Presentation at Show Unit : IBS Sequence of Work

Page 3: Presentation. _ JKR Lawatan kilang HCPS

Production Sequence

Page 4: Presentation. _ JKR Lawatan kilang HCPS

In-house Engineering & Accessories Fabrication

Page 5: Presentation. _ JKR Lawatan kilang HCPS

Precast Staircase Mould Installation & Dismantle Demo : 5 Minutes

Page 6: Presentation. _ JKR Lawatan kilang HCPS

Precast Shear Key Beam One Cast with In-situ Column

Page 7: Presentation. _ JKR Lawatan kilang HCPS

Model of Load Bearing & Non-load Bearing Wall

Page 8: Presentation. _ JKR Lawatan kilang HCPS

Training Unit Inspection ( Without Waterproofing , Roof Covering & Finishing – 9 Years)

Page 9: Presentation. _ JKR Lawatan kilang HCPS

Half Slab , Conduits & Wet Joint Modular Mould

Page 10: Presentation. _ JKR Lawatan kilang HCPS

Question & Answer after Visiting Production, Engineering, Fabrication & Training Unit

Page 11: Presentation. _ JKR Lawatan kilang HCPS

WELCOME

JKR

Cawangan Kejuruteraan Awam & Struktur,

Bahagian Pembangunan & Penyelidikan,

Tingkat 19, Blok G

Jalan Sultan Salahuddin

50480, Kuala Lumpur.

Visit To IBS Factory

IBS Superstructure In Malaysia 3 in 1

- 08 Dec 2016 -

Page 12: Presentation. _ JKR Lawatan kilang HCPS

Terima kasih di atas penerimaan lawatan ini. Sepertimana yang pihak puan sedia

maklum, lawatan ini bertujuan untuk mencari maklumat mengenai

spesifikasi Inspection & Testing Plan (ITP)yang digunapakai oleh pihak pembekal

PRECAST. Oleh itu, besarlah harapan kami sekiranya pihak puan dapat

menyalurkan maklumat atau perkara yang berkaitan kepada pihak kami

antaranya:

1. QAQC Plan (consist of ITP, Work Procedure & Inspection Form)

2. One sample of Quality/QAQC Report (monthly/quarterly etc)

3. References document that specified in ITP (specification, guidelines etc)

All item above covers all process in constructing building using precast

item (manufacture, Storage, Handling and Transport, Assembly & Erection &

connection)

Kerjasama dan jasa baik pihak puan amatlah saya hargai dan diucapkan ribuan

terima kasih.

Sekian, terima kasih.

“BERKHIDMAT UNTUK NEGARA”

Saya yang menurut perintah,

NORFARIZA BINTI ISMAIL

Penolong Pengarah,

Cawangan Kejuruteraan Awam & Struktur,

Bahagian Pembangunan & Penyelidikan,

Tingkat 19, Blok G

Jalan Sultan Salahuddin

50480, Kuala Lumpur.

Tel : 03-2618 9311

Page 13: Presentation. _ JKR Lawatan kilang HCPS
Page 14: Presentation. _ JKR Lawatan kilang HCPS
Page 15: Presentation. _ JKR Lawatan kilang HCPS

IMPORTANT

Elements Required To Complete A Building

Industrialised Building System ( IBS ) is a system not a machine or component

Open System And Proprietary System Is A Technology

Page 16: Presentation. _ JKR Lawatan kilang HCPS

- If we talk about lowering house prices, what is the best way to do it ?

- The best way is to build houses faster.

- One of the ways is by using Industrial Building Systems ( IBS ).

