Pengenalan Kepada Syarat – Syarat Kontrak PWD Facilities Management & Maintenance Form (2016) Bahagian Perundingan Pengurusan Aset Cawangan Perancangan Aset Bersepadu Ibu Pejabat JKR Malaysia

Upload: donhi

Post on 22-Feb-2018

1.765 views

Category:

Documents


223 download

TRANSCRIPT

Page 1: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

Pengenalan Kepada Syarat

– Syarat Kontrak PWD

Facilities Management &

Maintenance Form (2016)

Bahagian Perundingan Pengurusan AsetCawangan Perancangan Aset Bersepadu

Ibu Pejabat JKR Malaysia

Page 2: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

KANDUNGAN PEMBENTANGAN

PENGENALAN KONTRAK FMM

- Latarbelakang

- Skop Perkhidmatan / kerja FMM

- Halatuju

SYARAT-SYARAT KONTRAK PWD FMM (2016)

- Arahan KPKR Bil 23/2016 & Bil 15/2017

- Terma-terma Utama PWD FMM 2016

- Addenda kepada PWD FMM (2016)

RUMUSAN

Page 3: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

Latarbelakang kontrak FMM

JKR telah melaksanakan 53 kontrak FMM bernilai RM2.6 billion bagi

tempoh 2009 sehingga 2016 .

Kaedah perolehan dibuat secara tender terbuka dan rundingan

terus menggunakan Syarat-Syarat Kontrak FM 2008.

Skop perolehan FMM mengabungkan bidang kerja dengan

bidang perkhidmatan .

Tender adalah dipelawa kepada Kontraktor yang berdaftar

dengan CIDB di bawah kategori B(Bangunan) CE (Kejuruteraan)

dan ME (Mekanikal &Elektrikal)

Page 4: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

Skop Am Perkhidmatan /kerja FMM

Perkhidmatan PengurusanFasiliti

Perkhidmatan Operasidan PenyenggaraanFasiliti

Perkhidmatan Penjagaan Fasiliti

Perkhidmatan Nasihatdan Perakuan Teknikal

•i.e Quality Management, Human Resources Management, Utility Management, Transition Management , Event Management

• i.e Mechanical Services, Electrical Services , Sivil, Struktur Senibina dan Lanskap

•Cleaning & Housekeeping dan Kawalan Serangga Perosak. Keselamatan , Parkir kereta

•Menyediakan laporan analisisteknikal dan cadangan pembaikan

Page 5: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

HALATUJU KONTRAK FMM

JKR melalui surat KPKR bertarikh 14 November 2016 telah mengemukakan

Cadangan Hala Tuju Dasar perolehan kontrak Pengurusan Fasiliti dan

Penyenggaraan (FMM) dalam projek Kerajaan .

Cadangan kategori perolehan FMM sebagai perolehan kerja

Kaedah perolehan FMM – dimana 3 kaedah perolehan telah

dicadangkan oleh JKR mengikut skop kerja .

Model 1 Skop bidang kerja dan bidang perkhidmatan hendaklah ditender berasingan dan

ditawarkan kepada Kontraktor berdaftar dibawah bidang berkaitan

Model 2 Skop bidang kerja dan perkhidmatan dibuat secara WPS ditender bersama dan

ditawarkan kepada Kontraktor fasiliti dan kontraktor berdaftar dengan

Kementerian Kewangan.

Model 3 Skop bidang kerja dan perkhidmatan ditawarkan kepada kontraktor Fasiliti yang

berdaftar dengan CIDB dan Kontraktor melantik sub kontraktor tempatan yang

berdaftar dengan Kementerian Kewangan bagi bidang perkhidmatan.

Page 6: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

HALA TUJU KONTRAK FMMSURAT KEM. KEWANGAN BERTARIKH: 9 DISEMBER 2016

• Meluluskan kategori perolehan Pengurusan Fasiliti

sebagai perolehan Kerja

• Meluluskan senarai skop kerja FMM merangkumi 12

skop pengurusan tidak termasuk ‘Security

management’,Car parking management dan Event

Management.

• Meluluskan kaedah perolehan FMM mengikut Model 2

yang ditawarkan kepada kontraktor fasiliti manakala

bidang perkhidmatan `custodial’ hendaklah dibuat

secara Wang Peruntukan Sementara dan ditawarkan

kepada kontraktor yang berdaftar dibawah

Kementerian Kewangan.

Page 7: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

SKOP KERJA KONTRAK FMM

LAMPIRAN SKOP FMM

Page 8: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

HALA TUJU KONTRAK FMMSURAT KEM. KEWANGAN BERTARIKH: 6 Februari 2017

1 Perolehan peralatan melalui kontrak

adalah tidak dibenarkan.

2 Membenarkan penggunaan WJP

apabila kontraktor gagal

mengemukakan Bank Gerenti sebagai

Jaminan Perlaksanaan kepada

Kerajaan.

