    HOUSE OF REPRESENTATIVES 

     NOTICE OF PUBLIC HEARING

    COMMITTEE: Transportation

    TIME & DATE: 9:00 AM, Wednesday, March 30, 2016

    PLACE: E2.012

    CHAIR: Rep. Joseph Pickett

    The committee will meet to consider the following:

    Update on HB 2612

    1. list the amount of debt service on bonds issued for each toll project

    in this state;

    2. identify, bonds that would be appropriate for accelerated or complete

    lump-sum payment of debt service; and

    3. propose a plan to eliminate all toll roads in this state, except for

    tolls on roads constructed, operated, or maintained only with proceeds

    from the issuance of bonds by a toll project entity other than the

    department, by methods including:

    a. the acceleration or complete lump-sum payment of debt service on

    bonds identified under (1)

    b. requiring, as a condition on receipt of state financial

    assistance, a commitment by a toll project entity to eliminate toll

    collection on a project for which the financial assistance is provided.

  • 8/18/2019 TxDOT HB 2612

    3/27

  • 8/18/2019 TxDOT HB 2612

    4/27

    H.B.ANo.A2612

    AN ACT

    relating to a report to the legislature regarding the elimination

    of toll roads.

    BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

    SECTIONA1.AANot later than September 1, 2016, the Texas

    Department of Transportation shall submit to each standing

    1

    2

    3

    4

    5

    6

  • 8/18/2019 TxDOT HB 2612

    5/27

     ______________________________ ______________________________ 

    AAAAPresident of the Senate Speaker of the HouseAAAAAA

    I certify that H.B. No. 2612 was passed by the House on May 4,

    2015, by the following vote:AAYeas 140, Nays 0, 2 present, not

    voting.

     ______________________________ 

    Chief Clerk of the HouseAAA

    H.B.ANo.A2612

  • 8/18/2019 TxDOT HB 2612

    6/27

  • 8/18/2019 TxDOT HB 2612

    7/27

  • 8/18/2019 TxDOT HB 2612

    8/27

  • 8/18/2019 TxDOT HB 2612

    9/27

    Appendix 1

    H.B. No. 2612

    AN ACT

    relating to a report to the legislature regarding the elimination

    of toll roads.

    BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

    SECTION 1. Not later than September 1, 2016, the Texas

    Department of Transportation shall submit to each standingcommittee of the senate and house of representatives that has

    primary jurisdiction over transportation matters a report that:

    (1) lists the amount of debt service on bonds issued

    for each toll project in this state;

    (2) identifies, based on criteria provided by the

    Texas Transportation Commission, bonds that would be appropriate

    for accelerated or complete lump-sum payment of debt service; and

    (3) proposes a plan to eliminate all toll roads in this

    state, except for tolls on roads constructed, operated, or

    maintained only with proceeds from the issuance of bonds by a tollproject entity other than the department, by methods including:

    (A) the accelerated or complete lump-sum payment

    of debt service on bonds identified under Subdivision (1); or

    (B) requiring, as a condition on receipt of state

    financial assistance, a commitment by a toll project entity to

    eliminate toll collection on a project for which the financial

    assistance is provided.

    SECTION 2. This Act takes effect September 1, 2015.

    Texas Department of Transportation Rider 46. Report on the Elimination of Toll Roads.

    O t f f d i t d b it i th i t t f th L gi l t th t th T D t t f T t ti

  • 8/18/2019 TxDOT HB 2612

    10/27

     

    Appendix 2

    Toll Entity Information Form

    Please submit the completed Toll Entity Information Form in electronic Microsoft Word format via e-mail to

    Sara Ulbrich of the Texas Department of Transportation at [email protected]. Questions regarding this

    Toll Entity Information Form should also be submitted to Sara Ulbrich via e-mail.

