    SITE SAFETY ,ENVIRONMENTAND QUALITY IN

    CONSTRUCTION PROJECTS

    Ir.M.RAMUSERENSENIOR MANAGER CIDBB.Eng (Hons)., M.I.E.M., P.Eng ( M )., CCPM., CPESC.,

    B.Jur ( Hons ) Malaya., CLP

    Tel : 0162200200 / 03-26170360

    E-mail : [email protected]

    10thAugust 2009

    Quality Hotel, Shah Alam

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    2/42

    Topics That Will Be Covered

    Today

    Site SafetyHIRARC and

    SHASSIC

    EnvironmentWaste

    Management and SEC

    Workmanship Quality - QLASSIC

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    3/42

    OSH Management System

    There is no OSH Management System

    without HIRARC

    HIRARC is the key process for managingOSH Management System

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    4/42

    HIRARC - WHAT IS THIS ?

    HAZARD INDENTIFICATION ,

    RISK ANALYSIS OR ASSESSMENT

    RISK CONTROL MEASURES

    - in short we call HIRARC

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    5/42

    HAZARD INDENTIFICATION

    EACH ACTIVITITY HAS ITS OWN HAZARD

    FOR EXAMPLECONCRETING WORKS

    WHAT ARE THE POSSIBLE HAZARDS ? - NO PROPER WORKING PLATFORM

    WHICH MAY CAUSE WORKER FALL

    FROM HEIGHT

    - HIT BY CONCRETE BUCKET

    - CONCRETE DROPS FROM HEIGHTETC

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    6/42

    RISK ANALYSIS- HIT BY CONCRETE BUCKET

    ( LIKELIHOOD VS SEVERITY )

    LIKELIHOOD

    SEVERITY

    1VERY UNLIKELY

    2UNLIKELY

    3LIKELY

    4VERY LIKELY

    1ACCEPTABLE

    1 2 3 4

    2NOT SERIOUS

    2 4 6 8

    3SERIOUS

    3 6 9 12

    4VERY SERIOUS

    4 8 12 16

    6

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    7/42

    RISK RANKING

    SCORE( LIKELIHOOD VS SEVERITY)

    LEVEL

    7 - 16HIGH

    3 - 6 MEDIUM

    1 - 2 LOW

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    8/42

    RISK CONTROLMEASURES

    SCORE( LIKELIHOOD VS

    SEVERITY)

    LEVEL CONTROL

    7 - 16 HIGH ENGINEERINGSOLUTION

    3 - 6 MEDIUM TRAINING TO

    WORKERS AND

    CRANE

    OPERATOR

    1 - 2 LOW WARNING

    SIGNAGE

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    9/42

    I have finished on HIRARC

    NOWI AM GOING TO COVER

    SHASSIC

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    10/42

    WHAT IS SHASSIC ?

    SAFETY AND HEALTH

    ASSESSMENT

    SYSTEM INCONSTRUCTION

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    11/42

    SHASSIC OBJECTIVES

    To benchmarkthe level of safety and health

    performance of construction industry in

    Malaysia

    To have a common standardon safety and

    health assessment system for contractor (s)

    in construction industry

    To assess safety and health performanceof contractorbased on approved standard

    by the industry stakeholders

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    12/42

    SHASSIC OBJECTIVES

    Continue.

    To evaluate the performanceof

    contractor(s) based on the safety and health

    practices; and

    To compile data for statistical analysison

    contractors safety and health management

    and performance at sites

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    13/42

    SHASSIC OBJECTIVES ( con..)

    To study on which area contractors has failed

    or could not score higher points so that

    appropriate trainingcan be organized

    Part of preparation for OSH management

    systemin long run

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    14/42

    CRITERIA CONSIDERED FOR THE

    DEVELOPMENT OF SHASSIC

    Compliance to legal requirements

    - OHSA 1994, FMA, BOWEC Reg,

    Safety,Health & Welfare Reg,etc

    Based on approved Standard & good practice

    - OSH MS such as OHSAS 18001 AND MS

    1722 etc

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    15/42

    COMPONENT OF

    ASSESSMENT & WEIGHTAGE

    Divided into 3 categories:-

    DOCUMENT CHECK - 40% WORKPLACE INSPECTION - 40%

    EMPLOYEE INTERVIEW - 20%

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    16/42

    SHASSIC REQUIREMENT

    Work Progresshas to be within 25% to

    75%

    WHY ?

    Construction at peak

    Many activities

    Workers at full Strength Potential accidents

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    17/42

    DOCUMENT CHECK

    Checking on documents and records - to

    determine the compliance of establishment of

    OSH program and activities

    There are 63 questions/checklists

    Weightage is 40% of the total marks of 100

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    18/42

    WORKPLACE INSPECTION

    This assessment shall provide visualcomparison of evidence on the OSH programthat being implementation, enforced and

    practiced at site. There are 62 questions/checklists

    5 (five) high risk areas shall be assessedwithin the site ( areas to be decided byAssessor)

    It carries 40% of overall weightage

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    19/42

    EMPLOYEES INTERVIEW

    Employees shall be randomly selected forinterview purpose

    Divided into 3 categories of Employees,

    namely, management personal ( 1), safety &health personals (3) and finally workers(10)from various trades

    The set of questions are different for eachcategories

    There are 48 questions all together(12, 6, 30)

    It carries weightage of 20%

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    20/42

    METHOD TO CALCULATE

    SCORE FOR ASSESSMENT

    Document Check

    Total compliance in the checklist / ( 63

    minus Number of Not applicable items) X

    40% = A ( score for document check )

