profil syarikat 2017 - samase.com.mysamase.com.my/muaturun/profil syarikat 2017 (bm).pdf ·...
Post on 05-Feb-2018
460 Views
Preview:
TRANSCRIPT
PROFIL SYARIKAT 2017
•
•
•
•
•
•
•
•
SA MAINTENANCE & SERVICES (M) SDN BHD (718754 U)
1 PROFIL SYARIKAT 2017
2 PROFIL SYARIKAT 2017
ALAMAT BERDAFTAR No. 206 Jalan Rajawali Felda
kerteh 3 ,23100 Paka Dungun
Terengganu
3 PROFIL SYARIKAT 2017
ISI KANDUNGAN ____________________________________________________________________
1. MAKLUMAT KORPORAT Pengenalan Objektif Syarikat Latar Belakang Syarikat Carta Organisasi BIODATA Pengarah Urusan
2. KESIHATAN, KESELAMATAN & ALAM SEKITAR
Polisi Kesihatan, Keselamatan & Alam Sekitar 3. AKTIVITI PERNIAGAAN 4. PENDAFTARAN & LESEN 5. ASET & PERALATAN 6. REKOD PENGALAMA KERJA 7. ANUGERAH PERCAPAIAN PRESTASI 8. IKRAR INTERGRITI MALAYSIA
4 PROFIL SYARIKAT 2017
Pengenalan
Sukacitanya kami SA MAINTENANCE & SERVICES (M) SDN BHD ingin memperkenalkan
brosur syarikat kami, dengan harapan ia dapat memberi sedikit gambaran tentang organisasi
kami. Dilampirkan juga dokumen-dokumen yang berkaitan agar pemahaman yang sebaiknya
untuk pihak tuan/puan.
SA MAINTENANCE & SERVICES (M) SDN BHD adalah sebuah syarikat perniagaan
bumiputera 100% yang ditubuhkan dan diperbadankan dibawah Akta Syarikat 1965 pada
20hb Disember 2005. SA MAINTENANCE & SERVICES (M) SDN BHD telah bergiat aktif
dalam bidang industri minyak and gas ini pada 11hb April 2007. Syarikat ini telah memulakan
perniagaan dengan menyediakan pelbagai perkhidmatan kepada pelanggan dan membuka
peluang pekerjaan kepada anak-anak muda serta masyarakat bumiputra di dalam bidang
industry minyak dan gas terutamanya di Kawasan Perindustrian Kerteh, Terengganu.
SA MAINTENANCE & SERVICES (M) SDN BHD adalah sebuah syarikat yang menawarkan
perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim
& Pengandung Tekanan Tak Berapi (BOILER OVERHAUL), Kejuruteraan Awam dan
Binaan,Perkhidmatan Kebersihan & Rawatan, Penyelenggaraan & Kejuruteraan Loji, Kerja-
Kerja Paip dan Fabrikasi Struktur Logam, Kerja-Kerja Pemesinan, Perkhidmatan Guna
Tenaga dan Perkhidmatan Pembekalan.
Pelan pertumbuhan kami adalah untuk sentiasa berusaha ke arah prestasi yang cemerlang
pada perkhidmatan kami, memenuhi permintaan pelbagai industri dengan menetapkan
penanda aras operasi yang lebih tinggi dan langkah-langkah kawalan kualiti yang ketat untuk
mengekalkan tahap tinggi profesionalisme dan mengambil pendekatan yang dinamik,
progresif dan inovatif ke arah perniagaan kami.
5 PROFIL SYARIKAT 2017
OBJEKTIF SYARIKAT
Untuk mengembangkan dan meningkatkan keupayaan dan kecekapan kami dalam
menyediakan perkhidmatan berkualiti tinggi dalam bidang Penyelenggaraan,
Kejuruteraan, Pembaikpulih, Servis, Kerja-kerja EPCC/TA/SHUTDOWN terutamanya
dalam industri minyak & gas serta petrokimia.
Untuk menyediakan peluang pekerjaan kepada penduduk tempatan.
Untuk mencari ke hadapan dalam menyediakan perkhidmatan yang sangat baik dan
harga yang kompetitif dalam kerja-kerja mekanikal dan industri perdagangan.
6 PROFIL SYARIKAT 2017
LATAR BELAKANG SYARIKAT
Nama Syarikat : SA MAINTENANCE & SERVICES (M) SDN BHD
No. Pendaftaran : 718754-U
Tarikh Ditubuhkan : 20 DISEMBER 2005
Jenis Perniagaan : KERJA-KERJA PENYELENGGARAAN DALAM INDUSTRI MINYAK, GAS SERTA PETROKIMIA
Alamat Ibu Pejabat : NO 206 JALAN RAJAWALI, FELDA KERTEH 3 23100 PAKA, DUNGUN,TERENGGANU
Alamat Bengkel : NO. PT 21907, KG TOK ARUN, OFF JLN SANTONG, 23100 DUNGUN, TERENGGANU
Hubungi No. : Tel. No.: +609 8208141 Fax No.: +609 8208142
Email : sa_maintenance@yahoo.com.my
Struktur ekuiti : MALAYSIAN (BUMIPUTERA 100%)
Setiausaha syarikat : (LS BASE SERVICES (TR 0006652 X) ROHIZAM BINTI HAMZAH NO 66/44, TAMAN SRI INTAN
JALAN SULTAN OMAR 20300 KUALA TERENGGANU
Modal Dibenarkan : RM500,000.00 Modal Berbayar : RM500,000.00
Akaun Bank : Maybank Berhad, Caw. Paka, Terengganu : CIMB Bank Berhad, Caw. Dungun, Terengganu
Auditor : KUZAIMI & CO
7 PROFIL SYARIKAT 2017
CARTA ORGANISASI
LEMBAGA PENGARAH
SETIAUSAHA SYARIKAT
PENGARAH URUSAN Mat Said Mamat
PENGURUS AKAUN Zainani Zakaria
BAHAGIAN PENGURUSAN PROJEK
RUSLINA WATI BINTI MAMAT
E-PEROLEHAN & PENGURUS TENDER
Wan Zaidi Wan Hussin
8 PROFIL SYARIKAT 2017
BIODATA PENGARAH URUSAN
Maklumat Peribadi
Nama : Mat Said Bin Mamat
Jawatan : Pengarah Urusan
No Kad Pengenalan : 521106-11-5169
Tarikh Lahir : November 06th, 1952
Alamat : No 206, Jln Rajawali, Felda Kerteh 03,
23100 Paka, Dungun, Terengganu DarulIman
Mobile No. : 013-9231152
Status : Married
Communication Skill : B. Malaysian / English - Spoken & Written
Pengalaman Kerja:-
Lebih 40 tahun pengalaman dalam bidang penyelenggaraan mekanikal bekerja, baik pulih,
servis, kerja-kerja EPCC projek dan pulih kerja-kerja terutamanya dalam industri minyak &
gas dan petrokimia.
9 PROFIL SYARIKAT 2017
KESIHATAN, KESELAMATAN & ALAM SEKITAR
SA MAINTENANCE & SERVICES (M) SDN BHD
POLISI KESELAMATAN, KESIHATATAN & ALAM SEKITAR
Polisi utama SA Maintenance & Services (M) Sdn.Bhd ( SAMASE ) adalah berusaha mencapai kecemerlangan dalam semua bidang. SAMASE amat komited untuk mewujudkan persekitaran kerja yang sihat dan selamat bagi semua pekerja dan pelawat yang berada di persekitaran. Dalam merealisasikan matlamat tersebut, SAMASE komited dalam :-
Mematuhi segala undang-undang dan peraturan-peraturan yang berkaitan dengan segala aktiviti, proses kerja.
Mengekalkan tata amalan kerja yang baik bagi memastikan keselamatan, kesihatan dan persekitaran berada dalam keadaan terbaik.
Memberi latihan yang sewajarnya kepada semua pekerja yang terlibat
Membekalkan alat pelindung diri yang bersesuaian dengan kerja kepada
semua pekerja. Semua pekerja, pelawat dan orang awam mesti mematuhi sepenuhnya polisi ini ketika berada di dalam kawasan Premis. Mat Said Bin Mamat Pengarah Urusan 01 Januari 2015
10 PROFIL SYARIKAT 2017
AKTIVITI PERNIAGAAN KAMI
PERKHIDMATAN PENYELENGGARAAN MEKANIKAL
Baikpulih Dandang (Boiler) & Kerja-Kerja Servis Baikpulih Dandang (Boiler overhaul)
dan kerja-kerja servis adalah aktiviti utama kami di kalangan orang lain. Selain baik pulih dan servis, kami mempunyai keupayaan untuk melakukan pembaikan semula tiub-kerja-kerja serta memasang dandang baru.
Unfired Pressure Vessels (UPV)
Valves overhaul/services
11 PROFIL SYARIKAT 2017
Loji Penyelenggaraan (Plant Maintenance) Dari awal sederhana menyediakan pembaikan dan perkhidmatan
penyelenggaraan loji kecil syarikat itu telah berkembang menjadi kuasa hebat di dalam menyediakan perkhidmatan yang lebih kompleks dan bersepadu, termasuk penyelenggaraan loji berfungsi. SAMASE yang pakar dalam bidang masing-masing untuk menyampaikan perkhidmatan yang berkualiti kepada pelanggan.
DIANTARA KERJA-KERJA TERAS
• kerja-kerja Pemulihan • Perlindungan kakisan • Pembaikan Konkrit • Waterproofing • Insulation • Persediaan permukaan
Syarikat telah terlibat dalam pemulihan dan kerja-kerja lain yang berkaitan dengan pelbagai kilang di PETRONAS Group of Companies: a) Penapisan Petronas Penapisan (T) Sdn Bhd b) Petronas Gas Berhad (PGB) Petronas Gas Berhad - GPK
Petronas Gas Berhad - GPS Petronas Gas Berhad - UK / UG b) Petronas Chemical Group (PCG) Petronas Chemical Polyethylene / Ethylene LDPE Petronas Chemical Kerja-kerja Fabrikasi
Paip dan struktur keluli pra-fabrikasi akan dilakukan di bengkel kami. Fabrikasi akan berdasarkan kepada spesifikasi pelanggan. kualiti akan mengikut
12 PROFIL SYARIKAT 2017
spesifikasi pelanggan teknikal dan semua kod, standard, spesifikasi dan peraturan berkanun dirujuk di dalamnya.
Kerja-kerja Teras: Kerja Paip
Kerja Stuktur Besi
13 PROFIL SYARIKAT 2017
Penebat Panas & Sejuk (Hot & Cold Insulation) Pasukan Insulation kami adalah salah satu yang
paling berpengalaman di Terengganu. Pasukan kami mempunyai pengalaman bekerja di kilang petrokimia seperti Petronas Group of Companies.
Kerja Penyelenggaraan Lukisan (Initial/Maintenance Painting)
14 PROFIL SYARIKAT 2017
Kejuruteraan & Kerja-kerja Mesin
Perkhidmatan Guna Tenaga SAMASE telah berjaya membekalkan tenaga kerja yang berkelayakan dan
berpengalaman untuk pelbagai pelanggan sama ada secara langsung kepada PETRONAS GROUP atau KONTRAKTOR UTAMA.
SAMASE mempunyai keupayaan menyediakan pelbagai keperluan tenaga
manusia seperti berikut:
• Confined Space Entry (NIOSH Certified) Hole Watcher General Worker
• Fire Watcher (BOMBA & CEFS Certified) • Hydrojetter (NIOSH Certified) Technical Clerk • Work Leader
Perkhidmatan Pembekalan (Trading)
15 PROFIL SYARIKAT 2017
Kami juga berpengalaman dalam bidang khidmat pembekalan bahan minyak dan gas dan peralatan seperti kelengkapan paip, injap, perangkap stim, alat, jentera, alat ganti, dan lain-lain.
16 PROFIL SYARIKAT 2017
BIDANG-BIDANG LESEN
17 PROFIL SYARIKAT 2017
18 PROFIL SYARIKAT 2017
19 PROFIL SYARIKAT 2017
20 PROFIL SYARIKAT 2017
21 PROFIL SYARIKAT 2017
22 PROFIL SYARIKAT 2017
23 PROFIL SYARIKAT 2017
24 PROFIL SYARIKAT 2017
25 PROFIL SYARIKAT 2017
ASET & PERALATAN
No Description Quantity
1 Transport Forklift 3T - 1 ea Lorry 3T - Hicom 1 ea 2 Hydrotest equipment & accessories Chart Recorder c/w paper chart – Rototherm (0 to 6000 psi) 1 ea Chart Recorder c/w paper chart – Rototherm (0 to 1500 psi) 1 ea Chart Recodrder c/w paper chart – Rototherm (0 to 500 psi) 1 ea Pressure Gauge – Tecsis (0 to 580 psi) 2 ea Pressure Gauge – Ashcroft (0 to 1450 psi) 2 ea Pressure Gauge – Tecsis (0 to 3500 psi) 2 ea Pressure Gauge – Ashcroft (0 to 3700 psi) 2 ea Pressure Gauge – Tecsis (0 to 5800 psi) 2 ea Hand Pump 2 ea Airless Pump 1 ea 3 Confine Space equipment & accessories Explosion proof hand lamp 8 ea Transformer 4 ea 12” Ventilator Fan c/w hose 8 ea Air Line Trolley Draeger Pas Air Pack 1 1 ea Gas Detector MSA Altair 4 in 1 3 ea 4 Lifting tools & accessories 1 lot Chain block AKITA Level block Elephant Looper Shackle Lifting belt Webbing sling 5 Welding tools & accessories Welding Inverter 240/415V GM3000 Murex 2 ea Welding Inverter IT2000 AC/DC ARC 1 ea Junction Box, 4 outlet 4 ea TIG set 4 ea Welding Cables 500A, Australia Proflex 10 rolls Extension wire TRS 70/0.193/3C MPCI 40 rolls Cutting Torch MK250/251 1 ea Air Angle Grinder 4” ATS 1402A 8 ea Air Angle Grinder 4”, Bosch GWS-8-100Z 16 ea Air Angle Grinder 7”, Bosch 4 ea Air Angle Sander 4”, Bosch 4 ea Straight Grinder, Bosch GGS-5000L 2 ea Air Die grinder ¼” Puma 2 ea MS Baking Oven Force Arc BM151B 150kg 2 ea Quiver 5 ea
26 PROFIL SYARIKAT 2017
6 Tube Working Tools & Accessories Sugino Tube Expander BK-526 with DM c/w spare roller 1 ea Sugino Tube Expander BK-503 with DM c/w spare roller 1 ea Sugino Drum Mandrel DM-11 for BK Type Tube Expander 1 ea
7 Communication tools Walkie Talkie, Motorola GP-328 IS 16ch UHF 14 ea
8 Fire Safety Preventor 1 lot Fire Extinguisher Fire Water Hose 2” Signage/Signboard
9 Handtools / Powertools 1 lot Spannar Knock Ring Copper Hammer Impact wrench Jig Saw Impact Drill
10 Air Manifold c/w 6 outlets 2 ea 11 Pallet truck 3ton 1 ea 12 Test bench PSV 1 ea 13 Safety harness, c/w carabina, energy absorber, double lanyard large
hook 1 lot
14 Toolbox 1 lot
27 PROFIL SYARIKAT 2017
REKOD PENGALAMAN KERJA
ID DESCRIPTIONS OWNER DATE CLIENTS
METALLIC STRUCTURAL/PIPING (SM5090100)
Material supply, fabrication and installation of Hydrant
piping modification.
Scope of Work :
Demolition of existing pipe
Fabrication of piping and/or spool
Installation of new piping and/or spool
Painting work including surface preparation and
inspection.
Supply, fabrication and installation of piping
supports
Excavation work necessary
Inspection test plan
Required test based on inspection test plan
Erect scaffold at the worked areas as necessary.
(PO Number: 4120161632)
(RFX Number : 6100020389)
SA Maintenance &
Services (M) S/B December 2016 INSTEP
1
MECH MAINT-BOILERS (SM5010200): PR#To Fabricate, Supply, Delivery, Installation and
Commissioning of Four (4) Units of Steam Condenser
(Airfin Fan Cooler)at Gas Processing Plant Santong
(GPS), Petronas Gas Bhd.
Scope of Work :
Perform engineering, procurement & fabrication of
four (4) units of airfin fan coolers with all fixed
removable & installation of internal and external
components (mounting accessories, fittings
&hardware).
To supply manpower & equipment to install at site.
Perform inspection, QA/QC and testing recognized by
DOSH.
Perform surface preparation and painting as per
PETRONAS Technical Standard for Header Boxes
and Hot Dip Galvanizing (HDG) for Bundle Frames.
Provide transportation from the fabrication/assembly
location to the work site in PGB premise
Perform blinding and de-blinding activities.
Dismantling of existing airfin fan cooler bay including
tube bundles, plenum chambers, fan and drive systems.
Replace corroded setting plate & bolt and nut as per
PGB advice.
Install new sets of tube bundles and reinstallation of
existing airfin fan cooler bay including tube bundles,
plenum chambers, fan and drive systems.
(Order Number :)
(Contract No.: DTC-KTH/PGB-GPU/2016/0151)
SA Maintenance &
Services (M) S/B Sept 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
2
MECH MAINT-BOILERS (SM5010200):
To Perform HRSG A Main Stack Expansion Joint
Replacement at Utilities Gebeng Plant (UG), Gebeng,
Kuantan, Pahang.
Scope of works.
