insulation - ricwil (malaysia) sdn...

32
PREFABRICATED . PREINSULATED . PIPING SYSTEM INSULATION

Upload: others

Post on 03-Dec-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

PREFABRICATED . PREINSULATED . PIPING SYSTEMINSULATION

Page 2: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

p.02

p.03 - 05

p.06 - 13

p.14 - 20

p.21 - 22

p.23 - 25

p.26 - 28

p.29

p.30 - 31

About Us

Overview

Hi - Gard™

Terra - Gard™

Copper - Gard™

Proprietary Information

Project References

Certificates

Other Services & Contact Infomation

p. 01 / 02

CONTENTS

Page 3: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

ABOUT US

The three major activities of Ricwil (Malaysia) Sdn Bhd are in manufacturing, contracting and

engineering trading.

Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and balance 49% belonging to Ricwil Japan, is licensed to manufacture preinsulated pipes under the Industrial Co-ordination Act 1975. Currently it is 100% wholly owned by Malaysians.

Competent Japanese engineers in Malaysia trained our local technicians for one and a half years. Presently, Ricwil (Malaysia) Sdn Bhd provides services to Singapore, Indonesia, Nepal, Brunei, Philippines, Middle East, Hong Kong, Taiwan, Myanmar, Vietnam, Combodia, Sri Lanka, Bangladesh and Thailand.

Today, Ricwil’s underground and aboveground preinsulated pipes covering thousand of miles are functioning satisfactory in all areas of work. Through these ensuring years, Ricwil Malaysia has expanded its activities to mechanical contracting and trading, serving both the commercial and process industry sectors.

Having a track record of reliability, Ricwil ensure customer’s requirement are met and perform to their satisfaction. With its integrity proven over the years, Ricwil ensures consistency in its products. Coupled with the willingness and initiative of its workforce, Ricwil seeks to provide a service that surpasses the expectation of its valued customers.

“Reliability, Integrity, Consistency, Willingness,Improvement and Logic

Page 4: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

OVERVIEWRigid polyurethane foam systems for pipe insulationRigid polyurethane foam has been used for the insulation and protection of pipes for more than 30 years. It is now more widely used than ever, increasingly displacing alternative materials. One of the most popular areas of use is for district cooling systems, where it is the insulant of first choice for many specifiers. Other common uses are in: 1) On and offshore oil and gas pipelines2) Heating and plumbing services for power stations, chemical plants and refineries3) Dairy industry applications4) District heating systems5) Other special applications i.e. swimming pool pipelines

Polyurethane foam’s popularity is based on its outstanding insulation properties, which prevent heat loss, or alternatively maintain temperatures in cold environments to prevent freezing or cracking. These energy conservation qualities improve the overall cost efficiency of customers’ networks.

Other important characteristics include high mechanical strength, adhesion, flexibility and good flow-ability, necessary for the consistent fill and insulation of pipe sections.

It is a material with a proven track record for reliability, durability and efficiency. Versatility is demonstrated by the ability to insulate over an extremely wide range of temperatures, from the extreme cold of -196°C to the intense heat of more than 150°C.

It is also suitable for applications ranging from small plumbing pipes 10mm in diameter, up to the largest heating pipes with 2,000mm diameters and 250mm of insulation thickness.

Pipe manufacturing techniques for effective insulationThere are two main forms of pipe production techniques; discontinuous and continuous. The method adopted by an individual manufacturer will reflect the particular operations and applications of that company’s business.

Discontinuous pipe manufacturing techniquesDiscontinuous manufacture involves filling of the void between, typically, a steel inner pipe within a high density polyethylene (HDPE) casing pipe. The gaps at both ends of the pre-assembly are sealed with tightly fitting caps equipped with injection and air venting holes. Standard steel pipe lengths for this process are 6 m and 12 m.

p. 03 / 04

Page 5: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

Why polyurethane is an excellent insulantRigid polyurethane foam demonstrates versatility both through its physical strengths and mechanical properties. These qualities enable it to be used in a wide variety of multi-functional building products which combine insulation with load-bearing, sealing, impact resistance, weight and space-saving, together with ease of maintenance.

Low thermal conductivity Rigid polyurethane foam has one of the lowest thermal conductivity ratings of any insulant, which allows efficient retention of heat or, alternatively, maintenance of a refrigerated or frozen environment.

StrengthRigid polyurethane foam provides a high level of compression and shear strength, which is bond enhanced by bonding with facing materials such as metal or plasterboard.

ProcessabilityRigid polyurethane foam can be made either under continuous block or batch factory production, or by on-site mixing for spray and injection purposes.

In-situ stabilityRigid polyurethane foam can be used in applications which experience exceptional extremes of temperature, from -200°C to +100°C.

AdhesionDuring the short period between mixing and final curing, rigid polyurethane foam is extremely adhesive, which allows it to bond effectively with a wide range of building facings. The adhesion is so strong that the strength is usually higher than the tensile or shear strength of the foam.

CompatibilityRigid polyurethane foam is compatible with a large number of building facings, including paper, foil, glass fibre, aluminium, plasterboard, plywood and bitumen. These can complement the inherent strengths of the foam, enabling use as semi-structural panels and cladding and allowing foam to accept cosmetic finishes such as plaster to operate effectively as moisture barriers in conditions of high humidity.

Water absorptionThe water vapor permeability of rigid polyurethane foam is low and is enhanced in most building applications by the incorporation of a moisture barrier of polyethylene film or aluminium foil.

Page 6: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

Rigid polyurethane foams are usually used at lower thicknesses than other insulants, which means that their heat or fuel contribut ion to a fire is low compared to other, thicker insulating materials. The overall fire performance of an insulation panel can be significantly enhanced by the material that is used to face the panel - for example, steel.

Independently monitored, large-scale tests of buildings incorporating rigid polyurethane and polyisocyanurate (PIR) foam insulation carried out in the USA and Europe have concluded that, properly used, these materials do not add to the severity or serious hazard of fires.

LightnessAt low densities (e.g. 30kg/m3), the volume ofpolyurethane polymer in rigid polyurethane foam is around 3 per cent. The remaining 97 per cent of the foam is gas trapped within the cells, which provides the low thermal conductivity properties.

The lightness of the foam is an important aspect in terms of transportation, handling and ease of installation.

Chemical resistanceRigid polyurethane foam provides excellent resistance to a wide range of chemicals, solvents and oils.

PU FactorPolyurethane is an organic polymer formed by reacting a polyol (an alcohol with more than two reactive hydroxyl groups per molecule) with a diisocyanate or a polymeric isocyanate in the presence of suitable catalysts and additives.

