bab vii, pemampatan tanah

94
BAB VII KEMAMPUMAMPATAN TANAH (SETTLEMENT) BAB VII KEMAMPUMAMPATAN TANAH (SETTLEMENT)

Upload: danny

Post on 16-Feb-2016

296 views

Category:

Documents


1 download

DESCRIPTION

dasd

TRANSCRIPT

Page 1: Bab Vii, Pemampatan Tanah

BAB VII KEMAMPUMAMPATAN

TANAH (SETTLEMENT)

BAB VII KEMAMPUMAMPATAN

TANAH (SETTLEMENT)

Page 2: Bab Vii, Pemampatan Tanah

1.

PENYEBAB SETTLEMENT.

PENAMBAHAN BEBAN DIATAS MUKA TANAH•

PENURUNAN MUKA AIR TANAH

2. KOMPONEN SETTLEMENT.

IMMEDIATE SETTLEMENT/PEMAMPATAN SEGERA, Si

CONSOLIDATION SETTLEMENT/PEMAMPATAN KONSOLIDASI/PRIMARY CONSOLIDATION,Sc

SECONDARY SETTLEMENT/PEMAMPATAN SEKUNDER, Ss

.

Page 3: Bab Vii, Pemampatan Tanah

Settlement

Time

Consolidationsettlement

Initialsettlement

Finalsettlement

Typical settlement -

time response

Page 4: Bab Vii, Pemampatan Tanah

Load

Time

Components of settlement

Constructiontime

Settlement

Time

Consolidationsettlement sc

Initialsettlement si

Total finalsettlement

sTf

Const.time

Page 5: Bab Vii, Pemampatan Tanah

3. PEMAMPATAN SEGERA, Si

p = Beban

terbagi

rata.•

B = Lebar

pondasi

(diameternya)•

μ

= Poisson ratio (Tabel

7.2)•

E = Modulus Young (Tabel

7.3)•

Ip

= Faktor

pengaruh

(Tabel

7.1)

pi IE

BpS21..

Page 6: Bab Vii, Pemampatan Tanah

Tabel

7.1. Faktor

Pengaruh

Untuk

Pondasi

Bentuk

I pPanjang-----------

lebar

L e n t u r Kaku

Pusat Pojok Tengah

sisi

terpendek

Tengah

sisi

terpanjang Rata-rata Rata-rata

- Bulat - 1.0 0.64 0.64 0.64 0.85 0.88- Bujur

sangkar1 1.12 0.56 0.76 0.76 0.95 0.82

- Empatpersegipanjang

1.5 1.36 0.67 0.89 0.97 1.15 1.06

2.0 1.52 0.76 0.98 1.12 1.30 1.203.0 1.78 0.88 1.11 1.35 1.52 -5.0 2.10 1.05 1.27 1.68 1.83 1.70

10.0 2.53 1.26 1.49 2.12 2.25 2.10100.0 4.00 2.00 2.20 3.60 3.70 3.40

1000.0 5.47 2.75 2.94 5.03 5.15 -10000.0 6.90 3.50 3.70 6.50 6.60 -

Page 7: Bab Vii, Pemampatan Tanah

Tabel

7.2. Harga-harga

Angka

Poisson (μ).

Jenis

Tanah Angka

Poisson, μ

-

Pasir

lepas-

Pasir

agak

padat-

Pasir

padat-

Pasir

berlanau-

Lempung

lembek-

Lempung

agak

kaku

0.20 -

0.400.05 -

0.400.20 -

0.430.20 -

0.400.15 -

0.250.20 -

0.50

Page 8: Bab Vii, Pemampatan Tanah

Tabel

7.3. Harga-harga

Modulus Young (E).

Jenis

TanahModulus Young (E)

psi kN/m2

-

Lempung

lembek-

Lempung

keras

-

Pasir

lepas-

Pasir

padat

250 -

500850 -

2000

1500 -

10005000 -

10000

380 -

34723865 -

13200

10350 -

2760034500 -

69000

Page 9: Bab Vii, Pemampatan Tanah

Soil Layer

Rigid bedrock

h

P a pav 2

rigid

Rigid circular footing on an elastic layer on a rigid base

2a

s p aE

Iav

Page 10: Bab Vii, Pemampatan Tanah

0.0 0.2 0.4 0.6 0.8 1.0 0.8 0.6 0.4 0.2 0.0h/a a/h

1.6

1.2

0.8

0.4

0.0

Settlement Factor for rigid circular footing on a layer

2a

P a pav 2

h

s p aE

Iav

0.00.20.40.5

I

Page 11: Bab Vii, Pemampatan Tanah

3m9m

500 kN

Young’s Modulus = 5 MPaPoisson’s ratio = 0.3

Example: Rigid circular footing

I

p kPa

s m

av

122

50015

70 7

70 7 15 1225000

0 026

2

.

( . ).

. . . .

for a/h = 0.167,

= 0.3 by interpolation

Page 12: Bab Vii, Pemampatan Tanah

0.0 0.2 0.4 0.6 0.8 1.0 0.8 0.6 0.4 0.2 0.0h/a a/h

1.6

1.2

0.8

0.4

0.0

Settlement Factor for rigid circular footing on a layer

0.00.20.40.5

I

Page 13: Bab Vii, Pemampatan Tanah

E mz0

2a

Circular footing on a very deep non-homogeneous soil

p

E

z

s p aE

I0

Page 14: Bab Vii, Pemampatan Tanah

E mz0

2a

21

10--1

10--2

10--3

10--4

10---4 10---2 1 102

Settlement of circular footing on non-homogeneous soil

I

0

1/3

1/2

Ema

0

p

Page 15: Bab Vii, Pemampatan Tanah

E MPa0 220m

p kPa 75

E = 5MPa

10m

Example: circular footing on non-homogeneous soil

E E mzm

m MPa m

0

5 2 100 3. /

Page 16: Bab Vii, Pemampatan Tanah

Soil Layer

Rigid bedrock

h

Settlement under the edge of a flexible strip footing on an elastic layer overlaying a rigid base

