Bil Perkara
1 Objektif Pemeriksaan
2 Nama Projek
3 Nombor Kontrak
4 Jenis Kontrak
5 Perunding Elektrik
Kontraktor Utama
6 Kontraktor Elektrik
7 Perunding Rekabentuk Elektrik (JKR)
8 Perunding Pembinaan Elektrik (JKR)
9 Nama Pemeriksa Najmuddin Salmi Mat NanyanJohari HusinAwang Dawi Awang MatMohamed Shahril Abdul RashidMohd Firdaus ZubirJunaidi AripinNoorHunainie Mohd ZainudinMohd Hanif JamaludinAnuar Shahrin Ab MananSaffiah SulaimanRajentharan S. KaliapanMohd Hafizi Zainal AliBadrul Hisham Mohd NafiahArshayd AzizMuhammad Ikram Azahari Ismail (SHO)Che Azuan Che Ali Mohd Syahir Rashid (RE)
Wakil Kontraktor Elektrik
Syarikat Letrik Chen Guan Sdn. Bhd. Hasmizi Md Nor
10 Tarikh Pemeriksaan
11 Kategori pepasangan
12 Status Pepasangan Peratus
Pembinaan X 75%
DLP
Lain-lain
Wakil JKR (BPP-UKBF)
ABeNA Consultants.
Wakil Kontraktor Utama
SAFF Builders Sdn. Bhd.
Wakil JKR (BPR-E)
Wakil JKR Elektrik Wilayah Persekutuan Kuala Lumpur
Wakil JKR (BPP-UPIKE)
MaklumatMembuat pemeriksaan untuk menilai tahap pematuhan kepada prosedur kerja jabatan, spesifikasi, akta dan peraturan yang ditetapkan, dokumen kontrak, prosedur SPK dan piawaian amalan kejuruteraan elektrik atas arahan Pengarah Kanan Cawangan Kejuruteraan Elektrik melalui Borang FSq-1 bertarikh 4hb. Disember, 2012.
Urusetia Flying Squad dan Kualiti (BPR-UKTK)
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
JKR / IP / CKUB / 28 / 2010
JKR ELEKTRIK WILAYAH PERSEKUTUAN KUALA LUMPUR
12hb. Disember, 2012.
Sila tandakan (x)
Pejabat dan Balai Polis
ABeNA CONSULTANTS
BAHAGIAN PERUNDING REKABENTUK B, IP JKR KUALA LUMPUR.
KONVENSIONAL PERUNDING (PAKEJ)
SYARIKAT LETRIK CHEN GUAN SDN. BHD.
Wakil Perunding Elektrik
SAFF BUILDERS SDN. BHD.
Wakil JKR (BPP-USPMA)
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 1 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E1.
Lokasi: Tapak Bina Projek Penemuan: Tidak mematuhi Akta Keselamatan dan Kesihatan Pekerjaan 1994 dan Sistem Pendawaian Sementara tidak selamat. Ulasan: Peraturan-Peraturan Elektrik 1994, Peraturan 112(2). Mana - mana orang yang terlibat dalam kerja yang berkaitan dengan mana-mana pepasangan atau kelengkapan hendaklah dilindungi secukupnya daripada bahaya, dan tanggungjawab bagi perlindungan itu hendaklah terletak pada pemegang lesen atau pihak berkuasa bekalan, pemunya, pengurusan atau penghuni pepasangan itu, pengkhidmat atau ejennya, mengikut mana-mana yang berkenaan. Akta Keselamatan dan Kesihatan Pekerjaan 1994, Bahagian IV, Seksyen 15(2). Setakat yang praktik, • Mengadakan maklumat, arahan,
latihan dan penyeliaan; • Mengadakan dan menyenggara
tempat kerja dan laluan keluar/masuk ke/dari sebarang tempat kerja;
• Mengadakan dan menyenggara persekitaran kerja dan dengan kemudahan kebajikan yang mencukupi;
Isu: Pembinaan / Keselamatan Cadangan Penambahbaikan: Semasa kerja-kerja pembinaan semua pekerja tapak binaan mestilah memenuhi kehendak Peraturan - Peraturan Elektrik 1994 dan Akta Keselamatan dan Kesihatan Pekerjaan 1994 (OSHA 1994). Rujukan: 1. Peraturan - Peraturan
Elektrik 1994, Peraturan Peraturan 112(2).
2. Akta Keselamatan dan Kesihatan Pekerjaan 1994, Bahagian IV, Seksyen 15(2).
3. Akta Keselamatan dan Kesihatan Pekerjaan 1994, Bahagian VI, Seksyen 24.
Pemasangan Yang Baik
Pekerja tidak memakai kelengkapan pelindung diri.
Tiada notis amaran seperti AWAS, BAHAYA, SAFETY FIRST dan arahan pemakaian kelengkapan pelindung diri.
Pekerja tidak memakai kelengkapan pelindung diri.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 2 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
Akta Keselamatan dan Kesihatan Pekerjaan 1994, Bahagian VI, Seksyen 24. • Memberi perhatian munasabah
bagi keselamatan diri dan orang lain;
• Bekerjasama dengan majikan dan orang lain;
• Memakai dan menggunakan kelengkapan pelindung diri (PPE) yang dibekalkan;
• Mematuhi arahan keselamatan yang lain;
Kaedah pendawaian elektrik sementara yang tidak selamat.
