (M)
Sdn Bhd
2017 RM 59, 072.74
39 CADANGAN MEMBINA & MENYIAPKAN 21 UNIT
RUMAH TERES 1 TINGKAT DI ATAS LOT PT 942 - PT 946,
MUKIM GETTING, DAERAH PENGKALAN KUBUR,
JAJAHAN TUMPAT, KELANTAN.
Supply and Install Lightweight Steel
Truss and Accessories Works
BT Venture Sdn Bhd 2017 RM 106, 535.19
40 CADANGAN MEMBINA DAN MENYIAPKAN 16 UNIT
RUMAH TERES 2 TINGKAT DI KG. PAYA PASIR, MUKIM
CHENDERONG BATU, DAERAH WAKAF BHARU,
JAJAHAN TUMPAT, KELANTAN
Supply and Install Lightweight Steel
Truss and Accessories Works
LPT Property Sdn Bhd 2017 RM 74, 507.19
41 CADANGAN MEMBINA DAN MENYIAPKAN 6 UNIT
RUMAH BERKEMBAR 1 TINGKAT DI ATAS LOT PT 3039 &
PT 3040, PT 3041 & PT 3042, PT 3043 & PT 3044 MUKIM
MAHANG EAST (TIMUR) DAERAH KETEREH, JAJAHAN
KOTA BHARU, KELANTAN.
Supply and Install Lightweight Steel
Truss and Accessories Works
Haji Ali Homes Sdn Bhd 2017 50,943.60RM
42 PEMBINAAN BANGUNAN CANSELORI DAN GUNASAMA
UNIVERSITI MALAYSIA KELANTAN, KAMPUS BACHOK.
Supply and Install Ceiling, Lamp and
Aircond Grill Support
Wrosdee Resources (M)
Sdn Bhd
2017 59,072.74RM
43 CADANGAN MEMBINA DAN MENYIAPKAN 10 UNIT
KEDAI PEJABAT 2 TINGKAT DI ATAS LOT 16730 - LOT
16734, PT 8938, LOT 16736 - LOT 16738 DAN PT 8942,
MUKIM JELI TEPI SUNGAI, DAERAH JELI, JAJAHAN JELI,
KELANTAN.
Supply and Install Lightweight Steel
Truss, Metal Deck Astino PU Foam
and Accessories Works
Nas My Construction 2017 142,139.96RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
44 MEMBINA BARU MASJID KG. TEMPINIS, BESUT,
TERENGGANU
Supply and Install Light Weight Truss,
Mild steel, Insulation and Accessories
Works
Warisan Sebati Sdn Bhd 2017 371,000.00RM
45 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
BARU BLOK 8 SERTA KERJA-KERJA BERKAITAN DI
KOMPLEKS KOTA BHARU DARUL NAIM, KELANTAN.
Supply and Install Staircase PWC Bina Sdn Bhd 2017 62,540.00RM
46 CADANGAN MEMBINA DAN MENYIAPKAN 154 UNIT
RUMAH TERES SETINGKAT (TYPE B) DI ATAS LOT PT
6860 - PT 7013 SERTA KERJA-KERJA BERKAITAN DI
KAMPUNG BUKIT KELUANG, MUKIM KELUANG,
DAERAH BESUT, TERENGGANU DARUL IMAN.