Polyurethanes are flexible foams used in mattresses, chemical-resistant coatings, adhesives and sealants, insulation for buildings and technical applications like heat exchangers, cooling pipes and much more.

The relation between temperature and thermal conductivity is indicated in the diagram below:

T(°C) = 5/9[T(°F) - 32]

p. 05 / 06

Page 7: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

HI-GARD™LO-TEMP HI-GARD

RICWIL’S Lo-Temp Hi-Gard piping system is the highest quality, most efficient and dependable method of providing for above-ground distribution of fluids at temperatures up to 130°C.

Lo-temp Hi-Gard is prefabricated to improve quality and save labor, the Lo-Temp Hi-Gard piping system is completely preinsulated to satisfy insulation and jacketing needs for all above-ground applications, indoors and outside.

Lo-Temp Hi-Gard provides the unparalleled thermal efficiency of factory-applied polyurethane insulation, protected by any one of a multitude of jacket materials. Metal jackets of aluminium, galvanized steel, plastic coated glavanized steel, stainless steel, and U.V. inhibited plastic jacket of PVC and polyethylene are all available. Lo-Temp Hi-Gard components are factory assembled including all necessary fabricated fittings, such as elbows, tees, expansion loops and anchors, so a complete system ready for fast installation is delivered to the jobsite. Supporting of the Lo-Temp Hi-Gard system is simplified by the capability of supporting from the outside of the protective jacket.

MID-TEMP HI-GARDRICWIL’S Mid-Temp Hi-Gard piping system provides superior BTU savings in addition to an efficient, high quality, labor-saving method of providing for the distribution of fluids above-ground at temperatures of 130°C and above.

A combination of calcium silicate and polyurethane insulation makes BTU savings possible. These savings are extremely desirable in electric-traced applications where every BTU saved lowers electrical equipment material cost and adds to lifelong

savings in power usage. These savings also justify Mid-Temp Hi-Gard purchase for many district cooling and heating applications, where every BTU delivered to a customer brings added income to system owner. Supporting of pipe system is simplified by capability of supporting from the outside of the protective capability of supporting from the outside of the jacket.

Completely prefabricated and preinsulated, the Mid-Temp Hi-Gard piping system meets the design requirements of all above-groundinstallations for services of and above where maximum BTU savings are desired. Mid-Temp Hi-Gard.

Page 8: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

maintains thermal efficiency indoors and outside. It consists of a highly thermal-efficient inner layer of a calcium silicate, and outer layer of polyurethane factory-applied to the required thickness and density, and a protective jacket of a material best suited to the application. Metal jackets of aluminium, galvanized steel, plastic coated glavanized steel, stainless steel, and U.V. inhibited plastic acket of PVC and polyethylene are all available. These components are efficiently factory assembled including all necessary fabricated items such as elbows, tees, expansion loops and anchors, etc., to deliver a complete system to the jobsite.

HI-TEMP HI-GARDRICWIL’S Hi-Temp Hi-Gard piping system provides maximum durability in addition to an efficient, high quality, labor-saving method of providing for the distribution of fluids at temperatures above 150°C.

The combination of of RICWILs exclusive nonflammable insulation locking agent with calcium silicate makes maximum system economy possible.Hi-Temp Hi-Gard is a specially formulated, high-strength inorganic locking agent that exhibits

virtually no temperature limitations when used in a RICWIL piping system.

The inorganic locking agent’s high-compression strength, plus the combination of insulation materials that allows RICWIL to apply the minimum thickness of insulation required to maintain desired temperatures, results in a rugged,durable system. A syatem that allows maximum earing loads with maximum support spans. These design savings are added to the economy of Hi-Temp Hi Gard minimum insulation thickness.Completely preinsulated to handle all temperatures, the prefabricated piping system is particularly suited for indoor and outside applications. Supporting the Hi-Temp Hi-Gard system is simplified by capability of supporting from the outside of the protective jacket.

Hi-Temp Hi-Gard consist of an inner layer of calcium silicate insulation, factory applied to the required thickness,sealed with polyethylene shield, covered by an outer layer of RICWIL exclusive inorganic locking agent for strength,and protected by any one of a multitude of metal jacket materials.

Hi-Temp Hi-Gard’s nonflammable barrier permits its use in all commercial and industrial environments.Metal jackets of spirally locked seam aluminium, galvanized steel, plastic coated galvanized steel and stainless steel are available.

These components are factory-assembled including all necessary fittings, such as elbows, tees, expansion loops, and anchor, so a complete system ready for fast installation is delivered to your jobsite.

p. 07 / 08

Page 9: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

HI-GARD™ PRODUCT DATA

DESIGN CALCULATION

The heat loss per unit length from a uniformly insulated pipe is given by : Heat Flow Rate, Outside Surface Temperature

Where : Q’ heat loss per lineal metre of pipe per second ( W/m )Tp surface temperature of pipe ( °C )Ts outer surface temperature of insulation or cladding °CTa ambient air temperature (°C )KA thermal conductivity of insulation ( W/m °K )D2 diameter of outer surface of insulation ( m )D1 outer diameter of pipe ( m )f surface heat transfer coefficient ( W/m² °K )

as TfDQT +=

2

'p

Page 10: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

Pipe STD Pipe Size

Pipe OD

Jacket Size

Insulation thk

Heat Gain/Loss

Weight / Meter

Weight / Meter

(mm) (mm) (mm) (mm) Kcal/h With Water

Without water

API 5L Gr B - 9.5mm 600 609 711 51 -24.32 431.91 158.02API 5L Gr B - 7.9mm 600 609 711 51 -24.32 411.40 134.50API 5L Gr B - 9.5mm 550 559 660 50.5 -22.73 373.64 144.83API 5L Gr B - 7.9mm 550 559 660 50.5 -22.73 354.88 123.34API 5L Gr B - 9.5mm 500 508 609 50.5 -20.89 319.41 131.65API 5L Gr B - 7.9mm 500 508 609 50.5 -20.89 302.20 111.90API 5L Gr B - 9.5mm 450 457 558 50.5 -19.03 269.24 118.47API 5L Gr B - 7.9mm 450 457 558 50.5 -19.03 254.00 101.01API 5L Gr B - 9.5mm 400 406 508 51 -17.01 223.12 105.29API 5L Gr B - 7.9mm 400 406 508 51 -17.01 209.48 89.65JIS G 3452 Std 350 355 457 51 -15.15 169.20 78.51JIS G 3452 Std 300 323 431 54 -13.30 136.56 63.51JIS G 3452 Std 250 273 381 54 -11.54 102.26 51.59JIS G 3452 Std 200 219 318 49.5 -10.34 70.53 37.50BS 1387 Class “C” 150 168 279 55.5 -7.62 46.26 27.25BS 1387 Class “C” 125 141 254 56.5 -6.58 36.60 23.29BS 1387 Class “C” 100 114 203 44.5 -6.72 26.81 18.40BS 1387 Class “C” 80 89 177 44 -5.65 18.85 13.83BS 1387 Class “C” 65 73 152 39.5 -5.30 14.28 10.73BS 1387 Class “C” 50 60 142 41 -4.52 10.99 8.87BS 1387 Class “C” 40 48 127 39.5 -4.00 8.00 6.70BS 1387 Class “C” 32 42 127 42.5 -3.52 7.06 6.12BS 1387 Class “C” 25 33 115 41 -3.12 5.57 5.02BS 1387 Class “C” 20 27 101 37 -2.96 4.08 3.74BS 1387 Class “C” 15 21 101 40 -2.48 3.41 3.23