B

sp h

EI

p

Page 17: Bab Vii, Pemampatan Tanah

Settlement factor for a flexible strip load on a soil layer

2.0

1.6

1.2

0.8

0.4

0.00.0 0.25 0.5 h/B

2.0 1.0 0.0B/h

p

h B

sp h

EI

I

0.0

0.2

0.4

0.5

Page 18: Bab Vii, Pemampatan Tanah

4. PEMAMPATAN KONDOLIDASI, Sc

LIHAT MODEL “SPRING ANALOGY”

(GAMBAR 7.1)–

PEGAS ANALOG DENGAN : BUTIRAN TANAH–

AIR DALAM SILINDER ANALOG DENGAN : AIR PORI.

URUTAN PERISTIWA–

KONDISI AWAL DARI MODEL :•

TEGANGAN AIR TANAH = Uo

= TEGANGAN AIR TANAH NETRAL

TEGANGAN PADA BUTIRAN TANAH =σ’o

= TEGANGAN OVERBURDEN EFEKTIF.

DIBERI BEBAN = Δσ•

SAAT t = 0

TEG. AIR = U = Uo

+ ΔσTEG. PADA BUTIRAN = σ’ = σo

’ + 0•

SAAT t = t1

TEG. AIR = U = Uo

+ ΔU1

ΔU1

< ΔσTEG. PADA BUTIRAN :σ’= σ’1 + Δ σ’1

Δ σ1

< Δ σCATATAN : ΔU + Δσ1

=

Δσ•

SAAT t = ~

TEG. AIR U = U0

. ΔU~

=0 TEG. PADA BUTIRAN : σ’= σ’1 + Δ σ

Page 19: Bab Vii, Pemampatan Tanah

Soil-water analogy : Equilibrium

HydrostaticHydrostaticpressure, pressure, uuoo

Valve Valve ((closedclosed))

SpringSpring ((soil skeletonsoil skeleton))

Pore waterPore water

Overburden pressure, Overburden pressure, vv

Page 20: Bab Vii, Pemampatan Tanah

Soil-water analogy : Application of surcharge, at t=0

HydrostaticHydrostaticpressure, pressure, uuoo + + u u

Valve Valve (closed)(closed)

Small springSmall springcompressioncompression

Small waterSmall watercompressioncompression

''vv + + ssee

uu

''vv

Page 21: Bab Vii, Pemampatan Tanah

Soil-water analogy : Application of surcharge, at t>0

HydrostaticHydrostaticpressure, pressure, uuoo

Valve Valve ((openopen))

Large springLarge springcompressioncompression

Water expulsionWater expulsion

vv + + sscc

uutt11

''vv

uutt22 tt

Page 22: Bab Vii, Pemampatan Tanah

Soil-water analogy

11

22

33

44

55

vv + +

''vv

uutt11tt22

tt

Page 23: Bab Vii, Pemampatan Tanah

KONSOLIDASI

SATU DIMENSI.

LIHAT GAMBAR 7.2.

0000 1 ee

HH

AxHAxH

VV

Page 24: Bab Vii, Pemampatan Tanah

TEST KONSOLIDASI 1 DIMENSI.

ALAT : (GAMBAR 7.3)-

CONSOLIDOMETER FIXED –

RING-

CONSOLIDOMETER FLOATING –

RING

UKURAN SAMPEL :

DIAMETER : 2.5 INCHI (63.5mm)TINGGI : 1 INCHI (25.4mm)

RASIO PENAMBAHAN BEBAN :

LAMA/PERIODA PEMBEBANAN : 24 JAM UNTUK TIAP BEBAN.

DATA YANG DIPEROLEH :•

t = WAKTU.•

ΔH = BESAR PEMAMPATAN•

Δσ

= BESAR PENAMBAHAN BEBAN

1

Page 25: Bab Vii, Pemampatan Tanah
Page 26: Bab Vii, Pemampatan Tanah
Page 27: Bab Vii, Pemampatan Tanah

Base

Oedometer

Test

Porous Stone

Soil Specimen

Porous Stone

Loading Plate

Water / pore fluidWater / pore fluid Load( 25kPa )Load( 25kPa )

Confining RingConfining Ring

Page 28: Bab Vii, Pemampatan Tanah

Cell

Loading cap

Load Displacement measuring device

Soil samplewater

Porous disks

Measurement of soil properties

The oedometer

apparatus

Page 29: Bab Vii, Pemampatan Tanah

PARAMETER YANG DIPEROLEH :

-

INDEK KOMPRESI (Cc

)-

INDEK MENGEMBANG (Cs

)-

TEG. PRAKONSOLIDASI (σ’c

)-

KOEF. KONSOLIDASI (Cv

)

DIPERLUKAN UTK. MENGHITUNG BESAR PEMAMPATAN, Sc

.

DIPERLUKAN UTK. MENGHITUNG BESAR PEMAMPATAN, Sc

.

PEMAMPATAN KONSOLIDASI, Sc

.

ADALAH TIME-DEPENDENT PROCESS.RATE OF Sc IS CONTROLLED BY RATE OF WATER CAN BE EXPELLED FROM THE VOID ………………..

Page 30: Bab Vii, Pemampatan Tanah

KURVA e vs

log σ

KURVA e vs

log σ

DIGAMBARKAN DARI DATA HASIL TEST KONSOLIDASI LABORATORIUM.

URUTAN PEMBUATAN KURVA

HITUNG TINGGI BUTIRAN (SOLID) DARI TANAH (LIHAT GAMBAR 7.2)

ws

ss GA

WH..

Hs

= tinggi

solid tanah

HITUNG TINGGI AWAL PORI (Hv

).