  • 8/18/2019 TxDOT HB 2612

    11/27

    Toll Entity Information Form  Part I 

    Part I

    Current Toll Projects

    [Provide response here]

    Example Response:

    a Responding Tolling Entity: Texas Department of Transportationb Name of the contact person and contact information:

    i.  Name: John Jones

    john jones@txdot gov

    Please provide below a list and brief description of each toll project and/or toll system that your entity

    has owned and/or has operated, as of January 1, 2016. For each project or system listed, please

    briefly indicate:

    a) 

    Responding Tolling Entity

    b) 

    Name of the contact person and contact information

    c) 

    For each stand-alone toll project, toll project name;d) 

    For each toll system (i.e. one or more projects financed as part of a system), toll system name

    and name of each element within the system;

    e) 

    Whether any related toll revenue debt) was outstanding as of January 1, 2016;

    f) 

    Whether the toll revenue debt relates to a project only, a toll system, or some other financing

    arrangement;

     g) 

    Whether state funds (including funds allocated by an MPO), state ROW, or other form of state

    assistance was used in the development/construction of the project or system;

    h) 

    Whether any form of state assistance has been utilized, please indicate if any future

    assistance or state expenditure is expected or could occur under a contingent state liability, such as a TELA.

    Please see the Assumptions Regarding Projects and Debt that has been provided for information

    regarding what constitutes a toll project for the purpose of this request (Appendix 4).

    mailto:[email protected]:[email protected]:[email protected]

  • 8/18/2019 TxDOT HB 2612

    12/27

    Toll Entity Information Form Part II

    Part II

    Additional Toll Projects and Debt

    [Provide response here]

    Please provide below information regarding toll projects owned or sponsored by your entity as to:

    I. 

     Additional toll projects or toll system elements within the state that became or will become

    operational after January 1, 2016, but before September 1, 2017;

    II. 

     Any toll project debt transactions that have occurred or are planned to occur since January

    1, 2016 and before September 1, 2017, including any refundings or planned refundings of

    outstanding toll projector system debt;

    III. 

    Please also indicate, for each project/system or debt issuance in I. or II. above, whether

     state funds (including funds allocated by an MPO), state ROW, or other form of state

    assistance will or has been used in the development/ funding/financing of the project or

     system.

  • 8/18/2019 TxDOT HB 2612

    13/27

    Toll Entity Information Form Part III

    Part III

    Comments Regarding Debt Defeasance Criteria

    Section 1(2) of HB 2612 requires TxDOT to identify bonds that may be appropriate for early

    payment. TxDOT is giving each tolling entity the opportunity to provide input and commentary on

    the criteria to be used to identify bonds that may be appropriate for early payment. You may provide

    below any comments you wish to submit regarding the criteria that will be created and used to

    identify bonds that would be appropriate for early payment for the purposes of Section 1(2). Please

     see Section 1(2) of Appendix 4 for the current draft debt defeasance criteria. TxDOT will consider

     your comments in developing the final early debt payment criteria recommended to the Texas

    Transportation Commission (that, with additional information and considerations, will ultimately be

    used for preparing the report).

    [Provide response here, if desired] 

  • 8/18/2019 TxDOT HB 2612

    14/27

    Appendix 3

    Part B: Toll Debt Data Worksheet red text: data input

    System / Stand Alone Project 1 blue text: input type restricted to list

    as of January 1 2016 grey text: model calculation

    [mouse over cell for more information]

    Step 1: Enter Series Information Summary

    Note: single line per Series

    System Name (or Standalone) Series Issue Use of Tax Credit Credit Par

    Name Date Proceeds Status Description Ratings Outstanding  Total 3,172,770,000

    Central Texas Turnpike System CTTS 2002A 8/15/2002 New Money Tax-Exempt First Tier A3/ A-/ A- 767,095,000

    Central Texas Turnpike System CTTS 2012A 11/1/2012 Refunding Tax-Exempt First Tier A3/ A-/ A- 585,330,000

    Central Texas Turnpike System CTTS 2015A 2/4/2015 Refunding Tax-Exempt First Tier A3/ A-/ A- 225,000,000

    Central Texas Turnpike System CTTS 2015B 2/4/2015 Refunding Tax-Exempt First Tier A3/ A-/ A- 438,025,000

    Central Texas Turnpike System CTTS 2015C 2/4/2015 Refunding Tax-Exempt Second Tier Baa1/BBB+/BBB 1,157,320,000

  • 8/18/2019 TxDOT HB 2612

    15/27

    Appendix 3

    Part B: Toll Debt Data Worksheet red text: data input

    System / Stand Alone Project 1 blue text: input type restricted to list

    as of January 1 2016 grey text: model calculation

    [mouse over cell for more information]

    Step 2: Enter Series Information Detail

    Note: single line per Maturity or Sinking Fund Installment (blank if N/A) (blank if N/A)

