JUBM Sdn Bhd (27638-X)Arcadis (Malaysia) Sdn Bhd (520443-H) Arcadis Projeks Sdn Bhd (233819-K)Arcadis Consultancy Sdn Bhd (492788-H)KDN PP10466/05/2013(032500)
JUBM & ArcadisConstruction Cost Handbook
MALAYSIA2018
Sunway Velocity, Selangor
Desaru Adventure Water Park, Johor
Double Tree Hilton, Johor
Centre of Excellence (EPIC), Negeri SembilanCentre of Excellence (EPIC), Negeri Sembilan
Sunway Velocity, Selangor
SPICE, Penang Desaru Adventure Water Park, Johor
Double Tree Hilton, Johor
The following handbook of information relating to the Malaysian construction industry has been compiled by:
JUBM Sdn BhdArcadis (Malaysia) Sdn BhdArcadis Projeks Sdn BhdArcadis Consultancy Sdn Bhd
Level 5, Menara TSR12 Jalan PJU 7/3, Mutiara Damansara47810 Petaling JayaSelangor
Telephone : (6 03) 2106 8000/ 2106 9000Fax : (6 03) 2106 9090Email : [email protected] : http://www.arcadis.com © Arcadis (Malaysia) Sdn Bhd
All rights reserved. No part of this publication may be reproduced or copied in any form without prior written permission from Arcadis (Malaysia) Sdn Bhd.
The information contained herein should be regarded as indicative and for general guidance only. Whilst every effort has been made to ensure accuracy, no responsi-bility can be accepted for errors and omissions, however caused.
Unless otherwise stated, costs reflected in this handbook are Malaysian costs at 4th Quarter 2017.
KDN : PP10466/05/2013 (032500)For private circulation to staff and business associates only.
Printed: January 2018by
Spiral Ecoprint Sdn Bhd (KDN: PQ1780/4606)No.44, Jalan PBS 14/11,
Taman Perindustrian Bukit Serdang, 43300 Seri Kembangan, Selangor Darul Ehsan
1
JUBM Sdn Bhd (27638-X)
Arcadis Projeks Sdn Bhd (233819-K)Arcadis Consultancy Sdn Bhd (492788-H)
Arcadis (Malaysia) Sdn Bhd (520443-H)
Page No.Table of Contents 2About Us 4Calendars 10
1. CONSTRUCTION COST DATAConstruction Cost Specification 12Kuala Lumpur Construction Cost Trend (2007 - 2017) 14Construction Costs for Kuala Lumpur 16Construction Costs for Johor Bahru 18Construction Costs for Penang 20Construction Costs for Kota Kinabalu 22Construction Costs for Kuching 24Construction Costs for Selected Asian Cities 26Major Rates for Malaysia 32Major Rates for Selected Asian Cities 34ACMV Costs for Various Designs & Developments in Kuala Lumpur 40M&E Costs for Selected Asian Cities 42Unit Costs for Ancillary Facilities for Kuala Lumpur 48Fit-Out Costs for Kuala Lumpur 50
2. GENERAL CONSTRUCTION DATAJUBM - Arcadis Building Works Composite Tender Price Index (BWCTPI) 52JKR Tender Price Index 53Value of Construction Work Done by Type of Construction Activity 54 Performance of Construction Sector 55Estimating Rules of Thumb 56Technical Specifications 58Average Unit Prices 60Unit Price Index 62Construction Sector Indicators 63Commodities Price Trend (Jan to Nov 2017) 64Malaysia Construction Sector - Employment & GDP 66Progress Payments 67
3. PROPERTYResidential 70Hotel 72Office 74Shopping Complex 76Shop 78Industrial 79
TABLE OF CONTENTS2
TABLE OF CONTENTS
Page No.
4. FINANCIALFinancial Definitions & Formulae 82Mortgage Repayment Table 83Malaysia Balance of Trade 84Consumer Price Index 85Prime Rates & Base Lending Rates 86Interest Rates : Banking Institutions 87Currency Chart 88Exchange Rates 89
5. OTHER INFORMATIONUtility Costs for Selected Asian Cities 92Weight & Measures 96Conversion Guide 98Public Holidays 100Arcadis Asia Leadership Team 106Arcadis Asia Sectors 108Arcadis Asia Services 111Directory of Offices 114Telephone Directory (Malaysia) 123
TABLE OF CONTENTS 3
Arcadis is the leading global Design & Consultancy firm for natural and built assets. Applying our deep market sector insights and collective design, consultancy, engineering, project and management services we work in partnership with our clients to deliver exceptional and sustainable outcomes throughout the lifecycle of their natural and built assets. In Asia, we have over 4,500 people covering the Asia market across all sectors focused on improving quality of life.
As Arcadis (Malaysia) Sdn Bhd, we are one of the largest and longest established Quantity Surveying practices in the country. Together with our collaborative partner, JUBM Sdn Bhd, we offer a multi-disciplinary construction cost consultancy service and provides integrated solutions to our clientele throughout Malaysia working from five offices in Kuala Lumpur, Penang, Johor Bahru, Kota Kinabalu and Kuching.
We provide our specialist services to nearly all market segments in the construction industry from religious buildings to residential homes, hospitality to corporate headquarters, mixed use developments to master planning.
The diverse range of project experience provides us with a rich and extensive construction cost database which enables the company to handle the simplest to the most complex projects entrusted by clients who recognized our value and dynamism.
(Log on to www.arcadis.com for more details.)
ABOUT US4
ABOUT US
ABOUT US 5
People First
We care for each other and create a safe and respectful working environment where our people can grow, perform, and succeed.
Integrity
We always work to the highest professional and ethical standards and establish trust by being open, honest and responsible.
Client Success
We are passionate about our clients’ success and bring insights, agility, and innovation to co-create value.
Collaboration
We value the power of diversity and our global capabilities and deliver excellence by working as One Arcadis.
Sustainability
We base our actions for clients and communities on environmental responsibility and social and economic advancement.
Our Core Values
ABOUT US6
ABOUT US
Desaru Adventure Water Park, Johor 2017
Calvary Convention Centre, Bukit Jalil 2013
St. Regis, Kuala Lumpur 2017
Double Tree Hilton, Johor 2015 SPICE, Penang 2017
MITEC, Kuala Lumpur 2016
18.19.20.21.22.23.
Iringan Hijau, Kuala Lumpur 2010
The Pearl Stonor, Kuala Lumpur 2010
2 Hampshire Condominiums,Kuala Lumpur 2008
Seri Hening Residence, Kuala Lumpur 2007
Palazzio Sunway Condominiums,Kuala Lumpur 2011
Setia Sky Residences, Kuala Lumpur 2016
Le Nouvel Condominium, Kuala Lumpur 2016
11.12.13.
14.15.
16.17.
Sunway Putra Mall & Hotel, Kuala Lumpur 2015
Sunway Nexis, Selangor 2014 KLP Fashion Avenue, Kuala Lumpur 2012
Sunway Velocity, Selangor 2016
Louis Vuitton, Kuala Lumpur 2006
Setia Walk, Selangor 2014
5.6.7.8.9.10.
Menara Telekom, Kuala Lumpur 2002
The Pinnacle Sunway, Selangor 2014
Ilham Baru Tower, Kuala Lumpur 2014
PAM Centre, Kuala Lumpur 2016
1.2.3.4.
1
Hospitality, Sports & Leisure
Retail
Residential
Commercial
A Selection of Our Projects
2
13
21
17
5
ABOUT US 7
20
3
12
4
14
16
18
(Cont’d)
20
19
9
8
7
6
11
22
10
23
15
ABOUT US8
ABOUT US
47
Johor State Assembly Building, Johor 2007
Bangunan UMNO (Pekan), Pahang 2007
Citizenship and Immigration Canada (CIC)Annexe of Canadian High Commission,Kuala Lumpur 2004
Federal Government Administrative Centre,Putrajaya 2010
IBS Housing, Putrajaya 2011
43.44.45.
46.
47.
42Masjid Besar Sandakan, Sabah 1988
Lutheran Bible Training Institute, Selangor 2010
41.42.
41
39
PML Production Facility, Selangor 2011
Giant Distribution Centre (Sepang),Selangor 2009
Star Publications Office & NewspaperPrinting Factory, Selangor 2000
Perodua - Second National Car Plant,Selangor 1994
37.38.
39.
40.
Electrified Double Track-Padang Besar to Ipoh (Station Building) 2014
6 Stations for Kelana Jaya LRT Line Extension, Kuala Lumpur 2014
KVMRT Sungai Buloh - Kajang Line 2017
Semangar Water Treatment Plant, Johor 2013
Integrated Water Supply, Kuala Lumpur 2008
Bus Rapid Transit (BRT) Sunway 2015
31.
32.
33.34.35.36.
28Universiti Teknologi Petronas, Perak 2003
Sunway Monash University, Selangor 2007
Tropicana International School, Selangor 2016
Asia Pacific University Campus, Selangor 2016
2728.29.30.
Women Children Hospital, Kuala Lumpur 2017
Sunway Medical Centre, Selangor 1998
Pantai Hospital (Extension), Kuala Lumpur 2015
24.25.26.
Public
Religious Buildings
Industrial
Transport & Infrastructure
Private Educational
Healthcare
A Selection of Our Projects
34
24
(Cont’d)
29
ABOUT US 9
46
40
37
35
33
27
44
45
43
38
26
25
31
32
36
30
CALENDARS
CALENDARS10
CALENDARS
JAN FEB MAR
APR MAY JUN
JUL AUG SEP
OCT NOV DEC
JAN FEB MAR
APR MAY JUN
JUL AUG SEP
OCT NOV DEC
2018
2019
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
S M T W T F S
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
S M T W T F S
30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1CONSTRUCTION COST DATA
Construction Cost Specification
Kuala Lumpur Construction Cost Trend(2007 - 2017)
Construction Costs for Kuala Lumpur
Construction Costs for Johor Bahru
Construction Costs for Penang
Construction Costs for Kota Kinabalu
Construction Costs for Kuching
Construction Costs for SelectedAsian Cities
Major Rates for Malaysia
Major Rates for Selected Asian Cities
ACMV Costs for Various Designs &Developments in Kuala Lumpur
M&E Costs for Selected Asian Cities
Unit Costs for Ancillary Facilitiesfor Kuala Lumpur
Fit-Out Costs for Kuala Lumpur
CONSTRUCTION COST SPECIFICATIONDOMESTIC INDUSTRIALHOTELSOFFICE /
COMMERCIALAp
artm
ent, h
igh ris
e, av
erag
e stan
dard
Apar
tmen
t, high
rise,
high e
nd
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, av
erag
e stan
dard
Retai
l mall
s, hig
h end
Budg
et ho
tels -
3-sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
-star
Luxu
ry ho
tels -
5-sta
rInd
ustria
l unit
s, sh
ell on
ly (C
onve
ntion
al sin
gle st
orey
fra
med u
nits)
Owne
r ope
rated
facto
ries,
low ris
e, lig
ht we
ight in
dustr
y
Apar
tmen
t unit
s with
fit-o
ut, in
cludin
g air-
cond
itionin
g, kit
chen
cabin
ets an
d hom
e ap
plian
ces,
but e
xclu
ding
deco
rativ
e ligh
t fittin
gs an
d loo
se fu
rnitu
re.
(Mal
aysi
a on
ly) 6
-12 u
nits p
er flo
or, 4
6m2 -
83m2 p
er un
it exc
luding
air-c
ondit
ioning
.Ap
artm
ent u
nits w
ith go
od qu
ality
fit-ou
t, inc
luding
air-c
ondit
ioning
, kitc
hen c
abine
ts an
d ho
me ap
plian
ces,
but e
xclu
ding
deco
rativ
e ligh
t fittin
gs an
d loo
se fu
rnitu
re.
Hous
es w
ith fit
-out,
inclu
ding a
ir-co
nditio
ning,
kitch
en ca
binets
and h
ome a
pplia
nces
, bu
t exc
ludi
ng de
cora
tive l
ight fi
ttings
, loos
e fur
nitur
e, ga
rden
and p
arkin
g.(M
alay
sia
only
) Exc
ludi
ng ai
r-con
dition
ing, k
itche
n cab
inets
and h
ome a
pplia
nces
.Ho
uses
with
good
quali
ty fit-
out, i
nclud
ing ai
r-con
dition
ing, k
itche
n cab
inets
and h
ome
appli
ance
s, bu
t exc
ludi
ng de
cora
tive l
ight fi
ttings
, loos
e fur
nitur
e, ga
rden
and p
arkin
g.RC
stru
cture
, cur
tain w
all, in
cludin
g pub
lic ar
ea fit
-out,
tena
nt ar
ea w
ith ra
ised f
loor/
carp
et, pa
inted
wall
and f
alse c
eiling
.(M
alay
sia
only
) Ave
rage
stan
dard
and p
resti
ge qu
ality
office
s exc
lude t
enan
t fit-o
ut.
Includ
ing pu
blic a
rea f
it-out
and M
&E, b
ut ex
clud
ing
shop
fit-o
ut.
1) In
terior
deco
ratio
n2)
Fur
nitur
e (fix
ed an
d mov
able)
3) S
pecia
l ligh
t fittin
gs (c
hand
elier
s, etc
.)4)
Ope
ratin
g Sup
plies
and E
quipm
ent (
OS&E
) exc
lude
d.RC
stru
cture
with
stee
l roof
and M
&E to
main
distr
ibutio
n, bu
t exc
ludi
ng
air-co
nditio
ning,
heati
ng an
d ligh
ting.
RC st
ructu
re, in
cludin
g sma
ll offic
e with
simp
le fit-
out a
nd M
&E, b
ut ex
clud
ing
air-co
nditio
ning a
nd he
ating
.
BU
ILD
ING
TYP
EO
UTL
INE
SPEC
IFIC
ATI
ON
1. CONSTRUCTION COST DATA
CONSTRUCTION COST DATA12
CONSTRUCTION COST DATA1
RC st
ructu
reRC
stru
cture
, natu
ral v
entila
tion,
no fa
cade
enclo
sure
.Inc
luding
fit-o
ut an
d air-
cond
itionin
g, bu
t exc
luding
educ
ation
al eq
uipme
nt.(M
alay
sia
only
) Sch
ools
with
stand
ard g
over
nmen
t pro
vision
s.
Includ
ing fit
-out,
loos
e fur
nitur
e and
air-c
ondit
ioning
.(M
alay
sia
only
) Stud
ent h
ostel
s to u
niver
sity s
tanda
rd.
Dry s
ports
(no s
wimm
ing po
ol) an
d are
for ‘l
eisur
e cen
tre’ ty
pe sc
heme
s inc
luding
ma
in sp
orts
hall,
ancil
lary s
ports
facil
ities,
chan
ging a
nd sh
ower
s, re
staur
ant/c
afe,
bar,
etc. C
osts
includ
e a/c,
Fur
nitur
e, Fit
tings
and E
quipm
ent (
FF&E
).Ex
cludin
g med
ical a
nd op
erati
ng eq
uipme
nt.
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)
Scho
ols (p
rimar
y and
seco
ndar
y)
Stud
ents’
resid
ence
s
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re ce
ntres
(dry
spor
ts)
Gene
ral h
ospit
als -
publi
c sec
tor
OTHERS
CONSTRUCTION COST DATA 13
Not
es:
1. Th
e cos
ts for
the r
espe
ctive
categ
ories
give
n abo
ve ar
e ave
rage
s bas
ed on
fixed
price
comp
etitiv
e ten
ders.
It mu
st be
unde
rstoo
d tha
t the a
ctual
cost
of a b
uildin
g will
depe
nd up
on th
e des
ign an
d man
y othe
r fac
tors a
nd m
ay va
ry fro
m the
figur
es sh
own.
2. Th
e co
sts p
er s
quar
e me
tre a
re b
ased
on
Cons
tructi
on F
loor A
reas
(CFA
) mea
sure
d to
the o
utside
face
of t
he e
xtern
al wa
lls/ e
xtern
al pe
rimete
r inc
luding
lift s
hafts
, stai
rwell
s, ba
lconie
s, pla
nt ro
oms,
water
tank
s and
the l
ike.
3. Al
l buil
dings
are a
ssum
ed to
have
no ba
seme
nts (e
xcep
t othe
rwise
state
d) an
d are
built
on fla
t gro
und,
with
norm
al so
il and
site
cond
ition.
Th
e cos
t exc
ludes
site
forma
tion w
orks
, exte
rnal
works
, land
cost,
profe
ssion
al fee
s, fin
ance
and l
egal
expe
nses
.4.
The s
tanda
rd fo
r eac
h cate
gory
of bu
ilding
varie
s fro
m re
gion t
o reg
ion an
d do n
ot ne
cess
ary f
ollow
that
of ea
ch ot
her.
5. Al
l cos
ts ar
e in U
S$/m
2 CFA
unles
s othe
rwise
state
d. Flu
ctuati
on in
exch
ange
rates
may
lead
to ch
ange
s in c
onstr
uctio
n cos
ts ex
pres
sed i
n U.S
. doll
ars.
