profil syarikat 2017 - samase.com.mysamase.com.my/muaturun/profil syarikat 2017 (bm).pdf ·...

93
PROFIL SYARIKAT 2017 SA MAINTENANCE & SERVICES (M) SDN BHD (718754 U)

Upload: phamkhanh

Post on 05-Feb-2018

460 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

PROFIL SYARIKAT 2017

SA MAINTENANCE & SERVICES (M) SDN BHD (718754 U)

Page 2: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

1 PROFIL SYARIKAT 2017

Page 3: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

2 PROFIL SYARIKAT 2017

ALAMAT BERDAFTAR No. 206 Jalan Rajawali Felda

kerteh 3 ,23100 Paka Dungun

Terengganu

Page 4: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

3 PROFIL SYARIKAT 2017

ISI KANDUNGAN ____________________________________________________________________

1. MAKLUMAT KORPORAT Pengenalan Objektif Syarikat Latar Belakang Syarikat Carta Organisasi BIODATA Pengarah Urusan

2. KESIHATAN, KESELAMATAN & ALAM SEKITAR

Polisi Kesihatan, Keselamatan & Alam Sekitar 3. AKTIVITI PERNIAGAAN 4. PENDAFTARAN & LESEN 5. ASET & PERALATAN 6. REKOD PENGALAMA KERJA 7. ANUGERAH PERCAPAIAN PRESTASI 8. IKRAR INTERGRITI MALAYSIA

Page 5: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

4 PROFIL SYARIKAT 2017

Pengenalan

Sukacitanya kami SA MAINTENANCE & SERVICES (M) SDN BHD ingin memperkenalkan

brosur syarikat kami, dengan harapan ia dapat memberi sedikit gambaran tentang organisasi

kami. Dilampirkan juga dokumen-dokumen yang berkaitan agar pemahaman yang sebaiknya

untuk pihak tuan/puan.

SA MAINTENANCE & SERVICES (M) SDN BHD adalah sebuah syarikat perniagaan

bumiputera 100% yang ditubuhkan dan diperbadankan dibawah Akta Syarikat 1965 pada

20hb Disember 2005. SA MAINTENANCE & SERVICES (M) SDN BHD telah bergiat aktif

dalam bidang industri minyak and gas ini pada 11hb April 2007. Syarikat ini telah memulakan

perniagaan dengan menyediakan pelbagai perkhidmatan kepada pelanggan dan membuka

peluang pekerjaan kepada anak-anak muda serta masyarakat bumiputra di dalam bidang

industry minyak dan gas terutamanya di Kawasan Perindustrian Kerteh, Terengganu.

SA MAINTENANCE & SERVICES (M) SDN BHD adalah sebuah syarikat yang menawarkan

perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim

& Pengandung Tekanan Tak Berapi (BOILER OVERHAUL), Kejuruteraan Awam dan

Binaan,Perkhidmatan Kebersihan & Rawatan, Penyelenggaraan & Kejuruteraan Loji, Kerja-

Kerja Paip dan Fabrikasi Struktur Logam, Kerja-Kerja Pemesinan, Perkhidmatan Guna

Tenaga dan Perkhidmatan Pembekalan.

Pelan pertumbuhan kami adalah untuk sentiasa berusaha ke arah prestasi yang cemerlang

pada perkhidmatan kami, memenuhi permintaan pelbagai industri dengan menetapkan

penanda aras operasi yang lebih tinggi dan langkah-langkah kawalan kualiti yang ketat untuk

mengekalkan tahap tinggi profesionalisme dan mengambil pendekatan yang dinamik,

progresif dan inovatif ke arah perniagaan kami.

Page 6: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

5 PROFIL SYARIKAT 2017

OBJEKTIF SYARIKAT

Untuk mengembangkan dan meningkatkan keupayaan dan kecekapan kami dalam

menyediakan perkhidmatan berkualiti tinggi dalam bidang Penyelenggaraan,

Kejuruteraan, Pembaikpulih, Servis, Kerja-kerja EPCC/TA/SHUTDOWN terutamanya

dalam industri minyak & gas serta petrokimia.

Untuk menyediakan peluang pekerjaan kepada penduduk tempatan.

Untuk mencari ke hadapan dalam menyediakan perkhidmatan yang sangat baik dan

harga yang kompetitif dalam kerja-kerja mekanikal dan industri perdagangan.

Page 7: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

6 PROFIL SYARIKAT 2017

LATAR BELAKANG SYARIKAT

Nama Syarikat : SA MAINTENANCE & SERVICES (M) SDN BHD

No. Pendaftaran : 718754-U

Tarikh Ditubuhkan : 20 DISEMBER 2005

Jenis Perniagaan : KERJA-KERJA PENYELENGGARAAN DALAM INDUSTRI MINYAK, GAS SERTA PETROKIMIA

Alamat Ibu Pejabat : NO 206 JALAN RAJAWALI, FELDA KERTEH 3 23100 PAKA, DUNGUN,TERENGGANU

Alamat Bengkel : NO. PT 21907, KG TOK ARUN, OFF JLN SANTONG, 23100 DUNGUN, TERENGGANU

Hubungi No. : Tel. No.: +609 8208141 Fax No.: +609 8208142

Email : [email protected]

Struktur ekuiti : MALAYSIAN (BUMIPUTERA 100%)

Setiausaha syarikat : (LS BASE SERVICES (TR 0006652 X) ROHIZAM BINTI HAMZAH NO 66/44, TAMAN SRI INTAN

JALAN SULTAN OMAR 20300 KUALA TERENGGANU

Modal Dibenarkan : RM500,000.00 Modal Berbayar : RM500,000.00

Akaun Bank : Maybank Berhad, Caw. Paka, Terengganu : CIMB Bank Berhad, Caw. Dungun, Terengganu

Auditor : KUZAIMI & CO

Page 8: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

7 PROFIL SYARIKAT 2017

CARTA ORGANISASI

LEMBAGA PENGARAH

SETIAUSAHA SYARIKAT

PENGARAH URUSAN Mat Said Mamat

PENGURUS AKAUN Zainani Zakaria

BAHAGIAN PENGURUSAN PROJEK

RUSLINA WATI BINTI MAMAT

E-PEROLEHAN & PENGURUS TENDER

Wan Zaidi Wan Hussin

Page 9: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

8 PROFIL SYARIKAT 2017

BIODATA PENGARAH URUSAN

Maklumat Peribadi

Nama : Mat Said Bin Mamat

Jawatan : Pengarah Urusan

No Kad Pengenalan : 521106-11-5169

Tarikh Lahir : November 06th, 1952

Alamat : No 206, Jln Rajawali, Felda Kerteh 03,

23100 Paka, Dungun, Terengganu DarulIman

Mobile No. : 013-9231152

Status : Married

Communication Skill : B. Malaysian / English - Spoken & Written

Pengalaman Kerja:-

Lebih 40 tahun pengalaman dalam bidang penyelenggaraan mekanikal bekerja, baik pulih,

servis, kerja-kerja EPCC projek dan pulih kerja-kerja terutamanya dalam industri minyak &

gas dan petrokimia.

Page 10: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

9 PROFIL SYARIKAT 2017

KESIHATAN, KESELAMATAN & ALAM SEKITAR

SA MAINTENANCE & SERVICES (M) SDN BHD

POLISI KESELAMATAN, KESIHATATAN & ALAM SEKITAR

Polisi utama SA Maintenance & Services (M) Sdn.Bhd ( SAMASE ) adalah berusaha mencapai kecemerlangan dalam semua bidang. SAMASE amat komited untuk mewujudkan persekitaran kerja yang sihat dan selamat bagi semua pekerja dan pelawat yang berada di persekitaran. Dalam merealisasikan matlamat tersebut, SAMASE komited dalam :-

Mematuhi segala undang-undang dan peraturan-peraturan yang berkaitan dengan segala aktiviti, proses kerja.

Mengekalkan tata amalan kerja yang baik bagi memastikan keselamatan, kesihatan dan persekitaran berada dalam keadaan terbaik.