    Series Par Component Maturity / Term Bond

    Name Outstanding Debt Type Name Sinking Fund Date Maturity Date CUSIP

    CTTS 2015A 40,460,000 Bond - Tender/Put 15A-Term1 8/15/2041 8/15/2042 88283KAJ7

    CTTS 2015A 184,540,000 Bond - Tender/Put 15A-Term1 8/15/2042 8/15/2042 88283KAJ7

    CTTS 2015B 40,000,000 Bond - Fixed 15B1-Serial 8/15/2032 88283KAN8

    CTTS 2015B 113,520,000 Bond - Fixed 15B1-Term 8/15/2035 8/15/2037 88283KAL2

    CTTS 2015B 24,505,000 Bond - Fixed 15B1-Term 8/15/2036 8/15/2037 88283KAL2

    CTTS 2015B 20,000,000 Bond - Fixed 15B1-Term 8/15/2037 8/15/2037 88283KAL2

    CTTS 2015B 120,000,000 Bond - Fixed 15B2-Serial 8/15/2036 88283KAM0

    CTTS 2015B 120,000,000 Bond - Fixed 15B2-Serial 8/15/2037 88283KAK4CTTS 2015C 2,200,000 Bond - Fixed 15C-Serial 8/15/2022 88283KBD9

    CTTS 2015C 5,375,000 Bond - Fixed 15C-Serial 8/15/2023 88283KBA5

    CTTS 2015C 8,655,000 Bond - Fixed 15C-Serial 8/15/2024 88283KBB3

    CTTS 2015C 12,245,000 Bond - Fixed 15C-Serial 8/15/2025 88283KBC1

    CTTS 2015C 9,825,000 Bond - Fixed 15C-Serial 8/15/2026 88283KAP3

    CTTS 2015C 14,050,000 Bond - Fixed 15C-Serial 8/15/2027 88283KAQ1

    CTTS 2015C 13,395,000 Bond - Fixed 15C-Serial 8/15/2028 88283KAR9

    CTTS 2015C 14,620,000 Bond - Fixed 15C-Serial 8/15/2029 88283KAS7

    CTTS 2015C 16,290,000 Bond - Fixed 15C-Serial 8/15/2030 88283KAT5

    CTTS 2015C 125,215,000 Bond - Fixed 15C-Serial 8/15/2031 88283KAU2

    CTTS 2015C 97,730,000 Bond - Fixed 15C-Serial 8/15/2032 88283KAV0

    CTTS 2015C 151,045,000 Bond - Fixed 15C-Serial 8/15/2033 88283KAW8

    CTTS 2015C 150,165,000 Bond - Fixed 15C-Serial 8/15/2034 88283KAX6

  • 8/18/2019 TxDOT HB 2612

    16/27

    Appendix 3

    Part B: Toll Debt Data Worksheet red text: data input

    System / Stand Alone Project 1 blue text: input type restricted to list

    as of January 1 2016 grey text: model calculation

    [mouse over cell for more information]

    Series Interest Information Detail

    For For

    Series Fixed Rate Variable Rate

    Series Component Component Interest Type Coupon or Maximum

    Name Name Sinking Fund D (Code) CAB Yield Rate

    CTTS 2015A 15A-Term1 8/15/2041 Current - Fixed 5.000%

    CTTS 2015A 15A-Term1 8/15/2042 Current - Fixed 5.000%

    CTTS 2015B 15B1-Serial 8/15/2032 Current - Fixed 5.000%

    CTTS 2015B 15B1-Term 8/15/2035 Current - Fixed 5.000%

    CTTS 2015B 15B1-Term 8/15/2036 Current - Fixed 5.000%

    CTTS 2015B 15B1-Term 8/15/2037 Current - Fixed 5.000%

    CTTS 2015B 15B2-Serial 8/15/2036 Zero Coupon (CAB) 4.360%

    CTTS 2015B 15B2-Serial 8/15/2037 Zero Coupon (CAB) 4.380%CTTS 2015C 15C-Serial 8/15/2022 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2023 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2024 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2025 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2026 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2027 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2028 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2029 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2030 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2031 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2032 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2033 Current - Fixed 5.000%