KUALA LUMPUR CONSTRUCTION COST TREND 2007 - 2017
1. CONSTRUCTION COST DATA
All cost are at an average level unless otherwise stated
CONSTRUCTION COST DATA14
CONSTRUCTION COST DATA1
0500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
RM/m2
Office/Commercial
Average standard offices, high risePrestige offices, high riseShopping Centres
0500
1,0001,5002,0002,5003,0003,5004,000
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
RM/m2
Domestic
Bungalows (mass housing) Detached houses and bungalowsTerraced houses Luxury apts, high riseAverage standard apts high rise Low cost flats, high rise (<15 levels)Low cost flats, low rise (<6 levels) Low cost housing
All cost are at an average level unless otherwise stated
CONSTRUCTION COST DATA 15
0
600
1,200
1,800
2,400
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Industrial
Light duty flatted factoriesHeavy duty flatted factories and warehousesSingle storey conventional factory of structural steelworkOwner operated factories, low rise
RM/m2
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
RM/m2
Hotels
Resort Hotel inclusive of F.F.&E.3-star budget hotels, ditto5-star luxury hotels, ditto
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,620
2,285 72
51,2
302,3
75 440
605
710
1,615
2,190
1,985
3,240
3,375
6,100
- - - - - - - - - - - - - -
BU
ILD
ING 2,0
802,8
351,0
601,5
702,9
40 490
670
860
1,805
3,270
2,580
3,475
4,340
7,305
SER
VIC
ES
795
800
195
290
800
105
190
245
885
1,405 84
0
1,270 78
01,9
10
- - - - - - - - - - - - - -
995
995
285
560
910
150
240
315
1,090
1,620
1,320
1,585
1,460
2,030
TOTA
L
2,415
3,085 92
01,5
203,1
75 545
795
955
2,500
3,595
2,825
4,510
4,155
8,010
- - - - - - - - - - - - - -
3,075
3,830
1,345
2,130
3,850 64
091
01,1
75
2,895
4,890
3,900
5,060
5,800
9,335
CONSTRUCTION COST DATA16
CONSTRUCTION COST DATA1CONSTRUCTION COSTS FOR KUALA LUMPUR
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
895
1,165 985
1,305
1,120 735
840
975
1,880
- - - - - - - - -
955
1,225
1,190
1,430
1,440 935
970
1,050
2,165
525
585
345
490
370
210
200
255
550
- - - - - - - - -
685
740
490
600
635
285
230
305
675
1,420
1,750
1,330
1,795
1,490 945
1,040
1,230
2,430
- - - - - - - - -
1,640
1,965
1,680
2,030
2,075
1,220
1,200
1,355
2,840
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 17
DO
MES
TIC
Detac
hed h
ouse
s (ma
ss ho
using
)De
tache
d hou
ses (
high e
nd)
Terra
ced h
ouse
sAv
erag
e stan
dard
apar
tmen
ts, hi
gh ris
eLu
xury
apar
tmen
ts, hi
gh ris
eLo
w co
st ho
using
Low
cost
flats,
low
rise (
<6 le
vels)
Low
cost
flats,
high
rise (
<15 l
evels
)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,650
2,250 800
1,200
2,435 450
600
685
1,500
2,150
1,950
3,250
3,350
6,050
- - - - - - - - - - - - - -
BU
ILD
ING 2,1
502,8
051,1
301,6
003,0
50 550
750
785
1,800
3,250
2,400
3,450
4,350
7,250
SER
VIC
ES
750
800
200
300
600
105
155
230
775
1,350 855
1,250 780
1,900
- - - - - - - - - - - - - -
950
1,000 350
550
900
145
215
260
1,100
1,650
1,190
1,600
1,450
2,050
TOTA
L
2,400
3,050
1,000
1,500
3,035 555
755
915
2,275
3,500
2,805
4,500
4,130
7,950
- - - - - - - - - - - - - -
3,100
3,805
1,480
2,150
3,950 695
965
1,045
2,900
4,900
3,590
5,050
5,800
9,300
CONSTRUCTION COSTS FOR JOHOR BAHRU
CONSTRUCTION COST DATA18
CONSTRUCTION COST DATA1
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
900
1,150 980
1,300
1,110 700
825
965
1,850
- - - - - - - - -
915
1,250
1,175
1,430
1,450 850
950
1,050
2,105
520
580
350
500
350
210
200
250
550
- - - - - - - - -
675
750
500
600
600
290
235
300
670
1,420
1,730
1,330
1,800
1,460 910
1,025
1,215
2,400
- - - - - - - - -
1,590
2,000
1,675
2,030
2,050
1,140
1,185
1,350
2,775
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 19
DO
MES
TIC
Detac
hed h
ouse
s (ma
ss ho
using
)De
tache
d hou
ses (
high e
nd)
Terra
ced h
ouse
sAv
erag
e stan
dard
apar
tmen
ts, hi
gh ris
eLu
xury
apar
tmen
ts, hi
gh ris
eLo
w co
st ho
using
Low
cost
flats,
low
rise (
<6 le
vels)
Low
cost
flats,
high
rise (
<15 l
evels
)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,454
1,938 714
938
1,632 459
561
781
1,433
1,950
1,403
2,907
2,754
5,712
- - - - - - - - - - - - - -
BU
ILD
ING 1,7
851,9
581,0
141,3
462,2
95 479
612
859
1,683
2,750
2,144
3,188
4,106
7,167
SER
VIC
ES
918
826
153
281
755 87 145
121
867
1,350 760
1,148 969
1,923
- - - - - - - - - - - - - -
969
969
306
408
867
112
189
133
1,122
1,585 964
1,566
1,479
2,004
TOTA
L
2,372
2,764 867
1,219
2,387 546
706
903
2,300
3,300
2,162
4,055
3,723
7,635
- - - - - - - - - - - - - -
2,754
2,927
1,320
1,754
3,162 592
801
991
2,805
4,335
3,108
4,753
5,585
9,171
CONSTRUCTION COST DATA1
CONSTRUCTION COST DATA20
CONSTRUCTION COSTS FOR PENANG
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
775
923
785
1,020 842
541
673
867
1,581
- - - - - - - - -
918
1,122 949
1,265
1,387 842
898
984
1,800
530
597
495
510
326
192
199
214
541
- - - - - - - - -
714
760
571
612
561
326
255
281
714
1,306
1,520
1,280
1,530
1,168 732
872
1,081
2,122
- - - - - - - - -
1,632
1,882
1,520
1,877
1,948
1,168
1,153
1,265
2,514
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 21
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,540
2,340 790
1,050
2,450 420
540
610
1,570
2,230
1,600
3,330
4,060
6,290
- - - - - - - - - - - - - -
BU
ILD
ING 1,6
402,8
501,0
501,5
702,9
80 460
590
670
1,780
3,300
2,170
3,540
4,530
7,430
SER
VIC
ES
430
1,010 285
355
940
120
165
210
875
1,460 875
1,185
1,445
2,320
- - - - - - - - - - - - - -
540
1,245 340
430
1,065 165
185
220
1,010
1,665
1,010
1,445
1,595
2,475
TOTA
L
1,970
3,350
1,075
1,405
3,390 540
705
820
2,445
3,690
2,475
4,515
5,505
8,610
- - - - - - - - - - - - - -
2,180
4,095
1,390
2,000
4,045 625
775
890
2,790
4,965
3,180
4,985
6,125
9,905
CONSTRUCTION COSTS FOR KOTA KINABALU
CONSTRUCTION COST DATA22
CONSTRUCTION COST DATA1
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
930
1,190 990
1,330
1,000 670
720
960
1,900
- - - - - - - - -
990
1,260
1,240
1,500
1,190 860
850
1,030
2,040
430
500
355
430
250
185
235
260
720
- - - - - - - - -
525
570
430
510
285
220
370
285
875
1,360
1,690
1,345
1,760
1,250 855
955
1,220
2,620
- - - - - - - - -
1,515
1,830
1,670
2,010
1,475
1,080
1,220
1,315
2,915
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 23
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
1,175
1,785
1,030
1,215
1,815 575
800
845
1,570
1,865
1,765
2,815
3,010
4,805
- - - - - - - - - - - - - -
BU
ILD
ING 1,2
752,8
551,0
501,2
901,9
45 625
815
905
1,815
2,950
1,825
3,285
3,285
6,865
SER
VIC
ES
480
830
170
310
945
115
160
165
930
1,570 810
1,405
1,590
2,435
- - - - - - - - - - - - - -
610
970
205
410
1,180 145
190
240
1,080
1,670 990
1,670
1,735
2,500
TOTA
L
1,655
2,615
1,200
1,525
2,760 69
096
01,0
10
2,500
3,435
2,575
4,220
4,600
7,240
- - - - - - - - - - - - - -
1,885
3,825
1,255
1,700
3,125 770
1,005
1,145
2,895
4,620
2,815
4,955
5,020
9,365
RM
/m2
CONSTRUCTION COSTS FOR KUCHING
CONSTRUCTION COST DATA24
CONSTRUCTION COST DATA1
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
1,040
1,120 915
1,130
1,070 835
980
1,155
1,815
- - - - - - - - -
1,245
1,275
1,010
1,275
1,305 92
51,0
551,2
951,9
60
360
415
310
440
365
220
210
240
720
- - - - - - - - -
390
490
445
520
385
240
335
310
865
1,400
1,535
1,225
1,570
1,435
1,055
1,190
1,395
2,535
- - - - - - - - -
1,635
1,765
1,455
1,795
1,690
1,165
1,390
1,605
2,825
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 25
DO
MES
TIC
Apar
tmen
ts, hi
gh ris
e, av
erag
e stan
dard
Apar
tmen
ts, hi
gh ris
e, hig
h end
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
OFF
ICE
/ CO
MM
ERC
IAL
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, a
vera
ge st
anda
rdRe
tail m
alls,
high e
nd
HO
TELS
Budg
et ho
tels -
3 sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
star
Luxu
ry ho
tels -
5 sta
r
MA
NIL
A@
JAK
AR
TA#
BR
UN
EIB
AN
GK
OK
*
US$
/m2
375
-
520
780
-
945
225
-
330
755
-
940
615
-
710
880
- 1
,200
560
-
690
690
-
95
5
1,02
0 -
1,4
201,
760
- 2
,065
1,96
5 -
2,2
90
KU
ALA
LUM
PUR
^
695
-
864
988
- 1
,188
463
-
556
803
-
972
648
-
803
880
- 1
,111
633
-
818
849
-
880
1,15
8 -
1,2
811,
482
- 1
,698
1,72
9 -
2,0
06
726
-
998
897
- 1
,168
470
-
740
713
-
985
726
-
998
1,02
6 -
1,2
9770
4 -
9
75
929
- 1
,199
1,37
3 -
1,6
431,
936
- 2
,206
1,98
7 -
2,2
58
713
-
807
981
- 1
,107
378
-
492
1,02
7 -
1,1
49
703
-
778
1,03
5 -
1,1
5760
4 -
6
69
667
-
721
1,22
2 -
1,4
431,
666
- 1
,800
1,77
0 -
1,9
96
923
- 1
,088
1,22
7 -
1,7
1276
0 -
9
061,
570
- 2
,353
897
- 1
,048
1,26
4 -
1,3
8572
7 -
8
88
1,05
9 -
1,5
04
1,19
3 -
1,3
351,
322
- 1
,650
1,61
2 -
2,1
75
CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA26
CONSTRUCTION COST DATA1
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s bu
t exc
lusi
ve o
f con
tinge
ncie
s.^
Rat
es a
re n
ett o
f GS
T an
d co
ntin
genc
ies.
*R
ates
exc
lude
VAT
and
con
tinge
ncie
s.#
Rat
es a
re n
ett o
f VAT
.@
Rat
es a
re e
xclu
sive
of c
ontin
genc
ies
& in
clud
e 12
% V
AT.
(Cont’d)
CONSTRUCTION COST DATA 27
IND
UST
RIA
LInd
ustria
l unit
s, sh
ell on
ly. (C
onve
ntion
al s
ingle
store
y fra
med u
nits).
Ow
ner o
pera
ted fa
ctorie
s, low
rise,
light
weig
ht ind
ustry
OTH
ERS
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)Sc
hools
(prim
ary &
seco
ndar
y)St
uden
ts’ re
siden
ces
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re c
entre
s (dr
y spo
rts)
Gene
ral h
ospit
als -
publi
c sec
tor
Exch
ange
Rate
Use
d : U
S$1 =
325
-
410
440
-
500
365
-
510
230
-
300
255
-
295
300
-
330
595
-
695
875
- 1,
105
RM 4.
08
494
-
617
N/A
556
-
725
185
-
296
N/A
N/A
N/A
N/A
BAH
T 32
.39
334
-
605
456
-
727
N/A
372
-
643
544
-
815
638
-
908
1,465
- 1
,735
1,646
- 1
,917
B$ 1.
36
325
-
354
352
-
389
501
-
616
325
-
354
N/A
N/A
1,075
- 1
,611
N/A
IDR
13,05
5
445
-
501
598
-
677
499
-
568
457
-
678
693
-
798
750
-
895
1,200
- 1
,585
1,301
- 1
,504
PHP
50.50
CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES
(Cont’d)
CONSTRUCTION COST DATA28
CONSTRUCTION COST DATA1
DO
MES
TIC
Apar
tmen
ts, hi
gh ris
e, av
erag
e stan
dard
Apar
tmen
ts, hi
gh ris
e, hig
h end
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
OFF
ICE
/ CO
MM
ERC
IAL
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, a
vera
ge st
anda
rdRe
tail m
alls,
high e
nd
HO
TELS
Budg
et ho
tels -
3 sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
star
Luxu
ry ho
tels -
5 sta
r
MAC
AU$
HO
NG
KO
NG
^H
O C
HI M
INH
#
550
-
630
830
- 1
,000
380
-
400
500
-
525
415
-
450
520
-
550
405
-
440
565
-
610
780
-
865
1,21
5 -
1,4
401,
535
- 1
,680
US$
/m2
630
-
780
800
-
920
425
-
500
485
-
590
735
-
855
850
- 1
,160
N/A
690
-
900
1,37
0 -
1,6
70N/
A
1,72
5 -
2,0
70
3,08
0 -
3,6
204,
150
- 4
,830
4,22
0 -
4,9
205,
460
- 6
,220
3,01
0 -
3,5
803,
720
- 4
,490
3,08
0 -
3,5
90
4,08
0 -
4,8
50
3,91
0 -
4,2
304,
100
- 4
,870
4,81
0 -
5,5
80
2,22
9 -
2,7
403,
126
- 4
,770
3,82
3 -
4,5
454,
645
- 6
,040
2,57
8 -
3,3
253,
325
- 3
,636
2,42
8 -
3,6
36
3,82
3 -
4,5
83
3,38
7 -
3,8
364,
608
- 5
,504
5,50
4 -
6,5
13
IND
IA*
SING
APO
RE@ ++
1,32
5 -
1,5
102,
060
- 3
,090
1,73
0 -
1,9
502,
210
- 2
,945
1,73
0 -
1,9
501,
950
- 2
,135
1,95
0 -
2,0
60
2,06
0 -
2,2
80
2,17
0 -
2,3
902,
795
- 3
,165
2,79
5 -
3,1
65
++
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s bu
t exc
lusi
ve o
f con
tinge
ncie
s.@
Rat
es a
re n
ett o
f GS
T an
d ex
clus
ive
of c
ontig
enci
es.
+ In
clud
es ra
ised
floo
r and
cei
ling
to te
nant
ed a
reas
but
exc
lude
s of
fice
carp
ets
(nor
mal
ly u
nder
tena
nt’s
fit-o
ut)
++ O
pen
all s
ides
with
par
apet
.#
Rat
es a
re n
ett o
f VAT
and
con
tinge
ncie
s.*
Rat
es a
re b
ased
on
proj
ects
in B
anga
lore
and
are
net
t of G
ST.
Mum
bai c
osts
are
gen
eral
ly 8
% h
ighe
r.^
Offi
ces
of a
vera
ge s
tand
ard
are
built
to th
e fo
llow
ing
prov
isio
ns:
(i)
Cur
tain
wal
l/win
dow
wal
l fac
ade
(ii
) Ten
ant a
re w
ith s
cree
ded
floor
, pai
nted
wal
l and
cei
ling
Sch
ools
(prim
ary
and
seco
ndar
y) a
re o
f pub
lic a
utho
rity
stan
dard
, no
a/c
and
com
plet
e w
ith b
asic
ext
erna
l wor
ks.
$ R
ates
are
exc
lusi
ve o
f con
tinge
ncie
s an
d an
y m
anag
emen
t con
tract
fee.
(Cont’d)
CONSTRUCTION COST DATA 29
IND
UST
RIA
LInd
ustria
l unit
s, sh
ell on
ly. (C
onve
ntion
al s
ingle
store
y fra
med u
nits).
Ow
ner o
pera
ted fa
ctorie
s, low
rise,
light
weig
ht ind
ustry
OTH
ERS
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)Sc
hools
(prim
ary &
seco
ndar
y)St
uden
ts’ re
siden
ces
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re c
entre
s (dr
y spo
rts)
Gene
ral h
ospit
als -
publi
c sec
torEx
chan
ge R
ate U
sed :
US$
1 =
325
-
380
345
-
405
275
-
295
210
-
230
260
-
295
295
-
325
575
-
600
630
-
690
INR
65.00
735
-
945
N/A
945
- 1,
275
650
-
945
N/A
1,585
- 1
,730
1,985
- 2
,135
2,795
- 2
,945
S$ 1.
36
305
-
380
370
-
490
625
-
750
400
-
440
525
-
575
525
-
680
780
-
835
N/A
VND
22,60
0
N/A
2,360
- 3
,000
2,320
- 2
,880
1,450
- 1
,710
2,530
- 2
,740
2,490
- 2
,880
3,850
- 4
,360
5,000
- 5
,640
HK$ 7
.80
N/A
N/A
2,005
- 2
,964
1,108
- 1
,457
2,217
- 2
,578
1,768
- 2
,042
N/A
N/A
MOP
8.03
CONSTRUCTION COSTS FOR SELECTEDASIAN CITIES
(Cont’d)
CONSTRUCTION COST DATA30
CONSTRUCTION COST DATA1
DO
MES
TIC
Apar
tmen
ts, hi
gh ris
e, av
erag
e stan
dard
Apar
tmen
ts, hi
gh ris
e, hig
h end
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
OFF
ICE
/ CO
MM
ERC
IAL
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, a
vera
ge st
anda
rdRe
tail m
alls,
high e
nd
HO
TELS
Budg
et ho
tels -
3 sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
star
Luxu
ry ho
tels -
5 sta
r
BEIJ
ING
*SH
ENZH
EN/
GU
AN
GZH
OU
*C
HO
NG
QIN
G/
CH
ENG
DU
*
691
-
766
1,62
0 -
1,7
6946
5 -
4
9769
4 -
7
71
898
- 1
,195
1,19
5 -
1,4
92N/
A
1,27
0 -
1,6
40
985
- 1
,209
1,61
9 -
2,2
052,
205
- 2
,644
US$
/m2
541
-
648
889
- 1
,126
445
-
541
591
-
682
865
- 1
,005
1,08
9 -
1,4
7669
2 -
8
94
1,08
9 -
1,5
36
958
- 1
,189
1,83
9 -
2,3
03N/
A
529
-
585
886
-
971
402
-
442
550
-
605
773
-
855
1,06
2 -
1,1
7073
6 -
8
08
1,08
2 -
1,1
89
995
- 1
,095
1,60
5 -
1,7
682,
186
- 2
,409
638
-
701
1,54
5 -
1,7
6046
5 -
5
4370
1 -
7
80
892
- 1
,201
1,20
1 -
1,9
7368
0 -
9
09
1,23
0 -
1,6
93
1,00
6 -
1,2
401,
681
- 2
,220
2,14
2 -
2,7
55
SHA
NG
HA
I*
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, inc
lusi
ve o
f pre
limin
arie
s bu
t exc
lusi
ve o
f con
tinge
ncie
s.*
Hou
ses
are
built
to s
hell
and
core
sta
ndar
d on
ly, w
here
all
tena
nt o
r occ
upan
t are
as a
re u
nfur
nish
ed. S
choo
ls (p
rimar
y an
d se
cond
ary)
a
re o
f pub
lic a
utho
rity
stan
dard
, no
a/c
and
com
plet
e w
ith b
asic
ext
erna
l wor
ks.
CONSTRUCTION COST DATA 31
IND
UST
RIA
LInd
ustria
l unit
s, sh
ell on
ly. (C
onve
ntion
al s
ingle
store
y fra
med u
nits).
Ow
ner o
pera
ted fa
ctorie
s, low
rise,
light
weig
ht ind
ustry
OTH
ERS
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)Sc
hools
(prim
ary &
seco
ndar
y)St
uden
ts’ re
siden
ces
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re c
entre
s (dr
y spo
rts)
Gene
ral h
ospit
als -
publi
c sec
torEx
chan
ge R
ate U
sed :
US$
1 =
287
-
350
446
-
557
762
- 1,
062
392
-
546
544
-
697
388
-
543
988
- 1,
213
1,474
- 1
,912
RMB
6.60
448
-
571
N/A
N/A
309
-
386
417
-
464
N/A
N/A
N/A
RMB
6.60
505
-
556
N/A
508
-
812
364
-
400
403
-
444
262
-
294
747
-
824
N/A
RMB
6.60
281
-
343
543
-
623
777
-
854
467
-
473
541
-
699
383
-
541
927
-
934
1,218
- 1
,525
RMB
6.60
RM
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded
s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle
glaz
ed
m3 m3 m3 m3 m3 m3 kg kg m2 m2 m2 m2 m2
MAJOR RATES FOR MALAYSIA
CONSTRUCTION COST DATA32
CONSTRUCTION COST DATA1K
UA
LA
LUM
PUR
15.0
-
25.0
15.0
-
25.0
20.0
-
30.0
70.0
-
95.0
240.0
- 3
15.0
260.0
- 3
20.0
3.20
-
3.70
3.20
-
3.70
38.0
-
45.0
38.0
-
45.0
45.0
- 5
0.0
55.0
- 6
5.0
380.0
- 6
00.0
PEN
AN
G 18
.0 -
30.0
18.0
- 2
2.0 15
.0 -
30.0
80
.0 -
100.0
240.0
- 2
80.0
260.0
- 3
00.0
3.20
- 3
.803.2
0 -
3.80
38.0
- 4
5.038
.0 -
45.0
42.0
- 5
0.0
75.0
- 9
5.0
220.0
- 4
20.0
JOH
OR
BA
HR
U
16.5
- 3
5.016
.5 -
35.0
20.5
- 3
0.575
.0 -
120.0
235.0
265.0
3.70
3.70
40.0
40.0
40.0
- 5
5.0
80.0
320.0
- 4
00.0
KO
TA
KIN
AB
ALU
14.0
20.0
20.0
100.0
345.0
395.0
3.95
3.95
45.0
45.0
50.0
96.0*
250.0
- 3
50.0
KU
CH
ING
22.0
22
.0
25.0
10
5.0
36
0.0
4
00.0
3.
80
3.
