curiculum vitae azlan (latest)

7
AZLAN SHAH BIN AHMAD SUHIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9 Page 1 of 7 ADDRESS : LOT 204 A,JALAN BISTARI 6, KG SRI AMAN,BATU 13 POSCODE 47100.PUCHONG SELANGOR.MALAYSIA CONTACT NO : +60193323320 (Mobile) EMAIL ADDRESS : [email protected] PERSONAL DETAILS GENDER : MALE AGE : 30 DATE OF BIRTH : 01 October 1985 MARITAL STATUS : MARRIED NATIONALITY : MALAYSIA HEALTH : (FIT FOR OFFSHORE) BLOOD TYPE : B+ EDUCATION AND TECHNICAL QUALIFICATION LEVEL : DIPLOMA WELDING TECHNOLOGY(ADTEC) MAJOR : WELDING INSTITUTE : ADTEC LEVEL : SIJIL PELAJARAN MALAYSIA (SPM) INSTITUTE : SEK MEN KEB PUCHONG PERDANA LEVEL : SIJIL KEMAHIRAN MALAYSIA(SKM) MAJOR : LEVEL I&II WELDING FABRICATION (GIAT MARA) LEVEL : CERTIFICATE MARA/PETRONAS MAJOR : WELDING 6G PROGRAMME,BASIC SAFETY,PIPING SYSTEM &CPR INSTITUTE : INSTITUTE KEMAHIRAN MARA SG PETANI.KEDAH CONTACT INFO

Upload: azlan-shah

Post on 17-Aug-2015

54 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: curiculum vitae azlan (latest)

AZLAN SHAH BIN AHMAD SUHIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9

Page 1 of 7

ADDRESS : LOT 204 A,JALAN BISTARI 6,

KG SRI AMAN,BATU 13

POSCODE 47100.PUCHONG

SELANGOR.MALAYSIA

CONTACT NO : +60193323320 (Mobile)

EMAIL ADDRESS : [email protected]

PERSONAL DETAILS

GENDER : MALE

AGE : 30

DATE OF BIRTH : 01 October 1985

MARITAL STATUS : MARRIED

NATIONALITY : MALAYSIA

HEALTH : (FIT FOR OFFSHORE)

BLOOD TYPE : B+

EDUCATION AND TECHNICAL QUALIFICATION

LEVEL : DIPLOMA WELDING TECHNOLOGY(ADTEC)

MAJOR : WELDING

INSTITUTE : ADTEC

LEVEL : SIJIL PELAJARAN MALAYSIA (SPM)

INSTITUTE : SEK MEN KEB PUCHONG PERDANA

LEVEL : SIJIL KEMAHIRAN MALAYSIA(SKM)

MAJOR : LEVEL I&II WELDING FABRICATION (GIAT MARA)

LEVEL : CERTIFICATE MARA/PETRONAS

MAJOR : WELDING 6G PROGRAMME,BASIC SAFETY,PIPING SYSTEM &CPR

INSTITUTE : INSTITUTE KEMAHIRAN MARA SG PETANI.KEDAH

CONTACT INFO

Page 2: curiculum vitae azlan (latest)

AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9

Page 2 of 7

EDUCATION AND TECHNICAL QUALIFICATION

NORTHERN TEST CENTRE, ARGYY-RUANE LTD

PSALTER LANE, ROTHERHAM, SOUTH YORKS.S61 1DL UNITED KINGDOM

CERTIFIED (P.C.N) WELDING INSPECTOR LEVEL II

EXPIRY : 07/06/2019

PCN NO. : 306412

CERT. NO. : F009S3029999

CERTIFIED (P.C.N) RADIOGRAPHIC INTERPRETER LEVEL II (3.4)

EXPIRY : 11/03/2019

PCN NO. : 306412

CERT. NO. : F009S3620610

CERTIFIED (P.C.N) ULTRASONIC TESTING LEVEL II (3.1,3.2,3.8,3.9)

EXPIRY : 27/06/2019

PCN NO. : 306412

CERT. NO. : F009S3324212

TECHNICAL TRAINING AND COURSE ATTENDED

TRAINING IN HOUSE RADIOGRAPHY TESTING,DYE PENETRANT,MAGNETIC PENETRANT&ULTRASONIC TESTING BY J.A CONSULTANT SDN BHD

PCN WELDING INSPECTOR / RADIOGRAPHY INTERPRETER(3.4)&ULTRASONIC TESTING (3.1,3.2,3.8,3.9). COURSE CONDUCTED BY ARGYLL RUANE,SHEFFIELD,UNITED KINGDOM

