resume - mohd yunus bin mohd nafi

5
MOHD YUNUS BIN MOHD NAFI PERSONAL PARTICULARS Gender Age Date of Birth Driver License Identity Card Number Language Male 27 May 07, 1988 B2, D 880507-03-5797 English, Malay Home Address Phone E-mail No 30, Jalan Berjaya 5, Taman Berjaya, 68100 Batu Caves, Selangor +6017-9389210(M) [email protected] CAREER OBJECTIVE Loyal and committed. Good communication skills and able to adapt to new environment. Capable of executing tasks independently and enjoy traveling. Calm in facing difficulties and pressure. Have fine leadership skills and excellent at working as a team and make organization’s goal as a priority in career objective. PROFESSIONAL COURSE ATTENDED Understanding Lubricant Oil Analysis, Dr Zubil Bahak(MLA II), Jan 2010, UTM Occupational Safety and Health Act (OSHA), Dr Abd Rahman Abd Rahim, Feb 2010, UTM EDUCATIONAL BACKGROUND 2006 – 2010 Universiti Teknologi Malaysia (UTM), Malaysia Bachelor in Mechanical Engineering CGPA: 3.01 2005 – 2006 Mara Express UTM Science Physical CGPA: 2.86 WORKING EXPERIENCES 1) PBJV GROUP Sdn. Bhd. Address : No. 28, Jln PJU 5/4, Dataran Sunway, Kota Damansara, 47810 Petaling Jaya, Selangor Darul Ehsan, Malaysia. Position Specialization Industry Duration : Field Engineer/Pipeline Engineer : Pipeline Pre-commissioning : Oil and Gas Industry : November 2011 to present Work Description: 1. Experience in proposal procedure in mechanical work for pipeline services. 2. Satisfy Certificate in oil and gas safety passport and BOSET for offshore work. 3. Experience in handling project for pre-commissioning pipeline 5. Accept extreme pressure during work and can manage job to finish ahead of schedule 6. Manage manpower during work at site 7. Good in commence and completion for pre-commissioning and piping works – procedure, material inspections and closed out report. Project Involvement: Period of Work: DECEMBER 2012– FEBRUARY 2013 Project Name: PETROFAC MALAYSIA LIMITED (PML) / TL OFFSHORE SDN BHD WEST DESARU/ CENDOR PRE COMMISSIONING PROJECT 8" x 2.65KM KRUEZ INSTALLER TO CENDOR FSO - PETROFAC PIPELINE 6" x 1KM CENDOR FSO TO CENDOR MOPU - PETROFAC PIPELINE Client: TLO & PETROFAC LIMITED Scope of Work: FLOODING, PIGGING, HYDROTEST

Upload: mohd-yunus

Post on 15-Jan-2017

370 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Resume - MOHD YUNUS BIN MOHD NAFI

MOHD YUNUS BIN MOHD NAFIPERSONAL PARTICULARS

Gender

Age

Date of Birth

Driver License

Identity CardNumber

Language

Male

27

May 07, 1988

B2, D

880507-03-5797

English, Malay

HomeAddress

Phone

E-mail

No 30, Jalan Berjaya 5,Taman Berjaya,68100 Batu Caves,Selangor

+6017-9389210(M)

[email protected]

CAREER OBJECTIVE

Loyal and committed. Good communication skills and able to adapt to new environment. Capable of executingtasks independently and enjoy traveling. Calm in facing difficulties and pressure. Have fine leadership skills and

excellent at working as a team and make organization’s goal as a priority in career objective.

PROFESSIONAL COURSE ATTENDED

Understanding Lubricant Oil Analysis, Dr Zubil Bahak(MLA II), Jan 2010, UTMOccupational Safety and Health Act (OSHA), Dr Abd Rahman Abd Rahim, Feb 2010, UTM

EDUCATIONAL BACKGROUND

2006 – 2010 Universiti Teknologi Malaysia (UTM), MalaysiaBachelor in Mechanical Engineering CGPA: 3.01

2005 – 2006 Mara Express UTMScience Physical CGPA: 2.86

WORKING EXPERIENCES

1) PBJV GROUP Sdn. Bhd.