80
48
.0
48
.0
50.0
100.0
360
.0
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and
th
e like
16. 2
5mm
ceme
nt an
d san
d (1:3
) pav
ing17
. 20m
m ce
ment
and s
and (
1:4) p
laster
to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(
meas
ured
sepa
ratel
y)19
. 12m
m fib
rous
plas
terbo
ard c
eiling
lining
20. T
wo co
ats of
emuls
ion pa
int to
p
laster
ed su
rface
s
Aver
age e
xpec
ted pr
elimi
narie
s
kg kg m2 m2 m2 m2 m2 %
6.50
- 8
.00
6.50
- 8
.0020
.0 -
28.0
22.0
- 2
8.0 60
.0 -
90.0
35
.0 -
45.0
4.00
- 8
.50 3
- 6
6.5
0 -
8.00
6.50
- 8
.00 18
.0 -
25.0
30.0
- 3
5.0 65
.0 -
90.0
35.0
- 5
0.0
4.00
- 6
.00 7
- 1
2
9.00
9.00
25
.0
25.0
10
0.0
62.0
10.0
10
7.50
-
9.00
7.50
-
9.00
17.0
-
23.0
18.0
-
23.0
50.0
-
70.0
35.0
- 4
5.0
3.30
-
4.50
6 -
15
7.00
- 7
.50 6.5
0 -
7.00
25.0
25.0
80.0
48.0
8.00
5 -
7 Th
e ab
ove
cost
s ar
e at
4th
Qua
rter 2
017
leve
ls, e
xclu
sive
of c
ontin
genc
ies
and
prel
imin
arie
s.*
Rat
es is
for “
Klip
lok
Col
orbo
nd” 0
.54m
m p
rofil
ed s
teel
she
etin
g.
CONSTRUCTION COST DATA 33
m3 m3 m3 m3 m3 m3 kg
kg
m2 m2 m2 m2 m2 kg kg m2
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle g
lazed
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and t
he lik
e16
. 25m
m ce
ment
and s
and (
1:3) p
aving
15
- 2
5
15 -
25
2
0 -
30
70
- 9
524
0 -
315
260
- 32
0 3
.20 -
3.70
3.20
- 3
.70 3
8 -
45
38
- 4
545
-
50
55 -
65
380
- 60
0
7.50
- 9.0
0 7
.50 -
9.00
17 -
23
KU
ALA
LUM
PUR
@
RM
120
- 1
40 14
0 -
180
110
- 1
5065
0 -
750
2,300
- 2
,500
2,500
- 2
,700
24 -
2
5 23
-
24
400
- 4
50 40
0 -
450
650
- 7
50 1,
200
7,000
50 -
6
0 50
-
60
200
- 2
40
BANG
KOK*
BAHT
BR
UN
EIB
$
3.40
2.90
2.90
42
11
5
13
0
1.
20
1.
20
15
15
16
58
16
0 -
210
3
3
8
40
75
30
50
0
1,050
1,000
12
1
2
200
19
5
250
300
1,6
50
26
26
90
JAK
AR
TA*
IDR
’000
270
30
0
160
89
0
2,940
3,780
43
44
1,000
950
N/
A
1,100
10,50
0#
125
12
5
400
MA
NIL
APH
PMAJOR RATES FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA34
CONSTRUCTION COST DATA1
m2 m2 m2 m2
%
17. 2
0mm
ceme
nt an
d san
d (1:4
) plas
ter to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(me
asur
ed se
para
tely)
19. 1
2mm
fibro
us pl
aster
boar
d ceil
ing lin
ing20
. Two
coats
of em
ulsion
paint
to p
laster
ed
sur
faces
Aver
age e
xpec
ted pr
elimi
narie
s
18
-
23 5
0 -
70
35 -
45
3.30
- 4
.50
6 -
15
220
- 26
0 1,
200
750
- 85
0
110
- 14
012
- 1
8
8
33
28
5
5 -
8
100
20
0
215$
30
8 - 1
0
360
1,6
00
1,090
390
12
- 18
The
abov
e co
st a
re b
ased
on
lum
p su
m fi
xed
pric
e co
ntra
ct ra
te e
xclu
sive
of p
relim
inar
ies
and
cont
inge
ncie
s un
less
oth
erw
ise
stat
ed.
@ R
ates
are
net
t of G
ST.
* R
ates
are
net
t of V
AT.
$ 9
mm
gyp
sum
boa
rd.
# A
lum
iniu
m w
ith a
nodi
zed
finis
h; 6
mm
thic
k.
(Cont’d)
CONSTRUCTION COST DATA 35
92,40
0
92
,400
84,70
0
28
0,900
1,696
,400
1,955
,800
18,50
0
18
,000
201,8
00
22
0,000
312,7
80
401,1
10 -
597,6
006,3
15,00
0
52,65
0
52
,650
94,00
0
m3 m3 m3 m3 m3 m3 kg
kg
m2 m2 m2 m2 m2 kg kg m2
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle g
lazed
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and t
he lik
e16
. 25m
m ce
ment
and s
and (
1:3) p
aving
190
215
N/A
4,400
5,950
7,450
67
69
675
725
1,100
1,700
6,000
120
120
475
IND
IA*
INR
HO C
HI M
INH^
VND
130
15
0
100
1,2
00
1,3
50
1,2
50
7.1
0
7.10
25
0
250
45
0
N/A
4,0
00
35
40
120
MAC
AUM
OP
220
200
300#
950
1,100
1,300
9.70
9.70
410
410
400
870
3,200
36
38
150
HONG
KO
NGHK
$MAJOR RATES FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA36
CONSTRUCTION COST DATA1
20
20
15 -
20
50
17
5 -
185
115
- 12
01.2
0 -
1.30
1.20
- 1.3
040
40
35
-
40
43
29
0
4.00
- 4.5
04.0
0 -
4.50
21
SING
APO
RE@
S$
+
150
45
0
650
200
1
0
155
400
600
75
10 -
15
m2 m2 m2 m2
%
17. 2
0mm
ceme
nt an
d san
d (1:4
) plas
ter to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(m
easu
red s
epar
ately)
19. 1
2mm
fibro
us pl
aster
boar
d ceil
ing lin
ing20
. Two
coats
of em
ulsion
paint
to p
laster
edsu
rface
sAv
erag
e exp
ected
preli
mina
ries
39
0
1,7
00
1,350
240
8
- 12
The
abov
e co
sts
are
base
d on
lum
p su
m fi
xed
pric
e co
ntra
ct ra
te e
xclu
sive
of p
relim
inar
ies
and
cont
inge
ncie
s un
less
oth
erw
ise
stat
ed.
@ R
ates
are
net
t of G
ST.
+ R
ate
for l
ean
conc
rete
blin
ding
.^
Rat
es a
re n
ett o
f VAT
.*
Rat
es a
re s
uppl
y &
fix
base
d on
pro
ject
s in
Ban
galo
re a
nd a
re n
ett o
f GS
T. M
umba
i cos
ts a
re g
ener
ally
8%
hig
her.
# R
ates
incl
udin
g du
mpi
ng c
harg
es.
(Cont’d)
CONSTRUCTION COST DATA 37
22
74
30
3.50
- 4
.00
12 -
15
144,0
00
67
4,180
205,9
20
88,90
0
8
- 12
m3 m3 m3 m3 m3 m3 kg
kg
m2 m2 m2 m2 m2 kg kg m2
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle g
lazed
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and t
he lik
e16
. 25m
m ce
ment
and s
and (
1:3) p
aving
30
30
1
30
18
0
45
0
48
5
5.2
0
5.2
0
85
85
85
*
N/A
700
9.50
8.50
30
SHAN
GHA
IRM
B
22
26
67
16
0
32
0
36
0
5.2
0
5.2
0
60
60
70
N/A
650+
11.10
11.10
25
CHO
NGQ
ING
/CH
ENG
DURM
B
SHEN
ZHEN
/G
UANG
ZHO
URM
B 32
26
80 -
100
190
47
0
500
5.5
0
5.50
85
85
75
N/A
65
0
11.00
9.00
32
MAJOR RATES FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA38
CONSTRUCTION COST DATA126
31
37
170
410
480
4.90
4.90
85
73
72
N/A
815+
9.35
8.50
27
BEI
JIN
GR
MB
28
14
0
162
32
7 -
10
m2 m2 m2 m2
%
17. 2
0mm
ceme
nt an
d san
d (1:4
) plas
ter to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(me
asur
ed se
para
tely)
19. 1
2mm
fibro
us pl
aster
boar
d ceil
ing lin
ing20
. Two
coats
of em
ulsion
paint
to p
laster
ed
sur
faces
Aver
age e
xpec
ted pr
elimi
narie
s
30
155
150
40
5 -
10
30
15
5
190
35
5 -
10
35
13
0
150
35
5
- 1
0
The
abov
e co
sts
are
base
d on
lum
p su
m fi
xed
pric
e co
ntra
ct ra
te e
xclu
sive
of p
relim
inar
ies
and
cont
inge
ncie
s un
less
oth
erw
ise
stat
ed.
* R
ate
for 1
20m
m th
ick
conc
rete
blo
ck w
alls
.+
Rat
e fo
r dou
ble
glaz
ed w
indo
w.
CONSTRUCTION COST DATA 39
ACMV COSTS FOR VARIOUS DESIGNS & DEVELOPMENTS IN KUALA LUMPURACMV : Air Conditioning & Mechanical Ventilation System
310
100
350
190
60
280 278
391
190
450
280
90
450
400
0
100
200
300
400
500
Hos
pita
l
Aca
dem
icIn
stitu
tion
Offi
ce
Res
iden
tial
Fact
ory
Hot
el
Com
mer
cial
Com
plex
RM/m2 of Construction Floor Area
210
260
360
250
350
400
0
100
200
300
400
500
Central Variable Air Volume
Central Constant Air Volume
Central VariableRefrigerant Volume
RM/m2 of Construction Floor Area
CONSTRUCTION COST DATA40
CONSTRUCTION COST DATA1
RM/Tonne of Refrigeration
4000
5200
6650
4500
6000
7400
0
2000
4000
6000
8000
Central Variable Air Volume
Central Constant Air Volume
Central VariableRefrigerant Volume
RM/Tonne of Refrigeration
62006600
1200
4600
1300
65007500
7500
8500
2000
5000
2000
76008400
0
2500
5000
7500
10000
Hos
pita
l
Aca
dem
icIn
stitu
tion
Offi
ce
Res
iden
tial
Fact
ory
Hot
el
Com
mer
cial
Com
plex
CONSTRUCTION COST DATA 41
MEC
HA
NIC
AL
SER
VIC
ESOf
fices
Indus
trial*
Hotel
sSh
oppin
g Cen
tres
Apar
tmen
tsEL
ECTR
ICA
L SE
RVI
CES
Offic
esInd
ustria
l**Ho
tels
Shop
ping C
entre
sAp
artm
ents
HYD
RA
ULI
C S
ERVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
355
- 5
15
85 -
190
300
- 5
80 3
15 -
505
195
- 2
85
310
- 5
10 14
5 -
190
285
- 5
9531
0 -
495
105
- 2
20 30
-
60 40
-
5018
0 -
250
30 -
35
20 -
50
KU
ALA
LUM
PUR
^
RM
/m2
4,200
- 4
,700
1,550
- 1
,600
4,600
- 5
,100
4,200
- 4
,700
4,200
- 4
,500
3,400
- 3
,800
1,950
- 2
,200
3,800
- 4
,500
2,800
- 3
,200
2,800
- 3
,350
780
-
900
750
-
790
1,400
- 1
,650
790
-
950
1,200
- 1
,400
BANG
KOK@
BAHT
/m2
178
- 2
2023
-
3828
3 -
326
201
- 2
3920
8 -
239
226
- 2
8318
8 -
226
283
- 3
6936
9 -
308
244
- 3
08
16 -
38
11 -
19
59 -
81
12 -
40
37 -
58
BR
UN
EIB
$/m
2
981
- 1,
154
301
-
710
976
- 1,
313
863
- 1,
037
873
- 1
,226
792
- 1,
057
449
-
700
797
- 1,
124
690
-
868
838
- 1
,062
199
-
281
112
-
204
797
- 1,
124
189
-
291
848
- 1
,144
JAK
AR
TA#
IDR
’000
/m2
3,000
- 5
,200
700
- 1
,500
3,5
00 -
7,20
02,5
00 -
5,00
070
0 -
3,60
0
3,300
- 7
,000
2,000
- 3
,500
4,700
-10
,000
3,600
- 6
,000
3,600
- 6
,300
900
- 2,
200
700
- 1,
300
1,950
- 4
,300
700
- 1,
600
1,800
- 3
,000
MA
NIL
A$
PHP/
m2
M&E COSTS FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA42
CONSTRUCTION COST DATA1
FIR
E SE
RVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
LIFT
S / E
SCA
LATO
RS
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
60 -
80
45
-
65 6
5 -
95
65
-
8520
-
30
95 -
395
55 -
190
85 -
365
85 -
110
65 -
105
780
-
850
730
-
750
780
-
890
780
-
820
720
-
850
1,100
- 1
,350
N/A
1,100
- 1
,400
250
-
450
500
-
580
31 -
38
12 -
19
25 -
48
31 -
64
25 -
50
9 -
31
4 -
19
12 -
44
12 -
35
11 -
25
271
-
398
112
-
204
271
-
393
266
-
312
281
-
327
424
- 1,
134
N/A
414
- 1,
052
312
-
838
414
-
853
800
- 1,
300
750
- 2,
000
70
0 -
1,20
070
0 -
1,30
080
0 -
1,30
0
1,600
- 3
,600
0 -
40
01,8
00 -
3,40
080
0 -
2,30
085
0 -
2,20
0Th
e ab
ove
cost
s ar
e at
4th
Qua
rter 2
017
leve
ls, e
xclu
sive
of c
ontin
genc
ies
unle
ss o
ther
wis
e st
ated
.*
Gen
eral
ly w
ithou
t air
cond
ition
.**
Exc
lude
s sp
ecia
l pow
er s
uppl
y.^
Rat
es a
re n
ett o
f GS
T.@
Bas
ed u
pon
nett
encl
osed
are
a an
d ne
tt of
VAT
.#
All
rate
s ar
e ne
tt of
VAT
. Rat
es fo
r Ele
ctric
al S
ervi
ces
are
excl
udin
g ge
nset
. Rat
es fo
r Hyd
raul
ic S
ervi
ces
are
exc
ludi
ng S
TP.
R
ates
for M
echa
nica
l Ser
vice
s re
fers
to A
CM
V R
ates
onl
y.$
Tra
nsfo
rmer
incl
uded
in E
lect
rical
Ser
vice
s.
(Cont’d)
CONSTRUCTION COST DATA 43
2,000
- 2
,800
20
0 -
30
0 2,
200
- 2,
750
2,30
0 -
2,85
085
0 -
1,75
0
1,750
- 2
,500
650
-
900
1,900
- 2
,600
1,900
- 2
,500
1,10
0 -
1,75
0 70
0 -
90
050
0 -
70
02,0
00 -
3,00
070
0 -
90
01,5
00 -
2,40
0
HO
NG
KO
NG
HK
$/m
2
N/A
N/A
2,60
0 -
3,00
0 2
,200
- 2,
800
900
- 1,
100
N/A
N/A
2,600
- 3
,100
2,600
- 2
,800
1,000
- 1
,300
N/A
N/A
1,800
- 2
,200
600
-
800
1,500
- 2
,000
MA
CA
UM
OP/
m2
MEC
HA
NIC
AL
SER
VIC
ESOf
fices
Indus
trial*
Hotel
sSh
oppin
g Cen
tres
Apar
tmen
tsEL
ECTR
ICA
L SE
RVI
CES
Offic
esInd
ustria
l**Ho
tels
Shop
ping C
entre
sAp
artm
ents
HYD
RA
ULI
C S
ERVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
4,585
- 6
,500
2,110
- 3
,750
5,615
- 6
,130
4,380
- 5
,735
2500
- 3
,100
4,050
- 5
,575
2,390
- 3
,965
4,500
- 6
,135
3,870
- 5
,175
1,950
- 2
,680
710
- 1,
080
485
-
850
3,695
- 5
,565
1,050
- 1
,900
1,665
- 2
,300
INDI
A#IN
R/m
2
1,885
- 2
,687
N/A
N/A
N/A
1,423
- 1
,950
2,136
- 2
,547
N/A
N/A
N/A
1,884
- 2
,379
306
-
572
N/A
N/A
N/A
596
-
693
HO
CH
I MIN
HVN
D(’0
00)/m
2
153
- 2
49
34 -
117
129
- 2
78 1
47 -
246
90 -
170
158
- 2
58 55
- 1
3618
1 -
356
160
- 3
04 97
- 2
28 26
-
5518
-
3691
- 1
7246
-
8072
- 1
41
SING
APO
RE^
S$/m
2
M&E COSTS FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA44
CONSTRUCTION COST DATA1
550
-
700
400
-
500
600
-
850
550
-
700
200
-
450
700
- 1,
200
550
-
750
550
-
850
850
- 1,
000
450
-
850
N/A
N/A
900
- 1
,100
600
-
800
250
-
300
N/A
N/A
600
-
800
450
-
700
450
-
600
FIR
E SE
RVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
LIFT
S / E
SCA
LATO
RS
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
1,130
- 1
,475
540
-
710
1,315
- 1
,680
1,080
- 1
,250
600
-
715
940
- 1,
195
610
-
785
1,365
- 1
,990
1,600
- 2
,050
850
- 1,
100
664
- 1,
101
N/A
N/A
N/A
456
-
572
635
- 1,
212
N/A
N/A
1,293
- 1
,830
721
- 1,
044
33 -
56
23
-
51 2
8 -
57
37 -
56
25 -
50
63 -
162
41 -
104
49 -
108
56 -
90
41
- 1
13
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, exc
lusi
ve o
f con
tinge
ncie
s un
less
oth
erw
ise
stat
ed.
*G
ener
ally
with
out a
ir co
nditi
on.
** E
xclu
des
spec
ial p
ower
sup
ply.
^ R
ates
are
net
t of G
ST
and
excl
udin
g B
AS
.#
Rat
es a
re b
ased
on
proj
ects
in B
anga
lore
and
are
net
t of G
ST.
Mum
bai c
osts
are
gen
eral
ly 8
% h
ighe
r.
(Cont’d)
CONSTRUCTION COST DATA 45
MEC
HA
NIC
AL
SER
VIC
ESOf
fices
Indus
trial*
Hotel
sSh
oppin
g Cen
tres
Apar
tmen
tsEL
ECTR
ICA
L SE
RVI
CES
Offic
esInd
ustria
l**Ho
tels
Shop
ping C
entre
sAp
artm
ents
HYD
RA
ULI
C S
ERVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
776
- 9
85
176
- 2
95 9
90 -
1,29
0 1
,050
- 1,10
331
5 -
415
605 -
66
4 31
1 -
440
664
- 8
4753
0 -
664
257
-
375
110
- 1
63 89
-
131
368
- 4
8813
7 -
184
168
- 2
26
SHA
NG
HA
IR
MB
/m2
760
- 1,05
0
150
- 2
80 1
,080 -
1,35
0 7
00 -
96
015
0 -
400
530
- 7
80 31
0 -
450
700
- 10
0049
0 -
680
280
-
500
125
- 1
80 86
-
120
390
- 5
0011
0 -
165
145
- 2
80
SHEN
ZHEN
/G
UA
NG
ZHO
URM
B/m
2
690
- 9
90
140
- 2
30 7
30 -
1,18
0 5
90 -
99
011
0 -
300
430
- 6
60 26
0 -
360
520
- 7
7041
0 -
660
230
-
340
60 -
12
0 60
-
120
280
- 3
5060
-
120
100
- 1
80
CH
ON
GQ
ING
/C
HEN
GD
UR
MB
/m2
M&E COSTS FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA46
CONSTRUCTION COST DATA1
760
- 1,0
50 17
0 -
280
950
- 1,2
0079
0 -
950
140
-
450
460
- 7
03 32
0 -
450
705
- 9
4348
1 -
676
253
- 3
98 95
-
140
95 -
14
0 37
0 -
480
140
- 2
00 1
70 -
23
0
BEI
JIN
GR
MB
/m2
FIR
E SE
RVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
LIFT
S / E
SCA
LATO
RS
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
225
- 3
15 15
3 -
255
285
- 3
8525
5 -
380
53
- 1
02 28
0 -
550
135
- 3
9022
0 -
495
325
- 4
9516
5 -
325
225
- 3
50 14
0 -
270
280
- 4
2024
5 -
375
70 -
15
0 29
5 -
500
150
- 4
4025
0 -
470
325
- 4
7012
5 -
300
200
- 2
60 13
0 -
230
200
- 3
2025
0 -
350
60 -
11
0 34
0 -
590
150
- 3
5029
0 -
490
290
- 4
4014
0 -
240
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
7 le
vels
, exc
lusi
ve o
f con
tinge
ncie
s un
less
oth
erw
ise
stat
ed.
* G
ener
ally
with
out a
ir co
nditi
on.
**
Exc
lude
s sp
ecia
l pow
er s
uppl
y.
