  • 8/18/2019 Frm Lapran Mingguan Bbk

    1/4

    PR0GRAM : PENGEMBANGAN PERDAGANGAN DALAM NEGERI Minggu Ke : I SATU)

    PEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL BAHARI BERKESAN

    LOKASI : KELURAHAN GAMALAMA KOTA TERNATE Periode : 1

    SUMBER DANA : APBN-P T.A 2015

    K ON TR AK TO R PE LA KS AN A : P T CA KR AW AL A IN DA H PE RS ADA

    JANGKA WAKTU PELAKSANAAN : 90 (SEMBIAN PUUH) HARI KALENDER KONSULTAN SUPERVISI : CV. PUTRA ARENA MASA

    NO. KONTRAK : 870/217/DPP-KT/IX/2015

    TANGGAL : 30 SEPTEMBER 2015

    Jumlah Harga Bobot Jumlah Harga Bobot Jumlah Harga Bobot

    (Rp.) (Rp.) (%) (Rp) (%) (Rp) (%) (Rp) (%)

    A PEKERJAAN PERSIAPAN

    1 Pembersihan Lokasi 1,449.50  Ls 9,449.65  13,697,267.68  0.22  1,449.50  13,697,267.68  0.22  -  -  -  1,449.50  13,697,267.68  0.22 

    2 Pengukuran/Pasang Bouwplank 180.65  m1 72,072.92  13,019,973.02  0.21  180.65  13,019,973.02  0.21  -  -  -  180.65  13,019,973.02  0.21 

    3 Papan Nama Proyek 1.00  Ls 450,000.00  450,000.00  0.01  1.00  450,000.00  0.01  -  -  -  1.00  450,000.00  0.01 

    4 Admnistrasi dan Dokumentasi 1.00  Ls 30,000,000.00  30,000,000.00  0.48  1.00  30,000,000.00  0.48  -  -  -  1.00  30,000,000.00  0.48 

    5 Asbulit Drawing 1.00  Ls 20,000,000.00  20,000,000.00  0.32  1.00  20,000,000.00  0.32  -  -  -  1.00  20,000,000.00  0.32 

    6 Direksi Keet + Barak Kerja 48.00  m2 1,055,083.36  50,644,001.26  0.81  48.00  50,644,001.26  0.81  -  -  -  48.00  50,644,001.26  0.81 

    7 Penyediaan Air Kerja 1.00  Ls 4,404,000.00  4,404,000.00  0.07  1.00  4,404,000.00  0.07  -  -  -  1.00  4,404,000.00  0.07 

    8 Pek. Quality Kontrol 1.00  Ls 9,500,000.00  9,500,000.00  0.15  1.00  9,500,000.00  0.15  -  -  -  1.00  9,500,000.00  0.15 

    9 Pek. Pagar Pengamanan seng 186.00  m1 300,237.19  55,844,116.77  0.89  186.00  55,844,116.77  0.89  -  -  -  186.00  55,844,116.77  0.89 

    10 UPL Dan UKL 1.00  Ls 35,000,000.00  35,000,000.00  0.56  1.00  35,000,000.00  0.56  -  -  -  1.00  35,000,000.00  0.56 

    B PEMBANGUNAN KIOS PEDAGANG

    II PEKERJAAN TANAH

    1 Pek. Galian Tanah Pondasi Menerus 242.32  m3 40,121.20  9,722,213.32  0.16  242.32  9,722,213.32  0.16  -  -  -  242.32  9,722,213.32  0.16 

    2 Pek. Urugan Kembali Pondasi Menerus 60.58  m3 19,234.95  1,165,258.56  0.02  60.58  1,165,258.56  0.02  -  -  -  60.58  1,165,258.56  0.02 

    3 Pek. Urugan Pasir bwh Pondasi Menerus & bawah Lantai 158.90  m3

    280,373.10  44,550,668.77  0.71  158.90  44,550,668.77  0.71  -  -  -  158.90  44,550,668.77  0.71 4 Pek. Timbunan Tanah + Pemadatan 806.20  m

    3 231,581.35  186,700,421.21  2.98  806.20  186,700,421.21  2.98  -  -  -  806.20  186,700,421.21  2.98 

    III PEKERJAAN PASANGAN

    1 Pek. Batu Kali Pondasi Camp. 1 : 4 178.38  m3 960,093.87  171,265,384.91  2.74  178.38  171,265,384.91  2.74  -  -  -  178.38  171,265,384.91  2.74 

    2 Pek. Batu Kosong 117.19  m3 526,344.67  61,680,858.35  0.99  117.19  61,680,858.35  0.99  -  -  -  117.19  61,680,858.35  0.99 

    3 Pek. Pasangan Dinding Camp. 1 : 4 2,110.06  m2 199,764.59  421,516,060.50  6.74  2,110.06  421,516,060.50  6.74  -  -  -  2,110.06  421,516,060.50  6.74 

    4 Pek. Plesteran Dinding Camp. 1 : 4 4,220.13  m2 54,984.83  232,043,020.66  3.71  4,220.13  232,043,020.66  3.71  -  -  -  4,220.13  232,043,020.66  3.71 

    5 Pek. Plesteran Beton Camp. 1 : 3, t = 20 mm 200.10  m2 54,984.83  11,002,415.00  0.18  200.10  11,002,415.00  0.18  -  -  -  200.10  11,002,415.00  0.18 

    6 Pek. Plesteran Comprot 99.23  m2 62,674.29  6,219,170.09  0.10  99.23  6,219,170.09  0.10  -  -  -  99.23  6,219,170.09  0.10 

    7 Pek. Granit Lantai 60 x 60 cm 1,143.11  m2 266,982.02  305,189,814.66  4.88  1,143.11  305,189,814.66  4.88  -  -  -  1,143.11  305,189,814.66  4.88 