Remove all existing hex bolts
Remove all existing expansion joint bellow
Install new expansion joint bellow
Install new hex bolts
(Order Number: 3620275673)
(Contract No.: SM4Y160505/6200154645)
SA Maintenance &
Services (M) S/B Sept 2016
Petronas Gas Bhd
Utility Gebeng (UG)
28 PROFIL SYARIKAT 2017
3
METALLIC STRUCTURE/PIPING (SM5090100):
# Perform Major GP1 Piping Replacement
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform Rectification
Works of Piping at GPK1, Gas Processsing Plant omplex
A, Kertih, Kemaman, Terengganu Darul Iman.
Scope of Work :
To fabricate new spool at contractor’s workshop
To remove insulation at existing spool
To remove old pipe spool & install new spool
To perform blasting painting for new pipe spool
To supply manpower & equipment to install pipe spool
at site
Perform 100% RT (butt weld) and 100% Visual and
Dye Pent (fillet weld) on joint.
To reinstate insulation at the replaced pipe spool
Perform Blind and Deblinding
(Order No.: 4120154897)
(RFQ No.: 6200160635)
SA Maintenance &
Services (M) S/B Sept 2016
Petronas Gas Bhd,
Gas Processing
Kerteh (GPK)
4
HEAT EXCHANGERS, CONDENSERS &
COOLER (SM5010400):
Tube Bundle Replacement EB234 Stripper Reboiler.
Supply (1) one unit of Tube Bundles for Heat Exchanger
EB 234 Stripper Reboiler.
Scope of Work :
Supply (1) one unit of complete tube bundle with all
fixed and removable internal (tube sheet,
baffles,impingement plate) as per requirements
Fluorocarbon coating or hot dipped galvanized of all
B7 bolts for all joint including isolation.
Upgraded version of metal jacketed ring gasket with
exceptional of s[iral wound (SW) and ring type joint
(RTJ) to comprofile type of gasket including spares.
Supply head cover according to the applicable
standard.
Complete inspection, QA/QC and testing
requirements, surface preparation and painting (as per
PTS 15.20.03).
Transportation from the fabrication to the point of
delivery at site.
(Order Number: 4120153731)
(RFQ Number.: 6200158119)
SA Maintenance &
Services (M) S/B August 2016
Petronas Chemicals
MTBE Sdn Bhd.
5
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700):
Perform UPV D Servicing
To perform complete Mechanical Work of Unfired
Pressure Vessels and associate equipment for DOSH
inspection at Utilities Kertih, Terengganu Darul Iman.
Scope Of Work:
Dearator Head B (C1-2103B)
Dearator Storage Vessel B (V1-2103B)
o To perform blinding & de-blinding as per blind list.
o To remove insulation for access inspection activities
o Open/ dismantle side manways and tray.
o To perform tubing internal cleaning using vaccum
cleanin power brushing (ST-2) on parent metal &
ST-3 on weldment.
o Prepare and execute repair procedure for DOSH
Inspection
Condensate Cooler (E1-2103G)
Condensate Cooler (E1-2103H)
Condensate Cooler (E1-2103I)
Condensate Cooler (E1- 2103J)
Condensate Cooler (E1-2103K)
Condensate Cooler (E1-2103L)
o To perform blinding & de-blinding as per blind list.
o To remove insulation for access inspection activities
o Open/ dismantle side manways and 100% tubes
plug.
SA Maintenance &
Services (M) S/B August 2016
Petronas Gas Bhd,
Utility Kerteh (UK)
29 PROFIL SYARIKAT 2017
o To perform tubing internal cleaning using hydrojet
10,000 psi and air blowing in tubes.
o Prepare and execute repair procedure for DOSH
Inspection
(Order Number: 4120153274)
(RFQ Number.: 6200158213)
6
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE F-105 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS) for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
(Order Number: 3620268188)
(RFQ Number.: 6200092922)
SA Maintenance &
Services (M) S/B August 2016
Petronas Chemicals
Ethylene Sdn Bhd
7
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE & STLE F-103 Cleaning for CF
renewal at Petronas Chemicals Ethylene Sdn Bhd,
Kertih, Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There are two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Each furnace also consists of one (1) number of STLE.
Every STLE shall be cleaned by hydro-jetting method
SA Maintenance &
Services (M) S/B August 2016
Petronas Chemicals
Ethylene Sdn Bhd
30 PROFIL SYARIKAT 2017
on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS) for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
o Secondary Transfer Line Exchanger (STLE)
cleaning:
o STLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to facilitate
cleaning work.
o Hydro-jetting of both shell and tube bundle (internal
& external) using hydro-jetting method (10,000 psi
UHPWJT) at the equipment location or cleaning bay
as instructed by PCESB.
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 3620268219)
(RFQ Number.: 6200092922)
8
MECH ENG & MAINT-WORKSHOP
MACHINING (SM5080100): Design & Fabricate Cooling Fan - To Design & Fabricate
Cooling Fan KM5-0302A and Terminal Box for Electric
Motor at Gas Processing Santong (GPS), Jalan Santong,
and Terengganu Darul Iman.
Scope of Works:
Motor Fan Blade :
- Supply/fabricate motor fan blade as per
specification for 2 units of motors.
KM5-0302A (13.5kW)
PM5-0605A (70kW)
- Perform a performance test include Running ampere
and Vibration result at site.
Terminal Box and wire connection :
- Supply terminal box with wire connection for motor
KMD-0342B
- Perform a performance test include Running ampere
and Vibration result at site.
(Order No.: 4120151910)
(RFQ No.: 6200156336)
SA Maintenance &
Services (M) S/B August 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
9 MECH MAINT-BOILERS (SM5010200): SA Maintenance &
Services (M) S/B July 2016
Petronas Gas Bhd,
Utility Kerteh (UK)
31 PROFIL SYARIKAT 2017
To repair HRSG D diverter damper section at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, and
Terengganu Darul Iman.
Scope of Works:
To perform repair at detached west side diverter
damper frame.
To perform manual lifting & rigging activities to
reinstall damper frame.
To grind off/remove defects (crack) at bottom and west
structure frame and perform build up weld complete
with DPT.
To perform tack weld at guide bar GT diffuser.
To grind off/remove defects at plenum GT side and
perform build up weld.
To remove and install new lamellar seal at north, west,
south and east side bypass stack compartment.
(Order Number: 3620262866)
(Contract No.: SM8Y150604 / 620012032)
10
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE & STLE F-104 Cleaning for CF rene
wal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, K
emaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower, eq
uipment, material, consumables, and tools for executi
on of the WORKS.
There ar two (2) numbers of PTLE for each furnace, i
dentified as ET-0-E-101 A/B for furnace F-101, ET-0
-E-102 A/B for furnace F-102 with similar tagging un
til Furnace F-106. Each PTLE (both A and B units) sh
all be cleaned by mechanical means and/or hidro-jetti
ng method two (2) times per year basis.
Each furnace also consists of one (1) number of STLE
. Every STLE shall be cleaned by hydro-jetting metho
d on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment Iso
lation Sheet (EIS) for the purpose of positive isolation
and pressure testing of equipment and system of the W
ORKS.
Perform manual lifting and rigging activities to facilit
ate the WORKS.
Perform preventive maintenance work at associated e
quipment such as Transfer Line Valve (TLV) / Docok
e Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged equi
pment and surrounding areas to the satisfaction of PC
ESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE) cleanin
g:
o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning: o STLE cleaning shall be completed within three (3)
SA Maintenance &
Services (M) S/B July 2016
Petronas Chemicals
Ethylene Sdn Bhd
32 PROFIL SYARIKAT 2017
days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to facilitate
cleaning work.
o Hydro-jetting of both shell and tube bundle (internal
& external) using hydro-jetting method (10,000 psi
UHPWJT) at the equipment location or cleaning bay
as instructed by PCESB.
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 3620261644)
(RFQ Number.: 6200092922)
11
MECH MAINT-BOILERS (SM5010200):
PR# To do SH tube defining activity
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform defining activity
of superheater tube for Waste Heat Boiler (4 unit) at Gas
Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up all auxiliary & waste heat boilers
To remove fins for 25 SH tubes 1st row facing the flue
gas from the gas turbine exhaust.
Perform hydrotest and deblind works witness &
inspect by DOSH.
(Order No.: 4120147112)
(RFQ No.: 6200152866)
SA Maintenance &
Services (M) S/B June 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
12
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE F-106 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS) for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
SA Maintenance &
Services (M) S/B May 2016
Petronas Chemicals
Ethylene Sdn Bhd
33 PROFIL SYARIKAT 2017
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
(Order Number: 3620252799)
(RFQ Number.: 6200092922)
13
SPECIAL MAINT- HYDROJETTING (SS1130000):
STLE & PTLE F-101 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS) for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
(Order Number: 3620252802)
(RFQ Number.: 6200092922)
SA Maintenance &
Services (M) S/B May 2016
Petronas Chemicals
Ethylene Sdn Bhd
14
MECH MAINT-BOILERS (SM5010200):
Mech Package Boiler GPS for CF Renewal
Provision of manpower, supervision, equipment, tools,
material, and consumables for internal inspection
overhaul cleaning of all components of boiler such as
Steam Drum, Mud Drum, Fire Box, and ancillary
equipment including repair work prior to inspect and
certification for the extension of Certificate Of Fitness by
Department of Occupational Safety & Health (DOSH)at
Gas Processing Plant, Santong (GPS), Petronas Gas
Berhad (PGB), Terengganu Darul Iman.
Auxiliary Boiler A5-1203A
Waste Heat Boiler E5-1201B
Waste Heat Boiler E5-1201A
Waste Heat Boiler E5/6-1201
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
34 PROFIL SYARIKAT 2017
Open up and box up all auxiliary & waste heat boilers
Perform cleaning works for DOSH inspection.
Perform testing and servicing and overhaul of pressure
safety valve (PSV), Block Valve (BV) and check valve
(CV).
Dismantling, cleaning and reinstall multi spud gas
burned c/w burned shield and duct burner element.
Re install the steam drum removed parts,box up and
close all boiler drum manholes and access door.
(Order Number: 4120144949)
(Contract Number.: 6200151933)
15
MECH MAINT-BOILERS (SM5010200):
PR# Provision of manpower, supervision, tools,
equipment, materials and consumables for boiler repair
activity at Utility Gebeng Plant (UG), PGB, Kuantan,
Pahang.
(Order Number: 3620251294)
(Contract Number.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd
Utility Gebeng
16
MECH MAINT-FURNACES (SM5010500): PR# To perform welding & rectification of attemperator
& piping works waste heat boiler (WHB). (4 units) at Gas
Processing Santong (GPS), Gas Processing & Utilities,
Petronas Gas Bhd.
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle
Blind/deblind as per blind list
To fabricate new spool at workshop
To remove insulation at attemperator spool
To remove existing attemperator & install new
attemperator
To perform blasting painting for new attemperator
To perform NDT (PT & RT)
To perform Post Weld Heat Treatment (PWHT)
Perform Boiler HT
To reinstate insulation at the replaced pipe spool
(Order No.: 4120144687)
(RFQ No.: 6200149677)
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
17
MECH MAINT-BOILERS (SM5010200):
PR# Manpower, materials, and equipment to perform
boiler overhaul servicing at HRSG Unit F and associated
equipment for DOSH inspection at Utilities Kertih Plant
(UK), PGB, Kertih, Kemaman, Terengganu.
Heat Recovery Steam Generator B (F1-211B01)
Compressed Air Receiver F (V1-211B04)
Gas Final Scrubber (V1-211B02)
Air Cooled Heat Exchanger (E1-211B01)
o Perform blinding deblinding
o Perform cleaning and works as per SOE
o Perform testing and servicing of pressure relief
valve
o Perform flange tightening using controlled bolting
(HTW)
o Perform motor servicing & repair (Fin Fan Motor &
Scanner Air Blower)
o Perform instrument calibration and loop check.
(Order No.: 4120144561)
(RFQ No.: 6200142993)
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd,
Utility Kerteh
18
HEAT EXCHANGERS, CONDENSERS &
COOLER (SM5010400):
PR#PTLE Chamber Installation at F-101A at Petronas
Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,
Terengganu.
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
SA Maintenance &
Services (M) S/B May 2016
Petronas Chemicals
Ethylene Sdn Bhd
35 PROFIL SYARIKAT 2017
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS) for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon completion of each WORKS.
Secondary Transfer Line Exchanger (STLE)
cleaning: o STLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to facilitate
cleaning work.
o Hydro-jetting of both shell and tube bundle (internal
& external) using hydro-jetting method (10,000 psi
UHPWJT) at the equipment location or cleaning bay
as instructed by PCESB.
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 41201144488)
(RFQ Number.: 62000151498 )
19
MECH MAINT-BOILERS (SM5010200):
PR# External Contractor – SA MTN
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical work of HRSG A and associated equipment
for DOSH inspection at Utility Gebeng Plant (UG), PGB,
Kuantan, Pahang.
(Order No.: 3620249629)
(Contract Number.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd
Utility Gebeng
20
MECH MAINT-BOILERS (SM5010200):
PR# HRSG A burner vent line modification
Provision of manpower, supervision, tools, equipment,
materials and consumables for HRSG A burner vents line
modification at Utility Gebeng (UG), Kuantan, Pahang.
Scope of works:
To perform burner vent line modification as per UG’s
proposal.
To cut off/remove existing burner vent line.
To install new burner vent line.
To perform Non-Destructive Testing.
The purpose of the modification is to prevent raindrop
from entering the pipe.
(Order Number: 3620249628)
(Contract Number.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd
Utility Gebeng
21
MECH MAINT-BOILERS (SM5010200):
PR# GTB GCV/SRV N2 line purging installation
Provision of manpower, supervision, tools, equipment,
materials and consumables for GTB GCV/SRV N2
Purging line installation at Utility Gebeng Plant (UG),
PGB, Kuantan, Pahang.
Scope of works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
To supply, fabricate and install nitrogen line piping at
GTB, UG.
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd
Utility Gebeng
36 PROFIL SYARIKAT 2017
Blasting painting as per PTS and UG’s procedure
based on instruction by UG’s representative. PTS
30.48.00.31-P (15.20.03): Protective Coating and
Linings.
To cut off existing line for new nitrogen line
installation.
Perform manual lifting and rigging activities to
facilitate the WORKS.
To perform welding as per approved repair procedure
and Welding Procedure Specification.
To perform Non-Destructive Testing.
(Order Number: 36202451182)
(Contract Number.: SM8Y150510 / 620019030)
22
MECH MAINT-BOILERS (SM5010200):
PR# HRSG B Burner vent line modification
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform modification of
HRSG B burner vent line at Utility Gebeng Plant (UG),
PGB, Kuantan, Pahang.
Scope of works:
To perform burner vent line modification as per UG’s
proposal.
To cut off/remove existing burner vent line.
To install new burner vent line.
To perform Non-Destructive Testing.
The purpose of the modification is to prevent raindrop
from entering the pipe.
(Order Number: 36202451181)
(Contract Number.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B May 2016
Petronas Gas Bhd
Utility Gebeng
23
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE F-101 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
SA Maintenance &
Services (M) S/B April 2016
Petronas Chemicals
Ethylene Sdn Bhd
37 PROFIL SYARIKAT 2017
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
(Order Number: 3620244294)
(RFQ Number.: 6200092922)
24
MECH MAINT-BOILERS (SM5010200): PR# External Contractor – SA MTN
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical work of HRSG D and associated equipment
for DOSH inspection at Utility Gebeng Plant (UG), PGB,
Kuantan, Pahang.
(Order No.: 3620243472)
(Contract Number.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B April 2016
Petronas Gas Bhd
Utility Gebeng
25
MECH MAINT-BOILERS (SM5010200):
PR# IP Steam Header RV’s servicing 3 units
Provision of manpower, supervision, tools, equipment,
materials and consumables to remove, service & install
RV’s at IP Steam Header Line at Utility Gebeng Plant
(UG), PGB, Kuantan, Pahang.
Scope of works:
Remove/service/install RV’s – 3 units.
(Order No.: 3620243469)
(Contract Number.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B April 2016
Petronas Gas Bhd
Utility Gebeng
26
MECH MAINT-FURNACES (SM5010500): PR# F3-781 Boiler hotspot repair
Hotspot repair of F3-781 Auxiliary Boiler, Gas
Processing Kerteh (GPK), PGB, Kerteh, Kemaman,
Terengganu.
Perform all necessary blinding/deblinding for hotspot
repair
Provide necessary access for all inspection and repair
activities, including confined space entry for steam
drum, mud drum and furnace.
Removal of furnace rear wall components including
insulation cladding, mineral wool, rear wall casing,
rear wall refractory and rear wall tie bar (C Channel).
Perform procurement, fabrication and installation of
furnace rear components including refractory anchors,
rear wall refractory, rear wall tie-bar, rear wall casing,
mineral wool insulation, insulation cladding &
painting.
Provisional scope depends on as found condition
which covers for top furnace refractory repair.
(Order No.: 4120140948)
(RFQ No.: 6200147409)
SA Maintenance &
Services (M) S/B April 2016
Petronas Gas Bhd,
Gas Processing
Kerteh (GPK)
27
MECH MAINT-BOILERS (SM5010200):
PR# To do SH tube defining activity
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform defining activity
of superheater tube for Waste Heat Boiler (1 unit) at Gas
Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up waste heat boiler.
To remove fins for 25 SH tubes 1st row facing the flue
gas from the gas turbine exhaust.
Perform hydrotest and deblind works witness &
inspect by DOSH.