PREINSULATED HI-GARD PIPE DATA

GAL STEEL JACkET THk : 101mm - 318mm :- 0.5mm

381mm - 813mm :- 0.6mm

PU DENSITy : STD 15mm - 600mm @ 45kg/m³

p. 09 / 10

Page 11: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

QUANTITy Of fOAM REQUIRED PER JOINT ( kG / JOINT )

Pipe Size (mm)

Jacket Size (mm)

PU Thk (mm)

Straight Joint

Elbow Joint

Tee Joint Reducer joint

600 711 51 5.45 9.46 6.83 3.21 550 660 50.5 5.02 8.12 6.23 2.95 500 609 50.5 4.59 6.87 5.35 2.69 450 558 50.5 4.17 5.74 4.53 2.09 400 508 51 3.78 4.76 3.82 1.82 350 457 51 3.36 3.82 3.24 1.63 300 431 54 3.43 3.61 3.11 0.84 250 381 54 3.00 2.79 2.52 1.04 200 318 49.5 2.21 1.79 1.69 0.78 150 279 55.5 2.02 1.41 1.43 0.71 125 254 56.5 1.83 1.16 1.20 0.55 100 203 44.5 1.15 0.66 0.71 0.36 80 177 44 0.96 0.49 0.55 0.28 65 152 39.5 0.71 0.34 0.40 0.22 50 142 41 0.68 0.30 0.36 0.19 40 127 39.5 0.56 0.24 0.30 0.18 32 127 42.5 0.59 0.24 0.29 0.18 25 115 41 0.51 0.20 2.40 0.16 20 101 37 0.39 0.15 0.18 0.10 15 101 40 0.40 0.14 0.18 0.06

Note : Kindly contact Ricwil if you require more information and density more than 45kg/m³

Page 12: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

HI-GARD™ HEAT GAIN / LOSSfOR ABOVEGROUND PIPE JOB Temperature rise across 100 metre length of pipe of nominal size 250mm dia PIPE HEAT GAIN/LOSS CALCULATION ( ABOVE GROUND )

Formula :Heat Gain/Loss per meter length,

Where :

Q : Heat gain/loss ( Kcal/m.h )Ti : Fluid temperature ( °C ) 6.0 °CTa : Ambient temperature ( °C ) 35.0 °CD1 : Carrier Pipe I.D. ( m )D2 : Carrier Pipe O.D. ( m )D3 : Jacket I.D. ( m )D4 : Jacket O.D. ( m ) λp : Thermal conductivity of steel ( Kcal/m.h.°C ) 45.00 Kcal/m.h.°C λi : Thermal conductivity of insulation ( Kcal/m.h.°C ) 0.02 Kcal/m.h.°C λj : Thermal conductivity of GI Jacket ( Kcal/m.h.°C ) 45.00 Kcal/m.h.°C a : Surface coefficient of heat transfer ( Kcal/h.°C ) 8.00 Kcal/h.°C for dull metalic

surface still air

Temperature different, dT (F) = Total Heat Gain/Loss ( Kcal/h ) x 3.964 x 20 / Flowrate ( igpm ) /12000

dT ( In/Out )

FlowRate

(igpm)

PRE-INSULATED PIPE DETAILS PipeLength

(m)

TotalHeat

Gain/Loss(Kcal/h)

TempDifferent

(°F)Pipe Jacket Insulation

Nom I.D. O.D. I.D. O.D. Thk Thk

(mm) (mm) (mm) (mm) (mm) (mm) (mm)

10 D1 D2 D3 D4

Ton ( RT )

1000 2000 250 259.8 273 379.8 381 0.6 53.4 100 -1079.76 -0.0036

p. 11 / 12

Page 13: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

HI-GARD™ SPECIfICATIONCLAUSE REMARkS REMARkS

1. GENERAL Aboveground piping system shall be factory preinsulated and prefabricated RICWIL Hi-Gard and shall consist of steel carrier pipe insulated with rigid polyurethane foam which is protected with outer jacket.

The preinsulated pipes shall be of a product of manufacturer with ISO certification and who has been engaged in manufacturing preinsulated pipes at least for the last 10 years.

The system components shall comform to the following specifications. 2. MATERIAL DESCRIPTION

2.1 Carrier Pipe:

The carrier pipe shall be either of the following :Mild Steel Pipe to BS 1387 Medium / Heavy Grade.• Carbon Steel Pipe to JIS G3452 Standard.• Carbon Steel Pipe to API 5L Grade B / ASTM A106 Grade B • / ASTM A53 Grade B.ABS ( Acrylonitrile-Butadiene-Styrene ) Pipe to AS3518 / • BS3505 / BS3506 / BS5391 / MS1419.PVC ( Polyvinyl Chloride ) Pipe to BS 4346 / MS 628 with • min wall thickness of 3.5mm.PPR ( Polypropylene ) Pipe to ISO 15874-2: 2003, ISO • 15874-3: 2003, ISO 9001: 2000, EN ISO 3216, ONORM B 5174, ONORM EN 1254-3 BS 6920, BS 2872, BS 1224, SIRIM PK 027101, PK027102

All pipes shall be protected by plastic caps or plastic sheet cover

2.2 Insulation:

Insulation shall be rigid polyurethane machine injected and foamed in place completely filling the annular space between carrier pipe and jacket.Physical properties of polyurethene foam shall be as follows

Density : Minimum 45kg/m3 •Thermal Conductivity : Metric 0.017 Kcal/m h. • °C @ 23 °CCompression Stregth: Minimum 2.0 kg/cm (29 psi)•Closed Cell content : Minimum 90%•Insulation thickness shall be determined considering •condensation foaming on the outer jacket under following climatic condition.