CONSTRUCTION COST DATA 47
180
- 2
6515
0 -
225
220
- 3
7522
0 -
375
70
- 1
35
294
- 5
77 1
45 -
40
0 23
2 -
520
327
- 5
20 1
75 -
28
9
UNIT RM
per set 46,600
per room 15,200
per room 18,000
per hole 2,550,000
per set 275,000
DESCRIPTION PLAYGROUND EQUIPMENTOutdoor playground equipment comprising various activities and safety matAge group: 4 to 12Child Capacity: 15 - 20* Price varies according to equipment and design.
SAUNASSauna room complete with timber finishes (Finland Spruce), stainless steel heater with built-in control panel and all accessoriesSize: 8’ x 8’ x 7’6”
STEAM BATHSSteam bath complete with steam generator, aluminium framed glass door, ceramic wall tiles, water proofing system, lighting and all accessoriesSize: 8’ x 8’ x 7’6”
GOLF COURSES(Based on “Average Cost Model” of an 18 hole golf course in Asia). Including fairway construction and rough hydro seeding.
GOLF SIMULATORComplete golf simulation system complete with projector, high impact projection screen, artificial grass putting turf, putting green
UNIT COSTS FOR ANCILLARY FACILITIESFOR KUALA LUMPUR
CONSTRUCTION COST DATA48
CONSTRUCTION COST DATA1
UNIT RM
per court 59,300
per court 60,000
per pool 820,000
per pool 172,500
per pool 241,500
per pool 1,202,000
per pool 287,500
per pool 345,000
DESCRIPTION SQUASH COURTSSingle court with glass back wall including associated mechanical and electrical services but excluding any public facilities (enclosing structure not included)
TENNIS COURTSSingle court on grade with acrylic surfacing complete excluding chain link fence
SWIMMING POOLSSize: 25m x 10.5mDepth: approx. 1.2m to 1.8mOutdoor swimming pool built on ground, fully tiled, completed with 5m wide deck and associated equipment
Extra for heating equipment (solar)
Extra for ozone system
Size: 25m x 10.5mDepth: approx. 1.8m to 3.0mIndoor swimming pool built with suspended structure (enclosing structure not included) fully tiled and completed with 5m wide deck, including mechanical ventilation and associated equipment
Extra for heating equipment (solar)
Extra for ozone system
CONSTRUCTION COST DATA 49
RM/m2
2,360 - 3,3303,110 - 4,0503,990 - above
1,180 - 1,7401,620 - 2,6702,540 - above
460 - 630620 - 1,050
1,030 - above
2,370 - 3,7005,380 - above
DESCRIPTION
HOTELSPublic Area (Front of House):3 - star Hotel4 - star Hotel5 - star HotelGuest Rooms:3 - star Hotel4 - star Hotel5 - star HotelNotes:1. Includes furniture, floor, wall and ceiling finishes, drapery,
sanitary fittings and light fittings.2. Excludes partitioning, M&E works, chandelier, building shell,
operational items and equipment (e.g. bed, cutlery, crockery, linen, television, refrigerator etc.), opening expenses, stage equipment and computer systems.
OFFICESGeneral OfficeExecutive OfficePrestige OfficeNotes:1. Local furniture allowed for general offices.2. Includes furniture, partitioning, minor alteration to fire services,
air-conditioning and suspended ceiling to suit layout.3. Excludes telephones, Local Area Network, office equipment
(e.g. computers, photocopies, fax machines,UPS, etc).
RESTAURANTSGeneral dining restaurantFine dining restaurantNotes:1. Includes furniture, floor, wall and ceiling finishes, minor
alteration to air-conditioning and fire services installation to suit layout, exhaust for kitchen but excludes exhaust flue, operational items (e.g. cutlery, crockery, linen, utensils, etc.).
FIT-OUT COSTS FOR KUALA LUMPUR
CONSTRUCTION COST DATA50
CONSTRUCTION COST DATA1
2GENERAL CONSTRUCTION DATA
JUBM - Arcadis Building WorksComposite Tender Price Index (BWCTPI)
JKR Tender Price Index
Value of Construction Work Done byType of Construction Activity
Performance of Construction Sector
Estimating Rules of Thumb
Technical Specifications
Average Unit Prices
Unit Price Index
Construction Sector Indicators
Commodities Price Trend (Jan to Nov 2017)
Malaysia Construction Sector - Employment & GDP
Progress Payments
JUBM - ARCADIS BUILDING WORKSCOMPOSITE TENDER PRICE INDEX (BWCTPI)
Bas
e Ye
ar =
200
0
Sou
rce:
JU
BM
& A
rcad
is
GENERAL CONSTRUCTION DATA52
GENERAL CONSTRUCTION DATA2Te
nder
Pric
e In
dex
166.
8
100.
0
110.
0
120.
0
130.
0
140.
0
150.
0
160.
0
170.
0
180.
0
190.
0
200.
0
Q1 2011
Q2 2011
Q3 2011
Q4 2011
Q1 2012
Q2 2012
Q3 2012
Q4 2012
Q1 2013
Q2 2013
Q3 2013
Q4 2013
Q1 2014
Q2 2014
Q3 2014
Q4 2014
Q1 2015
Q2 2015
Q3 2015
Q4 2015
Q1 2016
Q2 2016
Q3 2016
Q4 2016
Q1 2017
Q2 2017
Q3 2017
Q4 2017
1H 2018 (F)
165.
1
167.
8
164.
7
163.
1
163.
3
163.
9 16
9.8
166.
416
3.5
166.
5 16
9.5
175.
8
174.
9
173.
3
171.
5
172.
0
170.
3
169.
4
167.
6
154.
9
154.
3
152.
5
150.
8
149.
1
149.
9
146.
3
146.
0
143.
2
JKR TENDER PRICE INDEX
Bas
e Ye
ar =
198
0S
ourc
e: C
ontra
ct a
nd Q
uant
ity S
urve
y B
ranc
h, P
ublic
Wor
ks D
epar
tmen
t (JK
R),
Mal
aysi
a
Year
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
TEN
DER
PR
ICE
IND
EX
1/2 393.6
441
5.44
441.6
842
7.14
410.1
840
8.49
420.4
941
5.24
446.0
346
1.82
477.1
5
2/2 412.6
242
6.13
458.7
644
6.03
398.5
941
1.36
429.3
243
7.35
453.9
946
9.54
484.6
9050100
150
200
250
300
350
400
450
500
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
Tend
er P
rice
Inde
x
GENERAL CONSTRUCTION DATA 53
VALUE OF CONSTRUCTION WORK DONE BYTYPE OF CONSTRUCTION ACTIVITY
Qua
rter
/ Y
ear
RM
mill
ion
(%)
Res
iden
tial
Bui
ldin
gsN
on-r
esid
entia
lB
uild
ings
Civ
ilEn
gine
erin
g(%
)(%
)
Spec
ial T
rade (%
)
Tota
l
(%)
RM
mill
ion
RM
mill
ion
RM
mill
ion
RM
mill
ion
Q1/20
13Q2
/2013
Q3/20
13Q4
/2013
Q1/20
14Q2
/2014
Q3/20
14Q4
/2014
Q1/20
15Q2
/2015
Q3/20
15Q4
/2015
Q1/20
16Q2
/2016
Q3/20
16Q4
/2016
Q1/20
17Q2
/2017
Q3/20
17
5,413
6,484
6,253
6,813
7,202
7,657
7,598
8,059
8,606
8,253
8,227
8,760
9,331
9,283
9,579
9,615
10,22
09,6
399,7
29
26.3
28.5
27.4
27.6
28.8
30.4
30.0
29.7
29.9
30.3
28.5
29.1
29.2
30.5
30.0
29.5
29.2
28.5
28.2
6,714
7,123
7,869
7,598
8,052
8,157
8,724
9,382
10,00
69,4
189,9
379,7
19
10,38
29,6
159,8
019,9
64
10,81
710
,546
10,08
0
32.6
31.4
34.4
30.8
32.2
32.4
34.5
34.6
34.8
34.6
34.5
32.3
32.5
31.6
30.7
30.6
30.9
31.2
29.2
7,603
8,025
7,667
9,006
8,399
8,167
7,838
8,285
8,753
8,288
9,330
10,21
7
10,61
510
,075
11,13
311
,495
12,31
412
,018
13,14
2
36.9
35.3
33.6
36.5
33.6
32.4
31.0
30.6
30.5
30.4
32.4
33.9
33.2
33.1
34.9
35.3
35.1
35.5
38.1
884
1,086
1,062
1,275
1,320
1,192
1,141
1,373
1,376
1,280
1,340
1,433
1,613
1,453
1,397
1,486
1,702
1,622
1,544
4.3 4.8 4.6 5.1 5.3 4.7 4.5 5.1 4.8 4.7 4.6 4.8 5.1 4.8 4.4 4.6 4.9 4.8 4.5
20,61
322
,717
22,85
224
,692
24,97
325
,173
25,30
127
,099
28,74
127
,239
28,83
430
,129
31,94
130
,427
31,91
032
,560
35,05
333
,825
34,49
5
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
Sou
rce:
Qua
rterly
Con
stru
ctio
n S
tatis
tics,
Dep
artm
ent o
f Sta
tistic
s M
alay
sia
GENERAL CONSTRUCTION DATA54
GENERAL CONSTRUCTION DATA2
PERFORMANCE OF THE CONSTRUCTION SECTOR
Sou
rce:
Qua
rterly
Con
stru
ctio
n S
tatis
tics,
Dep
artm
ent o
f Sta
tistic
s M
alay
sia
No. o
fPr
oject
Value
ofCo
nstru
ction
Do
ne (R
M’00
0)
Perce
ntage
Ch
ange
(%)
(QoQ
)(Y
oY)
2015 2016 2017Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
9,982
10,07
49,8
8310
,230
10,04
39,9
839,7
259,7
919,5
729,4
058,8
44
28,74
0,794
27,23
9,139
28,83
4,152
30,12
8,938
31,94
1,170
30,42
7,274
31,90
9,993
32,55
9,568
35,05
3,464
33,82
5,084
34,49
5,002
6.1 -5.2 5.9 4.5 6.0 - 4.7 4.9 2.0 7.7 -3.5 2.0
15.1 8.2 14.0
11.2
11.1
11.7
10.7 8.1 9.7 11.2 8.1
-10-505
10
15
20
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
20
152
016
20
17
Perc
enta
ge C
hang
e (%
)(Q
oQ)
Perc
enta
ge C
hang
e (%
)(Y
oY)
(%)
GENERAL CONSTRUCTION DATA 55
ESTIMATING RULES OF THUMB
Composition of Concrete (per m3)
Mix Cement Sand Aggregate 1:3:6 216kg 0.45m3 0.90m3
1:2:4 308kg 0.43m3 0.86m3
1:1:2 540kg 0.38m3 0.75m3
Weight of Concrete Items
Item WeightConcrete 2,400 kg/m3
Cement 1,441 kg/m3
Sand 1,600 kg/m3
Aggregate 1,350 kg/m3
Steel 7,843 kg/m3
Average Loads VolumeLorry 10.0 m3
Concrete truck (24 ton) 5.5 m3
Barge 200 - 1,450 m3
Dimensions for Standard Parking Space, Loading/Unloading Bays and Lay-bys
Minimum Length Width HeadroomPrivate Cars, Taxis 5 m 2.5 m 2.4 mand Light VansCoaches and Buses 12 m 3.0 m 3.8 mLorries 11 m 3.5 m 4.1 mContainer Vehicles 16 m 3.5 m 4.5 m
Minimum headroom means the clearance between thefloor and the lower most projection from the ceilingincluding any lighting units, ventilation duct, conduitsor similar.
GENERAL CONSTRUCTION DATA56
GENERAL CONSTRUCTION DATA2
Structure Design - Concrete Ratios
The following is a range of concrete ratios for buildingsuperstructure design:
Concrete/floor area 0.3 m3/m2 to 0.6 m3/m2
Formwork/floor area 2.2 m2/m2 to 3.0 m2/m2
Reinforcement/concrete vol. 160 kg/m3 to 250 kg/m3
Average External Wall/Floor Ratio
Residential Apartments 1.0 m2/m2
Office, Hotel 0.4 m2/m2
Industrial 0.4 m2/m2
Average Internal Wall/Floor Ratio
Residential Apartments 1.0 m2/m2
Office 0.5 m2/m2
Hotel 1.5 m2/m2
Air - Conditioning
Average 0.05 tonne/m2 of floor area
The above ratios are indicative and for reference purposesonly. They do not account for buildings with special shapes,configurations or particular small foot prints.
Indicative Dimensions for Sports Grounds
Length Width Tennis Court 40 m 20 m Squash Court 13 m 6 m Basketball Court 38 m 23 m Volleyball Court 30 m 20 m Badminton Court 20 m 10 m Rink 61 m 26 m Soccer Playing Feld 110 - 120 m 70 - 80 mFutsal 25 - 42 m 15 - 25 m
The above dimensions are for a single court with appropriateclearance. No spectator seating or support area has beenallowed.
GENERAL CONSTRUCTION DATA 57
TECHNICAL SPECIFICATIONS Table for Standard BRC Fabrics
A 10
A 9
A 8
A 7
A 6/5
A 5
A 4
BR
CR
ef.
No.
BS
4483
or S
S-32
Ref
No.
Size
mm
Spac
ing
mm
Size
mm
Spac
ing
mm
Mai
nm
m2 /m
Cro
ssm
m2 /m
Mas
s Pe
rU
nit A
rea
Kg/
m2
Mai
n W
ireC
ross
Wire
Cro
ss-S
ectio
nal A
rea
A 39
3
- A
252
A 19
3
-A
142
A 98
-
10.0 9.0 8.0 7.0 6.5 6.0 5.0 4.0
200
200
200
200
200
200
200
200
10.0 9.0 8.0 7.0 6.5 6.0 5.0 4.0
200
200
200
200
200
200
200
200
393
318
252
193
166
142 98 63
393
318
252
193
166
142 98 63
6.16
4.99
3.95
3.02
2.61
2.22
1.54
0.99
SQU
AR
E M
ESH
ES
B 12
B 10
B 9
B 8
B 7
B 6
B 5
C 10
C 9
C 8
C 7
C 6
C 5
B 11
31B
385
-
B 50
3B
385
B 28
3B
196
C 78
5C
636
C 50
3C
385
C 28
3
-
12.0
10.0 9.0 8.0 7.0 6.0 5.0 10.0 9.0 8.0 7.0 6.0 5.0
100
100
100
100
100
100
100
100
100
100
100
100
100
8.0 8.0 8.0 8.0 7.0 7.0 7.0 6.0 6.0 5.0 5.0 5.0 5.0
200
200
200
200
200
200
200
400
400
400
400
400
400
1,131 785
636
503
385
283
196
785
636
503
385
283
196
252
252
252
252
193
193
193 71 71 49 49 49 49
10.90 8.1
46.9
75.9
34.5
33.7
33.0
5
6.72
5.55
4.34
3.41
2.61
1.93
REC
TAN
GU
LAR
MES
HES
STA
ND
AR
D S
IZES
Shee
ts
(all R
ef. N
o’s)
Leng
th : 6
.0 me
tres
Widt
h : 2
.2 me
tres
Rol
ls
(Ref.
No’s
: A4,
A5, A
6, A6
/5 on
ly)Le
ngth
: 40.0
metr
esW
idth
: 2.0
metre
s
GENERAL CONSTRUCTION DATA58
GENERAL CONSTRUCTION DATA2
Weight Tables for Mild Steel Round Bar & High Tensile Deformed Bar
* High Yield Deformed Bar Standard Length : 12 metres straight.* Mild Steel Round Bar Standard Length : 12 metres straight or 12 metres once folded.* Special cut length can be produced from 6m to 15m on a certain min. quality per size per order upon request.
No. of Pcs.12m LengthPer Bundle
WeightPer Bundle
(MT)High YieldDeformed
Mild SteelRound
Std. Size (mm)
3762101681389654342822181412109
1.0020.9951.0061.0201.0231.0231.0061.0031.0171.0441.0611.0881.0681.065
D 6D 8D 9D 10D 12D 16D 20D 22D 25D 28D 32D 35D 38D 40
Ø 6Ø 8Ø 9Ø 10Ø 12Ø 16Ø 20Ø 22Ø 25Ø 28Ø 32Ø 35Ø 38 -
28.350.363.678.5
113.1201.1314.2380.1490.9615.8804.2962.1
1,134.11,256.6
CrossSectional Area (mm2)
UnitWeight(kg/m)
0.2220.3950.4990.6160.8881.5792.4662.9843.8544.8346.3137.5538.9039.864
GENERAL CONSTRUCTION DATA 59
AVERAGE UNIT PRICES
Regio
n: A
= Ce
ntral
Penin
sular
Mala
ysia;
B =
Kota
Kina
balu;
C =
Kuc
hing
Dece
mber
rates
are n
ot av
ailab
le at
time o
f prin
ting.
Sour
ce: S
pecia
l Rele
ase 1
, For
Civi
l Eng
ineer
ing W
orks
, Dep
artm
ent o
f Stat
istics
, Mala
ysia.
2017 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2.17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2.31
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
AC
B
80/1
00 P
enet
ratio
n
AC
BA
CB
Riv
er S
and
AC
B
Ord
inar
y Po
rtla
nd
AC
B
Cem
ent
RM
/50
kg B
ag
Regio
n
Sand
RM
/Met
ric T
onA
utom
ativ
e G
as O
ilR
M/L
itre
Bitu
men
RM
/Met
ric T
onFu
el O
ilR
M/L
itre
Die
sel R
etai
l Pric
eM
ediu
m
1750
.0017
20.00
1720
.0017
20.00
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2,180
.0 1,9
00.0
1,845
.0 1,8
75.0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2.05
2.15
2.20
2.14
2.02
1.92
1.93
2.01
2.09
2.13
2.21
2.05
2.15
2.20
2.14
2.02
1.92
1.93
2.01
2.09
2.13
2.21
2.05
2.15
2.20
2.14
2.02
1.92
1.93
2.01
2.09
2.13
2.21
48.28
48.28
48.28
47.10
47.10
47.10
47.10
47.58
48.01
48.01
48.01
36.66
36.66
36.66
47.04
47.04
47.04
65.21
65.21
65.21
65.21
65.21
39.00
39.00
39.00
39.00
39.00
39.00
39.00
39.00
39.00
39.00
39.00
19.06
19.30
19.30
19.30
19.04
19.04
18.66
18.49
18.33
18.33
18.18
18.89
18.89
18.89
18.89
17.97
17.97
17.97
17.97
17.97
17.97
17.97
20.06
20.06
20.06
20.06
20.06
20.06
20.06
19.72
19.72
19.73
19.73
GENERAL CONSTRUCTION DATA60
GENERAL CONSTRUCTION DATA2
Regio
n: A
= Ce
ntral
Penin
sular
Mala
ysia;
B =
Kota
Kina
balu;
C =
Kuc
hing
Dece
mber
rates
are n
ot av
ailab
le at
time o
f prin
ting.
Sour
ce: S
pecia
l Rele
ase 1
, For
Civi
l Eng
ineer
ing W
orks
, Dep
artm
ent o
f Stat
istics
, Mala
ysia.
GENERAL CONSTRUCTION DATA 61
2017 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Agg
rega
tes
Gra
nite
10m
m (3
/ 8” )
RM
/Met
ric T
on
AC
B
Gra
nite
20m
m (3
/ 4” )
AC
B
Gra
nite
40m
m (1
1 /2” )
AC
B
Cru
sher
run
AC
BRe
gion
41.65
41
.65
41.65
40
.44
35.48
35
.48
35.48
35
.48
35.48
35
.48
35.48
29.97
29.97
29.97
29.97
29.97
29
.97
29.97
29
.9729
.9729
.9729
.97
33.89
35
.41
35.38
35
.64
35.64
35
.58
35.79
35
.48
35.66
35
.66
35.48
62.83
62.83
62.83
65.19
65.19
65.19
65.19
65.19
65.19
65.19
65.19
32.20
32.20
32.20
33.63
33.63
33.63
33.63
33.63
33.63
33.63
33.63
31.33
33
.02
33.02
32
.02
32.02
32
.02
32.02
32
.0233
.23
33.23
33.23
48.70
48
.70
46.00
43
.30
43.30
43
.30
43.30
43
.30
43.30
40
.94
38.58
31.15
31.15
31.15
29.60
29.60
27.50
27.50
27.50
27.50
27.50
27.50
24.86
25
.77
26.67
26
.73
26.73
26
.59
27.11
27
.11
27.24
26
.97
26.97
39.13
39.13
38.26
37.83
36.61
36.61
35.38
35.38
35.38
35.38
35.38
24.79
24.79
25.60
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
31.84
33
.18
33.18
33
.18
32.79
32
.79
32.87
32
.87
32.97
32
.97
32.87
UNIT PRICE INDEX
Note:
July
2012
= 10
0
U
nit P
rice I
ndex
abov
e are
appli
cable
for W
ilaya
h Per
seku
tuan K
uala
Lump
ur, M
elaka
, Neg
eri S
embil
an an
d Sela
ngor
Reg
ion.
