COMPLETED PROJECT ENGINEERING AND CONSTRUCTION No. Description Duration Client 1 Building, Infra and Structures Works for Sekolah Rendah Agama Integrasi Saujana Utama, Daerah Kuala Selangor, Selangor. RM8,203,068.00 Aug 10 – Dec 11 Jabatan Agama Islam Selangor 2 Installation of ELV System for Kompleks Lembaga Hasil Dalam Negeri Malaysia (LHDNM), Sungai Petani, Kedah. RM 1,161,075.00 Oct 10 – Aug 11 Lembaga Hasil Dalam Negeri Malaysia 3 Installation of ELV System for Institut Perakaunan Negara (IPN), Sabak Bernam, Selangor (Phase III) Package 2 RM 684,392.00 Mac 10 – May 11 Ministry of Finance 4 Installation of ELV System for Institut Agro-Bioteknologi (ABI) Mosti at Mardi, UMP Serdang, Selangor RM 860,818.00 Feb 10 – Apr 11 MARDI 5 Supply, Installation, T&C of Telephone System, Information Technology and ELV for 8 Blocks INSPEN, Sepang, Selangor RM 1,508,808.00 Jun 09 – Mac 11 JKR/INSPEN 6 Electrical LV, ELV, Telephone System, ICT, Cold Water & Sanitary Plumbing, Fire Protection, Air-Con & Ventilation, Kitchen Equipment and LPG for 40School Blocks at Sek. Men. Sains Sembrong, Kluang, Johor RM 9,480,867.00 Dec 08 – Dec 10 RTZB/Ministry of Education 7 Supply, Deliver, Install, Testing and Commissioning Electric Fence System and Maintenance at FELCRA Gugusan Peta Temalek to Kamajuan Tanah Kg. Sg. Labis, Segamat, Johor. RM1,101,030.00 Nov 09 – Dec 10 FELCRA 8 ‘Design and Build’ for Architecture, Building, Structure, M&E works and Supply &Install Seven Units of Incinerator for DBKL, Kuala Lumpur RM 6,988,000.00 Oct 08 – Oct 10 Dewan Bandaraya Kuala Lumpur 9 Building, Infra and Structures Works for 4-storey Admin Block, Hostel Block, Mosque for Sek. Men. Sains Tuanku Jaafar, Kuala Pilah, Negeri Sembilan RM 7,950,000.00 Apr 08 – Apr 10 JKR/Ministry of Education 10 Upgrading Building, Structure, Sewerage and M&E Works for 3x4 storey Asrama Semai Bakti Felda, Ulu Kelang, Selangor RM 6,100,000.00 Feb 09 – Feb 10 FELDA HOLDING 11 Proposed Renovation Of Chiller System At Podium And Sundry Department, Plaza Bukit Bintang, Jalan Bukit Bintang, Kuala Lumpur. RM 5,405,500.00 May 09 – Jan 10 UDA Mall Sdn Bhd 12 Supply and Install Electrical System for IPD Dang Wangi, Kuala Lumpur. RM 6,079,716.00 May 07 – Aug 09 Ministry of Home Affairs

Upload: dinhnhan

Post on 21-Mar-2018

279 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: COMPLETED PROJECT 07082012 - TN SYNERGY … and LPG for 40School Blocks at Sek. Men. Sains ... UDA Mall Sdn Bhd 12 ... Civil Works At Transmission Main Intake Substation In Eastern

COMPLETED PROJECT

ENGINEERING AND CONSTRUCTION

No. Description Duration Client

1

Building, Infra and Structures Works for Sekolah Rendah Agama

Integrasi Saujana Utama, Daerah Kuala Selangor, Selangor.

RM8,203,068.00

Aug 10 – Dec

11

Jabatan Agama

Islam Selangor

2

Installation of ELV System for Kompleks Lembaga Hasil Dalam

Negeri Malaysia (LHDNM), Sungai Petani, Kedah.