Memberi latihan yang sewajarnya kepada semua pekerja yang terlibat

Membekalkan alat pelindung diri yang bersesuaian dengan kerja kepada

semua pekerja. Semua pekerja, pelawat dan orang awam mesti mematuhi sepenuhnya polisi ini ketika berada di dalam kawasan Premis. Mat Said Bin Mamat Pengarah Urusan 01 Januari 2015

Page 11: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

10 PROFIL SYARIKAT 2017

AKTIVITI PERNIAGAAN KAMI

PERKHIDMATAN PENYELENGGARAAN MEKANIKAL

Baikpulih Dandang (Boiler) & Kerja-Kerja Servis Baikpulih Dandang (Boiler overhaul)

dan kerja-kerja servis adalah aktiviti utama kami di kalangan orang lain. Selain baik pulih dan servis, kami mempunyai keupayaan untuk melakukan pembaikan semula tiub-kerja-kerja serta memasang dandang baru.

Unfired Pressure Vessels (UPV)

Valves overhaul/services

Page 12: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

11 PROFIL SYARIKAT 2017

Loji Penyelenggaraan (Plant Maintenance) Dari awal sederhana menyediakan pembaikan dan perkhidmatan

penyelenggaraan loji kecil syarikat itu telah berkembang menjadi kuasa hebat di dalam menyediakan perkhidmatan yang lebih kompleks dan bersepadu, termasuk penyelenggaraan loji berfungsi. SAMASE yang pakar dalam bidang masing-masing untuk menyampaikan perkhidmatan yang berkualiti kepada pelanggan.

DIANTARA KERJA-KERJA TERAS

• kerja-kerja Pemulihan • Perlindungan kakisan • Pembaikan Konkrit • Waterproofing • Insulation • Persediaan permukaan

Syarikat telah terlibat dalam pemulihan dan kerja-kerja lain yang berkaitan dengan pelbagai kilang di PETRONAS Group of Companies: a) Penapisan Petronas Penapisan (T) Sdn Bhd b) Petronas Gas Berhad (PGB) Petronas Gas Berhad - GPK

Petronas Gas Berhad - GPS Petronas Gas Berhad - UK / UG b) Petronas Chemical Group (PCG) Petronas Chemical Polyethylene / Ethylene LDPE Petronas Chemical Kerja-kerja Fabrikasi

Paip dan struktur keluli pra-fabrikasi akan dilakukan di bengkel kami. Fabrikasi akan berdasarkan kepada spesifikasi pelanggan. kualiti akan mengikut

Page 13: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

12 PROFIL SYARIKAT 2017

spesifikasi pelanggan teknikal dan semua kod, standard, spesifikasi dan peraturan berkanun dirujuk di dalamnya.

Kerja-kerja Teras: Kerja Paip

Kerja Stuktur Besi

Page 14: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

13 PROFIL SYARIKAT 2017

Penebat Panas & Sejuk (Hot & Cold Insulation) Pasukan Insulation kami adalah salah satu yang

paling berpengalaman di Terengganu. Pasukan kami mempunyai pengalaman bekerja di kilang petrokimia seperti Petronas Group of Companies.

Kerja Penyelenggaraan Lukisan (Initial/Maintenance Painting)

Page 15: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

14 PROFIL SYARIKAT 2017

Kejuruteraan & Kerja-kerja Mesin

Perkhidmatan Guna Tenaga SAMASE telah berjaya membekalkan tenaga kerja yang berkelayakan dan

berpengalaman untuk pelbagai pelanggan sama ada secara langsung kepada PETRONAS GROUP atau KONTRAKTOR UTAMA.

SAMASE mempunyai keupayaan menyediakan pelbagai keperluan tenaga

manusia seperti berikut:

• Confined Space Entry (NIOSH Certified) Hole Watcher General Worker

• Fire Watcher (BOMBA & CEFS Certified) • Hydrojetter (NIOSH Certified) Technical Clerk • Work Leader

Perkhidmatan Pembekalan (Trading)

Page 16: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

15 PROFIL SYARIKAT 2017

Kami juga berpengalaman dalam bidang khidmat pembekalan bahan minyak dan gas dan peralatan seperti kelengkapan paip, injap, perangkap stim, alat, jentera, alat ganti, dan lain-lain.

Page 17: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

16 PROFIL SYARIKAT 2017

BIDANG-BIDANG LESEN

Page 18: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

17 PROFIL SYARIKAT 2017

Page 19: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

18 PROFIL SYARIKAT 2017

Page 20: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

19 PROFIL SYARIKAT 2017

Page 21: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

20 PROFIL SYARIKAT 2017

Page 22: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

21 PROFIL SYARIKAT 2017

Page 23: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

22 PROFIL SYARIKAT 2017

Page 24: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

23 PROFIL SYARIKAT 2017

Page 25: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

24 PROFIL SYARIKAT 2017

Page 26: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

25 PROFIL SYARIKAT 2017

ASET & PERALATAN

No Description Quantity

1 Transport Forklift 3T - 1 ea Lorry 3T - Hicom 1 ea 2 Hydrotest equipment & accessories Chart Recorder c/w paper chart – Rototherm (0 to 6000 psi) 1 ea Chart Recorder c/w paper chart – Rototherm (0 to 1500 psi) 1 ea Chart Recodrder c/w paper chart – Rototherm (0 to 500 psi) 1 ea Pressure Gauge – Tecsis (0 to 580 psi) 2 ea Pressure Gauge – Ashcroft (0 to 1450 psi) 2 ea Pressure Gauge – Tecsis (0 to 3500 psi) 2 ea Pressure Gauge – Ashcroft (0 to 3700 psi) 2 ea Pressure Gauge – Tecsis (0 to 5800 psi) 2 ea Hand Pump 2 ea Airless Pump 1 ea 3 Confine Space equipment & accessories Explosion proof hand lamp 8 ea Transformer 4 ea 12” Ventilator Fan c/w hose 8 ea Air Line Trolley Draeger Pas Air Pack 1 1 ea Gas Detector MSA Altair 4 in 1 3 ea 4 Lifting tools & accessories 1 lot Chain block AKITA Level block Elephant Looper Shackle Lifting belt Webbing sling 5 Welding tools & accessories Welding Inverter 240/415V GM3000 Murex 2 ea Welding Inverter IT2000 AC/DC ARC 1 ea Junction Box, 4 outlet 4 ea TIG set 4 ea Welding Cables 500A, Australia Proflex 10 rolls Extension wire TRS 70/0.193/3C MPCI 40 rolls Cutting Torch MK250/251 1 ea Air Angle Grinder 4” ATS 1402A 8 ea Air Angle Grinder 4”, Bosch GWS-8-100Z 16 ea Air Angle Grinder 7”, Bosch 4 ea Air Angle Sander 4”, Bosch 4 ea Straight Grinder, Bosch GGS-5000L 2 ea Air Die grinder ¼” Puma 2 ea MS Baking Oven Force Arc BM151B 150kg 2 ea Quiver 5 ea

Page 27: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

26 PROFIL SYARIKAT 2017

6 Tube Working Tools & Accessories Sugino Tube Expander BK-526 with DM c/w spare roller 1 ea Sugino Tube Expander BK-503 with DM c/w spare roller 1 ea Sugino Drum Mandrel DM-11 for BK Type Tube Expander 1 ea

7 Communication tools Walkie Talkie, Motorola GP-328 IS 16ch UHF 14 ea

8 Fire Safety Preventor 1 lot Fire Extinguisher Fire Water Hose 2” Signage/Signboard

9 Handtools / Powertools 1 lot Spannar Knock Ring Copper Hammer Impact wrench Jig Saw Impact Drill

10 Air Manifold c/w 6 outlets 2 ea 11 Pallet truck 3ton 1 ea 12 Test bench PSV 1 ea 13 Safety harness, c/w carabina, energy absorber, double lanyard large

hook 1 lot

14 Toolbox 1 lot

Page 28: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

27 PROFIL SYARIKAT 2017

REKOD PENGALAMAN KERJA

ID DESCRIPTIONS OWNER DATE CLIENTS

METALLIC STRUCTURAL/PIPING (SM5090100)

Material supply, fabrication and installation of Hydrant

piping modification.