Supply and Install Metal Deck PU
Foam
Semenanjung Teguh Sdn
Bhd
2017 87,392.76RM
47 CADANGAN MEMBINA DAN MENYIAPKAN 23 UNIT
RUMAH TERES SETINGKAT DI MUKIM LABOK
MACHANG, KELANTAN
Mild Steel Truss and Metal Deck T & C Construction 2016 RM 102,500.00
48 CADANGAN MEMBINA DAN MENYIAPKAN 2 UNIT
RUMAH BANGLO JENIS A DAN 4 UNIT RUMAH BANGLO
JENIS C UNTUK PAKEJ 3 DAN 4 UNIT RUMAH SEMI-D DI
LADANG TAPIS JELI, KELANTAN
Roof Capping and Wall Capping Kelkon Sdn Bhd 2016 RM 197,600.00
49 CADANGAN MEMBINA DAN MENYIAPKAN 25 UNIT
BANGLO DI MUKIM SURA, DAERAH DUNGUN
TERENGGANU
Light Weight Truss and Roof Tiles Rimba Construction Sdn
Bhd
2016 RM 327,000.00
50 CADANGAN PEMBANGUNAN BANDAR BERSEPADU
MUKIM PASIR PUTIH & PENGKALAN, DAERAH
LIMBONGAN, PASIR PUTIH, KELANTAN
Light Weight Truss and Metal Deck SBJ Binajaya Sdn Bhd 2016 RM 1,390,500.00
51 CADANGAN MENBINA DAN MENYIAPKAN 15 UNIT
RUMAH TERES DI GAJAH MATI TAWANG BACHOK
KELANTAN.
Light Weight Truss and Roof Tiles Kheng Bee Construction
Sdn Bhd
2016 RM 65,600.00
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
PROJECT LIST
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
52 CADANGAN MEMBINA DAN MENYIAPKAN 72 UNIT
RUMAH TERES 2 TINGKAT DI TAMAN KIFAYAH BANDAR
BARU JELI, KELANTAN.
Light Weight Truss and Roof Tiles Robihah Sdn Bhd 2016 RM 405,500.00
53 PEMBANGUNAN BERCAMPUR RUMAH MAMPU MILIK
(RMM) 467 RUMAH TERES KOS SEDERHANA DI TUMPAT
KELANTAN. ( PHASE III ) SPNB TUMPAT
Light Weight Truss and Metal Deck Elite Forte Construction
Sdn Bhd
2016 RM 1,925,400.00
54 CADANGAN MEMBINA DAN MENYIAPKAN KEDAI
PEJABAT 2 TINGKAT DI SEKSYEN 3, BANDAR KOTA
BHARU, KELANTAN.
Light Weight Truss and Metal Deck LPT Construction Sdn Bhd 2016 RM 10,000.00
55 CADANGAN MEMBINA DAN MENYIAPKAN 21 UNIT
RUMAH KEDAI TERES DI PASAIR GENDA KUSIAL TANAH
MERAH, KELANTAN.
Light Weight Truss and Roof Tiles Elite Forte Construction
Sdn Bhd
2016 RM 111,900.00
56 CADANGAN PEMINDAAN DAN TAMBAHAN KE ATAS
BANGUNAN PERUSAHAAN SEDIA ADA DI GONG BADAK
KUALA NERUS TERENGGANU.
Light Weight Truss and Metal Deck Rimba Construction Sdn
Bhd
2016 RM 113,300.00
57 10 UNIT RUMAH BANGLO JENIS A DAN 8 UNIT RUMAH
BANGLO JENIS B TAMAN BINARAYA, MUKIM
GUNTUNG, DAERAH LIMBAT, KOTA BHARU, KELANTAN
Light Weight Truss and Accessories Kelkon Sdn Bhd 2015 186,600.00RM
58 MENGUBAH SUAI DEWAN PERNIAGAAN CINA KOTA
BHARU
Mild Steel Truss and Metal Deck Persatuan 2015 306,000.00RM
59 12 UNIT TERES 3 TINGKAT DI MUKIM, WAKAF BHARU,
KELANTAN
Light Weight Truss and Accessories BT Venture Sdn Bhd 2015 52,300.00RM
60 15 UNIT BANGLO MORAK, KEBAKAT KOTA BHARU Light Weight Truss and Accessories LPT Property Sdn Bhd 2015 96,800.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
61 2 UNIT SEMI - D MUKIM LUBUK PUKUL DAERAH
BANGGU, JAJAHAN KOTA BHARU, KELANTAN
Light Weight Truss and Accessories Juru Ukur Impian 2015 59,100.00RM
62 CADANGAN MEMBINA DAN MENYIAPKAN 22 UNIT
RUMAH BANGLO DI BUKIT MERBAU, KOK LANAS
KELANTAN.