Kabel bekalan elektrik sementara berada di atas lantai yang basah.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 3 / 15
Bil Gambar
Lokasi / Penemuan / Ulasan Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E2.
Lokasi: Bilik Suis Voltan Tinggi , Bilik MSB dan Bilik Janakuasa. Penemuan: 1. Tidak memasang notis standard dan
papan tanda pada pintu Bilik Papan Suis dengan lengkap.
2. Notis DILARANG MASUK tidak mengikut Peraturan - peraturan Elektrik 1994, Peraturan 38(2).
Ulasan: Spesifikasi JKR L-S1 (April 1999) Section 15.0. Standard notices displaying the words 'BAHAYA' and `DILARANG MASUK' and Electric Shock Treatment Chart shall be provided and installed at a place as required in accordance with Electricity Regulations 1994. Signage with words ‘BILIK SUIS UTAMA’, ‘BILIK SUIS’, ‘BILIK KHIDMAT ELEKTRIK’ and ‘DILARANG MEROKOK’ shall be installed for all rooms containing electrical switchboard and equipment to the satisfaction of the S.O.'s Representative. Peraturan-peraturan Elektrik 1994, Peraturan 38(2). Notis yang disebut dalam subperaturan (1) itu hendaklah daripada bahan yang sesuai, 350 milimeter lebar dan 240 milimeter tinggi dengan huruf berwarna hitam di atas latar belakang berwarna putih, dan perkataan ”DILARANG MASUK” hendaklah ditulis dengan huruf besar di tengah-tengah, dengan tulisan berukuran 290 milimeter panjang dan 30 milimeter tinggi dan jarak hurufnya ialah 6 milimeter. Keperluan-keperluan yang perlu dipamerkan pada setiap pintu Bilik Suis Elektrik: 1. NOTIS BAHAYA. 2. NOTIS DILARANG MASUK. 3. TANDA NAMA BILIK. 4. TANDA DILARANG MEROKOK.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan
Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR dan Peraturan - Peraturan Elektrik 1994. Rujukan: 1. Spesifikasi JKR L-S1
(April 1999) Section 15.0. 2. Peraturan - peraturan
Elektrik 1994, Peraturan 38(2).
Pemasangan Yang Baik
Pintu Bilik Suis Elektrik
2
Notis standard dan papan tanda yang lengkap.
Notis DILARANG MASUK tidak mengikut Peraturan-peraturan Elektrik 1994, Peraturan 38(2).
Tiada notis DILARANG MEROKOK dan tiada TANDA NAMA BILIK pada pintu Bilik MSB.
Tidak memasang notis standard dan papan tanda pada pintu Bilik Janakuasa.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 4 / 15
Bil Gambar Lokasi / Penemuan / Ulasan Tahap Kerosakan / Isu / Cadangan Penambahbaikan
E3.
Lokasi: Bilik Suis Voltan Tinggi dan Bilik MSB. Penemuan: Bilik Suis sempit. - Ruang untuk pengendalian
dan senggaraan di bahagian belakang papan suis kurang daripada 1 meter.
Ulasan: Peraturan-Peraturan Elektrik 1994, Peraturan 37. Mana-mana bahagian sesuatu pepasangan yang papan suis atau kelengkapan dipasang di dalam mana-mana premis :- c) hendaklah cukup dimensinya
bagi mengadakan ruang yang cukup bagi pengendalian atau penyenggaraan yang selamat.
Panduan Teknik CKE Edisi Ke-4, Chapter 2, 1.0. Room Requirements. Main switch board room should be large enough to allow easy installation and maintenance. Usually not less than 1.0m clearance should be allowed between the wall and the rear of the switch boards. The front clearance of the switch board should be minimum 1.5m to provide sufficient space for operation and maintenance of the switch gears.
Tahap Kerosakan: Isu: Rekabentuk / Senggaraan / Keselamatan Cadangan Penambahbaikan: 1. Perancangan yang teliti perlu
dilaksanakan semasa proses rekabentuk bagi memastikan ruang yang cukup untuk pengendalian dan senggaraan.
2. Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Peraturan - peraturan Elektrik 1994 dan Panduan Teknik CKE Edisi ke-4.
Rujukan: 1. Peraturan - peraturan Elektrik
1994, Peraturan 37(c). 2. Panduan Teknik CKE Edisi
Ke-4, Chapter 2, 1.0. Room Requirements.
Pemasangan Yang Baik
Ruang di bahagian belakang transformer dan switchgear voltan tinggi kurang daripada 1 meter.
2
Ruang pengendalian dan senggaraan bahagian belakang papan suis yang selamat.
Ruang di bahagian belakang MSB kurang daripada 1 meter.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 5 / 15
Bil Gambar Lokasi / Penemuan / Ulasan Tahap Kerosakan / Isu / Cadangan Penambahbaikan
E4.