Scope of Work :

Demolition of existing pipe

Fabrication of piping and/or spool

Installation of new piping and/or spool

Painting work including surface preparation and

inspection.

Supply, fabrication and installation of piping

supports

Excavation work necessary

Inspection test plan

Required test based on inspection test plan

Erect scaffold at the worked areas as necessary.

(PO Number: 4120161632)

(RFX Number : 6100020389)

SA Maintenance &

Services (M) S/B December 2016 INSTEP

1

MECH MAINT-BOILERS (SM5010200): PR#To Fabricate, Supply, Delivery, Installation and

Commissioning of Four (4) Units of Steam Condenser

(Airfin Fan Cooler)at Gas Processing Plant Santong

(GPS), Petronas Gas Bhd.

Scope of Work :

Perform engineering, procurement & fabrication of

four (4) units of airfin fan coolers with all fixed

removable & installation of internal and external

components (mounting accessories, fittings

&hardware).

To supply manpower & equipment to install at site.

Perform inspection, QA/QC and testing recognized by

DOSH.

Perform surface preparation and painting as per

PETRONAS Technical Standard for Header Boxes

and Hot Dip Galvanizing (HDG) for Bundle Frames.

Provide transportation from the fabrication/assembly

location to the work site in PGB premise

Perform blinding and de-blinding activities.

Dismantling of existing airfin fan cooler bay including

tube bundles, plenum chambers, fan and drive systems.

Replace corroded setting plate & bolt and nut as per

PGB advice.

Install new sets of tube bundles and reinstallation of

existing airfin fan cooler bay including tube bundles,

plenum chambers, fan and drive systems.

(Order Number :)

(Contract No.: DTC-KTH/PGB-GPU/2016/0151)

SA Maintenance &

Services (M) S/B Sept 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

2

MECH MAINT-BOILERS (SM5010200):

To Perform HRSG A Main Stack Expansion Joint

Replacement at Utilities Gebeng Plant (UG), Gebeng,

Kuantan, Pahang.

Scope of works.

Remove all existing hex bolts

Remove all existing expansion joint bellow

Install new expansion joint bellow

Install new hex bolts

(Order Number: 3620275673)

(Contract No.: SM4Y160505/6200154645)

SA Maintenance &

Services (M) S/B Sept 2016

Petronas Gas Bhd

Utility Gebeng (UG)

Page 29: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

28 PROFIL SYARIKAT 2017

3

METALLIC STRUCTURE/PIPING (SM5090100):

# Perform Major GP1 Piping Replacement

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform Rectification

Works of Piping at GPK1, Gas Processsing Plant omplex

A, Kertih, Kemaman, Terengganu Darul Iman.

Scope of Work :

To fabricate new spool at contractor’s workshop

To remove insulation at existing spool

To remove old pipe spool & install new spool

To perform blasting painting for new pipe spool

To supply manpower & equipment to install pipe spool

at site

Perform 100% RT (butt weld) and 100% Visual and

Dye Pent (fillet weld) on joint.

To reinstate insulation at the replaced pipe spool

Perform Blind and Deblinding

(Order No.: 4120154897)

(RFQ No.: 6200160635)

SA Maintenance &

Services (M) S/B Sept 2016

Petronas Gas Bhd,

Gas Processing

Kerteh (GPK)

4

HEAT EXCHANGERS, CONDENSERS &

COOLER (SM5010400):

Tube Bundle Replacement EB234 Stripper Reboiler.

Supply (1) one unit of Tube Bundles for Heat Exchanger

EB 234 Stripper Reboiler.

Scope of Work :

Supply (1) one unit of complete tube bundle with all

fixed and removable internal (tube sheet,

baffles,impingement plate) as per requirements

Fluorocarbon coating or hot dipped galvanized of all

B7 bolts for all joint including isolation.

Upgraded version of metal jacketed ring gasket with

exceptional of s[iral wound (SW) and ring type joint

(RTJ) to comprofile type of gasket including spares.

Supply head cover according to the applicable

standard.

Complete inspection, QA/QC and testing

requirements, surface preparation and painting (as per

PTS 15.20.03).

Transportation from the fabrication to the point of

delivery at site.

(Order Number: 4120153731)

(RFQ Number.: 6200158119)

SA Maintenance &

Services (M) S/B August 2016

Petronas Chemicals

MTBE Sdn Bhd.

5

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700):

Perform UPV D Servicing

To perform complete Mechanical Work of Unfired

Pressure Vessels and associate equipment for DOSH

inspection at Utilities Kertih, Terengganu Darul Iman.

Scope Of Work:

Dearator Head B (C1-2103B)

Dearator Storage Vessel B (V1-2103B)

o To perform blinding & de-blinding as per blind list.

o To remove insulation for access inspection activities

o Open/ dismantle side manways and tray.

o To perform tubing internal cleaning using vaccum

cleanin power brushing (ST-2) on parent metal &

ST-3 on weldment.

o Prepare and execute repair procedure for DOSH

Inspection

Condensate Cooler (E1-2103G)

Condensate Cooler (E1-2103H)

Condensate Cooler (E1-2103I)

Condensate Cooler (E1- 2103J)

Condensate Cooler (E1-2103K)

Condensate Cooler (E1-2103L)

o To perform blinding & de-blinding as per blind list.

o To remove insulation for access inspection activities

o Open/ dismantle side manways and 100% tubes

plug.

SA Maintenance &

Services (M) S/B August 2016

Petronas Gas Bhd,

Utility Kerteh (UK)

Page 30: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

29 PROFIL SYARIKAT 2017

o To perform tubing internal cleaning using hydrojet

10,000 psi and air blowing in tubes.

o Prepare and execute repair procedure for DOSH

Inspection

(Order Number: 4120153274)

(RFQ Number.: 6200158213)

6

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE F-105 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS) for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

(Order Number: 3620268188)

(RFQ Number.: 6200092922)

SA Maintenance &

Services (M) S/B August 2016

Petronas Chemicals

Ethylene Sdn Bhd

7

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE & STLE F-103 Cleaning for CF

renewal at Petronas Chemicals Ethylene Sdn Bhd,

Kertih, Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There are two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Each furnace also consists of one (1) number of STLE.

Every STLE shall be cleaned by hydro-jetting method

SA Maintenance &

Services (M) S/B August 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 31: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

30 PROFIL SYARIKAT 2017

on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS) for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

o Secondary Transfer Line Exchanger (STLE)

cleaning:

o STLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to facilitate

cleaning work.

o Hydro-jetting of both shell and tube bundle (internal

& external) using hydro-jetting method (10,000 psi

UHPWJT) at the equipment location or cleaning bay

as instructed by PCESB.

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 3620268219)

(RFQ Number.: 6200092922)

8

MECH ENG & MAINT-WORKSHOP

MACHINING (SM5080100): Design & Fabricate Cooling Fan - To Design & Fabricate

Cooling Fan KM5-0302A and Terminal Box for Electric

Motor at Gas Processing Santong (GPS), Jalan Santong,

and Terengganu Darul Iman.

Scope of Works:

Motor Fan Blade :

- Supply/fabricate motor fan blade as per

specification for 2 units of motors.

KM5-0302A (13.5kW)

PM5-0605A (70kW)

- Perform a performance test include Running ampere

and Vibration result at site.

Terminal Box and wire connection :

- Supply terminal box with wire connection for motor

KMD-0342B

- Perform a performance test include Running ampere

and Vibration result at site.

(Order No.: 4120151910)

(RFQ No.: 6200156336)

SA Maintenance &

Services (M) S/B August 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

9 MECH MAINT-BOILERS (SM5010200): SA Maintenance &

Services (M) S/B July 2016

Petronas Gas Bhd,

Utility Kerteh (UK)

Page 32: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

31 PROFIL SYARIKAT 2017

To repair HRSG D diverter damper section at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, and

Terengganu Darul Iman.

Scope of Works:

To perform repair at detached west side diverter

damper frame.

To perform manual lifting & rigging activities to

reinstall damper frame.

To grind off/remove defects (crack) at bottom and west

structure frame and perform build up weld complete

with DPT.

To perform tack weld at guide bar GT diffuser.

To grind off/remove defects at plenum GT side and

perform build up weld.