Specify carrier pipe

Insulation thickness may

varydepending on geographical

area.

Specify if higher density isrequired

Page 14: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

CLAUSE REMARkS REMARkS

AMBIENT TEMP RH % fLUID TEMP

35 °C 90 6 °C30 °C 95 6 °C

Note : more detail in PROPRIETARY INFORMATION

Min. insulation thickness shall be as follows Pipe size up to NB100 mm (4”) : 37 mm (1 1/2 “)NB 125 mm (5”) and longer : 50 mm (2”)

2.3 Jacket:

The jacket material shall be sufficiently sized to allow for desired insulation thickness for optimum performance of system. All metal jacket shall have an external spiral lockseam. Jacket shall be of thefollowing materials.

External spiral lockseamed galvanized steel with following •thickness Jacket size up to 304mm : 0.5mm (26 gauge) 318mm and larger : 0.6mm (24 gauge)External spiral lockseamed aluminium : 0.8mm (22 gauge)•External spiral lockseamed stailness steel : 0.5mm (26 gauge)•Polyvinyle Chloride (PVC) : Min 3mm Class 1 or JIS K6741High density extruded polyethylene : Min 3mm comforming to •MS1058 / ISO4427 / DIN8074/75 / EN 253

2.4 Fire Rating of Preinsulated Pipe Unit:

The preinsulated HI-GARD system shall be of a product which has conducted 2 hours fire test with a temperature in excess 1,000 °C. Fire Test : FM approved class 4924

3 fIELD JOINTS INSULATIONThe site insulation shall be performed strictly accordance with • manufacturer’s instructions and recommendations. The straight joints, valves and fittings (in case of not-preinsulated fittings), flanges,expansion joints etc. shall be site insulated and jacketed unless otherwise specified.A manufacturer’s field service instructor is to be present during critical • periods of installation. He should be factory trained and technically qualified to determine whether or not the installation is being made in accordance with the manufacturer’s recommendation.

The insulation shall be a rigid polyurethane foam preterably of the same source as the pipe foam and completely fill the annular space between carrier and outer

jacket.

Specify kind of jacket.

Specify if particular finish is

required.i.e colour jacket or plastic jacket

Where pipe expansion and/or

contraction provision is verycritical, refer to manufacturer’s

recommendation and

engineering instruction.

p. 13 / 14

Page 15: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

TERRA-GARD™TERRA-GARD™ PIPING SySTEM

TERRA-GARD is an underground piping system for distribution of hot or chilled fluids at temperatures up to 130°C. Every system is pre-engineered and factory tested before shipment. Carrier pipe is supplied in customer’s choice of materials which include steel, copper, stainless steel, aluminium, polyvinyl chloride (PVC), and fiberglass reinforced plastic (FRP). PVC or H.D.P.E. jacketing is standard, but customer can also specify jacketing of fiberglass reinforced plastic. Terra-Gard is shipped

in 6 meter or 12 meter random lengths, with 130-150 mm of carrier pipe exposed at unit ends to facilitate field joining.

TERRA-GARD™ PRODUCT DATA PREINSULATED TERRA-GARD™ PIPE DATA

Jacket Material : HDPE

PU Density : STD 50mm - 600mm @ 45kg/m³ Pipe STD Pipe

Size Pipe OD

Jacket Size

Insulation thk

Heat Gain/Loss

Weight/Meter

Weight/Meter

(mm) (mm) (mm) ( Kcal/h ) (With Water)

(W/Out Water)

API 5L Gr B 7.9mm 600 609 710 43.5 -18.56 414.09 137.16API 5L Gr B 7.9mm 550 558 710 69.0 -12.24 361.17 129.60API 5L Gr B 7.9mm 500 508 630 54.0 -13.34 306.21 115.94API 5L Gr B 7.9mm 450 457 560 45.5 -13.60 254.62 101.60

API 5L Gr B 7.9mm 400 406 500 41.0 -13.09 209.70 89.87JIS G3452 Std -Blk 350 355 500 66.5 -8.40 172.15 81.47JIS G3452 Std -Blk 300 323 450 57.5 -8.57 136.58 63.66JIS G3452 Std -Blk 250 273 400 58.5 -7.38 102.76 51.89JIS G3452 Std -Blk 200 219 315 44.0 -7.47 69.08 35.97BS 1387 Clss C - Blk 150 168 280 52.0 -5.50 45.75 26.74BS 1387 Clss C - Blk 125 141 225 38.5 -5.84 34.90 21.59BS 1387 Clss C - Blk 100 114 200 39.8 -4.92 25.86 17.45BS 1387 Clss C - Blk 75 89 160 32.5 -4.69 17.47 12.51BS 1387 Clss C - Blk 65 73 140 30.5 -4.26 13.28 9.73BS 1387 Clss C - Blk 50 60 140 37.0 -3.37 10.10 7.04

Page 16: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

p. 15 / 16

ENGINEERING DATA

Quantity Of Foam Required Per Joint ( kg / joint )

Pipe Size (mm)

Jacket Size (mm)

PU Thk (mm)

Straight Joint

Elbow Joint

Tee Joint Reducer joint

600 710 43.5 4.59 7.97 5.96 2.80 550 710 69.0 7.01 11.33 8.14 3.91 500 630 54.0 4.94 7.40 5.61 2.86 450 630 79.5 6.93 9.55 6.86 0.71 450 560 45.5 3.72 5.12 4.10 1.91 400 560 71.0 5.48 6.92 5.16 2.48 400 500 41.0 2.97 3.74 3.16 1.52 350 500 66.5 4.55 5.17 4.17 2.07 300 450 57.5 3.68 3.87 3.28 0.87 250 400 58.5 3.28 3.05 2.56 1.11 200 315 44.0 1.95 1.57 1.53 0.71 150 280 52.0 1.86 1.30 1.32 0.67 125 225 38.5 1.14 0.72 0.76 0.40 100 225 52.0 1.41 0.80 0.79 0.41 75 160 32.5 0.65 0.33 0.39 0.22 65 160 40.5 0.73 0.35 0.40 0.23 50 140 37.0 0.59 0.26 0.31 0.18

Note : Kindly contact Ricwil if you require more information and density more than 45kg/m³

Page 17: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

TERRA-GARD™ HEAT GAIN / LOSS fOR UNDERGROUND PIPE JOB Temperature rise across 100 metre length of pipe of nominal size 600mm

PIPE HEAT GAIN/LOSS CALCULATION ( UNDERGROUND )

Formula :Heat Gain/Loss per meter length,

Where :

