rencana peningkatan efektivitas mesin dengan ...eprints.umm.ac.id/60155/44/pendahuluan.pdfxiii...

21
RENCANA PENINGKATAN EFEKTIVITAS MESIN DENGAN METODE OVERALL EQUIPMENT EFFECTIFENESS (OEE) (CV KIRANA JAYA TEKNIK) Skripsi Diajukan Kepada Universitas Muhammadiyah Malang Untuk Memenuhi Salah Satu Pesyaratan Akademik Dalam Menyelesaikan Program Sarjana Teknik Disusun Oleh : AKHMAD IBRAHIM AFFAN 201310140311126 JURUSAN TEKNIK INDUSTRI FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH MALANG 2020

Upload: others

Post on 17-Feb-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

  • i

    RENCANA PENINGKATAN EFEKTIVITAS MESIN

    DENGAN METODE OVERALL EQUIPMENT

    EFFECTIFENESS (OEE)

    (CV KIRANA JAYA TEKNIK)

    Skripsi

    Diajukan Kepada Universitas Muhammadiyah Malang

    Untuk Memenuhi Salah Satu Pesyaratan Akademik

    Dalam Menyelesaikan Program Sarjana Teknik

    Disusun Oleh :

    AKHMAD IBRAHIM AFFAN

    201310140311126

    JURUSAN TEKNIK INDUSTRI

    FAKULTAS TEKNIK

    UNIVERSITAS MUHAMMADIYAH MALANG

    2020

  • i

  • ii

  • iii

  • iv

  • v

  • vi

  • vii

    Surat Pernyataan Keaslian

    Dengan ini saya menyatakan bahwa :

    Skripsi saya ini adalah asli dan belum pernah diajukan untuk mendapatkan

    gelar akademik sarjana baik di Universitas Muhammadiyah Malang maupun di

    Perguruan Tinggi lainnya.

    Skripsi ini adalah murni gagasan, rumusan, dan penelitian saya sendiri

    tanpa bantuan dari pihak lain kecuali arahan Dosen Pembimbing.

    Dalam skripsi ini tidak terdapat karya atau pendapat yang telah ditulis atau

    dipublikasikan orang lain, kecuali secara tertulis dengan jelas dicantumkan

    sebagai acuan dalam naskah dengan disebutkan nama dan dicantumkan dalam

    daftar pustaka.

    Pernyataan ini saya buat dengan ssungguhnya dan apabila di kemudian

    hari terdapat penyimpangan dan ketidakbenaran dalam pernyataan ini, maka saya

    bersedia menerima sanksi akademik sesuai dengan aturan yang berlaku.

    Malang, 21 Januari 2020

    Yang membuat pernyataan

    Materai

    Rp. 6.000

    Akhmad Ibrahim Affan

    201310140311126

    Akhmad Ibrahim Affan

    201310140311126

    Malang, 21 Januari 2020

    Yang membuat pernyataan

  • viii

  • ix

  • x

    KATA PENGANTAR

    Assalamu’alaikum Wr. Wb.

    Puji syukur kehadirat Allah SWT. yang telah melimpahkan rahmat dan

    hidayah-Nya, sehingga penulis dapat menyelesaikan tugas akhir skripsi dengan

    baik dan dalam keadaan sehat wal’afiat. Sholawat serta salam tetap tercurahkan

    kepada Nabi Muhammad SAW., sehingga penulis dapat menyelesaikan tugas

    akhir skripsi ini yang berjudul “RENCANA PENINGKATAN EFEKTIVITAS

    MESIN DENGAN METODE OVERALL EQUIPMENT EFFECTIFENESS”

    dengan baik.

    Dalam penyusunan laporan ini, tentunya penulis tidak lepas dari bantuan

    dan dukungan beberbagai pihak. Untuk itu, dalam kesempatan ini penulis akan

    mengucapkan terima kasih kepada :

    1. Allah SWT. yang telah memberikan kesehatan, kemudahan, ilmu

    pengetahuan, dan rahmat kepada penulis, sehingga penulis dapat

    menyelesaikan tugas akhir skripsi ini dengan lancar.

    2. Ayah, ibu, dan keluarga saya yang telah mendukung saya untuk

    menyelesaikan tugas akhir skripsi ini agar tepat waktu.