Page 9: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

Kategori Dan Pengkhususan Kontraktor FMM

KATEGORI PENGKHUSUSAN

F F01

Fasiliti

Fasiliti Bangunan dan Infrastruktur Am

(Aktiviti Pengurusan Fasiliti dan penyenggaraan

Bangunan/infrastruktur secara bersepadu yang meliputi

perkhidmatan kejuruteraan dan perkhidmatan yangs berkaitan

dengan keperluan pengguna

F02

Fasilti Bangunan Penjagaan Kesihatan

(Aktiviti Pengurusan Fasiliti dan penyenggaraan

Bangunan/infrastruktur secara bersepadu yang meliputi

perkhidmatan kejuruteraan biomedical dan perkhidmatan yang

berkaitan dengan keperluan pengguna

Page 10: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

SURAT ARAHAN KPKR

Page 11: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

SURAT ARAHAN KPKR

Page 12: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

COC FMM 2016

1. kelulusan dokumen daripada

AGC diperolehi pada 19 Oktober

2016.

2. COC FMM ini khusus untuk premis

Kerajaan bagi tempoh kontrak

tidak melebihi 5 tahun

Page 13: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

TABLE OF CONTENTS

Page 14: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

TABLE OF CONTENTS Cont’d

Page 15: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

APPENDIX 1 FORM OF TENDER

APPENDIX 2 LETTER OF ACCEPTANCE OF TENDER

APPENDIX 3 SUMMARY OF TENDER

APPENDIX 4 SCHEDULE OF PRICE

APPENDIX 5 APPENDIX TO THE CONDITIONS OF CONTRACT

APPENDIX 6 TREASURY’S INSTRUCTIONS

APPENDIX 7 GOVERNMENT’S REQUIREMENT

APPENDIX 7A FMM TECHNICAL SPECIFICATIONS

APPENDIX 7B PERFORMANCE REQUIREMENT

APPENDIX 8 SITE INFORMATION AND ASSET INVENTORIES

APPENDIX 9 FORM OF GUARANTEE FOR PERFORMANCE BOND

APPENDIX 10 SCOPE OF FMM SERVICES

LIST OF APPENDICES TO FORM OF CONTRACT

Page 16: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 1. DEFINITIONS AND

INTERPRETATION

Commencement Date

- Means the date of the commencement of the FMM Services as

provided in Clause 2.1

Contract Period

- Means the period referred to in Clause 2.1

Existing Management Information System

- Means a management information system already in existence as at

the Commencement Date to store

- And process information in all aspect of management, operation and

maintenance activities

Page 17: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 1. DEFINITIONS AND

INTERPRETATION Facility Manager:

- Person appointed by the Contractor pursuant to Clause 12

Facility Superintending Officer or FSO:

- ……………… and his successors in office as appointed by the

Government under Clause 23 to act on behalf of the Government for

matters stipulated in this Contract

FSO’s Representative:

- Person appointed by the FSO pursuant to Clause 24 to perform any of

the duties and exercise any of the right of the FSO

Page 18: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 1. DEFINITIONS AND

INTERPRETATION

Management Information System:

- System developed by the Contractor to store and process

information on all aspects of management, operation and maintenance

activities as specified in the FMM Technical Specification in Appendix 7A

Performance Requirement

- The standard performance of the FMM Services required to be

performed by the Contractor as specified in Appendix 7B

Page 19: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 2. CONTRACTPERIOD2.1 Contract Period

This Contract shall be for a period of …. years (hereinafter referred to as the“Contract Period”) commencing from …………….[insert date ofcommencement] (hereinafter referred to as the “Commencement Date”)and shall expire on………………[insert date of expiry] (hereinafter referred toas the “Contract Expiry Date”) unless terminated in accordance with theterms and conditions provided in this Contract.

2.2 Consequences of Expiry of Contract Period

Upon expiry of the Contract Period –

(a) The Contractor shall –

(i) cease to carry out all FMM Services;

(ii) at no cost to the Government, vacate the Site and remove all theContractor's equipment within fourteen (14) days from the Contract ExpiryDate, failing which the Government may (but without being responsible forany loss or damage) remove and sell any such equipment, holding theproceeds, less all costs incurred, to the credit of the Contractor, employees,agents and sub-Contractors from the Site;

(iii) co-operate with the Government to ensure a smooth transition of theFMM Services to the Government or any third party engaged by theGovernment;

iv) return to the Government any machinery, equipment, appliance,material, article, process, tool, record, document, manual, data and/orsoftware application in the Contractor's possession that belong to theGovernment;

v) hand over to the Government the Existing Management InformationSystem or the Management Information System together with its data inrelation to the FMM Services under this Contract in good and workingcondition; and

vi) at no cost to the Government, hand over to the Government all plans,designs, specifications and other relevant documents relating to the FMMServices.

(b) the Government shall pay to the Contractor all monies due andpayable as at the Contract Expiry Date PROVIDED THAT the Governmentshall be entitled to deduct any sum due to the Government from theContractor pursuant to the provisions of this Contract.

PENERANGAN

1. Tempoh kontrak hendaklahdinyatakan dalam Tahun

2. Kontrak bermula dari Tarikh Mula(Commencement Date)………………… hingga TarikhAkhir (Expiry Date)………………… yang dinyatakandalam kontrak.

3. Peraturan sebelum kontraktamat DIMANA kontraktorhendaklah diantaranya :

Mengosongkan tapak denganmengeluarkan semua peralatandan jentera dalam masa 14 haridari tarikh tamat kontrak (Expirydate).

Bekerjasama dengan Kerajaanbagi memastikan pengurusanperalihan operasi danpenyenggaraan berjalan lancarkepada pihak ketiga yangdilantik/ kontraktor baharu.

Page 20: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 5. TERMS OFPAYMENT

5.1 The Parties agree that the payment for theFMM Services shall be on a monthly basis andshall be based on the FMM Services done andproperly performed and executed by theContractor.