Lokasi: Bilik Suis Voltan Tinggi Penemuan: Perimeter earth bar conductor tidak dipasang pada sekeliling dinding dan tidak dicat dengan warna green enamel. Ulasan: Spesifikasi JKR L-S10, Section 9.0. An earth bar of flat hard drawn copper with dimension not less than 25 mm x 6mm shall be installed around the four walls of the transformer room at a height of 300 mm from the finished floor level. The earth bar shall be bolted to the frame earth of the transformer. All joints of the earth bar shall be tinned and bolted. The earth bars shall be painted with an approved green enamel. Spesifikasi JKR L-S15, Section 6.0. A similar earth bar shall run around the four walls of the switchroom at a height of 300 mm from the finished floor level. The earth bars shall be painted with an approved green enamel.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan
Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR.
Rujukan : 1. Spesifikasi JKR L-S10,
Section 9.0. 2. Spesifikasi JKR L-S15,
Section 6.0.
Pemasangan Yang Baik
2 Perimeter earth bar conductor tidak dipasang pada sekeliling dinding dan tidak dicat dengan warna green enamel.
Perimeter earth bar conductor tidak dipasang pada sekeliling dinding dan tidak dicat dengan warna green enamel.
Perimeter earth bar conductor dipasang pada sekeliling dinding dan dicat dengan warna green enamel.
Perimeter earth bar conductor dipasang pada sekeliling dinding dan dicat dengan warna green enamel.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 6 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E5.
Lokasi: Bilik Suis Voltan Tinggi , Bilik MSB dan Bilik Janakuasa. Penemuan: Alat pemadam api yang diletakkan di dalam bilik suis bersaiz 2 kg dan bukan jenis serbuk kering (dry powder). Ulasan: Spesifikasi JKR L-S1 (April 1999), Section 15.0. All electrical switchrooms shall be provided with one unit 9 kg dry powder fire extinguisher for A, B, C class of fire complete with pressure gauge, discharge\ hose with nozzle installed on wall bracket. The extinguisher shall be certified by Jabatan Bomba Dan Penyelamat Malaysia valid to be used for a period of twelve months from the completion date of the Contract.
Tahap Kerosakan : Isu: Pembinaan / Keselamatan Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR. Rujukan: Spesifikasi JKR L-S1 (April 1999), Section 15.0.
Pemasangan Yang Baik
2
9 kg dry powder fire extinguisher
Alat pemadam api yang diletakkan di dalam bilik suis bersaiz 2 kg dan bukan jenis serbuk kering (dry powder).
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 7 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E6.
Lokasi: Papan Suis Utama (MSB) Penemuan: Tidak memasang cable runner sebagai penyokong kabel dalam MSB. Ulasan:
Spesifikasi JKR L-S1 (April 1999) Section 2.2.1. Cables connection between the busbars and the switchgears shall be neatly arranged and mounted on cable runner.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR. Rujukan: Spesifikasi JKR L-S1 (April 1999) Section 2.2.1.
Pemasangan Yang Baik
2
Kabel dipasang di atas cable runner dalam MSB.
Cable runner disediakan dalam MSB sebagai pengokong kabel oleh pihak pengilang.
Tidak memasang cable runner sebagai penyokong kabel dalam MSB
Tidak memasang cable runner sebagai penyokong kabel dalam MSB
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 8 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E7.
Lokasi: Papan Suis Utama (MSB) dan Papan Suis Kecil (SSB) Penemuan: Pemasangan SPDs with modes of protection at each phase-to-neutral and neutral-to-earth pada bekalan masukan melebihi 600A. Ulasan: Spesifikasi JKR L-S1 (April 1999), Section 7.2. The SPDs modes of protection shall be each phase-to-neutral, each phase-to-earth and neutral-to-earth for either single phase or three phase supply system. However, for cases where the incoming feeder circuit breaker in the main switchboard is rated 600A or less, SPDs with modes of protection at each phase-to-neutral and neutral-to-earth may be allowed to be installed in the whole electrical installation.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR. Rujukan: Addenda kepada Spesifikasi JKR L-S1 (April 1999) Section 7.2. (`Surge Protective Device’ Revision : 1 melalui surat Pengarah CKE bertarikh 11hb Januari 2008).
Pemasangan Yang Baik
3
SPD of Modular Type (Protection at each phase-to-neutral, phase-to-earth and neutral-to-earth)
(SPD of Mono Block Type. (Protection at each phase-to-neutral, phase-to-earth and neutral-to-earth)
SPD of Modular Type (Protection at each phase-to-neutral and neutral-to-earth)
Bekalan masukan utama melebihi 600A
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 9 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E8.