    8 Pek. Granit Tangga 30 x 60 cm 36.41  m2 217,225.54  7,908,095.63  0.13  36.41  7,908,095.63  0.13  -  -  -  36.41  7,908,095.63  0.13 

    9 Pek. Keramik Lantai KM/WC uk. 30 x 30 cm 24.64  m2 192,934.49  4,753,905.72  0.08  24.64  4,753,905.72  0.08  -  -  -  24.64  4,753,905.72  0.08 

    10 Pek. Granit Dinding KM/WC uk. 30 x 60 cm 44.96  m2 290,840.44  13,076,186.30  0.21  44.96  13,076,186.30  0.21  -  -  -  44.96  13,076,186.30  0.21 

    11 Pek. Glass Block 9.60  m2 785,978.90  7,545,397.43  0.12  9.60  7,545,397.43  0.12  -  -  -  9.60  7,545,397.43  0.12 

    12 Pek. Roster 20/30 3.15  m2 363,380.12  1,144,647.37  0.02  3.15  1,144,647.37  0.02  -  -  -  3.15  1,144,647.37  0.02 

    13 Pek. Profil Beton 209.36  m1 62,674.29  13,121,489.98  0.21  209.36  13,121,489.98  0.21  -  -  -  209.36  13,121,489.98  0.21 

    IV PEKERJAAN BETON

    1 Pek. Sloof Beton 15/20 145 Kg 28.22  m3 5,535,311.26  156,187,110.27  2.50  28.22  156,187,110.27  2.50  -  -  -  28.22  156,187,110.27  2.50 

    2 Pek. Kolom Beton K1 20/30 145 Kg 6.75  m3 7,804,238.94  52,678,612.83  0.84  6.75  52,678,612.83  0.84  -  -  -  6.75  52,678,612.83  0.84 

    3 Pek. Kolom Beton K2 15/30 160 Kg 3.11 m

    3 8,093,000.33  25,128,766.03  0.40  3.11  25,128,766.03  0.40  -  -  -  3.11  25,128,766.03  0.40 

    4 Pek. Kolom Beton K3 20/20 140 Kg 20.78  m3 7,707,985.14  160,141,099.26  2.56  20.78  160,141,099.26  2.56  -  -  -  20.78  160,141,099.26  2.56 

    5 Pek. Kolom Praktis Beton 10/20 200 Kg 12.60  m3 8,863,030.72  111,674,187.06  1.78  12.60  111,674,187.06  1.78  -  -  -  12.60  111,674,187.06  1.78 

    6 Pek. Kolom Beton Hias 8/30 180 Kg 1.04  m3 8,478,015.53  8,779,832.88  0.14  1.04  8,779,832.88  0.14  -  -  -  1.04  8,779,832.88  0.14 

    7 Pek. Balok Beton B1 15/45 180 Kg 5.75  m3 7,782,833.70  44,785,343.67  0.72  5.75  44,785,343.67  0.72  -  -  -  5.75  44,785,343.67  0.72 

    8 Pek. Balok Beton B2 15/20 145 Kg 1.51  m3 7,109,057.11  10,723,301.75  0.17  1.51  10,723,301.75  0.17  -  -  -  1.51  10,723,301.75  0.17 

    9 Pek. Ring Balok Beton 15/20 200 Kg 25.29  m3 7,109,057.11  179,822,177.81  2.87  25.29  179,822,177.81  2.87  -  -  -  25.29  179,822,177.81  2.87 

    1 0 P ek. B alo k L at ai 1 5/ 20 ( Atas P in tu H ar mo nika) 2 00 K g 5 .2 4  m3 7,109,057.11  37,279,895.49  0.60  5.24  37,279,895.49  0.60  -  -  -  5.24  37,279,895.49  0.60 

    11 Pek. Kanopi Beton 8/83 100 Kg 5.59  m3 6,113,368.51  34,187,228.27  0.55  5.59  34,187,228.27  0.55  -  -  -  5.59  34,187,228.27  0.55 

    12 Pek. Rabat Lantai Beton Camp. 1 : 3 : 5 90.72  m3 1,005,901.65  91,256,101.82  1.46  90.72  91,256,101.82  1.46  -  -  -  90.72  91,256,101.82  1.46 

    V PEKERJAAN KAYU

    1 Pek. Kusen Pintu Kayu Kls I 0.52  m3 7,987,637.00  4,177,598.05  0.07  0.52  4,177,598.05  0.07  -  -  -  0.52  4,177,598.05  0.07 

    2 Pek. Daun Pintu Panel Kayu Kls I 14.24  m2 558,756.80  7,953,903.05  0.13  14.24  7,953,903.05  0.13  -  -  -  14.24  7,953,903.05  0.13 

    3 Pek. Daun Jendela Kayu Kls II + Kaca 5 mm 5.10  m2 618,972.26  3,156,758.51  0.05  5.10  3,156,758.51  0.05  -  -  -  5.10  3,156,758.51  0.05 

    3 Pek. Rangka Besi Hollow 40.40.2 mm 1,013.57  m2 648,578.66  657,379,876.08  10.51  1,013.57  657,379,876.08  10.51  -  -  -  1,013.57  657,379,876.08  10.51 

    4 Pek. Plafond Gypsum 1,013.57  m2 61,183.81  62,014,077.12  0.99  1,013.57  62,014,077.12  0.99  -  -  -  1,013.57  62,014,077.12  0.99 

    5 Pek. List Plafond gipsum Profil 1,319.79  m1 37,752.71  49,825,646.71  0.80  1,319.79  49,825,646.71  0.80  -  -  -  1,319.79  49,825,646.71  0.80 

