profile - bqsm€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan...

21
PROFILE JUB CENTRAL SDN BHD Box # 513, Lot 6.13, 6 th Wisma Central, Jalan Ampang, Floor 50450 Kuala Lumpur. Tel : 603-2168 8278, Fax : 603-2168 8608 Email : [email protected] / [email protected]

Upload: phungdang

Post on 07-May-2018

239 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

PROFILE

JUB CENTRAL SDN BHD Box # 513, Lot 6.13, 6th

Wisma Central, Jalan Ampang,

Floor

50450 Kuala Lumpur.

Tel : 603-2168 8278, Fax : 603-2168 8608

Email : [email protected] / [email protected]

Page 2: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

Name of Firm : Jub Central Sdn Bhd Date of Incorp. : 15 October 1992 LJBM Permit No. : 2001/FC00308 Office Address : Box 513, Lot. 6.13,

6th

Jalan Ampang Floor, Wisma Central,

50450 Kuala Lumpur

Telephone No. : 603 – 2168 8278 Fax No. : 603 – 2168 8608 Email Address : [email protected] [email protected]

Page 3: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

JUB Central Sdn Bhd (Company No: 250855 M) was incorporated in October 1992. The current Directors/shareholders of the Company are:-

Sr Hj. Jailani Bin Jasmani

Sr Chin Keh Liang

Sr Mohd Zainal Bin Lamit

JUB Central Sdn Bhd is established with the Clients’ requirements in mind. Our mission statement is to provide high quality professional management and administration services to our Clients and Development teams so as to achieve completion of construction projects within the budgeted cost and time frame, without compromising on quality.

The technical operation of the practice is constantly kept under review to incorporate the latest techniques of the construction industry. Every staff is equipped with his/her own computer connected to an advanced server. The staff are also trained to use the advanced and latest Q.S. software e.g. MbElite, QS Cad, etc. and autocad software installed in the server to assist them in the measurement work and preparation of Bills of Quantities.

The firm with its experience, forward-looking and dynamic directors and its hardworking and efficient staff is confident to undertake projects of any size and complexity, and if the need arises, it can call upon its international associates for assistance.

Page 4: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

Quantity Surveying Services 1. Basic Services for Building And Civil Engineering

Works

Pre-Contract ≅ Preparation of Preliminary Estimates and Cost Plans ≅ Preparation of Bills of Quantities and other tender documents ≅ Preparation of Tender Reports and Contract Documents ≅ Preparation of Tender Documents, Tender Reports and

Contract Documents for prime cost and provisional sum items other than those under the charge of Mechanical and Electrical Consultant

Post-Contract ≅ Valuation of works in progress for interim valuation/certificates ≅ Preparation and valuation of variation orders ≅ Attendance at site meetings ≅ Advice on Contractual claims during progress of works ≅ Preparation of Final Account

Page 5: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

2. Additional Services

Pre-Contract

≅ Preparation of Feasibility Studies including Income/Expenditure Cash Flow

≅ Preparation of Documents and Reports for Pre-qualification of Contractors

≅ Preparation of Bills of Quantities for works under Specialist Consultant

≅ Redrafting of Conditions of Contracts to meet special requirements of the Client

≅ Assisting in preparation of tender/bid documents (excluding Bills of Quantities) for projects under Turnkey or Design and Build

≅ Preparation of cost Analysis based on the accepted Contract Sum

≅ Preparation of Tender Price Index based on the accepted Contract Sum

Post-Contract ≅ Re-measurement of Works for Contracts based on Provisional

Bills of Quantities ≅ Services under Management Contract ≅ Services arising out of determination of the Contractor’s

employment ≅ Evaluation of Loss and Expense Claims by the Contractor

based on the actual costs ≅ Preparation of Bills of Quantities and other tender document for

defects and outstanding works to be carried out by a separate Contractor and valuation of defective works to be omitted from the Contract Sum of the defaulting Contractor

≅ Services for making good of works damaged by fire etc. ≅ Preparation of Costs Analysis based on the Final Contract Sum

Page 6: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

3. Special Services ≅ Project Management ≅ Certification of project accounts e.g. for loan purposes

Page 7: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

Name Designation Academic

Qualification Years of Experiences

Sr Jailani Bin Jasmani BQSM : RegQS 0295 ISM : M2516

Director

B.App ScQS WA

26

Sr Chin Keh Liang BQSM : RegQS 0252 ISM : M530 FRICS : 58747

Director B.Sc(Hons) Heriot-Watt Uni.

34

Sr Mohd Zainal Bin Lamit BQSM : RegQS 0742

Director B.Sc(Hons) Heriot-Watt Uni.