Dec
embe
r rate
s are
not a
vaila
ble at
time o
f prin
ting.
Sour
ce: S
pecia
l Rele
ase 2
, For
Buil
ding a
nd S
tructu
ral W
orks
, Dep
artm
ent o
f Stat
istics
, Mala
ysia.
2017
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Bricks & Wall
CeilingMaterials
Glass
Roofing Materials
Plywood
Timber
SanitaryFittings
Plumbing Materials
Floor & Wall Tiles
Steel & Metal Sections
Paints
103.9
10
3.9
103.9
10
4.1
104.1
10
2.7
101.9
10
1.8
101.8
10
1.8
101.9
115.9
11
5.9
115.9
11
5.9
115.9
11
5.9
115.9
11
5.9
115.9
11
5.9
115.9
108.6
10
8.6
108.6
10
8.6
108.6
10
8.6
108.6
10
8.410
8.610
8.610
8.6
107.4
10
7.4
107.4
10
7.4
107.5
10
7.0
107.3
10
9.710
9.911
1.211
1.2
122.2
12
2.2
122.2
12
2.2
122.8
12
2.6
122.6
12
0.1
115.7
11
3.3
113.4
85.6
85.6
85.6
85.6
85.6
85.6
85.6
83.0
83.0
80.3
80.3
114.7
11
4.7
114.7
11
4.7
114.7
11
4.7
114.7
11
4.7
114.7
11
4.7
114.9
114.7
11
4.7
114.7
11
4.7
114.7
11
4.7
114.7
11
5.2
115.2
11
5.2
115.2
104.6
10
4.6
104.6
10
4.7
104.7
10
4.7
104.6
10
4.7
104.6
10
4.6
105.2
95.1
96.2
97.2
97.5
97.5
97.0
96.9
100.2
101.0
103.4
104.6
111.4
11
1.4
111.8
11
8.8
111.8
11
1.8
112.0
11
2.0
112.1
11
2.6
112.9
GENERAL CONSTRUCTION DATA62
GENERAL CONSTRUCTION DATA2
0500
1,00
01,
500
2,00
02,
500
3,00
03,
500
4,00
0
0
5,00
0
10,0
00
15,0
00
20,0
00
25,0
00
JanFebMarApr
MayJuneJulyAug
SeptOctNovDecJanFebMarApr
MayJuneJulyAug
Sept
2016
2017
RM M
illion
Num
ber
Hou
sing
App
rova
ls* (
num
ber)
Loan
s Ap
prov
ed fo
r Con
stru
ctio
n Se
ctor
(RM
milli
on)
Oth
er A
rtic
les
of C
oncr
ete,
C
emen
t &
Plas
ter
2017
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
245.1
225.0
219.7
255.1
264.6
237.9
243.2
247.3
-
100.3 98
.411
4.912
0.211
9.511
6.612
1.911
1.1-
122.7
115.3
129.9
130.3
130.3
130.5
131.6
130.4
-
Bas
ic Ir
on
and
Stee
l Pr
oduc
ts
Con
stru
ctio
n R
elat
ed
Prod
ucts
Prod
uctio
n# (I
ndex
)
13,88
115
,758
22,30
99,1
6911
,484
13,31
09,4
0719
,089
17,35
7
Hou
sing
App
rova
ls*
(num
ber)
1,878
3,060
3,030
2,087
3,436
1,822
2,971
2,855
2,494
Loan
sA
ppro
val f
orC
onst
ruct
ion
Sect
or(R
M m
illio
n)
GENERAL CONSTRUCTION DATA 63
CONSTRUCTION SECTOR INDICATORS
Not
e: #
All
rate
s ar
e ba
sed
on th
e ne
w In
dust
rial p
rodu
ctio
n In
dex
(201
0 =
100)
.
* N
o. o
f hou
sing
uni
ts b
y pr
ivat
e de
velo
pers
app
rove
d fo
r con
stru
ctio
n by
the
Min
istry
of
Hou
sing
and
Loc
al G
over
nmen
t in
Pen
insu
lar M
alay
sia.
Sou
rce:
Mon
thly
Sta
tistic
al B
ulle
tin, C
entra
l Ban
k of
Mal
aysi
a.
80.0
100.
0
120.
0
140.
0
160.
0
180.
0
200.
0
220.
0
240.
0
260.
0
280.
0
Jan
Feb
Mar
Apr
May
June
July
Aug
Sept
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
June
July
Aug
2016
2017
Inde
x
Oth
er a
rticl
es o
f con
cret
e, c
emen
t and
pla
ster
(%
Cha
nge)
Bas
ic ir
on a
nd s
teel
pro
duct
s (%
Cha
nge)
Pro
duct
ion
of c
onst
ruct
ion
rela
ted
prod
ucts
(%
Cha
nge)
COMMODITIES PRICE TREND (JAN TO NOV 2017)
GENERAL CONSTRUCTION DATA64
GENERAL CONSTRUCTION DATA2
Nickel
Copper (Grade A)
USD/Tonne
USD/Tonne
8,000
9,000
10,000
11,000
12,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
5,400
5,600
5,800
6,000
6,200
6,400
6,600
6,800
7,000
7,200
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Source: London Metal Exchange
Aluminium Year2017
JanFebMarAprMayJunJulAugSepOctNov
1,789.951,856.081,900.651,930.281,913.211,885.891,902.832,029.162,099.812,129.642,100.11
5,736.555,940.655,820.655,697.065,590.715,698.685,977.626,477.186,582.176,796.306,824.61
Copper (Grade A)
9,977.1410,611.7510,220.87 9,661.11 9,147.62 8,924.55 9,475.7110,844.0911,227.1411,314.3211,987.05
Nickel
Monthly Average (USD / Tonne)
AluminiumUSD/Tonne
GENERAL CONSTRUCTION DATA 65
1,650
1,750
1,850
1,950
2,050
2,150
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Note: * For the first half 2017 ** Estimate by Ministry of Finance Malaysia *** Forecast by Ministry of Finance MalaysiaSource: Economic Report 2017/2018, Ministry of Finance, Malaysia
GENERAL CONSTRUCTION DATA66
GENERAL CONSTRUCTION DATA2MALAYSIA CONSTRUCTION SECTOR - EMPLOYMENT & GDP
Gross Domestic Product (GDP) for Construction SectorContribution to Total GDP
Year
%GDP (RM million)
%
Employment in Construction Sector (person)Employment in Construction Sector to Total Employment (%)
Employment (’000 persons)
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
20,000
25,000
30,000
35,000
40,000
45,000
50,000
55,000
60,000
2014 2015 2016 2017** 2018***
8.00%
8.20%
8.60%
8.80%
9.00%
9.20%
9.40%
9.60%
1,180
1,200
1,220
1,240
1,260
1,280
1,300
1,320
2016
8.40%
20152014 2017*Year
PROGRESS PAYMENTSTh
e fo
llow
ing
grap
h an
d ta
ble
are
an in
dica
tion
of th
e ra
te o
f exp
endi
ture
for c
onst
ruct
ion
proj
ects
.
The
rate
of e
xpen
ditu
re is
an
aver
age
rate
and
will
var
y fro
m p
roje
ct to
pr
ojec
t whe
n sp
ecifi
c pr
ojec
t circ
umst
ance
s ar
e ta
ken
into
acc
ount
.
No
acco
unt h
as b
een
mad
e fo
r ret
entio
n.
Pro
gres
s C
laim
s (%
)
Con
tract
Per
iod
(%)
100
80 60 40 20 00
2
0
40
6
0
80
100
Con
trac
t Pe
riod
5% 10%
15%
20%
25%
30%
35%
Cum
ulat
ive
Prog
ress
Cla
ims
2% 5% 8% 13%
18%
24%
30%
Con
trac
t Pe
riod
40%
45%
50%
55%
60%
65%
70%
Cum
ulat
ive
Prog
ress
Cla
ims
36%
43%
50%
57%
64%
70%
76%
Con
trac
t Pe
riod
75%
80%
85%
90%
95%
100%
Cum
ulat
ive
Prog
ress
Cla
ims
82%
87%
92%
95%
98%
100%
GENERAL CONSTRUCTION DATA 67
GENERAL CONSTRUCTION DATA68
GENERAL CONSTRUCTION DATA2
3PROPERTY
Residential
Hotel
Office
Shopping Complex
Shop
Industrial
Res
iden
tial
Q2
2017
p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
kM
ALA
YSIA
Exis
ting
Stoc
k (u
nit)
458,2
3710
,409
11,81
61,4
80,29
177
5,174
490,7
7446
2,428
257,8
7017
6,545
316,2
1026
2,054
96,70
777
,111
25,00
420
5,602
242,4
385,
348,
670
40,05
1 6,
264
1,29
0 11
5,377
87
,193
46,74
0 35
,726
21,59
3 15
,702
18,15
1 21
,980
17,40
2 9,
879
1,62
2 24
,840
21,62
3 48
5,43
3
Inco
min
g Su
pply
(uni
t)
p =
prel
imin
ary
Sou
rce:
Res
iden
tial P
rope
rty S
tock
Rep
ort,
2nd
Qua
rter
201
7, b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent.
Sou
rce:
Kni
ght F
rank
RESIDENTIAL
PROPERTY70
PROPERTY3Pr
ojec
tion
of C
umul
ativ
e Su
pply
for H
igh
End
Con
dom
iniu
ms
/R
esid
ence
s 20
13 -
2H20
17(f)
0102030405060
2013
2014
2015
1H20
162H
2016
1H20
172H
2017
(f)
No. of Units ('000)
Year
Bang
sar/
Dam
ansa
ra H
eigh
tsM
ont'
Kiar
a/Ha
rtam
asAm
pang
Hili
r/U
-Tha
ntKL
City
Loca
lity
Ask
ing
G
ross
Ren
tal
(RM
psf
/mon
th)
Ave
rage
A
skin
g Pr
ice
(RM
psf
/mon
th)
KL C
ity*
2.20 -
5.20
710 -
1,75
0Am
pang
Hilir
/ U-T
hant*
*
2.00 -
3.50
570 -
1,20
0Da
mans
ara H
eights
***
2.20 -
4.30
550 -
1,02
0Ke
nny H
ills
2.00 -
3.50
550 -
90
0Ba
ngsa
r
2.20 -
4.50
700 -
1,30
0Mo
nt Ki
ara*
*** 1.8
0 - 3.
4050
0 -
850
Ave
rage
Ask
ing
Pric
es a
nd R
enta
ls o
f Ex
istin
g H
igh
End
Con
dom
iniu
ms
(1H
201
7)
Sou
rce:
The
Edg
e
Not
es:
*
Exc
lude
s B
inja
i on
the
Par
k bu
t inc
lude
s P
avili
on R
esid
ence
s**
E
xclu
des
Ser
i Hen
ing
***
Inc
lude
s Tw
ins
@ D
aman
sara
Hei
ghts
****
Exc
lude
s V
erve
Sui
tes
whi
ch c
ompr
ise
mai
nly
fully
fu
rnis
hed
smal
l uni
ts
Sou
rce:
Kni
ght F
rank
PROPERTY 71
Cap
ital V
alue
for s
elec
ted
2-st
orey
terr
aced
hou
ses
(land
are
a 1,
200
- 1,8
70 s
qft)
in K
lang
Val
ley
2Q09
2Q10
2Q11
2Q12
2Q13
2Q14
2Q15
2Q16
2Q17
Bdr S
ri Da
man
sara
(SD7
)42
047
060
070
085
097
097
012
0010
00TT
DI (A
thin
ahap
an)
700
750
900
1100
1300
1400
1600
1600
1500
Band
ar U
tam
a (BU
1)53
061
080
092
011
0012
5013
0013
0013
00Ba
ngsa
r Bar
u95
011
0013
0013
5016
0017
8018
0017
0018
00US
J (US
J 6)
250
270
340
440
500
600
670
670
680
Bdr P
ucho
ng Ja
ya29
032
037
550
060
066
076
078
076
2
0
200
400
600
800
1000
1200
1400
1600
1800
2000
RM/U
nit (
'000
)
Bdr S
ri Da
man
sara
(SD7
)TT
DI (A
thin
ahap
an)
Band
ar U
tam
a (BU
1)Ba
ngsa
r Bar
uUS
J (US
J 6)
Bdr P
ucho
ng Ja
ya
Hot
elQ
2 20
17p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
kM
ALA
YSIA
Exis
ting
Stoc
k ( R
oom
)
38,69
51,0
681,6
1420
,221
26,79
818
,659
15,93
68,7
2613
,997
16,19
628
,857
7,860
4,480
1,111
20,57
018
,448
243,
236
5,32
8 24
3 47
9 1,
860
1,88
8 3,
036
938
1,66
1 4,
360
1,08
1 14
0 66
16
1 28
0 1,
688
911
24,
120
Inco
min
g Su
pply
(Roo
m)
p =
prel
imin
ary
Sou
rce:
Lei
sure
Pro
perty
Sto
ck R
epor
t, 2n
d Q
uarte
r
Sou
rce:
Mal
aysi
a In
stitu
te o
f Eco
nom
ic R
esea
rch
201
7, b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
Tour
ism
Mar
ket I
ndex
5060708090100
110
120
130
140
1Q15
2Q15
3Q15
4Q15
1Q16
2Q16
3Q16
4Q16
1Q17
2Q17
Poin
ts
Tour
ism M
arke
t Ind
ex -
up
HOTEL
PROPERTY72
PROPERTY3
Sou
rce:
Tou
rism
Mal
aysi
a S
ourc
e: P
rope
rty M
arke
t 201
7, C
BR
E /
WTW
Res
earc
h
PROPERTY 73
Year
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
Arr
ival
s (m
illio
n)
26.76
25.72
27.44
25.72
25.03
24.71
24.58
23.65
22.05
20.97
17.55
82.1
69.1
72.0
65.4
60.6
58.3
56.5
53.4
49.6
53.4
36.3
Rec
eipt
s (R
M b
illio
n)
Tour
ist
Arriv
als
& R
ecei
pts
to M
alay
sia
Perf
orm
ance
of H
otel
s
01020304050607080
050100
150
200
250
300
350
2012
2013
2014
2015
2016
Percentage %
RM
Ave
rage
Roo
m R
ate
Ave
rage
Occ
upan
cy R
ate
KL
City
Integ
ra To
wer
Mena
ra M
axis
Vista
Towe
rG
Towe
rMe
nara
Dar
ussa
lamMe
nara
Binj
aiMe
nara
Pre
stige
KL
Frin
geMe
nara
CIM
BMe
nara
Allia
nz S
entra
l & N
u Tow
er 2
The G
arde
ns N
orth
& So
uth To
wers
Mena
ra B
RDB
Axiat
a Tow
er (f
orme
rly Q
uill 7
)1 S
entru
mB
eyon
d K
L (S
elan
gor)
1 Firs
t Ave
nue
Plaz
a 33
Suria
n Tow
erTh
e Asc
ent @
Par
adigm
Puch
ong F
inanc
ial C
orpo
rate
Centr
eTh
e Pinn
acle
Wism
a Mus
tapha
Kam
al
Ask
ing
Gro
ss R
enta
l (R
M p
sf/m
onth
)
Sele
cted
Gra
de A
Offi
ce A
skin
g R
enta
ls (1
H20
17)
11.00
10.50
7.50 -
8.50
8.00
8.50
8.80
7.50 -
8.50
8.00
7.00
7.80
6.50
7.50
7.80
6.00
4.50
5.50
5.50
4.50
5.50
4.50
All
Gra
de C
BD
Ove
rall
Ren
t & V
acan
cy R
ate
(1Q
2016
- 2Q
2017
)
Sou
rce:
IVP
S R
esea
rch
Sou
rce:
Kni
ght F
rank
13.0
0
14.0
0
15.0
0
16.0
0
17.0
0
$0.0
0
$2.0
0
$4.0
0
$6.0
0
$8.0
0
$10.
00
$12.
00
1Q20
162Q
2016
3Q20
164Q
2016
1Q20
172Q
2017
Rent (US$sf/month)
Over
all R
ent
Vaca
ncy R
ate
(%)
OFFICE
PROPERTY74
PROPERTY3
Purp
ose
Bui
lt O
ffice
Q2
2017
p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
kM
ALA
YSIA
Exis
ting
Stoc
k To
tal S
pace
(m2 )
8,738
,261
2,114
,207
66,71
63,4
37,01
31,1
37,99
61,1
13,40
162
0,110
306,6
5740
2,247
362,0
8640
1,386
343,7
1138
6,070
131,0
3872
5,813
707,4
8420
,994
,196
59
9,762
48
1,679
19
,222
447,6
11
134,2
77
20,39
0 1,
839
9,48
7 -
31
,019
19,17
5 2,
042
8,45
2 11
,933
47,62
4 41
,570
1,8
76,0
82
Inco
min
g Su
pply
Tota
l Spa
ce (m
2 )
p =
prel
imin
ary
Sou
rce:
Kni
ght F
rank
Res
earc
hS
ourc
e: C
omm
erci
al P
rope
rty S
tock
Rep
ort,
2nd
Qua
rter 2
017
b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
PROPERTY 75
Kua
la L
umpu
r - O
ccup
ancy
and
Ren
tal T
rend
s 1H
2012
- 1H
2017
0102030405060708090100
1234567
Occupancy (%)
Rental (RM psf/month)
Occu
panc
y (%)
Rent
al (R
M p
sf/m
onth
)
Exis
ting
Stoc
k To
tal S
pace
(m2 )
Shop
ping
Com
plex
Q2
2017
p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
k
3,0
58,20
061
,090
28,43
43,4
30,02
41,7
70,65
31,7
38,28
297
5,135
463,1
0356
3,389
580,6
7829
2,203
165,1
7433
4,880
55,87
269
5,658
884,0
66M
ALA
YSIA
15,0
96,8
41
227,6
53
26,45
6 0
394,6
62
518,3
37
43,96
3 29
,146
70,23
8 48
,923
4,89
5 85
,334
8,74
5 11
5,287
6,
806
95,19
2 17
6,593
1
,852
,230
Inco
min
g Su
pply
Tota
l Spa
ce (m
2 )
p = pr
elimi
nary
Sou
rce:
Com
mer
cial
Pro
perty
Sto
ck R
epor
t 2nd
Qua
rter 2
017
by V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
SHOPPING COMPLEX
PROPERTY76
PROPERTY3D
istr
ibut
ion
of S
hopp
ing
Com
plex
in M
alay
sia
as a
t Q2
2017
p
20.2
6%
22.7
2%
11.7
3%11
.51%
33.7
8%
WP
Kual
aLu
mpu
rO
ther
St
ates Pul
au
Pina
ng
Joho
r
Sel
ango
r
Shop
ping
Cen
tres
Sch
edul
ed fo
r Com
plet
ion
/ Ope
ning
in 2
H20
17
Melaw
ati M
allKL
Eco
City
Reta
il Pod
iumAm
erin
Mall (
Cher
as S
elatan
)Ev
o Sho
pping
Mall
Empir
e City
Mall
620,0
0020
0,000
155,6
0025
1,000
2,300
,000
New
Pro
ject
sEs
timat
e N
et.
Letta
ble
Are
a (s
f)
Sou
rce:
Com
mer
cial
Pro
perty
Sto
ck R
epor
t 2nd
Qua
rter 2
017
by
Valu
atio
n &
Pro
perty
Ser
vice
s D
epar
tmen
t S
ourc
e: K
nigh
t Fra
nk
Shop
ping
Com
plex
’s E
xist
ing
Stoc
k in
Kua
la L
umpu
r & S
elan
gor (
By
Loca
tion)
as a
t Q2
2017
PROPERTY 77
- 1
00,0
00 2
00,0
00 3
00,0
00 4
00,0
00 5
00,0
00 6
00,0
00 7
00,0
00
Petaling Jaya
Subang Jaya/Sunway
Shah Alam
Klang
Bangsar
Central Commercial Area
Jalan Ampang
Bukit Bintang / Jalan RajaChulan
m2
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
k
Shop
Q2
2017
p
MA
LAYS
IA
Exis
ting
Stoc
k (u
nit)
25,75
342
088
987
,893
75,36
432
,631
54,73
420
,101
18,96
427
,152
22,83
26,8
159,9
624,1
6618
,499
30,73
243
6,90
7
1,81
7 11
9 10
2 15
,420
19,50
7 5,
135
6,21
9 5,
068
5,09
1 4,
759
2,94
0 1,
365
2,86
4 80
3 5,
005
3,74
0 7
9,95
4
Inco
min
g Su
pply
(uni
t)
p = pr
elimi
nary
Sou
rce:
Com
mer
cial
Pro
perty
Sto
ck R
epor
t, 2n
d Q
uarte
r 201
7, b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
SHOP
PROPERTY78
PROPERTY3
Pre-
War
1- 1
1/2
Sto
rey
2- 2
1/2
Sto
rey
3- 3
1/2
Sto
rey
4- 4
1/2
Sto
rey
5- 5
1/2
Sto
rey
6- 6
1/2
Sto
rey
Abov
e 6
1/2
Stor
ey
p =
preli
mina
ry
Dis
trib
utio
n of
Exi
stin
g an
d In
com
ing
Supp
ly o
f Sho
p in
K
uala
Lum
pur a
nd S
elan
gor a
s at
Q2
2017
286 ;
2.4
3%4,49
8 ;
38.2
6%
4,54
5 ;
38.6
6%
1,57
5 ;
13.4
0%
344 ;
2.9
3%30
1 ; 2
.56%
206
; 1.7
5%In
com
ing
Supp
lyp
2,37
6 ; 2
.41%
7,76
0 ;
7.86
%
34,7
18 ;
35.1
9%
31,0
05 ;
31.4
2%
19,4
99 ;
19.7
6%
1,62
2 ; 1
.64%
945 ;
0.9
6%74
6 ; 0
.76%
Existi
ngSt
ockp
Exis
ting
Stoc
k (u
nit)
Indu
stria
lQ
2 20
17p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
k
5,1
38 48 563
39,13
916
,117
9,057
8,103
5,433
6,495
3,825
3,495
865
604
222
6,051
6,637
0 0 75 1,45
4 1,
821
246
474
61 938
47 113
48 17 31 262
477
MA
LAYS
IA11
1,79
2 6
,064
Inco
min
g Su
pply
(uni
t)
p =
prel
imin
ary
Dis
trib
utio
n of
Exi
stin
g an
d In
com
ing
Supp
ly o
f Ind
ustr
ial U
nits
in
Kua
la L
umpu
r and
Sel
ango
r as
at Q
2 20
17
p =
prel
imin
ary
Terra
ced
Sem
i-Det
ache
dD
etac
hed
Flat
ted
Fact
ory
Indu
stria
l Com
plex
30,5
69 ;
69.0
4%
6,17
8 ;
13.9
5%5,
490
; 12
.40%
1,93
3 ; 4
.37%
107
; 0.2
4%
Exis
ting
Stoc
kp
636
;43
.74%
634
;43
.60%
183
; 12
.59%0; 0
.00%
1; 0
.07%
Inco
min
g Su
pply
p
INDUSTRIAL
Sou
rce:
Indu
stria
l Pro
perty
Sto
ck R
epor
t, 2n
d Q
uarte
r 201
7, b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
PROPERTY 79
PROPERTY80
PROPERTY3
4FINANCIAL
Financial Definitions & Formulae
Mortgage Repayment Table
Malaysia Balance of Trade
Consumer Price Index
Prime Rates & Base Lending Rates
Interest Rates : Banking Institutions
Currency Chart
Exchange Rates
Discount Rate
The rate of return a developer expects when investing in a project. i.e. opportunity cost
Internal Rate of Return (IRR)
The IRR may be defined as the interest rate that equates the present value of expected future cash flows to the cost of the investment.
The IRR can be compared to the Discount Rate.
Net Present Value (NPV)
The NPV is the present value of all future cash flows, discounted back to today’s values at the Discount Rate.
The NPV indicates in today’s dollars the profit or loss a developer makes above or below his required profit (based on a nominated Discount Rate).
72 Rule
The approximate number of years required to double your capital can be calculated by dividing the interest rate into 72.
e.g. If interest rate = 10% p.a. Then 72 ÷ 10 = 7.2 years It will take approximately 7.2 years to double your capital if it is invested at 10% p.a.
Future value of $1Future value of $1 per periodSinking fund (the amount required to be put away periodically to realise some future sum)Present value of $1Present value of $1 per periodAnnuity with a PV of $1 (Mortgage bond formula)
FV = PV (1+i)n
FV = PMT [((1+i)n – 1) ÷ i]
PMT = FV [i ÷ ((1+i)n – 1)]
PV = FV [1÷ (1+i)n]PV = PMT [((1+i)n – 1) ÷ (i(1+i)n)]
PMT = PV[(i(1+i)n) ÷ ((1+i)n - 1)]
PV = present valueFV = future valuePMT = payment amountn = period (e.g. 10 years with monthly payments, n = 10 x 12 = 120)i = interest rate per period (e.g. 12% p.a. compounded monthly; i = 12% ÷ 12 month = 1% per period)
FINANCIAL DEFINITIONS
FINANCIAL FORMULAE
FINANCIAL82
FINANCIAL4
Based on:* 1,000 units of currency* Interest compounded monthly* Equal monthly repayments
Example
Borrow $1,000,000 to be repaid monthly at 10% p.a. over 10 years.
Repayments = 1,000,000 / 1,000 x $13.22 = $13,220 per month
MORTGAGE REPAYMENT TABLE
REPAYMENT (years) Interest p.a. 5 10 15 20 5% 18.87 10.61 7.91 6.60 6% 19.33 11.10 8.44 7.16 7% 19.80 11.61 8.99 7.75 8% 20.28 12.13 9.56 8.36 9% 20.76 12.67 10.14 9.00 10% 21.25 13.22 10.75 9.65 11% 21.74 13.78 11.37 10.32 12% 22.24 14.35 12.00 11.01 13% 22.75 14.93 12.65 11.72 14% 23.27 15.53 13.32 12.44 15% 23.79 16.13 14.00 13.17 16% 24.32 16.75 14.69 13.91 17% 24.85 17.38 15.39 14.67 18% 25.39 18.02 16.10 15.43 19% 25.94 18.67 16.83 16.21 20% 26.49 19.33 17.56 16.99 21% 27.05 19.99 18.31 17.78 22% 27.62 20.67 19.06 18.57 23% 28.19 21.35 19.82 19.37 24% 28.77 22.05 20.58 20.17 25% 29.35 22.75 21.36 20.98
FINANCIAL 83
Trade Balance
Export (RM million)Import (RM million)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
05 06 07 08 09 10 11 12 13 14 15 16 17*
Import/ExportRM million
Trade BalanceRM million
Exports Imports Trade Balance Year (RM mil) (RM mil) (RM mil)
2007 605,175 475,687 129,4882008 663,875 492,076 171,7992009 552,920 412,565 140,3552010 641,135 504,384 136,7512011 658,421 517,893 140,5292012 644,864 531,835 113,0302013 637,683 541,131 96,5522014 678,865 565,538 113,3272015 681,275 572,051 109,2242016 686,075 584,693 101,3822017 390,895 338,569 52,325
MALAYSIA BALANCE OF TRADE
Note: * January to June 2017 onlySource: Economic Report 2017/2018, Ministry of Finance, Malaysia
FINANCIAL84
FINANCIAL4
Year CPI % Change
2007 92.7 2.03 %
2008 97.7 5.44 %
2009 98.3 0.58 %
2010 100.0 1.71 %
2011 103.2 3.19 %
2012 104.9 1.66 %
2013 107.1 2.11 %
2014 110.5 3.14 %
2015 112.8 2.10 %
2016 115.0 1.78%
2017* 119.5 4.09%
% Change in CPI
Year
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
*
Note: Year 2010 is the Base Year * Average from January to November 2017 onlySource: Department of Statistics, Malaysia
CONSUMER PRICE INDEX
FINANCIAL 85
Country Rate (%) Brunei 5.50 China* 4.75 Hong Kong 5.00 India 9.55 Indonesia 5.00 Macau 5.25 Malaysia** 4.35 Philippines 4.14 Singapore 5.28 Thailand+ 7.00 United Kingdom 0.50 United States of America 4.50 Vietnam# 9.00
PRIME RATES & BASE LENDING RATESas at 4th Quarter 2017
Source:Arcadis Asia Offices
* 5-Year Benchmark Lending Rate** Indicative Effective Lending Rate+ Minimum Loan Rate % pa (Average Based on Local Bank)# Minimum and in VND per year
FINANCIAL86
FINANCIAL4
Commercial Banks Investment Banks 2017 Base Average Average Lending Lending Rates Lending Rates Rates (%) (%) (%)
Jan 6.66 4.56 6.47Feb 6.66 4.61 6.51Mar 6.66 4.60 6.42Apr 6.65 4.59 6.42May 6.65 4.61 6.46Jun 6.65 4.63 6.48Jul 6.66 4.61 6.47Aug 6.67 4.61 6.49Sep 6.68 4.62 6.51Oct 6.68 4.64 6.44Nov 6.68 4.61 6.47
Note: Only Jan until Nov rates are available at time of publication.Source: Monthly Statistical Bulletin, Central Bank of Malaysia
INTEREST RATES: BANKING INSTITUTIONS
FINANCIAL 87
4.00
5.00
6.00
7.00
8.00
9.00
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Commercial Banks : Base Lending RatesCommercial Banks : Average Lending RatesInvestment Banks : Average Lending Rates
Percent Per Annum
CURRENCY CHART
FINANCIAL88
FINANCIAL4R
ingg
it (R
M)
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Yea
rR
M p
er 1
US
DR
M p
er 1
GB
PR
M p
er 1
00 J
PY
RM
per
1 E
UR
OR
M p
er 1
SG
D
Country Currency RM1 US $1 Australia dollar 0.3152 1.2806 Bahrain dinar 0.0919 0.3735 Brunei dollar 0.3274 1.3304 China rmb 1.6020 6.5097 Egypt pound 4.3665 17.7432 European Currency Unit ecu 0.2050 0.8329 Hong Kong dollar 1.9227 7.8130 India rupees 15.6473 63.5830 Indonesia rupiah 3,328.47 13,525.3 Japan yen 27.7230 112.653 Kenya shillings 25.1571 102.23 Lebanon pound 367.432 1,493.1 Malaysia ringgit 1.0000 4.0590 New Zealand dollar 0.3466 1.4085 Pakistan rupee 27.2813 109.47 Philippines peso 12.2887 49.935 Qatar riyal 0.8797 3.5748 Singapore dollar 0.3288 1.3363 South Africa rand 3.0365 12.339 South Korea won 262.238 1,065.61 Sri Lanka rupee 37.3756 151.876 Thailand baht 7.9754 32.408 United Arab Emirates dirham 0.9037 3.6724 United Kingdom pound 0.1821 0.7401 United States of America dollar 0.2461 1.0000 Vietnam dong 5,542.12 22,520.5
Source: www.oanda.com/currency/converter/
EXCHANGE RATESas at 1 January 2018
FINANCIAL 89
FINANCIAL92
FINANCIAL4
FINANCIAL90
FINANCIAL4
5OTHER INFORMATION
Utility Costs for Selected Asian Cities
Weight & Measures
Conversion Guide
Public Holidays
Arcadis Asia Leadership Team
Arcadis Asia Sectors
Arcadis Asia Services
Directory of Offices
Telephone Directory (Malaysia)
CO
UN
TRY
Exch
ange
R
ate
US
$1 =
Dom
estic
Com
mer
cial
/ In
dust
riaI
Dom
estic
Com
mer
cial
/ In
dust
rial
Die
sel
Lead
edU
nlea
ded
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
HO
NG
KO
NG
HK$ 7
.80
0.110
0.130
0.830
0.590
1.570
N/A
1.990
ELEC
TRIC
ITY
(Dom
estic
): 0 -
400 k
Wh =
US$
0.11;
400 -
1,00
0kW
h = U
S$0.1
2; 1,0
00 -
1,800
kWh =
US$
0.14;
1,800
- 2,6
00kW
h = U
S$0.1
8; 2,6
00 -
3,400
kWh =
US$
0.21;
3,4
00 -
4,200
kWh =
US$
0.23;
Abov
e 4,20
0 kW
h = U
S$0.2
3 (Ba
sed o
n tar
iff sc
heme
of C
LP H
olding
Limi
ted an
d is c
harg
ed on
bi-m
onthl
y
cons
umpti
on)
WAT
ER (D
omes
tic):
0 - 12
m3 =
F.O
.C; 1
2 - 43
m3 = U
S$0.5
3/m3 ;
43 -
62m3 =
US$
0.83/m
3 ; Ab
ove 6
2m3 =
US$
1.16/m
3 .
GU
AN
GZH
OU
RMB
6.60
0.100
0.140
0.440
0.740
0.940
N/A
1.060
UNLE
ADED
FUE
L: Un
leade
d gas
oline
97
BEI
JIN
GRM
B 6.6
00.0
70 -
0.119
0.758
- 1.3
641.3
64 -
1.439
0.92
0N/
A1.0
40
ELEC
TRIC
ITY
(Dom
estic
/ mon
th): 1
- 24
0kW
h = U
S$0.0
73; 2
41 -
400k
Wh =
US$
0.082
; 400
kWh a
bove
= U
S$0.1
19W
ATER
(Dom
estic
/ yea
r): 1
- 180
m3 = U
S$0.7
58; 1
81 -
260m
3 = U
S$1.0
61; 2
61m3 a
bove
= U
S$1.3
64W
ATER
(Com
merci
al / In
dustr
ial):
Centr
al Di
strict
s = U
S$1.4
39; O
ther D
istric
ts =
US$1
.364
UNLE
ADED
FUE
L: Un
leade
d gas
oline
97
KU
ALA
LU
MPU
RRM
4.08
0.053
- 0.1
400.0
93 -
0.108
0.2
52 -
0.490
0.5
07 -
0.559
0.5
39N/
A0.5
51UN
LEAD
ED F
UEL:
Unlea
ded p
etrol
RON
95
0.230
(pea
k)0.1
33 (n
orma
l)
UTILITY COSTS FOR SELECTED ASIAN CITIESas at 4th Quarter 2017
OTHER INFORMATION92
OTHER INFORMATION5
CO
UN
TRY
Exch
ange
R
ate
US
$1 =
Dom
estic
Com
mer
cial
/ In
dust
riaI
Dom
estic
Com
mer
cial
/ In
dust
rial
Die
sel
Lead
edU
nlea
ded
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
CH
ON
GQ
ING
RMB
6.60
0.130
0.530
0.690
0.860
N/A
0.980
0.080
SHA
NG
HA
IRM
B 6.6
00.1
60 (p
eak)
0.079
(nor
mal)
0.530
- 0.8
80.7
200.9
30N/
A1.0
530.0
93 (p
eak)
0.047
(nor
mal)
UNLE
ADED
FUE
L: Un
leade
d 93#
= U
S$0.9
3/litre
; 97#
= U
S$0.9
8/litre
BA
NG
ALO
RE
INR
65.00
0.050
- 0.1
14
0.130
- 0.1
320.4
00 -
0.692
1.358
0.908
N/A
1.077
ELEC
TRIC
ITY
(Dom
estic
): 0 -
3,12
0 kW
h = U
S$0.0
93 (p
eak)
/ US$
0.047
(nor
mal);
3,120
- 4,80
0kW
h = U
S$0.1
(pea
k) / U
S$0.0
51 (n
orma
l); Ab
ove 4
,800 k
Wh =
US$
0.148
(pea
k)
/ US$
0.074
(nor
mal).
Char
ged o
n yea
rly co
nsum
ption
. EL
ECTR
ICIT
Y (C
omme
rcial)
: Cha
rges
on co
nsum
ption
less
than
1,00
0kW
h per
mon
th for
summ
er pe
riod o
nly. R
efer t
o www
.shdr
c.gov
.cn fo
r deta
iled c
harg
es fo
r diffe
rent
tiers
and c
harg
es fo
r non
-summ
er pe
riod.
WAT
ER (D
omes
tic):
0-22
0m3 =
US$
0.53/m
3 ; 22
0 - 30
0m3 =
US$
0.73/m
3 ; Ab
ove 3
00m3 =
US$
0.88/m
3.
UNLE
ADED
FUE
L: Un
leade
d 95.
MOP
8.03
0.170
0.560
- 0.91
00.7
501.5
40 N
/A1.2
80EL
ECTR
ICIT
Y: E
lectric
ity ta
riff is
a co
mpos
ition o
f dem
and c
harg
es, c
onsu
mptio
n cha
rges
, fuel
claus
e adju
stmen
t and
gove
rnme
nt tax
.W
ATER
(Dom
estic
): Co
nsum
ption
char
ge =
US$0
.56/m
3 for
28m3
or be
low; U
S$0.6
5/m3 f
or 29
m3 to
60m3
; US$
0.75/m
3 for
61m3
to 79
m3 an
d US$
0.91/m
3 for
80m3
or ab
ove.
WAT
ER C
omme
rcial/
Indus
trial):
Char
ges f
or or
dinar
y use
rs (e
.g. B
usine
ss, g
over
nmen
t buil
dings
, sch
ools,
asso
ciatio
ns, h
ospit
als an
d othe
rs) on
ly. S
pecia
l use
rs (e
.g. ga
ming
indu
stries
, hote
ls, sa
unas
, golf
cour
ses,
cons
tructi
on, p
ublic
infra
struc
tures
and o
ther t
empo
rary
cons
umpti
on) a
re ex
clude
d.
0.170
MA
CA
U
93OTHER INFORMATION
UTILITY COSTS FOR SELECTED ASIAN CITIES(Cont’d)
HO
CH
I MIN
HVN
D 22
,700
0.790
/ 0.48
00.1
10 0.
090 -
0.14
0 0.
060 -
0.11
00.2
70 -
0.570
All ra
tes ar
e VAT
inclu
sive.
ELEC
TRIC
ITY
(Dom
estic
): Do
mesti
c elec
tricity
rates
are a
pplie
d to t
he 30
1th K
W ab
ove w
ards
.FU
EL (D
iesel)
: D.O
- 0.0
5%UN
LEAD
ED F
UEL:
92 U
nlead
ed P
etrol
& 95
Unle
aded
Petr
ol as
at O
ctobe
r 201
2.
0.640
0.800
- 0.8
30N/
A
INR
65.00
NEW
DEL
HI
0.063
- 0.1
32 0.
141 -
0.16
40.2
88 -
1.037
1.318
- 5.8
860.8
961.0
74N/
A
BR
UN
EIB$
1.39
0.009
- 0.1
300.0
65 -
0.182
0.343
0.461
0.479
0.09
9 - 0.
398
0.55
2 - 0.
596
BA
NG
KO
KBA
HT 32
.390.
262 -
0.44
60.8
140.8
590.0
72 -
0.136
0.0
97 -
0.099
0.293
- 0.4
88N/
AUN
LEAD
ED F
UEL:
Gaso
hol 9
5EL
ECTR
ICIT
Y (D
omes
tic) F
or no
rmal
tariff
with
cons
umpti
on no
t exc
eedin
g 150
kWh/m
onth.
ELEC
TRIC
ITY
(Dom
estic
): Ta
riff ef
fectiv
e fro
m 1s
t Jan
2012
. 1-1
0kW
h 10c
, 11-
60kW
h 8c,
61-1
00kW
h 12c
, abo
ve 10
0kW
h 15c
.
OTHER INFORMATION94
OTHER INFORMATION5C
OU
NTR
YEx
chan
ge
Rat
eU
S $1
=D
omes
ticC
omm
erci
al/
Indu
stria
ID
omes
ticC
omm
erci
al/
Indu
stria
lD
iese
lLe
aded
Unl
eade
d
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
JAK
AR
TAID
R 13
,570
0.108
0.108
0.503
- 1.0
800.0
77 -
0.549
0.538
N/A
0.608
Dome
stic g
roup
in In
done
sia w
ill co
ver r
eside
nce,
relig
ion bu
ilding
, non
-pro
fit or
ganiz
ation
build
ing an
d gov
ernm
ent h
ospit
al.Co
mmer
cial g
roup
in In
done
sia w
ill co
ver lu
xury
resid
ence
, apa
rtmen
t, offic
es, h
otel, c
omme
rcial
build
ing, a
nd fa
ctorie
s.