To remove and install new lamellar seal at north, west,

south and east side bypass stack compartment.

(Order Number: 3620262866)

(Contract No.: SM8Y150604 / 620012032)

10

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE & STLE F-104 Cleaning for CF rene

wal at Petronas Chemicals Ethylene Sdn Bhd, Kertih, K

emaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower, eq

uipment, material, consumables, and tools for executi

on of the WORKS.

There ar two (2) numbers of PTLE for each furnace, i

dentified as ET-0-E-101 A/B for furnace F-101, ET-0

-E-102 A/B for furnace F-102 with similar tagging un

til Furnace F-106. Each PTLE (both A and B units) sh

all be cleaned by mechanical means and/or hidro-jetti

ng method two (2) times per year basis.

Each furnace also consists of one (1) number of STLE

. Every STLE shall be cleaned by hydro-jetting metho

d on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment Iso

lation Sheet (EIS) for the purpose of positive isolation

and pressure testing of equipment and system of the W

ORKS.

Perform manual lifting and rigging activities to facilit

ate the WORKS.

Perform preventive maintenance work at associated e

quipment such as Transfer Line Valve (TLV) / Docok

e Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged equi

pment and surrounding areas to the satisfaction of PC

ESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE) cleanin

g:

o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning: o STLE cleaning shall be completed within three (3)

SA Maintenance &

Services (M) S/B July 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 33: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

32 PROFIL SYARIKAT 2017

days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to facilitate

cleaning work.

o Hydro-jetting of both shell and tube bundle (internal

& external) using hydro-jetting method (10,000 psi

UHPWJT) at the equipment location or cleaning bay

as instructed by PCESB.

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 3620261644)

(RFQ Number.: 6200092922)

11

MECH MAINT-BOILERS (SM5010200):

PR# To do SH tube defining activity

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform defining activity

of superheater tube for Waste Heat Boiler (4 unit) at Gas

Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up all auxiliary & waste heat boilers

To remove fins for 25 SH tubes 1st row facing the flue

gas from the gas turbine exhaust.

Perform hydrotest and deblind works witness &

inspect by DOSH.

(Order No.: 4120147112)

(RFQ No.: 6200152866)

SA Maintenance &

Services (M) S/B June 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

12

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE F-106 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS) for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

SA Maintenance &

Services (M) S/B May 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 34: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

33 PROFIL SYARIKAT 2017

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

(Order Number: 3620252799)

(RFQ Number.: 6200092922)

13

SPECIAL MAINT- HYDROJETTING (SS1130000):

STLE & PTLE F-101 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS) for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

(Order Number: 3620252802)

(RFQ Number.: 6200092922)

SA Maintenance &

Services (M) S/B May 2016

Petronas Chemicals

Ethylene Sdn Bhd

14

MECH MAINT-BOILERS (SM5010200):

Mech Package Boiler GPS for CF Renewal

Provision of manpower, supervision, equipment, tools,

material, and consumables for internal inspection

overhaul cleaning of all components of boiler such as

Steam Drum, Mud Drum, Fire Box, and ancillary

equipment including repair work prior to inspect and

certification for the extension of Certificate Of Fitness by

Department of Occupational Safety & Health (DOSH)at

Gas Processing Plant, Santong (GPS), Petronas Gas

Berhad (PGB), Terengganu Darul Iman.

Auxiliary Boiler A5-1203A

Waste Heat Boiler E5-1201B

Waste Heat Boiler E5-1201A

Waste Heat Boiler E5/6-1201

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

Page 35: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

34 PROFIL SYARIKAT 2017

Open up and box up all auxiliary & waste heat boilers

Perform cleaning works for DOSH inspection.

Perform testing and servicing and overhaul of pressure

safety valve (PSV), Block Valve (BV) and check valve

(CV).

Dismantling, cleaning and reinstall multi spud gas

burned c/w burned shield and duct burner element.

Re install the steam drum removed parts,box up and

close all boiler drum manholes and access door.

(Order Number: 4120144949)

(Contract Number.: 6200151933)

15

MECH MAINT-BOILERS (SM5010200):

PR# Provision of manpower, supervision, tools,

equipment, materials and consumables for boiler repair

activity at Utility Gebeng Plant (UG), PGB, Kuantan,

Pahang.

(Order Number: 3620251294)

(Contract Number.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd

Utility Gebeng

16

MECH MAINT-FURNACES (SM5010500): PR# To perform welding & rectification of attemperator

& piping works waste heat boiler (WHB). (4 units) at Gas

Processing Santong (GPS), Gas Processing & Utilities,

Petronas Gas Bhd.

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle

Blind/deblind as per blind list

To fabricate new spool at workshop

To remove insulation at attemperator spool

To remove existing attemperator & install new

attemperator

To perform blasting painting for new attemperator

To perform NDT (PT & RT)

To perform Post Weld Heat Treatment (PWHT)

Perform Boiler HT

To reinstate insulation at the replaced pipe spool

(Order No.: 4120144687)

(RFQ No.: 6200149677)

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

17

MECH MAINT-BOILERS (SM5010200):

PR# Manpower, materials, and equipment to perform

boiler overhaul servicing at HRSG Unit F and associated

equipment for DOSH inspection at Utilities Kertih Plant

(UK), PGB, Kertih, Kemaman, Terengganu.

Heat Recovery Steam Generator B (F1-211B01)

Compressed Air Receiver F (V1-211B04)

Gas Final Scrubber (V1-211B02)

Air Cooled Heat Exchanger (E1-211B01)

o Perform blinding deblinding

o Perform cleaning and works as per SOE

o Perform testing and servicing of pressure relief

valve

o Perform flange tightening using controlled bolting

(HTW)

o Perform motor servicing & repair (Fin Fan Motor &

Scanner Air Blower)

o Perform instrument calibration and loop check.

(Order No.: 4120144561)

(RFQ No.: 6200142993)

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd,

Utility Kerteh

18

HEAT EXCHANGERS, CONDENSERS &

COOLER (SM5010400):

PR#PTLE Chamber Installation at F-101A at Petronas

Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,

Terengganu.

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

SA Maintenance &

Services (M) S/B May 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 36: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

35 PROFIL SYARIKAT 2017

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS) for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon completion of each WORKS.

Secondary Transfer Line Exchanger (STLE)

cleaning: o STLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to facilitate

cleaning work.

o Hydro-jetting of both shell and tube bundle (internal

& external) using hydro-jetting method (10,000 psi

UHPWJT) at the equipment location or cleaning bay

as instructed by PCESB.

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 41201144488)

(RFQ Number.: 62000151498 )

19

MECH MAINT-BOILERS (SM5010200):

PR# External Contractor – SA MTN

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical work of HRSG A and associated equipment

for DOSH inspection at Utility Gebeng Plant (UG), PGB,

Kuantan, Pahang.

(Order No.: 3620249629)

(Contract Number.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd

Utility Gebeng

20

MECH MAINT-BOILERS (SM5010200):

PR# HRSG A burner vent line modification

Provision of manpower, supervision, tools, equipment,

materials and consumables for HRSG A burner vents line

modification at Utility Gebeng (UG), Kuantan, Pahang.

Scope of works:

To perform burner vent line modification as per UG’s

proposal.

To cut off/remove existing burner vent line.

To install new burner vent line.

To perform Non-Destructive Testing.

The purpose of the modification is to prevent raindrop

from entering the pipe.

(Order Number: 3620249628)

(Contract Number.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd

Utility Gebeng

21

MECH MAINT-BOILERS (SM5010200):

PR# GTB GCV/SRV N2 line purging installation

Provision of manpower, supervision, tools, equipment,

materials and consumables for GTB GCV/SRV N2

Purging line installation at Utility Gebeng Plant (UG),

PGB, Kuantan, Pahang.

Scope of works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

To supply, fabricate and install nitrogen line piping at

GTB, UG.

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd

Utility Gebeng

Page 37: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

36 PROFIL SYARIKAT 2017

Blasting painting as per PTS and UG’s procedure

based on instruction by UG’s representative. PTS

30.48.00.31-P (15.20.03): Protective Coating and

Linings.

To cut off existing line for new nitrogen line

installation.