Q : Heat gain/loss (Kcal/m.h)Ti : Fluid temperature (°C) 5.0 °C 5.0 °FTa : Ambient temperature (°C) 30.0 °CD1 : Carrier Pipe I.D. (m)D2 : Carrier Pipe O.D. (m)D3 : Jacket I.D. (m)D4 : Jacket O.D. (m)H : Buried depth to C/L of pipe (m) 1.00 m λp : Thermal conductivity of steel (Kcal/m.h.°C) 45.00 Kcal/m.h.°C λi : Thermal conductivity of insulation (Kcal/m.h.°C) 0.02 Kcal/m.h.°C λs : Thermal conductivity of soil (Kcal/m.h.°C) 1.00 Kcal/h.°C

Temperature different, dT (F) = Total Heat Gain/Loss ( Kcal/h ) x 3.964 x 20 / Flowrate (igpm) /12000

dT (In/Out)

FlowRate

(igpm)

PRE-INSULATED PIPE DETAILS PipeLength

(m)

TotalHeat

Gain/Loss(Kcal/h)

TempDifferent

(°F)Pipe Jacket Insulation

Nom I.D. O.D. I.D. O.D. Thk Thk

(mm) (mm) (mm) (mm) (mm) (mm) (mm)

10 D1 D2 D3 D4

Ton (RT)

1000 2000 600 589.94 609 696 710 7 43.5 100 -1781.84 -0.0061

Page 18: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

TERRA-GARD™ SPECIfICATION

CLAUSE REMARkS REMARkS

1. UNDERGROUND PIPING SySTEM

All thermally insulated underground piping system shall be RICWIL TERRA-GARD™ fill-in type without air-gap or approved equal. The thermal insulating jacket shall be of non-metallic sectional factory peinsulated and prefabricated type. It shall be structually strong, water tight and entirely resistant to corrosive elements normally encountered underground. It shall consist of the carrier pipe, insulation,jacket, anchors, fittings, wall seals, expansion provision and field joining materials. TERRA-GARD™ system components shall be of the physical properties shown below. TERRA-GARD™ system shall be installed strictly in accordance with the manufacturer’s recommendations and instructions. The preinsulated pipes shall be of the product of the manufacturer who has been engaged in manufacturing preinsulated pipes for at least the last 10 years.

2. CARRIER PIPE

Unless otherwise specified, carrier pipe shall beeither of the following standard.

API5 LOW B, ASTMA106, ASTM A53 Gr.B Std ERW / seamless black.• BS 1387 class medium / Heavy• For pipe size 26” and larger, carrier pipe shall be API 5L Gr.B SAW. • Minimum wall thickness shall be 9.5mm.

All carrier pipe end shall be bevelled for field welding in accordance with ASTM or JIS standard and shall be properly protected.

3. INSULATION

Insulation shall be polyurethane foam injected by foaming machine in one continuous process and foamed in place completely filling the annular space between carrier pipe and jacket. Insulation shall be of the following characteristics.

3.1 Density Minimum 45 kg/m³ (4.7 lb/ft³). 3.2 Thermal Conductivity 0.02W /m.°K or 0.017K cal/m.hr.°C

Specify Aqualearn leak

detection system if required.

Select most suitable carrier

pipe.

p. 17 / 18

Page 19: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

CLAUSE REMARkS REMARkS

3.3 Compressive Strength 2.0 kg/cm² (29 psi) 2.8 kg/cm³ (40 psi) for 50 kg/m³ 5.0 kg/cm³ (71 psi) for 75 kg/m³ 3.4 Closed Cell Content Min 90% by volume 3.5 Insulation Thickness Insulation thickness shall be selected on economical bases in such a manner to ensure that heat gain at maximum 5°C does not exceed recognized standard.

PIPE SIzE (NB) THICkNESS

15mm - 300mm 25 mm350mm and over 35 mm

4. OUTER JACkET Jacket shall be extruded high density polyethylenetube complying to:

MS 1058 ASTM D 1248 TYPE CLASS 3JIS K 6761BS 3284/1967 TYPE 50DIN 8074/75EN 253ISO 4427

5. fITTINGS

All fittings shall be prefabricated and preinsulated.Prefabricated and preinsulated elbows, loops and tees shall be furnished and installed where shown on plans and shall consist of pipe, insulation, and jacket conforming to the same specification as here in before specified for straight runs. Expansion loops shall be of proper design in accordance with stress limits indicated by The Code for Pressure Piping, ANSI B31.1. Loop piping shall be installed in jacket sUitably sized to handle indicated pipe movement.

Specify if higher density is required.

50 kg/m³,75 kg/m³

a) 0.021 W/m. °K for 50 kg/ m³

b) 0023 W/m. °K for 75 kg/ m³

Specify if PVC jacket or other type

of jacket isdesired.

If expansion loop can not be used

because oflimited space,

specify bellows or ball joints or otherexpansion joints.

Page 20: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

CLAUSE REMARkS REMARkS

ALTERNATE: Where space does not permit, the use of loops, expansion joints in manholes shall be provided.

6. END SEALS AND GLAND SEALS

Terminal ends of jacket inside manholes, pits, or building walls shall be equipped with End Seals consisting of a heat shrinkable polyethylene bulk-head installed to the pipe and jacket. Where there is no anchor within 1.5 meter of a terminal end, jackets shall be equipped with Gland Seals consisting of a packed stuffing box and gland follower mounted on a steel plate installed to end of jacket. Terminate all jackets 100 mm beyond the inside face of manhole or bUilding walls to protect any exposed piping insulation from damp-wall condensation. If pipe is cut due to field alteration, End-Seal (shipped lose) must be applied prior to welding of carrier pipe or apply elastmetric compound furnished by manufacturer.

7. LEAk PLATES AND RUBBER LINk-SEAL

To provide an effective moisture barrier, wall sleeve with leak plate at building or manhole walls must be provided. Wallsleeve and leakplates shall consist of steel sleeve and steel plate flange 100 mm larger in outsidendiameter than the steel wall sleeve. Between jacket and wall sleeve, rubber LINK-SEAL must be installed to prevent ingress of water and moisture.

8. fIELD JOINTS

Field joint must be performed strictly in accordance with manufacturer’s recommendations. Straight joints shall be field insulated using polyurethane foam, split P.E. connector band and polyethylen shrink sleeve.

p. 19 / 20

Page 21: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

CLAUSE REMARkS REMARkS

9. MANUfACTURER’S fIELD INSTALLATION INSTRUCTOR

A Manufacturer’s Field Service Instructor is to be present during critical periods of installation and testing of the system. He should be factory trained and technically qualified to determine whether or not the installation is being made in accordance with the manufacturer’s recommendation. On completion of the installation, the contractor shall deliver to the owner a certificate from the manufacturer stating that the installation has been made in accordance with the manufacturer’s recommendations.