RM 1,161,075.00

Oct 10 – Aug

11

Lembaga Hasil

Dalam Negeri

Malaysia

3

Installation of ELV System for Institut Perakaunan Negara (IPN),

Sabak Bernam, Selangor (Phase III) Package 2

RM 684,392.00

Mac 10 – May

11

Ministry of

Finance

4

Installation of ELV System for Institut Agro-Bioteknologi (ABI)

Mosti at Mardi, UMP Serdang, Selangor

RM 860,818.00

Feb 10 – Apr

11

MARDI

5

Supply, Installation, T&C of Telephone System, Information

Technology and ELV for 8 Blocks INSPEN, Sepang, Selangor

RM 1,508,808.00

Jun 09 – Mac

11

JKR/INSPEN

6

Electrical LV, ELV, Telephone System, ICT, Cold Water & Sanitary

Plumbing, Fire Protection, Air-Con & Ventilation, Kitchen

Equipment and LPG for 40School Blocks at Sek. Men. Sains

Sembrong, Kluang, Johor

RM 9,480,867.00

Dec 08 – Dec

10

RTZB/Ministry

of Education

7

Supply, Deliver, Install, Testing and Commissioning Electric Fence

System and Maintenance at FELCRA Gugusan Peta Temalek to

Kamajuan Tanah Kg. Sg. Labis, Segamat, Johor.

RM1,101,030.00

Nov 09 – Dec

10

FELCRA

8

‘Design and Build’ for Architecture, Building, Structure, M&E works

and Supply &Install Seven Units of Incinerator for DBKL, Kuala

Lumpur

RM 6,988,000.00

Oct 08 – Oct

10

Dewan

Bandaraya

Kuala Lumpur

9

Building, Infra and Structures Works for 4-storey Admin Block,

Hostel Block, Mosque for Sek. Men. Sains Tuanku Jaafar, Kuala

Pilah, Negeri Sembilan

RM 7,950,000.00

Apr 08 – Apr

10

JKR/Ministry of

Education

10

Upgrading Building, Structure, Sewerage and M&E Works for 3x4

storey Asrama Semai Bakti Felda, Ulu Kelang, Selangor

RM 6,100,000.00

Feb 09 – Feb

10

FELDA HOLDING

11

Proposed Renovation Of Chiller System At Podium And Sundry

Department, Plaza Bukit Bintang, Jalan Bukit Bintang, Kuala

Lumpur.

RM 5,405,500.00

May 09 – Jan

10

UDA Mall Sdn

Bhd

12

Supply and Install Electrical System for IPD Dang Wangi, Kuala

Lumpur.

RM 6,079,716.00

May 07 – Aug

09

Ministry of

Home Affairs

Page 2: COMPLETED PROJECT 07082012 - TN SYNERGY … and LPG for 40School Blocks at Sek. Men. Sains ... UDA Mall Sdn Bhd 12 ... Civil Works At Transmission Main Intake Substation In Eastern

COMPLETED PROJECT

ELECTRICAL POWER

No. Description Duration Client

1

Design and Built for Electrical Supply Project (BELB) for Gridlines

Zone 5A Sabah.

Year 2009 – 2010.

RM 16,588,000.00

Jan 10 – Nov

10

BH/

Kementerian

Luar Bandar dan

Wilayah

2

Supply, Installation, Testing And Commissioning of 11KV 3-Core

XLPE Submarine Cable And Accessories From Pelabuhan Klang to

Pulau Ketam

RM 12,000,000.00

Jul 08 – Oct

10

Abadi Ria Sdn

Bhd/ TNB

3

Supply, Delivery, Installation, T&C of 2 units Generator Set 750 kVA

for UKM-MTDC Technology Centre, Bangi, Selangor

RM 2,245,974.00

Sep 09 – Sep

10

UKM MTDC

4

Supply, Erect & Commmissioning of 132KV, 33KV & 11KV

Switchgear And Ancilliary Equipment Complete With Assosiated

Civil Works At Transmission Main Intake Substation In Eastern

Region

RM 11,000,000.00

Mac 07 – Jul

10

Transpro /TNB

5

Supply, Install, Testing & Commissioning Works for 3 Substation inc

of HT&LV Switchgear, Transformer, Genset and Cabling for Bukit

Bintang Complex, Kuala Lumpur

RM 9,038,680.00

Sep 09 – Feb

10

UDA HOLDING

6

Installation, Testing And Commissioning Of 33KV Aluminium XPLE

Single Core Underground Cable And Accessories From PMU TJID

To PPU Industri Senawang, For TNB Distribution, Negeri Sembilan.