Hv

= H –

Hs

H = tinggi

sampel

yang ditestkonsolidasi.

Page 31: Bab Vii, Pemampatan Tanah

HITUNG ANGKA PORI AWAL (eo

).

s

v

s

v

s

v

HH

AHAH

VVe

.

.0

sHHe

HITUNG PERUBAHAN ANGKA PORI, Δe, AKIBAT PEMAMPATAN TANAH, ΔH.

BUAT TABULASI PERHITUNGAN.

σ ΔH Δe e

σ1 ΔH1 Δe1 e1=e0

-e1

σ2 ΔH2 Δe2 e2=e1

-

Δe2

: : : :

dst dst dst dst

Page 32: Bab Vii, Pemampatan Tanah

NOTE :

222

2223

111

1112

1

1

ΔH1

= PEMAMPATAN AKIBAT BEBAN σ1

.

ΔH2

= PEMAMPATAN AKIBAT BEBAN σ2

.

-

GAMBAR KURVA e vs

log σ

(GAMBAR 7.4) HARI HASIL PERHITUNGAN.

Page 33: Bab Vii, Pemampatan Tanah

TEGANGAN PRAKONSOLIDASI (σ’c

)

σc

DITENTUKAN DARI KURVA e vs

log σ’

(GAMBAR 7.4) DENGAN CARA :

-

TENTUKAN TITIK PADA KURVA e vs

log σ’

YANG MEMPUNYAI JARI-JARI TERPENDEK (MIS.: TITIK A).

-

DARI TITIK A, BUAT :

-

GARIS DATAR

-

GARIS SINGGUNG

-

BUAT GARIS BAGI PADA SUDUT

-

PERPANJANG BAGIAN YANG LURUS DARI KURVA (GARIS ) HINGGA MEMOTONG GARIS DI TITIK H. ABSIS TITIK H = HARGA σc

YANG DICARI.

AB

CD

AE

AEFG

BAD

Page 34: Bab Vii, Pemampatan Tanah

A

C

B

D

F

pc

e

Estimating the preconsolidation

pressure

log (’)

Casagrande’s

method

E

F

G

H

Page 35: Bab Vii, Pemampatan Tanah
Page 36: Bab Vii, Pemampatan Tanah
Page 37: Bab Vii, Pemampatan Tanah

• Preconsolidation

stress (pressure)The maximum effective stress which has been applied to an element of soil

• Over-consolidated A soil is called over-consolidated (OC) if:

• Normally consolidatedA soil is called normally consolidated (NC) if:

Teminology

Current Effective Stress

Preconsolidation

Stress<

Current Effective Stress

Preconsolidation Stress

=

r

Page 38: Bab Vii, Pemampatan Tanah

TANAH YANG TERKONSOLIDASI NORMAL (NORMALMALLY CONSOLIDATED SOIL/NC-SOIL)

TANAH YANG TERKONSOLIDASI LEBIH (OVER CONSOLIDATED SOIL/OC-SOIL)

-

NC –

SOIL 1''

o

cOCR

-

OC –

SOIL

OCR > 1

OCR = OVER CONSOLIDATED RATIO.

σo

= TEG. OVERBURDEN EFEKTIF.

σc

= TEG. PRAKONSOLIDASI EFEKTIF.

σo

’ = ’h

σo

AKIBAT BERAT EFEKTIF TANAH DIATAS BIDANG/TITIK YANG DITINJAU.

BERAT VOL. TANAH EFEKTIF.

h KEDALAMAN TITIK YANG DITINJAU.

Page 39: Bab Vii, Pemampatan Tanah

INDEK KOMPRESI (Cc

).

INDEK KOMPRESI LAPANGAN (Cc-lap

) DIPERLUKAN UNTUK MEMPRAKIRAKAN BESAR PEMAMPATAN KONSOLIDASI Sc

AKIBAT ADANYA BEBAN Δσ

.

CARA MENENTUKAN Cc-lap

UNTUK NC-SOIL (GAMBAR 7.5)

TENTUKAN /PLOT HARGA eo

PADA SUMBU ORDINAT PADA KURVA e vs

log σ.

TENTUKAN HARGA σc

DARI KURVA e vs

log σ’.

PLOT HARGA σc

PADA KURVA e vs

log σ’.

BUAT GARIS DATA MELALUI eo

HINGGA MEMOTONG GARIS KERJA σc

DI TITIK B.

BUAT GARIS DATAR MELALUI TITIK D (TTK. D TERLETAK PADA ORDINAT 0.42 eo

) HINGGA MEMOTONG PERPANJANGAN BAGIAN KURVA YANG LURUS DI TITIK C.

HUBUNGKAN TITIK B DAN TITIK C KEMIRINGAN/ TANGEN DARI GARIS ADALAH Cc(LAB)

.

BC

'log'log42.0

1)(

c

ooLAPc

eeC

BC

Page 40: Bab Vii, Pemampatan Tanah

CARA MENENTUKAN Cc-lap

UNTUK OC-SOIL (GAMBAR 7.6)

TENTUKAN HARGA eo

, σc

’, σo

’.

PLOT HARGA eo

, σc

’, σo

PADA KURVA e vs

log σ’.

BUAT GARIS DATAR MELALUI eo

HINGGA MEMOTONG GARIS KERJA σc

DI TITIK D.

BUAT GARIS DATAR MELALUI TITIK D YANG SEJAJAR GARIS

( ADALAH GARIS LURUS DARI KURVA UNLOADING) HINGGA MEMOTONG GARIS KERJA σc

DI TITIK E.

BUAT GARIS DATAR MELALUI TITIK F (TITIK F MEMPUNYAI ORDINAT 0.42 eo

) HINGGA MEMOTONG PERPANJANGAN BAGIAN KURVA YANG LURUS DI TITIK C.