Perform manual lifting and rigging activities to

facilitate the WORKS.

To perform welding as per approved repair procedure

and Welding Procedure Specification.

To perform Non-Destructive Testing.

(Order Number: 36202451182)

(Contract Number.: SM8Y150510 / 620019030)

22

MECH MAINT-BOILERS (SM5010200):

PR# HRSG B Burner vent line modification

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform modification of

HRSG B burner vent line at Utility Gebeng Plant (UG),

PGB, Kuantan, Pahang.

Scope of works:

To perform burner vent line modification as per UG’s

proposal.

To cut off/remove existing burner vent line.

To install new burner vent line.

To perform Non-Destructive Testing.

The purpose of the modification is to prevent raindrop

from entering the pipe.

(Order Number: 36202451181)

(Contract Number.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B May 2016

Petronas Gas Bhd

Utility Gebeng

23

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE F-101 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

SA Maintenance &

Services (M) S/B April 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 38: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

37 PROFIL SYARIKAT 2017

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

(Order Number: 3620244294)

(RFQ Number.: 6200092922)

24

MECH MAINT-BOILERS (SM5010200): PR# External Contractor – SA MTN

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical work of HRSG D and associated equipment

for DOSH inspection at Utility Gebeng Plant (UG), PGB,

Kuantan, Pahang.

(Order No.: 3620243472)

(Contract Number.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B April 2016

Petronas Gas Bhd

Utility Gebeng

25

MECH MAINT-BOILERS (SM5010200):

PR# IP Steam Header RV’s servicing 3 units

Provision of manpower, supervision, tools, equipment,

materials and consumables to remove, service & install

RV’s at IP Steam Header Line at Utility Gebeng Plant

(UG), PGB, Kuantan, Pahang.

Scope of works:

Remove/service/install RV’s – 3 units.

(Order No.: 3620243469)

(Contract Number.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B April 2016

Petronas Gas Bhd

Utility Gebeng

26

MECH MAINT-FURNACES (SM5010500): PR# F3-781 Boiler hotspot repair

Hotspot repair of F3-781 Auxiliary Boiler, Gas

Processing Kerteh (GPK), PGB, Kerteh, Kemaman,

Terengganu.

Perform all necessary blinding/deblinding for hotspot

repair

Provide necessary access for all inspection and repair

activities, including confined space entry for steam

drum, mud drum and furnace.

Removal of furnace rear wall components including

insulation cladding, mineral wool, rear wall casing,

rear wall refractory and rear wall tie bar (C Channel).

Perform procurement, fabrication and installation of

furnace rear components including refractory anchors,

rear wall refractory, rear wall tie-bar, rear wall casing,

mineral wool insulation, insulation cladding &

painting.

Provisional scope depends on as found condition

which covers for top furnace refractory repair.

(Order No.: 4120140948)

(RFQ No.: 6200147409)

SA Maintenance &

Services (M) S/B April 2016

Petronas Gas Bhd,

Gas Processing

Kerteh (GPK)

27

MECH MAINT-BOILERS (SM5010200):

PR# To do SH tube defining activity

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform defining activity

of superheater tube for Waste Heat Boiler (1 unit) at Gas

Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up waste heat boiler.

To remove fins for 25 SH tubes 1st row facing the flue

gas from the gas turbine exhaust.

Perform hydrotest and deblind works witness &

inspect by DOSH.

(Order No.: 4120140732)

(RFQ No.: 6200147067)

SA Maintenance &

Services (M) S/B March 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

28

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700):

# V-29208 DOSH

KR2 MIXED LPG BULLET OVERHAUL – Provision

of manpower, supervision, tools, equipment, materials

and consumables for overhaul of mixed LPG bullet

which inclusive of equipment blinding and de-blinding,

SA Maintenance &

Services (M) S/B March 2016

Petronas Penapisan

(T) Sdn Bhd (PPTSB)

Page 39: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

38 PROFIL SYARIKAT 2017

ventilation, internal cleaning, internal scaffolding

erection and removal, blasting, power brushing and

maintenance painting for internal and external of bullet

and hydrostatic testing at Petronas Penapisan

(Terengganu) Sdn Bhd (PPTSB)Kerteh, Kemaman,

Terengganu.

To carry out blinding works for the bullet as per

PPTSB instruction

To perform cleaning and gas freeing the bullet

To perform erection and removal of internal

scaffolding (purple shaded area as per scaffolding

drawing attached)

To power tool at weldment (at the yellow, green, and

purple shaded area – both drawings)

To blast the internal bottom (clock location no5 to no7)

and paint as per PTS 13A

To replace piping and valve as per Inspection Worklist

(Order No.: 4120140684)

(RFQ No.: 6200144771)

29

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE F-103 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS) for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

(Order Number: 3620241785)

(RFQ Number.: 6200092922

SA Maintenance &

Services (M) S/B March 2016

Petronas Chemicals

Ethylene Sdn Bhd

30

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE STLE F-105 Cleaning for CF renewal

at Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

SA Maintenance &

Services (M) S/B March 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 40: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

39 PROFIL SYARIKAT 2017

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101, ET-

0-E-102 A/B for furnace F-102 with similar tagging

until Furnace F-106. Each PTLE (both A and B units)

shall be cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

Each furnace also consists of one (1) number of STLE.

Every STLE shall be cleaned by hydro-jetting method

on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS) for the purpose of positive

isolation and pressure testing of equipment and system

of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction of

PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of top and bottom cones including opening

of Coke Catcher.

o Cleaning of coke by mechanical means or hydro-

jetting method (10,000 psi UHPWJT) at cones,

tubes, and coke catcher as instructed by PCESB.

o Facilitate inspection / NDT work such as preparation

for Internal Rotating Inspection (IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test and

Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning: o STLE cleaning shall be completed within three (3)

days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to facilitate

cleaning work.

o Hydro-jetting of both shell and tube bundle (internal

& external) using hydro-jetting method (10,000 psi

UHPWJT) at the equipment location or cleaning bay

as instructed by PCESB.

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 3620241784)

(RFQ Number.: 6200092922)

31

MECH MAINT-HOT INSULATION (SM5120100):

# To perform AGO Castable replacement

Provision of manpower, supervision, tools, equipments,

material, and consumables to perform castable & burner

repair of Acid Gas Oxidizer 3 (AGO-3) at KCS, Gas

Processing Plant, Kerteh (GPK), Petronas Gas Berhad

(PGB), Terengganu Darul Iman.

Refractory work

o Blind/deblind as per blind list

SA Maintenance &

Services (M) S/B March 2016

Petronas Gas Bhd,

Gas Processing

Kerteh (GPK)

Page 41: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

40 PROFIL SYARIKAT 2017

o Remove AGO-3 burner from burner throat to

gain access of confine space area inside AGO.

o Remove existing castable (both layer).

o Inform PGB to perform inspection.

o Surface cleaning and install new castables.

Burner Work

o Remove the burner from burner throat in safe

manner to a safe place.

o Inform PGB to perform inspection prior any

repair commencement.

o Repair burner as per PGB requirement.

o Perform NDT at joints as per PGB requirement.

(Order Number: 4120140233)

(RFQ Number.: 62000147092

32

MECH MAINT-BOILERS (SM5010200):

# Mech Package HRSG GPS for CF Renewal

Provision of manpower, material, and equipment to

perform boiler overhauls servicing at F5/6-2201A &

E5/6-2201B at Gas Processing Plant, Santong (GPS),

Petronas Gas Berhad (PGB), Terengganu Darul Iman.

Heat Recovery Steam Generator HRSG F5/6-2201A

(TG PMD 560)

Heat Recovery Steam Generator HRSG F5/6-2201B

(TG PMD 559)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning using 10,000

psi UHP waterjet, power tools, air blowing,

vacuum, etc) – Furnace / Super heater / Steam Drum

/ Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order Number: 4120140142)

(RFQ Number.: 62000147132)

SA Maintenance &

Services (M) S/B March 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

33

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700):

# To perform desuperheater servicing

To perform desuperheater rectification and servicing

works at Gas Processing Plant-4 (GPP-4), Gas

Processing Kerteh, Gas Processing & Utilities, Petronas

Gas Bhd, Kerteh, Kemaman, Terengganu.