Light Weight Truss and Accessories Tee Jin Sdn Bhd 2015 176,800.00RM
63 CADANGAN MEMBINA DAN MENYIAPKAN 15 UNIT
KEDAI PEJABAT DI MUKIM KELEWEH, DAERAH
PANGKAL MELERET JAJAHAN MACHANG
Light Weight Truss and Roof Tiles Wai Construction 2015 225,000.00RM
64 CADANGAN MEMBINA & MENYIAPKAN 30 UNIT
RUMAH TERES DI MUKIM PASIR GENDA, KUSIAL TANAH
MERAH, KELANTAN.
Light Weight Truss and Roof Tiles APM Construction 2015 540,000.00RM
65 CADANGAN MEROBOH DAN MEMBINA SEMULA 1 UNIT
BANGUNAN PERUSHAAN DI MUKIM KUALA NERUS,
TERENGGANU ( HONDA SHOWROOM & STOR )
Light Weight Truss and Roof Tiles Wen Wah Construction 2015 428,000.00RM
66 CADANGAN MEMBINA DAN MENYIAPKAN 23 UNIT
RUMAH TERES 1 TINGKAT DI MUKIM LABOK MACHANG
( BLOK A, B, C )
Mild Steel Truss and Metal Deck SRI Labok Development
Sdn Bhd
2015 102,500.00RM
67 CADANGAN MEMBINA DAN MENYIAPKAN 10 UNIT
RUMAH BERKEMBAR 2 TINGKAT DI MUKIM KERTIH
KEMAMAN, TERENGGANU.
Light Weight Truss and Accessories Vinrine Leverage Builders 2015 63,400.00RM
68 43 UNIT PASIR PUTIH TAMAN TERATAI ( SBJ ) Light Weight Truss and Roof Tiles Tee Jin Sdn Bhd 2014 559,000.00RM
69 40 UNIT RUMAH MAMPU MILIK DI MUKIM TUMPAT,
DAERAH TUMPAT KELANTAN.
Light Weight Truss and Roof Tiles MJ Utama Sdn Bhd 2014 573,600.00RM
70 2 UNIT SHOP LOT 6 TGKT, 4 TGKAT SHOPLOT 4 TGKT 91
UNIT SHOPLOT 3 TGKT KUALA NERUS, TERENGGANU
MS Steel Truss and Roof Tiles Kheng Bee Construction
Sdn Bhd
2014 307,800.00RM
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
PROJECT LIST
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
71 4 UNIT SHOP LOT 2 TINGKAT DI TAMAN D’ JAH PADANG
LANDAK JERTIH TERENGGANU.
Mild Steel Truss and Metal Deck Persoda Construction Sdn
Bhd
2014 70,000.00RM
72 15 UNIT KEDAI PEJABAT, BANDAR BARU, TUNJUNG
KOTA BHARU, KELANTAN
Mild Steel Truss and Metal Deck Wat Construction 2014 247,500.00RM
73 11 UNIT RUMAH BERKEMBAR 1 TINGKAT SEMAT JAL,
WAKAF BHARU,
Light Weight Truss and Roof Tiles Seri Barat Sdn Bhd 2014 184,800.00RM
74 PELAN PINDAAN CADANGAN MEMBINA &
MENYIAPKAN 54 – UNIT RUMAH TERES, 2 TINGKAT DI
MUKIM MORAK KEBAKAT TUMPAT KELANTAN
Light Weight Truss and Roof Tiles Seri Barat Sdn Bhd 2014 961,200.00RM
75 UBAHSUAI 24 UNIT RUMAH TERES 2 TGKT KEPADA 1
TGKT, MUKIM KENOR DAERAH BATU MENGKEBANG,
KUALA KRAI, KELANTAN
Light Weight Truss and Metal Deck Kuala Krai Construction
Sdn Bhd
2014 412,800.00RM
76 9 UNIT KEDAI DAN PEJABAT 3 TINGKAT MUKIM
TUMPAT, DAERAH TUMPAT KELANTAN
Light Weight Truss and Roof Tiles MJ Utama Sdn Bhd 2014 158,400.00RM