10. MANUfACTURER’S SHOP DRAWINGS

Drawings for approval are prepared by the manufacturer for each project in accordance with the requirements of the contract plans and specifications set forth herein. After approval of the drawingand descriptive brochure, part numbers are assigned to each unit. These part numbers are shown on the drawing which thus becomes a shop drawing. Each unit is marked and tagged to correspond with the part numbers shown on the shop drawing. Shop drawings, with part numbers, accompany actual shipments.

Page 22: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

RICWIL Copper-Gard pipe is a completely factory fabricated, insulated and jacketed copper piping system for distribution of domestic hot water and Refrigerant gas lines. Copper-Gard consists of 2 copper tubes insulated with rigid polyurethane foam which is protected with outer Jacket.

MATERIAL DESCRIPTION

Carrier Pipe:The carrier pipe shall be distribution of Refrigerant R22 or R410 in either of the following.

AS/NZ5 – 1571 Copper Tube• ASTM B280 Copper Tube• JIS H3300• EN 12735-1•

INSULATION Insulation shall be rigid polyurethane machine injected and foamed in place completely filling the annular space between carrier pipe and jacket. Min. 25mm ( 1 inch ) insulation thickness shall be apply.

Properties for the polyurethane foam: Thermal Conductivity, K-value : 0.017 Kcal / m. h °C (0.022 • W/m.°K)Minimum Density : 45 kg/m• ²Compressive Stress : 0.31 N/mm• ² (33 psi)Flexural Strength : 0.36 N/mm• ² (42 psi) Closed Cell content : min 90%• Water Vapour Permeability : 3.7 PERM-CM (2.2 PERM-IN)•

Jacket:The jacket material shall be sufficiently sized to allow for desired insulation thickness for optimum performance of system. All metal jackets shall have an external spiral lockseam. Jacket shall be of the following materials.

COPPER-GARD™

SINGLE TUBE

DOUBLE TUBE

COPPER-GARD REfRIGERATION

p. 21 / 22

Page 23: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

Copper-gard Pre-insulated copper pipe shall be factory fabricated using a Single Machine-Injected System for Polyurethane Foam.

The list of Copper Tube Standard that can be used as the Carrier Pipe :-

Copper Tube to BS EN 1057 Class X / Class Y ( Hard Drawn • / Half Hard ).Copper Tube to ASTM B88 Type K / Type L. •

Insulation must be machine injected polyurethane foam : 2-component-system for the production of closed cell rigid foams using R 141b as blowing agent. The foams shall make of Elastopor MH 4101 with a minimum overall density of 50kg/m³ and with minimum insulation thickness of 25mm.

Properties for the polyurethane foam: Thermal Conductivity, K-value : 0.018 Kcal / m. h °C (0.022 • W/m.°K)Minimum Density : 45 kg/m• ²Compressive Stress : 0.31 N/mm• ² (33 psi)Flexural Strength : 0.36 N/mm• ² (42 psi) Closed Cell content : min 90%• Water Vapour Permeability : 3.7 PERM-CM (2.2 PERM-IN)•

Pre-insulated pipe shall be of a product which conducted FM approvals construction materials calorimeter which measures a product’s maximum rate of heat release of 230 Btu/ft2/min. or less.

Copper-gard Pre-insulated Pipe product is in compliance with the requirement for BS 476 Part : Part 20 : 1987, BS 476 Part 6 ,Part 7 and Part 12.

Field Joints Insulations Field joint insulation works must be performed strictly in accordance with manufacture’s recommendations. Polyurethane foam material must be the same material with the piping systems.

COPPER-GARD PRE-INSULATED COPPER PIPE ( HOT WATER )

Page 24: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

PROPRIETARy INfORMATIONRICWIL LOW-TEMP HI-GARD™PHySICAL PROPERTIES METRIC METRIC ASTM TEST

DENSITy 45 kg/m³ 50 kg/m³ D1622THERMAL CONDUCTIVITy 0.017 Kcal/m.h °C

(0.02 W/m °K)0.018 Kcal/m.h °C

(0.021 W/m °K)C518

COMPRESSIVE STRENGTH 2.0 kgf/cm² 2.8 kgf/cm² D1621

CLOSED CELL CONTENT 90% 91% D2856WATER VAPOUR PERMEILITy 3.7 PERM-CM

(2.2 PERM-CM)3.5 PERM-CM

(2.1 PERM-CM)C355

Above density is RICWIL’s standard, higher density polyurethane foam is available upon

request.

RICWIL DEW POINT AND POLyURETHANE THICkNESS CALCULATION HEAT GAIN FORMULA : Q = ( Ta - Ti ) / R

Where R = Total Heat Resistance

Ta = Ambient Temperature

Ti = Fluid Temperature

But R = Ln ( D2 / D1 ) / ( 2 x π x K ) + 1 / (π x D2 x E ) Where D2 = Outer Diameter of Jacket D1 = Outer Diameter of Carrier Pipe

K = Thermal Conductivity Of Polyurethane

E = Jacket Surface Emission Coeffient

Jacket Surface Temperature Tj = Ta - Q [ 1 / (π x D2 x E ) ]

p. 23 / 24

Page 25: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

EXAMPLE 1

AMBIENT TEMPERATURE 30°C The followings are data for calculation : K = 0.017 Kcal / m.hr.°CE = 8Ta = 30.0°CTi = 6.0°CTdew = 29.1°C at RH 95% Condition No 1Tdew = 28.1°C at RH 90% Condition No 1Tdew = 27.2°C at RH 85% Condition No 2Tdew = 26.2°C at RH 80% Condition No 3

RICWIL STANDARD THICKNESS PRE-INSULATED PIPES SIzE RESIS-

TANCEHEAT/

M²HEAT Q Tj ( C ) D1

(mm)D2

(mm)Ln ( D2/D1 ) PU Thk

15 MM 15.02 5.01 1.60 29.37 21.3 101.6 1.56 40.220 MM 12.90 5.83 1.86 29.27 26.7 101.6 1.34 37.525 MM 11.92 5.57 2.01 29.30 33.4 115.0 1.24 40.832 MM 10.63 5.66 2.26 29.29 42.2 127.0 1.10 42.440 MM 9.36 6.42 2.56 29.20 48.3 127.0 0.97 39.450 MM 8.30 6.48 2.89 29.19 60.3 142.0 0.86 40.965 MM 7.13 7.05 3.37 29.12 73.0 152.0 0.73 39.580 MM 6.71 6.40 3.58 29.20 88.9 177.8 0.69 44.5