Lokasi: Bilik MSB dan Bilik Janakuasa. Penemuan: Pemasangan Main Earthing Terminal (MET) tidak mematuhi Spesifikasi JKR. 1. Tiada transparent protective cover dan
tiada penandaan pada MEB. 2. Earthing conductors tidak cukup saiz. 3. Protective Conductor tidak cukup saiz. Ulasan: Spesifikasi JKR L-S1 (April 1999), Section 13.0. A transparent protective cover of sufficient thickness and dimensions with label engraved and marked in red legibly with words ‘Main Earthing Terminals - Safety Electrical Connections - Do Not Remove’ shall be installed to cover full length of the main eathing bar. Spesifikasi JKR L-S1 (April 1999), Section 13.0. Two earthing conductors of tinned copper tape of dimension as in Table 4 below shall be provided to connect the main earthing bar to two different earth electrodes. Spesifikasi JKR L-S1 (April 1999), Section 13.0. Protective conductors between main switchboard or sub-switchboard and main earthing bar shall be effected by tinned copper tape of same dimensions as the main earthing bars and they shall be protected by running in insulated PVC rectangular channel flushed with the floor slab. Spesifikasi JKR L-S1 (April 1999), Section 13.0. Two test earth electrodes namely potential test probe and current test probe shall be provided. The test earth electrodes shall be one length of 1500 mm in depth. The current test probe shall be placed 30 m from the first earth electrodes with potential test probe midway between. Test leads of 2.5 sq. mm PVC insulated cable connecting test earth electrodes shall be terminated independently on the porcelain insulators next to the main earthing terminals or bars.
Tahap Kerosakan : Isu: Pembinaan / Keselamatan Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR. Rujukan: Spesifikasi JKR L-S1 (April 1999), Section 13.0. Pemasangan Yang Baik
TABLE 4
Pemasangan Main Earthing Terminal (MET) tidak mematuhi Spesifikasi JKR.
Main Earthing Terminal (MET) yang mematuhi Spesifikasi JKR.
3
Pemasangan Main Earthing Terminal (MET) tidak mematuhi Spesifikasi JKR.
Pemasangan Main Earthing Terminal (MET) tidak mematuhi Spesifikasi JKR.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 10 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E9.
Lokasi: Bilik Janakuasa. Penemuan: Tidak menyediakan kerb di sekeliling tangki minyak. Ulasan: Peraturan-Peraturan Elektrik 1994, Peraturan 37. Mana-mana bahagian sesuatu pepasangan yang papan suis atau kelengkapan dipasang di dalam mana-mana premis :- a) hendaklah cukup terang, dialih
udara dan sentiasa kering; Peraturan-Peraturan Elektrik 1994, Peraturan 110(1). Sesuatu pepasangan hendaklah disenggarakan dalam keadaan baik dan berfungsi dan langkah-langkah awasan hendaklah dipatuhi pada setiap masa untuk mencegah bahaya. (Penerimaan Aset Kerajaan) Pematuhan pada Borang JKR(E)-S1A-1, Pemeriksaan Visual Pepasangan. Bil. 6.0 – Tangki Minyak c. Kerb keliling tangki.
.
Tahap Kerosakan: Isu: Rekabentuk / Pembinaan / Senggaraan / Keselamatan Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR, Peraturan-Peraturan Elektrik 1994 dan Pematuhan pada Borang JKR(E)-S1A-1.
. Rujukan : 1. Peraturan - Peraturan Elektrik
1994, Peraturan 37(a). 2. Peraturan - Peraturan Elektrik
1994, Peraturan 110(1). 3. Pematuhan pada Borang
JKR(E)-S1A-1. Pemeriksaan Visual Pepasangan.
Pemasangan Yang Baik
2
Kerb dipasang sekeliling tangki minyak.
Tidak menyediakan kerb di sekeliling tangki minyak.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 11 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E10.
Lokasi: Bilik Papan Suis Utama.
Penemuan: Trunking diskru terus pada dinding. Ulasan: Spesifikasi JKR L-S1 (April 1999) Section 9.6. The trunking shall be supported by fixing brackets so that the trunking will not be in contact with the walls or floor slabs. The brackets shall be installed at intervals not greater than 1500 mm for vertical runs and not greater than 1000 mm for horizontal runs. The brackets shall be derusted, finished in a primer and coated with standard orange enamel.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan Cadangan Penambahbaikan: Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR. Rujukan: Spesifikasi JKR L-S1 (April 1999) Section 9.6.
Pemasangan Yang Baik
2
Trunking dipasang di atas brackets.
Trunking diskru terus pada dinding.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 12 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E11.
Lokasi: Papan Suis Penemuan: Tiada rubber gromet / penebat bush pada bukaan masukan kabel ke papan suis. Ulasan: Peraturan-peraturan Elektrik 1994, Peraturan 15(1). Mana-mana radas, konduktor atau aksesori bagi maksud penyambungan kepada sesuatu pepasangan hendaklah dalam saiz, kuasa dan bilangan yang mencukupi bagi menepati maksud yang dicadangkan dan hendaklah dibina, dipasang, disusun, dilindungi, dikerjakan dan disenggarakan sedemikian rupa bagi mencegah bahaya. Peraturan-peraturan Elektrik 1994, Peraturan 15(3). Sesuatu konduktor yang tidak dilindungi dengan penyalut logam atau dialirkan dalam pembuluh hendaklah dilindungi dengan penebat bush atau tiub, apabila konduktor itu menembusi dinding, sesekat, lantai atau bumbung bangunan atau binaan lain.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan / Senggaraan Cadangan Penambahbaikan: 1. Penebat bush mestilah
dipasang di sekeliling bukaan masukan kabel SEBELUM menarik kabel bagi mengelak kabel luka dan rosak.
2. Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Peraturan-peraturan Elektrik 1994.