77 8 UNIT RUMAH KEDIAMAN, MUKIM BADAK MATI
DAERAH BANGGU KOTA BHARU, KELANTAN
Mild Steel Truss and Metal Deck BT Venture Sdn Bhd 2014 124,800.00RM
78 22 UNIT TERES 1 TINGKAT DI KUBANG PANJANG,
CHABANG EMPAT TUMPAT, KELANTAN
Light Weight Truss and Metal Deck Mentari Arus Sdn Bhd 2014 407,000.00RM
79 5 UNIT BANGLO MUKIM BAUNG DAERAH PANJI,
JAJAHAN KOTA BHARU KELANTAN
Light Weight Truss and Roof Tiles THI Constrcution 2014 88,000.00RM
80 PERSATUAN HAINAM, KOTA BHARU, KELANTAN. Light Weight Truss and Metal Deck Persatuan 2013 89,000.00RM
81 50 UNIT TERES KEMUMIN, KOTA BHARU, KELANTAN. Concrete Tiles and Roof Tiles Megan Ekuiti Sdn Bhd 2013 119,000.00RM
82 6 UNIT SHOPLOT 3 TING., PASIR PEKAN, WAKAF
BAHRU, KELANTAN
Light Weight Truss and Metal Deck Tee Jin Sdn Bhd 2013 90,000.00RM
83 15 UNIT TERES MUKIM KANGKONG, PASIR MAS,
KELANTAN.
Light Weight Truss and Roof Tiles Mentari Arus Sdn Bhd 2013 435,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
84 8 UNIT SEMI-D & 15 UNIT TERES DAN SHOPLOT
PELAGAT, JERTEH, TERENGGANU.
Light Weight Truss and Roof Tiles SKY Construction Sdn Bhd 2013 644,000.00RM
85 1 UNIT BANGLO, PINTU GENG, KOTA BHARU,
KELANTAN.
Light Weight Truss End User 2013 18,800.00RM
86 4 UNIT RUMAH KEDAI 2 TINGKAT, TAMAN D’JAH,
PADANG LANDAK, JERTEH, TERENGGANU.
Light Weight Truss and Roof Tiles Lim Construction 2013 132,000.00RM
87 APARTMENT 24 TINGKAT, LADANG TOK PELAM, KUALA
TERENGGANU.
Light Weight Truss and Metal Deck Core Steel Sdn Bhd 2013 293,000.00RM
88 RESTORAN KFC PANDU LALU (DRIVE THRU) 1 TINGKAT,
MUKIM BETING, DAERAH PANJI, KOTA BHARU,
KELANTAN.
Light Weight Truss Aplikasi Cekal Sdn Bhd 2013 208,000.00RM
89 16 UNIT BANGLO, TAMAN CAHAYA BINARAYA, MUKIM
PASIR GENDA, JAJAHAN TANAH MERAH, KELANTAN.
Light Weight Truss and Metal Deck LPT Property Sdn Bhd 2013 69,500.00RM
90 1 BLOK APARTMENT 3 TINGKAT DI ATAS KAWASAN
ISTANA MAHKOTA KELANTAN, KUBANG KERIAN, KOTA
BHARU, KELANTAN.
Mild Steel Truss and Metal Deck MJ Utama Sdn Bhd 2013 392,000.00RM
91 9 UNIT RUMAH TERES 1 TINGKAT, SEKSYEN 2, BANDAR
PASIR PUTEH, JAJAHAN PASIR PUTEH, KELANTAN.
Light Weight Truss and Roof Tiles SBJ Binajaya Sdn Bhd 2013 252,000.00RM
92 KEDAI & PEJABAT 3 TINGKAT JENIS 'A' 55 UNIT DI LOT
PT438-492, SEKSYEN 17, MUKIM KAMPUNG SIREH,
PINTU GENG, KOTA BHARU, KELANTAN.
Light Weight Truss and Metal Deck SBJ Binajaya Sdn Bhd 2012 450,000.00RM
93 CADANGAN MEMBINA & MENYIAPKAN 48 UNIT
RUMAH TERES 1 TINGKAT DI LOT PT 594-645, MUKIM
GETTING, PENGKALAN KUBOR, TUMPAT, KELANTAN.