BASIC OFFSHORE SAFETY INDUCTION&EMERGENCY TRAINING,BOSET INCLUDE HUET CONDUCT BY CONSIST SDN BHD

NIOSH OIL&GAS SAFETY PASPORT(OGSP) CONDUCT BY NIOSH BANGI

IN-HOUSE TRAINING(AUTOMATIC ULTRASONIC TESTING) TOFD AND PHASE ARRAY BY G.E SINGAPORE AND OTI

EXXONMOBIL LOST PREVENTATION SYSTEM TRAINING(LPS)

ALX(DATA LOGGER)

SPECIFICATION CODES ACQUAINT

AMERICAN PETROLEUM INSTITITE (A.P.I)

º 1104 - WELDING OF PIPELINES & RELATED FACILITIES

º 5L - SPECIFICATION FOR LINE PIPE

• AMERICAN WELDING SOCIETY (A.W.S)

º D1.1 -STUCTURAL WELDING CODES

• AMERICAN SOCIETY OF MECHANICAL ENGINEER (A.S.M.E)

º ASME SECTION V - NON DESTRUCTIVE EXAMINATION

º ASME SECTION IX - QUALIFICATION STANDARDS FOR WELDING & BRAZING

Page 3: curiculum vitae azlan (latest)

AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9

Page 3 of 7

TECHNICAL TRAINING AND COURSE ATTENDED

CONSIST SDN. BHD. • BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY

TRAINING, BOSIET INCLUDE HUET - DATE - 05 FEBUARY 2014 - EXPIRED -02 FEBUARY 2018

OFFSHORE MEDICAL - 17 MAC 2013 – 7 MAC 2015

NIOSH • NIOSH OIL&GAS SAFETY PASPORT

- OG005908S - EXPIRED DATE- 13 JANUARY 2016

MALAYSIA SEAMAN • SEAMAN NO 200922003421

PETRONAS OFFSHORE SAFETY PASPORT(SMART CARD)

WORKING EXPERIANCE & PROJECT INVOLVED

COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 MAY 2014 – JUNE 2015 POSITION: WELDING/QAQC INSPECTOR(GOM CLIENT REP) PROJECT: FABRICATION AND MODIFICATION OF NEW STRUCTURAL STRINGER 3 SECTION FOR DLB 264 AT ASIA PROPEL SDN BHD,RAWANG.SELANGOR COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 16 OCTOBER 2014 – 30 JANUARY 2015 POSITION: WELDING/QAQC INSPECTOR(GOM REP) PROJECT: FABRICATION AND MODIFICATION OF NEW STRUCTURAL STRINGER 2 SECTION FOR DLB 264 AT PIONEER PEGASUS SDN BHD.TELUK KALUNG,TERENGGANU COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 FEBUARY 2014 – 13 OCTOBER 2014 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: EVA-NMB AUTOMATIC WELDING PROCEDURE(WPQT) for 28’’x18.3mm INVOLVED WITH SEEDED DEFECT,ECA AND AUT OFFSHORE PIPELINE INSTALLATION 280 KM FROM PPT KERTEH TO PLTS KAMELIA SPOOL AND PLEM INSTALLATION COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 JULY 2013 – 20 OCTOBER 2013 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC SUPERVISOR PROJECT: PROVISSION OF EVA-NMB GAS DELIVERY SYSTEM 28’’ SHORE APPROACH PIPELINE INSTALLATION AT PETRONAS PENAPISAN TERENGGANU(PPT) FINAL DOCUMENTATION OF EVA-NMB(PCSB)

Page 4: curiculum vitae azlan (latest)

AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9

Page 4 of 7

COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 15 FEBUARY 2013 – 25 MAY 2013 CLIENT: HESS & BV EXPLORATION POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: 14’’ AUTOMATIC WELDING PROCEDURE (WPQT)-(ZONE 1) HESS 14’’ AUTOMATIC WELDING PROCEDURE (WPQT)-(ZONE 2) EXXONMOBIL INVOLVED WITH SEEDED DEFECT,ECA AND AUT 14’’ X 57KM PIPELINE INSTALLATION (HESS-ZONE 1) LAWIT-A 14’’ X 500METER PIPELINE INSTALLTION (ZONE 2) EXXONMOBIL 14’’ RISER AND PLEM INSTALLATION (HESS-LAWIT-A) COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 15 SEPTEMBER 2012 – 25 OCTOBER 2012 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR BARGE: DLB 264

