curiculum vitae azlan (latest)
TRANSCRIPT
AZLAN SHAH BIN AHMAD SUHIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9
Page 1 of 7
ADDRESS : LOT 204 A,JALAN BISTARI 6,
KG SRI AMAN,BATU 13
POSCODE 47100.PUCHONG
SELANGOR.MALAYSIA
CONTACT NO : +60193323320 (Mobile)
EMAIL ADDRESS : [email protected]
PERSONAL DETAILS
GENDER : MALE
AGE : 30
DATE OF BIRTH : 01 October 1985
MARITAL STATUS : MARRIED
NATIONALITY : MALAYSIA
HEALTH : (FIT FOR OFFSHORE)
BLOOD TYPE : B+
EDUCATION AND TECHNICAL QUALIFICATION
LEVEL : DIPLOMA WELDING TECHNOLOGY(ADTEC)
MAJOR : WELDING
INSTITUTE : ADTEC
LEVEL : SIJIL PELAJARAN MALAYSIA (SPM)
INSTITUTE : SEK MEN KEB PUCHONG PERDANA
LEVEL : SIJIL KEMAHIRAN MALAYSIA(SKM)
MAJOR : LEVEL I&II WELDING FABRICATION (GIAT MARA)
LEVEL : CERTIFICATE MARA/PETRONAS
MAJOR : WELDING 6G PROGRAMME,BASIC SAFETY,PIPING SYSTEM &CPR
INSTITUTE : INSTITUTE KEMAHIRAN MARA SG PETANI.KEDAH
CONTACT INFO
AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9
Page 2 of 7
EDUCATION AND TECHNICAL QUALIFICATION
NORTHERN TEST CENTRE, ARGYY-RUANE LTD
PSALTER LANE, ROTHERHAM, SOUTH YORKS.S61 1DL UNITED KINGDOM
CERTIFIED (P.C.N) WELDING INSPECTOR LEVEL II
EXPIRY : 07/06/2019
PCN NO. : 306412
CERT. NO. : F009S3029999
CERTIFIED (P.C.N) RADIOGRAPHIC INTERPRETER LEVEL II (3.4)
EXPIRY : 11/03/2019
PCN NO. : 306412
CERT. NO. : F009S3620610
CERTIFIED (P.C.N) ULTRASONIC TESTING LEVEL II (3.1,3.2,3.8,3.9)
EXPIRY : 27/06/2019
PCN NO. : 306412
CERT. NO. : F009S3324212
TECHNICAL TRAINING AND COURSE ATTENDED
TRAINING IN HOUSE RADIOGRAPHY TESTING,DYE PENETRANT,MAGNETIC PENETRANT&ULTRASONIC TESTING BY J.A CONSULTANT SDN BHD
PCN WELDING INSPECTOR / RADIOGRAPHY INTERPRETER(3.4)&ULTRASONIC TESTING (3.1,3.2,3.8,3.9). COURSE CONDUCTED BY ARGYLL RUANE,SHEFFIELD,UNITED KINGDOM
BASIC OFFSHORE SAFETY INDUCTION&EMERGENCY TRAINING,BOSET INCLUDE HUET CONDUCT BY CONSIST SDN BHD
NIOSH OIL&GAS SAFETY PASPORT(OGSP) CONDUCT BY NIOSH BANGI
IN-HOUSE TRAINING(AUTOMATIC ULTRASONIC TESTING) TOFD AND PHASE ARRAY BY G.E SINGAPORE AND OTI
EXXONMOBIL LOST PREVENTATION SYSTEM TRAINING(LPS)
ALX(DATA LOGGER)
SPECIFICATION CODES ACQUAINT
AMERICAN PETROLEUM INSTITITE (A.P.I)
º 1104 - WELDING OF PIPELINES & RELATED FACILITIES
º 5L - SPECIFICATION FOR LINE PIPE
• AMERICAN WELDING SOCIETY (A.W.S)
º D1.1 -STUCTURAL WELDING CODES
• AMERICAN SOCIETY OF MECHANICAL ENGINEER (A.S.M.E)
º ASME SECTION V - NON DESTRUCTIVE EXAMINATION
º ASME SECTION IX - QUALIFICATION STANDARDS FOR WELDING & BRAZING
AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9
Page 3 of 7
TECHNICAL TRAINING AND COURSE ATTENDED
CONSIST SDN. BHD. • BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY
TRAINING, BOSIET INCLUDE HUET - DATE - 05 FEBUARY 2014 - EXPIRED -02 FEBUARY 2018
OFFSHORE MEDICAL - 17 MAC 2013 – 7 MAC 2015
NIOSH • NIOSH OIL&GAS SAFETY PASPORT
- OG005908S - EXPIRED DATE- 13 JANUARY 2016
MALAYSIA SEAMAN • SEAMAN NO 200922003421
PETRONAS OFFSHORE SAFETY PASPORT(SMART CARD)
WORKING EXPERIANCE & PROJECT INVOLVED
COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 MAY 2014 – JUNE 2015 POSITION: WELDING/QAQC INSPECTOR(GOM CLIENT REP) PROJECT: FABRICATION AND MODIFICATION OF NEW STRUCTURAL STRINGER 3 SECTION FOR DLB 264 AT ASIA PROPEL SDN BHD,RAWANG.SELANGOR COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 16 OCTOBER 2014 – 30 JANUARY 2015 POSITION: WELDING/QAQC INSPECTOR(GOM REP) PROJECT: FABRICATION AND MODIFICATION OF NEW STRUCTURAL STRINGER 2 SECTION FOR DLB 264 AT PIONEER PEGASUS SDN BHD.TELUK KALUNG,TERENGGANU COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 FEBUARY 2014 – 13 OCTOBER 2014 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: EVA-NMB AUTOMATIC WELDING PROCEDURE(WPQT) for 28’’x18.3mm INVOLVED WITH SEEDED DEFECT,ECA AND AUT OFFSHORE PIPELINE INSTALLATION 280 KM FROM PPT KERTEH TO PLTS KAMELIA SPOOL AND PLEM INSTALLATION COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 JULY 2013 – 20 OCTOBER 2013 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC SUPERVISOR PROJECT: PROVISSION OF EVA-NMB GAS DELIVERY SYSTEM 28’’ SHORE APPROACH PIPELINE INSTALLATION AT PETRONAS PENAPISAN TERENGGANU(PPT) FINAL DOCUMENTATION OF EVA-NMB(PCSB)
AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9
Page 4 of 7
COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 15 FEBUARY 2013 – 25 MAY 2013 CLIENT: HESS & BV EXPLORATION POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: 14’’ AUTOMATIC WELDING PROCEDURE (WPQT)-(ZONE 1) HESS 14’’ AUTOMATIC WELDING PROCEDURE (WPQT)-(ZONE 2) EXXONMOBIL INVOLVED WITH SEEDED DEFECT,ECA AND AUT 14’’ X 57KM PIPELINE INSTALLATION (HESS-ZONE 1) LAWIT-A 14’’ X 500METER PIPELINE INSTALLTION (ZONE 2) EXXONMOBIL 14’’ RISER AND PLEM INSTALLATION (HESS-LAWIT-A) COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 15 SEPTEMBER 2012 – 25 OCTOBER 2012 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR BARGE: DLB 264
PROJECT: 6’’ OFFSHORE PIPELINE REPLACEMENT AND SPOOL INSTALLATION, RISER GUARD INSTALLATION FOR BEKOK-A & TIONG-A COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 28 JULY 2012 – 30 AUGUST 2012 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR(GOM CLIENT REP) PROJECT: FABRICATION NEW RISER GUARD T’K’Y,RISER CLAMP& 6’’ RISER PIPELINE FOR BEKOK-A TO TIONG-A AT SAPURA KENCANA YARD,TELUK KALONG TERENGGANU COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 3 JULY 2012 – 25 JULY 2012 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR PROJECT: WELDING PROCEDURE (WPQT)6’’ FOR BEKOK PIPELINE AND RISER INSTALLATION COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 1 JUNE 2012 – 30 JUNE 2012 CLIENT: SHELL / KPOC (KEBABANGAN PETROLEUM OPERATING COMPANY) POSITION: WELDING/QC INSPECTOR PROJECT: WELDING PROCEDURE (WPQT)8’’ & 10’’ for MALIKAI(SHELL)2KM PARTIAL LAY INVOLVED WITH ALX(DATA LOGGER) COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 FEBUARY 2012- 20 MAY 2012 CLIENT: KPOC (KEBABANGAN PETROLEUM OPERATING COMPANY) POSITION: WELDING/QC INSPECTOR PROJECT: 24’’&14’’ AUTOMATIC WELDING PROCEDURE (WPQT) INVOLVED WITH SEEDED DEFECT,ECA AND AUT OFFSHORE PIPELINE INSTALLATION SOGT TO KBB PLATTFORM (24’’X 124 km) COMPANY: GLOBAL OFFSHORE MALAYSIA SDN BHD(GLOBAL INDUSTRIES) DURATION: 18 SEPTEMBER 2011 – 17 OCTOBER 2011 CLIENT: KPOC (KEBABANGAN PETROLEUM OPERATING COMPANY POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: 24’’&14’’SHORE APPROACH PIPELINE INSTALLATION-SOGT KOTA KINABALU,SABAH
AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9
Page 5 of 7
COMPANY: GLOBAL OFFSHORE MALAYSIA SDN BHD(GLOBAL INDUSTRIES) DURATION: 20 FEBUARY2011 – 10 SEPTEMBER 2011 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: - Automatic Welding Procedure (WPQT) and Welding Qualification Test(WQT) For Project Tapis(Terengganu),Kumang(Bintulu),Kinabalu(Sabah Petroleum) - Line Pipe Inspection,Check Ovality and Squarness at Wesco.Kuantan - Line Pipe Inspection,Check Ovality and Squarness at Bredero Shaw.Kuantan. - KINABALU NON ASSOCIATED GAS(KNAG) 24’’ Shore Approach Pipeline Installation Project
- KINABALU (KNPG-B - SOGT) 24’’ X (95.54km – 132km) Pipeline Installation COMPANY: ALAM MARITIM (SECONDED TO DAYA OCI) DURATION: 8 JANUARY2011 – 18 FEBUARY2011 CLIENT: PETRONAS CARIGALI. POSITION: WELDING/QC SUPERVISOR PROJECT: DOCUMENTATION QA/QC REPORT FOR TCOT SHORE APPROCH CRUDE OIL PIPE INSPECTION OVALITY AND SQUARNESS COMPANY: GLOBAL OFFSHORE MALAYSIA SDN BHD(GLOBAL INDUSTRIES) DURATION: 10 JULY2010 - 12 SEPTEMBER 2010 CLIENT: PETRONAS CARIGALI. POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT:
- Provision Of Installation 24’’and 18’’ Riser Pipeline and Spool Tie-In At RDP-A Plattform. - Provision Of Installation And Commisioning 24’’ Pipeline 58km from RDP-A Plattform to TBR-A Plattform - 6’’ Pipeline Replacment and installation 6’’ Riser and Spool Tie-in (6Km) from MLDP-A Plattform to MLDP-B - Installation 24’’ Riser Pipeline and Tie-in at TBR-A Plattform. - Continue Installation 24’’ Pipeline (6Km) to 58 from RDP-A Plattform to TBR-A Plattform - KINABALU NON ASSOCIATED GAS(KNAG) RISER Installation Stalk 18’’(KNPG-B-KNJT-C PL)@KNPG-B - RISER Installation Stalk 24’’(SOGT/KNPG-B PL)@KNPG-B
- KINABALU NAG DEVELOPMENT PROJECT (SBO) 18’’ X 2km KNPG-B to KNJT-C PL Installation. - KUMANG Cluster Development Pipeline (SKO) RISER Installation Stalk On/ 24’’ KAKG-A Plattform - Kumang Cluster Development Pipeline (SKO) 24’’ X 4.9km KAKG-A to KASS-A PL Installation - MWB Offshore Installation / 12’’ X 2km Pulai-A/Tapis-A Sectional Pipeline Replacement (PMO) - PETRONAS MWB Offshore Installation / 24’’ X 4.9km Kumang Cluster COMPANY: PBJV GROUP SDN BHD DURATION: MAC 2010 – 30 JUNE 2010 CLIENT: TL OFFSHORE, PETRONAS CARIGALI. POSITION: WELDING/QC INSPECTOR(ACTING SUPERVISOR) BARGE: LEIGHTON(FAULKANER) PROJECT: 28’’ KAKG-A/MLNG,6 KM-SHORE APPROACH PIPELINE INSTALLATION FOR KUMANG CLUSTER DEVELOPMENT PROJECT COMPANY: OMBAK MARINE GROUP SDN BHD(Seconded To Alam Maritim (M) sdn Bhd ) DURATION: SEPTEMBER2009 - NOVEMBER2009 CLIENT: PETRONAS CARIGALI, SARAWAK OPERATION. POSITION: WELDING/QC INSPECTOR BARGE: KALINDA PROJECT: PROVISION OF INSTALLATION AND COMMISIONING OF 18’’-11KM, WLP-A TO MCOT OIL PIPELINE REPLACEMENT
AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9
Page 6 of 7
COMPANY: SHAMIRA INSPECTION SDN BHD DURATION: JULY2009 – AUGUST 2009 CLIENT: PETRONAS CARIGALI POSITION: MULTITECH,RADIOGRAPHY INTERPRETER PROJECT: SK304 GAS DEVELOPMENT PROJECT SPOOL TIE-IN FABRICATION&INSTALLATION COMPANY: PETRA RESOURCES SDN BHD DURATION: MAC 2006 - JUNE 2008 POSITION TRAINEE AND QC INSPECTOR PROJECT: FABRICATION OF BOILER&PRESSURE VESSEL,PIPING(IN ACCORDANCE TO ASME
SPECIFICATION CODE AND STANDART
COMPANY: KNM GROUP SDN BHD DURATION: MAY 2005 – DECEMBER 2005 POSITION: WELDER PROJECT: BOILER & PRESSURE VESSEL FOR NESTLE AUSTRALIA COMPANY: TEPAT TEKNIK SDN BHD DURATION: AUGUST 2004 - MARCH 2005 POSITION: WELDER PROJECT: BOILER & PRESSURE VESSEL
SUMMARY OF SKILLS
LANGUAGE READING WRITING SPEAKING
ENGLISH GOOD GOOD GOOD
BAHASA MALAYSIA GOOD GOOD GOOD
COMPUTER AND NON TECHNICAL SKILL:
PROGRAMME: Microsoft Office (Word, Excel, PowerPoint), Adobe Photoshop and Acrobat Professional.
LANGUAGE: C++ Visual Basic
SUMMARY:More than (7) years experience in Quality Control and Inspection of oil and gas - Piping systems, pipelines,
pressure vessels, oil and gas facilities,structure other related industrial facilities during fabrication, erection and
installation stages, and testing. Participate in audit program activities, review and confirm quality requirements and
records of subcontractors. Attend meeting with Company, Subcontractor and Vendor to determine subjects and
problems relevant to quality control and inspection, and give solution to problems that may arise. Maintain and monitor
the implementation of approved QA/QC procedures and inspection program. Review Inspection and Test Plans (ITP),
and method of statement procedures issued by subcontractors. Perform and conduct timely on-site inspection, and
check quality control activities to ensure conformance to QA/QC requirements and specified procedures, and all items of
construction work comply with drawings, standards and project specifications. Verify that all inspection and test
required have been completed and rated acceptable. Perform inspection survey for materials as per approved purchase
order, material data sheet and specification requirement. Take lead role in review of fabrication packages (as per system
definition) issued by contractor. Coordinate with construction and subcontractor to complete the outstanding inspection
and activities.
AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9
Page 7 of 7
CAREER INTERESTS
AVAILABILITY : IMMEADIATELY WILLING TO TRAVEL : HEAVY(>100%) WILLING TO RELOCATE : YES
Mohd Fendi bin Darus, Edey Simla QA/QC Supervisor, QA/QC Supervisor, Petra Resources Sdn Bhd, Ombak Marine Group, 012-6199465 Tel: 019-7700383.
Borhanudin Mohammad Izzudin bin ismain QQ/QC Engineer, Head of QA/QC department,
PBJV Group KNM Group
Tel: 0176815220. 017-3632231
Amir Zakee Adnal Azmi Mohammad QA/QC Manager, QA/QC Manager GOM Resources(M)sdn bhd Global offshore Malaysia sdn bhd [email protected] [email protected] 0125222976 0127770592
REFERENCES