    3. Bapak Ilyas Mas’udin selaku Dosen Pembimbing I saya yang telah

    membimbing dan mengarahkan saya jika terjadi kesalahan dalam pengerjaan

    skripsi. Terima kasih karena bapak telah meluangkan waktunya ditengah

    kesibukan dan segala ilmu yang ibu berikan kepada saya.

    4. Bapak Heri Mujayin Kholik selaku Dosen Pembimbing II saya yang

    membimbing dan meluangkan waktunya untuk saya. Semoga ilmu yang telah

    bapak berikan akan bermanfaat dikemudian hari.

    5. Kepada pihak perusahaan terutama Bapak Ainur Rofiq yaitu pembimbing

    lapangan saya selama melakukan penelitian di perusahaan. Terima kasih telah

    memberikan saya kesempatan melakukan penelitian di CV Kirana Jaya

    Teknik. Banyak pengalaman dan kenalan yang saya dapat di sana. Semoga

  • xi

    kedepannya perusahaan menjadi lebih baik dan lebih maju untuk bersaing

    dengan perusahaan lain.

    6. Teman-teman saya yang tidak mungkin saya sebutkan satu persatu namanya.

    Terima kasih karena mampu meluangkan waktunya untuk membantu dan

    menemani saya dalam proses pengerjaan skripsi. Terima kasih pula karena

    mampu menghilangkan stress yang saya alami selama pengerjaan skrispi ini.

    Penulis menyadari bahwa dalam penulisan dan pengerjaan tugas akhir

    skripsi ini jauh dari kata sempurna. Maka dari itu, penulis mengharapkan saran

    dan kritik yang bersifat membangun.

    Peulis juga mengharapkan semoga tugas akhir skripsi ini dapat bermanfaat

    bagi yang membacanya dan semoga tugas akhir ini dapat dikembangkan oleh

    penulis lainnya yang ingin berminat pada metode yang terdapat pada isi skripsi

    ini.

    Wassalamu’alaikum Wr. Wb.

    Malang, 21 Januari 2020

    Penulis

  • xii

    ABSTRAK

    RENCANA PENINGKATAN EFEKTIVITAS MESIN DENGAN

    METODE OVERALL EQUIPMENT EFFECTIFENESS

    (CV KIRANA JAYA TEKNIK)

    Akhmad Ibrahim Affan1, Ilyas Mas’udin2, Heri Mujayin Kholik3 123Jurusan Teknik Industri, Fakultas Teknik, Universitas Muhammadiyah Malang

    Jl. Raya Tlogomas No. 246 Malang, Jawa Timur 65144 Telp (0341) 464318 / Fax (0341) 460782, 460435

    Email : aaffan58@gmail,com

    Abstrak

    Artikel ini bertujuan untuk mengetauhi Mesin bubut digunakan untuk

    memproduksi pipa capvalve belum sepenuhnya bekerja secara efektif. Hal ini

    ditunjukkan dengan adanya downtime, penurunan kecepatan produksi mesin, dan

    produk-produk yang tidak sesuai standard yang telah ditetapkan. Penelitian ini

    bertujuan untuk mengukur dan mengetahui tingkat efektivitas mesin bubut dengan

    menggunakan metode Overall Equipment Effectiveness (OEE), mengidentifikasi

    faktor penyebab six big losses dan memberikan usulan perbaikan untuk

    meningkatkan tingkat efektivitas mesin. Dari hasil penelitian, OEE mesin bubut

    mencapai rata-rata 58,83%, dan masih berada di bawah nilai OEE ideal (85%).

    Usulan perbaikan yang direkomendasikan meliputi eliminasi six big losses,

    mengembangkan program pemeliharaan, dan memberikan pelatihan untuk

    meningkatkan kemampuan maintenance dan operasional.