Rujukan : Peraturan-peraturan Elektrik 1994, Peraturan 15(1) dan 15(3)
Pemasangan Yang Baik
2
Rubber gromet dipasang pada bukaan masukan kabel ke papan suis.
Tidak memasang rubber gromet / penebat bush pada bukaan masukan kabel.
Tidak memasang rubber gromet / penebat bush pada bukaan masukan kabel.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 13 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E12.
Lokasi: Switched socket outlet di Bilik MSB Penemuan: Tidak memasang cable for bonding the back box to switched socket outlet. Ulasan: Spesifikasi JKR L-S1 (April 1999), Section 10.3. Unless otherwise specified, boxes used for mounting switch plates, switched socket outlet and socket outlets in concealed wiring and concealed conduit wiring shall be metalclad steel type. Earth terminal complete with brass screw shall be provided. Cable for bonding the box to switch, switched socket outlet and socket outlet shall be the same size as the circuit protective conductor. Peraturan - peraturan Elektrik1994, Peraturan 34(1) Mana-mana penyalut, tudung, gagang, peti cantuman, peti suis, peti fius, bingkai gear suis yang berlogam dan rangka dan tapak logam mana-mana janakuasa, penukar, rektifier dan motor, peti dan teras berlogam bagi mana-mana pengubah, dan bingkai dan penutup logam bagi mana-mana peti sejuk, dapur memasak dan kelengkapan elektrik lain termasuklah apa-apa perkakas domestik, kecuali yang digolongkan sebagai binaan kelas II, hendaklah dibumikan dengan berkesan.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan Cadangan Penambahbaikan: 1. Semua kabel bumi bagi suis
soket alir keluar dan suis lampu hendaklah diikatkan pada back box earth terminal dengan cable lug dan diskru.
2. Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR dan Peraturan - peraturan Elektrik 1994.
Rujukan : 1. Spesifikasi JKR L-S1 (April
1999) Section 10.3. 2. Peraturan - peraturan Elektrik
1994, Peraturan 34(1).
Pemasangan Yang Baik
2
Cable for bonding the back box to switched socket outlet diikat pada back box earth terminal dan diskru.
Tidak memasang cable for bonding the back box to switched socket outlet.
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 14 / 15
Bil Gambar Lokasi / Penemuan / Ulasan
Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E13
Lokasi: Control Board Lampu Pagar. Penemuan: Penamatan kabel bawah tanah (PVC/SWA/PVC) tidak menggunakan cable gland dan sistem pembumian tidak sempurna. Ulasan: Spesifikasi JKR L-S3 (April 1999), Section 9.1. PVC/SWA/PVC, XLPE/SWA/PVC, XLPE/AWA/PVC, and XLPE/PVC cable shall be provided with compression cable gland for termination. The cable gland shall be of gunmetal or brass type and shall grip both the inner and outer PVC sheath of the cable and so designed that any strain on the cable is taken by the steel wire armouring which shall be effectively sealed between the gland it self and the outer cable sheath. Spesifikasi JKR L-S20, Section 8.15. An appropriate type of earthing clamp shall be provided to bond the armouring of the cable which shall be effectively earthed. Cable glands c/w hot-dipped galvanised mild steel L- bracket shall be used for all armoured cable termination. The cables, including the earthing cable, from the road lighting cut-outs to the luminaires shall not be less than 2.5 mm2 pvc. They shall be bundled together with cable ties and terminated with lugs.
Tahap Kerosakan: Isu: Pembinaan / Keselamatan / Senggaraan
Cadangan Penambahbaikan:
Semua bahan, kelengkapan dan kaedah pemasangan sistem elektrik mestilah memenuhi kehendak Spesifikasi JKR. Rujukan : 1. Spesifikasi JKR L-S3 (April
1999), Section 9.1. 2. Spesifikasi JKR L-S20
Section 8.15.
Pemasangan Yang Baik
2
Penamatan kabel bawah tanah (PVC/SWA/PVC) dalam Control Board Lampu Kawasan menggunakan cable gland lengkap dengan sistem pembumian.
Penamatan kabel bawah tanah (PVC/SWA/PVC) tidak menggunakan cable gland.
SWA dipotong strand untuk dijadikan sebagai kabel bumi (earth wire).
FSq-7 PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
FSq-7 IPD SENTUL KUALA LUMPUR
Muka 15 / 15
Bil Gambar
Lokasi / Penemuan / Ulasan Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
E14.
RUJUK LAPORAN PEMERIKSAAN
BARANGAN PENGGUNAAN BAHAN-
BAHAN MANDATORI JKR ELEKTRIK (FSq-5e).
Lokasi: Tapak Projek.
Penemuan: Tiada Ulasan: Semua ulasan penemuan rujuk Laporan Pemeriksaan Barangan Penggunaan Bahan-bahan Mandatori JKR Elektrik (FSq-5e).
Tahap Kerosakan: - Isu: - Cadangan Penambahbaikan: -
FSq-5e
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTOL, KUALA LUMPUR.
FSq-5e IPD SENTOL KUALA LUMPUR
Muka 1 / 1
Bil Gambar
Lokasi / Penemuan / Ulasan Tahap Kerosakan / Isu /
Cadangan Penambahbaikan
B1.