RM 4,156,500.00

Sep 08 – Aug

09

Abadi Ria Sdn

Bhd/ TNB

7

Design, Construction, Deviation, Resiting And Dismantle Works For

Implementation Of 132KV & 275KV DC Transmission Line At PMU

Semabok And Ujung Pasir.

RM 3,000,000.00

Apr 07 – May

09

Transpro/TNB

Page 3: COMPLETED PROJECT 07082012 - TN SYNERGY … and LPG for 40School Blocks at Sek. Men. Sains ... UDA Mall Sdn Bhd 12 ... Civil Works At Transmission Main Intake Substation In Eastern

COMPLETED PROJECT

MAINTENANCE AND RETROFITTING SERVICES

No. Description Year

Completed Client

1

Installation and Maintenance Works of Decorative Lighting at Di

Wilayah Persekutuan Kuala Lumpur for The Year 2009/2011.

RM 1,200,000.00

March 2012 Dewan

Bandaraya

Kuala Lumpur

2

TNB Relay Retrofitting FAT Testing Phase 2 – 32 Bays, 275kV &

132kV.

RM 102,400.00

February

2012

Reltech

Ventures Sdn

Bhd

3

Modification Works For SCADA And RTU For Mainhead C & D

(Phase 3)

RM 324,000.00

February

2012

ETD Makmur

Sdn Bhd

4

Retrofitting Works For 132kV UGC Feeder: PMU TNB HQ And PMU

Imbi.

RM 70,000.00

February

2012

Reltech

Ventures Sdn

Bhd

5

Retrofitting Works(275kV & 132kV) For Mainhead B & D At Paka

Power Station, PMU Kg. Awah, Kenyir Power Station, PMU Telok

Kalong, PMU Kuantan North, PMU Gebeng Industry, PMU Yong

Peng East, PMU Kemaman, PMU Telok Kalong, PMU Salak Tinggi,

PMU Plentong, PMU Cahaya Baru, PD Power Station, PMU Kangkar

Tebrau, PMU Rengit, PMU Seelong, PMU Kg. Gadek, PMU

Kelemak, PMU Cheng, PMU Masjid Tanah, PMU Rantau, PMU

Rasah, PMU Kuala Pilah & PMU Pasir Besar.

RM 2,150,000.00

January 2012 Reltech

Ventures Sdn

Bhd

6

Modification Works For SCADA & RTU At PMU Proton 132kV And

PMU Hicom 132kV

RM 100,000.00

August 2011 Reltech

Ventures Sdn

Bhd

7

Civil Maintenance Works for 11KV Substation at Kuala Lumpur

Centre Region for TNB Distribution.

RM 74,817.27

June 2011 TNB

Distribution

8

Retrofitting Works (275kV & 132kV) For Mainhead A & B At PMU

Paka, PMU Kg. Awah, PMU Kenering, PMU Kuala Kangsar, PMU

Pergau, PMU Tanah Merah, PMU Temenggor, PMU Kangar, PMU

Kuala Perlis, PMU Bukit Merah, PMU Bagan Serai, PMU Kota Setar,

PMU Kota Sarang Semut & PMU Rantau Petronas.

RM 361,500.00

October 2010 Sisma

Enterprise Sdn

Bhd

9

Retrofitting Works At PMU Merlimau 132kV And Melaka Power

Station 132kV For Restricted Earthfault Protection.

RM 28,000.00

October 2010 Warta Prima

Sdn Bhd

Page 4: COMPLETED PROJECT 07082012 - TN SYNERGY … and LPG for 40School Blocks at Sek. Men. Sains ... UDA Mall Sdn Bhd 12 ... Civil Works At Transmission Main Intake Substation In Eastern

COMPLETED PROJECT

MAINTENANCE AND RETROFITTING SERVICES

No. Description Year

Completed Client

10

Retrofitting Works At PMU Merlimau 132kV And Melaka Power

Station 132kV – Transformer Differential Protection.

RM 25,000.00

September

2010

Warta Prima

Sdn Bhd

11

Retrofitting Works At PMU Zarina 132kV and PMU Gerisik 132k -

Transformer Diferential Protection.