Address : No. 28, Jln PJU 5/4, Dataran Sunway, Kota Damansara,47810 Petaling Jaya, Selangor Darul Ehsan, Malaysia.

PositionSpecializationIndustryDuration

: Field Engineer/Pipeline Engineer: Pipeline Pre-commissioning: Oil and Gas Industry: November 2011 to present

Work Description:

1. Experience in proposal procedure in mechanical work for pipeline services.

2. Satisfy Certificate in oil and gas safety passport and BOSET for offshore work.

3. Experience in handling project for pre-commissioning pipeline

5. Accept extreme pressure during work and can manage job to finish ahead of schedule

6. Manage manpower during work at site

7. Good in commence and completion for pre-commissioning and piping works – procedure, material

inspections and closed out report.

Project Involvement:

Period of Work: DECEMBER 2012– FEBRUARY 2013

Project Name: PETROFAC MALAYSIA LIMITED (PML) / TL OFFSHORE SDN BHD WEST DESARU/ CENDOR

PRE COMMISSIONING PROJECT

8" x 2.65KM KRUEZ INSTALLER TO CENDOR FSO - PETROFAC PIPELINE6" x 1KM CENDOR FSO TO CENDOR MOPU - PETROFAC PIPELINE

Client: TLO & PETROFAC LIMITED

Scope of Work: FLOODING, PIGGING, HYDROTEST

Page 2: Resume - MOHD YUNUS BIN MOHD NAFI

Period of Work: MARCH 2013 – APRIL 2013

Project Name: NEWFIELD (NFX) / EAST BELUMUT PARTIAL DE-OILING

10" x 27 KM EB-A - TG-A CRUDE OIL PIPELINE (PARTIAL DE-OILING) – PETRONAS PIPELINE

Client: NEWFIELD & PETRONAS CARIGALI SDN BHD

Scope of Work: FLOODING, PIGGING

Period of Work: APRIL 2013 – MAY 2013

Project Name: PETRONAS CARIGALI SDN BHD/ DULANG ASSIST IP WORKS & BI-DIRECTIONAL PIG C/W

GAUGE PLATE

12" x 3.7 KM DL-A - DL-B CRUDE OIL PIPELINE – PETRONAS PIPELINE12" x 3.7 KM DL-C - DL-B CRUDE OIL PIPELINE – PETRONAS PIPELINE

Client: PETRONAS CARIGALI SDN BHD

Scope of Work: PIGGING

Period of Work: JUNE 2013 – SEPTEMBER 2013

Project Name: MURPHY OIL PIPELINE DEVELOPEMENT 2013

8” x 17 KM SA-PA TO S.PLEM MULTIPHASE PIPELINE

10” X 40 KM PR-PA TO SA-PA MULTIPHASE PIPELINE

16” X 8 KM BE-SA TO SE-PA MULTIPHASE PIPELINE

16” x 15 KM SA-PA TO SE-PA DRY GAS PIPELINE

Client: MURPHY OIL CORP. LTD

Scope of Work: PRECOMMISSIONING, HYDROTEST, DEC0MMISSIONING AND RISER LEAKTEST

Period of Work: OCTOBER 2013 – NOVEMBER 2013

Project Name: DECOMMISSIONING OF PL27, PRECOMMISSIONING ANDASSIST COMMISSIONING OF PL27APL27 12’’ X 17 KM (CRUDE&CONDENSATE PIPELINE) FROM PULAI-A TO TINGGI-APL27A 3’’ X 17KM (CRUDE&CONDENSATE REINFORCED THERMOPLASTIC(RTP) PIPELINE)FROM PULAI-A TO TINGGI-A

Client: PETRONAS CARIGALI SDN BHD

Scope of Work: INSTALLATION OF REINFORCED THERMOPLASTIC PIPE (RTP), DEOILING, PIGGING(MESSENGER LINE), CLEANING RUN, HYDROTESTING & ASSIST COMMISSIONING