    SAMPAI BULAN INI

    Volume Volume Volume

    L POR N MINGGU N

    NO. URAIAN PEKERJAAN VOLUME SATUANH AR GA S AT UA N JU ML AH H AR GA BOBOT

    SAMPAI BULAN LALU BULAN INI

  • 8/18/2019 Frm Lapran Mingguan Bbk

    2/4

    VI PEKERJAAN ATAP

    1 Pek. Rangka Atap Baja Ringan 1,222.14  m2 373,305.75  456,230,471.47  7.29  1,222.14  456,230,471.47  7.29  -  -  -  1,222.14  456,230,471.47  7.29 

    2 Pek. Atap Ounduline Tebal 0.35 mm 1,222.14  m2 94,283.62  115,227,422.85  1.84  1,222.14  115,227,422.85  1.84  -  -  -  1,222.14  115,227,422.85  1.84 

    VII PEKERJAAN BESI

    1 Pek. Pintu Harmonika 421.50  m2 1,201,302.61  506,349,048.74  8.09  421.50  506,349,048.74  8.09  -  -  -  421.50  506,349,048.74  8.09 

    2 Pemasangan Papan Nama Bangunan (Stainlees) 1.00  Ls 25,000,000.00  25,000,000.00  0.40  1.00  25,000,000.00  0.40  -  -  -  1.00  25,000,000.00  0.40 

    VIII PEKERJAAN PENGECETAN/FINISHING

    1 Pengecetan Tembok dan Beton 4,375.27  m2 33,170.89  145,131,523.27  2.32  4,375.27  145,131,523.27  2.32  -  -  -  4,375.27  145,131,523.27  2.32 

    2 Pengecetan Plafon 1,013.57  m2 51,034.78  51,727,326.53  0.83  1,013.57  51,727,326.53  0.83  -  -  -  1,013.57  51,727,326.53  0.83 

    3 Pek. Pengecetan Kayu 67.20  m2 51,034.78  3,429,537.52  0.05  67.20  3,429,537.52  0.05  -  -  -  67.20  3,429,537.52  0.05 

    4 Pek. Acian 4,375.27  m2 22,196.40  97,115,193.73  1.55  4,375.27  97,115,193.73  1.55  -  -  -  4,375.27  97,115,193.73  1.55 

    IX PEKERJAAN SANITASI1 Pek. Kloset Jongkok 8.00  Bh 798,078.96  6,384,631.70  0.10  8.00  6,384,631.70  0.10  -  -  -  8.00  6,384,631.70  0.10 

    2 Pek. Kran Air 8.00  Bh 79,928.59  639,428.70  0.01  8.00  639,428.70  0.01  -  -  -  8.00  639,428.70  0.01 

    3 Septictank + Perlengkapan 2.00  Ls 8,500,000.00  17,000,000.00  0.27  2.00  17,000,000.00  0.27  -  -  -  2.00  17,000,000.00  0.27 

    4 Profil Tank Stainlees 2500 Ltr (Tanam) 2.00  Bh 6,409,185.18  12,818,370.36  0.20  2.00  12,818,370.36  0.20  -  -  -  2.00  12,818,370.36  0.20 

    5 Profil Tank Stainlees 1100 Ltr (Lantai Atap) 2.00  Bh 3,165,763.47  6,331,526.95  0.10  2.00  6,331,526.95  0.10  -  -  -  2.00  6,331,526.95  0.10 

    6 Pompa Air Hisap 1" 2.00  Bh 3,750,000.00  7,500,000.00  0.12  2.00  7,500,000.00  0.12  -  -  -  2.00  7,500,000.00  0.12 

    7 Pompa Air Dorong 1" 2.00  Bh 3,750,000.00  7,500,000.00  0.12  2.00  7,500,000.00  0.12  -  -  -  2.00  7,500,000.00  0.12 

    8 Penyambungan Air + Instalasi 1.00  Ls 2,100,000.00  2,100,000.00  0.03  1.00  2,100,000.00  0.03  -  -  -  1.00  2,100,000.00  0.03 

    9 Pipa Pembuang Air PVC 4" 52.00  M1 73,192.15  3,805,991.98  0.06  52.00  3,805,991.98  0.06  -  -  -  52.00  3,805,991.98  0.06 

    10 Pipa Pembuangan Air PVC 3" 28.14  M1 58,119.59  1,635,485.32  0.03  28.14  1,635,485.32  0.03  -  -  -  28.14  1,635,485.32  0.03 

    11 Pipa Pembuangan Air PVC 2" 12.00  M1 30,543.15  366,517.83  0.01  12.00  366,517.83  0.01  -  -  -  12.00  366,517.83  0.01 

    12 Pipa Pembuangan Air PVC 1" 12.00  M1 34,171.82  410,061.80  0.01  12.00  410,061.80  0.01  -  -  -  12.00  410,061.80  0.01 

    13 Pek. Pipa 1/2 48.00  M1 54,141.05  2,598,770.30  0.04  48.00  2,598,770.30  0.04  -  -  -  48.00  2,598,770.30  0.04 

    14 Pek. Pipa 3/4 60.00  M1 79,794.21  4,787,652.67  0.08  60.00  4,787,652.67  0.08  -  -  -  60.00  4,787,652.67  0.08 

    X PEKERJAAN INSTALASI LISTRIK

    1 Penyambungan Daya Listrik 23500 VA 1.00  Ls 28,336,000.00  28,336,000.00  0.45  1.00  28,336,000.00  0.45  -  -  -  1.00  28,336,000.00  0.45 

    2 B ox Panel 1.00  Ls 7,500,000.00  7,500,000.00  0.12  1.00  7,500,000.00  0.12  -  -  -  1.00  7,500,000.00  0.12 

    3 Pek. Kabel NYM 2 x 2.5 mm 612.50  M1 18,451.33  11,301,441.14  0.18  612.50  11,301,441.14  0.18  -  -  -  612.50  11,301,441.14  0.18 

    4 Pek. Kabel NYM 3 x 2.5 mm 752.50  M1 24,177.28  18,193,400.83  0.29  752.50  18,193,400.83  0.29  -  -  -  752.50  18,193,400.83  0.29 