Light Weight Truss BT Venture Sdn Bhd 2012 336,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
94 STB INDUSTRIAL SUPPLIES, CHERANG, KOTA BHARU,
KELANTAN.
MS Steel Truss and Metal Truss STB Industrial 2012 78,000.00RM
95 60 UNIT TERES 1 TINGKAT, TAMAN SRI MESA, PT 2328 -
PT 2387, FASA 2, MUKIM GUAL PERIOK, PASIR MAS,
KELANTAN.
Light Weight Truss and Metal Deck SBJ Binajaya Sdn Bhd 2012 720,000.00RM
96 CADANGAN MEMBINA DAN MENYIAPKAN 52 UNIT
R.TERES 2 TKT DI ATAS LOT PT2485-PT2509, DAN 73
UNIT R.TERES 1 TKT DI ATAS LOT PT2510-PT2582.
DAERAH BATU MENGKEBANG, JAJAHAN KUALA KRAI,
KELANTAN.
Light Weight Truss Promosi Mantap Sdb Bhd 2012 438,000.00RM
97 TERES 15 UNIT, KG. KANGKONG, JALAN TANAH MERAH,
KELANTAN
Light Weight Truss LPT Development Sdn Bhd 2012 112,500.00RM
98 30 UNIT SHOP LOT AT PASIR MAS, JALAN RANTAU
PANJANG, PASIR MAS, KELANTAN.
Light Weight Truss and Metal Deck LPT Property Sdn Bhd 2012 390,000.00RM
99 9 UNIT TERES PASIR PUTEH, SEKSYEN 2, BANDAR PASIR
PUTEH, PASIR PUTEH, KELANTAN.
Light Weight Truss MJ Utama Sdn Bhd 2012 54,000.00RM
100 25 UNIT SHOP LOT AT JALAN RANTAU PANJANG, PASIR
MAS, KELANTAN.
Light Weight Truss and Metal Deck Tee Jin Sdn Bhd 2012 325,000.00RM
101 CADANGAN MEMBINA & MENYIAPKAN 4 UNIT
BANGUNAN KEDAI & PEJABAT 2 TINGKAT DI ATAS LOT
7479-7482 (GM 4187-4190), 15 UNIT RUMAH TERES 1
TINGKAT DI ATAS LOT 7483-7497 (GM 4191-4205), 8
UNIT RUMAH BERKEMBAR 1 TINGKAT DI ATAS LOT
7498-7505 (GM 4206-4213) PELAGAT, BESUT,
TERENGGANU.
Light Weight Truss and Metal Deck Kheng Bee Construction
Sdn Bhd
2012 644,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
102 20 UNIT TERES WAKAF CHE YEH, KOTA BHARU,
KELANTAN.
Light Weight Truss SBJ Binajaya Sdn Bhd 2012 100,000.00RM
103 12 UNIT TERES & 2 UNIT BANGLO, MELOR, KOTA BHARU
KELANTAN.
Light Weight Truss LPT Development Sdn Bhd 2012 78,000.00RM
104 139 UNIT SHOPLOT 2½ TINGKAT, MUKIM KOTA, KOTA
BHARU, KELANTAN.
Light Weight Truss and Metal Deck SBJ Binajaya Sdn Bhd 2012 1,668,000.00RM
105 24 UNIT RUMAH JENIS CLUSTER, BUKIT PUTERI, BESUT,
TERENGGANU.
Light Weight Truss Tee Jin Sdn Bhd 2012 144,000.00RM
106 BANGLO, SEMI-D & RUMAH LINK, WAKAF BHARU,
TUMPAT, KELANTAN.
Light Weight Truss Tee Jin Sdn Bhd 2012 80,000.00RM
PROJECT LIST
COMPLETED PROJECT - LIGHTWEIGHT STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
1 CADANGAN PEMBINAAN SEMULA DAN MENAIKTARAF
SEKOLAH DAIF MENGGUNAKAN KAEDAH
INDUSTRIALISED BUILDING SYSTEM (IBS) DI
SEMENANJUNG MALAYSIA (FASA 1) TAHUN 2018 BAGI
NEGERI KELANTAN. PAKEJ 1 - (PASIR MAS/TANAH
MERAH) - SEKOLAH KEBANGSAAN BUKIT PERAH
Supply and Install Mild Steel and
Roofing Works.