Lokasi: Tapak Projek.
Penemuan: Tiada Ulasan: Semua jenama dan model bahan/barangan bagi projek ini berdaftar dengan Electrical Material Approved List (EMAL).
Isu: - Cadangan Penambahbaikan: -
TIADA PENEMUAN
Fsq-5c
Page 1 Penyeliaan tapak
PEMERIKSAAN BORANG SPK BAGI KERJA-KERJA ELEKTRIK DI TAPAK BINA
KEMAJUAN PROJEK : 75%
SKOP
* - Sila tandakan ‘√ ’
Ya Tidak
i. REKOD KUALITI Surat Setuju Terima (SST) √ Ditemui dalam JKR/IP/CKUB/28/2010 Jld 1 1 1
ii. REKOD KUALITI Dokumen Tender √ Ditemui dalam JKR/IP/CKUB/28/2010 Jld 2 1 1
iii. REKOD KUALITI Buku Harian Tapak √ Mempunyai buku harian tapak untuk kerja-kerja elektrik sahaja. 1 1
1 JKR.PK(O).04-1 Verifikasi Harta Pelanggan √ tiada ditemui dalam fail 0 2
2 JKR.PK(O).04-2 Pelan Kualiti Pembinaan (C-Plan) √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
Agenda Mesyuarat Pra Pembinaan √ tiada ditemui dalam fail 0 1
Senarai Lukisan Pembinaan √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 1
4 JKR.PK(O).04-4 Kalibrasi Peralatan √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
5 JKR.PK(O).04-5 Pemeriksaan Mock-up √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
Mesyuarat Tapak √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 1
Mesyuarat Teknikal √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 1
PROJEK : Pemasangan Elektrik Untuk Ibu Pejabat Polis, Sentul, Kuala Lumpur
Mematuhi*CATATAN MARKAH
DAPAT
PROSEDUR PEMBINAAN DAN PENYELIAAN TAPAK BINA [JKR.PK(O).04]
OBJEKTIFProsedur ini adalah garis panduan pengurusan dan penyeliaan pembinaan projek JKR dalam menzahirkan produk sebagaimana dasar dan objektif kualiti.
Prosedur ini adalah digunapakai oleh semua pegawai yang ditugaskan mengurus dan menyelia tapak bina projek dibawah tanggungjawab JKR Malaysia dan Negeri.
MARKAH PENUHBIL RUJUKAN
DOKUMEN BORANG
JKR.PK(O).04-33
6 JKR.PK(O).04-6
Fsq-5c
Page 2 Penyeliaan tapak
* - Sila tandakan ‘√ ’
Ya TidakMematuhi*
CATATAN MARKAH DAPAT
MARKAH PENUHBIL RUJUKAN
DOKUMEN BORANG
7 JKR.PK(O).04-7 Senarai Semakan Audit Pembinaan Projek R&B - - TB - -
8 JKR.PK(O).04-8
8.1 JKR.PK(O).04-SKE.1A
Borang Pemeriksaan Kerja-Kerja Awalan Kontrak Elektrik √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.2 JKR.PK(O).04-SKE.2A
Pemeriksaan Pengesahan Penerimaan Bahan √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.3 JKR.PK(O).04-SKE.2B
Pemeriksaan / Ujian Alatan Di Kilang √ tiada ditemui dalam fail 0 2
8.4 JKR.PK(O).04-SKE.3A Pemeriksaan Kabel Bawah Tanah √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.5 JKR.PK(O).04-SKE.3B
Pemeriksaan Pemasangan Elektrod Bumi √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 0
8.6 JKR.PK(O).04-SKE.4A
Pemeriksaan Pemasangan / Pendawaian Konduit / Trunking √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.7 JKR.PK(O).04-SKE.4B
Pemeriksaan Bilik Suis / Mesin Elektrik Belum Laksana
8.8 JKR.PK(O).04-SKE.4C
Pemeriksaan Pemasangan PSU / PSK / Feeder Pillar Belum Laksana
8.9 JKR.PK(O).04-SKE.4D
Pemeriksaan Pemasangan Papan Agihan √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.1 JKR.PK(O).04-SKE.4E Pemeriksaan Kelengkapan Elektrik √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.11 JKR.PK(O).04-SKE.4F
Pemeriksaan Pemasangan Sistem Perlidungan Kilat √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.12 JKR.PK(O).04-SKE.5A Pemeriksaan Ujian-Ujian Elektrik √
Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
8.13 JKR.PK(O).04-SKE.5B
Pemeriksaan Kefungsian Komponen Elektrik Belum Laksana
8.14 JKR.PK(O).04-SKE.5C
Pemeriksaan Ujian Fungsi Pemasangan Elektrik Belum Laksana
Senarai Induk Borang Pemeriksaan Pembinaan Bagi Kerja-Kerja Elektrik :
Fsq-5c
Page 3 Penyeliaan tapak
* - Sila tandakan ‘√ ’
Ya TidakMematuhi*
CATATAN MARKAH DAPAT
MARKAH PENUHBIL RUJUKAN
DOKUMEN BORANG
8.15 JKR.PK(O).04-SKE.6A
Pemeriksaan Pengesahan Pentauliahan Pemasangan / Peralatan Elektrik
Belum Laksana
9 JKR.PK(O).04-SRE.1
Pemeriksaan Audit Projek R & B Kerja Awalan Elektrik - - TB - -
10 JKR.PK(O).04-SRE.2
Pemeriksaan Audit Projek R & B Penyeliaan Pemasangan Elektrik - - TB - -
11 JKR.PK(O).04-9 Senarai Semakan Pengujian dan Pentauliahan - - Belum Laksana - -
12 JKR.PK(O).04-10 Perakuan Siap Kerja Projek - - Belum Laksana - -
3 33JUMLAH
Fsq-5g
Page 1 Spesifikasi
PEMERIKSAAN BORANG SPK BAGI KERJA-KERJA ELEKTRIK DI TAPAK BINA
KEMAJUAN PROJEK : 75%
SKOP
* - Sila tandakan ‘√ ’