    CTTS 2015C 15C-Serial 8/15/2034 Current - Fixed 5 000%

  • 8/18/2019 TxDOT HB 2612

    17/27

    Appendix 3

    Part B: Toll Debt Data Worksheet red text: data input

    System / Stand Alone Project 1 blue text: input type restricted to list

    as of January 1 2016 grey text: model calculation

    [mouse over cell for more information]

    Series Redemption Information Detail

    (blank if N/A) (blank if N/A)

    Series Make Whole (MW) Call

    Series Component Component First First MW Spread

    Name Name Sinking Fund Date Call Date Call Price Tender Date Tender Price MW Index (bps)

    CTTS 2015A 15A-Term1 8/15/2041   4/1/2020 100

    CTTS 2015A 15A-Term1 8/15/2042   4/1/2020 100

    CTTS 2015B 15B1-Serial 8/15/2032   8/15/2024 100

    CTTS 2015B 15B1-Term 8/15/2035   8/15/2024 100

    CTTS 2015B 15B1-Term 8/15/2036   8/15/2024 100

    CTTS 2015B 15B1-Term 8/15/2037   8/15/2024 100

    CTTS 2015B 15B2-Serial 8/15/2036   8/15/2024 100

    CTTS 2015B 15B2-Serial 8/15/2037   8/15/2024 100CTTS 2015C 15C-Serial 8/15/2022

    CTTS 2015C 15C-Serial 8/15/2023

    CTTS 2015C 15C-Serial 8/15/2024

    CTTS 2015C 15C-Serial 8/15/2025   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2026   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2027   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2028   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2029   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2030   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2031   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2032   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2033   8/15/2024 100

    CTTS 2015C 15C-Serial 8/15/2034 8/15/2024 100

  • 8/18/2019 TxDOT HB 2612

    18/27

    Appendix 3

    Part B: Toll Debt Data Worksheet red text: data input

    System / Stand Alone Project 1 blue text: input type restricted to list

    as of January 1, 2016 grey text: model calculation

    [mouse over cell for more information]

    Derivative Information

     as of last disclosure)

    Series Notional Termination

    Name Amount Cost / MTM

  • 8/18/2019 TxDOT HB 2612

    19/27

    Appendix 4

    H B 2612 and TxDOT Rider 46 –

     Assumptions Regarding Projects and Debt

    As stated in HB 2612: 

    SECTION 1. Not later than September 1, 2016, the Texas Department of Transportation shall submit

    to each standing committee of the senate and house of representatives that has primary jurisdiction

    over transportation matters a report that:

    1)

     

    Lists the amoun t of debt service on bonds issued for each toll project in this state;

    Assumptions1.  Bonds issued on or before January 1, 2016 for toll projects will be included in the analysis and

    report.

    2.  Debt service will be calculated on a forward-looking basis beginning January 1, 2016.

    3. 

    Bonds issued for all toll projects in the state will be included in the analysis. These include bonds

    issued for projects owned/managed by TxDOT, regional and county toll authorities, regional

    mobility authorities, transportation corporations, transit authorities, counties, road improvement

    districts, and private entities.

    4. 

    For the purpose of this analysis “toll projects” are defined as toll roads, toll bridges, and managed

    lanes toll facilities whether publicly or privately operated. International bridge and international

    crossing toll projects are not included. “Pass through” toll projects or other road projects where

    no toll or fee is imposed on drivers are not included.

    5. 

    For the purpose of this analysis, “bonds” include toll revenue bonds or other debt used to finance

    or refinance toll projects, either publicly offered or privately placed.

     

    Toll revenue bonds issued to fund a toll project are included even if there is a secondarysource of repayment (such as a G.O. backstop pledge).

      Bonds issued to fund a toll project that are not payable from toll revenues are not included.

    C i l b k fi i d th t f b d l d dit f iliti d t f d

  • 8/18/2019 TxDOT HB 2612

    20/27

    Debt Product Assumption

    Fixed Rate Debt   Debt service to maturity (not to prior optional redemption date).

     

    Use stated fixed interest rates.

      Debt service on maturities having mandatory sinking fund amortizations

    should reflect such mandatory amortizations.

    Put Bonds   Debt service to stated nominal maturity (not to prior optional redemption

    date or mandatory put/tender date).

      Use fixed interest rate during initial fixed rate period.