Period of Work: NOVEMBER 2013 – DECEMBER 2013

Project Name: ASSIST INTELLIGENT PIGGING (I.P), ASSIST COMMISSONING OF PL373 ANDDECOMMISSIONING OF PL215PL373 8’’ X 0.9KM (CRUDE&CONDENSATE PIPELINE) FROM TKP-B TO TKP-APL215 8’’ X 0.9KM (CRUDE&CONDENSATE PIPELINE) FROM TKP-B TO TKP-A

Client: PETRONAS CARIGALI SDN BHD

Scope of Work: DEOILING, PIGGING (INTELLIGENT PIG, CALIPER PIG, GAUGING PIG) & ASSISTCOMMISSIONING

Period of Work: APRIL 2014 – DECEMBER 2014

Project Name: CENDOR PHASE 2 PRE-COMMISSIONING WORK ON CDW-B / CDW-C12" X 2.032 KM CDW-B PRODUCTION 1 & 12" X 2.031 KM CDW-B PRODUCTION-28" X 1.990 KM CDW-B WATER INJECTION PIPELINE & 8" X 2.003 KM CDW-B12" X 3.673 KM CDW-C WATER INJETION PIPELINE & 8" 3.676 KM CDW-C GASINJECTION8" X 0.2285 KM WEST DESARU FLEXIBLE RISER

Client: PETROFAC (MALAYSIA-PM304) LIMITED

Scope of Work: LEAKTESTING, BULK DEWATERING, FLUSHING, FINAL DEWATERING, AIR DRYING AND N2PURGING AND PACKING

Page 3: Resume - MOHD YUNUS BIN MOHD NAFI

Period of Work: JUNE 2015 – AUGUST 2015

Project Name: DEOILING PRE-COMMISSIONING WORK ON TAPIS PIPELINE10” X 4 KM TAPIS-DELTA TO TAPIS-BRAVO12” X 4 KM TAPIS-BRAVO TO TAPIS-ALFA6” X 4 KM TAPIS-CHARLIE TO TAPIS-ALFA12” X 4 KM TAPIS-CHARLIE TO TAPIS-ALFA16” X 8 KM TAPIS-ALFA TO TAPIS-PUMP

Client: EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA INC (EMEPMI)

Scope of Work: FLUSHING AND PIGGING CLEANING

Period of Work: AUGUST 2015 – PRESENT

Project Name: LEAKTESTING KANOWIT KAKG-A FLEXIBLE PIPELINE10” X 3.115 KM KAKG-A TO PLET PIPELINE (SUBSEA)

Client: PETRONAS CARIGALI SDN BHD

Scope of Work: LEAKTESTING

2) ANZ Engineering Sdn. Bhd

Address : 7191 Kaw. Perindustrian Jakar 2, Chukai, 24000 Kemaman, Terengganu.

PositionSpecializationIndustryDuration

: Project and Sales Engineer: Piping and Project: Oil and Gas Industry: March 2011 to November 2011

Work Description:

1. Experience in tendering proposal documentation in civil and mechanical work

2. Satisfy Certificate in NIOSH oil and gas safety passport

3. Experience in handling project inside Petronas Plant

4. Involve in Petronas Turnaround

5. Accept extreme pressure during work

6. Manage manpower during work in site

7. Good in QA and QC for piping work – work procedure, material inspections and closed out report.

8. Experience in Mechanical Piping in Oil and Gas Company;

i) Material procurement

ii) Material Inspection

iii) Fabrication work

iv) Installation work in site

v) Testing

vi) Closed out report

3) J.K. Wire Harness Sdn. Bhd (JKWH)

Position TitlePosition LevelSpecializationIndustryDuration

: Assistant Engineer: Executive: Quality Assurance: Manufacturing / Production (Automotive Wire Harness): Sept 2010 to March 2011

Work Description:

1. Hands-on to assist troubleshoot & rectification of production or machineries issues2. Study & provide proposal to ensure production target are achieved on time, with optimal utilization of

resources available.3. Provide recommendation to minimizing defect levels through process and quality improvement.4. Assist in quality defect investigation and recommend counteractive measures.5. Ensuring that the manufacturing processes are timely and accurately set up.6. Ensure the Technical Team performing regular checks of production lines and ensuring all are running

smoothly.