RM 33,000.00

September

2010

ETD Makmur

Sdn Bhd

12

Retrofitting Works Complete With Testing And Commissioning At

PMU Mersing 132/11kV For REF, SBEF, OCEF And Annunciator

RM 50,000.00

September

2010

ETD Makmur

Sdn Bhd

13

Design, Supply And Retrofitting Works At PMU Kuala Lumpur South

132kV & PMU New Sea Park 132kV

RM 130,000.00

August 2010 Reltech

Ventures Sdn

Bhd

14

Retrofitting Works At PMU Malim Jaya 132kV.

RM 20,000.00

July 2010 ETD Makmur

Sdn Bhd

15

Retrofitting Work For 132kV & 275kV Protection Relay For

Mainhead D At PMU Salak Tinggi, PMU Kg. Awah, Kuala Langat

Power Station, Port Dickson Power Station, PMU Kuala Lumpur

East, PMU Balakong, PMU Seri Damansara, PMU Bukit Jalil, PMU

Serdang & PMU Kuala Lumpur North.

RM 290,000.00

May 2010 Reltech

Ventures Sdn

Bhd

16

Retrofitting Flag Relay & Annunciator At PPU Kg. Gajah 33/11kV

RM 30,500.00

April 2010 IA Services Sdn

Bhd

17

Services And Maintenance Works At Hospital Sungai Buloh, Kolej

Sains Kesihatan Bersekutu Sungai Buloh, Hospital Serdang And

Hospital Sultan Nur Zahirah.

RM 108,226.00

February

2010

Radicare (M)

Sdn Bhd

18

Retrofitting OCEF At PMU Merlimau 132/11kV And PMU Zarina

132/11kV.

RM 44,000.00

February

2010

Bekal Hikmat

Sdn Bhd

Page 5: COMPLETED PROJECT 07082012 - TN SYNERGY … and LPG for 40School Blocks at Sek. Men. Sains ... UDA Mall Sdn Bhd 12 ... Civil Works At Transmission Main Intake Substation In Eastern

COMPLETED PROJECT

OIL AND GAS

No. Description Duration Client

1

Electrical Works at Pusat Sample Geologi Petronas, Ulu Kelang,

Gombak

CONTRACT VALUE: RM 1,752,972.00

Oct 10 – Sept

11 Petronas Sdn Bhd

2

Installation And Pre-Commissioning Of Electrical &

Instrumentation Works For The Construction Package During

PSR-1 Turnaround (PESO Project) At Petronas Penapisan

(Melaka) Sdn Bhd.

CONTRACT VALUE: RM 140,000.00

Nov 10 – Jan

11

Dialog Plant

Services Sdn Bhd

3

Electrical Installation Works For Upgrading Of Power for Boiler

Extension At Methanol Plant Labuan.

CONTRACT VALUE: RM 255,000.00

May 10 – Oct

10 KENTZ MEPC (M)

4

Installation And Commissioning Of Instrument Works For

Petronas Centralised Utilities Facilities & Manpower Supply For

Maintenance/ Services & Variation Order At Gebeng, Kuantan.

CONTRACT VALUE: RM 1,750,000.00

Mac 09 – Jul

10 KENTZ MEPC (M)

5

Instrumentation Installation And Commissioning Works For

Petronas BASF JV – BPC BDO Complex project & Variation

Order At Gebeng, Kuantan.

CONTRACT VALUE: RM 1,520,000.00

Mar 10 – May

10 KENTZ MEPC (M)

6

Electrical, Instrumentation And DCS Installation Works For New

Expansion Of Process Plant, Reactor/SPS Area, New Tank Farm,

Air Compressor / Hot Oil Heater Area.

CONTRACT VALUE: RM 504,000.00

Nov 07 – Aug

08

ESTEROL Palm Oil

Sdn Bhd

7 Electrical Works at Petronas Research Sdn Bhd, Bangi.

CONTRACT VALUE: RM 1,003,732.00

Nov 07 – May

08

Petronas Research

Sdn Bhd

8

Electrical And Instrumentation Installation For 3 x 700 MV

Coal-Fired Generating Power Plant Of Tanjung Bin, Johor.

CONTRACT VALUE: RM 3,250,000.00

Nov 05 – Nov

07

Bestwide /

Pinewell Matrix

Sdn Bhd

9

Supply And Installation Of Electrical Works For M & E Oleomas

Hydrogen & Stream Supply Plant At Pulau Indah, Selangor.

CONTRACT VALUE: RM 182,000.00

Jul 06 – Mar

07

Dialog E&C Sdn

Bhd