    5 Titik Instalasi 252.00  T itik 170,604.91  42,992,437.22  0.69  252.00  42,992,437.22  0.69  -  -  -  252.00  42,992,437.22  0.69 

    6 Stop Kontak 62.00  Bh 34,345.76  2,129,437.39  0.03  62.00  2,129,437.39  0.03  -  -  -  62.00  2,129,437.39  0.03 

    7 Stop Kontak AC 2.00  Bh 175,000.00  350,000.00  0.01  2.00  350,000.00  0.01  -  -  -  2.00  350,000.00  0.01 

    8 Sakl ar T un gga l 6 0. 00  Bh 34,345.76  2,060,745.86  0.03  60.00  2,060,745.86  0.03  -  -  -  60.00  2,060,745.86  0.03 

    9 S aklar G and a 9 .0 0  Bh 40,565.32  365,087.92  0.01  9.00  365,087.92  0.01  -  -  -  9.00  365,087.92  0.01 

    10 Lampu Jari-jari 40 Watt Philips 102.00  Bh 68,701.43  7,007,545.92  0.11  102.00  7,007,545.92  0.11  -  -  -  102.00  7,007,545.92  0.11 

    11 Lampu Jari-jari 8 Watt 17.00  Bh 43,823.19  744,994.22  0.01  17.00  744,994.22  0.01  -  -  -  17.00  744,994.22  0.01 

    12 Lampu Sorot 500 Watt 8.00  Bh 522,531.88  4,180,255.08  0.07  8.00  4,180,255.08  0.07  -  -  -  8.00  4,180,255.08  0.07 

    XI PEKERJAAN KUNCI-KUNCI

    1 Kunci Pintu Tanam Kualitas Baik 10.00  Bh 373,450.52  3,734,505.24  0.06  10.00  3,734,505.24  0.06  -  -  -  10.00  3,734,505.24  0.06 

    2 Engsel Jendela Kualitas Baik 16.00  Bh 50,611.63  809,786.10  0.01  16.00  809,786.10  0.01  -  -  -  16.00  809,786.10  0.01 

    3 Engsel Pintu Kualitas Baik 30.00  Bh 69,302.99  2,079,089.81  0.03  30.00  2,079,089.81  0.03  -  -  -  30.00  2,079,089.81  0.03 

    4 Grendel Pintu Kualitas Baik 10.00  Bh 34,519.75  345,197.53  0.01  10.00  345,197.53  0.01  -  -  -  10.00  345,197.53  0.01 

    5 Grendel Jendela Kualitas Baik 12.00  Bh 34,519.75  414,237.04  0.01  12.00  414,237.04  0.01  -  -  -  12.00  414,237.04  0.01 

    C PEMBANGUNAN RUANG GREY BULOG, PENGELOLA & MUSALLAH

    PEKERJAAN LANTAI I

    I PEK ER JA AN T AN AH

    1 Pek. Galian Tanah Pondasi Poer 81.00  m3 40,121.20  3,249,817.20  0.05  81.00  3,249,817.20  0.05  -  -  -  81.00  3,249,817.20  0.05 

    2 Pek. Galian Tanah Pondasi Menerus 24.12  m3 40,121.20  967,707.30  0.02  24.12  967,707.30  0.02  -  -  -  24.12  967,707.30  0.02 3 Pek. Urugan Kembali Pondasi Poer 60.75  m

    3 19,234.95  1,168,523.21  0.02  60.75  1,168,523.21  0.02  -  -  -  60.75  1,168,523.21  0.02 

    4 Pek. Urugan Kembali Pondasi Menerus 6.03  m3 19,234.95  115,984.83  0.00  6.03  115,984.83  0.00  -  -  -  6.03  115,984.83  0.00 

    5 Pek. U ru ga n Pas ir b wh Poe r M en er us , Pon das i M en er us & ba wa h L an ta i 9 .6 0  m3 280,373.10  2,692,927.55  0.04  9.60  2,692,927.55  0.04  -  -  -  9.60  2,692,927.55  0.04 

    6 Pek. Timbunan Tanah + Pemadatan 39.57  m3 231,581.35  9,163,210.86  0.15  39.57  9,163,210.86  0.15  -  -  -  39.57  9,163,210.86  0.15 

    I I PEKERJAAN PASANGAN

    1 Pek. Batu Kali Pondasi Camp. 1 : 4 13.30  m3 960,093.87  12,770,448.59  0.20  13.30  12,770,448.59  0.20  -  -  -  13.30  12,770,448.59  0.20 

    2 Pek. Batu Kosong 5.68  m3 526,344.67  2,987,111.28  0.05  5.68  2,987,111.28  0.05  -  -  -  5.68  2,987,111.28  0.05 

    3 Pek. Pasangan Dinding Camp. 1 : 4 92.94  m2 199,764.59  18,566,120.58  0.30  92.94  18,566,120.58  0.30  -  -  -  92.94  18,566,120.58  0.30 

    4 Pek. Plesteran Dinding Camp. 1 : 4 185.88  m2 54,984.83  10,220,580.20  0.16  185.88  10,220,580.20  0.16  -  -  -  185.88  10,220,580.20  0.16 

    5 Pek. Plesteran Beton Camp. 1 : 3, t = 20 mm 151.26  m2 54,984.83  8,317,186.84  0.13  151.26  8,317,186.84  0.13  -  -  -  151.26  8,317,186.84  0.13 

    6 Pek. Plesteran Comprot 9.80  m2 62,674.29  614,270.75  0.01  9.80  614,270.75  0.01  -  -  -  9.80  614,270.75  0.01 

    7 Pek. Granit Lantai 60 x 60 cm 137.81  m2 266,982.02  36,791,457.00  0.59  137.81  36,791,457.00  0.59  -  -  -  137.81  36,791,457.00  0.59 