HUBUNGKAN TITIK C DAN TITIK E KEMIRINGAN/ TANGEN DARI GARIS ADALAH Cc(LAB)

.B

'log'log42.0

2

1)(

c

oLAPc

eeC

GF GF

CE

Page 41: Bab Vii, Pemampatan Tanah

INDEK MENGEMBANG (Cs

).

HARGA Cs

UNTUK NC-SOIL.

LIHAT GAMBAR 7.5 KEMIRINGAN DARI GARIS EF

ADALAH HARGA Cs

.

'log'log EF

FEs

eeC

'log'log GH

HGs

eeC

HARGA Cs

UNTUK OC-SOIL.

LIHAT GAMBAR 7.6 KEMIRINGAN DARI GARIS GH

ADALAH HARGA Cs

.

Page 42: Bab Vii, Pemampatan Tanah

BESAR PEMAMPATAN KONSOLIDASI (Sc

) DI LAPANGAN.

FORMULA Sc

UNTUK NC-SOIL.

LIHAT GAMBAR 7.2 .

HeeSH

ee

HH

oc

oo

11

BILA :

PADA TEG. OVERBURDEN, σ0

, HARGA e = eo

.

AKIBAT PENAMBAHAN BEBAN, Δσ

, HARGA eo

BERKURANG MENJADI e1

.

(Δe = eo

–e1

).

HARGA Δe DIGANTI DENGAN HARGA Cc

(GBR. 7.5)

Δe = Cc

(log σ1

-

log σo

’) σ1

’ = σo

’+ Δσ

ATAU :

''log

o

oeCe

Page 43: Bab Vii, Pemampatan Tanah

JADI :

'

'log1~

o

oe

oc C

eHS

NC-SOIL

……………………………….. a

Page 44: Bab Vii, Pemampatan Tanah

FORMULA Se UNTUK OC-SOIL

LIHAT GAMBAR 7.6 DAN DENGAN CARA SAMA UNTUK NC-SOIL DIDAPAT :

-

BILA (σo

’ + Δσ) ≤ σo

'

'log1~

o

os

oc C

eHS

-

BILA (σo

’ + Δσ) >

σc

'

'log1'

'log1 1

~c

oc

o

cs

ec C

eHC

eHS

………………….. b

…………………. c

Page 45: Bab Vii, Pemampatan Tanah

Over -

consolidated soil

Q

P

R

e = e0e = ef

O

0 f pc logarithmic scale

F

OCR pc

Overconsolidation

ratio, (5)

Page 46: Bab Vii, Pemampatan Tanah

KOEFISIEN PEMAMPATAN/COMPRESSIBILITY COEFFICIENT (av

).

KOEFISIEN PERUBAHAN VOLUME/VOLUME CHANGE COEFFICIENT (mv

).

HARGA av

.

-

DITENTUKAN DARI KURVA e vs

σ’

(GBR. 7.7)

-

av

MERUPAKAN TANGEN DARI GARIS SINGGUNG YANG DIBUAT PADA BAGIAN KURVA YANG PALING LENGKUNG.

12

21

eeav

Page 47: Bab Vii, Pemampatan Tanah

HARGA mv

.

-

DITENTUKAN DARI KURVA ε

vs

σ’

(GBR. 7.8)

-

mv

MERUPAKAN TANGEN DARI GARIS SINGGUNG YANG DIBUAT PADA BAGIAN KURVA YANG PALING LENGKUNG.

o

vv

ov

eam

eem

1

:maka1

karena;12

21

Page 48: Bab Vii, Pemampatan Tanah

Stress-strain :

vs ’

Coefficient of volume change, mv

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

0 1000 2000 3000 4000Effective pressure, ' (kPa)

Vert

ical

Str

ain,

(%)

mv = -

d

= 1d’

D

mv = -

d

= 1d’

D

1320 kPa1320 kPa

650 kPa

= 13.0%650 kPa

= 13.0%2000 kPa

= 21.2%2000 kPa

= 21.2%

At 1320 kPa :mv = 6.21e-5 kPa-1

and D = 16.1 MPa

1

D = Constrained ModulusD = Constrained Modulus

mv

Page 49: Bab Vii, Pemampatan Tanah

PENENTUAN HARGA Cc

DAN Cs

SECARA EMPIRIS.

Cc

= 0.009 (LL –

10)

Cs ≈

1/5 sampai

1/10 Cc

.

KECEPATAN WAKTU KONSOLIDASI.

LIHAT GAMBAR 7.1. DAN GAMBAR 7.9.

FORMULA YANG DIKEMBANGKAN OLEH TERZAGHI (1948) DENGAN ASUMSI :

1.

TANAH ADALAH HOMOGEN.

2.

TANAH DALAM KONDISI JENUH.

3.

KEMAMPUMAMPATAN AIR DAN BUTIRAN DIABAIKAN.

4.

ALIRAN AIR HANYA TERJADI DALAM SATU ARAH (PADA ARAH PEMAMPATAN).

5.

HUKUM DARCY BERLAKU

Page 50: Bab Vii, Pemampatan Tanah

Stress-strain : e vs

log ’ Compression Index, Cc

0

0.2

0.4

0.6

0.8

1

1.2

1 10 100 1000 10000Effective pressure, ' (kPa)

Void

Rat

io, e

Cc = -

de d log'

Cc = -

de d log'

420~3200 kPa420~3200 kPa

420 kPae

= 0.87420 kPae

= 0.873200 kPae

= 0.533200 kPae

= 0.53From 420~3200 kPa :Cc = 0.386

Page 51: Bab Vii, Pemampatan Tanah

LIHAT GAMBAR 7.10.–

LAPISAN TANAH LEMPUNG YANG MEMAMPAT, TEBAL = 2 H.

BEBAN Δσ

DIBERIKAN; TEG. AIR PORI BERTAMBAH.

PADA ELEMEN A :

KECEPATAN AIR MENGALIR KELUAR –

KECEPATAN AIR YANG MENGALIR MASUK = KECEPATAN PERUBAHAN VOLUME.