Ya Tidak
1 JKR.PK(P).04-1 Borang NCR √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
2 JKR.PK(P).04-2 Format Log NCR √Tidak ditemui dalam fail projek. Ditemui dalam dalam fail perunding.
0 2
3 REKOD KUALITI Laporan Analisa NCP & Penambahbaikan - -
Belum dilaksanakan. Dicadangkan penemuan NCR dianalisa supaya penambahbaikan dibuat dan kesilapan yang sama tdiak berulang
- -
0 4
PROJEK : Pemasangan Elektrik Untuk Ibu Pejabat Polis, Sentul, Kuala Lumpur
Prosedur ini adalah digunapakai oleh semua pegawai yang ditugaskan mengurus dan menyelia tapak bina projek dibawah tanggungjawab JKR Malaysia dan Negeri.
PROSEDUR KAWALAN PRODUK YANG TIDAK MEMENUHI SPESIFIKASI [JKR.PK(P).04]
OBJEKTIFProsedur ini adalah garis panduan pengurusan dan penyeliaan pembinaan projek JKR dalam menzahirkan produk sebagaimana dasar dan objektif kualiti.
JUMLAH
MARKAH PENUHBIL RUJUKAN
DOKUMEN BORANGMematuhi*
CATATAN MARKAH DAPAT
Fsq-5
Page 1 Pentadbiran Kontrak
PEMERIKSAAN BORANG SPK BAGI KERJA-KERJA ELEKTRIK DI TAPAK BINA
KEMAJUAN PROJEK : 75%
PROSEDUR PENTADBIRAN KONTRAK [JKR.PK(O).04A]
SKOP
* - Sila tandakan ‘√ ’
Ya Tidak
1 JKR.PK(O).04A-1 Borang Pembayaran Pendahuluan - - Tidak berkenaan - -
2 JKR.PK(O).04A-2 Dokumen Kontrak √ Ada di tapak bina. JKR/IP/CKUB/28/2010 1 1
3 JKR.PK(O).04A-3 Bayaran Interim - - Tidak berkenaan - -
4 JKR.PK(O).04A-4 Kajian Perubahan Kerja - - Tidak berkenaan - -
5 JKR.PK(O).04A-5 Penyelarasan Harga Kontrak - - Tidak berkenaan - -
6 JKR.PK(O).04A-6 Perakuan Kelewatan dan Lanjutan Masa - - Tidak berkenaan - -
7 JKR.PK(O).04A-7 Perakuan Kerja Tidak Siap - - Belum dilaksanakan - -
8 JKR.PK(O).04A-8 Perakuan Siap Kerja - - Belum dilaksanakan - -
9 JKR.PK(O).04A-9a Penilaian Tuntutan dan Laporan Pegawai Penguasa - - Belum dilaksanakan - -
10 JKR.PK(O).04A-9b Penilaian Tuntutan dan Ulasan Urusetia - - Belum dilaksanakan - -
11 JKR.PK(O).04A-10 Perakuan Akaun Muktamad - - Belum dilaksanakan - -
1 1
MARKAH PENUH
JUMLAH
PROJEK : Pemasangan Elektrik Untuk Ibu Pejabat Polis, Sentul, Kuala Lumpur
OBJEKTIFProsedur ini adalah garis panduan pengurusan dan penyeliaan pembinaan projek JKR dalam menzahirkan produk sebagaimana dasar dan objektif kualiti.
Prosedur ini adalah digunapakai oleh semua pegawai yang ditugaskan mengurus dan menyelia tapak bina projek dibawah tanggungjawab JKR Malaysia dan Negeri.