    Kata kunci: Overall Equipment Effectiveness (OEE), Total Productive

    Maintenance, Setup, Avaibility, performance, Rate of Quality

  • xiii

    ABSTRACT

    RENCANA PENINGKATAN EFEKTIVITAS MESIN DENGAN

    METODE OVERALL EQUIPMENT EFFECTIFENESS

    (CV KIRANA JAYA TEKNIK)

    Akhmad Ibrahim Affan1, Ilyas Mas’udin2, Heri Mujayin Kholik3 123Jurusan Teknik Industri, Fakultas Teknik, Universitas Muhammadiyah Malang

    Jl. Raya Tlogomas No. 246 Malang, Jawa Timur 65144 Telp (0341) 464318 / Fax (0341) 460782, 460435

    Email : aaffan58@gmail,com

    Abstract

    This article aims to deals with the lathes used to produce capvalve pipes not yet

    fully working effectively. This is indicated by the existence of downtime, a

    decrease in engine production speed, and products that are not in accordance with

    established standards. This study aims to measure and determine the effectiveness

    of the lathe by using the Overall Equipment Effectiveness (OEE) method, identify

    the factors causing six big losses and provide suggestions for improvement to

    increase the level to engine effectiveness. From the results of the study, OEE lathe

    reached an average of 58,83% and is still below the ideal OEE value (85%).

    Recommended improvement proposals include eliminating six big losses,

    developing a maintenance and operational capabilities.

    Keywords : Overall Equipment Effectiveness (OEE), Total Productive

    Maintenance, Setup, Avaibility, Performance, Rate of Quality

  • xiv

    DAFTAR ISI

    Lembar Pengesahan Skripsi ..................................................................................... i

    Lembar Asistensi Skripsi ........................................................................................ ii

    Berita Acara Ujian ..................................................................................................vi

    Surat Pernyataan Keaslian ....................................................................................vii

    Surat Keterangan Pengambilan Data dari Perusahaan ......................................... viii

    Form Cek Plagiasi .................................................................................................. ix

    Kata Pengantar ........................................................................................................ x

    Abstrak .................................................................................................................. xii

    Abstract ............................................................................................................... xiii

    DAFTAR ISI ........................................................................................................ xiv

    DAFTAR TABEL ............................................................................................... xvii

    DAFTAR GAMBAR ......................................................................................... xviii

    BAB I PENDAHULUAN .................................................................................... 1

    1.1 Latar Belakang .................................................................................................. 1

    1.2 Rumusan Masalah… ......................................................................................... 2

    1.3 Tujuan Penelitian… .......................................................................................... 2

    1.4 Manfaat Penelitian… ........................................................................................ 3

    1.5 Batasan Masalah….............................................................................................3

    BAB II LANDASAN TEORI… ......................................................................... 4

    2.1 Total Productive Maintenance .......................................................................... 4

    2.2 Definisi Perawatan… ....................................................................................... 8

    2.3 OEE (Overall Equipment Effectiveness)… .................................................... 10

    2.3.1 Perhitungan Ketersediaan (Availability Rate) ..................................... 12

  • xv

    2.3.2 Perhitungan Efektivitas Kerja (Performance Rate) ............................... 12

    2.3.3 Perhitungan Tingkat Kualitas Produk (Quality Rate) ........................... 13

    2.4 Diagram Pareto…..............................................................................................13

    2.5 Enam Kerugian Utama (Six Big Looses)… .................................................... 15

    2.6 Diagram Sebab Akibat .................................................................................... 17

    BAB III PEMBAHASAN ................................................................................... 20

    3.1 Flowchart Penelitian.........................................................................................20

    3.2 Penjelasan Flowchart Penelitian ..................................................................... 21

    BAB IV PENGUMPULAN DAN PENGOLAHAN DATA… ....................... 26

    4.1 Sejarah Perusahaan.........................................................................................26

    4.2 Pengumpulan Data ......................................................................................... 27

    4.3 Pengolahan Data…..........................................................................................28

    4.3.1 Perhitungan Ketersediaan ........................................................................28

    4.3.2 Perhitungan Efektifitas Kinerja (Performance Rate)… .......................... 30

    4.3.3 Quality Rate ............................................................................................ 31

    4.3.4 Perhitungan OEE ..................................................................................... 33

    4.4 Analisis Six Big Losses ............................................................................... 35

    4.4.1 Down Time Losses… .......................................................................... 35

    4.5 Speed Losses ................................................................................................... 38

    4.6 Defect Losses .................................................................................................. 41

    4.7 Pareto Chart .................................................................................................... 44

    4.8 Analisa Pareto Chart ...................................................................................... 45

    4.9 Diagram Sebab Akibat atau Fish Bone ........................................................ 46

  • xvi

    BAB V ANALISA PEMBAHASAN .................................................................. 47

    5.1 Analisa Total Productive Maintenance ........................................................... 47

    5.2 Analisa Overall Equipment Efectiveiness ....................................................... 47

    5.3 Analisa Six Big Losses.....................................................................................47

    5.4 Analisa Pareto Chart ....................................................................................... 48

    5.5 Analisa Diagram Sebab Akibat ...................................................................... 48

    5.6 Analisa Usulan Perbaikan ............................................................................... 50

    BAB VI PENUTUP ............................................................................................. 55

    6.1 Kesimpulan ..................................................................................................... 55

    6.2 Saran ................................................................................................................ 55