G4-751 – Desuperheater for LP Steam No.1

(Letdown HP/LP)

G4-752 – Desuperheater for LLP Steam No.1

(Letdown LP/LLP)

G4-738 – Desuperheater for PT-735 A/B/D

G4-351 – T4-351

G4-451 – T4-451

G4-755 – MP Steam Header

G4-756 – LP Steam No.2

Scope Of Work

To perform blinding & de-blinding.

To perform Desuperheater rectification and

servicing.

To perform fabrication works as per existing

drawing.

To perform 100% & RT on butt-weld joints and

SA Maintenance &

Services (M) S/B April / March 2016

Petronas Gas Bhd,

Gas Processing

Kerteh (GPK)

Page 42: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

41 PROFIL SYARIKAT 2017

100% visual and Dye-penetrant Inspection on fillet

weld joint.

To perform lifting

Supply relative materials and manpower

(ORDER NUMBER: 4120139156)

(RFQ NUMBER: 6200145548)

34

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE F-102 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

o Supply / provide skilled and competent

manpower, equipment, material, consumables,

and tools for execution of the WORKS.

o There ar two (2) numbers of PTLE for each

furnace, identified as ET-0-E-101 A/B for

furnace F-101, ET-0-E-102 A/B for furnace F-

102 with similar tagging until Furnace F-106.

Each PTLE (both A and B units) shall be

cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

o Shall install and remove blind(s) as per

Equipment Isolation Sheet (EIS) for the purpose

of positive isolation and pressure testing of

equipment and system of the WORKS.

o Perform manual lifting and rigging activities to

facilitate the WORKS.

o Perform preventive maintenance work at

associated equipment such as Transfer Line

Valve (TLV) / Docoke Valve (DV) during

cleaning activity.

o Perform cleaning and housekeeping of

packaged equipment and surrounding areas to

the satisfaction of PCESB upon completion of

each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

(Order Number: 3620237385)

(RFQ Number.: 6200092922)

SA Maintenance &

Services (M) S/B March 2016

Petronas Chemicals

Ethylene Sdn Bhd

35

MECH MAINT-BOILERS (SM5010200):

# GPP3TA TA Activities – Boiler/Smallbore

To perform welding and rectification of boiler/smallbore

at Gas Processing Plant-3 (GPP-3), Gas Processing

Kerteh, Gas Processing & Utilities, Petronas Gas Bhd,

Kerteh, Kemaman, Terengganu.

To perform blinding & de-blinding.

To perform 100% & RT on butt-weld joints and

100% visual and Dye-penetrant Inspection on fillet

weld joint.

Installation MSV & Check Valve at WHB F3-761 &

F3-771

Guillotine Gate Servicing for WHB F3-761 & F3-

SA Maintenance &

Services (M) S/B March 2016

Petronas Gas Bhd,

Gas Processing

Kerteh (GPK)

Page 43: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

42 PROFIL SYARIKAT 2017

771

Replace pipe spool 3” CBD line from AGRU to

GPP-3 (LD-3”-9308-C1109)

Rectification work at WHB F3-761

Rectification work at WHB F3-771

Blinding/Deblinding at Auxiliary Boiler F3-781

Supply valves

IGV FD Fan repair for boiler F3-791

Supply gate valve 8” 600# Flgd RF A216WCB/HF

to PGB

(Order Number: 3620237266)

(Contract No.: SM8Y150815 / 6200128350)

36

MECH MAINT-BOILERS (SM5010200):

# GPK Package Boiler CF Renewal

To supply manpower, materials and equipment to

perform boiler overhaul servicing at F4-771, WHRU#1,

and WHRU#2 for DOSH inspection at Gas Processing

Kerteh (GPK), PGB, Kerteh, Kemaman, Terengganu.

Waste Heat Boiler F4-771 (PMD12204)

Waste Heat Boiler WHRU#1 (PMD12235)

Waste Heat Boiler WHRU#2 (PMD12236)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order Number: 4120137879)

(Contract No.: 6200144212)

SA Maintenance &

Services (M) S/B February 2016

Petronas Gas Bhd,

Gas Processing

Kerteh (GPK)

37

MECH MAINT – MECHANICAL VALVE

(SM5030100):

To Perform DOSH Inspection for UPV B:

To perform complete mechanical work of unfired

pressure vessel and associated equipment for DOSH

inspection at Utilities Kertih Plant (UK), PGB, Kertih,

Kemaman, Terengganu

Deaerator Head (C1-2103A

Air Dryer Vessel (V1-24201A)

Air Dryer Vessel (V1-24201B)

Deaerator Storage Vessel (V1-2103A)

Water Separator (V1-2402A)

Main Instr. Air Receiver (V1-2402A)

Natural Gas Surge Drum (V1-2801C)

o Perform blinding deblinding

o Open manhole & ventilation

o Remove internal fittings.

o Perform unloading media catalyst.

o Powertool cleaning & air blowing

o DOSH Inspection

o Touch up painting

o Perform loading media catalyst.

o Close manhole and boxup.

Condensate Cooler (E1-2103A)

Condensate Cooler (E1-2103B)

Condensate Cooler (E1-2103C)

Condensate Cooler (E1-2103D)

SA Maintenance &

Services (M) S/B

March 2016

&

June 2016

Petronas Gas Bhd,

Utility Kerteh

Page 44: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

43 PROFIL SYARIKAT 2017

Condensate Cooler (E1-2103E)

Condensate Cooler (E1-2103F)

o Perform blinding deblinding

o Remove plugs

o Perform waterjetting at 10,000 psi.

o Perform air blowing

o DOSH Inspection

o Install plugs

(Order Number: 4120136800)

(RFQ No.: 6200143122)

38

MECH MAINT-BOILERS (SM5010200):

To supply manpower, materials, and equipment to

perform boiler overhaul servicing at HRSG Unit B and

associated equipment for DOSH inspection at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu.

Heat Recovery Steam Generator B (F1-211B01)

Compressed Air Receiver B (V1-211B04)

Gas Final Scrubber (V1-211B02)

Air Cooled Heat Exchanger (E1-211B01)

o Perform blinding deblinding

o Perform cleaning and works as per SOE

o Perform testing and servicing of pressure relief

valve

o Perform flange tightening using controlled

bolting (HTW)

o Perform motor servicing & repair (Fin Fan

Motor & Scanner Air Blower)

o Perform instrument calibration and loop check.

(Order No.: 4120136316)

(RFQ No.: 6200142993)

SA Maintenance &

Services (M) S/B March 2016

Petronas Gas Bhd,

Utility Kerteh (UK)

39

MECH MAINT-BOILERS (SM5010200):

To perform boiler hotspot and leak repair.

Tube leak repair and hotspot repair for Auxiliary Boiler

F2-791 Gas Processing Plant-2 (GPP-2), Gas Processing

Kerteh, Gas Processing & Utilities, Petronas Gas Bhd,

Kerteh, Kemaman, Terengganu.

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Retubing 1 length of BR tube

Removal and installation of furnace rear wall

components including refractory, insulation, C

Channel, etc.

Grind build-up defected tubes

NDT and hydrostatic test (HT)

Cleaning & overhaul for DOSH CF renewal

(Order Number: 4120136313)

(RFQ No.: 6200143188)

SA Maintenance &

Services (M) S/B

Mid Feb – End

March 2016

Petronas Gas Bhd,

Gas Processing

Kerteh (GPK)

40

MECH MAINT-BOILERS (SM5010200):

Package Boiler D for CF Renewal.

To supply manpower, materials, and equipment to

perform boiler overhaul servicing at Boiler D (F2-

211D01) and associated equipment for DOSH inspection

at Utility Gebeng Plant (UG), PGB, Kuantan, Pahang.

(Order Number: 4120136088)

(RFQ No.: 6200142958)

SA Maintenance &

Services (M) S/B February 2016

Petronas Gas Bhd,

Utility Gebeng (UG)

41

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700):

PCC KR2LSD Modification and DOSH

Provision of manpower, supervision, tools, equipment,

materials and consumables for PCC KR2LSD

Modification and DOSH which inclusive of equipment

blinding and de-blinding, ventilation, internal cleaning,

internal scaffolding erection and removal, lifting, power

brushing and maintenance painting for internal and

internal vessel modification at Petronas Penapisan

(Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman,

Terengganu.