5.2 For the purpose of payment in Clause 5.1,the Contractor shall submit to the FSO, at suchtimes and in such form as the FSO mayprescribe, a written application for the FMMServices monthly payments. The application forpayment shall be accompanied by documentsevidencing the following:

a) the value of FMM Services properlyexecuted for that particular month basedon the Schedule of Price as specified inAppendix 4;

b) the amount of any valuation of variations asinstructed by the FSO under Clause 29.1 (ifany);

c) the amount in regards to the expenditure ofProvisional Sum executed or expended;

d) the reports required by the FSO pursuant toClause 11.2 and particularly as described inAppendix 7A, which shall include theamount of ascertained performancededuction in accordance with thecalculation specified in the PerformanceRequirement in Appendix 7B (if any); and

PENERANGAN

1. Kaedah Bayaran dibuat secara bulanan (Monthly

Basis) berasaskan skop kerja yang telah dilaksana

dengan sempurna bagi bulan tersebut dan mencapai

KPI yang telah ditetapkan.

Bayaran juga termasuk V.O (jika ada)dan

perbelanjaan Provisional Sum yang dilaksana

dibawah skop kontrak.

2. Dokumen sokongan kepada bayaran spt.

- Laporan yang perlu disediakan seperti yang

dinyatakan di dalam FMM Technical Specifications

(Appendix 7A).

- Lukisan (jika ada)

Work

done

kpi

Page 21: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 6. PERFORMANCE

BOND

6.1 The Contractor shall, prior to the

Commencement Date, provide to the Government

an irrevocable Performance Bond issued or to be

issued in favour of the Government by an approved

licensed bank or financial institution incorporated in

Malaysia for a sum equivalent to five percent (5%)

of the Contract Sum amounting to Ringgit

……………………. (RM ………..) to secure the due

performance of the Contractor’s obligations under

this Contract.

6.2 The Performance Bond shall remain valid and

effective until twelve (12) months after the expiry of

the Contract Period.

PENERANGAN

1. Nilai Bon Perlaksanaan adalah 5%

daripada harga kontrak dalam bentuk

Bank atau Insuran Gerenti dari Institusi

Kewangan yang diluluskan oleh

Kerajaan.

2. PB hendaklah sahlaku sehingga 12

bulan selepas Tarikh tamat kontrak .

3. Addendum kepada PB dimana Kem

Kewangan telah membenarkan

penggunaan WJP . JKR melalui

Arahan KPKR bil 15/2017 bertarikh 7Jun

2017 telah mengeluarkan Addendum

no.1 kepada Syarat-syarat kontrak

FMM 2016

Page 22: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

Sepanjang tempoh kontrak kontraktor hendaklah:

a) Menjalankan kerja Pengurusan fasiliti &

penyenggaraan mengikut terma dan syarat-syarat

kontrak yang dijelaskan dalam scope of Fmm

Services (appendix 10).

b) Menunaikan tanggungjwab seperti dinyatakan di

dalam Facilities Management Plan (FMP).

c) Melaksanakan Pengurusan Fasiliti dan

Penyenggaraan dengan teratur dan menepati ‘best

practice’ yang memberi keuntungan kepada pihak

Kerajaan di dalam menjaga kepentingan Kerajaan.

CLAUSE 7.OBLIGATIONS OF THECONTRACTOR

During the Contract Period, the Contractorshall—

a) carry out the FMM Services inaccordance with the terms andconditions of this Contract andparticularly as described in the Scope ofFMM Services in Appendix 10;

b) carry out its obligations as specified in thefacilities management plan (hereinafterreferred to as “FMP”);

c) perform the FMM Services in a propermanner and in accordance with the bestmanagement and industry practices andto the best advantage of theGovernment in order to protect theinterest of the Government;

d) at all times perform its obligations underthis Contract in such manner as willalways safeguard and protect theGovernment’s interest and take allnecessary and proper steps to preventabuse of the Site and in accordance withthe provisions of this Contract;

Page 23: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

1. Dalam masa 14 hari dari Tarikh Mula kontrak

Kontraktor hendaklah menyerahkan FMP mengikut

format yang ditentukan kepada FSO /Wakil FSO

2. FSO/Wakil FSO dalam tempoh 14 / 28 hari, dari

tarikh serahan FMP oleh kontraktor hendaklah

a)Menolak secara bertulis.

b)Menerima secara bertulis dengan pindaan/tanpa

pindaan.

c)Memohon maklumat tambahan berkaitan FMP.

CLAUSE 9. FACILITIESMANAGEMENT PLAN

9.1 Within fourteen (14) days from theCommencement Date, the Contractor shallsubmit its FMP in the form and manner asspecified in the FMM Technical Specificationsin Appendix 7A to the FSO or FSORepresentative.

9.2 The FSO or FSO’s Representative shallwithin [fourteen (14) / twenty-eight (28)] daysafter the receipt of the FMP—

a) reject the FMP in writing;

b) accept the FMP in writing with or withoutmodification; and/or

c) request the Contractor to supply furtherinformation to clarify or substantiate theprogramme specified in the FMP or tosatisfy the FSO or FSO’s Representative asto its reasonableness having regard to theContractor’s obligations under theContract,

PROVIDED THAT if none of the actions inClause 9.2(a), 9.2(b), and/or 9.2(c) is takenwithin the period of fourteen (14) days fromthe date of receipt of the FMP, the FSO orFSO’s Representative shall be deemed tohave accepted the FMP as submitted.