Page 4: Resume - MOHD YUNUS BIN MOHD NAFI

4) INTERNSHIP TRAINING

Location PETRONAS Gas Berhad (PGB).Duration 10 weeks (11th May 2009 – 17th July 2009)Position Mechanical Engineer Trainee

Projects i. Involvement in LM 2500 Industrial Gas Turbine Replacement- Study the cracking section of GPPB plant and its function- Learn how the process replacement gas turbine during plant shutdown

ii. Involvement in Nouvo Pignone Amine Circulating Pump Shutdown- Learn the shutdown progress on mechanical day including the inspection

at amine pump section- Prepare the weekly report for plant supervisor and get his comment.

iii. Overhaul Gearbox for General Electrical Gas Generator LM2500- Completed the job on overhaul gearbox- Study on how to do the 5 point check balancing and do the weekly report for

plant supervisor.

iv. Involvement in startup and troubleshooting Dresser Rand Steam Turbine- Experience the process to startup the gas turbine and learn the important part

of the steam turbine and some precaution during the process.

v. Refill Glycol For Amine Pump- Experience the process and function of the lubricant for amine pump.

FINAL YEAR PROJECT (2009/2010)

Title Structural Health Monitoring Using Vibration Based Method

Description The objective of this project is to determine the health condition of a structure usingvibration based method. The main focus of this project is to compare the result fromexperiment frequencies by using beam structure with theoretical frequencies.

Software PAK Mobile-MK-II version 5.2

SKILLS AND PROFICIENCY

Software Proficiency Description

Solid Work Intermediate 3D mechanical CAD (computer-aided design) program

MathCAD Intermediate Verification, validation, documentation and re-use ofengineering calculations

MATLAB Intermediate High-Performance Language for Technical Computing

AutoCAD Intermediate Technical Drawing Software

PROJECTS COMPLETED

Year Title Description

2009 i. Flexible Lifter Design and analyze the strength of flexible lifter machineprototype.

2008 ii. Bicycle crankAnalysis

iii. Soap Box

Analyze the strength of bicycle crank design by using FiniteElement Analysis.

Design and make the prototype of gravity car.

2007 iv. Bicycle Absorber Use the AutoCAD software to redesign and improve theproduct design.

RELEVANT COURSE TAKEN

Static, Dynamics, Thermodynamics, Fluid Mechanics, Mechanics of Solids, Vibration and Mechanics ofMachines, Electrics, Electronics, Instrumentation, Control Engineering, Applied Numerical Methods,

Calculus, Engineering Statistic, Industrial Engineering, Engineering Economy, Heat Transfer, HydraulicMachines and Pipe Systems, Condition Based Monitoring

Page 5: Resume - MOHD YUNUS BIN MOHD NAFI

PROFESSIONAL MEMBERSHIPS

Mechanical Engineering Club (Mechanical) PETERA (2006-2010)

PARTICIPATIONS AND EXTRA-CURRICULAR ACTIVITIES

• Participant “Navigate Your Career” by MISC at UTM (2009)• Members of Kelab Kompang Kolej 10 (2007/2008).• Members of PETERA (Kesatuan Kejuruteraan Jentera) (2006-until now).• Representative College in rugby team for inter college sports carnival (SUKAM) UTM (2006)• Representative College in football team for inter college sports carnival (SUKAM) UTM (2008)• Representative College in rugby team for inter college sports carnival (SUKAM) UTM (2008)

MISCELLANEOUS

Willing to TravelWilling to RelocateAvailability

: Yes: Yes: One month notice

REFERENCES

Prof. Dr. Roslan Abdul Rahman

LecturerFaculty of Mechanical EngineeringUniversity Technology of MalaysiaTel: 014-3830262

Ihsan Bin Abdul Rahman

Assistant Manager,QA Department,J.K. Wire Harness Sdn. Bhd.Tel : 012-7736578

Badrul Hisham Sairan

Executive TurbomachineryMaintenance Dept. GPP-B,Petronas Gas BerhadTel:014-2163898

Mohd Sharil Ahmad

Head of Department,Pipeline Services Department,PBJV GROUP SDN. BHD.Tel:016-2122347