    8 Pek. Granit Tangga 30 x 60 cm 9.36  m2 217,225.54  2,033,231.02  0.03  9.36  2,033,231.02  0.03  -  -  -  9.36  2,033,231.02  0.03 

    9 Pek. Roster 20/30 1.20  m2 363,380.12  436,056.14  0.01  1.20  436,056.14  0.01  -  -  -  1.20  436,056.14  0.01 

  • 8/18/2019 Frm Lapran Mingguan Bbk

    3/4

    I II PEKERJAAN BETON

    1 Pek. Lantai Kerja, Camp. 1 : 3 : 5 6.22  m3 1,005,901.65  6,252,684.66  0.10  6.22  6,252,684.66  0.10  -  -  -  6.22  6,252,684.66  0.10 

    2 Pek. Poer Plat 165 Kg 20.72  m3 5,547,437.90  114,942,913.30  1.84  20.72  114,942,913.30  1.84  -  -  -  20.72  114,942,913.30  1.84 

    3 Pek. Sloof Beton 20/50 225 Kg 5.18  m3 7,075,372.04  36,650,427.15  0.59  5.18  36,650,427.15  0.59  -  -  -  5.18  36,650,427.15  0.59 

    4 Pek. Sloof Beton 20/25 285 Kg 1.77  m3 8,230,417.62  14,596,645.64  0.23  1.77  14,596,645.64  0.23  -  -  -  1.77  14,596,645.64  0.23 

    5 Pek. Kolom Beton KA 25/30 250 Kg 5.39  m3 9,825,568.70  52,925,425.81  0.85  5.39  52,925,425.81  0.85  -  -  -  5.39  52,925,425.81  0.85 

    6 Pek. Kolom Beton KB 25/45 160 Kg 2.29  m3 8,093,000.33  18,500,598.76  0.30  2.29  18,500,598.76  0.30  -  -  -  2.29  18,500,598.76  0.30 

    7 Pek. Kolom Praktis Beton 10/20 200 Kg 0.07  m3 8,863,030.72  584,960.03  0.01  0.07  584,960.03  0.01  -  -  -  0.07  584,960.03  0.01 

    8 Pek. Balok Beton BA 20/40 275 Kg 4.14  m3 9,611,655.87  39,838,391.24  0.64  4.14  39,838,391.24  0.64  -  -  -  4.14  39,838,391.24  0.64 

    9 Pek. Balok Beton BB 25/30 260 Kg 2.84  m3 9,322,894.47  26,465,366.68  0.42  2.84  26,465,366.68  0.42  -  -  -  2.84  26,465,366.68  0.42 

    10 Pek. Ring Balok BG 20/30 155 Kg 1.32  m3 7,301,564.71  9,624,922.60  0.15  1.32  9,624,922.60  0.15  -  -  -  1.32  9,624,922.60  0.15 

    11 Pek. Balok Beton 15/50 180 Kg 1.77 m

    3 7,782,833.70  13,769,778.52  0.22  1.77  13,769,778.52  0.22  -  -  -  1.77  13,769,778.52  0.22 

    1 2 P ek. B alo k L at ai 1 5/ 20 ( Atas P in tu H ar mo nika) 2 00 K g 0 .4 1  m3 7,109,057.11  2,932,486.06  0.05  0.41  2,932,486.06  0.05  -  -  -  0.41  2,932,486.06  0.05 

    13 Pek. Plat Lantai, Tebal 12 cm 100 Kg 11.33  m3 6,113,368.51  69,281,582.62  1.11  11.33  69,281,582.62  1.11  -  -  -  11.33  69,281,582.62  1.11 

    14 Pek. Kanopi Beton 8/83 100 Kg 2.16  m3 6,113,368.51  13,228,351.31  0.21  2.16  13,228,351.31  0.21  -  -  -  2.16  13,228,351.31  0.21 

    15 Pek. Rabat Lantai Beton Camp. 1 : 3 : 5 9.65  m3 1,005,901.65  9,703,279.38  0.16  9.65  9,703,279.38  0.16  -  -  -  9.65  9,703,279.38  0.16 

    IV PEKERJAAN BESI

    1 Pek. Pintu Harmonika 34.38  m3 1,201,302.61  41,294,777.11  0.66  34.38  41,294,777.11  0.66  -  -  -  34.38  41,294,777.11  0.66 

    2 Rel ing Tangga Besi Hol low 3 .98  m2 829,274.70  3,300,845.03  0.05  3.98  3,300,845.03  0.05  -  -  -  3.98  3,300,845.03  0.05 

    2 Pek. Rangka Besi Hollow 40.40.2 mm 106.38  m2 648,578.66  68,995,798.23  1.10  106.38  68,995,798.23  1.10  -  -  -  106.38  68,995,798.23  1.10 

    3 Pek. Plafond Gypsum 106.38  m2 61,183.81  6,508,734.00  0.10  106.38  6,508,734.00  0.10  -  -  -  106.38  6,508,734.00  0.10 

    4 Pek. List Plafond gipsum Profil 189.28  m1 37,752.71  7,145,832.60  0.11  189.28  7,145,832.60  0.11  -  -  -  189.28  7,145,832.60  0.11 

    V PEKERJAAN PENGECETAN/FINISHING

    1 Pengecetan Tembok dan Beton 346.94  m2 33,170.89  11,508,452.76  0.18  346.94  11,508,452.76  0.18  -  -  -  346.94  11,508,452.76  0.18 

    2 Pengecetan Plafon 106.38  m2 51,034.78  5,429,080.38  0.09  106.38  5,429,080.38  0.09  -  -  -  106.38  5,429,080.38  0.09 

    3 Pek. Pengecetan Lis Profil 18.93  m2 51,034.78  965,986.40  0.02  18.93  965,986.40  0.02  -  -  -  18.93  965,986.40  0.02 