100 MM 5.58 6.73 4.30 29.16 114.3 203.2 0.58 44.5125 MM 5.65 5.33 4.25 29.33 141.3 254.0 0.59 56.4150 MM 4.89 5.59 4.91 29.30 168.3 279.4 0.51 55.6200 MM 3.60 6.69 6.67 29.16 219.1 317.5 0.37 49.2250 MM 3.23 6.22 7.44 29.22 273.0 381.0 0.33 54.0300 MM 2.78 6.35 8.62 29.21 323.9 431.8 0.29 54.0350 MM 2.44 6.85 9.84 29.14 355.6 457.2 0.25 50.8400 MM 2.17 6.94 11.07 29.13 406.4 508.0 0.22 50.8450 MM 1.94 7.07 12.39 29.12 457.2 558.0 0.20 50.4500 MM 1.76 7.12 13.61 29.11 508.0 609.0 0.18 50.5

Page 26: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

EXAMPLE 2

AMBIENT TEMPERATURE 35°C

The followings are data for calculation : K = 0.017 Kcal / m.hr.°CE = 8Ta = 35.0°C

Ti = 6.0°CTdew = 34.1°C at RH 95% Condition No 1Tdew = 33.1°C at RH 90% Condition No 1Tdew = 32.1°C at RH 85% Condition No 2Tdew = 31.1°C at RH 80% Condition No 3

RICWIL STANDARD THICKNESS PRE-INSULATED PIPES SIzE RESIS-

TANCEHEAT/

M²HEAT Q Tj ( C ) D1

(mm)D2

(mm)Ln ( D2/D1 ) PU Thk

15 MM 15.02 6.05 1.93 34.24 21.3 101.6 1.56 40.220 MM 12.90 7.04 2.25 34.12 26.7 101.6 1.34 37.525 MM 11.92 6.73 2.43 34.16 33.4 115.0 1.24 40.832 MM 10.63 6.84 2.73 34.15 42.2 127.0 1.10 42.440 MM 9.36 7.76 3.10 34.03 48.3 127.0 0.97 39.450 MM 8.30 7.83 3.49 34.02 60.3 142.0 0.86 40.965 MM 7.13 8.52 4.07 33.94 73.0 152.0 0.73 39.580 MM 6.71 7.73 4.32 34.03 88.9 177.8 0.69 44.5

100 MM 5.58 8.14 5.19 33.98 114.3 203.2 0.58 44.5125 MM 5.65 6.44 5.14 34.20 141.3 254.0 0.59 56.4150 MM 4.89 6.76 5.93 34.16 168.3 279.4 0.51 55.6200 MM 3.60 8.08 8.06 33.99 219.1 317.5 0.37 49.2250 MM 3.23 7.51 8.99 34.06 273.0 381.0 0.33 54.0300 MM 2.78 7.68 10.42 34.04 323.9 431.8 0.29 54.0350 MM 2.44 8.28 11.89 33.97 355.6 457.2 0.25 50.8400 MM 2.17 8.38 13.38 33.95 406.4 508.0 0.22 50.8450 MM 1.94 8.54 14.97 33.93 457.2 558.0 0.20 50.4500 MM 1.76 8.60 16.45 33.93 508.0 609.0 0.18 50.5

p. 25 / 26

Page 27: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

PROJECT NAME

1. One Borneo KK Sabah2. Brem Mall Kepong KL3. Kompleks Warisan Melaka4. Tropicana Medical Centre Kota D’mansara5. Wisma Haniffa KL6. Wisma Jaya 33 PJ7. Gurney Plaza Penang8. Bank Of Commerce KL9. Mahkamah Syariah Penang10. Zhulian Industries Penang 11. Sunway Pyramid New Wing PJ12. Carefour Melaka13. Wisma Persekutuan Kuching14. Crimson Growth Kl15. Quill Land Cyberjaya16. TM Net Cyberjaya17. Al Bukhari Alor Star18. Tawakal Hospital KL19. Shopping Complex Putra Square Ktn 20. Dell Cyberjaya21. AirPort K.Terengganu22. PDRM Bukit Aman KL23. Majlis Sukan Negara Bukit Jalil Kl24. Sutera Mall JB25. Time Square Penang26. Hospital B.Mertajam Penang27. Digi Centre Shah Alam28. Ilkap Bangi29. Konica Minolta Melaka30. Dun Nusajaya JB31. UiTM Puncak Alam Shah Alam32. Solaris A1-A4 Kl33. Sarawak Convention Centre34. UEM Nusajaya JB35. Goldis Tower KL36. The Spring Shopping Mall Kuching37. Bank Negara KL38. Politeknik Muadzan Shah Kuantan Pahang

PROJECT NAME

1. Clock Tower Penang 2. Tesco Setia Alam Klang3. Hotel Singapore 4. Hotel Melaka 5. Sabah Project6. USIM Nilai7. Novatel Kuching8. Solaris Dutamas9. KSB Kalong Kemaman10. Finas Ulu Klang KL11. USIM Nilai12. Abu Dhabi 13. JPS Bkt Tengah Penang14. Wisma Persekutuan Melaka15. Sing Tel Singapore16. Mutiara Rini PJ17. IKBN Kuala Kubu18. Satyam Cyberjaya19. Golden Avenue Kl20. Q, Cell Sepang21. Today Market JB22. Kingwood Hotel Sarawak23. UITM K.Pilah 24. Cyberjaya project25. Subang Avenue PJ26. Grand Hall Brunei27. Solaris Dutamas Kl28. FAMA Sepang29. Tesco K.Selangor30. AET Pekan Nenas JB31. UITM Sg. Buloh32. Westin Langkawi33. Sirim Sepang34. Tmn Ilmu K.Terengganu35. Micasa Hotel KL36. Kluang Mall Johor37. Mydin Melaka38. Sheraton Hotel Kuching

20082007

PROJECT REfERENCES

Page 28: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

p. 27 / 28

2009

PROJECT NAME

1) Hyatt Hotel , KK Sabah 2) Likas Hospital , Sabah 3) Anti Dadah Sepang SEL 4) Argo Bank Bangi SEL 5) Micasa Hotel KL