JADI :

tVdzdydx

zVz

zuk

zhkkiV

wz

HUKUM DARCY :

tvdzdydx

zuk

w

2

2

SEHINGGA :

Page 52: Bab Vii, Pemampatan Tanah

NOTE :

teV

tVe

tVeVV

ttV

edzdydx

eVV

eVVVVV

sss

ss

s

ssvs

)(

11

KARENA TANAH TIDAK KOMPRESSIBLE MAKA :

te

edzdydx

teV

tVt

V

s

s

1

0

Page 53: Bab Vii, Pemampatan Tanah

MASUKKAN PERSAMAAN 1 KE PERSAMAAN 2

te

ezUk

te

edydzdxdzdydx

zUk

w

w

11

1

2

2

2

2

TELAH DIKETAHUI

uaae

eea

vv

v

Page 54: Bab Vii, Pemampatan Tanah

MASUKKAN 4 KE 3.

tUa

ezUk

vw

11

2

2

2

2

2

2

2

2

)1(zU

aek

zU

mk

tU

tUm

zUk

wv

o

wv

vw

vwv

o Ca

ek

)1(

ATAU :

BILA :

MAKA :

2

2

zUC

tU

v

Cv

= Koef. konsolidasi

Page 55: Bab Vii, Pemampatan Tanah

UNTUK PENYELESAIAN PERSAMAAN DIATAS DIPERLUKAN :

PENENTUAN KONDISI BATAS DAN KONDISI AWAL UNTUK KONSOLIDASI SATU DIMENSI.

YAITU :

-

z = 0

u = 0

-

z = 2 Hdr

u = 0 Hdr

= panjang

aliran

air terpanjang.

KONDISI DOUBLE DRAINAGE Hdr

= H/2

KONDISI SINGLE DRAINAGE Hdr

= H

H = TEBAL LAPISAN TANAH YANG MEMAMPAT.

- t = 0

Δu = Δσ

= (σ2

’ – σ1

’)

Page 56: Bab Vii, Pemampatan Tanah

z = 2H : u = 0z = 2H : u = 0

z = 0 : u = 0z = 0 : u = 0

t = t =

: : u = 0u = 0t = 0 : t = 0 : u = u =

INITIALINITIALCONDITIONSCONDITIONS

BOUNDARYBOUNDARYCONDITIONSCONDITIONS

2H2H

Page 57: Bab Vii, Pemampatan Tanah

PENYELESAIAN MATEMATIS (TERZAGHI 1925) :

U =(σ2

’ – σ1

’)

Σ

f1

(Z) f2

(T)

waktufaktor;

waktu;

ditinjauyangkedalaman;

2

T

tH

tCT

zHzZ

drv

WAKTU KONSOLIDASI (t)

v

dr

CHT

t 2

Page 58: Bab Vii, Pemampatan Tanah

DERAJAT KONSOLIDASI (U).

PROSES KONSOLIDASI PADA SUATU WAKTU t DAN PADA SUATU KEDALAMAN Z PADA LAP. YANG MEMAMPAT DAPAT DIKORELASIKAN DENGAN ANGKA PORI e.

KORELASI TERSEBUT DINAMAKAN :

DERAJAT KONSOLIDASI (U)

1221

1 ; eeeeeeeU z

e1

= ANGKA PORI SEBELUM PEMBEBANAN/ANGKA PORIAWAL.

e2

= ANGKA PORI PADA SAAT TEG. AIR PORI = Uo

= 0/ANGKA PORI FINAL.

Page 59: Bab Vii, Pemampatan Tanah

'''

efektifawalteg.'''''

12

112

1

Uz

ii

i

UU

UUUUz

1'' 1

Ui

= DERAJAT KONSOLIDASI SAAT t = 0

U = DERAJAT KONSOLIDASI SAAT ~ > t > 0

YANG UMUM DIPERLUKAN ADALAH :DERAJAT KONSOLIDASI RATA-RATA (URATA2

)

~,

,2

e

teRATA S

SU

ATAU :

Se,t

= Se

pada

saat

t.

Sc,~

= Se

pada

saat

t = ~.

Page 60: Bab Vii, Pemampatan Tanah

TIME FAKTOR (T)

UNTUK URATA-RATA

60%

22

100%

44

UUT

UNTUK URATA-RATA

> 60%

T = 1.781 –

0.933 log (100-U%)

Page 61: Bab Vii, Pemampatan Tanah

KOEFISIEN KONSOLIDASI (Cv

).

HARGA Cv

DITENTUKAN DARI DATA KONSOLIDASI HASIL TEST LABORATORIUM DENGAN MENGGUNAKAN :

1.

METODA LOGARITME –

WAKTU (CASSAGRANDE, 1940)

2.

METODA AKAR WAKTU (TAYLOR, 1942)

METODA LOG. WAKTU (GBR. 7.11)

DATA YG DIPLOT ADALAH :

WAKTU PEMBICARAAN PEMAMPATAN (t).

BESAR PEMAMPATAN (ΔH)

SKALA YANG DIPAKAI ADALAH : SEMI –

LOG

ORDINAT : SKALA LINIER

ABSIS : SKALA LOG

SETIAP BEBAN DIHASILKAN 1 (SATU) KURVA

ΔH vs

log t LIHAT GAMBAR 7.11.