SA Maintenance &

Services (M) S/B January 2016

Petronas Penapisan

(T) Sdn Bhd (PPTSB)

Page 45: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

44 PROFIL SYARIKAT 2017

To carry out blinding works for the vessel as per

PPTSB instruction

To perform cleaning and gas freeing the vessel

To perform erection and removal of internal

scaffolding (purple shaded area as per scaffolding

drawing attached)

To power tool at weldment

Internal vessel modification

(Order No.: 4120135117)

(RFQ No.: 6200140485)

42

MECH MAINT-BOILERS (SM5010200):

Mech Package Boiler GPS for CF Renewal

Provision of manpower, supervision, equipment, tools,

material, and consumables for internal inspection

overhaul cleaning of all components of boiler such as

Steam Drum, Mud Drum, Fire Box, and ancillary

equipment including repair work prior to inspect and

certification for the extension of Certificate Of Fitness by

Department of Occupational Safety & Health (DOSH)at

Gas Processing Plant, Santong (GPS), Petronas Gas

Berhad (PGB), Terengganu Darul Iman.

Waste Heat Boiler E5-1201A

Waste Heat Boiler E5-1202A

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up all waste heat boilers

Perform cleaning works for DOSH inspection.

Perform testing and servicing and overhaul of

pressure safety valve (PSV), Block Valve (BV) and

check valve (CV).

Re install the steam drum removed parts,box up and

close all boiler drum manholes and access door.

(Order Number: 4120133323)

(RFQ No.: 6200140442)

SA Maintenance &

Services (M) S/B

February 2016

&

March 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

43

MECH MAINT-BOILERS (SM5010200):

PR: To repair econ tube leak.

To perform welding and rectification of Economizer tube

for Auxiliary Boiler A6-1203 at Gas Processing Plant,

Santong (GPS), Petronas Gas Berhad (PGB),

Terengganu Darul Iman.

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation

Partial retubing Economizer Tube 5 lengths

Removal and installation of bracket

Grind build-up defected tube 1 length

NDT and hydrostatic test (HT)

Cleaning & overhaul for DOSH CF renewal Internal

cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Boiler Box-up activity and Housekeeping

(Order Number: 4120133072)

(RFQ No.: 6200140483)

SA Maintenance &

Services (M) S/B

January - February

2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

44

MECH MAINT-BOILERS (SM5010200):

To replace LG steam side isolation Gate valve at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

(Order Number: 3620232500)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B February 2016

Petronas Gas Bhd,

Utility Kerteh (UK)

Page 46: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

45 PROFIL SYARIKAT 2017

45

MECH MAINT-BOILERS (SM5010200):

To replace Economizer vent 3” Valve, CBD valve at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

(Order Number: 3620232490)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B February 2016

Petronas Gas Bhd,

Utility Kerteh (UK)

46

MECH MAINT-BOILERS (SM5010200):

To perform repair at flange 10” HHP Header Steam Line

at Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu.

(Order Number: 3620230312)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B February 2016

Petronas Gas Bhd,

Utility Kerteh (UK)

47

SPECIAL MAINT- HYDROJETTING

(SM5010200):

Blinding & PTLE F-104 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu

PTLE: Primary Transfer Line Exchanger

o Supply / provide skilled and competent

manpower, equipment, material, consumables,

and tools for execution of the WORKS.

o There ar two (2) numbers of PTLE for each

furnace, identified as ET-0-E-101 A/B for

furnace F-101, ET-0-E-102 A/B for furnace F-

102 with similar tagging until Furnace F-106.

Each PTLE (both A and B units) shall be

cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

o Shall install and remove blind(s) as per

Equipment Isolation Sheet (EIS) for the purpose

of positive isolation and pressure testing of

equipment and system of the WORKS.

o Perform manual lifting and rigging activities to

facilitate the WORKS.

o Perform preventive maintenance work at

associated equipment such as Transfer Line

Valve (TLV) / Docoke Valve (DV) during

cleaning activity.

o Perform cleaning and housekeeping of

packaged equipment and surrounding areas to

the satisfaction of PCESB upon completion of

each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening o of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

Closing and reinstallation of the cones and coke catcher;

followed by pressure testing (Coil Test and Leak Test on

the system.

(Order Number: 3620229126)

(RFQ Number.: 6200092922

SA Maintenance &

Services (M) S/B January 2016

Petronas Chemicals

Ethylene Sdn Bhd

48

MECH MAINT-BOILERS (SM5010200):

To perform repair activity at Air Drier Filter at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works:

Remove vessel & mob to site.

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Kerteh (UK)

Page 47: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

46 PROFIL SYARIKAT 2017

Perform internal blasting to ensure no defects

inside vessel.

Cut-off/remove flange & support.

Fit-up & weld new flange as per approved

procedure.

Perform Non-Destructive Testing.

Perform Hydrostatic Test.

Install support.

Touch up painting.

Install vessel at site.

(Order Number: 3620229115)

(Contract No.: SM8Y150604 / 620012032)

49

MECH MAINT-BOILERS (SM5010200):

Valve servicing at Lube Oil cooler GAN Compressor

Unit at Utilities Kertih Plant (UK), PGB, Kertih,

Kemaman, Terengganu

(Order Number: 3620229114)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Kerteh (UK)

50

MECH MAINT-BOILERS (SM5010200):

Air Fin Cooler F cleaning for CF Renewal at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works:

Perform blinding deblinding as per EIS

Remove all plugs

Perform waterjetting at 10,000 psi.

Perform air blowing.

DOSH Inspection.

Install plugs.

(Order Number: 3620228799)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Kerteh (UK)

51

SPECIAL MAINT- REFRACTORY (SS1110000):

PTLE F-105 Cleaning for CF renewal at Petronas

Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,

Terengganu.

PTLE: Primary Transfer Line Exchanger

o Supply / provide skilled and competent

manpower, equipment, material, consumables,

and tools for execution of the WORKS.

o There ar two (2) numbers of PTLE for each

furnace, identified as ET-0-E-101 A/B for

furnace F-101, ET-0-E-102 A/B for furnace F-

102 with similar tagging until Furnace F-106.

Each PTLE (both A and B units) shall be

cleaned by mechanical means and/or hidro-

jetting method two (2) times per year basis.

o Shall install and remove blind(s) as per

Equipment Isolation Sheet (EIS) for the purpose

of positive isolation and pressure testing of

equipment and system of the WORKS.

o Perform manual lifting and rigging activities to

facilitate the WORKS.

o Perform preventive maintenance work at

associated equipment such as Transfer Line

Valve (TLV) / Docoke Valve (DV) during

cleaning activity.

o Perform cleaning and housekeeping of

packaged equipment and surrounding areas to

the satisfaction of PCESB upon completion of

each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

SA Maintenance &

Services (M) S/B January 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 48: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

47 PROFIL SYARIKAT 2017

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings.

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

(Order Number: 3620225706)

(RFQ Number.: 6200092922)

52

MECH MAINT-BOILERS (SM5010200):

Rectify IP steam header isolation valve at Utility

Gebeng Plant (UG), PGB, Kuantan, Pahang.

To replace 2 units of 8” Gate Valve welded type.

To replace 2 units of 14” Gate valve flanged type.

Fabricate 8” IP steam header spool at workshop

Perform hydrostatic test

Perform Non-Destructive Testing

To cut-off/remove existing/defected spool

To perform new spool installation at site

To dismantle/service/install 3 units of RV’s.

(Order Number: 3620225447)

(Contract No.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Gebeng (UG)

53

MECH MAINT-BOILERS (SM5010200):

GTC GCV/SRV N2 Purging line installation at Utility

Gebeng Plant (UG), PGB, Kuantan, Pahang.

Scope of works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

To supply, fabricate and install nitrogen line piping

at GTB, UG.

Blasting painting as per PTS and UG’s procedure

based on instruction by UG’s representative. PTS

30.48.00.31-P (15.20.03): Protective Coating and

Linings.