6) Intel Kulim 7) Mahkamah Kajang 8) Sekolah Besut 9) TGV Wangsa Maju KL 10) UTHM , Batu Pahat Johor11) Wisma Persekutuan Melake 12) Yayasan Melake 13) SINGTEL 14) CTRM , Melake 15) Tabung Haji Office KL16) Empire Tower KL 17) Hospital Seremban 18) Kuantan Hotel & Convention , Pahang 19) UPM Serdang , SEL 20) Mara HQ KL 21) Hospital Alor Gajah 22) IKBN KKB SEL 23) TRW Boulevard Cyberjaya 24) Akrib Negara Kuantan Pahang 25) Kompleks FAMA KLIA 26) F & N Parcel B 27) F & N CC Shah Alam 28) UMS , KK Sabah 29) KWDI Cyberjaya SEL30) UIA Library Block , Kuantan Pahang 31) UIA Dentistry , Kuantan Pahang 32) HP Cyberjaya 33) Hospital Alor Gajah 34) Creative centre Cyberjaya SEL

2010 PROJECT NAME

1) Newcasttle University 2) KDN JLN Duta KL 3) Naza HQ KL 4) Instep , KT Terrengganu 5) UE36) Uitm Sg. Buloh Infra 7) UPM , Pekan Pahang 8) Jab. Kesihatan Petrajaya , Sarawak 9) Perjabat Tanah & Galian , Kuantan

Pahang 10) Grand Hyatt Hotel , KL 11) Wisma Perwira, KL 12) ACC KL 13) Tesco Seremban , negeri Sembilan14) Tesco Setiawan , Perak 15) IPD , Jasin Melake 16) Shah Alam Hospital , SEL 17) USIM , Nilai Negeri Sembilan 18) KHEDN , Johor 19) UTHM ( FKAAS ) Bt. Pahat Johor 20) Permai Hospital , Johor 21) Konica Factory , Melake 22) The Cruve Plant extention SEL 23) KDN , JLN Duta KL 24) Capital Square KL 25) UITM Shah Alam SEL 26) UUM Sintok 27) TGC Kepong KL 28) South Sea Hotel KK Sabah 29) Cyberjaya Infra 30) JPJ , Kuantan Pahang

Page 29: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

JkR PROJECT

PROJECT NAME

1 PARLIAMENT HOUSE 2 DEWAN UNDANGAN IPOH 3 DEWAN UNDANGAN MELAKA4 MAHKAMAH SYARIAH, IPOH5 MAHKAMAH SYARIAH, JB 6 KLIA MAS CATERING BUILDING 7 KLIA CARGO 8 KLIA INFRA9 KLIA MAIN TERMINAL 10 KLIA CONTACT PIER 11 KLIA SATELLITE 12 KLIA CONTROL TOWER13 KLIA CUSTOM14 KUCHING AIRPORT 15 NEW BINTULU AIR PORT16 TANJUNG PELEPAS PORT 17 BINTULU PORT 18 SIBU PORT 19 PUTRAJAYA PARCEL A 20 PUTRAJAYA PARCEL B21 PUTRAJAYA HOSPITAL,

PUTRAJAYA22 PUTRAJAYA HEALTH CLINIC23 PUTRAJAYA BALAI BOMBA

HEAQQUARTER24 PUTRAJAYA BALAI POLIS

HEAQQUARTER25 PUTRAJAYA SUB-PARCEL E16 26 PUTRAJAYA SUB-PARCEL E6, E7,

E10, E11 27 PUTRAJAYA ISTANA SELANGOR28 PUTRAJAYA 2C129 PUTRAJAYA 2G1 (MOE)30 PUTRAJAYA LRT STATION31 PUTRAJAYA 2G5 & 2G632 PUTRAJAYA CONVENTION HALL

COMMERCIAL PROJECT PROJECT NAME

1 1-UTAMA SHOPPING COMPLEX PH1 & 2

2 ALAM WARISAN , PUTRAJAYA 3 ALTERA R & D CENTER, PENANG 4 AMCORP, MALL 5 ASM FACTORY, PASIR GUDANG 6 AWANA GENTING HOTEL 7 AMPANG PUTERI HOSPITAL 8 CARSEM SEMICONDUCTOR, IPOH

PERAK 9 CHIPPAC SEMICONDUCTOR 10 CHUNG HWA PICTURE TUBE 11 CUBIC ELECTRONIC 12 CURTIN UNIVERSITY 13 DAMANSARA SPECIALIST HOSPITAL 14 GARDENIA SHAH ALAM 15 GENTING FIST WORLD HOTEL 16 GAINT, CHERAS 17 ILP, NIBONG TEBAL 18 IMPIANA HOTEL KL 19 INFINEON TECHNOLOGY 20 JAYA JASCO, JB 21 JAYA JASCO, KLANG 22 JOHOR SPECIALIST HOSPITAL 23 KLCC CONVENTIONAL CENTER 24 PAN PACIFIC HOTEL 25 RHIGA HOTEL 26 RITZ CARLTON 27 SABAH MEDICAL CENTER 28 SHANGRI-LA HOTEL, SABAH 29 SONY ELECTRONIC, PENANG 30 STANDARD CHARTERED BANK KL31 SUNWAY PYRAMID PH1 &2 32 TANJUNG PELEPAS PORT 33 TUNG SHIN HOSPITAL 34 WESTIN HOTEL 35 PICCOLO HOTEL 36 EQUATORIAL HOTEL 37 HILTON AND MEDITERRANEAN

HOTEL KL

Page 30: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

CERTIfICATES

MANUFACTURING LICENCEMIXING AND BLENDING Of POLyOL

MS ISO 9001:2008 CERTIFICATE FM APPROVED CERTIFICATE

MANUFACTURING LICENCEPREINSULATED PIPES

p. 29 / 30

Page 31: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

OTHER SERVICES

Spray PU System• Hot and Cold Thermal Insulation•

TRADING ACTIVITIES

Brush Cleaning System for Chiller • CondensorRickard Variable Air Volume (VAV) • DiffusersPipes, Fittings, Valves and Accessories • for HVAC Industry

IN ADDITION TO OUR PRINCIPAL AREAS Of

ACTIVITy, RICWIL PROVIDES A VARIETy RANGE Of

SERVICES. kINDLy CONTACT US If yOU REQUIRE

MORE INfORMATION ABOUT THESE SERVICES.

Page 32: INSULATION - Ricwil (Malaysia) Sdn Bhdricwil.com/wp-content/uploads/2019/03/ricwil_catalog_10...Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd, with 51% Malaysian Shareholders and

NO. 122, JALAN 2D, kAMPUNG BARU SUBANG,SEkSyEN U6, 40150 SHAH ALAM,

SELANGOR DARUL EHSAN,MALAySIA

TEL : 03-7847 3377 / 03-7847 5709fAX : 03-7847 5103 / 03-7847 4622

www.ricwil.com