Yusri Maju Sdn Bhd 2018 RM 186,600.00
2 CADANGAN PEMBINAAN SEMULA DAN MENAIKTARAF
SEKOLAH DAIF MENGGUNAKAN KAEDAH
INDUSTRIALISED BUILDING SYSTEM (IBS) DI
SEMENANJUNG MALAYSIA (FASA 1) TAHUN 2018 BAGI
NEGERI KELANTAN. PAKEJ 1 - (PASIR MAS/TANAH
MERAH) - SEKOLAH KEBANGSAAN KEDONDONG
Supply and Install Mild Steel and
Roofing Works.
Yusri Maju Sdn Bhd 2018 RM 51,200.00
3 CADANGAN MEMBINA DAN MENYIAPKAN
BANGUNAN BARU BLOK 8 SERTA KERJA-KERJA
BERKAITAN DI KOMPLEKS KOTA DARUL NAIM, KOTA
Supply and Install of Mild Steel Roof
Trusses, Roof Insulation and Others
Works
PWC Bina Sdn Bhd 2018 RM 311,979.40
4 CADANGAN PEMBANGUNAN PUSAT PEMPROSESAN
DAN PENGELUARAN PRODUK KENAF DI LOT 1099,
Supply and Install Mild Steel Works
and Trusses, Metal Deck, Metal
Cladding, Skylight, Insulation
Gold Yang Trading 2018 RM 1,792,452.00
5 PEMULIHAN & PENINGKATAN KEM TENTERA DARAT DI
KEM BATALION KE-2, REJIMEN SEMPADAN, BATU
MELINTANG, JELI, KELANTAN. - PINTU GERBANG &
STESEN PAM MINYAK -
Supply and Install MS Steel Truss,
Metal Roofing and All Accessories
Works
Mansashi Sdn Bhd 2017 RM 179,253.00
6 PEMULIHAN & PENINGKATAN KEM TENTERA DARAT DI
KEM BATALION KE-2, REJIMEN SEMPADAN, BATU
MELINTANG, JELI, KELANTAN.
Supply and Install Mild Steel Truss,
Metal Deck, Insulation, Fascia Board
and Hip Capping
Mansashi Sdn Bhd 2017 RM 285,856.00
PROJECT LIST
COMPLETED PROJECT - MILD STEEL TRUSS (GOVERNMENT SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
7 BINA BARU DEWAN ORANG RAMAI DAN KERJA-KERJA
BERKAITAN DI POS BROOKE, LOJING, GUA MUSANG,
KELANTAN
Supply and Install Mild Steel Truss,
Roofing, Insulation and all
Accessories Works
HN Makmur Trading 2017 RM 168,610.00
8 PEMBINAAN DEWAN TERBUKA UNIVERSITI MALAYSIA
KELANTAN, KAMPUS JELI.
Supply and Install Frame, Mild Steel
Truss, Lightweight Truss, Concrete
Tile and Assecories
Sinarzaria Enterprise 2017 RM 3,133,630.16
9 CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH
PUSAT KEGIATAN IBU TUNGGAL NEGERI TERENGGANU
(YAYASAN PEMBANGUNAN KELUARGA TERENGGANU)
DI CHENDERING, KUALA TERENGGANU.
Supply and Install Mild Steel Truss,
Metal Decking, Flashing, Capping and
Fascia Board
CYS Marketing Sdn Bhd 2017 RM 256,503.06
10 SAUJANA SETIU, MUKIM PANTAI TERENGGANU. Mild Steel Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2015 - 2016 RM 2,179,300.00
11 CADANGAN MEMBINA 1 BLOK BANGUNAN SEKOLAH
(GANTIAN 8BD) DAN LAIN-LAIN KERJA YANG
BERKAITAN DI SJK (C) CHONG HWA, MARANG,
TERENGGANU.