Page 24: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 11. PERFORMANCE REQUIREMENT

11.1 Level of performance

The Contractor shall perform the FMM Services according to the

terms and conditions of this Contract and comply with the

standards specified by the Government in the Performance

Requirement in Appendix 7B.

11.2 Submission of reports

The Contractor shall prepare and submit the reports as specified in

the FMM Technical Specifications in Appendix 7A in accordance

with the time period specified therein for purposes of FSO’s records

and/or information and valuation of the Contractor’s performance

which shall also form the basis of the calculation for ascertained

performance deduction under Clause 11.3.

The Contractor shall submit such reports under Clause 11.2.1 for the

FMM Services monthly payments which the Contractor shall be

entitled to pursuant to Clause 5. The Parties agree that in the event

the Contractor fails to submit such reports, the FSO shall make the

valuation of the FMM Services based on available documents

submitted to him for the purpose of issuance of interim payment

certificate.

11.3 Ascertained Performance Deduction

The Parties agree that the Government shall have the right to

deduct a sum calculated in accordance with the formula specified

in the Performance Requirement in Appendix 7B in the form of

ascertained performance deduction in the event that the

performance of the FMM Services fails to meet the key

performance indicator as specified in the Performance

Requirement in Appendix 7B. The Contractor hereby agrees that

the Government shall have the right to deduct the ascertained

performance deduction from any monies due or becoming due to

the Contractor under this Contract and failing which such

deductions shall be recovered from the Performance Bond or as a

debt due from the Contractor.

1. Kontraktor hendaklah melaksanakan FMM services

mengikut terma Kontrak dan menepati piawai

yang ditetapkan oleh Kerajaan di dalam

Performance Requirement (Appendix 7B).

2. Laporan hendaklah dikemukakan mengikut

kekerapan sebagaimana ditentukan dalam

Technical Specification (Appendix 7A).

3. Potongan bayaran akan dibuat bagi FMM services

yang tidak mencapai KPI mengikut formula yang

ditetapkan (Appendix 7B)

Page 25: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 12. FACILITY

MANAGER

12.1 The Contractor shall appoint a Facility Manager to

manage the FMM Services on Site and to liaise with the

FSO whenever necessary. The Facility Manager shall

have the following criteria:

(a) competent, efficient, suitably qualified and

experienced in the relevant industry;

(b) of good character; and

(c) able to communicate and receive instructions in

Bahasa Malaysia and English.

12.2 The Contractor shall ensure that the Facility

Manager appointed pursuant to Clause 12.1 shall be at

the Site at all times. If the Government is of the view

that the Facility Manager appointed by the Contractor

does not fulfil the criteria as specified in Clause 12.1,

upon written notification from the Government, the

Contractor shall provide an immediate replacement of

the Facility Manager and all wages and other expenses

in connection with the employment of such

replacement shall be borne by the Contractor. Any

directions, explanations or instructions given to such

Facility Manager by the FSO shall be deemed to have

been given to the Contractor.

PENERANGAN

1. Kontraktor hendaklah melantik Facility Manager (FM) untuk

mengurus FMM Services di tapak dan berurusan dengan

FSO . Facility Manager yang dilantik hendaklah

mempunyai kriteria spt berikut;

a)Kompeten, cekap, berkelayakan dan berpengalaman.

b) Karakter yang baik.

c) Mampu berkomunikasi dan menerima arahan di dalam

Bahasa Melayu dan Inggeris.

Sekiranya Kerajaan mendapati FM yang dilantik tidak

memenuhi ciri-ciri diatas maka Kerajaan berhak memohon

Kontraktor menggantikannya.

3. Facility Manager (FM) yang dilantik hendaklah sentiasa

berada di tapak sepanjang tempoh kontrak.

Page 26: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 13. EMPLOYMENT

OF WORKMEN 13.1 The Contractor shall provide workmen of skilled,

qualified, experienced and competent in the industry

in carrying out the FMM Services.

13.2 The Contractor shall employ only Malaysian

citizens as its workmen and they shall possess the

basic qualifications and relevant experience as

specified in the FMM Technical Specifications in

Appendix 7A.

CLAUSE 14. COMPLIANCE WITH

THE EMPLOYMENT ACT 1955, ETC

PENERANGAN

1. Kontraktor hendaklah menyediakan pekerja mahir,

berkelayakan dan kompeten di dalam industry

bagi melaksanakan FMM Services.

2. Penggajian pekerja hendaklah dikalangan warga

negara Malaysia yang mempunyai kelayakan asas

dan pengalaman berkaitan.

3. Kontraktor hendaklah mematuhi akta penggajian

yang ditetapkan oleh Kerajaan iaitu Employment

Act 1955 [Act 265], Employment (Restriction) Act

1968 [Act 353], National Wages Consultative

Council Act 2011 [Act 732] dan lain-lain undang-

undang yang ditetapkan.