(Order No.: 4120140732)
(RFQ No.: 6200147067)
SA Maintenance &
Services (M) S/B March 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
28
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700):
# V-29208 DOSH
KR2 MIXED LPG BULLET OVERHAUL – Provision
of manpower, supervision, tools, equipment, materials
and consumables for overhaul of mixed LPG bullet
which inclusive of equipment blinding and de-blinding,
SA Maintenance &
Services (M) S/B March 2016
Petronas Penapisan
(T) Sdn Bhd (PPTSB)
38 PROFIL SYARIKAT 2017
ventilation, internal cleaning, internal scaffolding
erection and removal, blasting, power brushing and
maintenance painting for internal and external of bullet
and hydrostatic testing at Petronas Penapisan
(Terengganu) Sdn Bhd (PPTSB)Kerteh, Kemaman,
Terengganu.
To carry out blinding works for the bullet as per
PPTSB instruction
To perform cleaning and gas freeing the bullet
To perform erection and removal of internal
scaffolding (purple shaded area as per scaffolding
drawing attached)
To power tool at weldment (at the yellow, green, and
purple shaded area – both drawings)
To blast the internal bottom (clock location no5 to no7)
and paint as per PTS 13A
To replace piping and valve as per Inspection Worklist
(Order No.: 4120140684)
(RFQ No.: 6200144771)
29
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE F-103 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS) for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
(Order Number: 3620241785)
(RFQ Number.: 6200092922
SA Maintenance &
Services (M) S/B March 2016
Petronas Chemicals
Ethylene Sdn Bhd
30
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE STLE F-105 Cleaning for CF renewal
at Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
SA Maintenance &
Services (M) S/B March 2016
Petronas Chemicals
Ethylene Sdn Bhd
39 PROFIL SYARIKAT 2017
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101, ET-
0-E-102 A/B for furnace F-102 with similar tagging
until Furnace F-106. Each PTLE (both A and B units)
shall be cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
Each furnace also consists of one (1) number of STLE.
Every STLE shall be cleaned by hydro-jetting method
on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS) for the purpose of positive
isolation and pressure testing of equipment and system
of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction of
PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of top and bottom cones including opening
of Coke Catcher.
o Cleaning of coke by mechanical means or hydro-
jetting method (10,000 psi UHPWJT) at cones,
tubes, and coke catcher as instructed by PCESB.
o Facilitate inspection / NDT work such as preparation
for Internal Rotating Inspection (IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test and
Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning: o STLE cleaning shall be completed within three (3)
days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to facilitate
cleaning work.
o Hydro-jetting of both shell and tube bundle (internal
& external) using hydro-jetting method (10,000 psi
UHPWJT) at the equipment location or cleaning bay
as instructed by PCESB.
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 3620241784)
(RFQ Number.: 6200092922)
31
MECH MAINT-HOT INSULATION (SM5120100):
# To perform AGO Castable replacement
Provision of manpower, supervision, tools, equipments,
material, and consumables to perform castable & burner
repair of Acid Gas Oxidizer 3 (AGO-3) at KCS, Gas
Processing Plant, Kerteh (GPK), Petronas Gas Berhad
(PGB), Terengganu Darul Iman.
Refractory work
o Blind/deblind as per blind list
SA Maintenance &
Services (M) S/B March 2016
Petronas Gas Bhd,
Gas Processing
Kerteh (GPK)
40 PROFIL SYARIKAT 2017
o Remove AGO-3 burner from burner throat to
gain access of confine space area inside AGO.
o Remove existing castable (both layer).
o Inform PGB to perform inspection.
o Surface cleaning and install new castables.
Burner Work
o Remove the burner from burner throat in safe
manner to a safe place.
o Inform PGB to perform inspection prior any
repair commencement.
o Repair burner as per PGB requirement.
o Perform NDT at joints as per PGB requirement.
(Order Number: 4120140233)
(RFQ Number.: 62000147092
32
MECH MAINT-BOILERS (SM5010200):
# Mech Package HRSG GPS for CF Renewal
Provision of manpower, material, and equipment to
perform boiler overhauls servicing at F5/6-2201A &
E5/6-2201B at Gas Processing Plant, Santong (GPS),
Petronas Gas Berhad (PGB), Terengganu Darul Iman.
Heat Recovery Steam Generator HRSG F5/6-2201A
(TG PMD 560)
Heat Recovery Steam Generator HRSG F5/6-2201B
(TG PMD 559)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning using 10,000
psi UHP waterjet, power tools, air blowing,
vacuum, etc) – Furnace / Super heater / Steam Drum
/ Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order Number: 4120140142)
(RFQ Number.: 62000147132)
SA Maintenance &
Services (M) S/B March 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
33
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700):
# To perform desuperheater servicing
To perform desuperheater rectification and servicing
works at Gas Processing Plant-4 (GPP-4), Gas
Processing Kerteh, Gas Processing & Utilities, Petronas
Gas Bhd, Kerteh, Kemaman, Terengganu.
G4-751 – Desuperheater for LP Steam No.1
(Letdown HP/LP)
G4-752 – Desuperheater for LLP Steam No.1
(Letdown LP/LLP)
G4-738 – Desuperheater for PT-735 A/B/D
G4-351 – T4-351
G4-451 – T4-451
G4-755 – MP Steam Header
G4-756 – LP Steam No.2
Scope Of Work
To perform blinding & de-blinding.
To perform Desuperheater rectification and
servicing.
To perform fabrication works as per existing
drawing.
To perform 100% & RT on butt-weld joints and
SA Maintenance &
Services (M) S/B April / March 2016
Petronas Gas Bhd,
Gas Processing
Kerteh (GPK)
41 PROFIL SYARIKAT 2017
100% visual and Dye-penetrant Inspection on fillet
weld joint.
To perform lifting
Supply relative materials and manpower
(ORDER NUMBER: 4120139156)
(RFQ NUMBER: 6200145548)
34
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE F-102 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
o Supply / provide skilled and competent
manpower, equipment, material, consumables,
and tools for execution of the WORKS.
o There ar two (2) numbers of PTLE for each
furnace, identified as ET-0-E-101 A/B for
furnace F-101, ET-0-E-102 A/B for furnace F-
102 with similar tagging until Furnace F-106.
Each PTLE (both A and B units) shall be
cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
o Shall install and remove blind(s) as per
Equipment Isolation Sheet (EIS) for the purpose
of positive isolation and pressure testing of
equipment and system of the WORKS.
o Perform manual lifting and rigging activities to
facilitate the WORKS.
o Perform preventive maintenance work at
associated equipment such as Transfer Line
Valve (TLV) / Docoke Valve (DV) during
cleaning activity.
o Perform cleaning and housekeeping of
packaged equipment and surrounding areas to
the satisfaction of PCESB upon completion of
each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
(Order Number: 3620237385)
(RFQ Number.: 6200092922)
SA Maintenance &
Services (M) S/B March 2016
Petronas Chemicals
Ethylene Sdn Bhd
35
MECH MAINT-BOILERS (SM5010200):
# GPP3TA TA Activities – Boiler/Smallbore
To perform welding and rectification of boiler/smallbore
at Gas Processing Plant-3 (GPP-3), Gas Processing
Kerteh, Gas Processing & Utilities, Petronas Gas Bhd,
Kerteh, Kemaman, Terengganu.
To perform blinding & de-blinding.
To perform 100% & RT on butt-weld joints and
100% visual and Dye-penetrant Inspection on fillet
weld joint.
Installation MSV & Check Valve at WHB F3-761 &
F3-771
Guillotine Gate Servicing for WHB F3-761 & F3-
SA Maintenance &
Services (M) S/B March 2016
Petronas Gas Bhd,
Gas Processing
Kerteh (GPK)
42 PROFIL SYARIKAT 2017
771
Replace pipe spool 3” CBD line from AGRU to
GPP-3 (LD-3”-9308-C1109)
Rectification work at WHB F3-761
Rectification work at WHB F3-771
Blinding/Deblinding at Auxiliary Boiler F3-781
Supply valves
IGV FD Fan repair for boiler F3-791
Supply gate valve 8” 600# Flgd RF A216WCB/HF
to PGB
(Order Number: 3620237266)
(Contract No.: SM8Y150815 / 6200128350)
36
MECH MAINT-BOILERS (SM5010200):
# GPK Package Boiler CF Renewal
To supply manpower, materials and equipment to
perform boiler overhaul servicing at F4-771, WHRU#1,
and WHRU#2 for DOSH inspection at Gas Processing
Kerteh (GPK), PGB, Kerteh, Kemaman, Terengganu.
Waste Heat Boiler F4-771 (PMD12204)
Waste Heat Boiler WHRU#1 (PMD12235)
Waste Heat Boiler WHRU#2 (PMD12236)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order Number: 4120137879)
(Contract No.: 6200144212)
SA Maintenance &
Services (M) S/B February 2016
Petronas Gas Bhd,
Gas Processing
Kerteh (GPK)
37
MECH MAINT – MECHANICAL VALVE
(SM5030100):
To Perform DOSH Inspection for UPV B:
To perform complete mechanical work of unfired
pressure vessel and associated equipment for DOSH
inspection at Utilities Kertih Plant (UK), PGB, Kertih,
Kemaman, Terengganu
Deaerator Head (C1-2103A
Air Dryer Vessel (V1-24201A)
Air Dryer Vessel (V1-24201B)
Deaerator Storage Vessel (V1-2103A)
Water Separator (V1-2402A)
Main Instr. Air Receiver (V1-2402A)
Natural Gas Surge Drum (V1-2801C)
o Perform blinding deblinding
o Open manhole & ventilation
o Remove internal fittings.
o Perform unloading media catalyst.
o Powertool cleaning & air blowing
o DOSH Inspection
o Touch up painting
o Perform loading media catalyst.
o Close manhole and boxup.
Condensate Cooler (E1-2103A)
Condensate Cooler (E1-2103B)
Condensate Cooler (E1-2103C)
Condensate Cooler (E1-2103D)
SA Maintenance &
Services (M) S/B
March 2016
&
June 2016
Petronas Gas Bhd,
Utility Kerteh
43 PROFIL SYARIKAT 2017
Condensate Cooler (E1-2103E)
Condensate Cooler (E1-2103F)
o Perform blinding deblinding
o Remove plugs
o Perform waterjetting at 10,000 psi.
o Perform air blowing
o DOSH Inspection
o Install plugs
(Order Number: 4120136800)
(RFQ No.: 6200143122)
38
MECH MAINT-BOILERS (SM5010200):
To supply manpower, materials, and equipment to
perform boiler overhaul servicing at HRSG Unit B and
associated equipment for DOSH inspection at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu.
Heat Recovery Steam Generator B (F1-211B01)
Compressed Air Receiver B (V1-211B04)
Gas Final Scrubber (V1-211B02)
Air Cooled Heat Exchanger (E1-211B01)
o Perform blinding deblinding
o Perform cleaning and works as per SOE
o Perform testing and servicing of pressure relief
valve
o Perform flange tightening using controlled
bolting (HTW)
o Perform motor servicing & repair (Fin Fan
Motor & Scanner Air Blower)
o Perform instrument calibration and loop check.
(Order No.: 4120136316)
(RFQ No.: 6200142993)
SA Maintenance &
Services (M) S/B March 2016
Petronas Gas Bhd,
Utility Kerteh (UK)
39
MECH MAINT-BOILERS (SM5010200):
To perform boiler hotspot and leak repair.
Tube leak repair and hotspot repair for Auxiliary Boiler
F2-791 Gas Processing Plant-2 (GPP-2), Gas Processing
Kerteh, Gas Processing & Utilities, Petronas Gas Bhd,
Kerteh, Kemaman, Terengganu.
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Retubing 1 length of BR tube
Removal and installation of furnace rear wall
components including refractory, insulation, C
Channel, etc.
Grind build-up defected tubes
NDT and hydrostatic test (HT)
Cleaning & overhaul for DOSH CF renewal
(Order Number: 4120136313)
(RFQ No.: 6200143188)
SA Maintenance &
Services (M) S/B
Mid Feb – End
March 2016
Petronas Gas Bhd,
Gas Processing
Kerteh (GPK)
40
MECH MAINT-BOILERS (SM5010200):
Package Boiler D for CF Renewal.
To supply manpower, materials, and equipment to
perform boiler overhaul servicing at Boiler D (F2-
211D01) and associated equipment for DOSH inspection
at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang.
(Order Number: 4120136088)
(RFQ No.: 6200142958)
SA Maintenance &
Services (M) S/B February 2016
Petronas Gas Bhd,
Utility Gebeng (UG)
41
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700):
PCC KR2LSD Modification and DOSH
Provision of manpower, supervision, tools, equipment,
materials and consumables for PCC KR2LSD
Modification and DOSH which inclusive of equipment
blinding and de-blinding, ventilation, internal cleaning,
internal scaffolding erection and removal, lifting, power
brushing and maintenance painting for internal and
internal vessel modification at Petronas Penapisan
(Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman,
Terengganu.
SA Maintenance &
Services (M) S/B January 2016
Petronas Penapisan
(T) Sdn Bhd (PPTSB)
44 PROFIL SYARIKAT 2017
To carry out blinding works for the vessel as per
PPTSB instruction
To perform cleaning and gas freeing the vessel
To perform erection and removal of internal
scaffolding (purple shaded area as per scaffolding
drawing attached)
To power tool at weldment
Internal vessel modification
(Order No.: 4120135117)
(RFQ No.: 6200140485)
42
MECH MAINT-BOILERS (SM5010200):
Mech Package Boiler GPS for CF Renewal
Provision of manpower, supervision, equipment, tools,
material, and consumables for internal inspection
overhaul cleaning of all components of boiler such as
Steam Drum, Mud Drum, Fire Box, and ancillary
equipment including repair work prior to inspect and
certification for the extension of Certificate Of Fitness by
Department of Occupational Safety & Health (DOSH)at
Gas Processing Plant, Santong (GPS), Petronas Gas
Berhad (PGB), Terengganu Darul Iman.
Waste Heat Boiler E5-1201A
Waste Heat Boiler E5-1202A
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up all waste heat boilers
Perform cleaning works for DOSH inspection.
Perform testing and servicing and overhaul of
pressure safety valve (PSV), Block Valve (BV) and
check valve (CV).
Re install the steam drum removed parts,box up and
close all boiler drum manholes and access door.
(Order Number: 4120133323)
(RFQ No.: 6200140442)
SA Maintenance &
Services (M) S/B
February 2016
&
March 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
43
MECH MAINT-BOILERS (SM5010200):
PR: To repair econ tube leak.
To perform welding and rectification of Economizer tube
for Auxiliary Boiler A6-1203 at Gas Processing Plant,
Santong (GPS), Petronas Gas Berhad (PGB),
Terengganu Darul Iman.
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation
Partial retubing Economizer Tube 5 lengths
Removal and installation of bracket
Grind build-up defected tube 1 length
NDT and hydrostatic test (HT)
Cleaning & overhaul for DOSH CF renewal Internal
cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Boiler Box-up activity and Housekeeping
(Order Number: 4120133072)
(RFQ No.: 6200140483)
SA Maintenance &
Services (M) S/B
January - February
2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
44
MECH MAINT-BOILERS (SM5010200):
To replace LG steam side isolation Gate valve at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
(Order Number: 3620232500)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B February 2016
Petronas Gas Bhd,
Utility Kerteh (UK)
45 PROFIL SYARIKAT 2017
45
MECH MAINT-BOILERS (SM5010200):
To replace Economizer vent 3” Valve, CBD valve at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
(Order Number: 3620232490)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B February 2016
Petronas Gas Bhd,
Utility Kerteh (UK)
46
MECH MAINT-BOILERS (SM5010200):
To perform repair at flange 10” HHP Header Steam Line
at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu.
(Order Number: 3620230312)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B February 2016
Petronas Gas Bhd,
Utility Kerteh (UK)
47
SPECIAL MAINT- HYDROJETTING
(SM5010200):
Blinding & PTLE F-104 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu
PTLE: Primary Transfer Line Exchanger
o Supply / provide skilled and competent
manpower, equipment, material, consumables,
and tools for execution of the WORKS.
o There ar two (2) numbers of PTLE for each
furnace, identified as ET-0-E-101 A/B for
furnace F-101, ET-0-E-102 A/B for furnace F-
102 with similar tagging until Furnace F-106.
Each PTLE (both A and B units) shall be
cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
o Shall install and remove blind(s) as per
Equipment Isolation Sheet (EIS) for the purpose
of positive isolation and pressure testing of
equipment and system of the WORKS.
o Perform manual lifting and rigging activities to
facilitate the WORKS.
o Perform preventive maintenance work at
associated equipment such as Transfer Line
Valve (TLV) / Docoke Valve (DV) during
cleaning activity.
o Perform cleaning and housekeeping of
packaged equipment and surrounding areas to
the satisfaction of PCESB upon completion of
each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening o of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
Closing and reinstallation of the cones and coke catcher;
followed by pressure testing (Coil Test and Leak Test on
the system.
(Order Number: 3620229126)
(RFQ Number.: 6200092922
SA Maintenance &
Services (M) S/B January 2016
Petronas Chemicals
Ethylene Sdn Bhd
48
MECH MAINT-BOILERS (SM5010200):
To perform repair activity at Air Drier Filter at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works:
Remove vessel & mob to site.
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Kerteh (UK)
46 PROFIL SYARIKAT 2017
Perform internal blasting to ensure no defects
inside vessel.
Cut-off/remove flange & support.
Fit-up & weld new flange as per approved
procedure.
Perform Non-Destructive Testing.
Perform Hydrostatic Test.
Install support.
Touch up painting.
Install vessel at site.
(Order Number: 3620229115)
(Contract No.: SM8Y150604 / 620012032)
49
MECH MAINT-BOILERS (SM5010200):
Valve servicing at Lube Oil cooler GAN Compressor
Unit at Utilities Kertih Plant (UK), PGB, Kertih,
Kemaman, Terengganu
(Order Number: 3620229114)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Kerteh (UK)
50
MECH MAINT-BOILERS (SM5010200):
Air Fin Cooler F cleaning for CF Renewal at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works:
Perform blinding deblinding as per EIS
Remove all plugs
Perform waterjetting at 10,000 psi.
Perform air blowing.
DOSH Inspection.
Install plugs.
(Order Number: 3620228799)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Kerteh (UK)
51
SPECIAL MAINT- REFRACTORY (SS1110000):
PTLE F-105 Cleaning for CF renewal at Petronas
Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,
Terengganu.
PTLE: Primary Transfer Line Exchanger
o Supply / provide skilled and competent
manpower, equipment, material, consumables,
and tools for execution of the WORKS.
o There ar two (2) numbers of PTLE for each
furnace, identified as ET-0-E-101 A/B for
furnace F-101, ET-0-E-102 A/B for furnace F-
102 with similar tagging until Furnace F-106.
Each PTLE (both A and B units) shall be
cleaned by mechanical means and/or hidro-
jetting method two (2) times per year basis.
o Shall install and remove blind(s) as per
Equipment Isolation Sheet (EIS) for the purpose
of positive isolation and pressure testing of
equipment and system of the WORKS.
o Perform manual lifting and rigging activities to
facilitate the WORKS.
o Perform preventive maintenance work at
associated equipment such as Transfer Line
Valve (TLV) / Docoke Valve (DV) during
cleaning activity.
o Perform cleaning and housekeeping of
packaged equipment and surrounding areas to
the satisfaction of PCESB upon completion of
each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
SA Maintenance &
Services (M) S/B January 2016
Petronas Chemicals
Ethylene Sdn Bhd
47 PROFIL SYARIKAT 2017
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings.
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
(Order Number: 3620225706)
(RFQ Number.: 6200092922)
52
MECH MAINT-BOILERS (SM5010200):
Rectify IP steam header isolation valve at Utility
Gebeng Plant (UG), PGB, Kuantan, Pahang.
To replace 2 units of 8” Gate Valve welded type.
To replace 2 units of 14” Gate valve flanged type.
Fabricate 8” IP steam header spool at workshop
Perform hydrostatic test
Perform Non-Destructive Testing
To cut-off/remove existing/defected spool
To perform new spool installation at site
To dismantle/service/install 3 units of RV’s.
(Order Number: 3620225447)
(Contract No.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Gebeng (UG)
53
MECH MAINT-BOILERS (SM5010200):
GTC GCV/SRV N2 Purging line installation at Utility
Gebeng Plant (UG), PGB, Kuantan, Pahang.
Scope of works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
To supply, fabricate and install nitrogen line piping
at GTB, UG.
Blasting painting as per PTS and UG’s procedure
based on instruction by UG’s representative. PTS
30.48.00.31-P (15.20.03): Protective Coating and
Linings.
To cut off existing line for new nitrogen line
installation.
Perform manual lifting and rigging activities to
facilitate the WORKS.
To perform welding as per approved repair
procedure and Welding Procedure Specification.
To perform Non-Destructive Testing.
(Order Number: 3620225446)
(Contract No.: SM8Y150510 / 620019030
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Gebeng (UG)
54
MECH MAINT-BOILERS (SM5010200):
HRSG D Fuel Gas Line Cleaning activity at Utility
Gebeng Plant (UG), PGB, Kuantan, Pahang.
Perform blinding deblinding.
Drop spool & valves.
Perform waterjetting inside clogged piping.
Replace all gasket & corroded stud bolt & nuts.
Install existing valves & spool.
(Order Number: 3620225445)
(Contract No.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Gebeng (UG)
55
MECH MAINT-BOILERS (SM5010200):
HRSG C Fuel Gas Line Cleaning activity at Utility
Gebeng Plant (UG), PGB, Kuantan, Pahang.
Perform blinding deblinding.
Drop spool & valves.
Perform waterjetting inside clogged piping.
Replace all gasket & corroded stud bolt & nuts.
Install existing valves & spool.
(Order Number: 3620225444)
(Contract No.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Gebeng (UG)
56 MECH MAINT-BOILERS (SM5010200): SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Gebeng (UG)
48 PROFIL SYARIKAT 2017
HRSG C Burner Vent Line modification work at Utility
Gebeng Plant (UG), PGB, Kuantan, Pahang.
Scope of works:
To perform burner vent line modification as per
UG’s proposal.
To cut off/remove existing burner vent line.
To install new burner vent line.
To perform Non-Destructive Testing.
The purpose of the modification is to prevent
raindrop from entering the pipe.
(Order Number: 3620225443)
(Contract No.: SM8Y150510 / 620019030)
57
MECH MAINT-BOILERS (SM5010200):
HRSG C CF activity #December 2015 at Utility Gebeng
Plant (UG), PGB, Kuantan, Pahang.
Perform blinding deblinding.
Open all manhole.
Perform cleaning works at superheater, economizer,
evaporator, steam drum, bypass stack, main stack &
riser.
Perform cleaning works at Final gas Scrubber,
Compressed Air Receiver & Blowdown Tank.
Remove/service/install RV’s – 10 units.
Perform repair at burner area – inner sheeting plate
patching.
DOSH activity.
Close manhole / boxup.
(Order Number: 3620225442)
(Contract No.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Gebeng (UG)
58
MECH MAINT-BOILERS (SM5010200):
HRSG B Fuel Gas Line cleaning activity at Utility
Gebeng Plant (UG), PGB, Kuantan, Pahang.
Perform blinding deblinding.
Drop spool & valves.
Perform waterjetting inside clogged piping.
Replace all gasket & corroded stud bolt & nuts.
Install existing valves & spool.
(Order Number: 3620225441)
(Contract No.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B January 2016
Petronas Gas Bhd
Utility Gebeng (UG)
59
MECH MAINT-BOILERS (SM5010200):
Open IGV bellmouth cover GT B at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Cut-off/remove bolt nut.
Open manhole.
Perform tack weld nut at manhole.
Close manhole & boxup.
(Order Number: 3620222219)
(Contract No.: SM8Y150604 / 620012032
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
60
MECH MAINT-BOILERS (SM5010200):
Repair work rectification during UPV F CF renewal at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu.
Perform repair at finding defects:
o Pinhole & linear indication observed at fillet
weld vortex breaker Deaerator Head D.
o Rounded indication was detected at 11 o’clock
position from shell view Natural Gas Heater A.
Perform grind off/remove defects.
Perform build up weld as per approved repair
procedure.
Perform Non-Destructive Testing.
(Order Number: 3620222202)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
61
MECH MAINT-BOILERS (SM5010200):
To perform loading / unloading for CP F at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu.
Scope of works.
Perform blinding deblinding.
Drop spool.
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
49 PROFIL SYARIKAT 2017
Open manhole
Perform unloading water/sand/raisin from vessel.
Perform repair at Mix Bed Exchanger mid collector.
Perform repair at internal ladder.
Perform loading water/sand/raisin into the vessel.
Install spool.
Close manhole/boxup.
(Order Number: 3620221772)
(Contract No.: SM8Y150604 / 620012032)
62
MECH MAINT-BOILERS (SM5010200):
To repair diverter damper HRSG G at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of Works:
To perform repair at detached diverter damper
frame.
To perform manual lifting & rigging activities to
reinstall damper frame.
To grind off/remove defects (crack) at structure
frame and perform build up weld complete with
DPT.
To grind off/remove defects at plenum GT side and
perform build up weld.
To remove and install new lamellar seal bypass stack
compartment.
(Order Number: 3620221769)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
63
MECH MAINT-BOILERS (SM5010200):
To perform repair expansion joint bellow at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Remove existing defected bellow
Remove machine bolts.
Install new bellow
Install/tighten new machine bolts.
(Order Number: 3620221520)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
64
MECH MAINT-BOILERS (SM5010200):
To replace gasket at HHP line 10” 2500# at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Cut-off/remove stud bolt & nuts using oxy-cutter.
Remove existing gasket
Install new gasket
Install new stud bolt & nuts.
Perform flange tightening using Hydraulic Torque
Wrench.
(Order Number: 3620221519)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
65
MECH MAINT-BOILERS (SM5010200):
To replace gasket at 12” 150# at Utilities Kertih Plant
(UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Remove stud bolt & nuts.
Remove existing gasket
Install new gasket
Install new stud bolt & nuts.
Perform flange tightening using manual torque
wrench.
(Order Number: 3620221515)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
67
MECH MAINT-BOILERS (SM5010200):
To replace 3” BFW line to 4A925CV at ASU at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
Scope of works.
Cut-off/remove defected piping.
Install new 3” pipe.
Perform Non-Destructive Testing
Install pipe shoe.
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
50 PROFIL SYARIKAT 2017
(Order Number: 3620221513)
(Contract No.: SM8Y150604 / 620012032)
68
SPECIAL MAINT- HYDROJETTING (SS1130000):
F-102 blinding deblind, top roof repair at Petronas
Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,
Terengganu.
Scope of works.
Perform blinding deblinding
(Order Number: 3620219021)
(RFQ Number.: 6200092922)
SA Maintenance &
Services (M) S/B December 2015
Petronas Chemicals
Ethylene Sdn Bhd
69
MECH MAINT-BOILERS (SM5010200):
To perform piping leak test at Utilities Kertih Plant
(UK), PGB, Kertih, Kemaman, Terengganu.
Scope of works.
Cut-off/remove clogged piping at all HRSG’s.
Perform waterjetting & air blowing inside piping.
Perform repair at leaked fittings.
Install existing piping.
Perform Non-Destructive Testing.
(Order Number: 3620218821)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B December 2015
Petronas Gas Bhd
Utility Kerteh (UK)
70
MECH MAINT-BOILERS (SM5010200):
To perform replacement economizer vent e at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu.
Scope of works.
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure.
(Order Number: 3620217023)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
71
MECH MAINT-BOILERS (SM5010200):
To perform replacement CBD valve steam drum at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
Scope of works.
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure.
(Order Number: 3620217022)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
72
MECH MAINT-BOILERS (SM5010200):
To perform replacement of spool at CP at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Remove defected PVC spool
Replace gasket.
Install new pipe spool
(Order Number: 3620216886)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
73
SPECIAL MAINT- HYDROJETTING (SS1130000):
PTLE STLE Cleaning for CF renewal at Petronas
Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,
Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
SA Maintenance &
Services (M) S/B November 2016
Petronas Chemicals
Ethylene Sdn Bhd
51 PROFIL SYARIKAT 2017
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning: o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the equipment
location or cleaning bay as instructed by
PCESB.
Re-painting or touch up painting as PTS and PCESB’s
procedure based on instruction by PCESB’s
representative. PTS 30.48.00.31-P (15.20.03): Protective
Coating and Linings
(Order Number: 3620214573)
(RFQ Number.: 6200092922)
74
MECH MAINT-BOILERS (SM5010200):
To perform repair lamellar seal HRSG G at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu.
Scope of works.
Open manhole
Erect internal scaffolding
Remove existing lamellar seal & machine bolts.
Install new lamellar seal & machine bolts.
Close manhole.
(Order Number: 3620213817)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
75
MECH MAINT-BOILERS (SM5010200):
To replace HHP vent valve HRSG G at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
52 PROFIL SYARIKAT 2017
Perform Non-Destructive Testing.
Touch up painting as per approved procedure.
(Order Number: 3620213816)
(Contract No.: SM8Y150604 / 620012032)
76
MECH MAINT-BOILERS (SM5010200):
To repair MRO E PVC pipe leak at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Remove leaked PVC pipe spool.
Fabricate new spool.
Install new PVC MRO E pipe spool.
(Order Number: 3620213815)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
77
MECH MAINT-BOILERS (SM5010200):
To fabricate ice block eliminator ASU 2 at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Fabricate structure at using c channel and
galvanized grating.
Perform welding at grating and c channel.
Perform drill at designated area for machine bolt
holes.
Perform installation at site.
(Order Number: 3620213813)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
78
MECH MAINT-BOILERS (SM5010200):
To repair Preheater A leak at Utilities Kertih Plant
(UK), PGB, Kertih, Kemaman, Terengganu.
Scope of works.
Remove bolt nut & open preheater cover plate.
Perform gasket & bolt nut replacement.
Perform internal plate replacement.
Install preheater cover plate.
(Order Number: 3620213812)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Kerteh (UK)
79
MECH MAINT-BOILERS (SM5010200):
Rectify HRSG B Diverter Damper at Utility Gebeng
Plant (UG), PGB, Kuantan, Pahang.
Scope of Works:
To perform repair at detached diverter damper
frame.
To perform manual lifting & rigging activities to
reinstall damper frame.
To grind off/remove defects (crack) at structure
frame and perform build up weld complete with
DPT.
To perform tack weld at guide bar GT diffuser.
To remove and install new lamellar seal at bypass
stack
compartment.
(Order Number: 3620213200)
(Contract No.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Gebeng (UG)
80
MECH MAINT-BOILERS (SM5010200):
Demin Water BPC & PDH pipe cleaning at Utility
Gebeng Plant (UG), PGB, Kuantan, Pahang.
Scope of works.
Perform blinding deblinding.
Drop spool & valves.
Perform waterjetting inside clogged piping.
Replace all gasket & corroded stud bolt & nuts.
Install existing valves & spool.
(Order Number: 3620213197)
(Contract No.: SM8Y150510 / 620019030)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Gebeng (UG)
81
MECH MAINT-BOILERS (SM5010200):
HRSG C Eco Module bypass rectification at Utility
Gebeng Plant (UG), PGB, Kuantan Pahang
Scope of works:
Perform blinding deblinding, open manhole &
ventilation.
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Utility Gebeng (UG)
53 PROFIL SYARIKAT 2017
Perform cutting on boiler wall.
Remove & hacking castable Module 13, 14 & 15 top
header.
Cut-off interconnecting line.
Perform lifting and install new interconnecting
bypass pipe.
Perform welding new bypass interconnecting M13
to M15 & end plate outlet interconnecting M14.
Perform Non-Destructive Testing.
Install castable, wall plate & insulation.
Close manhole & boxup.
(Order Number: 3620199291)
(Contract No.: SM8Y150510 / 620019030)
82
SPECIAL MAINT- HYDROJETTING (SS1130000):
PTLE STLE F-104 Cleaning for CF renewal at Petronas
Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,
Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning:
o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
SA Maintenance &
Services (M) S/B November 2015
Petronas Chemicals
Ethylene Sdn Bhd
54 PROFIL SYARIKAT 2017
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the equipment
location or cleaning bay as instructed by
PCESB.
Re-painting or touch up painting as PTS and PCESB’s
procedure based on instruction by PCESB’s
representative. PTS 30.48.00.31-P (15.20.03): Protective
Coating and Linings
(Order Number: 3620212939)
(RFQ Number.: 6200092922)
83
SPECIAL MAINT- HYDROJETTING (SS1130000):
PTLE STLE Cleaning for CF renewal at Petronas
Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,
Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning:
o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
SA Maintenance &
Services (M) S/B November 2015
Petronas Chemicals
Ethylene Sdn Bhd
55 PROFIL SYARIKAT 2017
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the equipment
location or cleaning bay as instructed by
PCESB.
Re-painting or touch up painting as PTS and PCESB’s
procedure based on instruction by PCESB’s
representative. PTS 30.48.00.31-P (15.20.03):
Protective Coating and Linings
(Order Number: 3620212452)
(RFQ Number.: 6200092922)
84
MECH MAINT-FURNACES (SM5010500):
PR: soot cleaning & damper service
To perform maintenance work at Furnaces F6-0301 &
F6-0602 (Soot cleaning and damper service) at GPP-6,
Gas Processing Plant Complex B
Scope of Works:
Furnace F6-0602:-
o Perform necessary blinding as per approved
blind list
o Perform soot cleaning on radiant and
convection coils (required internal scaffolding)
o Perform blowers mechanical damper minor
servicing at site.
o To provide new gasket and replace corroded
stud bolts with new
o To do repair of castables inside of furnace if
required.
o Box-up furnace and deblind (use new gasket on
each open joints and manholes).
Furnace F6-0301
o Perform soot cleaning on convection coils from
outside platform thru available soot cleaning
flanges.
o Perform blowers mechanical damper greasing
thru grease nozzle
o Box-up furnace (use new gasket on each open
joints and manholes)
(Order No.: 4120128781)
(RFQ No.: 6200137342)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Gas Processing
Santong (GPS)
85
MECH MAINT-BOILERS (SM5010200):
Provision Of Manpower, Supervision, Tools, Equipment,
Material And Consumables For boiler / piping repair
works Qtr4, Gas Processing Kerteh, Gas Processing &
Utilities, Petronas Gas Bhd, Kerteh, Kemaman,
Terengganu.
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order Number: 4120126330)
(RFQ No.: SM8Y150815 / 6200128350)
SA Maintenance &
Services (M) S/B November 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
86 SPECIAL MAINT- HYDROJETTING (SS1130000):
56 PROFIL SYARIKAT 2017
Blinding F103 at Petronas Chemicals Ethylene Sdn Bhd,
Kertih, Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning:
o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the equipment
location or cleaning bay as instructed by
PCESB.
Re-painting or touch up painting as PTS and PCESB’s
procedure based on instruction by PCESB’s
representative. PTS 30.48.00.31-P (15.20.03): Protective
Coating and Linings
(Order Number: 3620206078)
(RFQ Number.: 6200092922)
87 SPECIAL MAINT- REFRACTORY (SS1110000):
Blinding & PTLE F-101 Cleaning at Petronas Chemicals
Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.
SA Maintenance &
Services (M) S/B Oct 2015
Petronas Chemicals
Ethylene Sdn Bhd
57 PROFIL SYARIKAT 2017
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
(Order Number: 3620206962)
(RFQ Number.: 6200092922)
88
MECH MAINT-BOILERS (SM5010200):
To replace drain valve HW HP/IP Bat Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu.
Scope of works.
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure.
(Order Number: 3620205973)
(Contract No.: SM8Y150604 / 620012032)
SA Maintenance &
Services (M) S/B October 2015
Petronas Gas Bhd
Utility Kerteh (UK)
89
MECH MAINT-BOILERS (SM5010200):
Provision Of Manpower, Supervision, Tools, Equipment,
Material And Consumables For Boiler F3-791, F4-791,
F3-761 & F3-771 Internal Inspection Overhaul And
Repair Work (Mechanical Package Boiler GPK for CF
renewal)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
SA Maintenance &
Services (M) S/B October 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
58 PROFIL SYARIKAT 2017
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order Number: 4120126330)
90
METALLIC STRUCTURE/PIPING (SM5090100):
# Mechanical work & rejuvenation Demin Plant
Provision of manpower, supervision, tools, equipment,
materials and consumables for Demineralization plant
rejuvenation 2015 at Petronas Penapisan (Terengganu)
Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu.
5 units push button replacement
Gravel replacement within Demineralization plant
Concrete repair at outside border of
Demineralization plant
Cable tray replacement
To replace utility air piping
To install drain extension to DAC for ST 265
(Order No.: 4120125741)
(RFQ No.: 6200132449)
SA Maintenance &
Services (M) S/B October 2015
Petronas Penapisan
(T) Sdn Bhd
91
MECH MAINT-BOILERS (SM5010200):
Provision of manpower, supervision, tools, material,
and consumables for internal inspection overhauls and
repair work.
Auxiliary Boiler A5/6-1203
Auxiliary Boiler A6-1203
Waste Heat Boiler E6-1201B
Waste Heat Boiler E6-1201A
Waste Heat Boiler E5/6-1202
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up all auxiliary & waste heat
boilers
Perform cleaning works for DOSH inspection.
Perform testing and servicing and overhaul of
pressure safety valve (PSV), Block Valve (BV) and
check valve (CV).
Dismantling, cleaning and reinstall multi spud gas
burned c/w burned shield and duct burner element.
Re install the steam drum removed parts,box up and
close all boiler drum manholes and access door.
(Order No.: 4120123811)
(RFQ No.: 6200130886)
SA Maintenance &
Services (M) S/B
November 2015 –
January 2016
Petronas Gas Bhd
Gas Processing
Santong (GPS)
92
UNFIRED PRESSURE VESSEL: To Perform
Complete Mechanical Work Of Unfired Pressure Vessel
And Associated Equipment For Dosh Inspection At
Utilities Kertih, Terengganu Darul Iman
SA Maintenance &
Services (M) S/B Oct 2015
Petronas Gas Bhd
Utility Gebeng (UG)
93
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700):
UPV F package DOSH inspection
To Perform Complete Mechanical Work Of Unfired
Pressure Vessel (UPV-F) And Associated Equipment
For Dosh Inspection At Utilities Kertih, Terengganu
Darul Iman.
Natural Gas Surge Drum V1-2801A
Deaerator Storage Vessel V1-2103D
Deaerator Head (C1-2103D)
Natural Gas Heater E1-2102A
Main Instrument Air Receiver V1-2402B
Water Separator V1-2401B
Air Dryer Vessel V1-242B01B
SA Maintenance &
Services (M) S/B October 2015
Petronas Gas Bhd
Utility Kerteh (UK)
59 PROFIL SYARIKAT 2017
Air Dryer Vessel V1-242B01A
o Perform blinding deblinding
o Open manhole & ventilation
o Remove internal fittings.
o Perform unloading media catalyst.
o Powertool cleaning & air blowing
o DOSH Inspection
o Touch up painting
o Perform loading media catalyst.
o Close manhole and boxup..
(Order Number: 4120123405)
(RFQ No.: 6200129358)
94
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE F-101 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
(Order Number: 3620209809)
(RFQ Number.: 6200092922)
SA Maintenance &
Services (M) S/B Oct 2015
Petronas Chemicals
Ethylene Sdn Bhd
95
MANPOWER SUPPLY- LABOUR SUPPLY
(SM2010100):
Provision Of Manpower, Supervision, Tools,
Equipments, Materials And Consumables To Perform
Castable& Burner Repair Of Acid Gas Oxidizer 2
(AGO-2) At KCS, Gas Processing Plant Complex A,
Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.
Refractory work
o Blind/deblind as per blind list
SA Maintenance &
Services (M) S/B Oct 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
60 PROFIL SYARIKAT 2017
o Remove AGO-2 burner from burner throat to
gain access of confine space area inside AGO.
o Remove existing castable at defected area (both
layer).
o Inform PGB to perform inspection.
o Surface cleaning and install new castables.
Burner Work
o Remove the burner from burner throat in safe
manner to a safe place.
o Inform PGB to perform inspection prior any
repair commencement.
o Repair burner as per PGB requirement.
o Perform NDT at joints as per PGB requirement.
(To perform castable replacement)
(Order No.: 4120123228)
(RFQ No.: 6200131365)
96
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700) & HEAT EXCHANGERS,
CONDENSER & COOLER (SM5010400): Provision of manpower, supervision, equipment, tools,
materials, and consumables of mechanical shut down
works For LP & LLP FGRU (K5/6-1704 & K5/6-1705)
At Gas Processing Plant, Santong (GPS), Petronas Gas
Berhad (PGB), Terengganu Darul Iman.
FGRU SD UPV & AFC Cleaning
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
Erection & dismantling of scaffolding for
accessibility.
Open up and box up all vessels and Air Fin Cooler
(AFC).
Perform cleaning works for DOSH inspection.
Perform water jet cleaning work for Air Fin Cooler
(AFC).
(Order No.: 4120122006)
(RFQ No.: 6200129396)
SA Maintenance &
Services (M) S/B Sept – Oct 2015
Petronas Gas Bhd
Gas Processing
Santong (GPS)
97
MECH MAINT-BOILERS (SM5010200):
To Supply Manpower, Supervision, Tools, Equipment,
Material And Consumables For Boiler F2-771, F3-781,
F2-761 And F4-781 Internal Inspection Overhaul And
Repair Work
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order Number: 4120119511)
(RFQ No.: 6200126669)
SA Maintenance &
Services (M) S/B Sept 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
98
MECH MAINT – HOT INSULATION
(SM5120100): Provision Of Manpower, Supervision, Tools,
Equipments, Materials And Consumables To Perform
Castable& Burner Repair Of Acid Gas Oxidizer 4
SA Maintenance &
Services (M) S/B Sept – Oct 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
61 PROFIL SYARIKAT 2017
(Ago-4) At Kcs, Gas Processing Plant Complex A,
Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.
(To perform castable repair)
Refractory work
o Blind/deblind as per blind list
o Remove AGO-2 burner from burner throat to
gain access of confine space area inside AGO.
o Remove existing castable at defected area (both
layer).
o Inform PGB to perform inspection.
o Surface cleaning and install new castables.
Burner Work
o Remove the burner from burner throat in safe
manner to a safe place.
o Inform PGB to perform inspection prior any
repair commencement.
o Repair burner as per PGB requirement.
o Perform NDT at joints as per PGB requirement.
(Order No.: 4120118147)
(RFQ No.: 6200124529)
99
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & PTLE F-103 Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu
PTLE: Primary Transfer Line Exchanger
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
(Order Number: 3620199488)
(RFQ Number.: 6200092922)
SA Maintenance &
Services (M) S/B Aug 2015
Petronas Chemicals
Ethylene Sdn Bhd
62 PROFIL SYARIKAT 2017
100
HEAT EXCHANGERS, CONDENSER & COOLER
(SM5010400):
# To replace tube bundle
Provision of manpower, supervision, tools, equipment,
materials and consumables for E-21115 tube bundle
replacement at Petronas Penapisan (Terengganu) Sdn
Bhd (PPTSB) Kerteh, Kemaman, Terengganu.
To remove old HEX bundle using chain block
Cleaning of HEX bundle at PPTSB cleaning bay
Cleaning of HEX shell and channel head
To install new HEX bundle at site
Reinstall HEX channel head
To do hydro Test prior to line up
(Order No.: 4120119495)
(RFQ No.: 6200127514)
SA Maintenance &
Services (M) S/B August 2015
Petronas Penapisan
(T) Sdn Bhd (PPTSB)
101
HEAT EXCHANGERS, CONDENSER & COOLER
(SM5010400):
# To do online E21102 bank cleaning
Provision of manpower, supervision, tools, equipment,
materials and consumables of four (4) banks of E-21102
Air Fin coolers (AFC) at Petronas Penapisan
(Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman,
Terengganu.
Mobilization, site preparation, blinding, tube plugs
removal, tube bundle cleaning, post cleaning
inspection, re-fit tube plugs, testing / HT, deblind &
JIT, commissioning, demobilization and
housekeeping
(Order No.: 4120118485)
(RFQ No.: 6200125512)
SA Maintenance &
Services (M) S/B August 2015
Petronas Penapisan
(T) Sdn Bhd (PPTSB)
102
MECH MAINT-FURNACES(SM5010500): PR: Attemperator Rectification
To Perform Welding And Rectification Of Attemperator
& Its Associated Piping Works For Waste Heat Boiler
(WHB E6-1202A) At Gas Processing Santong (GPS),
Gas Processing & Utilities, Petronas Gas Bhd.
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle
Blind/deblind as per blind list
To fabricate new spool at workshop
To remove insulation at attemperator spool
To remove existing attemperator & install new
attemperator
To perform blasting painting for new attemperator
To perform NDT (PT & RT)
To perform Post Weld Heat Treatment (PWHT)
Perform Boiler HT
To reinstate insulation at the replaced pipe spool
(Order No.: 4120118488)
(RFQ No.: 6200124977)
SA Maintenance &
Services (M) S/B August 2015
Petronas Gas Bhd
Gas Processing
Santong (GPS)
103
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding & Deblinding at Petronas Chemicals Ethylene
Sdn Bhd, Kertih, Kemaman, Terengganu
(Order Number: 3620191641)
(RFQ Number.: 6200092922)
SA Maintenance &
Services (M) S/B July 2015
Petronas Chemicals
Ethylene Sdn Bhd
104
MECH MAINT-BOILERS (SM5010200):
To Perform Water By-Passing Economizer Module
M14 at HRSG C (PMD 15303), Utilities Gebeng.
Scope of works:
Perform blinding deblinding, open manhole &
ventilation.
Perform cutting on boiler wall.
Remove & hacking castable Module 13, 14 & 15 top
header.
Cut-off interconnecting line.
Perform lifting and install new interconnecting
SA Maintenance &
Services (M) S/B July - Aug 2015
Petronas Gas Bhd
Utility Gebeng (UG)
63 PROFIL SYARIKAT 2017
bypass pipe.
Perform welding new bypass interconnecting M13
to M15 & end plate outlet interconnecting M14.
Perform Non-Destructive Testing.
Install castable, wall plate & insulation.
Close manhole & boxup
(Order No.: 3620199291)
105
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding PTLE & STLE Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning:
o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the
equipment location or cleaning bay as
instructed by PCESB.
SA Maintenance &
Services (M) S/B June 2015
Petronas Chemicals
Ethylene Sdn Bhd
64 PROFIL SYARIKAT 2017
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 3620187398)
(RFQ Number.: 6200092922)
106
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding PTLE & STLE Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning: o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the
equipment location or cleaning bay as
instructed by PCESB.
o Re-painting or touch up painting as PTS and
SA Maintenance &
Services (M) S/B June 2015
Petronas Chemicals
Ethylene Sdn Bhd
65 PROFIL SYARIKAT 2017
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 3620183902)
(RFQ Number.: 6200092922)
107
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700): To perform total of 25 UPV CF Mechanical Activity
(Stage B & C)
Scope of works:
Natural Gas Heater – 2 units
Natural Gas Surge Drum – 2 units
Deaerator Head – 2 units
Deaerator Storage Vessel – 2 units
Online Washing Skid Air Receiver – 1 unit
Air Dryer Vessel – 4 units
Main Instrument Air Receiver – 2 units
Condensate Cooler – 6 units
Potable Water Cartridge Filter – 2 units
Water Separator – 2 units
o Perform blinding deblinding
o Open manhole & ventilation
o Remove internal fittings.
o Remove plugs.
o Perform unloading media catalyst.
o Powertool cleaning & air blowing
o Perform waterjetting at 10,000 psi & air
blowing.
o DOSH Inspection
o Install plugs
o Touch up painting
o Perform loading media catalyst.
o Close manhole and boxup
(Order No.: 4120107212)
(RFQ Number.: 6200114808)
SA Maintenance &
Services (M) S/B June 2015
Petronas Gas Bhd
Utility Gebeng (UG)
108
MECH MAINT-BOILERS (SM5010200):
Servicing KCSBO HRSG CF Renewal Package at Gas
Processing Kerteh (GPK), Gas Processing & Utilities,
Petronas Gas Bhd. Kertih Terengganu.
(Order No.: 4120107887)
(RFQ Number.: 6200115292)
SA Maintenance &
Services (M) S/B July - Aug 2015
Petronas Gas Bhd
Utility Gebeng (UG)
109
PRESSURE & UNPRESSURIZED VESSEL
(SM5010700):
To perform total of 25 UPV CF Mechanical Activity
(Stage A)
Scope of works:
Natural Gas Heater – 2 units
Natural Gas Surge Drum – 2 units
Deaerator Head – 2 units
Deaerator Storage Vessel – 2 units
Online Washing Skid Air Receiver – 1 unit
Air Dryer Vessel – 4 units
Main Instrument Air Receiver – 2 units
Condensate Cooler – 6 units
Potable Water Cartridge Filter – 2 units
Water Separator – 2 units
o Perform blinding deblinding
o Open manhole & ventilation
o Remove internal fittings.
o Remove plugs.
o Perform unloading media catalyst.
o Powertool cleaning & air blowing
o Perform waterjetting at 10,000 psi & air
blowing.
o DOSH Inspection
o Install plugs
o Touch up painting
o Perform loading media catalyst.
SA Maintenance &
Services (M) S/B May 2015
Petronas Gas Bhd
Utility Gebeng (UG)
66 PROFIL SYARIKAT 2017
o Close manhole and boxup
(Order No.: 4120105893)
(RFQ Number.: 6200114153)
110
MECH MAINT-FURNACES
(SM5010500):
To perform maintenance work at 3 units of Furnace F-
301, F-601 & F-602 GPP-5 SD (Soot Cleaning & Service
Damper) at Gas Processing Santong (GPS), Tok Arun,
Paka
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up manhole for furnace.
Erection & dismantling of scaffolding inside furnace
for soot cleaning works.
Perform soot cleaning works at convection & radiant
coil inside furnace.
To do castable repair if required.
Perform servicing of blower damper for all furnace
(Order No.: 4120104518)
(RFQ Number.: 6200111329)
SA Maintenance &
Services (M) S/B May 2015
Petronas Gas Bhd
Gas Processing
Santong (GPS)
111
MAIN MAINT-MECHANICAL VALVE
(SM5030100):
To Supply Piping Material and Perform Valve and
Flange Installation for Main Air Compressor B and Gas
Argon Compressor at ASU2 during TA 2015
Scope of works:
To fabricate new spool at contractor’s workshop
To remove insulation at existing spool
To remove old pipe spool & install new spool
To perform blasting painting for new pipe spool
To supply manpower & equipment to install pipe
spool at site
To perform Post Weld Heat Treatment (PWHT)
To perform NDT (PT & RT)
To reinstate insulation at the replaced pipe spool
(Order No.: 4120101862)
(RFQ No.: 6200105411)
SA Maintenance &
Services (M) S/B
07.05.2015 –
19.05.2015
Petronas Gas Bhd
Utility Kerteh (UK)
112
METALLIC STRUCTURE/PIPING (SM5090100):
To replace 2 Flanges of 20” 600# IP Steam Line and 4
Flanges of 10” 2500# HHP Steam Line during TA
2015
To remove insulation at flanges area
To remove old flanges & install new flanges at the
intended line
To perform blasting painting for 2 unit of 20” 600#
& 4 unit of 10” 2500# flanges
To supply manpower & equipment to install flanges
at site
To perform Post Weld Heat Treatment (PWHT)
To perform NDT (PT & RT)
To reinstate insulation at the replaced flanges
(Order No.: 4120098985)
(RFQ No.: 6200104233)
SA Maintenance &
Services (M) S/B
14.05.2015 –
20.05.2015
Petronas Gas Bhd
Utility Kerteh (UK)
113
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding PTLE & STLE Cleaning F103 for CF renewal
at Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
SA Maintenance &
Services (M) S/B March 2015
Petronas Chemicals
Ethylene Sdn Bhd
67 PROFIL SYARIKAT 2017
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning: o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the
equipment location or cleaning bay as
instructed by PCESB.
Re-painting or touch up painting as PTS and PCE SB’s
procedure based on instruction by PCESB’s
representative. PTS 30.48.00.31-P (15.20.03):
Protective Coating and Linings
(Order Number: 3620172711)
(RFQ Number.: 6200092922)
114
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding PTLE & STLE Cleaning E102/112 for CF
renewal at Petronas Chemicals Ethylene Sdn Bhd,
Kertih, Kemaman, Terengganu.
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
SA Maintenance &
Services (M) S/B March 2015
Petronas Chemicals
Ethylene Sdn Bhd
68 PROFIL SYARIKAT 2017
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning:
o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning:
o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the
equipment location or cleaning bay as
instructed by PCESB.
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 3620172141)
(RFQ Number.: 6200092922)
115
MECH MAINT-BOILERS (SM5010200):
To supply manpower, materials, and equipment to
perform hydrostatic test at HRSG B Utility Gebeng
Plant (UG), PGB.
Scope of works:
Perform blinding deblinding as per EIS
Perform drop spool.
Cut/off remove valves (capping point).
Perform capping process.
Fill up water inside boiler.
Pre-HT.
DOSH Inspection (HT).
Drain water from boiler.
Perform decapping process.
Perform Non-Destructive Testing.
Boxup.
SA Maintenance &
Services (M) S/B March 2015
Petronas Gas Bhd
Utility Gebeng (UG)
69 PROFIL SYARIKAT 2017
(Order No.: 4120103285)
(RFQ No.: 6200111001)
116
MECH MAINT-BOILERS (SM5010200): PR# Rectification Attemperator Piping
To Perform Welding And Rectification Of Attemperator
& Its Associated Piping Works For Waste Heat Boiler
(WHB E6-1201A) At Gas Processing Santong (GPS),
Gas Processing & Utilities, Petronas Gas Bhd.
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle
Blind/deblind as per blind list
To fabricate new spool at workshop
To remove insulation at attemperator spool
To remove existing attemperator & install new
attemperator
To perform blasting painting for new attemperator
To perform NDT (PT & RT)
To perform Post Weld Heat Treatment (PWHT)
Perform Boiler HT
To reinstate insulation at the replaced pipe spool
(Order No.: 4120098922)
(RFQ No.: 6200104678)
SA Maintenance &
Services (M) S/B February 2015
Petronas Gas Bhd
Gas Processing
Santong (GPS)
117
MECH MAINT-BOILERS (SM5010200): PR: To Replace Attemperator Piping
To Perform Welding And Rectification Of Attemperator
& Its Associated Piping Works For Waste Heat Boiler
(WHB E5/6-1201) At Gas Processing Santong (GPS),
Gas Processing & Utilities, Petronas Gas Bhd.
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle
Blind/deblind as per blind list
To fabricate new spool at workshop
To remove insulation at attemperator spool
To remove existing attemperator & install new
attemperator
To perform blasting painting for new attemperator
To perform NDT (PT & RT)
To perform Post Weld Heat Treatment (PWHT)
Perform Boiler HT
To reinstate insulation at the replaced pipe spool
(Order No.: 4120099824)
(RFQ No.: 6200106843)
SA Maintenance &
Services (M) S/B February 2015
Petronas Gas Bhd
Gas Processing
Santong
118
MECH MAINT-BOILERS (SM5010200):
To Supply Manpower, Materials, and Equipment to
Perform Hydrostatic Test at HRSG Unit D, F, And G and
Lube Oil Cooler Cleaning at GT Unit D, F, And G at
Utility Kertih Plant (UK).
Scope of works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely
Perform blinding deblinding as per EIS
Drop spool.
Cut/off remove valves (capping point).
Perform capping process.
Fill up water.
Pre-HT.
DOSH Inspection (HT).
Drain water.
Perform decapping process.
Perform Non-Destructive Testing
(Order No.: 4120097833)
SA Maintenance &
Services (M) S/B
GT/HRSG-D:
09.02.2015 –
03.03.2015
GT/HRSG-G:
GT/HRSG-F:
Petronas Gas Bhd
Utility Kerteh (UK)
70 PROFIL SYARIKAT 2017
(RFQ No.: 6200104281)
119
MECH MAINT-BOILERS (SM5010200):
Provision of manpower, supervision, tools, material,
and consumables for internal inspection overhauls and
repair work.
Waste Heat Boiler E5/6-1202
Waste Heat Boiler E5/6-1202
Waste Heat Boiler E5-1201B
Waste Heat Boiler E6-1202A
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up all waste heat boilers
Perform cleaning works for DOSH inspection.
Perform testing and servicing and overhaul of
pressure safety valve (PSV), Block Valve (BV) and
check valve (CV).
Dismantling, cleaning and reinstall multi spud gas
burned c/w burned shield and duct burner element.
Re install the steam drum removed parts,box up and
close all boiler drum manholes and access door.
(Order Number: 4120099225)
(RFQ No.: 6200106712)
SA Maintenance &
Services (M) S/B
February – July
2015
Petronas Gas Bhd
Gas Processing
Santong (GPS)
120
SPECIAL MAINT- HYDROJETTING (SS1130000):
Blinding PTLE & STLE Cleaning for CF renewal at
Petronas Chemicals Ethylene Sdn Bhd, Kertih,
Kemaman, Terengganu
PTLE: Primary Transfer Line Exchanger
STLE: Secondary Transfer Line Exchanger
Scope Of Works:
Supply / provide skilled and competent manpower,
equipment, material, consumables, and tools for
execution of the WORKS.
There ar two (2) numbers of PTLE for each furnace,
identified as ET-0-E-101 A/B for furnace F-101,
ET-0-E-102 A/B for furnace F-102 with similar
tagging until Furnace F-106. Each PTLE (both A
and B units) shall be cleaned by mechanical means
and/or hidro-jetting method two (2) times per year
basis.
Each furnace also consists of one (1) number of
STLE. Every STLE shall be cleaned by hydro-
jetting method on one (1) time per year basis.
Shall install and remove blind(s) as per Equipment
Isolation Sheet (EIS)for the purpose of positive
isolation and pressure testing of equipment and
system of the WORKS.
Perform manual lifting and rigging activities to
facilitate the WORKS.
Perform preventive maintenance work at associated
equipment such as Transfer Line Valve (TLV) /
Docoke Valve (DV) during cleaning activity.
Perform cleaning and housekeeping of packaged
equipment and surrounding areas to the satisfaction
of PCESB upon completion of each WORKS.
Primary Transfer Line Exchanger (PTLE)
cleaning: o PTLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of top and bottom cones including
opening of Coke Catcher.
o Cleaning of coke by mechanical means or
hydro-jetting method (10,000 psi UHPWJT) at
cones, tubes, and coke catcher as instructed by
PCESB.
o Facilitate inspection / NDT work such as
preparation for Internal Rotating Inspection
(IRIS).
SA Maintenance &
Services (M) S/B January 2015
Petronas Chemicals
Ethylene Sdn Bhd
71 PROFIL SYARIKAT 2017
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
o Closing and reinstallation of the cones and coke
catcher; followed by pressure testing (Coil Test
and Leak Test on the system.
Secondary Transfer Line Exchanger (STLE)
cleaning: o STLE cleaning shall be completed within three
(3) days inclusive blinding and deblinding.
o Removal of channel and the tube bundle to
facilitate cleaning work.
o Hydro-jetting of both shell and tube bundle
(internal & external) using hydro-jetting
method (10,000 psi UHPWJT) at the
equipment location or cleaning bay as
instructed by PCESB.
o Re-painting or touch up painting as PTS and
PCESB’s procedure based on instruction by
PCESB’s representative. PTS 30.48.00.31-P
(15.20.03): Protective Coating and Linings
(Order Number: 3620157218)
(RFQ Number.: 6200092922)
121
MECH MAINT-BOILERS
(SM5010200): Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler WHRU#2 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Main Mechanical Package WHRU #2)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order No.: 4120094738)
(RFQ No.: 6200101309)
SA Maintenance &
Services (M) S/B January 2015
Petronas Gas Bhd
Gas Processing
Kerteh
122
MECH MAINT-BOILERS
(SM5010200): Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler WHRU#1 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Main Mechanical Package WHRU #1)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
SA Maintenance &
Services (M) S/B January 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
72 PROFIL SYARIKAT 2017
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order No.: 4120094739)
(RFQ No.: 6200101363/SM4Y141218)
123
MECH MAINT-BOILERS
(SM5010200):
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler F2-781 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Main Mechanical Package F2-781)
(Order No.: 4120094760)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(RFQ No.: 6200101364/SM4Y141219)
SA Maintenance &
Services (M) S/B January 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
124
MECH MAINT-BOILERS
(SM5010200): Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler F4-781 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Main Mechanical Package F4-781)
(Order No.: 4120094761)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(RFQ No.: 6200101366/SM4Y141220)
SA Maintenance &
Services (M) S/B January 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
73 PROFIL SYARIKAT 2017
125
MECH MAINT-BOILERS
(SM5010200):
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler F4-761 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Main Mechanical Package F4-761)
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order No.: 4120094762)
(RFQ No.: 6200101367/SM4Y141221)
SA Maintenance &
Services (M) S/B January 2015
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
126
METALLIC STRUCTURE/PIPING
(SM5090100):
PR# To Fabricate Floater Aerator
To fabricate new floater c/w platform, installation and
commissioning Aerator (Aeration Basin) at Gas
Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
To fabricate new floater c/w platform as per material
requirement at workshop.
To perform blasting painting as per coating system
approved by client for floater,
To perform NDT (PT)
To perform leak test on floater.
To install aerator at site.
(Order No.: 4120092301)
(RFQ No.: 6200098464)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Gas Processing
Santong (GPS)
127
MECH MAINT-BOILERS
(SM5010200): PR# To perform servicing renew Boiler CF
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler E5-1201A internal
inspection overhaul and repair work for Gas Processing
Plant Santong, Petronas Gas Bhd, Terengganu.
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up waste heat boilers
Perform cleaning works for DOSH inspection.
Perform testing and servicing and overhaul of
pressure safety valve (PSV), Block Valve (BV) and
check valve (CV).
Re install the steam drum removed parts,box up and
close all boiler drum manholes and access door.
(Order No.: 4120090952)
(RFQ No.: 6200098271)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Gas Processing
Santong (GPS)
74 PROFIL SYARIKAT 2017
128
HEAT EXCHANGER, CONDENSERS & COOLER
(SM5010400):
PR# To Plugging Leaking Tube S/Condenser
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform inspection and
plugging tube Exchanger Steam Condenser for Gas
Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
Carry out the preparing inspection, perform leak
test and plugging tube eight (8) unit Bundle Air
Cooled Steam Condenser (Unit 11)
Fabricate plug tube as per sizing and material
requirement.
(Order No.: 4120093105)
(RFQ No.: 6200099531)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Gas Processing
Santong (GPS)
129
MECH MAINT-LINED PIPE
(SM5090300):
PR# Rectification Letdown & Piping
To perform welding and rectification piping works at Gas
Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
To rectify let-down piping
To rectify WWS piping
Butt weld 16”
(Order No.: 4120091319)
(RFQ No.: 6200098269)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Gas Processing
Santong (GPS)
130
MECH MAINT-BOILERS
(SM5010200): PR# HRSG CF Renewal UG
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical work of HRSG and associated equipment for
DOSH inspection at Utilities Kertih Plant (UK), PGB,
Kertih, Kemaman, Terengganu.
Scope of works:
Heat Recovery Steam Generator B (F1-211B01)
Compressed Air Receiver B (V1-211B04)
Gas Final Scrubber (V1-211B02)
Air Cooled Heat Exchanger (E1-211B01)
o Perform blinding deblinding
o Perform cleaning and works as per SOE
o Perform testing and servicing of pressure relief
valve
o Perform waterjetting at 10,000 psi & air
blowing
o DOSH Inspection
o Perform flange tightening using manual torque
wrench.
(Order No.: 4120084797)
(RFQ No.: 6200092118)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Utility Kerteh (UK)
131
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP C
To perform blinding deblinding line HHP/HP C at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
Scope of works:
Unbolt nut using controlled bolting (HTW)
Replace new gasket.
Install new studbolt & nuts.
Perform flange tightening using controlled bolting
(HTW)
(Order No.: 3620152259)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Utility Kerteh (UK)
132
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP A
To perform blinding deblinding line HHP/HP A at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu.
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Utility Kerteh (UK)
75 PROFIL SYARIKAT 2017
Scope of works:
Unbolt nut using controlled bolting (HTW)
Replace new gasket.
Install new studbolt & nuts.
Perform flange tightening using controlled bolting
(HTW)
(Order No.: 3620152258)
(Contract No.: SM5Y150604)
134
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP B
To perform blinding deblinding line HHP/HP B at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
Scope of works:
Unbolt nut using controlled bolting (HTW)
Replace new gasket.
Install new studbolt & nuts.
Perform flange tightening using controlled bolting
(HTW)
(Order No.: 3620151999)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Utility Kerteh (UK)
135
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: To supply 6CBD elbow set
To supply 6 set of CBD elbow for HRSG at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
(Order No.: 3620151907)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Utility Kerteh (UK)
136
MECH MAINT-BOILERS
(SM5010200):
PR# SAMtn: To replace 6CBD elbow
To replace CBD elbow HRSG C & F at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works:
Erect scaffolding at designated area
Delag insulation
Cut-off/remove existing/defected CBD elbow
Fit-up & weld new CBD elbow as per approved
procedure.
Perform Non-Destructive Testing.
(Order No.: 3620152261)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B December 2014
Petronas Gas Bhd
Utility Kerteh (UK)
137
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: To replace 14” vlv HHPstm OPTIMAL
To perform defect rectification for HRSG D, B and
preheater unit A at Utilities Kertih Plant (UK), PGB,
Kertih, Kemaman, Terengganu
(Order No.: 3620152260)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B
December 2014 Petronas Gas Bhd
Utility Kerteh (UK)
138
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: To replace 6 valves at HRSG C
To perform defect rectification at HRSG C, Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620143584)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B November 2014
Petronas Gas Bhd
Utility Kerteh (UK)
139
MECH MAINT-BOILERS
(SM5010200):
PR# SAMtn: To rplc vlv to PICA-1F57
To replace isolation valve to PICA57 at HRSG G,
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
SA Maintenance &
Services (M) S/B November 2014
Petronas Gas Bhd
Utility Kerteh (UK)
76 PROFIL SYARIKAT 2017
Scope of works.
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620143583)
(Contract No.: SM5Y150604)
140
MECH MAINT-BOILERS
(SM5010200):
PR# SAMtn: To rplc vlv CBD 1st vent vlv HRSG G
To replace CBD line vent 1st valve at HRSG G, Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620143582)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B November 2014
Petronas Gas Bhd
Utility Kerteh (UK)
141
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: To rplc CBD/IBD Elbow HRSG F
To perform defect rectification at HRSG F, Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works.
Cut-off/remove defected elbow.
Install/weld new elbow as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620143581)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B November 2014
Petronas Gas Bhd
Utility Kerteh (UK)
142
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HP/IPB HTW resurfc flng HP side
To perform HTW at HP/IP Letdown B at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Scope of works:
Unbolt nut using controlled bolting (HTW)
Replace new gasket.
Install new studbolt & nuts.
Perform flange tightening using controlled bolting
(HTW
(Order No.: 36200135434)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B November 2014
Petronas Gas Bhd
Utility Kerteh (UK)
143
MECH MAINT-BOILERS
(SM5010200): PR# Boiler D Tube Rectification
Provision of manpower, supervision, tools, equipment,
materials and consumables for tube rectification at Boiler
D, Utility Gebeng, Pahang Darul Makmur.
Capping De-capping, Top roof plate
Swing module
Remove partial tube & plugging activity
PWHT, DPT, RT
HT
(Order No.: 4120085737)
(RFQ No.: 6200094451)
SA Maintenance &
Services (M) S/B October 2014
Petronas Gas Bhd
Gas Processing
Gebeng (UG)
144
MECH MAINT-BOILERS
(SM5010200): PR# Servicing for HRSG CF Renewal (UK)
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical work of HRSG E & HRSG G and
associated equipment for DOSH inspection, Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
HRSG E
o Heat Recovery Steam Generator (PMD12375)
o Compressed Air Receiver (PMT127577)
o Gas Final Scrubber (PMT127610)
SA Maintenance &
Services (M) S/B October 2014
Petronas Gas Bhd
Gas Processing
Gebeng (UG)
77 PROFIL SYARIKAT 2017
o Air Cooled Heat Exchanger (TG PMT4668)
Perform blinding deblinding
Perform cleaning and works as per SOE
Perform testing and servicing of pressure
relief valve
Perform waterjetting at 10,000 psi & air
blowing
DOSH Inspection
Perform flange tightening using manual
torque wrench
HRSG G
o Heat Recovery Steam Generator (PMD12377)
o Compressed Air Receiver (PMT127587)
o Gas Final Scrubber (PMT127612)
o Air Cooled Heat Exchanger
Perform blinding deblinding
Perform cleaning and works as per SOE
Perform testing and servicing of pressure
relief valve
Perform waterjetting at 10,000 psi & air
blowing
DOSH Inspection
Perform flange tightening using manual
torque wrench
(Order No.: 4120084143)
(RFQ No.: 6200091519)
145
MECH MAINT-BOILERS
(SM5010200):
PR# Overhaul Boiler CF Mechanical Package
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical equipment for DOSH inspection at Boiler
D, Utility Gebeng, Pahang Darul Makmur.
Heat Recovery Steam Generator
Steam Drum
Blowdown tank
Swing Module
o Perform blinding deblinding
o Perform swing module for accessibility
o Perform cleaning and works as per SOE
o Perform testing and servicing of pressure relief
valve
o DOSH Inspection
o Perform flange tightening using manual torque
wrench
(Order No.: 4120081922)
(RFQ No.: 6200089500)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Gas Processing
Gebeng (UG)
146
HEAT EXCHANGER, CONDENSERS & COOLER
(SM5010400): PR# Rectification job for GPP2 T2-622/T2-701
Provision of manpower, supervision, tools, equipment,
materials and consumables for unit T2-622 and T2-701
rectfification at GPP-2, Gas Processing Plant Kerteh,
Petronas Gas Bhd, Terengganu.
Scaffolding erection – working platform, access to
blinding activity, channel heads removal, etc
Remove insulation – blinding activity, channel
heads removal
Blinding activity as per EIS
Remove channel heads (front & back).
Lifting activity for front and back channel heads
Prepare surface preparation on channel heads, tubes
and tube sheet using ultrahigh pressure water
jetting 40,000 psi
Drying tubes and tube sheet using air blow
Perform tube pneumatic leak test (shell side) @
10barg
Tube rectification – tube plugging & seal weld
Hydrostatic Test @ 1.3 of Design Pressure
Powerbrush cleaning on tube sheet, & touch painting
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
78 PROFIL SYARIKAT 2017
Install back channel heads (front & back).
Deblind, dismantle scaffolding & housekeeping.
(Order No.: 4120081227)
(RFQ No.: 6200086283)
147
METALLIC STRUCTURE/PIPING
(SM5090100): PR# Supply and replace hydrogen piping
To perform piping replacement for ASU2 Hydrogen
Line 40-H-24520-ECH20 at Utilities Kertih Plant (UK),
PGB, Kertih, Kemaman, Terengganu.
To fabricate new pipe spool at contractor’s
workshop
To remove old spool & install new spool
To perform blasting painting for new pipe spool
To supply manpower & equipment to install pipe
spool at site
To perform NDT (PT & RT)
To perform Hydrostatic Test for new spool
(Order No.: 4120081092)
(RFQ No.: 6200088518)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
148
METALLIC STRUCTURE/PIPING
(SM5090100):
PR# SEDAR External services
To perform rectification works for Mix Bed Exchanger
Stainless Steel piping at Demin Plant, Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu.
To perform pipe survey & data consolidation
To perform grind & build up weld at defected area
To perform touch up painting at all spool
To supply manpower & equipment for rectification
works at site
To perform NDT (PT)
(Order No.: 4120081091)
(RFQ No.: 6200088508)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
149
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HRSG E: To replace IBD valve#1
PR# SAMtn: To rectify leak at Preheater A
PR# SAMtn: Repair damper face detach
PR# SAMtn: rplc cbdvlv#1, IBD elbow, IBDvlv1
PR# SAMtn: Resurface flange vlv LP stmhdr rvB
PR# SAMtn: To replace MSV bypass manual vlv
To perform defect rectification at HRSG’s at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
(Order No.: 3620130597)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
150
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HRSG G: To replace CBD elbow
To replace CBD elbow for HRSG G at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Cut-off/remove defected elbow.
Install/weld new elbow as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620129293)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
151
MECH MAINT-BOILERS
(SM5010200):
PR# SAMtn: HRSG E: To replace IBD valve #2
To replace 1-1/2 Y-type Globe Valve for HRSG E at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620129292)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
79 PROFIL SYARIKAT 2017
152
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HRSG E: To replace CBD elbow
To replace CBD elbow for HRSG E at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Cut-off/remove defected elbow.
Install/weld new elbow as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620129291)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
153
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HRSG E HT package
To perform hydrostatic test for HRSG E during CF
renewal at Utilities Kertih Plant (UK), PGB, Kertih,
Kemaman, Terengganu
Scope of works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely
Perform blinding deblinding as per EIS
Cut/off remove valves (capping point).
Perform capping process.
Fill up water.
Pre-HT.
DOSH Inspection (HT).
Drain water.
Perform decapping process.
Perform Non-Destructive Testing
(Order No.: 3620129288)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
154
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: to rectify leak at HRSG C CBD bypass
To replace 1” pipe at CBD bypass line HRSG C at
Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,
Terengganu
Cut-off/remove defected piping.
Install/weld new pipe as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620129289)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B September 2014
Petronas Gas Bhd
Utility Kerteh (UK)
155
MECH MAINT-BOILERS
(SM5010200): PR# F2-781 Tube Leak Repair
Provision of manpower, supervision, tools, equipment,
materials and consumables for tube leaks repair of F2-
781 Auxiliary Boiler, Gas Processing Plant Kerteh,
Petronas Gas Bhd, and Terengganu Darul Iman.
Blinding activity as per EIS
Boiler wall casing & castable/refractory removal
Cut generating tubes
Fabricate plugs
Procure generating tubes
Bending tube (BSW integral fins)
Grind, reweld, DPT SH tubes
PWHT
Welding of 44 plugs
Pre-HT
Provision for repair
Pre-HT
Reinstate castable on SH
Removal of plugs
Tube stub collapsed tube area
Install 7 expand tubes
SA Maintenance &
Services (M) S/B August 2014
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
80 PROFIL SYARIKAT 2017
Fin weldings for BSW
Pre-HT
HT with DOSH
Saturated box castable & casing installation
Boxup, deblind &housekeeping.
(Order No.: 4120077942)
(RFQ No.: 6200085498)
156
MECH MAINT-FURNACES
(SM5010500): PR# To perform internal inspection
Provision of manpower, supervision, tools, equipment,
materials and consumables for S-707 inspection &
rectification at GPP-1, Gas Processing Plant Kerteh,
Petronas Gas Bhd, Terengganu Darul Iman.
Lifting & rigging as per approved procedure
Blinding activity as per EIS
To open up S-707 – dismantling the silencer cover
and internal of blower R-707 A/B, blower R-706 &
damper/ducting/internal blower R-707A/B
Perform bolting/debolting,
Perform manual / mechanical cleaning
Rectification works of attachment
NDT
Boxup, deblind &housekeeping.
(Order No.: 4120077738)
(RFQ No.: 6200086276)
SA Maintenance &
Services (M) S/B August 2014
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
157
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HRSG F LG LHS vlv #1 rplcement
To replace LG LHS valve for HRSG F at Utilities
Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu
Cut-off/remove defected valves.
Install/weld new valves as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620121192)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B July 2014
Petronas Gas Bhd
Utility Kerteh (UK)
158
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: Fabricate&install autodrain line
To fabricate and install autodrain line at Utilities Kertih
Plant (UK), PGB, Kertih, Kemaman, Terengganu
Cut-off/remove defected piping.
Install/weld new pipe as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620121191)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B July 2014
Petronas Gas Bhd
Utility Kerteh (UK)
159
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HRSG D desupvlvBFWinlet chkvlv
To replace Desuperheater Valve BFW inlet Check
Valve for HRSG D at Utilities Kertih Plant (UK), PGB,
Kertih, Kemaman, Terengganu
Cut-off/remove defected valve.
Install/weld new valve as per approved procedure.
Perform Non-Destructive Testing.
Touch up painting as per approved procedure
(Order No.: 3620121190)
(Contract No.: SM5Y150604)
SA Maintenance &
Services (M) S/B July 2014
Petronas Gas Bhd
Utility Kerteh (UK)
160
MECH MAINT-BOILERS
(SM5010200): PR# SAMtn: HRSG B HT package
To perform hydrostatic test for HRSG F during CF
renewal at Utilities Kertih Plant (UK), PGB, Kertih,
Kemaman, Terengganu
Scope of works:
SA Maintenance &
Services (M) S/B July 2014
Petronas Gas Bhd
Utility Kerteh (UK)
81 PROFIL SYARIKAT 2017
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely
Perform blinding deblinding as per EIS
Cut/off remove valves (capping point).
Perform capping process.
Fill up water.
Pre-HT.
DOSH Inspection (HT).
Drain water.
Perform decapping process.
Perform Non-Destructive Testing
(Order No.: 3620121188)
(Contract No.: SM5Y150604)
161
MECH MAINT-FURNACES
(SM5010500): PR# Wall Rupture Repair
To perform repair works at Acid Gas Incinerator A5-
0202, Gas Processing Plant Santong, Petronas Gas Bhd,
Terengganu Darul Iman
Mob/demob Tools/equipments
Circumferential wall repair
Compensator repair
Burner refractory repair
Guide plate repair
Reinstate wall insulation
Burner vane crack repair
Preheater leak repair
Preheater refractory repair
(Order No.: 4120070967)
(RFQ No.: 6200074135)
SA Maintenance &
Services (M) S/B June 2014
Petronas Gas Bhd
Gas Processing
Santong (GPS)
162
BUILDING & STRUCTURE CONSTRUCTION
REPAIR & MAINTENANCE
(SC2030500): PR# Wall Rupture Repair
To perform repair works at Acid Gas Incinerator A5-
0202, Gas Processing Plant Santong, Petronas Gas Bhd,
Terengganu Darul Iman
Mob/demob Tools/equipments
Circumferential wall repair
Compensator repair
Burner refractory repair
Guide plate repair
Reinstate wall insulation
Burner vane crack repair
Preheater leak repair
Preheater refractory repair
(Order No.: 4120070967)
(RFQ No.: 6200074135)
SA Maintenance &
Services (M) S/B June 2014
Petronas Gas Bhd
Gas Processing
Santong (GPS)
163
MECH MAINT-BOILERS
(SM5010200): PR# Boiler Overhaul DOSH CF
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical equipment for DOSH inspection for Boiler
at Gas Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
Scope of Works:
Perform Blinding & De-Blinding works as per blind
list.
Open up and box up waste heat boilers
Perform cleaning works for DOSH inspection.
Perform testing and servicing and overhaul of
pressure safety valve (PSV), Block Valve (BV) and
check valve (CV).
Re install the steam drum removed parts,box up and
close all boiler drum manholes and access door.
(Order No.: 3620086452)
Local Engineering
(M) Sdn Bhd December 2013
Petronas Gas Bhd
Gas Processing
Santong (GPS)
82 PROFIL SYARIKAT 2017
164
MECH MAINT-BOILERS
(SM5010200):
PR# Boiler Overhaul DOSH CF
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical equipment for DOSH inspection for Boiler
D at Utilities Kertih Plant (UK), PGB, Kertih,
Kemaman, Terengganu.
Heat Recovery Steam Generator
Steam Drum
Blowdown tank
Swing Module
o Perform blinding deblinding
o Perform swing module for accessibility
o Perform cleaning and works as per SOE
o Perform testing and servicing of pressure relief
valve
o DOSH Inspection
o Perform flange tightening using manual torque
wrench
(Order No.: 3620042385)
Local Engineering
(M) Sdn Bhd February 2013
Petronas Gas Bhd
Utility Kerteh (UK)
165
MECH MAINT-BOILERS
(SM5010200): PR# Boiler Boiler DOSH overhaul for F4-771 DOSH
CF
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical equipment for DOSH inspection for Boiler
at Gas Processing Plant Kerteh, Petronas Gas Bhd,
Terengganu
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum.
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order No.: 3620082321)
(RFQ No.: LQ-PGB(A)-0244/13)
Local Engineering
(M) Sdn Bhd December 2013
Petronas Gas Bhd
Gas Processing
Kerteh
166
RETUBING: To repair leak boiler tube
Tube Leak Repair
Provision of manpower, supervision, tools, equipment,
materials and consumables for tube leaks repair of F2-
781 Auxiliary Boiler, Gas Processing Plant Kerteh,
Petronas Gas Bhd, Terengganu Darul Iman.
Blinding activity as per EIS
Boiler wall casing & castable/refractory removal
Cut generating tubes
Fabricate plugs
Procure generating tubes
Bending tube (BSW integral fins)
Grind, reweld, DPT SH tubes
PWHT
Welding of 44 plugs
Pre-HT
Provision for repair
Pre-HT
Local Engineering
(M) Sdn Bhd Dec 2013
Petronas Gas Bhd
Gas Processing
Kerteh
83 PROFIL SYARIKAT 2017
Reinstate castable on SH
Removal of plugs
Tube stub collapsed tube area
Install 7 expand tubes
Fin weldings for BSW
Pre-HT
HT with DOSH
Saturated box castable & casing installation
Boxup, deblind &housekeeping
(Order No.: 3620073316)
(RFQ No.: LQ-PGB(A)-0162/13)
167
Internal inspect & overhaul WH boiler
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical equipment for DOSH inspection for Boiler
at Gas Processing Plant Kerteh, Petronas Gas Bhd,
Terengganu
Scope of Works:
Supply sufficient manpower, equipment, tools and
consumables/materials to execute the work
satisfactorily and safely.
Scaffolding erection/dismantle – internal / external
Blind/deblind as per blind list
Manhole opening and ventilation.
External/internal fittings removal/installation works
PSV’s removal / servicing / testing (bench test) /
installation.
Block Valve’s removal / servicing / installation
Level Gauge’s removal / servicing / installation
Internal cleaning (waterjet cleaning, power tools, air
blowing, vacuum, etc) – Furnace / Super heater /
Steam Drum / Mud Drum
Castable and cladding minor repair
Minor repair; DOSH & NonDOSH repair within 2
days
Boiler Box-up activity and Housekeeping
(Order No.: 3620082292)
Local Engineering
(M) Sdn Bh Dec 2013
Petronas Gas Bhd
Gas Processing
Kerteh
168
RETUBING: To repair leak boiler tube
Tube Leak Repair
Provision of manpower, supervision, tools, equipment,
materials and consumables for tube leaks repair of F2-
781 Auxiliary Boiler, Gas Processing Plant Kerteh,
Petronas Gas Bhd, Terengganu Darul Iman.
Blinding activity as per EIS
Boiler wall casing & castable/refractory removal
Cut generating tubes
Fabricate plugs
Procure generating tubes
Bending tube (BSW integral fins)
Grind, reweld, DPT SH tubes
PWHT
Welding of 44 plugs
Pre-HT
Provision for repair
Pre-HT
Reinstate castable on SH
Removal of plugs
Tube stub collapsed tube area
Install 7 expand tubes
Fin weldings for BSW
Pre-HT
HT with DOSH
Saturated box castable & casing installation
Boxup, deblind &housekeeping
(Order No.: 3620073316)
(RFQ No.: LQ-PGB(A)-0162/13)
Local Engineering
(M) Sdn Bhd Dec 2013
Petronas Gas Bhd
Gas Processing
Kerteh
84 PROFIL SYARIKAT 2017
169
Tube Leak Rectification For F3-791, PGB
Tube Leak Repair
Provision of manpower, supervision, tools, equipment,
materials and consumables for tube leaks repair of F3-
791 Auxiliary Boiler, Gas Processing Plant Kerteh,
Petronas Gas Bhd, Terengganu Darul Iman.
Blinding activity as per EIS
Boiler wall casing & castable/refractory removal
Cut generating tubes
Fabricate plugs
Procure generating tubes
Bending tube (BSW integral fins)
Grind, reweld, DPT SH tubes
PWHT
Welding of 44 plugs
Pre-HT
Provision for repair
Pre-HT
Reinstate castable on SH
Removal of plugs
Tube stub collapsed tube area
Install 7 expand tubes
Fin weldings for BSW
Pre-HT
HT with DOSH
Saturated box castable & casing installation
Boxup, deblind &housekeeping
(Order No.: 3620086329)
(RFQ No.: LQ-PGB(A)-210/13)
Local Engineering
(M) Sdn Bhd Nov 2013
Petronas Gas Bhd
Gas Processing
Kerteh
170
CASTABLE: To Perform Ago2 Castable Repair At
GPP-2, PGB
Provision Of Manpower, Supervision, Tools,
Equipments, Materials And Consumables To Perform
Castable& Burner Repair Of Acid Gas Oxidizer 2
(AGO-2) At KCS, Gas Processing Plant Complex A,
Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.
(To perform castable replacement)
Refractory work
o Blind/deblind as per blind list
o Remove AGO-2 burner from burner throat to
gain access of confine space area inside AGO.
o Remove existing castable at defected area (both
layer).
o Inform PGB to perform inspection.
o Surface cleaning and install new castables.
Burner Work
o Remove the burner from burner throat in safe
manner to a safe place.
o Inform PGB to perform inspection prior any
repair commencement.
o Repair burner as per PGB requirement.
o Perform NDT at joints as per PGB requirement.
(Order No.: 4120033626)
(RFQ No.: SM1B130130)
Local Engineering
(M) Sdn Bhd Oct – Nov 2013
Petronas Gas Bhd
Gas Processing
Kerteh
171
BOILER OVERHAUL:Boiler Overhaul Works For
F3-791, PGB
PR# F3-791 Boiler Overhaul of F3-781 Auxiliary
Boiler, Gas Processing Kerteh (GPK), PGB, Kerteh,
Kemaman, Terengganu.
Perform all necessary blinding/deblinding for
hotspot repair
Provide necessary access for all inspection and
repair activities, including confined space entry for
steam drum, mud drum and furnace.
Removal of furnace rear wall components including
insulation cladding, mineral wool, rear wall casing,
rear wall refractory and rear wall tie bar (C
Channel).
Perform procurement, fabrication and installation of
Local Engineering
(M) Sdn Bhd October 2013
Petronas Gas Bhd
Gas Processing
Kerteh
85 PROFIL SYARIKAT 2017
furnace rear components including refractory
anchors, rear wall refractory, rear wall tie-bar, rear
wall casing, mineral wool insulation, insulation
cladding & painting.
Provisional scope depends on as found condition which
covers for top furnace refractory repair
(Order No.: 3620086329)
(RFQ No.: LQ-PGB(A)-0210/13)
172
BOILER OVERHAUL:Boiler Overhaul F-4001,
PPTSB
Provision of manpower, supervision, tools, equipment,
materials and consumables for overhaul of mixed LPG
bullet which inclusive of equipment blinding and de-
blinding, ventilation, internal cleaning, internal
scaffolding erection and removal, blasting, power
brushing and maintenance painting for internal and
external of bullet and hydrostatic testing at Petronas
Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh,
Kemaman, Terengganu.