Conventional vs HC Precast System Sdn Bhd

Schedule of Rate - Single Storey Semi - D House

Fast & Easy Cost Comparison ( .xls format )

Notes :

Rate to be fill by you

Rate that has been key in is automatically links to page 2 & page 3

- 800 ft2 : RM 23,688.00 ( ex-factory )

- Precast Element : 88% ( off site )

- Wet Work : 12% ( on site )

Page 17: Presentation. _ JKR Lawatan kilang HCPS

- 800 ft2 : RM 23,688.00 ( ex-factory )

- Precast Element : 88% ( off site )

- Wet Work : 12% ( on site )

Page 18: Presentation. _ JKR Lawatan kilang HCPS

- 800 ft2 : RM 23,688.00 ( ex-factory )

- Precast Element : 88% ( off site )

- Wet Work : 12% ( on site )

Page 19: Presentation. _ JKR Lawatan kilang HCPS
Page 20: Presentation. _ JKR Lawatan kilang HCPS
Page 21: Presentation. _ JKR Lawatan kilang HCPS
Page 22: Presentation. _ JKR Lawatan kilang HCPS
Page 23: Presentation. _ JKR Lawatan kilang HCPS
Page 24: Presentation. _ JKR Lawatan kilang HCPS

Double Storey HC Precast System Drawing - 3D

Superstructure ( Frame & Wall ) :

- By HC Precast System

77 %

23 %

Sub- Structure By Other :

- Appointed By Client

Page 25: Presentation. _ JKR Lawatan kilang HCPS

INDUSTRIALISED BUILDING SYSTEM ( IBS )

is a system not a machine or component

IMPORTANT

ELEMENTS REQUIRED TO COMPLETE A BUILDING

SEQUENCE OF WORK : 5 Steps & No Variation Order

Step 1 Step 2 Step 3 Step 4 Step 5

Drawing Mould Production Delivery Installation

Conversion Fabrication Numbering

( 2D to 3D ) ( Decide by Client )

Speed, Quality & Environment

Page 26: Presentation. _ JKR Lawatan kilang HCPS

Step 1 : Drawing Conversion 2D To 3D - 1 Month

Original 2D To System 3D

Page 27: Presentation. _ JKR Lawatan kilang HCPS

Step 1 : Drawing Conversion 2D To 3D - 1 Month

Original 2D To System 3D

Page 28: Presentation. _ JKR Lawatan kilang HCPS

Original Drawing To System Shop Drawing - 1

Step 1a : M & E Conversion original to system shop drawing 1

Page 29: Presentation. _ JKR Lawatan kilang HCPS

Original Drawing To System Shop Drawing - 1

Step 1a : M & E Conversion original to system shop drawing 2

Page 30: Presentation. _ JKR Lawatan kilang HCPS

Step 2 : Mould Fabrication - 1 Month

1. Designed by You 2. Coping 1 Cast 3. Chequer Plate ( Tiling )

4. L shape Panel 5. Door Frame 1 Cast 6. Half Slab

Page 31: Presentation. _ JKR Lawatan kilang HCPS

Existing production 8 acres : 1,800 to 2,500 units

of single storey ( 1000 ft2 ) per year

Future development 13 acres : 2,500 to 3,500 units

of single storey ( 1000 ft2 ) per year

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 32: Presentation. _ JKR Lawatan kilang HCPS

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 33: Presentation. _ JKR Lawatan kilang HCPS

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 34: Presentation. _ JKR Lawatan kilang HCPS

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 35: Presentation. _ JKR Lawatan kilang HCPS

Every Truck Every 20m3 Casting & Leveling Mould Dismantling

Rebound Hammer Test Panel Lifting Vertical Curing 7days Proper Storage Yards

Step 3 : Production ( Decide by Client ) - 7 to 9 units / day

Page 36: Presentation. _ JKR Lawatan kilang HCPS

External transport to project

Step 3a : Quality Control & Assurance

Bay yard storage 7 days Panel 18 hrs hoist G30 design mixed 14 hrs hoist

Page 37: Presentation. _ JKR Lawatan kilang HCPS

Step 3b : Decide by Client - 7 to 9 units / day

Page 38: Presentation. _ JKR Lawatan kilang HCPS

Step 4 : Delivery ( 4 Options ) - Decide by Client

Page 39: Presentation. _ JKR Lawatan kilang HCPS

Step 4a : Delivery ( 4 Options ) - Decide by Client

1. Bay Yard to Block Yard 2. Bay Yard to Site yard (project) – Advance Casting

3. Storage Yard (factory) to Block Yard – Advance Casting 4. Storage Yard (factory) to Site Yard (project) – Advance Casting