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    21/42

    METHOD TO CALCULATE

    SCORE FOR ASSESSMENT

    Workplace Inspect ion

    Total compliance in the checklist / (

    62X5=310 minus Number of Not applicable

    items) X 40% = B ( score for Workplace

    Inspection )

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    22/42

    METHOD TO CALCULATE

    SCORE FOR ASSESSMENT

    Employees Interv iew

    Total compliance in the checklist / ( 330

    minus Number of Not applicable items) X

    20% = C ( score for Employees

    Interview )

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    23/42

    TOTAL CHECKLISTS

    Document Check 63

    Workplace Inspection 310 ( 62 X 5 )

    Employee Interviews 330 ( 12(x1) +6(x3)+ 30 (x10)

    TOTAL = 63 + 310 + 330703 / site

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    24/42

    SCORE STARS( RATING )

    85 - 100

    70 - 84

    55 - 69

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    25/42

    SCORE STARS

    ( RATING )

    40 - 54

    39 and

    less

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    26/42

    ASSESSOR

    Who can be the SHASSIC Assessor (s) ?

    A person who has attended one day training and

    passed exam and must have 5 years woking

    experience in construction industry Attended and passed Lead Auditor OHSAS

    18001/MS 1722 course and with 3 years working

    experience in Construction Industry

    CSHO with 2 years working experience inconstruction industry

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    27/42

    ENVIRONMENTAL

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    28/42

    ENVIRONMENTAL

    TWO IMPORTANT MATTERS TO

    CONSIDER

    1. CONSTRUCTION WASTE MANAGEMENT

    2. EROSION AND SEDIMENT CONTROL

    3. GREEN BUIDING INDEX

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    29/42

    CONSTRUCTION WASTE

    MANAGEMENT

    EXTRA ORDERS

    CONVENTIONAL TYPE OF

    CONSTRUCTION USING A LOT OF

    TIMBER FORMWORKS ETC

    BREAKAGE / POOR HANDLING

    - ONE WAY TO CONTROL CONSTRUTION

    WASTE IS BY ADOPTING IBS

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    30/42

    EROSION AND SEDIMENT CONTROL

    SITE CLEARING CAN CAUSE IMMEDIATEAND HUGE SOIL LOST IF NOTPROTECTED IMMEDIATELY

    PROPER PLANNING IS REQUIREDBEFORE THE EXECUTION OF SITECLEARING

    VEGITATION REMOVED MUST BEIMMEDIATELY COVERED BY SUITABLEMATERIAL OR CONSTRUCTION MUSTTAKE PLACE IMMEDIATELY

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    31/42

    GREEN BUIDING INDEX

    IT IS A RATING SYSTEM FOR GREEN

    BUIDING

    A CERTIFICATE WILL BE ISSUED FOR

    BUIDING WHICH HAS COMPLIED THE

    GREEN BUILDINGS REQUIREMENTS

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    32/42

    GREEN BUILDING

    ASSESSMENT SYSTEM

    In USA it is known as LEED

    AustraliaGreen Star

    SingaporeGreen Mark UKBREEAM

    MalaysiaGBI ( by PAM & ACEM )

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    33/42

    GREEN BUILDING RATING

    Developed by PAM & ACEM

    CIDB having discussion with PAM & ACEM

    to convert GBI to Construction Industry

    Standard

    Ratingwill take consideration of the

    following:-

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    34/42

    GREEN BUILDING

    RATINGcontinue

    Energy Efficiency

    Indoor environmental Quality

    Sustainable site & Management Material & Resources

    Water Efficiency

    Innovation

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    35/42

    QLASSIC

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    36/42

    QLASSIC

    Quality Assessment System In Construction

    Was developed in 2006 as Construction

    Industry Standard ( CIS )

    This is workmanship quality assessment

    standard

    CIDB is providing free assessment service for

    contractors

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    37/42

    How QLASSIC can help CIDB

    to improve ConstructionsWorkmanship Quality ?

    Base on score Contractor failed or score less in certain

    areas could be identified

    CIDB could arrange proper training program

    for contractor

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    38/42

    ASSESSMENT APPROACH

    Assessor determines the samples to be

    assessed prior to asssessment

    Samples are selected from drawings and

    plans

    Samples shall be distributed uniformly

    Scoring will be done on the works that are

    inspected for the first time

    Rectified works would not be assessed

    COMPONENTS TO BE

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    39/42

    COMPONENTS TO BE

    ASSESSED

    STRUCTURAL WORKS

    ARCHITECTURAL WORKS

    MECHANICAL & ELECTRICAL WORKS EXTERNAL WORKS

    All ti f W i ht F

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    40/42

    Allocation of Weightage For

    Components ( % )CATEGORIES

    COMPONENTS

    Landed

    Housing

    Stratified

    Housing

    PublicBuilding

    SpecialPublic

    Building

    Structural 25 30 30 30

    Architect 60 50 45 35

    M & E 5 10 15 25

    Ext.

    works

    10 10 10 10

    T. Score 100 100 100 100

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    41/42

    CONCLUSION

    SAFETYLESS ACCIDENT AT SITE IFIBS ADOPTED AS WE WILL BE DEALINGWITH LESS WORKERS AND PROCESSES

    ENVIROMENTVERY LITTLECONSTRUCTION WASTE IF IBS METHODADOPTED

    QUALITY- WORKMANSHIPS QUALITYDEFINITELY IMPROVED IF IBS METHODOF CONSTRUCTION IS ADOPTED

  • 7/27/2019 JKR-SHAH ALAM[1].ppt

    42/42

    THANK YOU