CARA MENENTUKAN :

Ro

; R50

; R100

; t50

; t100

:

Page 62: Bab Vii, Pemampatan Tanah

Coefficient of Consolidation,

cv Casagrande

(1938) Method

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.1 1 10 100 1000 10000Elapsed Time (min)

Dis

plac

emen

t (m

m)

PrimaryConsolidation

PrimaryConsolidation

Secondary CompressionSecondary Compression

End of PrimaryConsolidation

End of PrimaryConsolidation

d100 d100

Page 63: Bab Vii, Pemampatan Tanah

Coefficient of Consolidation,

cv Casagrande

(1938) Method

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.1 1 10 100 1000 10000Elapsed Time (min)

Dis

plac

emen

t (m

m)

d100 : U = 100%d100 : U = 100%

d2 d2

t2 t2

d1 d1

t1 t1

t2 = 4 t1 t2 = 4 t1d0 = 2 d1 - d2 d0 = 2 d1 - d2

d0 : U = 0%d0 : U = 0%

d50 : U = 50%d50 : U = 50%

t50 = 13.6 mint50 = 13.6 min

Page 64: Bab Vii, Pemampatan Tanah

Coefficient of Consolidation,

cv Casagrande

(1938) Method

Coefficient of Consolidation,

cv Casagrande

(1938) Method

H = 20.58

HHdrdr = 10.29= 10.29

Porous Stone

Porous Stone

Cv = T50 H2 dr

t50

CCvv = T= T50 50 HH22 drdr

tt5050

CCvv = 0.197*1.03= 0.197*1.0322

13.6*6013.6*60 = 2.56x10= 2.56x10--44cmcm22/s/s = 0.81m= 0.81m22/yr/yr

Page 65: Bab Vii, Pemampatan Tanah

PERPANJANGAN BAGIAN KURVA YANG LURUS (PADA PEMAMPATAN KONSOLIDASI PRIMER DAN SEKUNDER) HINGGA BERPOTONGAN DI TITIK A.

-

ORDINAT DARI TITIK A R100

: PEMAMPATAN DI (U = 100%) AKHIR KONSOLIDASI PRIMER.

-

ABSIS DARI TITIK A t100

: WAKTU BERAKHIRNYA KONSOLIDASI PRIMER.

PADA BAGIAN AWAL DARI KURVA YANG BERBENTUK PARABOLA, TENTUKAN TITIK (MIS. : TITIK B) YANG MEMPUNYAI ABSIS t1

; MELALUI TITIK B, BUAT GARIS DATA l1

.

TENTUKAN SATU TITIK LAGI PADA KURVA (MIS. : TITIK C) YANG MEMPUNYAI ABSIS t2

= 4t1

. MELALUI TITIK C, BUAT GARIS DATAR l2

.

UKUR JARAK VERTIKAL ANTARA GARIS l1

DAN l2

, MISALNYA : y;

PADA JARAK y DARI GARIS l1

, BUAT GARIS DATAR HINGGA MEMOTONG SUMBU ORDINAT DI TITIK D.

Page 66: Bab Vii, Pemampatan Tanah

ORDINAT DARI TITIK ADALAH Ro KONDISI PADA SAAT DERJAT KONSOLIDASI U = 0%.

UNTUK MENENTUKAN t50

; TENTUKAN TITIK TNEGAH ANTARA R0

DAN R100

. (MIS. TITIK E), DAN BUAT GARIS DATAR MELALUI TITIK E HINGGA MEMOTONG KURVA DI TITIK F.

ABSIS DARI TITIK F ADALAH t50

.

HARGA Cv50

DIHITUNG DENGAN CARA :

50

250

50)(

tHdrTCv

Hdr

= ½

H DOUBLE DRAINAGE

Hdr

= H SINGLE DRAINAGE

H = TINGGI SAMPEL.

Page 67: Bab Vii, Pemampatan Tanah

METODA AKAR WAKTU

DATA YANG DIPLOT :

-

BESAR PEMAMPATAN (ΔH)

-

AKAR WAKTU PEMBACAAN PEMAMPATAN (√t).

SKALA PENGEPLOTAN : LINIEAR.

SETIAP BEBAN DIHASILKAN 1 (SATU) KURVA ΔH vs

√t

(LIHAT GAMBAR 7.12)

CARA MENENTUKAN R0

DAN t90

.

BAGIAN YANG LURUS DARI KURVA DIPERPANJANG SAMPAI MEMOTONG SUMBU ORDINAT, TITIK A. PERPOTONGAN TERSEBUT R0

DERAJAT KONSOLIDASI U = 0%.

GAMBAR GARIS AC SEDEMIKIAN RUPA DIMANA :

DC = 1.15 DB

HINGGA GARIS AC MEMOTONG KURVA DI TITIK E.

ABSIS DARI TITIK E = √t90

29090 tt

Page 68: Bab Vii, Pemampatan Tanah

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0 10 20 30 40Square Root Elapsed Time (min)

Dis

plac

emen

t (m

m)

Coefficient of Consolidation,

cv Taylor (1948) Method

dd0.15d0.15d

d90 : U = 90%d90 : U = 90%

d0 : U = 0%d0 : U = 0%

t90 = 7.25 min0.5

t90 = 7.25 min0.5

t90 = 52.6 min t90 = 52.6 min

Page 69: Bab Vii, Pemampatan Tanah

HARGA Cv90

DIHITUNG DENGAN CARA :

90

290

90)(

tHTC dr

v

T90

= TIME FACTOR UNTUK U = 90%

Page 70: Bab Vii, Pemampatan Tanah

Coefficient of Consolidation,

cv Taylor (1948) Method

Coefficient of Consolidation,

cv Taylor (1948) Method

H = 20.58

HHdrdr = 10.29= 10.29

Porous Stone

Porous Stone

Cv = T90 H2 dr

t90

CCvv = T= T90 90 HH22 drdr

tt9090

CCvv = 0.848*1.03= 0.848*1.0322

52.6*6052.6*60 = 2.85x10= 2.85x10--44cmcm22/s/s = 0.90m= 0.90m22/yr/yr

cv Taylor usu. > cv Casagrandeccvv Taylor usu. > Taylor usu. > ccvv CasagrandeCasagrande

Page 71: Bab Vii, Pemampatan Tanah

CARA MENENTUKAN WAKTU KONSOLIDASI DI LAPANGAN.