SIN
GA
POR
ES$
1.36
0.150
0.150
1.176
2.010
1.176
2.010
1.10
N/A
1.75
MA
NIL
A 0
.210 -
0.22
0 PH
P 50
.50 0
.150
0.480
- 0.8
00
1.120
0.600
N/A
Actua
l Billi
ng: In
clude
misc
. cha
rges
such
as E
nviro
nmen
tal C
harg
e, Cu
rrenc
y Exc
hang
e Rate
Adju
stmen
t (CE
RA),
VAT,
etc.
ELEC
TRIC
ITY
- (Do
mesti
c): 19
0 kW
h - 86
0 kW
h; (C
omme
rcial
/ Indu
strial
): 15
0,000
kWh;
WAT
ER -
(Dom
estic
): 29
m3 - 41
m3 ; W
ATER
- (C
omme
rcial
/ Indu
strial
): 4,0
30m3
0.900
All ra
tes ar
e nett
of G
ST.
ELEC
TRIC
ITY:
Tar
iff is
base
d on l
ow te
nsion
powe
r sup
ply.
WAT
ER (D
omes
tic) -
Effe
ctive
from
1 Ju
ly 20
17 to
30 Ju
ne 20
18 &
from
1 Ju
ly 20
18: R
ate in
clude
s con
serva
tion t
ax, w
ater-b
orne
fee,
sanit
ary a
pplia
nce f
ee &
is an
aver
age
fo
r the
1st 4
0m3 .
WAT
ER (C
omme
rcial
/ Indu
strial
) - E
ffecti
ve fr
om 1
July
2017
to 30
June
2018
& fr
om 1
July
2018
: Rate
inclu
des w
ater c
onse
rvatio
n tax
, wate
r bor
ne fe
e & sa
nitar
y app
lianc
e fee
.FU
EL (D
iesel)
- As
at 2
Nove
mber
2017
.UN
LEAD
ED F
UEL:
98 U
nlead
ed pe
trol a
s at 2
Nov
embe
r 201
7.
CO
UN
TRY
Exch
ange
R
ate
US
$1 =
Dom
estic
Com
mer
cial
/ In
dust
riaI
Dom
estic
Com
mer
cial
/ In
dust
rial
Die
sel
Lead
edU
nlea
ded
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
95OTHER INFORMATION
OTHER INFORMATION96
LENGTH 1 millimetre (mm) = 0.0394 in 1 centimetre (cm) = 10 mm = 0.3937 in 1 metre (m) = 100 cm = 1.0936 yd 1 kilometre (km) = 1,000 m = 0.6214 mile AREA 1 sq cm (cm2) = 100 mm2 = 0.1550 in2
1 sq metre (m2) = 10,000 cm2 = 1.1960 yd2 1 hectare (ha) = 10,000 m2 = 2.4710 acres 1 sq km (km2) = 100 ha = 0.3861 mile2 VOLUME / CAPACITY 1 cu cm (cm3) = 0.0610 in3 1 cu decimetre (dm3) = 1,000 cm3 = 0.0353 ft3 1 cu metre (m3) = 1,000 dm3 = 1.3080 yd3 1 litre (l ) = 1 dm3 = 1.76 pt 1 hectolitre (hl ) = 100 l = 21.997 gal MASS (WEIGHT) 1 milligram (mg) = 0.0154 grain 1 gram (g) = 1,000 mg = 0.0353 oz 1 kilogram (kg) = 1,000 g = 2.2046 lb 1 tonne (t) = 1,000 kg = 0.9842 ton USA MEASURES AND EQUIVALENTS USA Dry Measure Equivalents 1 pint = 0.9689 UK pint = 0.5506 l USA Liquid Measure Equivalents 1 fluid ounce = 1.0408 UK fl oz = 29.574 ml 1 pint (16 fl oz) = 0.8327 UK pt = 0.4723 l 1 gallon = 0.8327 UK gal = 3.7854 l
WEIGHT AND MEASURES
Metric Measures and Equivalents
OTHER INFORMATION5
LENGTH 1 inch (in) = 2.54 cm 1 foot (ft) = 12 in = 0.3048 m 1 yard (yd) = 3 ft = 0.9144 m 1 mile = 1,760 yd = 1.6093 km 1 int. nautical mile = 2,025.4 yd = 1.853 km AREA 1 sq inch (in2) = 6.4516 cm2 1 sq foot (ft2) = 144 in2 = 0.0929 m2 1 sq yard (yd2) = 9 ft2 = 0.8361 m2 1 acre = 4,840 yd2 = 4,046.9 m2 1 sq mile (mile2) = 640 acres = 2.59 km2 VOLUME / CAPACITY 1 cu inch (in3) = 16.387 cm3 1 cu foot (ft3) = 1,728 in3 = 0.0283 m3 1 fluid ounce (fl oz) = 28.413 ml 1 pint (pt) = 20 fl oz = 0.5683 l 1 gallon (gal) = 8 pt = 4.5461 l MASS (WEIGHT) 1 ounce (oz) = 437.5 grains = 28.35 g 1 pound (lb) = 16 oz = 0.4536 kg 1 stone = 14 lb = 6.3503 kg 1 hundredweight (cwt) = 112 lb = 50.802 kg 1 ton = 20 cwt = 1.016 t Temperature Conversion oC = 5/9 (oF - 32) oF = (9/5 oC) + 32
oC
oF
Imperial Measures and Equivalents
97OTHER INFORMATION
LENGTHTo Convert Multiply bymili-inches into micrometres 25.4inches into milimetres 25.4inches into centimetres 2.54inches into metres 0.0254
feet into centimetresfeet into milimetres 304.8
30.48feet into metres 0.3048yards into metres 0.9144fathoms into metres 1.8288chains into metres 20.1168furlongs into metres 201.168miles, statute into kilometres 1.609344miles, nautical into kilometres 1.852
VOLUME & CAPACITY
To Convert Multiply bycubic inches into cubic centimetres 16.387064cubic inches into litres 0.016387cubic feet into cubic metres 0.0283168cubic feet into litres 28.316847
UK quarts into litresUK pints into litres 0.5682613
1.1365225cubic yards into cubic metres 0.7645549UK gallons into litres 4.54609UK gallons into cubic metres 0.0045461UK fluid ounces into cubic centimetres 28.413063
Conversion Formulae
To use the conversion formulae simply multiply the Imperial measurement by the factor beside the conver-sion you wish to make. For example 6 inches into milimetres. 6 inches multiplied by 25.4 equals 152.4 milimetres. Conversely if you wish to convert Metric measure into Imperial measure simply divide by the same factor.
CONVERSION GUIDE
OTHER INFORMATION5
OTHER INFORMATION98
POWER
To Convert Multiply byfoot pounds-force per second into watts 1.35582horsepower into watts 745.7foot pounds-force per second into kilowatts 0.001356horsepower into kilowatts 0.7457horsepower into metric horsepower 1.01387
AREATo Convert Multiply bysquare inches into square milimetres 645.16square inches into square centimetres 6.4516square feet into square centimetres 929.0304square feet into square metres 0.092903
square yards into (0.01 hectare)square yards into square metres 0.836127
0.0083613acres into square metres 4046.8564acres into hectares 0.4046856square miles into square kilometres 2.589988
MASS
To Convert Multiply bygrains into miligrams 64.79891grains into metric carats 0.323995grains into grams 0.064799pennyweights into grams 1.555174
ounces troy into gramsounces into grams 28.349523
31.103477ounces into kilograms 0.0283495pounds into kilograms 0.4535924stones into kilograms 6.35023932hundredweights into kilograms 50.802345tons into kilograms 1016.0469tons into metric tonnes 1.01605tahils into grams 37.799kati into kilograms 0.60479
99OTHER INFORMATION
2018MALAYSIANew Year’s Day**Chinese New YearLabour DayWesak DayHari Raya Aidilfitri*Hari Raya Qurban*National DayKing/Agong’s Birthday#Awal Muharam (Maal Hijrah)Malaysia Day#Deepavali*Prophet Muhammad’s BirthdayChristmas Day
* Subject to change** Except Johor, Kelantan, Kedah, Perlis & Terengganu# The following day will be an additional Public Holiday
0116 - 17
0129
15 - 162231091116062025
JanFebMayMayJunAugAugSepSepSepNovNovDec
BRUNEINew Year’s Day Chinese New Year National DayIsrak MirajFirst Day of RamadhanRoyal Brunei Armed Forces DayNuzul QuranHari Raya Aidilfitri*Hari Raya Aidilfitri* Hari Raya Aidilfitri*HM The Sultan’s Birthday Hari Raya Aidil Adha* Christmas Day
* Subject to change
01162313163101151618152225
JanFebFebAprMayMayJunJunJunJunJulAugDec
PUBLIC HOLIDAYS
OTHER INFORMATION5
OTHER INFORMATION100
2018
(Cont’d)
HONG KONGThe first day of JanuaryLunar New Year’s DayThe 2nd day of Lunar New YearThe 4th day of Lunar New YearGood FridayThe day following Good FridayEaster MondayChing Ming FestivalLabour DayBuddha’s BirthdayTuen Ng FestivalThe day following HKSAR Establishment DayThe day Following Chinese Mid-Autumn FestivalNational DayChung Yeung FestivalChristmas DayThe 1st weekday after Christmas Day
01 16
171930310205012218022501172526
JanFebFebFeb*MarMarAprAprMayMayJunJul*SepOctOctDecDec
CHINANew Year’s DayChinese New Year’s EveChinese New YearTomb-Sweeping DayLabour DayDragon-Boat FestivalMid Autumn FestivalNational Day
0115
16 - 1905011824
01 - 03
JanFebFeb$
Apr+
May@
JunSepOct#
$ 16 - 21 February are holidays. 11 February 2018 and 24 February 2018 are working days.+ 5 and 6 April 2018 are holidays. 8 April 2018 is working day.@ 30 Apr - 1 May 2018 are holidays. 28 April 2018 is working day.# 1 - 7 October 2018 are holidays. 29 - 30 September 2018 are working days.
* As the the third day of Lunar New Year in 2018 falls on Sunday, the fourth day of Lunar New Year is designated as a general holiday in substitution. In addition, since the Hong Kong Special Administrative Region Establish-ment Day in 2018 falls on Sunday, the day following it is designated as a general holiday in substitution.
101OTHER INFORMATION
2018
New Year’s Day*#
Lunar New Year’s Eve (Afternoon)@
Lunar New Year’s Day*#
The 2nd day of Lunar New Year*The 3rd day of Lunar New Year*The 4th day of Lunar New Year@#
The 5th day of Lunar New Year@
Good Friday*#
The day before Easter*The first working day after the Day before Easter@#
Ching Ming Festival*#
Labour Day*#
The Buddha’s Birthday*#
Tung Ng Frestival (Dragon Boat Festival)*#
Mid-Autumn Festival*#
National Day*#
The day following National Day*Chung Yeung Festival*#
All Soul’s Day*#
Feast of the Immaculate Conception*The first working day after Feast of the ImmaculateConception@
Macau SAR Establishment Day*#
Winter Solstice*Christmas Eve*#
Christmas Day*#
The first working day after Christmas Day@#
New Year’s Day (Afternoon)@
# Bank’s Holiday* Obligatory Holiday@ Special Holiday granted by Chief Executive for staff in Public Administration.
0115161718192030310205012218250102170208
10202224252631
JanFebFebFebFebFebFebMarMarAprAprMayMayJunSepOctOctOctNovDec
DecDecDecDecDecDecDec
MACAU
(Cont’d)
PUBLIC HOLIDAYS
OTHER INFORMATION5
OTHER INFORMATION102
(Cont’d)
103OTHER INFORMATION
2018INDIANew Year’s DayRepublic DayGood FridayIndependence DayGanesh ChaturthiDussheraKarnataka Formation DayDiwaliChristmas Day
01 26 30
151319010625
JanJanMarAugSepOctNovNovDec
INDONESIANew Year’s DayChinese New Year (Imlek)Hindu Day of Quiet (Nyepi)Good FridayAscension of Prophet MohammadWaisak DayInternational Labour DayAscension Day of Jesus ChristPancasila Day*Idul FitriNational Independence DayIdul Adha DayHijriyah New YearProphet Muhammad’s BirthdayChristmas Day
* Subject to changes
01161730132901
1001
15 - 161722112025
JanFebMarMarAprMayMayMayJunJunAugAugSepNovDec
2018PHILIPPINES Regular HolidaysNew Year’s Day*Chinese New Year#
EDSA People Power Revolution Anniversary#
Maundy Thursday*Good Friday*Black Saturday#
Araw ng Kagitingan*Labour Day*Independence Day*Ninoy Aquino Day#
National Heroes Day*All Saints Day#
Additional special non-working day#
Bonifacio Day*Additional special non-working day#
Christmas Day*Rizal Day*Last day of the year#
* Regular Holidays# Special Non-Working Day
011625293031090112212701023024253031
JanFebFebMarMarMarAprMayJunAugAugNovNovNovDecDecDecDec
SINGAPORENew Year’s DayChinese New YearGood FridayLabour DayVesak DayHari Raya PuasaNational DayHari Raya HajiDeepavaliChristmas Day
01 16 - 17
3001291509220625
JanFebMarMayMayJunAugAugNovDec
(Cont’d)
PUBLIC HOLIDAYS
OTHER INFORMATION5
OTHER INFORMATION104
2018THAILANDNew YearMakha Bucha DayChakri Memorial daySongkran FestivalLabour DayWisakha Bucha DayAsarnha Bucha DayH.M. The King’s BirthdayH.M. The Queen’s BirthdayThe Passing of H.M. the Late KingBhumibol Adulyadej (Rama IX)Chulalongkorn dayH.M. the Late King Bhumibol Adulyadej’sBirthday, National Day and NationalFather’s DayConstitution DayNew Year’s Eve
01 - 020106
13 - 160129273013
1523
05 10 31
Jan*JanMacApr**MayMayJulJul***Aug****
Oct*****Oct
DecDecDec
VIETNAM (Normal Scheduled Holidays)New Year’s DayLunar New YearHung Vuong King CelebrationLiberation Day of SaigonInternational Labour DayNational DayChristmas Day
* Substitute for 17 & 18 Feb (Saturday & Sunday)** Substitute for 2 September (Sunday)
01 15 - 21
253001
02 - 03 24 - 25
JanFeb*AprAprMaySep**Dec
* Substitute for 31 Dec 2017 (Sun)** Substitute for 14 Apr 2018 (Sat) and 15 Apr 2018 (Sun)*** Substitute for 28 Jul 2018 (Sat)**** Substitute for 12 Aug 2018 (Sun)***** Substitute for 13 Oct 2018 (Sat)
105OTHER INFORMATION
Eric de KruifChief Financial Offi cer, [email protected]
Graham KeanRegional Client Development
Matt BennionChief Executive Offi cer, [email protected]
Adam SuttonRegional HR and Change
John BattenRegional Sustainable Cities
Carl WatsonGeneral Counsel, Asia
Niek NiensRegional Operations Director
Penny Murphy Regional Head of Marketing &
ARCADIS ASIA LEADERSHIP TEAM
OTHER INFORMATION5
OTHER INFORMATION106
107OTHER INFORMATION
Loo Ming CheeRegional Solutions Leader
Lai Pak Hung Regional Head of Greater
Tim RisbridgerCountry Head, Singapore
Francis AuCountry Head, Hong [email protected]
Justin TeohCountry Head, [email protected]
ARCADIS ASIA SECTORS
OTHER INFORMATION5
OTHER INFORMATION108
AUTOMOTIVE
AVIATION
At the present time we are witnessing a massive shift in the automotive sector. Electric vehicles are rapidly establishing themselves as a credible alternative as their range and performance meets (and exceeds) customer expectation. We are seeing more and more brands developing their own models across the region. In addition, the race for autonomous vehicles is leading to the development of new technologies at a pace that is unprecedented in the sector. We are helping our clients to restructure their manufacturing bases to meet shifting global demand, to remodel production lines for the new models demanded by customers, and to invest in the new supply chain technology.
Automotive retail continues to be fiercely competitive, with digital technology entering this space creating a more immersive buying experience. The race to roll out new retail formats around the globe requires lean and efficient delivery models and global standardization, supply chains and logistics.
The recent successful launches of new airframe technologies has caused airports to rethink how they can service larger passenger planes, and, with the prospect of new routes being enabled by longer range and new airframe formats, we expect to see further expansion and development of airports around the globe.
Domestic air travel and cargo hubs are also among popular areas of investment in aviation sector. Invest-ment in domestic air travel is essential, as passengers demand an experience comparable with the best international airports. New cargo hubs are planned to meet ‘same day’ delivery expectations from on line retailers and logistics firms. We expect to see continued investment and demand for high quality design and engineering solutions in the aviation sector for many years to come.
(Cont’d)
109OTHER INFORMATION
CHEMICALS & PHARMACEUTICALS
The chemical and pharmaceutical industry faces a diverse range of challenges across globe. Growing and ageing populations have created rising demands for medication and more effective cures for diseases. Asia is no exception, despite Asia having a relatively younger population compared the other regions. It is also important to take note that approximately two thirds of total global demand growth for chemicals is expected to be generated in Asia.
In order to stay ahead of the competition, we work with our clients across Asia to improve their supply chain and secure their pipelines. The chemicals and pharmaceuti-cals industry will continue to be ‘on the move’ to Asia with rapid development in the future to fulfill demand coming from Asia and beyond.
Commercial developers are a significant proportion of our market in Asia, especially in those countries where the economy is driven by investment in property. In the last 10 years China, for example, has been fuelled by demand for properties as a result of rapid urbanization, and this is also now the case in countries such as Vietnam and the Philippines.
All building types, including commercial offices, residen-tial, leisure, hospitality and retail, are confronted with ever increasing challenges in terms of efficiency of land use, planning compliance, product positioning, cost, quality, impact on communities, sustainability and also market competitiveness. The commercial developer sector will continue to play a key role in all economies across Asia.
COMMERCIAL DEVELOPERS
(Cont’d)
ARCADIS ASIA SECTORS
OTHER INFORMATION5
OTHER INFORMATION110
FINANCIAL INSTITUTIONSDriving better investment and asset performance and improving sustainable returns in current challenging markets is the key focus of our sector specialists.
Through utilizing unique market insight, such as our global asset performance benchmarks, our deep techni-cal knowledge, and an unrivalled global track record in working with financial institutions, we are able to define solutions to meet client needs and to enhance their business outcomes.
Rising production costs and unpredictable prices put oil & gas clients under more pressure than ever. Growing complexities of shifting environmental legislation combined with an increased need for asset decommis-sioning, oil & gas has become a complex and rapidly evolving sector.
We partner with global oil & gas clients to maximize returns on our clients’ investments, through better management of project risks and costs, and improve-ment of opex performance. We work across the asset lifecycle from concept through to decommissioning. We bring together upstream & downstream expertise and understanding from a broad base of capabilities includ-ing cost & risk management, environmental manage-ment, project management and maintenance strategy.
OIL AND GAS
Rapid large scale urbanization, tight budgets and environmental sensitivity require innovative approaches to deliver advanced infrastructure. With our expertise in rail, and our transformational thinking, clients rely on us to improve performance and connect communities cross countries and regions.
In Asia, we have been involved in providing engineering design, cost management, contract administration, risk management, business advisory and mobility oriented design for numerous metro and high speed rail projects in Hong Kong, Mainland China, Taiwan, Singapore and Malaysia.
RAIL
111OTHER INFORMATION
ARCADIS ASIA SERVICES
PORTS AND WATERWAYS
RETAIL & CONGLOMERATES
Ports are at the heart of globalization, facilitating the spread of trade and prosperity. The rapid growth of Asia has seen a substantial investment in port and logistics infrastructure, but also increasing competition between ports, and a focus on raising productivity and service quality. At the same time, it is increasingly necessary to respond to public concerns about environmental and safety issues.
Delivering sustainable growth is a great challenge and requires know-how and expertise across a broad range of disciplines. We offer governments, port institutions, private terminal operators, investors and shipping lines all the disciplines necessary for an integrated approach and the delivery of successful outcomes, whether in the technical, operational, nautical, environmental, risk, financial or economic arena.