PROJECT: 6’’ OFFSHORE PIPELINE REPLACEMENT AND SPOOL INSTALLATION, RISER GUARD INSTALLATION FOR BEKOK-A & TIONG-A COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 28 JULY 2012 – 30 AUGUST 2012 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR(GOM CLIENT REP) PROJECT: FABRICATION NEW RISER GUARD T’K’Y,RISER CLAMP& 6’’ RISER PIPELINE FOR BEKOK-A TO TIONG-A AT SAPURA KENCANA YARD,TELUK KALONG TERENGGANU COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 3 JULY 2012 – 25 JULY 2012 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR PROJECT: WELDING PROCEDURE (WPQT)6’’ FOR BEKOK PIPELINE AND RISER INSTALLATION COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 1 JUNE 2012 – 30 JUNE 2012 CLIENT: SHELL / KPOC (KEBABANGAN PETROLEUM OPERATING COMPANY) POSITION: WELDING/QC INSPECTOR PROJECT: WELDING PROCEDURE (WPQT)8’’ & 10’’ for MALIKAI(SHELL)2KM PARTIAL LAY INVOLVED WITH ALX(DATA LOGGER) COMPANY: GOM RESOURCES SDN BHD(PUNCAK NIAGA OIL&GAS) DURATION: 10 FEBUARY 2012- 20 MAY 2012 CLIENT: KPOC (KEBABANGAN PETROLEUM OPERATING COMPANY) POSITION: WELDING/QC INSPECTOR PROJECT: 24’’&14’’ AUTOMATIC WELDING PROCEDURE (WPQT) INVOLVED WITH SEEDED DEFECT,ECA AND AUT OFFSHORE PIPELINE INSTALLATION SOGT TO KBB PLATTFORM (24’’X 124 km) COMPANY: GLOBAL OFFSHORE MALAYSIA SDN BHD(GLOBAL INDUSTRIES) DURATION: 18 SEPTEMBER 2011 – 17 OCTOBER 2011 CLIENT: KPOC (KEBABANGAN PETROLEUM OPERATING COMPANY POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: 24’’&14’’SHORE APPROACH PIPELINE INSTALLATION-SOGT KOTA KINABALU,SABAH

Page 5: curiculum vitae azlan (latest)

AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9

Page 5 of 7

COMPANY: GLOBAL OFFSHORE MALAYSIA SDN BHD(GLOBAL INDUSTRIES) DURATION: 20 FEBUARY2011 – 10 SEPTEMBER 2011 CLIENT: PETRONAS CARIGALI POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT: - Automatic Welding Procedure (WPQT) and Welding Qualification Test(WQT) For Project Tapis(Terengganu),Kumang(Bintulu),Kinabalu(Sabah Petroleum) - Line Pipe Inspection,Check Ovality and Squarness at Wesco.Kuantan - Line Pipe Inspection,Check Ovality and Squarness at Bredero Shaw.Kuantan. - KINABALU NON ASSOCIATED GAS(KNAG) 24’’ Shore Approach Pipeline Installation Project

- KINABALU (KNPG-B - SOGT) 24’’ X (95.54km – 132km) Pipeline Installation COMPANY: ALAM MARITIM (SECONDED TO DAYA OCI) DURATION: 8 JANUARY2011 – 18 FEBUARY2011 CLIENT: PETRONAS CARIGALI. POSITION: WELDING/QC SUPERVISOR PROJECT: DOCUMENTATION QA/QC REPORT FOR TCOT SHORE APPROCH CRUDE OIL PIPE INSPECTION OVALITY AND SQUARNESS COMPANY: GLOBAL OFFSHORE MALAYSIA SDN BHD(GLOBAL INDUSTRIES) DURATION: 10 JULY2010 - 12 SEPTEMBER 2010 CLIENT: PETRONAS CARIGALI. POSITION: WELDING/QC INSPECTOR BARGE: DLB 264 PROJECT:

- Provision Of Installation 24’’and 18’’ Riser Pipeline and Spool Tie-In At RDP-A Plattform. - Provision Of Installation And Commisioning 24’’ Pipeline 58km from RDP-A Plattform to TBR-A Plattform - 6’’ Pipeline Replacment and installation 6’’ Riser and Spool Tie-in (6Km) from MLDP-A Plattform to MLDP-B - Installation 24’’ Riser Pipeline and Tie-in at TBR-A Plattform. - Continue Installation 24’’ Pipeline (6Km) to 58 from RDP-A Plattform to TBR-A Plattform - KINABALU NON ASSOCIATED GAS(KNAG) RISER Installation Stalk 18’’(KNPG-B-KNJT-C PL)@KNPG-B - RISER Installation Stalk 24’’(SOGT/KNPG-B PL)@KNPG-B