FORMULA YANG DIPAKAI :

v

dr

CHTt

2)(

Hdr

= ½

H DOUBLE DRAINAGE

Hdr

= H SINGLE DRAINAGE

H = TEBAL LAPISAN TANAH DI LAPANGAN YANG MEMAMPAT.

Page 72: Bab Vii, Pemampatan Tanah

CARA MENENTUKAN “BESAR KONSOLIDASI”

(Sc) DI LAPANGAN PADA SAAT “t1

”.

HITUNG HARGA TIME FAKTOR (T)

21

)( dr

v

HCxtT

HITUNG HARGA DERAJAT KONSOLIDASI (U).

HITUNG HARGA DENGAN : PERSAMAAN 5 ATAU 6

HITUNG Sc

PADA SAAT t1

Sct1

Sct1

= Ut1

x Sc~

Sc~

= BESAR PEMAMPATAN KONSOLIDASI PADA SAAT t = ~, DIHITUNG DENGAN PERSAMAAN a, b, ATAU c.

Page 73: Bab Vii, Pemampatan Tanah

5. PEMAMPATAN SEKUNDER (Ss

).

Ss

ADALAH TIME-DEPENDENT PROCESS, YANG TERJADI PADA KONDISI :

TEGANGAN EFEKTIF KONSTAN DAN TANPA PERUBAHAN TEGANGAN AIR PORI.

RATE OF SECONDARY SETTLEMENT IS CONTROLLED BY THE RATE AT WHICH THE SOIL SKELETON ITSELF YIELDS.

BESAR Ss

DIHITUNG DENGAN CARA :

pp

ds t

tHe

CS 2log1

ep

= ANGKA PORI PADA SAAT AKHIR PEMAMPATANKONSOLIDASI, U = 100%

tp

= WAKTU SAAT U = 100%H = TEBAL LAPISAN YANG MEMAMPAT.Cα

= INDEK PEMAMPATAN SEKUNDER.

Page 74: Bab Vii, Pemampatan Tanah

HARGA Cα

DITENTUKAN DARI :

KURVA e vs

log t

12 loglog tteC

Page 75: Bab Vii, Pemampatan Tanah

BAB VIIIPEMADATAN

BAB VIIIPEMADATAN

Page 76: Bab Vii, Pemampatan Tanah

1.

KEGUNAAN PEMADATAN.

MENINGKATKAN BERAT VOLUME TANAH, YANG BERARTI :

MENINGKATKAN KEKUATAN TANAH UNTUK MENDUKUNG BEBAN.

MENAIKKAN STABILITAS LERENG.

MENGURANGI PEMAMPATAN TANAH.

Page 77: Bab Vii, Pemampatan Tanah

2.

PENGARUH KADAR AIR TERHADAP PEMADATAN :

-

KEPADATAN TANAH MENINGKAT DENGAN MENINGKATNYA KADAR AIR AIR BERFUNGSI SEBAGAI “PELUMAS”.

TAPI :

PENAMBAHAN AIR YANG BERLEBIHAN

KEPADATAN MENURUN.

KARENA :

AIR MENGAMBIL ALIH TEMPAT-TEMPAT YANG SEMULA DITEMPATI OLEH BUTIRAN.

-

KADAR AIR DIMANA KEPADATAN TANAH MAX. KADAR AIR OPTIMUM (Wc-opt

).

Page 78: Bab Vii, Pemampatan Tanah

3. CARA MENENTUKAN KEPADATAN MAX. (d-max

) DAN KADAR AIR OPTIMUM (Wc-opt

).

JENIS TEST :

-

STANDARD PROCTOR TEST.

-

MODIFIED PROCTOR TEST.

Page 79: Bab Vii, Pemampatan Tanah

4. STANDARD PROCTOR TEST.

CARA PELAKSANAAN TEST :

-

ASTM TEST D-698

-

AASHTO TEST T-99

VOLUME CETAKAN : 1/30

ft3

= 943.3 cm3

ø

CETAKAN = 4”

= 101.6 mm.

BERAT PALU PEMUKUL = 5.5 lb = 2.5 KG.

TINGGI JAUH PALU = 12”

= 304.8mm

TANAH DILETAKKAN DIDALAM CETAKAN = 3 LAPIS.

JUMLAH TUMBUKAN @ LAPIS = 25 PUKULAN.

Page 80: Bab Vii, Pemampatan Tanah

5.

MODIFIED PROCTOR TEST.

CARA PELAKSANAAN TEST :

ASTM TEST D-1557.

AASHTO TEST T-180

VOLUME CETAKAN : 1/30

ft3

= 943.3 cm3

BERAT PALU PEMUKUL = 10 lb = 4.54 kg

TINGGI JATUH PALU = 18”

= 457.2 mm.

TANAH DILETAKKAN DIDALAM CETAKAN = 5 LAPIS.

JUMLAH TUMBUHKAN @ LAPIS = 25 PUKULAN.

Page 81: Bab Vii, Pemampatan Tanah

6.

ENERGY PEMADATAN.

)(

..

@..

CetakanVolumePenumbuk

JatuhTingx

PemukulBerat

xlapisJmlxlapis

tumbJml

E

Page 82: Bab Vii, Pemampatan Tanah

7. CARA MENGGAMBAR KURVA PEMADATAN.

DATA YANG DIDAPATKAN DARI TEST PEMADATAN :

KADAR AIR, Wc

.

BERAT VOLUME, .

HITUNG KEPADATAN (d

) UNTUK MASING-MASING Wc

.

cd W

1

Page 83: Bab Vii, Pemampatan Tanah

MENGGAMBAR KURVA ZAV (ZERO AIR VOID)

ZERO AIR VOID SATURATED (JENUH)

MENGHITUNG :

eG ws

zavd

1)(

SR

.e

n= Gs

.Wc

SR

= 100% e = Gs

Wc

cs

wszavd WG

G

1)(

HITUNG d(zav)

UNTUK Wc

TERTENTU

GAMBAR KURVA ANTARA Wc

DAN d(zav)

YANG SALING BERSESUAIAN.