    4 Pek. Acian 346.94  m2 22,196.40  7,700,915.66  0.12  346.94  7,700,915.66  0.12  -  -  -  346.94  7,700,915.66  0.12 

    VI PEKERJAAN SANITASI

    1 Septictank + Perlengkapan 1.00  Ls 8,500,000.00  8,500,000.00  0.14  1.00  8,500,000.00  0.14  -  -  -  1.00  8,500,000.00  0.14 

    2 Pipa Pembuang Air PVC 4" 16.00  M1 73,192.15  1,171,074.46  0.02  16.00  1,171,074.46  0.02  -  -  -  16.00  1,171,074.46  0.02 

    3 Pipa Pembuangan Air PVC 3" 20.00  M1 58,119.59  1,162,391.84  0.02  20.00  1,162,391.84  0.02  -  -  -  20.00  1,162,391.84  0.02 

    4 Pipa Pembuangan Air PVC 2" 16.00  M1 30,543.15  488,690.44  0.01  16.00  488,690.44  0.01  -  -  -  16.00  488,690.44  0.01 

    5 Pipa Pembuangan Air PVC 1" 12.00  M1 34,171.82  410,061.80  0.01  12.00  410,061.80  0.01  -  -  -  12.00  410,061.80  0.01 

    6 Pek. Pipa 1/2 32.00  M1 54,141.05  1,732,513.54  0.03  32.00  1,732,513.54  0.03  -  -  -  32.00  1,732,513.54  0.03 

    7 Pek. Pipa 3/4 12.00  M1 79,794.21  957,530.53  0.02  12.00  957,530.53  0.02  -  -  -  12.00  957,530.53  0.02 

    VII PEKERJAAN INSTALASI LISTRIK

    1 Penyambungan Daya Listrik 2500 VA 1.00  Ls 3,080,000.00  3,080,000.00  0.05  1.00  3,080,000.00  0.05  -  -  -  1.00  3,080,000.00  0.05 

    2 B ox Panel 1.00  Ls 7,500,000.00  7,500,000.00  0.12  1.00  7,500,000.00  0.12  -  -  -  1.00  7,500,000.00  0.12 

    3 Pek. Kabel NYM 2 x 2.5 mm 122.50  M1 18,451.33  2,260,288.23  0.04  122.50  2,260,288.23  0.04  -  -  -  122.50  2,260,288.23  0.04 

    4 Pek. Kabel NYM 3 x 2.5 mm 150.50  M1 24,177.28  3,638,680.17  0.06  150.50  3,638,680.17  0.06  -  -  -  150.50  3,638,680.17  0.06 

    5 Titik Instalasi 31.00  T itik 170,604.91  5,288,752.20  0.08  31.00  5,288,752.20  0.08  -  -  -  31.00  5,288,752.20  0.08 

    6 Stop Kontak 7.00  Bh 34,345.76  240,420.35  0.00  7.00  240,420.35  0.00  -  -  -  7.00  240,420.35  0.00 

    7 Stop Kontak AC 1.00  Bh 175,000.00  175,000.00  0.00  1.00  175,000.00  0.00  -  -  -  1.00  175,000.00  0.00 

    8 Sakl ar T un gga l 5 .0 0  Bh 34,345.76  171,728.82  0.00  5.00  171,728.82  0.00  -  -  -  5.00  171,728.82  0.00 

    9 S aklar G and a 7 .0 0  Bh 40,565.32  283,957.27  0.00  7.00  283,957.27  0.00  -  -  -  7.00  283,957.27  0.00 

    10 Lampu Jari-jari 40 Watt Philips 9.00  Bh 68,701.43  618,312.88  0.01  9.00  618,312.88  0.01  -  -  -  9.00  618,312.88  0.01 

    11 Lampu Jari-jari 25 Watt Philips 2.00  Bh 51,523.60  103,047.19  0.00  2.00  103,047.19  0.00  -  -  -  2.00  103,047.19  0.00 

    PEKERJAAN LANTAI II

    I PEKERJAAN PASANGAN

    1 Pek. Pasangan Dinding Camp. 1 : 4 170.95  m2 199,764.59  34,149,016.78  0.55  170.95  34,149,016.78  0.55  -  -  -  170.95  34,149,016.78  0.55 

    2 Pek. Plesteran Dinding Camp. 1 : 4 341.89  m2 54,984.83  18,798,906.49  0.30  341.89  18,798,906.49  0.30  -  -  -  341.89  18,798,906.49  0.30 3 Pek. Plesteran Beton Camp. 1 : 3, t = 20 mm 102.92  m

    2 54,984.83  5,659,185.18  0.09  102.92  5,659,185.18  0.09  -  -  -  102.92  5,659,185.18  0.09 

    4 Pek. Keramik Lantai 60 x 60 cm 103.22  m2 266,982.02  27,557,883.90  0.44  103.22  27,557,883.90  0.44  -  -  -  103.22  27,557,883.90  0.44 

    5 Pek. Keramik Lantai KM/WC uk. 30 x 30 cm 3.55  m2 244,591.98  868,301.54  0.01  3.55  868,301.54  0.01  -  -  -  3.55  868,301.54  0.01 

    6 Pek. Keramik Dinding KM/WC uk. 30 x 60 cm 19.46  m2 217,225.54  4,226,774.48  0.07  19.46  4,226,774.48  0.07  -  -  -  19.46  4,226,774.48  0.07 

    7 Pek. Glass Block 0.64  m2 785,978.90  503,026.50  0.01  0.64  503,026.50  0.01  -  -  -  0.64  503,026.50  0.01 

    8 Pek. Roster 20/30 10.80  m2 363,380.12  3,924,505.28  0.06  10.80  3,924,505.28  0.06  -  -  -  10.80  3,924,505.28  0.06 