Supply, MS Truss, Double Sided
Aluminium Foil and 12" x 12mm
Fascia Board
Naa Dengir 2015 RM 99,940.65
12 3 BLOK BANGUNAN KEDAI & PEJABAT 3 TINGKAT
BANDAR KOTA BHARU, KELANTAN UNTUK DIJADIKAN
KAMPUS KOLEJ POLY – TECH MARA ( KPTM )
Mild Steel Truss and Metal Deck Kementerian Pelajaran
Malaysia (KPM)
2014 - 2015 370,000.00RM
COMPLETED PROJECT - MILD STEEL TRUSS (GOVERNMENT SECTOR)
PROJECT LIST
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
13 CADANGAN MEMBINA DAN MENYIAPKAN PROJEK
SEBUAH MAKMAL DIAGNOSTIK BERSEPADU, BESUT
TERENGGANU
Mild Steel Truss and Roof Tile Jabatan Kerja Raya (JKR) 2014 RM 564,000.00
14 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
PLAZA TOL, BANGUNAN PENTADBIR DAN BANGUNAN
PENYELENGGARAAN DI PERSIMPANGAN BERTINGKAT
KIJAL DI LEBUHRAYA PANTAI TIMUR FASA 2
Mild Steel Truss and Metal Deck Jabatan Kerja Raya (JKR) 2014 RM 1,138,600.00
15 CADANGAN MEMBINA DAN MENYIAPKAN KOMPLEKS
PLAZA TOL DI PERSIMPANGAN BERTINGKAT CHUKAI
TERENGGANU
Mild Steel Truss and Metal Deck Jabatan Kerja Raya (JKR) 2013 - 2014 RM 290,500.00
PROJECT LIST
COMPLETED PROJECT - MILD STEEL TRUSS (GOVERNMENT SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
1 CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH
KOMPLEKS MEMBELI BELAH ( AEON MALL SHOPPING
CENTRE ) 4 TINGKAT DI BANDAR KOTA BHARU,
JAJAHAN KOTA BHARU, KELANTAN.
Mild Steel Truss and Metal Deck GNP Construction Sdn Bhd 2015 - 2016 RM 1,079,200.00
2 CADANGAN MEROBOH DAN MEMBINA SEMULA 1 UNIT
BANGUNAN PERUSAHAAN DI ATAS LOT 28166 (PN
6373) MUKIM KUALA NERUS, DAERAH KUALA
TERENGGANU (HONDA SHOWROOM & STORE)
Supply and Install Mild Steel Truss Weng Wah Construction
Co. Sdn. Bhd.
2015 RM 190,000.00
3 MENYIAPKAN 1 BLOK PANGSAPURI MAMPU MILIK 4
TINGKAT 72 UNIT DI KG TOK SABOH KUALA BESUT,
TERENGGANU.
Mild Steel Truss and Metal Deck Rimba Construction Sdn
Bhd
2014 - 2015 RM 428,400.00
4 CADANGAN MEMBINA & MENYIAPKAN UNIT KFC, GUA
MUSANG, KELANTAN
Mild Steel Truss and Metal Deck PMA Vision Construction
Sdn Bhd
2013 - 2014 RM 180,000.00
5 CADANGAN MEMBINA DAN MENYIAPKAN 1 UNIT
STORE DAN CAR PORCH, DI GUA MUSANG, KELANTAN.
Mild Steel Truss and Metal Deck True Impression Sdn Bhd 2014 RM 122,000.00
6 CADANGAN MEMBINA & MENYIAPKAN 1 UNIT SPORT
CENTER 3 TINGKAT DI ATAS LOT PT 1440, KAWASAN
PERINDUSTRIAN PENGKALAN CHEPA II, SEKSYEN 39,
MUKIM KEMUMIN, JAJAHAN KOTA BHARU, KELANTAN.