      For the period from the end of the initial fixed rate period to final maturity,

    calculate debt service using the interest rate assumptions used in the

    most recent debt offering document or other financial/disclosuredocument that includes debt service projections for the bonds.

    Variable Rate

    Bonds (Floating

    Rate Notes,

    VRDOs, and

    similar)

      Debt service to stated nominal maturity (not to prior optional redemption

    date or mandatory tender date).

      Calculate debt service using the interest rate assumptions used in the

    most recent debt offering document or other financial/disclosure

    document that includes debt service projections for the bonds. If there

    are no interest rate assumptions included in the most recent offering

    document or financial/disclosure document, the respondent should

    provide an assumed rate and brief rationale.  Debt service should reflect (i) net payments projected to be made under

    any hedge agreements related to the bonds, (ii) projected remarketing

    fees, and (iii) projected fees for liquidity or credit support.

    Commercial

    Paper Programs

      Debt service should be calculated assuming that the principal amount

    outstanding on the January 1, 2016 calculation date is amortized on a

    level debt service basis to the maximum maturity under the program at an

    interest rate assumed in the issuer’s most recent offering document or

    financial/disclosure document that includes debt service projections on

    the bonds.  If there are no interest rate assumptions included in the most recent

    offering document or financial/disclosure document, the respondent

    should provide an assumed rate and brief rationale.

  • 8/18/2019 TxDOT HB 2612

    21/27

    2)   identifies, based on criteria provided by the Texas Transportation Commission, bonds

    that would be appropriate for accelerated or complete lump-sum payment of debt service;

    Possible Criteria

    1. 

    The calculation date when accelerated debt service might begin, or complete lump-sum payment

    of debt service might occur, will be assumed to be September 1, 2017.

    2. 

    For the purpose of this section, “toll projects” and “bonds” are defined as in Draft Assumptions-

    Section 1.

    3. 

    Calculations related to accelerated or complete lump-sum payment of debt service will include:  “Debt service” as defined in Draft Assumptions Section 1

      Termination payments required under interest rate swap or hedge agreements.

      Payments or fees related to early termination of bank credit facilities and other credit and

    financial services agreements related to toll project debt.

      Termination payments and other costs associated with the early termination of

    Comprehensive Development Agreements that involve private equity investment.

     

    Estimated costs for legal and financial services associated with accelerated or completelump-sum payment of debt service.

    4.  Bonds that may be appropriate for complete lump-sum payment of debt service might include

    those where:

    a. 

    The sponsoring toll agency or TxDOT has available unrestricted cash on hand sufficient to fully

    pay or defease outstanding debt service;

    b. 

    Amount of outstanding debt is relatively low and/or soon to mature;

    c. 

    Bonds are currently callable;

    d.  Bonds will be currently callable on or before [September 1, 2020]; or

    e. 

    Bonds will be currently callable after [September 1, 2020], and the interest rate of the bonds

    i ffi i tl high t k h d f t ff ti

  • 8/18/2019 TxDOT HB 2612

    22/27

    3)   proposes a pla n to eliminate a ll toll roads in this state, except for tolls on roads

    constructed, operated, or maintained only with proceeds from the issuance of bonds by a toll project

    entity other than the department, by methods including:

    A) the accelerated or complete lump-sum payment of debt service on bonds

    identified under Subdivision 1); or

    B) requiring, as a condition on receipt of state financial assistance, a commitment

    by a toll project entity to eliminate toll collection on a project for which the financia l assistance is

    provided.

    Draft Assumptions

    The plan specified under this section is to be developed once the assumptions, methodology, and

    calculations for the data under Section 1 (1) and Section 1 (2) are finalized.

  • 8/18/2019 TxDOT HB 2612

    23/27

    Project Owner

    System or Project Name

    SH 550

    César Chávez Express Toll Lanes

    [iv]

    Border Highway West Expressway

    Mopac Managed Lanes

    SH 71 Express

    Fort Bend Grand Parkway Toll Road Authority System

    Vacek Pass Bridge

    Toll Projects in the State of Texas

    [i]