    9 Pek. Profil Beton 5.64  m1 62,674.29  353,483.01  0.01  5.64  353,483.01  0.01  -  -  -  5.64  353,483.01  0.01 

    I I PEKERJAAN BETON

    1 Pek. Ring Balok Beton 15/35 300 Kg 1.86  m3 10,092,924.86  18,736,505.71  0.30  1.86  18,736,505.71  0.30  -  -  -  1.86  18,736,505.71  0.30 

    2 Pek. Balok Beton 15/30 210 Kg 1.02  m3 8,360,356.49  8,543,866.31  0.14  1.02  8,543,866.31  0.14  -  -  -  1.02  8,543,866.31  0.14 

    3 Pek. Balok Pagar10/20 200 Kg 0.43  m3 7,109,057.11  3,075,378.11  0.05  0.43  3,075,378.11  0.05  -  -  -  0.43  3,075,378.11  0.05 

    4 Pek. Balok Beton15/50 180 Kg 1.92  m3 7,782,833.70  14,931,366.45  0.24  1.92  14,931,366.45  0.24  -  -  -  1.92  14,931,366.45  0.24 

    5 Pek. Ring Balok Beton 15/20 200 Kg 0.48  m3 7,109,057.11  3,442,205.45  0.06  0.48  3,442,205.45  0.06  -  -  -  0.48  3,442,205.45  0.06 

    6 Pek. Kanopi Beton Tebal 10 cm 100 Kg 5.22  m3 6,113,368.51  31,933,547.20  0.51  5.22  31,933,547.20  0.51  -  -  -  5.22  31,933,547.20  0.51 

  • 8/18/2019 Frm Lapran Mingguan Bbk

    4/4

    I II PEKERJAAN KAYU

    1 Pek. Kusen Pintu Kayu Kls I 0.87  m3 7,987,637.00  6,988,735.07  0.11  0.87  6,988,735.07  0.11  -  -  -  0.87  6,988,735.07  0.11 

    2 Pek. Daun Pintu Panel Kayu Kls I 4.80  m2 558,756.80  2,682,032.64  0.04  4.80  2,682,032.64  0.04  -  -  -  4.80  2,682,032.64  0.04 

    3 Pek. Pintu dan Jendela Kaca 5 mm Kayu Kls I 3.00  m2 618,972.26  1,856,916.77  0.03  3.00  1,856,916.77  0.03  -  -  -  3.00  1,856,916.77  0.03 

    3 Pek. Daun Jendela Kayu Kls II + Kaca 5 mm 12.95  m2 618,972.26  8,015,690.73  0.13  12.95  8,015,690.73  0.13  -  -  -  12.95  8,015,690.73  0.13 

    3 Pek. Rangka Besi Hollow 40.40.2 mm 100.42  m2 648,578.66  65,130,269.40  1.04  100.42  65,130,269.40  1.04  -  -  -  100.42  65,130,269.40  1.04 

    4 Pek. Plafond Gypsum 100.42  m2 61,183.81  6,144,078.48  0.10  100.42  6,144,078.48  0.10  -  -  -  100.42  6,144,078.48  0.10 

    5 Pek. List Plafond gipsum Profil 120.51  m1 37,752.71  4,549,578.86  0.07  120.51  4,549,578.86  0.07  -  -  -  120.51  4,549,578.86  0.07 

    IV PEKERJAAN ATAP

    1 Pek. Rangka Atap Baja Ringan 177.02  m2 373,305.75  66,082,957.28  1.06  177.02  66,082,957.28  1.06  -  -  -  177.02  66,082,957.28  1.06 

    2 Pek. Atap Ounduline Tebal 0.35 mm 177.02  m2 94,283.62  16,690,180.37  0.27  177.02  16,690,180.37  0.27  -  -  -  177.02  16,690,180.37  0.27 

    V PEKERJAAN PENGECETAN/FINISHING

    1 Pengecetan Tembok dan Beton 425.36  m2 33,170.89  14,109,480.92  0.23  425.36  14,109,480.92  0.23  -  -  -  425.36  14,109,480.92  0.23 

    2 Pengecetan Plafon 100.42  m2 51,034.78  5,124,913.06  0.08  100.42  5,124,913.06  0.08  -  -  -  100.42  5,124,913.06  0.08 

    3 Pek. Pengecetan Kayu 51.20  m2 51,034.78  2,612,980.97  0.04  51.20  2,612,980.97  0.04  -  -  -  51.20  2,612,980.97  0.04 

    4 Pek. Acian 425.36  m2 22,196.40  9,441,401.44  0.15  425.36  9,441,401.44  0.15  -  -  -  425.36  9,441,401.44  0.15 

    VI PEKERJAAN SANITASI

    1 Pek. Kloset Jongkok 2.00  Bh 798,078.96  1,596,157.93  0.03  2.00  1,596,157.93  0.03  -  -  -  2.00  1,596,157.93  0.03 

    2 Pek. Kran Air 6.00  Bh 79,928.59  479,571.52  0.01  6.00  479,571.52  0.01  -  -  -  6.00  479,571.52  0.01 

    3 Septictank + Perlengkapan 2.00  Ls 8,500,000.00  17,000,000.00  0.27  2.00  17,000,000.00  0.27  -  -  -  2.00  17,000,000.00  0.27 

    4 Profil Tank Stainlees 2500 Ltr (Tanam) 1.00  Bh 6,409,185.18  6,409,185.18  0.10  1.00  6,409,185.18  0.10  -  -  -  1.00  6,409,185.18  0.10 

    5 Profil Tank Stainlees 1100 Ltr (Lantai Atap) 1.00  Bh 3,165,763.47  3,165,763.47  0.05  1.00  3,165,763.47  0.05  -  -  -  1.00  3,165,763.47  0.05 

    6 Pompa Air Hisap 1" 2.00  Bh 3,750,000.00  7,500,000.00  0.12  2.00  7,500,000.00  0.12  -  -  -  2.00  7,500,000.00  0.12 

    7 Pompa Air Dorong 1" 2.00  Bh 3,750,000.00  7,500,000.00  0.12  2.00  7,500,000.00  0.12  -  -  -  2.00  7,500,000.00  0.12 

    8 Penyambungan Air + Instalasi 1.00  Ls 2,100,000.00  2,100,000.00  0.03  1.00  2,100,000.00  0.03  -  -  -  1.00  2,100,000.00  0.03 

    9 Pipa Pembuang Air PVC 4" 4.00  M1 73,192.15  292,768.61  0.00  4.00  292,768.61  0.00  -  -  -  4.00  292,768.61  0.00 

    10 Pipa Pembuangan Air PVC 3" 12.00  M1 58,119.59  697,435.11  0.01  12.00  697,435.11  0.01  -  -  -  12.00  697,435.11  0.01 

    11 Pipa Pembuangan Air PVC 2" 12.00  M1 30,543.15  366,517.83  0.01  12.00  366,517.83  0.01  -  -  -  12.00  366,517.83  0.01 

    12 Pipa Pembuangan Air PVC 1" 16.00  M1 34,171.82  546,749.07  0.01  16.00  546,749.07  0.01  -  -  -  16.00  546,749.07  0.01 

    13 Pek. Pipa 1/2 48.00  M1 54,141.05  2,598,770.30  0.04  48.00  2,598,770.30  0.04  -  -  -  48.00  2,598,770.30  0.04 

    14 Pek. Pipa 3/4 24.00  M1 79,794.21  1,915,061.07  0.03  24.00  1,915,061.07  0.03  -  -  -  24.00  1,915,061.07  0.03 

    VII PEKERJAAN INSTALASI LISTRIK

    1 Penyambungan Daya Listrik 23500 VA 1.00  Ls 28,336,000.00  28,336,000.00  0.45  1.00  28,336,000.00  0.45  -  -  -  1.00  28,336,000.00  0.45 

    2 B ox Panel 1.00  Ls 7,500,000.00  7,500,000.00  0.12  1.00  7,500,000.00  0.12  -  -  -  1.00  7,500,000.00  0.12 

    3 Pek. Kabel NYM 2 x 2.5 mm 157.50  M1 18,451.33  2,906,084.86  0.05  157.50  2,906,084.86  0.05  -  -  -  157.50  2,906,084.86  0.05 

    4 Pek. Kabel NYM 3 x 2.5 mm 107.50  M1 24,177.28  2,599,057.26  0.04  107.50  2,599,057.26  0.04  -  -  -  107.50  2,599,057.26  0.04 

    5 Titik Instalasi 24.00  T itik 170,604.91  4,094,517.83  0.07  24.00  4,094,517.83  0.07  -  -  -  24.00  4,094,517.83  0.07 

    6 Stop Kontak 5.00  Bh 34,345.76  171,728.82  0.00  5.00  171,728.82  0.00  -  -  -  5.00  171,728.82  0.00 

    7 Stop Kontak AC 1.00  Bh 175,000.00  175,000.00  0.00  1.00  175,000.00  0.00  -  -  -  1.00  175,000.00  0.00 

    8 Sakl ar T un gga l 5 .0 0  Bh 34,345.76  171,728.82  0.00  5.00  171,728.82  0.00  -  -  -  5.00  171,728.82  0.00 

    9 S aklar G and a 3 .0 0  Bh 40,565.32  121,695.97  0.00  3.00  121,695.97  0.00  -  -  -  3.00  121,695.97  0.00 

    10 Lampu Jari-jari 40 Watt Philips 9.00  Bh 68,701.43  618,312.88  0.01  9.00  618,312.88  0.01  -  -  -  9.00  618,312.88  0.01 

    11 Lampu Jari-jari 25 Watt Philips 2.00  Bh 51,523.60  103,047.19  0.00  2.00  103,047.19  0.00  -  -  -  2.00  103,047.19  0.00 

    VIII PEKERJAAN KUNCI-KUNCI

    1 Kunci Pintu Tanam Kualitas Baik 5.00  Bh 373,450.52  1,867,252.62  0.03  5.00  1,867,252.62  0.03  -  -  -  5.00  1,867,252.62  0.03 

    2 Engsel Jendela Kualitas Baik 58.00  Bh 50,611.63  2,935,474.61  0.05  58.00  2,935,474.61  0.05  -  -  -  58.00  2,935,474.61  0.05 

    3 Engsel Pintu Kualitas Baik 18.00  Bh 69,302.99  1,247,453.89  0.02  18.00  1,247,453.89  0.02  -  -  -  18.00  1,247,453.89  0.02 

    4 Grendel Pintu Kualitas Baik 29.00  Bh 34,519.75  1,001,072.84  0.02  29.00  1,001,072.84  0.02  -  -  -  29.00  1,001,072.84  0.02 

    5 Grendel Jendela Kualitas Baik 5.00  Bh 34,519.75  172,598.76  0.00  5.00  172,598.76  0.00  -  -  -  5.00  172,598.76  0.00 

    a. JUMLAH TOTAL 6,257,296,500.64  100.00  6,257,296,500.64  100.00  -  6,257,296,500.64  100.00 

    b. P P N (10% x a) 625,729,650.06  625,729,650.06  -  625,729,650.06 

    c. JUMLAH TOTAL ( a + b ) 6,883,026,150.70  6,883,026,150.70  -  6,883,026,150.70 

    e. DIBULATKAN 6,883,000,000.00  6,883,000,000.00  -  6,883,000,000.00 

    MENGETAHUI DIPERIKSA OLEH DI BUAT OLEHPEJABAT PEMBUAT KOMITMEN   KONSULTAN SUPERVISIDISPERINDAG KOTA TERNATE CV. PUTRA ARENA MASA

    RIZAL SANTOSO, SE IKRAM M AHMAD, ST BUSTAMIN TUBU, STNIP.1966042 200003 1 002 NIP 1760806200031001 SITE MANAGER