Page 27: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 18. INSURANCE FOR FMM SERVICES

18.1 Taking of Insurance

18.1.1 The Contractor shall take out and maintain, in the joint

names of the Government and the Contractor, insure

against loss and damage by fire, lightning, explosion, storm

tempest, flood, ground subsidence, bursting or overflowing of

water tanks, apparatus or pipes, aircraft and other aerial

devices or articles dropped therefrom, riot and civil

commotion, burglary, vandalism, professional indemnity, all

work executed and all unfixed materials and goods,

delivered to, placed on or adjacent to the FMM Services…

CLAUSE 19. INSURANCE AGAINST PERSONAL INJURIES AND DAMAGE TO PROPERTY19.1 Taking of Insurance

19.1.1 Without prejudice to its liability to indemnify the Government under Clause 15, the Contractor shall, as a condition precedent to the commencement of any work under this Contract, effect and maintain the insurance policy against personal injuries and damage to property whether with or without an excess amount as specified in the Appendix to the Conditions of Contract in Appendix 5 as are necessary to cover the liability of the Contractor and all sub-contractors, whether nominated or otherwise.

PENERANGAN

1. Kontraktor hendaklah mengambil insuran FMM Services bagi

melindungi kerugian dan kerosakan yang dinyatakan di

dalam kontrak .

2. Nilai insurans adalah nilai kontrak seperti dinyatakan di

dalam Appendix 5.

3. Tempoh liputan insurans FMM services hendaklah meliputi

tempoh kontrak iaitu dari Tarikh Mula sehingga Tarikh Tamat

Kontrak (Expiry Date).

4. Insurans kemalangan diri dan kerosakan harta, tanggungan

hendaklah meliputi kontraktor dan sub kontraktor

(nominated atau selainnya) .

5. Tempoh liputan insuran adalah bermula dari tarikh mula

operasi dan penyenggaraan (Tarikh Milik Tapak) hingga

tamat kontrak.

Page 28: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 22. MANAGEMENT

INFORMATION SYSTEM

22.1 Contractor’s Obligation

22.1.1 The Contractor shall, within three (3)months from the Commencement Date,develop, procure, manage and maintain theManagement Information System which shall becompatible with and able to integrate with theGovernment’s asset management informationsystem.

22.1.2 If there is an Existing ManagementInformation System, the Contractor shallmanage, maintain, amend, upgrade andupdate the Existing Management InformationSystem accordingly.

22.1.3 The Contractor shall integrate theManagement Information System or the ExistingManagement Information System with theGovernment’s asset management system at itsown cost and expense.

1. Tanggungjawab Kontraktor dalam masa 3 bulan

dari Tarikh Mula hendaklah membangun,

memperoleh, mengurus dan menyenggara MIS bagi

membolehkan operasi dan penyenggaraan dapat

dilaksanakan dengan lancar. MIS yang dibangun

hendaklah boleh berintegrasi dengan sistem

maklumat aset Kerajaan yang ada.

2. Sekiranya kontrak telah mempunyai MIS `sediada’

Kontraktor hendaklah mengurus, mengemaskini dan

meminda secara teratur.

Page 29: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 23. FACILITY

SUPERINTENDING OFFICER

23.1 Appointment of FSO

The Government shall appoint a

FSO to act on behalf of the

Government for matters stipulated

in Clause 23.5 of this Contract.

CLAUSE 24. FSO’S REPRESENTATIVE

24.1 The FSO may from time to time

appoint such number of FSO’s

Representative as he deems fit and

may change the FSO’s

Representative by giving the

Contractor notice in writing of such

change.

PENERANGAN

1. Kerajaan hendaklah melantik FSO untuk

bertindak bagi perkara di bawah klausa 23.5

(FSO’s duties).

2. FSO adalah agen kepada Kerajaan dan

bertanggungjawab mengawasi serta

mengarah kerja bagi pelaksanaan serta

penyiapan sesuatu kerja tersebut.

3. FSO dari semasa ke semasa boleh melantik

beberapa orang sebagai Wakil FSO (Klausa

24)yang layak dan bertanggungjawab kepada

FSO dan merupakan seorang sub agen kepada

Kerajaan.

Page 30: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 25.

GOVERNMENT’S RIGHT

TO RENOVATE THE SITE

25.1 The Government may, at any time during

the Contract Period, appoint any third party to

carry out any renovation and/or modification to

the Site or any part of the Site at the

Government’s cost and expense. The Contractor

shall render any assistance required by the third

party appointed by the Government for the

purpose of carrying out any renovation and/or

modification to the Site or any part of the Site at

no cost to the Government.

25.2 Notwithstanding Clause 25.1, the

Contractor hereby agrees that any renovation

and/or modification to the Site or any part of the

Site carried out by the Government shall not

relieve the Contractor of its obligations in

carrying out the FMM Services under this

Contract.

PENERANGAN

1. Kerajaan mempunyai hak untuk

pengubahsuaian tapak sepanjang

tempoh kontrak di mana Kerajaan perlu

melantik pihak ketiga untuk menjalankan

kerja renovation/modification kepada

tapak atau sebahagiannya dengan

menggunakan peruntukan berasingan.

Kontraktor hendaklah bersetuju bahawa

kerja renovation/modification yang

diarahkan oleh Kerajaan ini tidak

melepaskan tanggungjawab kontraktor di

dalam melaksanakan FMM services di

bawah Kontrak .