26

Azham Ridzuan Ab Rahman Senior Project Executive

BSc(Hons) Q.S. (UiTM)

13

Roshidi Bin Rosli Senior Project Executive

B.Sc Q.S (UIAM) 7

Salwani Bt Mat Hussein Senior Project Executive

B.Sc(Hons) Q.S. (UTM)

7

Nor Aslinda Bt Kaharuddin Project Executive

B.Sc(Hons) Q.S (UM)

5

Zuria Bt Muhammad Project Executive

B.Sc(Hons) Q.S (UM)

5

Page 8: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

Name Designation Academic Qualification

Years of Experiences

Mohd Fazilen Bin Noordin

Project Executive

B.Sc(Hons) Q.S. (UiTM)

4

Shahrul Anuar Bin Abdul Rasheed

Project Executive

B.Sc(Hons) Q.S. (UiTM)

5

Mohd Arif Bin Othman

Project Executive

B.Sc Q.S (UIAM)

2

Aiman Bin Ruslan Project Executive

B.Sc(Hons) Q.S. (UiTM)

1

Khalimaton Binti Ab Aziz Project Executive

B.Sc(Hons) Q.S. (UiTM)

1

Fazlin Azma Bt Mohd Nor Project Assistant

Dip. Q.S (UTM) 4

Adam Mohd Aizat B. Noor Azam Project Assistant

Dip. Q.S (PKB) 4

Mohd Idham Ismail Project Assistant

Dip. Q.S (PKB) 2

Page 9: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

Registration

(I) Lembaga Juruukur Bahan Malaysia

(II) Kementerian Kewangan

Malaysia

(III) Registration with SSM

Page 10: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan
Page 11: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan
Page 12: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan
Page 13: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

APPENDIX

PROJECTS

(Completed & In-Progress)

Page 14: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

CADANGAN PEMBANGUNAN SEMULA BALAI POLIS BANDA HILIR, 1 UNIT KUARTERS KELAS E, 50 UNIT KUARTERS KELAS F, KEMUDAHAN-KEMUDAHAN LAIN DAN KERJA-KERJA INFRASTRUKTUR DI ATAS LOT 169 MUKIM BANDAR MELAKA, MELAKA BANDARAYA BERSEJARAH PROJECT VALUE : 24.0 Mil

COMPLETED PROJECT

PENJARA REMAN (TEGAR) DI JOHOR BAHRU, JOHOR (REKA & BINA) PROJECT VALUE : 51.5 Mil

CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN 1 BLOK PEJABAT 10 TINGKAT SECARA ‘DESIGN & BUILD’ DI ATAS LOT PT15246 & 5487 DI TAPAK PEMBANGUNAN MITC, AYER KEROH, 75450 MELAKA PROJECT VALUE : 29.0 Mil

Page 15: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

COMPLETED PROJECT

CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN ‘BUDGET HOTEL’ SECARA ‘DESIGN AND BUILD’ DI ATAS LOT 1 DAN LOT 2 ‘FOOD CITY’, TAPAK PEMBANGUNAN MITC AYER KEROH, DAERAH MELAKA TENGAH, MELAKA BANDARAYA BERSEJARAH PROJECT VALUE : 12.0 Mil

CADANGAN PEMBANGUNAN 11 UNIT KEDAI DAN PEJABAT 3 TINGKAT DI ATAS LOT PT28, JALAN BANDAR ENAM, PEKAN DESA PUCHONG, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN LUM KONG SDN. BHD. PROJECT VALUE : 3.5 Mil

Page 16: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

COMPLETED PROJECT

CADANGAN PENINGKATAN KEMUDAHAN PELANCONGAN DI PORT DICKSON (PD WALK), NEGERI SEMBILAN. PROJECT VALUE : 3.3 Mil

Page 17: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

UPGRADING OF BATU BERENDAM AIRPORT MELAKA PROJECT VALUE : 188.2 Mil

COMPLETED PROJECT

Page 18: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

CADANGAN MEMBINA SEBUAH BANGUNAN BENGKEL 1 ½ BESERTA STOR, BILIK PAMERAN DAN RUANG REHAT DI ATAS LOT PT 14414, JALAN BK 1 ¼, NO. HAK MILIK HS (D) 59365 DI BANDAR KINRARA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN. PROJECT VALUE : 14.0 Mil

CADANGAN PEMBANGUNAN BILIK PAMERAN / PEJABAT 2 TINGKAT DAN BENGKEL 1 TINGKAT DI ATAS LOT PT31, JALAN BANDAR LIMA, PEKAN DESA PUCHONG, DAERAH PETALING, SELANGOR D.E. UNTUK TETUAN KAH BINTANG AUTO SDN.BHD. PROJECT VALUE : 3.1 Mil

COMPLETED PROJECT

Page 19: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

CADANGAN MEMBINA SEBUAH RUMAH BANGLO 3 TINGKAT DENGAN PONDOK PENGAWAL DAN KOLAM RENANG DI ATAS LOT 28150, NO.6, SIMPANG BUKIT TUNKU, BUKIT TUNKU, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN UNTUK MADAM MEBAL GAN PEK HUONG. PROJECT VALUE : 3.29 Mil

COMPLETED PROJECT

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SEKOLAH KEBANGSAAN TAMAN SERI REMBAU YANG MENGANDUNGI 18 BILIK DARJAH DAN KEMUDAHAN BERKAITAN DI DAERAH REMBAU, NEGERI SEMBILAN DARUL KHUSUS. PROJECT VALUE : 14.5 Mil

Page 20: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

CADANGAN PEMULIHAN PROJEK TERBENGKALAI BANDAR

IN PROGRESS PROJECT

Page 21: PROFILE - BQSM€¦ · profile . jub central sdn bhd . ... ‘design and build’ di atas lot 1 dan lot ... 3 tingkat dengan pondok pengawal dan

AIRCRAFT MAINTENANCE DEPARTMENT

MECHANICAL ENGINEERING DEPARTMENT

ACADEMIX COMPLEX (COMMUNAL)

MEMBINA DAN MENYIAPKAN POLITEKNIK BANTNG, SELANGOR- PHASE 2.

PROJECT VALUE : 149.5 Mil

IN PROGRESS PROJECT