    As of January 1, 2016

    SH 550

    System Elemen

    US 183 South

    US 183A

    US 290 East

    US 290 – Segments 1A, 2, and 3

    Central Texas Regional Mobility Authority

    Camino Real Regional Mobility Authority

    Cameron County Regional Mobility Authority

    SH 99 Grand Pkwy Segment D - For

    Fort Bend Co. Westpark Tollway

    Galveston County Road District #1

    Fort Bend Grand Parkway Toll Road Authority

    Mopac Improvement Project

    SH 71 Express

    Fort Bend County Toll Road Authority

    San Luis – Vacek Pass Bridge

    Central Texas Regional Mobility Authority System

    Fort Bend County Toll Road Authority System

    Grand Parkway Transportation Corporation

    Grand Parkway Transportation Corporation System

    SH 99 Grand Pkwy Segment D - Har

    SH 99 Grand Pkwy Segment E

    Loop 375 César Chávez Express To

    Loop 375 Border Highway West Exp

    SH 99 Grand Pkwy Segment F1

    Fort Bend Co. Pkwy Toll Road

  • 8/18/2019 TxDOT HB 2612

    24/27

    Project Owner

    System or Project Name

    Toll Projects in the State of Texas

    [i]

    As of January 1, 2016

    System Elemen

    North Texas Tollway Authority

    Metro Transit Authority of Harris County

    Harris County Toll Road Authority

    Westpark Tollway

    Sam Houston Tollway

    Tomball Tollway

    Katy (I-10) Managed Lanes

    Harris County Toll Road System

    Hardy Toll Road

    US 59 North Managed Lanes

    Sam Rayburn Tollway (SH 121)

    I-45 So. Gulf Freeway Managed Lan

    Addison Airport Toll Tunnel

    NTTA System

    Mountain Creek Lake Toll Bridge

    President George Bush Turnpike

    Dallas North Tollway

    I-45 No. Gulf Freeway Managed Lan

    METRO HOV/HOT Express) Lane System

    US 290 NW Freeway Managed Lane

    Pres. Geo. Bush Turnpike West Ext.

    US 59 SW Freeway Managed Lanes

    Fort Bend Parkway Extension

    Hardy Toll Road Airport Connector

    Pres. Geo. Bush Turnpike East Ext.

    Lewisville Lake Bridge

  • 8/18/2019 TxDOT HB 2612

    25/27

  • 8/18/2019 TxDOT HB 2612

    26/27

    TxDOT Bond Program Summary 

    As 

    of  

    March 

    29, 

    2016 

    Bond Capacity Used 

    TMF 

    Prop 

    14 

    Prop 

    12 

    Total 

    Par + Premium  $7,390,629,619 $5,299,851,213 $3,557,991,860  $16,248,472,692

    Total Repayments 1  $13,990,000,000 $7,940,000,000 $5,440,000,000  $27,370,000,000

    WAC 4  3.85% 3.37% 3.15% 

    Bonds Outstanding 

    TMF  Prop 14  Prop 12  Total 

    Total Bonding Capacity 

    TMF  Prop 14  Prop 12  Total 

    Par + Premium  $7,390,629,619  $6,000,000,000  $5,000,000,000  $18,390,629,619

    Total 

    Repayments 

    $13,990,000,000 

    $8,940,000,000 

    $7,800,000,000 

    $30,730,000,000 

    Projected MADS 2  $545,000,000  $400,000,000  $320,000,000 

    Repayment Fund  Texas Mobility  State Highway  General Revenue 3 

    TxDOT Projected Debt Service

  • 8/18/2019 TxDOT HB 2612

    27/27

    TxDOT Projected Debt Service

    TxDOT Project Finance and Debt Mgmt Division, March 2016

    TOTAL

    TOTAL

    Fiscal

    Year Outstanding Proposed Total Debt Service Outstanding Proposed

    Total Debt

    Service Outstanding Proposed

    Total Debt

    Service

     All Prog rams Debt

    Service

    2016 336,000,000  336,000,000  298,000,000  -  298,000,000  214,000,000  -  214,000,000  848,000,000 

    2017 344,000,000  344,000,000  309,000,000  92,000,000  401,000,000  212,000,000  58,000,000  270,000,000  1,015,000,000 

    2018 347,000,000  347,000,000  307,000,000  94,000,000  401,000,000  210,000,000  112,000,000  322,000,000  1,070,000,000 2019 356,000,000  356,000,000  307,000,000  94,000,000  401,000,000  208,000,000  110,000,000  318,000,000  1,075,000,000 2020 363,000,000  363,000,000  307,000,000  94,000,000  401,000,000  205,000,000  108,000,000  313,000,000  1,077,000,000 