(SHAPE UP SPORT COMPLEX)
Mild Steel Truss and Metal Deck Nusaco Sdn Bhd 2013 RM 2,850,000.00
PROJECT LIST
COMPLETED PROJECT - MILD STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
7 CADANGAN MEMBINA & MENYIAPKAN 1 UNIT KILANG
DI ATAS LOT 4258, SEKSYEN 44, KAWASAN
PERINDUSTRIAN PENGKALAN CHEPA II, MUKIM
PANCHOR, DAERAH KEMUMIN, JAJAHAN KOTA BHARU,
KELANTAN.
Mild Steel Truss and Metal Deck Lai Huat Sdn Bhd 2011 RM 3,850,000.00
8 CADANGAN MEROBOH DAN MEMBINA SEMULA
KILANG SARUNG TANGAN DI ATAS LOT PLO 9 & PLO 18,
JALAN MERSING, KAWASAN PERINDUSTRIAN KLUANG,
MUKIM KLUANG, DAERAH KLUANG, JOHOR.
Mild Steel Truss and Metal Deck Nusaco Sdn Bhd 2011 RM11,550,000.00
9 CADANGAN MEMBINA & MENYIAPKAN 1 UNIT
TAMBAHAN KILANG (BLOK O) SARUNG TANGAN DII
ATAS LOT PT 4093, KAWASAN PERINDUSTRIAN
PENGKALAN CHEPA II (FTZ), MUKIM PANCHOR,
DAERAH KEMUMIN, KOTA BHARU, KELANTAN.
Mild Steel Truss and Metal Deck Lai Huat Sdn Bhd 2010 RM 8,600,000.00
PROJECT LIST
COMPLETED PROJECT - MILD STEEL TRUSS (PRIVATE SECTOR)
Item Project Title Scope of Works Client Completed
Date
Contract Value
(RM)
1 CADANGAN MEMBINA DAN MENYIAPKAN 1 UNIT
RUMAH KEDIAMAN 2 TINGKAT DI ATAS LOT 14086
MUKIM KETIL DAERAH GALAS JAJAHAN KUALA KRAI,
KELANTAN.
Supply and Install Light Weight Steel
Truss, Metal Deck, Insulation, Strip
Ceiling, Aluminium Composite Panel
and Accessories Works
Sebastian Concept 2019 RM 71,141.55
2 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
KOMPLEKS PENTADBIRAN MAJLIS BANDARAYA KUALA
TERENGGANU BERSERTA KEMUDAHAN-KEMUDAHAN
LAIN DI SOUTHERN BREAKWATER, KUALA
TERENGGANU, TERENGGANU DARUL IMAN.
Supply and Install Handrailing &
Spiral Staircase Works.
Excel Engineering &
Construction Sdn Bhd
2019 RM 501,193.00
3 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
KOMPLEKS PENTADBIRAN MAJLIS BANDARAYA KUALA
TERENGGANU BERSERTA KEMUDAHAN-KEMUDAHAN
LAIN DI SOUTHERN BREAKWATER, KUALA
TERENGGANU, TERENGGANU DARUL IMAN.
Supply and Install Corner Guard Excel Engineering &
Construction Sdn Bhd
2019 RM 79,950.00
4 CADANGAN MEMBINA DAN MENYIAPKAN 1 UNIT
RUMAH KEDIAMAN 2 TINGKAT DI PT 2696 BATU
MENGKEBANG, KUALA KRAI, KELANTAN DARUL NAIM
Supply and Install Light Weight Steel
Truss, Metal Deck, Insulation, Strip
Ceiling, Aluminium Composite Panel
and Accessories Works
Sebastian Concept 2018 RM 73,993.00
5 PEMBINAAN BANGUNAN CANSELORI DAN GUNASAMA
UNIVERSITI MALAYSIA KELANTAN, KAMPUS BACHOK.
Supply and Install Ceiling, Lamp and
Aircond Grill Support
Wrosdee Resources (M)
Sdn Bhd
2018 RM 68,716.00
6 CADANGAN MEMBINA DAN MENYIAPKAN
BANGUNAN BARU BLOK 8 SERTA KERJA-KERJA
BERKAITAN DI KOMPLEKS
Supply and Install Buah Butong PWC Bina Sdn Bhd 2016 RM 120,000.00
PROJECT LIST
COMPLETED PROJECT - MISSCELLANEOUS