Page 84: Bab Vii, Pemampatan Tanah

8. FAKTOR-FAKTOR YANG MEMPENGARUHI KEPADATAN.

TIPE TANAH YANG DIPADATKAN

DISTRIBUSI UKURAN BUTIRAN

KADAR AIR

ENERGI YANG DIPAKAI UNTUK MEMADATKAN

Page 85: Bab Vii, Pemampatan Tanah

9.

PENGARUH PEMADATAN TERHADAP STRUKTUR TANAH LEMPUNG.

KADAR AIR (Wc

) < Wc

opt

DRY SIDE Wc-opt

.

KADAR AIR (Wc

) > Wc

opt

WET SIDE Wc-opt

.

PADA TITIK A STRUKTUR BUTIRAN : “FLOCCULATE”

(ACAK).

KARENA :Wc

-RENDAH

DIFFUSE DOUBLE LAYER TIDAK BERKEMBANG SEPENUHNYA. AKIBATNYA : GAYA TOLAK-MENOLAK

ANTAR BUTIR KECIL.

PADA TITIK B DIFFUSE DOUBLE LAYER BERTAMBAH.

PADA TITIK C GAYA TOLAK-MENOLAK ANTAR BUTIR BESAR SUSNAN PARTIKEL “DISPERSED”.

Page 86: Bab Vii, Pemampatan Tanah

10. SIFAT TANAH LEMPUNG YANG DIPADATKAN.

DAYA REMBES.

KEKUATAN TANAH

KOMPRESSIBILITAS.

11.

PEMADATAN TANAH DI LAPANGAN.ALAT YANG UMUM DIGUNAKAN :

SMOTH-WHELL ROLLER

RUBBER-TIRED ROLLER

SEEPFOOT ROLLER

TAMPING FOOT ROLLER

Page 87: Bab Vii, Pemampatan Tanah

12. SPESIFIKASI PEMDATAN LAPANGAN.

a.

END PRODUCT SPECIFICATION (EPS).

b.

METHOD SPECIFICATION (MS).

Page 88: Bab Vii, Pemampatan Tanah

a.

END PRODUCT SPECIFICATION.

YANG DITENTUKAN : PROSENTASE KEPADATAN AKHIR YANG DICAPAI DILAPANGAN : RELATIVE COMPACTION ATAU : KEPADATAN RELATIVE (R ).

%100(%)max

xRlabd

lapangd

ATAU :

lapangd

do

oR

o

lapangd

d

dd

dlapangdR

RRD

RR

xD

min

max

minmax

min

)1(1

Page 89: Bab Vii, Pemampatan Tanah

b. METHOD SPECIFICATION.

YANG DITENTUKAN :

-

TYPE DAN BERAT ALAT PEMADAT.

-

JUMLAH LINTASAN ALAT PEMADAT.

-

KETEBALAN LAPISAN TANAH YANG DIPADATKAN.

KONTRAKTOR HANYA MENJALANKAN “SPESIFIKASI”

HASIL AKHIR BUKAN TANGGUNG JAWAB KONTRAKTOR.

Page 90: Bab Vii, Pemampatan Tanah

13.

CARA MENENTUKAN KEPADATAN LAPANGAN.-

SAND CONE.

-

RUBBER BALLOON.

-

NUCLEAR DENSITY METER.

SAND CONE.

TENTUKAN :

BERAT BOTOR + CORONG + PASIR OTTAWA = W1

.

BERAT TANAH GALIAN = W2

KADAR AIR TANAH GALIAN = Wc

BERAT KERING TANAH GALIAN = W3

.

cWWW

1

23

Page 91: Bab Vii, Pemampatan Tanah

VOLUME GALIAN, CARANYA :

-

TENTUKAN BERAT BOTOL + CORONG + SISA PASIR OTTAWA = W4

.

-

TENTUKAN BERAT PASIR YANG MENGISI LUBANG + CORONG = W5

.

W5

= W1

– Wu

BILA BERAT PASIR PENGISI CORONG = W6

BERAT PASIR PENGISI LUBANG = W7

W7

= W5

– W6

VOLUME GALIAN :

pasird

WV

7

Page 92: Bab Vii, Pemampatan Tanah

RUBBER BALLOON.

SAMA SEPERTI SAND CONE.

HANYA :

VOLUME GALIAN DITENTUKAN DENGAN CARA :

MEMASUKKAN KARET DALAM LUBANG GALIAN DAN DIISI DENGAN CARIAN YANG SUDAH DIKETAHUI BERAT VOLUMENYA.

NUCLEAR DENSITY METER.DIOPERASIKAN DIPERMUKAAN TANAH ATAU DIDASAR LUBANG GALIAN.YANG DIUKUR :

BERAT TANAH BASAH PER-SAT. VOLUME.–

BERAT AIR YANG DIKANDUNG PER-SAT VOLUME.

Page 93: Bab Vii, Pemampatan Tanah

14.

FAKTOR YANG MEMPENGARUHI KEPADATAN LAPANGAN

-

JENIS TANAH.

-

KADAR AIR.

-

TENAGA UNTUK MEMADATKAN.

-

TEBAL LAPISAN YANG DIPADATKAN.

-

INTENSITAS TEKANAN PADA PERMUKAAN.

-

LUAS DAERAH YANG DIPADATKAN.

Page 94: Bab Vii, Pemampatan Tanah

15. PEMADATAN SPESIAL DI LAPANGAN.

TANAH BERBUTIR KASAR

-

DYNAMIC COMPACTION

-

VIBRO FLOATATION

-

BLASTING.

TANAH BERBUTIR HALUS :

-

PRELOADING

-

DEWATERING.