    2021 371,000,000  371,000,000  307,000,000  94,000,000  401,000,000  203,000,000  106,000,000  309,000,000  1,081,000,000 2022 378,000,000  378,000,000  307,000,000  94,000,000  401,000,000  201,000,000  103,000,000  304,000,000  1,083,000,000 

    2023 386,000,000  386,000,000  377,000,000  24,000,000  401,000,000  199,000,000  101,000,000  300,000,000  1,087,000,000 2024 394,000,000  394,000,000  377,000,000  24,000,000  401,000,000  197,000,000  98,000,000  295,000,000  1,090,000,000 

    2025 401,000,000  401,000,000  357,000,000  44,000,000  401,000,000  194,000,000  96,000,000  290,000,000  1,092,000,000 2026 408,000,000  408,000,000  330,000,000  71,000,000  401,000,000  192,000,000  94,000,000  286,000,000  1,095,000,000 2027 417,000,000  417,000,000  343,000,000  58,000,000  401,000,000  190,000,000  91,000,000  281,000,000  1,099,000,000 

    2028 425,000,000  425,000,000  387,000,000  14,000,000  401,000,000  188,000,000  89,000,000  277,000,000  1,103,000,000 2029 434,000,000  434,000,000  387,000,000  14,000,000  401,000,000  186,000,000  87,000,000  273,000,000  1,108,000,000 

    2030 442,000,000  442,000,000  387,000,000  14,000,000  401,000,000  184,000,000  84,000,000  268,000,000  1,111,000,000 2031 456,000,000  456,000,000  182,000,000  8,000,000  190,000,000  182,000,000  82,000,000  264,000,000  910,000,000 

    2032 457,000,000  457,000,000  182,000,000  8,000,000  190,000,000  179,000,000  80,000,000  259,000,000  906,000,000 2033 465,000,000  465,000,000  182,000,000  8,000,000  190,000,000  178,000,000  78,000,000  256,000,000  911,000,000 

    2034 473,000,000  473,000,000  182,000,000  8,000,000  190,000,000  176,000,000  75,000,000  251,000,000  914,000,000 2035 481,000,000  481,000,000  76,000,000  76,000,000  174,000,000  73,000,000  247,000,000  804,000,000 

    2036 490,000,000  490,000,000  76,000,000  76,000,000  172,000,000  71,000,000  243,000,000  809,000,000 2037 491,000,000  491,000,000  170,000,000  69,000,000  239,000,000  730,000,000 2038 536,000,000  536,000,000  168,000,000  66,000,000  234,000,000  770,000,000 

    2039 545,000,000  545,000,000  166,000,000  64,000,000  230,000,000  775,000,000 2040 171,000,000  171,000,000  164,000,000  62,000,000  226,000,000  397,000,000 

    2041 173,000,000  173,000,000  111,000,000  60,000,000  171,000,000  344,000,000 2042 173,000,000  173,000,000  109,000,000  57,000,000  166,000,000  339,000,000 

    2043 171,000,000  171,000,000  47,000,000  55,000,000  102,000,000  273,000,000 2044 171,000,000  171,000,000  45,000,000  53,000,000  98,000,000  269,000,000 

    2045 171,000,000  171,000,000  50,000,000  50,000,000  221,000,000 2046 48,000,000  48,000,000  48,000,000 

    TOTAL 11,226,000,000  -  11,226,000,000  5,815,000,000  1,009,000,000  6,824,000,000  5,024,000,000  2,380,000,000  7,404,000,000  25,454,000,000 

    Notes and Assumptions:

     All debt service is net of Build America Bond 35% direct subsidy payments from the federal government.Prop 14

    Proposed Debt includes issuing the remaining $700 million in authorization in late FY16 at 5% interest cost.

    Prop 12

    Proposed Debt includes issuing half of the remaining $1.4 billion in authorization in FY16 and half in FY17 at 5% interest cost.

    Texas Mobility Fund revenues (Fund 365) State Highway Fund revenues (Fund 006) General Revenues of the State (Fund 001)

    Texas Mobility Fund Bonds Prop 14 Bonds Prop 12 Bonds

    Source for repayment: Source for repayment: Source for repayment: