KESIMPULAN RANCANGAN CAMPURAN BAHAN AGREGAT LAPIS PONDASI KELAS A
NO. PEGUJIAN NILAI SPESIFIKASI1 Persentase Gabungan : Batu Pecah 1/2 20% Batu Pecah 2/3 47% Abu Batu 33%
2 Kepadatan 2,118
gr/cm3 3 Kadar Air Optimum (wop) 5.80% 4 CBR 186.67 Min.90 %5 Indeks Plastis 0 0 - 106 Abrasi Agregat 16.49 0 – 40 %7 Gumpalan Lempung 3.828 0 – 5 %
Sieve Analysis of AggregateANALISIS SARINGAN AGREGAT KASAR (Batu Pecah 1-2)
SNI 03 - 1968 - 1990 / AASHTO T-27-82
Kelompok : I (SATU)
Kelas : 3A Transportasi
SAMPEL : BATU PECAH 1 / 2Saringan Berat Komulatif Persen
ASTM (mm) Tertahan Tertahan Tertahan Lolos2" 50,00 0,00 0,00 0,00 100,00
1 1/2" 37,50 0,00 0,00 0,00 100,001" 25,00 0,00 0,00 0,00 100,00
3/8" 9,50 0,00 0,00 0,00 100,00No.4 4,75 1612,80 1612,80 80,65 19,35No.10 2,00 348,30 1961,10 98,07 1,93No.40 0,25 37,60 1998,70 99,95 0,05No.200 0,075 0,70 1999,40 99,98 0,02PAN 0,30 1999,70 100,00 0,00
1999,40
Sieve Analysis of Aggregate
ANALISIS SARINGAN AGREGAT KASAR (Batu Pecah 2-3)SNI 03 - 1968 - 1990 / AASHTO T-27-82
Kelompok : I (SATU)
Kelas : 3A Transportasi
SAMPEL : BATU PECAH 2-3Saringan Berat Komulatif Persen
ASTM (mm) Tertahan Tertahan Tertahan Lolos2" 50,00 0,00 0,00 0,00 100,00
1 1/2" 37,50 0,00 0,00 0,00 100,001" 25,00 979,50 979,50 32,57 67,43
3/8' 9,50 1838,30 2817,80 93,68 6,32No.4 4,75 189,80 3007,60 99,99 0,01No.10 2,00 0,00 3007,60 99,99 0,01No.40 0,25 0,00 3007,60 99,99 0,01No.200 0,075 0,00 3007,60 99,99 0,01PAN 0,20 3007,80 100,00 0,00
3007,60
Sieve Analysis of Aggregate
ANALISIS SARINGAN AGREGAT HALUS (ABU BATU)SNI 03 - 1968 - 1990 / AASHTO T-27-82
Kelompok : I (SATU)
Kelas : 3A Transportasi
SAMPEL : ABU BATU Saringan Berat Komulatif Persen
ASTM (mm) Tertahan Tertahan Tertahan Lolos2" 50,00 0,00 0,00 0,00 100,00
1 1/2" 37,50 0,00 0,00 0,00 100,001" 25,00 0,00 0,00 0,00 100,00
3/8" 9,50 0,00 0,00 0,00 100,00No.4 4,75 7,90 7,90 0,79 99,21No.10 2,00 273,60 281,50 28,21 71,79No.40 0,25 441,20 722,70 72,44 27,56No.200 0,075 171,40 894,10 89,62 10,38PAN 103,60 997,70 100,00 0,00
997,70
Kelompok : I (SATU)
Kelas: 3A Transportasi
Saringan 47% 20% 33% TotalSpek
ASTM (mm) Agg. 2-3 Agregat 1/2 Abu Batu 100%
2" 50,00 100,00 100,00 100,00 100,00 1 1/2" 37,50 100,00 100,00 100,00 100,00 100
1" 25,00 67,43 100,00 100,00 84,69 79-85
3/8" 9,50 6,32 100,00 100,00 55,97 44-58
No.4 4,75 0,01 19,35 99,21 36,61 29-44
No.10 2,00 0,01 1,93 71,79 24,08 17-30
No.40 0,25 0,01 0,05 27,56 9,11 7-17
No.200 0,075 0,01 0,02 10,38 3,43 2-8
PENGUJIAN KEAUSAN AGGREGAT DENGAN MESIN LOS ANGELOS
SK.SNI.M02.1989.F / SNI.03-2417-1991
SAMPEL : BATU PECAH 1-2 & 2-3 (SAMPEL1)
KELOMPOK : 1
S a r I n g a n I IIRata-rata
Lewat Tertahan 19,0 (3/4") 12,5 (1/2") 2500.4 2500.2 12,5 (1/2") 9,5 (3/8") 2501.2 2500.6 Jumlah Berat A 5001.6 5000.8 Berat tertahan saringan No.12 sesudah percobaan B 4187.40 4165.30 A - B 814.20 835.50 Keausan = (A-B)/A X 100 % 16.28 16.71 16.49
PERCOBAAN PEMADATAN
(COMPACTION TEST)
Berat Bahan+Mold gram 14045 14104 14222 14213Berat Mold gram 7060 7060 7060 7060Berat tanah basah gram 6985 7044 7162 7153Volume Mold cm3 3173,91 3173,91 3173,91 3173,91Berat isi basah gr/cm3 2,20 2,22 2,26 2,25Berat isi tanah kering (Yd) gr/cm3 2,108 2,110 2,115 2,085
Nomor cawan 1 2 3 4Berat tanah basah gram 707,90 715,90 1008,70 807,70Berat tanah kering gram 678,10 680,70 945,30 747,30Berat air gram 29,80 35,20 63,40 60,40Berat cawan kosong gram 29,10 24,40 24,40 24,40Berat tanah kering gram 678,10 680,70 945,30 747,30Kadar Air % 4,39 5,17 6,71 8,08
2,118 gr/cm3wop = 5,8 %
Kesimpulan:
Dari Pengujian pemadatan yang telah di lakukan, maka dapat disimpulkan Nilai kepadatan kering = 2,118 gr/cm3 dan Nilai Kadar Air Optimum adalah 5.8 %
PEMERIKSAAN CBR SNI 03-1744-1989
Kelompok : I (SATU)
Kelas : 3A Transportasi
BERAT ISI :
Berat Mould + Tanah basah 13928 gram
Berat Mould 5881,3 gram
Berat Tanah Basah 8046,7 gram
Isi Mould 3228,32 cm3
Berat isi basah 2,49 gram/cm3
Berat isi kering 2,35 gram
KADAR AIR :
Tanah basah + cawan 105,3 gram
Tanah kering + cawan 100,7 gram
Berat cawan 26,6 gram
Kadar Air 6,21 %
PENETRASI :
WAKTU PENURUNAN Pembacaan Beban (lb)
(menit) (Inchi) Arloji
0,00 0 0
0,25 0,0125
0,50 0,0250
1,00 0,0500
1,50 0,0750
2,00 0,1000
3,00 0,1500
4,00 0,2000
6,00 0,3000
8,00 0,4000
10,00 0,5000
CBR % CBR %
0,1" 0,2"
(2000 / 3 X 1000) X 100% (3800 / 3 X 1500) X 100%
66,67% 84,44%
Grafik CBR