Cth. Kerja

penggantian 1 lift

yang rosak dari 10

bilangan lif yang

beroperasi didalam

bangunan

Page 31: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 30 : SCHEDULE OF PRICE

30.1 Basis of Contract Sum

30.1.1 The quality and the description of theFMM Services as set out in the Schedule ofPrice in Appendix 4 shall be the basis of theContract Sum. Any error in description oromission of the FMM Services from the saidSchedule of Price shall not vitiate this Contractbut shall be rectified and the amount inrespect of such rectification shall be added toor deducted from the Contract Sum as thecase may be.

30.1.2 The Government reserves the right toadjust the prices and rates in the Schedule ofPrice submitted by the Contractor to ensuretheir reasonableness before acceptance oftender and the decision of the Governmentshall be final.

1. Schedule of Price (Appendix 4) merupakan asas

kepada Harga Kontrak. Sekiranya terdapat

kesilapan/peninggalan kepada kerja yang dinyatakan

di dalam SOP, ianya hendaklah diperbetulkan dan

tidak dianggap membatalkan kontrak.

2. Kerajaan mempunyai hak untuk melaras harga dan

kadar harga di dalam Schedule of Price dengan tidak

mengubah jumlah harga tender yang ditawarkan di

Borang Tender (Appendix 1) untuk memastikan

kemunasabahannya sebelum LOA.

3. Kuantiti Sementara yang diperuntukkan di dalam

Schedule of Price adalah merupakan kuantiti

anggaran dan tertakluk kepada pengukuran semula.

4. Wang Peruntukan Sementara adalah jumlah yang

diperuntukkan pada peringkat tender dan

perbelanjaannya samada keseluruhan atau pun

sebahagian hendaklah dilaraskan.

Page 32: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 32. FINALACCOUNT ANDFINAL CERTIFICATE

32.1 Application for Final Account

32.1.1 The Contractor shall submit to the FSO, at such timesand in such form as the FSO may prescribe, a writtenapplication for final payment of the value of the FMMServices showing the amounts which in the Contractor’sopinion are due under the Contract.

32.1.2 Submission of the written application by the Contractorto the FSO pursuant to Clause 32.1.1 shall be accompaniedwith—

a) all documentation substantiating the amounts which inthe Contractor’s opinion are due under the Contract;and

b) the return of all drawings, details, specifications, reportsand management plans.

32.2 Final Certificate

32.2.1 Within three (3) months after receipt of theContractor's application for the final account pursuant toClause 32.1, the FSO shall issue a final certificate based on hisdetermination of the final account. The FSO's determinationof the final account and final certificate will be based on theContractor's application for the final account made pursuantto Clause 32.1 (in so far as the FSO deems it relevant to hisdetermination) and/or such other information anddocumentation that the FSO deems fit. The final certificateshall state the amount to be paid under this Contract by theGovernment to the Contractor or otherwise, as the case maybe, after deducting all amounts previously paid to theContractor by the Government and all sums to which theGovernment is entitled under this Contract and/or in law.

PENERANGAN

1. Dalam masa 3 bulan dari tarikh

penerimaan tuntutan akhir Kontraktor,

FSO hendaklah mengeluarkan Perakuan

Muktamad setelah menolak kesemua

bayaran yang telah dibayar dibawah

kontrak.

2. Sekiranya Kontraktor tidak

mengemukakan tuntutan bayaran akhir

dalam tempoh 3 bulan selepas tamat

kontrak FSO hendaklah menghantar

notis dengan memberi tempoh 2bulan

untuk kontraktor mengemukakantuntutan akhir. Sekiranya Kontraktor

gagal berbuat demikian maka FSO

hendaklah menyediakan perakuan

akhir tanpa perlu merujuk pada

Kontraktor.

Page 33: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 33. INVESTIGATION

AND AUDIT BY THE

GOVERNMENT

33.1 Government's right to inspect, investigate and

audit

The Government or any officer or person authorized in

writing by the Government at any time during the

Contract Period, shall have the right to—

a) inspect and investigate the Site, components and

any standard or equipment therein used in the

implementation of the FMM Services;

b) audit or monitor the performance of the FMM

Services;

c) inspect and investigate all records and documents

and make copies thereof in relation to the

implementation of the FMM Services which are

required to be kept at the Site;

d) request and obtain any information with regard to

the FMM Services; and

e) carry out audits on the operational, contractual

and financial matters pertaining to the Contract.

PENERANGAN

1. Kerajaan atau pegawai yang diberi kuasa

berhak menjalankan audit iaitu:

a) Memeriksa dan menyiasat tapak, komponendan piawaian atau peralatan yangdigunakan di dalam melaksanakan FMMServices

b) Audit atau mematau prestasi FMM Services

c) Memeriksa dan menyiasat semua rekod dandokumen dan membuat salinan yangberkaitan kepada dokumen

d) Meminta dan mendapatkan apa-apamaklumat yang berkaitan perkhidmatan FMM;dan

e) Menjalankan audit keatas operasi,pengurusan kontrak dan isu kewangankepada kontrak.

Kontraktor hendaklah menyediakan segala

keperluan dan maklumat berkenaan dan

bekerjasama sepanjang pemeriksaan, penyiasatan

dan audit yang dijalankan oleh Kerajaan.

Page 34: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 34. GOVERNMENT’S REPRESENTATIVE

Notwithstanding any provision in this

Contract, the right to act on behalf of

the Government in respect of any

matter which arises out of the

provisions of Clauses 35, 36, 37, 39 and

40 shall be exercised by the

Government’s Representative who is

an officer named in the Appendix to

the Conditions of the Contract in

Appendix 5.