Page 40: Presentation. _ JKR Lawatan kilang HCPS

Step 5 : Installation - Decide By Client

Sequence Block by Block One Time Adjustment

Page 41: Presentation. _ JKR Lawatan kilang HCPS

Step 5a : Installation - Numbering

Page 42: Presentation. _ JKR Lawatan kilang HCPS

1. Panel Guide 2. Panel Installation 3. Wall Prop installation

4. Vertical Adjust 5. Expending Cement 6. Rebar Installation

Step 5b : Installation

Page 43: Presentation. _ JKR Lawatan kilang HCPS

Step 5b1 : Expanding Cement Motar

Page 44: Presentation. _ JKR Lawatan kilang HCPS

7. Mould Installation 8. Wet joint Casting 9. Mould Dismantling

10. Half Slab installation 11. Rebar Install 12. RC Flat Roof Casting

Step 5c : Installation

Page 45: Presentation. _ JKR Lawatan kilang HCPS

Step 5d : Over View

Page 46: Presentation. _ JKR Lawatan kilang HCPS

No Variation Order

Absolutely no Variation Order (V.O) due to :-

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building precast elements

-(wall, beam, staircase & partition ) compared to bricks,

-reinforcement work and concreting at site.

Page 47: Presentation. _ JKR Lawatan kilang HCPS

Macro Economy & Green

1. One of the way to improve the Outflow of Currency is the utilization of

Industrial Building System ( IBS ).

“ IBS is a system which suit all architectural demands & not a machine or component “

2. If we talk about lowering house prices, what is the best way to do it? The best way is to build

houses faster and cheaper. One of the ways is by using Industrial Building Systems ( IBS ).

3. The low usage of IBS in Malaysia is due to the lack of enforcement besides other

shortcoming of IBS adoption. If independent enforcement is based on the contracts awards,

the usage of IBS will higher.

4. Industrialised Building System is a system not a machine or component. Responsibility of the

building should not have many different mix system and manufacture products.

5. Q-Lassic or Conquas should be carried-out upon the completion of the superstructure

works (frame & wall) instead of upon of completion finishing work.

6. System provider and manufacturer should provided installer of the building precast

element. Same concept applies when we buy computer and hardware.

7. IBS Superstructure In Malaysia 3 in 1: HC PRECAST SYSTEM.

- Load Bearing Wall + Modular Shear Keys Wet Joint + Box System.

- Speed, Quality & Environment.

- Precast Element ( off site ) 80%

- Wet Work ( on site ) 20%

Page 48: Presentation. _ JKR Lawatan kilang HCPS

PROPOSE TO GOVERNMENT & PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility ( flexibility to suit all

architectural demands ) to participate to built the show unit with work below and superstructure

without finishing for the Government & Private Developer to identify the system in terms of quality,

speed and environment for supply in its development.

--------------------------------------------------------------------------------------------------------------------------------

1. Architect

• Appointed by the Government & Private Developer.

• Design of single storey bungalow of 1,000 ft2 ( affordable home ), up to superstructure without

finishing.

• With M&E requirement.

• Wall finishing with plaster or skim coat only.

• Door and window frame included except door leaf.

• Ground floor without tiling.

2. Industrialized building system manufacturer have formed their BQ for superstructure ( in terms of

wall area ) and to submit work program with sequence of work for record purposes.

3. Proper record by the Government & Private representative during construction, in terms of labour

and machinery involved per day up to completion ( superstructure only ).

4. Conquas or QLassic consultant ( 2 ) engaged by the Government & Private Developer.

5. Cost Comparison for each Industrialized Building System Manufacturer by the Government &

Private Developer ( for superstructure only ). Cost will be fixed for the selected manufacturer and

supply to its development.

Page 49: Presentation. _ JKR Lawatan kilang HCPS

THANK YOU

DESIGN BY YOU