- KINABALU NAG DEVELOPMENT PROJECT (SBO) 18’’ X 2km KNPG-B to KNJT-C PL Installation. - KUMANG Cluster Development Pipeline (SKO) RISER Installation Stalk On/ 24’’ KAKG-A Plattform - Kumang Cluster Development Pipeline (SKO) 24’’ X 4.9km KAKG-A to KASS-A PL Installation - MWB Offshore Installation / 12’’ X 2km Pulai-A/Tapis-A Sectional Pipeline Replacement (PMO) - PETRONAS MWB Offshore Installation / 24’’ X 4.9km Kumang Cluster COMPANY: PBJV GROUP SDN BHD DURATION: MAC 2010 – 30 JUNE 2010 CLIENT: TL OFFSHORE, PETRONAS CARIGALI. POSITION: WELDING/QC INSPECTOR(ACTING SUPERVISOR) BARGE: LEIGHTON(FAULKANER) PROJECT: 28’’ KAKG-A/MLNG,6 KM-SHORE APPROACH PIPELINE INSTALLATION FOR KUMANG CLUSTER DEVELOPMENT PROJECT COMPANY: OMBAK MARINE GROUP SDN BHD(Seconded To Alam Maritim (M) sdn Bhd ) DURATION: SEPTEMBER2009 - NOVEMBER2009 CLIENT: PETRONAS CARIGALI, SARAWAK OPERATION. POSITION: WELDING/QC INSPECTOR BARGE: KALINDA PROJECT: PROVISION OF INSTALLATION AND COMMISIONING OF 18’’-11KM, WLP-A TO MCOT OIL PIPELINE REPLACEMENT

Page 6: curiculum vitae azlan (latest)

AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9

Page 6 of 7

COMPANY: SHAMIRA INSPECTION SDN BHD DURATION: JULY2009 – AUGUST 2009 CLIENT: PETRONAS CARIGALI POSITION: MULTITECH,RADIOGRAPHY INTERPRETER PROJECT: SK304 GAS DEVELOPMENT PROJECT SPOOL TIE-IN FABRICATION&INSTALLATION COMPANY: PETRA RESOURCES SDN BHD DURATION: MAC 2006 - JUNE 2008 POSITION TRAINEE AND QC INSPECTOR PROJECT: FABRICATION OF BOILER&PRESSURE VESSEL,PIPING(IN ACCORDANCE TO ASME

SPECIFICATION CODE AND STANDART

COMPANY: KNM GROUP SDN BHD DURATION: MAY 2005 – DECEMBER 2005 POSITION: WELDER PROJECT: BOILER & PRESSURE VESSEL FOR NESTLE AUSTRALIA COMPANY: TEPAT TEKNIK SDN BHD DURATION: AUGUST 2004 - MARCH 2005 POSITION: WELDER PROJECT: BOILER & PRESSURE VESSEL

SUMMARY OF SKILLS

LANGUAGE READING WRITING SPEAKING

ENGLISH GOOD GOOD GOOD

BAHASA MALAYSIA GOOD GOOD GOOD

COMPUTER AND NON TECHNICAL SKILL:

PROGRAMME: Microsoft Office (Word, Excel, PowerPoint), Adobe Photoshop and Acrobat Professional.

LANGUAGE: C++ Visual Basic

SUMMARY:More than (7) years experience in Quality Control and Inspection of oil and gas - Piping systems, pipelines,

pressure vessels, oil and gas facilities,structure other related industrial facilities during fabrication, erection and

installation stages, and testing. Participate in audit program activities, review and confirm quality requirements and

records of subcontractors. Attend meeting with Company, Subcontractor and Vendor to determine subjects and

problems relevant to quality control and inspection, and give solution to problems that may arise. Maintain and monitor

the implementation of approved QA/QC procedures and inspection program. Review Inspection and Test Plans (ITP),

and method of statement procedures issued by subcontractors. Perform and conduct timely on-site inspection, and

check quality control activities to ensure conformance to QA/QC requirements and specified procedures, and all items of

construction work comply with drawings, standards and project specifications. Verify that all inspection and test

required have been completed and rated acceptable. Perform inspection survey for materials as per approved purchase

order, material data sheet and specification requirement. Take lead role in review of fabrication packages (as per system

definition) issued by contractor. Coordinate with construction and subcontractor to complete the outstanding inspection

and activities.

Page 7: curiculum vitae azlan (latest)

AZLAN SHAH BIN AHMAD SUHAIMI PCN WELDING INSPECTOR PCN RADIOGRAPHIC INTERPRETER 3.4 PCN ULTRASONIC TESTING 3.1,3.2,3.8,3.9

Page 7 of 7

CAREER INTERESTS

AVAILABILITY : IMMEADIATELY WILLING TO TRAVEL : HEAVY(>100%) WILLING TO RELOCATE : YES

Mohd Fendi bin Darus, Edey Simla QA/QC Supervisor, QA/QC Supervisor, Petra Resources Sdn Bhd, Ombak Marine Group, 012-6199465 Tel: 019-7700383.

Borhanudin Mohammad Izzudin bin ismain QQ/QC Engineer, Head of QA/QC department,

PBJV Group KNM Group

Tel: 0176815220. 017-3632231

Amir Zakee Adnal Azmi Mohammad QA/QC Manager, QA/QC Manager GOM Resources(M)sdn bhd Global offshore Malaysia sdn bhd [email protected] [email protected] 0125222976 0127770592

REFERENCES