    DAFTAR PUSTAKA .......................................................................................... 56

  • xvii

    DAFTAR TABEL

    Tabel 4.1 Data Waktu Tersedia Break Down Time dan Produksi Mesin Bubut ..27

    Tabel 4.2 Perhitungan Availibility Rate .................................................................28

    Tabel 4.3 Perhitungan Performance Eficiency .......................................................30

    Tabel 4.4 Perhitungan Quality Rate ...................................................................... 32

    Tabel 4.5 Perhitungan Overall Equipment Evectiviness .......................................33

    Tabel 4.6 Perhitungan Failure Losses ................................................................... 35

    Tabel 4.7 Perhitungan Set Up and Adjustment Losses ........................................ 37

    Tabel 4.8 Perhitungan Idling Minor Stopagge ...................................................... 38

    Tabel 4.9 Perhitungan Reduce Speed .....................................................................39

    Tabel 4.10 Reject & Rework Losses ..................................................................... 41

    Tabel 4.11 Reduce Yield Losses ........................................................................... 43

    Tabel 4.12 Perhitungan Presentase Six Big Losses............................................... 44

    Tabel 4.13 Pengurutan Presentase Faktor Six Big Losses .................................... 45

  • xviii

    DAFTAR GAMBAR

    Gambar 2.1 Perkembangan Total Productive Maintenance .................................. 4

    Gambar 2.2 Pilar Total Productive Maintenance ................................................... 5

    Gambar 2.3 Pareto Chart ....................................................................................... 14

    Gambar 2.4 Ishikawa Chart ............................................................................................. 17

    Gambar 3.1 Flowchart Metodelogi Penelitian .................................................................. 20

    Gambar 4.1 Pembubutan Pipa, Cap Valve CV Kirana Jaya Teknik ................................. 26

    Gambar 4.12 Pareto Chart ................................................................................................. 45

    Gambar 4.13 Diagram Sebab Akibat ................................................................................ 46

  • 56

    Daftar Pustaka

    Aspinwall,M. dan Elgharib, M.”TPM implementatition and large medium size

    organisations” journal of manufacturing mangement Vol.24 No. 5

    2013

    Ishikawa, Kaoru, Guide to Quality Control, Asian Productivity Organization,

    UNIPUB, 1976.

    Jonsson, p, danlesshammer, M .“Evaluation and improvement of manufacturing

    performance measurmernt system-the role of OEE” international journal of

    operations and production management Vol.19 No 1 1999

    Khamba dan Ahuja. “Total Produktive maintenance literature review and direction”

    international journal of quality realibility management Vol.25 No. 7 2008

    Mairesse, J, dan Teonas, B. “Improvement of ndustrial performance with TPM

    implementation” Journal of Quality In Maintenance Enginering Vol.20 No,

    01, 2014

    Prasetyo, H., Adianto, H. dan Ulfaizah “ Rancangan Total Productive

    Maintenance (TPM) dibagian press II” jurnal online institut teknologi nasional

    No.01,Vol.01 Tahun 2014

    Rajbir, s., bhatti, dan jain, A. “OEE enchancement in SMEs throught mobile

    maintenance with

    TPM concept” international journal of quality reliability management Vol.

    37 No. 5, 2015

    Rinawati, D., dan Dewi, C.N, “Analisis penerapan Total Productive Maintenance

    (TPM) menggunakan Overall Equipment Efectiviness (OEE) dan six big losses

    pada mesin cavitec” Prosiding SNATIF Ke -1 Tahun 2014

    Wahyudi, s., dan Rahmat dan Praktiko.“Penerapan Overall Equipment

    Effectiveness (OEE) Dalam Implementasi Total Productive Maintenance

    (TPM)” Jurnal Rekayasa Mesin Vol.3,No.3 Tahun 2012 : 431-437

  • 56