PENERANGAN

1. Kontrak memperuntukkan Pegawai Yang

Dinamakan ( Appendix 5 ) mempunyai hak

untuk bertindak bagi pihak Kerajaan bagi

perkara berbangkit di bawah klausa

35,36,37,39 dan 40 .

Klausa 35 – Suspension Of FMM Services Klausa 36 – Termination by the Government Klausa 37 – Termination by the Contractor Klausa 39 – Termination on Corruption, Unlawful or

Illegal Activities Klausa 40 – Termination on National Interest

Page 35: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 36. TERMINATION

BY THE GOVERNMENT36.1 Default by the Contractor

36.1.1 Event of Default

Without prejudice to any other rights or remedies whichthe Government may possess under this Contract orunder the law, if during the Contract Period, theContractor—

(a) fails to commence the FMM Services at the Site inaccordance with Clause 9.5;

(b) wilfully suspends or abandons the carrying out of theFMM Services or any part thereof;

(c) fails to proceed regularly or diligently with theperformance of its obligations under this Contract;

(d) fails to execute the FMM Services in accordance withthe terms and conditions of this Contract;

(e) persistently neglects to perform its obligations underthis Contract;

(f) fails to comply with any of the FSO's and / or the

Government’s Representative’s instructions;

(g) fails to maintain the validity of the Performance Bonduntil twelve (12) months after the expiry of this Contract;and/or

(h) fails to perform the FMM Services in accordance withthe Performance Requirement,

PENERANGAN

Kerajaan tanpa menjejas apa-apa remidi boleh membuatpenamatan kontrak jika kontraktor melakukan kemungkiran satuatau lebih daripada perkara berikut, iaitu:

1. Gagal memulakan operasi dan penyenggaraan sebagaimanaklausa 9.5 (FMP)

2. Dengan sengaja menggantung atau meninggalkankeseluruhan perkhidmatan FMM atau sebahagiannya ;

3. Gagal meneruskan perkhidmatan FMM mengikut aturan DANdengan tekunnya untuk mencapai prestasi yangdipertanggungjawabkan di bawah kontrak;

4. Gagal melaksanakan perkhidmatan FMM mengikut terma dansyarat-syarat Kontrak;

5. Kecuaian berterusan dalam menunaikan obligasinya di bawah

Kontrak;

6. Gagal mematuhi arahan P.P.F dan/ atau Wakil Kerajaan yang

Dinamakan;

7. Gagal memastikan tempoh sah laku Bon Jaminan Pelaksanaan

sehingga Dua Belas (12) bulan selepas Tarikh tamat Kontrak;

8. Gagal mencapai prestasi FMM services yang ditetapkan di

dalam Performance Requirement (Appendix 7B)

Page 36: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 37. TERMINATION BY THE

CONTRACTOR

37.1 Event of default by the Government

37.1.1 If the Government without any reasonable causefails to perform or fulfil any of its obligations which adverselyaffects the FMM Services, then the Contractor may issue anotice specifying the default by the Government andrequiring the Government to remedy the same within theperiod specified therein taking into account the nature ofthe remedy to be carried out by the Government or suchother period as may be agreed by both Parties from thedate of receipt of such notice.

37.1.2 If the Government fails to remedy the default periodspecified in such notice issued under Clause 37.1.1 withinthe stipulated period time therein or such other period as

may be agreed by the Parties, the Contractor shall havethe right to forthwith terminate this Contract by giving awritten notice to that effect (hereinafter referred to as the“Notice of Termination”).

PENERANGAN

Syarat-syarat kontrak memperuntukkan penamatan

pengambilan kerja oleh kontraktor boleh dibuat

apabila berlaku kemungkiran oleh Kerajaan kepada

perkara berikut:

1. Kerajaan didapati dgn secara munasabahnya

gagal memenuhi mana-mana tanggungjawab

kontraknya yang secara ketara menjejaskan

pelaksanaan perkhidmatan. Sekiranya Kerajaan

didapati gagal membetulkan kemungkiran tersebut

dalam tempoh yang dinyatakan maka kontraktor

berhak menamatkan pengambilan

perkhidmatannya dengan memberi notis bertulis

kepada Kerajaan.

Page 37: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 42. RESOLUTION OFDISPUTE

42.1 Dispute Resolution Committee

Any matter, dispute or claim between the Parties inrespect of any matter under this Agreement shall besettled amicably through mutual consultation ornegotiation between the Parties. Should the Parties fail toachieve an amicable settlement, the matter, dispute orclaim may be referred by either Party to a disputeresolution committee (the “Dispute ResolutionCommittee”) consisting of:-

(i) Ketua Pengarah Kerja Raya Malaysia or hisrepresentative as Chairman;

(ii) two (2) representatives appointed by theGovernment; and

(iii) two (2) representatives appointed by the Contractor.

42.2 Independent Expert

The Dispute Resolution Committee may appoint anindependent expert in the relevant field or in each of therelevant fields (if there is more than one field) to advise iton any matter to it and all costs, fees and expenses ofany independent expert so appointed shall be borneequally by the Parties.

42.3 Determination of Procedures

(i) The Dispute Resolution Committee shall determine itsown procedures.

(ii) The Dispute Resolution Committee shall meet andendeavour to achieve an amicable settlement betweenthe Parties in respect of any dispute referred to it.