To carry out blinding works for the bullet as per
PPTSB instruction
To perform cleaning and gas freeing the bullet
To perform erection and removal of internal
scaffolding (purple shaded area as per scaffolding
drawing attached)
To power tool at weldment (at the yellow, green, and
purple shaded area – both drawings)
To blast the internal bottom (clock location no5 to
no7) and paint as per PTS 13A
To replace piping and valve as per Inspection
Worklist
HSE Resources
Sdn Bhd Sept 2013 PPTSB
173
BUILDING & STRUCTURE CONSTRUCTION
REPAIR AND MAINTENANCE
(SC2030500): To provide all necessary manpower, materials, tools,
equipment, and consumables for replace & install new
roofing for HSE Cabin CUFK, Centralised Utility
Facilities (CUF) Kerteh, Petronas Gas Bhd, Kerteh,
Terengganu Darul Iman
Mob/demob Tools/equipments
Dismantle the existing roof
To install new arch (roof structure)
To install new roof
To concrete the floor between the 2 cabin
To install new complete wiring for lamp & fan +
plug point
Housekeeping
(Order No.: 4120035379)
(RFQ No.: 6200037576)
SA Maintenance &
Services (M) S/B September 2013
Petronas Gas Bhd
Gas
Centralised Utility
Facilities (CUF)
Kerteh
174
MACHINING & FABRICATION WORKSHOP
(SM5080000):
PR# Tagging and labelling at process area
To provide all necessary manpower, materials, tools,
equipment, and consumables for tagging and labelling
work for ZONE 1 area, Gas Processing Plant Complex
B, Petronas Gas Bhd, Tok arun, Terengganu Darul
Iman
Mob/demob Tools/equipments
Painting 288 location as per current size in site
(Alphabet Black color & Background Yellow
Color)
Steel plate Engrave 106 location as per current size
in site (Alphabet Black color & Background White
Color)
Plastic plate Engrave 251 location as per current
size in site (Alphabet Engrave)
(Order No.: 4120037027)
(RFQ No.: 6200039496)
SA Maintenance &
Services (M) S/B September 2013
Petronas Gas Bhd
Gas Processing Plant
Complex B, Tok arun
86 PROFIL SYARIKAT 2017
175
OFFICE ADMIN SERVICE - PAINTING
(SC1030100):
PR# Sampling signage KR2B
Design, fabricate, deliver and install operational signage
for Petronas Penapisan (Terengganu) Sdn Bhd /
Aromatics Malaysia Sdn Bhd at KR-2B Aromatics
complex, Terengganu Darul Iman
Sampling signage, size 4’ x 3’, material Aluminum
with reflective sticker.
(Order No.: 4120036419)
(RFQ No.: 6200037761)
SA Maintenance &
Services (M) S/B September 2013
Petronas Penapisan
(Terengganu) Sdn
Bhd
176
CASTABLE: To perform AGO2 castable repair
Provision Of Manpower, Supervision, Tools,
Equipments, Materials And Consumables To Perform
Castable& Burner Repair Of Acid Gas Oxidizer 2
(AGO-2) At KCS, Gas Processing Plant Complex A,
Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.
To perform castable replacement)
Refractory work
o Blind/deblind as per blind list
o Remove AGO-2 burner from burner throat to
gain access of confine space area inside AGO.
o Remove existing castable at defected area (both
layer).
o Inform PGB to perform inspection.
o Surface cleaning and install new castables.
Burner Work
o Remove the burner from burner throat in safe
manner to a safe place.
o Inform PGB to perform inspection prior any
repair commencement.
o Repair burner as per PGB requirement.
Perform NDT at joints as per PGB requirement
Local Engineering
(M) Sdn Bhd Aug 2013
Petronas Gas Bhd
Gas Processing
Kerteh
177
GENERAL STRUCTURE / BUILDING PAINTING
PASSO PROGRAM – PUMP BASEMENT
PAINTING
(SC2130100):
To provide all necessary manpower, materials, tools,
equipment, and consumables for BT1 PASSO Pump
basement project at Petronas Penapisan (Terengganu)
Sdn Bhd, Terengganu Darul Iman
Mob/demob Tools/equipments
Removal and dismantling of old corroded structure.
Installation and painting of new structures as per
original design.
The badly corroded structure shall be replace with
new including but not limited to handrail,
ladder,cable tray support, wooden spacer, support
plate, support beam, bolt/nut, grating, pipe clip,
spacer, and etc.
Carry out NDT such as DPT on the welding joints
of the new structure.
Carry out hot dipped galvanizing work for the new
structure after completed fabrication and all the
required testing.
Carry out painting for the new structure after
completion of hot dipped galvanizing work.
New structure shall be painted as per existing color.
(Order No.: 4120028564)
(RFQ No.: 6200032116)
SA Maintenance &
Services (M) S/B July 2013
Petronas Penapisan
(Terengganu) Sdn
Bhd
178
BUILDING & STRUCTURE CONSTRUCTION
REPAIR AND MAINTENANCE
(SC2030500): To provide all necessary manpower, materials, tools,
equipment, and consumables for replace & install new
roofing for HSE Cabin CUFK, Centralised Utility
Facilities (CUF) Kerteh, Petronas Gas Bhd, Kerteh,
Terengganu Darul Iman
Mob/demob Tools/equipments
Dismantle the existing roof
SA Maintenance &
Services (M) S/B July 2013
Petronas Gas Bhd
Gas
Centralised Utility
Facilities (CUF)
Kerteh
87 PROFIL SYARIKAT 2017
To install new arch (roof structure)
To install new roof
To concrete the floor between the 2 cabin
To install new complete wiring for lamp & fan +
plug point
Housekeeping
(Order No.: 4120048093)
(RFQ No.: 6200045354)
179
GENERAL STRUCTURE / BUILDING PAINTING
(SC2130100): PR# Structure repair at PE-1/2-S-320
To provide all necessary manpower, materials, tools,
equipment, and consumables for BT1 PASSO Pump
basement project at Petronas Penapisan (Terengganu)
Sdn Bhd, Terengganu Darul Iman
(Order No.: 4120029587)
(RFQ No.: 6200031489)
SA Maintenance &
Services (M) S/B
July 2013
Petronas Chemicals
Polyethylene Sdn
Bhd
180
RETUBING: Repair Boiler D
PR# Boiler D Tube Rectification
Provision of manpower, supervision, tools, equipment,
materials and consumables for tube rectification at
Boiler D, Utility Gebeng, Pahang Darul Makmur.
Capping De-capping, Top roof plate
Swing module
Remove partial tube & plugging activity
PWHT, DPT, RT
HT
(Order No.: 3620053654)
Local Engineering
(M) Sdn Bhd April 2013
Petronas Gas Bhd
Utility Gebeng
181
To perform boiler overhaul
PR# F4-761 Boiler Overhaul of F4-761 Auxiliary
Boiler, Gas Processin (GPK), PGB, Kerteh, Kemaman,
Terengganu.
Perform all necessary blinding/deblinding for
hotspot repair
Provide necessary access for all inspection and
repair activities, including confined space entry for
steam drum, mud drum and furnace.
Removal of furnace rear wall components including
insulation cladding, mineral wool, rear wall casing,
rear wall refractory and rear wall tie bar (C
Channel).
Perform procurement, fabrication and installation of
furnace rear components including refractory
anchors, rear wall refractory, rear wall tie-bar, rear
wall casing, mineral wool insulation, insulation
cladding & painting.
(Order No.: 3620053654)
(RFQ No.: LQ-PGB(A)-0094/13)
Local Engineering
(M) Sdn Bhd May 2013
Petronas Gas Bhd
Gas Processing
Kerteh
182
RETUBING: Repair Boiler D
PR# To do SH tube defining activity
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform defining activity
of superheater tube for Waste Heat Boiler (1 unit) at
Gas Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
Local Engineering
(M) Sdn Bhd April 2013
Petronas Gas Bhd
Utility Gebeng
183
Boiler Overhaul & DOSH Inspection
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler internal inspection
overhaul and repair work for Gas Processing Plant
Kerteh, Petronas Gas Bhd, Terengganu.
Local Engineering
(M) Sdn Bhd March 2013
Petronas Gas Bhd
Gas Processing
Kerteh
184 To repair, fabricate and install P6-0201B Lube Oil
Cooler Structure
Local Engineering
(M) Sdn Bhd March 2013
Petronas Gas Bhd
Gas Processing
Santong
185
Internal Inspect & overhaul w heat boiler
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler WHRU#1 internal
inspection overhaul and repair work for Utility Gebeng,
Petronas Gas Bhd.
Local Engineering
(M) Sdn Bhd Feb 2013
Petronas Gas Bhd
Utility Gebeng
88 PROFIL SYARIKAT 2017
186
F3-781 Boiler overhaul and tube rectify
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler F2-781 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Order No.: 3620073313)
(RFQ No.: LQ-PGB(A)-0174/13)
Local Engineering
(M) Sdn Bhd July 2013
Petronas Gas Bhd
Gas Processing
Kerteh
187
Smallbore rectification for GPP 4 SD
Provision of Piping Work Services for GPP4 Shutdown
2012.
TMM Engineering
Sdn Bhd May – June 2012
Petronas Gas Bhd
Gas Processing
Kerteh
188
F4-761 Boiler overhaul and tube rectify
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler F4-761 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Order No.: 3620067225)
(RFQ No.: LQ-PGB(A)-0094/13)
Local Engineering
(M) Sdn Bhd June 2012
Petronas Gas Bhd
Gas Processing
Kerteh
189
To rectify defect parts/welding works
PR# Rectification Letdown & Piping
To perform welding and rectification piping works at
Gas Processing Plant Santong, Petronas Gas Bhd,
Terengganu.
Local Engineering
(M) Sdn Bhd July 2012
Petronas Gas Bhd
Gas Processing
Santong
190
Boiler Overhaul & DOSH Inspection
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler internal inspection
overhaul and repair work for Gas Processing Plant
Kerteh, Petronas Gas Bhd, Terengganu.
Local Engineering
(M) Sdn Bhd
June 2012
Petronas Gas Bhd
Gas Processing
Santong
191
BOILER OVERHAUL:F2-781 Boiler overhaul and
tube rectify
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler F2-781 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Order No.: 3620073313)
(RFQ No.: LQ-PGB(A)-0174/13)
Local Engineering July 2012
Petronas Gas Bhd
Gas Processing
Kerteh
192
BOILER OVERHAUL:F2-791 Boiler Overhaul
Provision of manpower, supervision, tools, equipment,
materials and consumables for Boiler F2-791 internal
inspection overhaul and repair work for Gas Processing
Plant Kerteh, Petronas Gas Bhd, Terengganu.
(Order No.: 3620073313)
(RFQ No.: LQ-PGB(A)-0174/13)
Local Engineering
(M) Sdn Bhd
Aug 2012
Petronas Gas Bhd
Gas Processing
Kerteh
193
Boiler activities during PRR GPP3
Provision of manpower, supervision, equipment, tools,
materials, and consumables for boiler activity during
shut down works At Gas Processing Plant, Kerteh
(GPK), Petronas Gas Berhad (PGB), Terengganu Darul
Iman.
Local Engineering
(M) Sdn Bhd Oct 2012
Petronas Gas Bhd
Gas Processing
Kerteh
194
Additional for F4-791 wall repair
To perform repair activity at F4-791 wall at Gas
Processing Plant Kerteh, Petronas Gas Bhd, Terengganu
(Order No.: 3200120663)
(RFQ No.: LQ-PGB(A)-0231/12)
Local Engineering
(M) Sdn Bhd Dec 2012
Petronas Gas Bhd
Gas Processing
Kerteh
195
BOILER OVERHAUL:Boiler DOSH overhaul for F4-
771
PR# Boiler Boiler DOSH overhaul for F4-771 DOSH
CF
Provision of manpower, supervision, tools, equipment,
materials and consumables to perform complete
mechanical equipment for DOSH inspection for Boiler
at Gas Processing Plant Kerteh, Petronas Gas Bhd,
Terengganu
Local Engineering
(M) Sdn Bhd Dec 2012
Petronas Gas Bhd
Gas Processing
Kerteh
196
GENERAL STRUCTURE / BUILDING PAINTING
(SC2130100):
PR# Provision of TCOT Washroom Refurbishment PR#
PR# Provision 10% for optional scope (TCOT & OSC)
(Order No.: 3310131161)
(RFQ No.:)
SA Maintenance &
Services (M) S/B
June 2011
Petronas Carigali Sdn
Bhd
89 PROFIL SYARIKAT 2017
REKOD PENGALAMAN KERJA SEMASA
Id Description Client / Main
Contractor
Contract
Period Plant Owner
A. MECH MAINT-BOILERS
(SM5010200):
TERM CONTRACT for provision of
manpower, material, equipment &necessary facilities for Equipment Cleaning of Heat
Exchanger at Petronas Chemicals Olefins Sdn
Bhd, Petronas Chemicals Glycols Sdn Bhd
and Petronas Derivatives Sdn Bhd, Kerteh, Terengganu.
(Contract No.: DTC-
KTH/PCDSB/2016/0091)
(BID No.: DTC-KTH/PCDSB/2016/0091)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M)
S/B
01.10.2016
–
30.09.2018
Petronas Chemical Derivatives Sdn
Bhd.
(PCOGD)
B. MECH MAINT-BOILERS
(SM5010200): TERM CONTRACT for provision of
manpower, material, equipment & services
for GPU Boiler Overhaul and Repair Work for Gas Processing and Utilities
(GPU),Petronas Gas Bhd
(Contract No.: DTC-KTH/PGB-
GPU/2016/0142)
(BID No.: DTC-KTH/PGB-
GPU/2016/0142)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M) S/B
01.10.2016
– 30.09.2018
Petronas Gas Bhd,
Gas Processing Kerteh (GPK)
C. MECH MAINT-BOILERS
(SM5010200):
TERM CONTRACT for provision of manpower, material, equipment & services
for Boiler Repair Works for Utilities Gebeng
(UG), Petronas Gas Bhd.
(Contract No.: SM4Y160505/6200154645)
(BID No.: 6200154645)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M)
S/B
19.07.2016
–
18.07.2017
Petronas Gas Bhd
Utility Gebeng
(UG)
D. MECH MAINT-FURNACES
(SM5010500):
TERM CONTRACT for E-21102 AFC
Tubes Internal Cleaning for Petronas
Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu.
(Contract No.: RFX 6200138215)
(BID No.: 6200138215)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M) S/B
10.02.2016
– 09.02.2018
Petronas
Penapisan (T) Sdn Bhd (PPTSB)
90 PROFIL SYARIKAT 2017
E. MECH MAINT-BOILERS
(SM5010200): TERM CONTRACT for supply of material
and manpower for Boiler Repair Works for
Gas Processing Plant Kerteh (GPK),
Petronas Gas Bhd.
(Contract No.: SM8Y150815)
(BID No.: 6200128350)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M)
S/B
26.10.2015
–
26.10.2016
Petronas Gas Bhd
Gas Processing
Kerteh (GPK)
F. MECH MAINT-FURNACES
(SM5010500):
TERM CONTRACT for Primary and
Secondary Transfer Line Exchanger (PTLE & STLE) Maintenance Cleaning by means of
Hydrojetting for Petronas Chemical Ethylene
Sdn Bhd (PCESB), Kerteh, Kemaman, Terengganu.
(Contract No.: RFX6200092922)
(BID No.: 6200092922)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M)
S/B
15.12.2014
–
14.12.2016
Petronas Chemical
Ethylene Sdn Bhd
(PCESB)
G. MECH MAINT-BOILERS
(SM5010200):
TERM CONTRACT for supply of material and manpower for Boiler Repair Works for
Utilities Kertih Plant (UK), PGB, Kertih,
Kemaman, Terengganu, Petronas Gas Bhd.
(Contract No.: SM8Y150604)
(BID No.: 6200122032)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M)
S/B
01.08.2015
–
31.07.2016
Petronas Gas Bhd
Utility Kerteh
(UK)
H. MECH MAINT-BOILERS
(SM5010200):
TERM CONTRACT for supply of material
and manpower for Boiler Repair Works for
Utility Gebeng Plant (UG), Petronas Gas Bhd (PGB), Kuantan, Pahang.
(Contract No.: SM8Y150510)
(BID No.: 6200119030)
(Contract Value: RM500k and Above)
SA Maintenance
& Services (M) S/B
01.07.2015
– 30.06.2016
Petronas Gas Bhd
Utility Gebeng (UG)
91 PROFIL SYARIKAT 2017
ANUGERAH PENCAPAIAN PRESTASI (HSE Performance achievement awards)
92 PROFIL SYARIKAT 2017
IKRAR INTEGRITI MALAYSIA
Kami, Rakyat Malaysia Merdeka, Berwawasan Berdaulat Dengan Tulus
dan Suci Hati, Berikrar, Memantap dan Memperkukuhkan, Maruah dan
Integriti Kami, Keluarga Dan Masyarakat, Agama, Bangsa dan Negara
Kami.Ke Arah Kualiti Kami Akan:
Mematuhi Sepenuhnya Perlembagaan Persekutuan, Undang-undang
dan Peraturan Semasa.
Mematuhi dan Mengamalkan Prinsip-prinsip Rukun Negara.
Sentiasa Berusaha Memupuk dan Mengamalkan Nilai-Nilai Murni,
Etika dan Integriti.
Bekerjasama Sepenuhnya Dengan Mana-Mana Pihak Untuk
Mencegah Sebarang Perlakuan Jenayah,Salah Laku Dan Perbuatan
Tidak Berintegriti.
Bertindak Tegas Terhadap Mereka Yang Melanggar Undang-
Undang Dan Peraturan.
Bertindak Tegas Terhadap Mereka Yang Cuba Mengugat
Integriti,Imej Masyarakat dan Negara.
Secara Kolektif dan Berterusan Membudayakan Integriti Masyarakat
Malaysia
top related