BIL RUJUKAN DOKUMEN BORANG
Mematuhi*CATATAN MARKAH
DAPAT
Fsq-5d
Page 1 Penyerahan
PEMERIKSAAN BORANG SPK BAGI KERJA-KERJA ELEKTRIK DI TAPAK BINA
KEMAJUAN PROJEK : 75%
SKOP
* - Sila tandakan ‘√ ’
Ya Tidak
1 JKR.PK(O).05-1 Senarai Semakan Pra Penyerahan - - Belum Laksana - -
2 JKR.PK(O).05-2 Senarai semakan Penyerahan - - Belum Laksana - -
3 JKR.PK(O).05-3 Pegawai perhubungan Pihak JKR - - Belum Laksana - -
4 JKR.PK(O).05-4 Borang Kecacatan/Kerosakan - - Belum Laksana - -
5 JKR 8 – Pin 1/2005(5 & 5A) Laporan Prestasi Kontraktor - - Belum Laksana - -
0 0
PROJEK : Pemasangan Elektrik Untuk Ibu Pejabat Polis, Sentul, Kuala Lumpur
PROSEDUR PENYERAHAN DAN POS PENYERAHAN [JKR.PK(O).05]
OBJEKTIFProsedur ini adalah garis panduan pengurusan dan penyeliaan pembinaan projek JKR dalam menzahirkan produk sebagaimana dasar dan objektif kualiti.
Prosedur ini adalah digunapakai oleh semua pegawai yang ditugaskan mengurus dan menyelia tapak bina projek dibawah tanggungjawab JKR Malaysia dan Negeri.
JUMLAH
MARKAH PENUHBIL RUJUKAN
DOKUMEN BORANGMematuhi*
CATATAN MARKAH DAPAT
Kesimpulan SPK
Page 1 Kesimpulan
[JKR.PK(O).04]
9.09%
NOTA : [JKR.PK(O).05]
Jumlah Markah yang diperolehi : 3 0 1 0
Jumlah Markah Keseluruhan : 33 4 1 0
B : TAHAP KEPATUHAN KUALITI SPK C : TAHAP KEPATUHAN KUALITI SPK KESELURUHAN
A 90 - 100 % SANGAT BAIKB 76% - 89% BAIKC 60% - 75% MEMUASKAND <59% TIDAK MEMUASKAN
Komen Untuk Penambahbaikan :1)2)3)
4)
5)6)7) Walaupun penyediaan pembinaan dilaksanakan oleh perunding, semua salinan borang-borang SPK perlu dimasukkan dalam fail projek WPPe untuk tujuan
rekod dan rujukan.
Penggunaan borang SPK perlu selari dengan setiap borang pindaan.
PROJEK : Pemasangan Elektrik Untuk Ibu Pejabat Polis, Sentul, Kuala Lumpur
Setiap dokumen dan borang-borang SPK yang telah diisi dengan lengkap dan dibuat pengesahan perlu dimasukkan dalam fail projek dan diminitkan.
PERATUS (%) 0.00% 100.00% Belum Laksana 36.36%
[JKR.PK(O).04] [JKR.PK(P).04] [JKR.PK(O).04A]
PERATUS KEPATUHAN 36.36%
TAHAP KEPATUHAN D (TIDAK MEMUASKAN)
KEMAJUAN PROJEK : 75%
A : PERATUS KEPATUHAN KEPADA PROSEDUR SPK
Cadangan penambahbaikan adalah dengan melampirkan dokumen sokongan seperti gambar, resit penghantaran pesanan (DO), keputusan ujian dan sebaginya bersama borang SPK sebagai bukti.Pihak PTB adalah disyorkan untuk menyediakan borang-borang SPK dan mengadakan sesi penerangan penggunaan borang kepada kontraktor sebelum kerja pembinaan dimulakan.
MARKAH KESELURUHANYANG TERLIBAT
Log NCR perlu dikemaskini sekiranya tindakan terhadap NCR tersebut telah dilaksanakan.
PROSEDUR SPK *[JKR.PK(P).04] *[JKR.PK(O).04A] *[JKR.PK(O).05]
Secara keseluruhannya tahap pematuhan terhadap dokumen dan borang SPK adalah TIDAK MEMUASKAN.
FSq -8
Kesimpulan Dari Ketidakpatuhan Muka 1/2
Tahap 1 0 0 0
Tahap 2 9 2 0
Tahap 3 2 0 0
Jumlah Penemuan 11 2 0
Pecahan Peratus Kelemahan 85% 15% 0%
Petunjuk :
Tindakan pembetulan tidak melibatkan kos
TAHAP 2
- Tidak bahaya Merbahaya
Susah senggara
CATATAN
Tindakan pembetulan melibatkan kos
Tidak mematuhi spesifikasi (MSB, SSB, Janakuasa, HT Switchgear, CPC dan
Earthing).
Berfungsi Tidak berfungsi
Tidak mematuhi spesifikasi (selain daripada MSB, SSB, Janakuasa, HT
Switchgear, CPC dan Earthing).
Tidak mematuhi EMAL
-
Isu
Kel
emah
an P
embi
naan
Tindakan pembetulan melibatkan kos
TAHAP 3
-
Berfungsi
TAHAP 1
Mencacatkan pandangan
-
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) SENTUL, KUALA LUMPUR.
A : JADUAL PENEMUAN
TAHAP
Tidak boleh disenggara
Tiada penemuan penggunaan jenama/model bahan/barangan yang TIDAK BERDAFTAR
DENGAN EMAL JKR Elektrik.
Isu
Tida
k M
emat
uhi E
MA
L
Isu
Kel
emah
an R
ekab
entu
k
3 2
1
1
2
3
1
2
3
3 2
1
1
2
3
1
2
3