As the world of retails faces the fiercest competition yet due to the change of traditional retail landscape and the rapid development of online retail industry, we work with our retail clients to gain a competitive advantage in their market expansion or re-branding. It is essential for us to tailor our services to fit client strengths and needs, to minimize spend and achieve the best solution for each individual company.
With unrivaled experience across all facets of retail development, from luxury and sports fashion to cosmet-ics, supermarkets and restaurant chains, we help our clients successfully navigate through complex challenges in retail development.
(Cont’d)
ARCADIS ASIA SERVICES
OTHER INFORMATION5
OTHER INFORMATION112
BUSINESS ADVISORY
COST MANAGEMENT
From rapid urbanization and pressure on natural resources, to tighter regulation and market consolida-tion, we live in an increasingly complex world. In Arcadis you have a partner that understands your business challenges and has first-hand experience of the assets you own and operate. We bring unique insights which support you in getting better results with more certainty.
Be it a high-rise office building, a state-of-the-art rail station or a large scale industrial development, the need to achieve value for money is central to every investment strategy.
Our people understand the need to accurately advise on costs and procurement at planning stage, ensuring a development or program is both economically and environmentally viable for many years to come.
ENVIRONMENT
We all deserve a clean, safe environment in which to live. Now more than ever, businesses and governments recognize the need to incorporate environmental concerns into their decision making. Arcadis is a global leader in inventive technical and financial approaches, helping some of the world’s leading corporates and governments understand their impact on the natural world.
(Cont’d)
113OTHER INFORMATION
PROJECT & PROGRAMME MANAGEMENT
Organizing the creation of the world’s largest, most com-plex and iconic programs of work in the built and natural environment today is no easy task. Budgets, supply chains, health and safety, timeframes and the large num-ber of parties involved can be daunting.
At Arcadis, we work alongside our clients to create the right strategy, manage and mitigate risk, and assure the outcomes to meet our clients’ business objectives and create exceptional value.
WATER
From source to tap and then back to nature, the planet’s most precious resource should be cherished.
Thanks to our centuries of experience in the water sector, Arcadis’ specialist teams around the globe are uniquely positioned to provide safe and secure water technology that is built to withstand the demands of a rapidly chang-ing world.
MALAYSIASELANGORJUBM SDN BHDARCADIS (MALAYSIA) SDN BHDARCADIS PROJEKS SDN BHDARCADIS CONSULTANCY SDN BHDLevel 5, Menara TSR12 Jalan PJU 7/3, Mutiara Damansara47810 Petaling JayaSelangor Darul Ehsan, MalaysiaGPS : 3.1616, 101.6129Tel/Fax : (60 3) 2106 8000 / (60 3) 2106 9090Email : [email protected] : Loo Ming Chee / Justin Teoh / Nur Aziz Abu Bakar / Mohamad Faiz Awang / Syed Mahadzir Syed Ahmad / Yap Sai Hoe / Lim Jit Fung, Jeffrey / Rozila Abdul Rahman / Mohd Ali Abd Karim (Non-Executive Chairman)
JOHOR47, Jalan Setia Tropika 1/30Taman Setia Tropika81200 Johor BahruJohor Darul Takzim, MalaysiaGPS : 1.5422, 103.7111Tel/Fax : (60 7) 232 8300 / (60 7) 232 8232Email : [email protected] : Syed Mahadzir Syed Ahmad / Tan Pei Ling
PENANGSuite 3A-3, Level 3AWisma Great EasternNo.25, Lebuh Light10200 Penang, MalaysiaGPS : 5.4201, 100.3408Tel : (60 4) 264 2071 / 264 2072 / 264 2073Fax : (60 4) 264 2068Email : [email protected] : Nur Aziz Abu Bakar / Yeng Khiam Jin
SABAHSuite 8A, 8th FloorWisma Pendidikan, Jalan PadangP.O.Box 11598, 88817 Kota KinabaluSabah, MalaysiaGPS : 5.9783, 116.0761Tel : (60 88) 223 369 / 223 371Fax : (60 88) 216 537Email : [email protected] : Mohd Faiz Awang / VK Wong / Lim Jit Fung, Jeffrey
SARAWAKJUBM SDN BHDNo.2 (3rd Floor)Jalan Song Thian Cheok93100 KuchingSarawak, MalaysiaGPS : 1.5532, 110.3532Tel/Fax : (60 82) 232 212 / (60 82) 232 198Email : [email protected] : Nor Azman Bin Baharum
DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION114
BRUNEIBANDAR SERI BEGAWANARCADIS (B) SDN BHDUTAMACON (B) SDN BHDUnit 25, BT ComplexKg. Jaya Setia, Mukim Berakas ‘A’ BB2713P.O.Box 313, Bandar Seri Begawan BS8670Negara Brunei DarussalamGPS : 4.9394, 114.9377Tel/Fax : (00 673) 233 2833 / (00 673) 233 2933Email : [email protected] : Shafie Yusof / Shahril Othman
KUALA BELAITUnit 18, 1st Floor, Block CLot 7563, Kg. PandanKuala Belait, KA1931Negara Brunei DarussalamTel : (673) 334 7641Email : [email protected] : Shafie Yusof / Shahril Othman
CHINAHONG KONGARCADIS HONG KONG LIMITEDARCADIS INVESTMENT SERVICES HK LIMITED38/F, AIA Kowloon Tower, Landmark East,100 How Ming StreetKwun Tong, Kowloon, Hong KongGPS : 22.3125, 114.2223Tel/Fax : (852) 2830 3500 / (852) 2576 0416Email : [email protected] : Francis Au
BEIJINGBEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD.Suite 1225 - 1242, South Wing Central Tower, Junefield Plaza10 Xuan Wu Men Wai StreetBeijing 100 052, ChinaGPS : 39.896738,116.375676Tel/Fax : (86 10) 6310 1136 / (86 10) 6310 1143Email : [email protected] : Andrew Chan
CHANGSHAARCADIS CONSULTANCY (SHANGHAI) CO. LTD. CHANGSHA BRANCHRoom 2315-2317HUAYUAN International CenterNo.36 Section 2, Xiangjiang Middle RoadTianxin District, Changsha, Hunan Province410002, ChinaGPS : 28.195233,112.976893Tel/Fax : (86 731) 8277 2500 / (86 731) 8971 6736Email : [email protected] : Chen Yong
(Cont’d)
115OTHER INFORMATION
CHENGDUARCADIS CONSULTANCY (CHENGDU) CO., LTDRoom 807, Block A, Times Plaza2 Zongfu Road, Chengdu, Sichuan Province 610 016, ChinaGPS : 30.656666,104.080567Tel/Fax : (86 28) 8671 8373 / (86 28) 8671 8535Email : [email protected] : Gary Lin
CHONGQINGARCADIS CONSULTANCY (CHENGDU) CO., LTD. CHONGQING BRANCHRoom 3409-3410, International Trade Centre38 Qing Nian Road, Central District Chongqing 400010, ChinaGPS : 29.556331,106.574332Tel/Fax : (86 23) 8655 1333 / (86 23) 8655 1616Email : [email protected] : Gary Lin
DALIANBEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD. DALIAN BRANCHUnit 07, 32F, Xiwang Tower136 Zhongshan Road, Zhongshan DistrictDalian, Liaoning Province116001, ChinaGPS : 38.914864,121.631245Tel/Fax : (86 411) 8800 8018 / (86 411) 8800 8823Email : [email protected] : Kenn Ng
FOSHANARCADIS CONSULTANCY (SHENZHEN) CO., LTD. FOSHAN BRANCH3/F, Foshan Ling Nan Tian DiZu Miao Road Shop Nos. Z01-Z11Zu Miao Road, FoshanGuangdong Province528000, ChinaGPS : 23.031224,113.11278Tel/Fax : (86 757) 8203 0028 / (86 757) 8203 0029Email : [email protected] : Dickey Lee
GUANGZHOUARCADIS CONSULTANCY (SHENZHEN) CO., LTD. GUANGZHOU BRANCH3A10-18 Unit, 3A/FBank of America Plaza555 Ren Min Zhong RoadGuangzhou, Guangdong Province, 510 145, ChinaGPS : 23.123148,113.253628Tel/Fax : (86 20) 8130 3813 / (86 20) 8130 3812Email : [email protected] : Xu Wei Bin
(Cont’d)
DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION116
HAIKOUARCADIS CONSULTANCY (SHENZHEN) CO.,LTD. HAIKOU BRANCH Unit C 10/F Times Square2 Guomao Road, HaikouHainan Province570100, ChinaGPS : 20.029509,110.326235Tel/Fax : (86 898) 6652 7818 / (86 898) 6652 7809Email : [email protected] : Ricky Ho
HANGZHOUARCADIS CONSULTANCY (SHANGHAI) CO. LTD. HANGZHOU BRANCHRoom 1306 WinNing International100 Min Xin RoadHangzhou, Zhejiang Province310016, ChinaGPS : 30.251755,120.218913Tel/Fax : (86 571) 2829 7766 / (86 571) 2829 7622Email : [email protected] : Alex Zou
HENGQINARCADIS CONSULTANCY ZHUHAI HENGQIN CO., LTD.7/F, 156 Nan Shan Ju RoadHengqin, ZhuhaiGuangdong Province 519031, China GPS : 22.142774, 113.544438Tel/Fax : (86 756) 868 8986 / (86 756) 868 8969Email : [email protected] : Stanley Wan
MACAUARCADIS MACAU LIMITEDAvenida da Praia Grande, No. 594 Edificio BCM, 12th Floor, MacauGPS : 22.192210,113.541252Tel/Fax : (853) 2833 1710 / (853) 2833 1532Email : [email protected] : Katherine Chan
NANJINGARCADIS CONSULTANCY (SHANGHAI) CO. LTD. NANJING BRANCH1104 South Tower Jinmao Plaza201 Zhong Yang Road, NanjingJiangsu Province 210009, ChinaGPS : 32.071984, 118.783443Tel/Fax : (86 25) 57911860 / (86 25) 6698 1860Email : [email protected] : Taofen Chen
(Cont’d)
117OTHER INFORMATION
QINGDAOARCADIS CONSULTANCY (SHANGHAI) CO. LTD. QINGDAO BRANCHRoom 2008, 20F, HNA Center234 Yan An San Road, Shinan DistrictQingdao, Shangdong Province266071, ChinaGPS : 36.060852,120.375351Tel/Fax : (86 532) 8280 1818 / (86 532) 8280 1881Email : [email protected] : Andy Feng
SHANGHAIARCADIS CONSULTANCY (SHANGHAI) CO. LTD. 11th Floor, Building C, The PlaceNo. 150, Zunyi RoadChangning DistrictShanghai 200051, China GPS : 31.207363, 121.407984Tel/Fax : (86 21) 6026 1300 / (86 21) 6026 1800Email : [email protected] : Joe Chan
SHENYANGBEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD. SHENYANG BRANCHRoom 3013-3015, Office Tower 1Forum66, 1-1 Qingnian AvenueShenhe District, Shenyang 110063Liaoning, ChinaGPS : 41.799603,123.433787Tel/Fax : (86 24) 3195 8880 / (86 24) 3128 6983Email : [email protected] : Simon Chow
SHENZHENARCADIS CONSULTANCY (SHENZHEN) CO. LTD.Room 1001, AVIC Centre1018 Huafu Road, Shenzhen Guangdong Province 518031, ChinaGPS : 22.543241, 114.082051Tel/Fax : (86 755) 2598 1841 / (86 755) 2598 1854Email : [email protected] : Kenneth Lo
SUZHOUARCADIS CONSULTANCY (SHANGHAI) CO. LTD. SUZHOU BRANCHRoom 906, The Summit118 Suzhou Avenue WestSuzhou, Jiangsu Province215021 ChinaGPS : 31.315966, 120.669099Tel/Fax : (86 512) 8777 5599 / (86 512) 8777 5600Email : [email protected] : Zhang Rui
(Cont’d)DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION118
TIANJINBEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD. TIANJIN BRANCH4002, 40/F Tianjin World Financial Centre Office Tower 2 Dagubei Road, He Ping District, Tianjin 300 020, ChinaGPS : 39.129619,117.202758Tel/Fax : (86 22) 2329 8611 / (86 22) 2319 3186Email : [email protected] : Kenn Ng
WUHANARCADIS CONSULTANCY (SHANGHAI) CO. LTD. WUHAN BRANCHRM.1703, Citic Pacific MansionNo.1627 Zhongshan Avenue, Jiangan DistrictWuhan, Hubei Province 430 010, ChinaGPS : 30.616813, 114.317276Tel/Fax : (86 27) 5920 9299 / (86 27) 5920 9298Email : [email protected] : Wong Chin Ying
XI’ANARCADIS CONSULTANCY (SHENZHEN) CO., LTD. XI’AN BRANCHRoom 1606-1607, CapitaMall Office Building64 South Second Ring WesternXi’an, Shaanxi Province710065, ChinaGPS : 34.230397,108.934893Tel/Fax : (86 29) 8866 9711 / (86 29) 8866 9760Email : [email protected] : Wang Zhu Zhu
INDIA BANGALOREARCADIS INDIA PRIVATE LIMITED135, 4th Floor, RMZ TitaniumOld Airport Road, KodihalliBangalore 560 017, IndiaTel/Fax : (00 91 80) 4123 9141 / (00 91 80) 4123 8922Email : [email protected] : Sreekanth A P V
DELHIARCADIS INDIA PRIVATE LIMITED3rd Floor, Tower BLogix Techno ParkSector 127, Uttar Pradesh 201304 Noida, IndiaTel : (00 91 120) 436 8400Email : [email protected] : Sreekanth A P V
(Cont’d)
119OTHER INFORMATION
MUMBAIARCADIS INDIA PRIVATE LIMITEDPlatinum Techni Park – Offices 802,803,804Plot no. 17-18Sector 30A, VashiNavi, Mumbai 400705Maharashtra, IndiaTel : (00 91 22) 6464 5591Email : [email protected] Contact : Sreekanth A P V
INDONESIABALIP.T. ARCADIS INDONESIALevel 2, Alamanda OfficeJalan By Pass Ngurah Rai No. 67Banjar Pengenderan, KedongananBali 80361, IndonesiaGPS : 8.7893, 115.2106Tel/Fax : (00 62 361) 472 5353 / (00 62 361) 472 5354Email : [email protected] : Ir. Putu Arya Canti
JAKARTAP.T. ARCADIS INDONESIALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846Email : [email protected] [email protected] : Peter Robinson / Haelly Hamid / Gary Miles / Natalia Pujiyanti
PHILIPPINESMANILAARCADIS PHILIPPINES INC25th Floor, Circuit Corporate Center 1Circuit Makati, A.P. Reyes Street, Bgy CarmonaMakati City 1207, PhilippinesGPS : 14.57333, 121.01802Tel/Fax : (00 63 2) 811 2971 / (00 63 2) 811 2071Email : [email protected] : Darneil Perez / Michael Hearn
CEBU12F, 2Quad Bldg. Cardinal Rosales Avenue Cebu Business Park Cebu City 6000, PhilippinesGPS : 10.3142574, 123.9053502Tel/Fax : (00 63 32) 2322 200 / (00 63 32) 2603 699Email : [email protected] : Darneil Perez / Michael Hearn
(Cont’d)DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION120
JAKARTALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846Email : [email protected] : Peter Robinson
JAKARTALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846Email : [email protected] : Peter Robinson
SINGAPOREARCADIS SINGAPORE PTE LTD1 Magazine Road#05-01 Central MallSingapore 059567GPS : 1.288526,103.842085Tel : (65) 6222 3888 / (65) 6224 7089Email : [email protected] : Tim Risbridger / Khoo Sze Boon / Lorimer A. Doig
ARCADIS PROJECT MANAGEMENT PTE LTD1 Magazine Road#05-01 Central MallSingapore 059567GPS : 1.288526,103.842085Tel/Fax : (65) 6222 3888 / (65) 6224 7089Email : [email protected] : Tim Risbridger / Teoh Wooi Sin
THAILANDBANGKOKARCADIS (THAILAND) LTD10th Floor, Kian Gwan II Building140/1 Wireless Road, Lumpini, PratumwanBangkok 10330, ThailandGPS : 13.734969, 100.545448Tel/Fax : (00 66 2) 253 1438 / (00 66 2) 253 4977Email : [email protected] : Ang Yen Kooi / Wong Soon Bin
VIETNAMHANOIARCADIS VIETNAM CO LTDLevel 2, Hoa Binh Tower Building 106 Hoang Quoc Viet StreetCau Giay District, Hanoi, VietnamGPS : 21.046818, 105.795193Tel/Fax : (84 24) 3942 7525 / (84 24) 3942 7526Email : [email protected] : Mark Olive
HO CHI MINH CITYL12-03, Level 12, VINCOM Center B 72 Le Thanh Ton StreetBen Nghe wardDistrict 01, Ho Chi Minh City, VietnamGPS : 10.777936, 106.702265Tel/Fax : (84 28) 3823 8297 / (84 28) 3823 8197Email : [email protected] : Mark Olive
(Cont’d)
121OTHER INFORMATION
ARCADIS ASIA HEADQUARTERS HONG KONG ARCADIS ASIA LIMITEDARCADIS ASIA REGIONAL HEADQUARTERS LIMITED38/F, AIA Kowloon Tower, Landmark East 100 How Ming StreetKwun Tong, Kowloon, Hong KongGPS : 22.3125, 114.2223Tel/Fax : (852) 2830 3500 / (852) 2576 0416Email : [email protected] : Matt Bennion, CEO, Asia / Eric De Kruif, CFO Asia
ARCADIS HEADQUARTERS AMSTERDAMARCADIS NV“Symphony”Gustav Mahlerplein 97-1031082 MS AmsterdamP.O. Box 78951008 AB AmsterdamThe NetherlandsTel/Fax : (31 20) 201 1011 / (31 20) 201 1002Email : [email protected] : www.arcadis.comContact : Stephanie Hottenhuis, Executive Board Member
(Cont’d)DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION122
123OTHER INFORMATION
TELEPHONE DIRECTORY (MALAYSIA)
Ministries/DepartmentsDepartment of Statistics MalaysiaDepartment of Town and Country PlanningMinistry of Domestic Trade, Co-operatives & ConsumerismMinistry of Urban Wellbeing, Housing & Local GovernmentMinistry of Works MalaysiaKuala Lumpur City Hall (DBKL)Perbadanan PutrajayaPetaling Jaya City Council (MBPJ)Shah Alam City Council (MBSA)Subang Jaya Municipal Council (MPSJ)Kajang Municipal Council (MPK)Selayang Municipal Council (MPS)Ampang Jaya Municipal Council (MPAJ)City Council of Penang Island (MBPP)SIRIM BerhadThe Malaysia Highway AuthorityContractor’s AssociationMaster Builders Association MalaysiaContractor’s Registration BoardConstruction Industry Development Board (CIDB)Professional Registration BoardsBoard of Architects MalaysiaBoard of Engineers MalaysiaBoard of Quantity Surveyors MalaysiaProfessional BodiesAssoc. of Consulting Engineers Malaysia (ACEM)Malaysia Institute of Architects (PAM)Malaysia Institute of Planners (MIP)The Institution of Engineers Malaysia (IEM)Royal Institution of Surveyors Malaysia (RISM)Other Important NumbersAmbulance & PoliceCivil Defence (Rescue)Fire FighterGeneral Hospital KLSYABAS Sdn BhdTenaga Nasional (KL)
03-8885 700003-2265 0600
03-8882 5500
03-8000 800003-8000 800003-2617 900003-8000 800003-7956 354403-5510 513303-8024 770003-8737 789903-6126 580003-4296 800004- 259 202003-5544 600003-8738 3000
03-7984 8636
03-4047 7000
03-2698 287803-2691 209003-2610 8140
03-2095 003103-2202 286603-7877 063603-7968 400103-7955 1773
999999999
03-2615 63911800 88 525203-2296 5566
5
JUBM SDN BHDARCADIS (MALAYSIA) SDN BHD ARCADIS PROJEKS SDN BHDARCADIS CONSULTANCY SDN BHDLevel 5, Menara TSR, 12 Jalan PJU 7/3Mutiara Damansara, 47810 Petaling JayaSelangor, MalaysiaTel: (603) 2106 8000 / 2106 9000Fax: (603) 2106 9090Email: [email protected]
FOLLOW US@Arcadis_Asia
JOIN USLinkedln Arcadis
www.arcadis.com