PENERANGAN

1. Apabila berlaku pertikaian atau tuntutan

antara kedua pihak berkontrak ianya

hendaklah diselesaikan secara

rundingan bersama. Apabila sesuatu

rundingan gagal mencapai kata putus,

maka ianya boleh dirujuk kepada

Jawatankuasa Dispute Resolution

Committee (DRC)

2. Keputusan DRC yang tidak mendapat

persetujuan dari kedua-dua pihak

berkontrak hendaklah dirujuk kepada

Timbangtara .

Jawatankuasa DRC terdiri daripada: KPKR atau wakilnya sebagai pengerusi 2 wakil yang dilantik oleh kontraktor

2 wakil yang dilantik oleh Kerajaan

Page 38: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 44. STEP IN RIGHT OFTHE GOVERNMENT

44.1 In the event of the occurrence of a matterwhich the Government considers affects thenational interest, national security, publicpolicy, or a serious risk exists which affect thehealth or safety of persons or property or theenvironment of the Site, the Government shallhave the right to step in and carry out orcontinue all or any part of the FMM Services inplace of the Contractor for such period asdeemed fit by the Government.

44.2 For the purposes of this Clause, except for“serious risk” which is to be interpreted anddetermined in accordance with theOccupational Safety and Health Act 1994 [Act514], what constitutes “national interest”,“national security”, and “public policy” shall besolely determined by the Government andsuch determination shall for all intents andpurposes be final and conclusive and shall notbe open to any challenge whatsoever.

44.3 In no event shall the Government’sexercise any of its rights pursuant to Clause44.1 shall be deemed to be a transfer of theContractor’s obligations under this Contract tothe Government.

PENERANGAN

1. Kerajaan berhak untuk mengambil alih apabila berlaku

hal-hal berkaitan yang memberi kesan kepada

kepentingan negara, keselamatan negara, polisi awam

atau risiko tinggi kepada kesihatan dan keselamatan ke

atas orang atau harta benda atau persekitaran tapak

dan menjalankan sendiri perkhidmatan atau sebahagian

dari pekhidmatan FMM yang dijalankan oleh Kontraktor

sehingga satu masa yang dirasakan selamat .

Page 39: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

CLAUSE 45. SUB-

CONTRACTING AND

ASSIGNMENT

45.1 Sub-Contracting and assignment

The Contractor shall not, without the prior written approval of

the FSO, sub-contract the whole or any part of the FMM

Services. Where the FSO consents to any sub-contracting under

this clause such consent shall not in any way absolve and

release the Contractor of its obligations under this Contract. The

Contractor shall also be responsible for the acts, omissions,

defaults and/or negligence of any of its sub-contractors, and

their agents, servants or employees as fully as if they were the

acts, omissions, defaults and/or negligence of the Contractor.

45.2 Determination of Sub-Contract

It shall be a condition in all the Contractor’s sub-contracts that

upon termination or expiry of this Contract, the Contractor shall

terminate its arrangement with the sub-contractors and no

claim whatsoever shall be made by the sub-contractors against

the Government in the event of the termination or the expiry of

the Contract and sub-contracts.

PENERANGAN

1. Tanpa kebenaran bertulis dari FSO, kontraktor tidak dibenarkan sub-

kontrak kesemua atau sebahagian FMM Services dan

bertanggungjawab sepenuhnya ke atas FMM Services yang telah di

sub-kontrak dibawah kontrak.

2. Sekiranya sub-kontrak ditamatkan perkhidmatan atau tamat tempoh

kontrak, kontraktor boleh menamatkan perkhidmatan sub-kontraktor

dan sub-kontraktor tidak dibenarkan membuat sebarang tuntutan

kepada Kerajaan.

3. Klausa 45.5.1 memperuntukkan, sekiranya FSO tidak berpuas hati

dengan prestasi mana-mana sub-kontraktor, FSO boleh meminta

kontraktor untuk:

Menamatkan perkhidmatan sub-kontraktor

Menggantikan sub-kontraktor

Menggantikan mana-mana pekerja atau ejen sub-kontraktor

Page 40: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

PINDAAN KEPADA SYARAT-SYARAT KONTRAK PWD FACILITIES MANAGEMENT AND

MAINTENANCE FORM (2016) – ADDENDUM NO. 1

Page 41: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

PINDAAN KEPADA SYARAT-SYARAT KONTRAK PWD FACILITIES MANAGEMENT AND MAINTENANCE FORM (2016) – ADDENDUM NO. 1

Page 42: Pengenalan Kepada Borang Kontrak PWD Facility …jpak.jkr.gov.my/document/files/Dokumen/Seminar/SPFSA 2017/Kertas... · F F01 Fasiliti Fasiliti Bangunan dan Infrastruktur Am ... PENERANGAN

RUMUSAN

Syarat-syarat kontrak piawai PWD FMM 2016 adalah merupakanpenambahbaikan kepada syarat-syarat kontrak FM 2008 yang

menjelaskan lebih terperinci keperluan-keperluan yang diperuntukkan di

bawah kontrak FMM dan diharapkan dapat meningkatkan lagi

keberkesanan di dalam pentadbiran kontrak FMM yang dilaksakan oleh

Jabatan.

Pengenalan kepada syarat-syarat kontrak FMM 2016 diharap dapat

memberi pengetahuan dan meningkatkan kefahaman dikalangan

FSO/Wakil FSO dan pegawai JKR keseluruhannya.