To cut off existing line for new nitrogen line

installation.

Perform manual lifting and rigging activities to

facilitate the WORKS.

To perform welding as per approved repair

procedure and Welding Procedure Specification.

To perform Non-Destructive Testing.

(Order Number: 3620225446)

(Contract No.: SM8Y150510 / 620019030

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Gebeng (UG)

54

MECH MAINT-BOILERS (SM5010200):

HRSG D Fuel Gas Line Cleaning activity at Utility

Gebeng Plant (UG), PGB, Kuantan, Pahang.

Perform blinding deblinding.

Drop spool & valves.

Perform waterjetting inside clogged piping.

Replace all gasket & corroded stud bolt & nuts.

Install existing valves & spool.

(Order Number: 3620225445)

(Contract No.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Gebeng (UG)

55

MECH MAINT-BOILERS (SM5010200):

HRSG C Fuel Gas Line Cleaning activity at Utility

Gebeng Plant (UG), PGB, Kuantan, Pahang.

Perform blinding deblinding.

Drop spool & valves.

Perform waterjetting inside clogged piping.

Replace all gasket & corroded stud bolt & nuts.

Install existing valves & spool.

(Order Number: 3620225444)

(Contract No.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Gebeng (UG)

56 MECH MAINT-BOILERS (SM5010200): SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Gebeng (UG)

Page 49: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

48 PROFIL SYARIKAT 2017

HRSG C Burner Vent Line modification work at Utility

Gebeng Plant (UG), PGB, Kuantan, Pahang.

Scope of works:

To perform burner vent line modification as per

UG’s proposal.

To cut off/remove existing burner vent line.

To install new burner vent line.

To perform Non-Destructive Testing.

The purpose of the modification is to prevent

raindrop from entering the pipe.

(Order Number: 3620225443)

(Contract No.: SM8Y150510 / 620019030)

57

MECH MAINT-BOILERS (SM5010200):

HRSG C CF activity #December 2015 at Utility Gebeng

Plant (UG), PGB, Kuantan, Pahang.

Perform blinding deblinding.

Open all manhole.

Perform cleaning works at superheater, economizer,

evaporator, steam drum, bypass stack, main stack &

riser.

Perform cleaning works at Final gas Scrubber,

Compressed Air Receiver & Blowdown Tank.

Remove/service/install RV’s – 10 units.

Perform repair at burner area – inner sheeting plate

patching.

DOSH activity.

Close manhole / boxup.

(Order Number: 3620225442)

(Contract No.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Gebeng (UG)

58

MECH MAINT-BOILERS (SM5010200):

HRSG B Fuel Gas Line cleaning activity at Utility

Gebeng Plant (UG), PGB, Kuantan, Pahang.

Perform blinding deblinding.

Drop spool & valves.

Perform waterjetting inside clogged piping.

Replace all gasket & corroded stud bolt & nuts.

Install existing valves & spool.

(Order Number: 3620225441)

(Contract No.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B January 2016

Petronas Gas Bhd

Utility Gebeng (UG)

59

MECH MAINT-BOILERS (SM5010200):

Open IGV bellmouth cover GT B at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Cut-off/remove bolt nut.

Open manhole.

Perform tack weld nut at manhole.

Close manhole & boxup.

(Order Number: 3620222219)

(Contract No.: SM8Y150604 / 620012032

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

60

MECH MAINT-BOILERS (SM5010200):

Repair work rectification during UPV F CF renewal at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu.

Perform repair at finding defects:

o Pinhole & linear indication observed at fillet

weld vortex breaker Deaerator Head D.

o Rounded indication was detected at 11 o’clock

position from shell view Natural Gas Heater A.

Perform grind off/remove defects.

Perform build up weld as per approved repair

procedure.

Perform Non-Destructive Testing.

(Order Number: 3620222202)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

61

MECH MAINT-BOILERS (SM5010200):

To perform loading / unloading for CP F at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu.

Scope of works.

Perform blinding deblinding.

Drop spool.

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

Page 50: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

49 PROFIL SYARIKAT 2017

Open manhole

Perform unloading water/sand/raisin from vessel.

Perform repair at Mix Bed Exchanger mid collector.

Perform repair at internal ladder.

Perform loading water/sand/raisin into the vessel.

Install spool.

Close manhole/boxup.

(Order Number: 3620221772)

(Contract No.: SM8Y150604 / 620012032)

62

MECH MAINT-BOILERS (SM5010200):

To repair diverter damper HRSG G at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of Works:

To perform repair at detached diverter damper

frame.

To perform manual lifting & rigging activities to

reinstall damper frame.

To grind off/remove defects (crack) at structure

frame and perform build up weld complete with

DPT.

To grind off/remove defects at plenum GT side and

perform build up weld.

To remove and install new lamellar seal bypass stack

compartment.

(Order Number: 3620221769)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

63

MECH MAINT-BOILERS (SM5010200):

To perform repair expansion joint bellow at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Remove existing defected bellow

Remove machine bolts.

Install new bellow

Install/tighten new machine bolts.

(Order Number: 3620221520)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

64

MECH MAINT-BOILERS (SM5010200):

To replace gasket at HHP line 10” 2500# at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Cut-off/remove stud bolt & nuts using oxy-cutter.

Remove existing gasket

Install new gasket

Install new stud bolt & nuts.

Perform flange tightening using Hydraulic Torque

Wrench.

(Order Number: 3620221519)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

65

MECH MAINT-BOILERS (SM5010200):

To replace gasket at 12” 150# at Utilities Kertih Plant

(UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Remove stud bolt & nuts.

Remove existing gasket

Install new gasket

Install new stud bolt & nuts.

Perform flange tightening using manual torque

wrench.

(Order Number: 3620221515)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

67

MECH MAINT-BOILERS (SM5010200):

To replace 3” BFW line to 4A925CV at ASU at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

Scope of works.

Cut-off/remove defected piping.

Install new 3” pipe.

Perform Non-Destructive Testing

Install pipe shoe.

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

Page 51: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

50 PROFIL SYARIKAT 2017

(Order Number: 3620221513)

(Contract No.: SM8Y150604 / 620012032)

68

SPECIAL MAINT- HYDROJETTING (SS1130000):

F-102 blinding deblind, top roof repair at Petronas

Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,

Terengganu.

Scope of works.

Perform blinding deblinding

(Order Number: 3620219021)

(RFQ Number.: 6200092922)

SA Maintenance &

Services (M) S/B December 2015

Petronas Chemicals

Ethylene Sdn Bhd

69

MECH MAINT-BOILERS (SM5010200):

To perform piping leak test at Utilities Kertih Plant

(UK), PGB, Kertih, Kemaman, Terengganu.

Scope of works.

Cut-off/remove clogged piping at all HRSG’s.

Perform waterjetting & air blowing inside piping.

Perform repair at leaked fittings.

Install existing piping.

Perform Non-Destructive Testing.

(Order Number: 3620218821)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B December 2015

Petronas Gas Bhd

Utility Kerteh (UK)

70

MECH MAINT-BOILERS (SM5010200):

To perform replacement economizer vent e at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu.

Scope of works.

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure.

(Order Number: 3620217023)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

71

MECH MAINT-BOILERS (SM5010200):

To perform replacement CBD valve steam drum at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

Scope of works.

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure.

(Order Number: 3620217022)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

72

MECH MAINT-BOILERS (SM5010200):

To perform replacement of spool at CP at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Remove defected PVC spool

Replace gasket.

Install new pipe spool

(Order Number: 3620216886)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

73

SPECIAL MAINT- HYDROJETTING (SS1130000):

PTLE STLE Cleaning for CF renewal at Petronas

Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,

Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

SA Maintenance &

Services (M) S/B November 2016

Petronas Chemicals

Ethylene Sdn Bhd

Page 52: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

51 PROFIL SYARIKAT 2017

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning: o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the equipment

location or cleaning bay as instructed by

PCESB.

Re-painting or touch up painting as PTS and PCESB’s

procedure based on instruction by PCESB’s

representative. PTS 30.48.00.31-P (15.20.03): Protective

Coating and Linings

(Order Number: 3620214573)

(RFQ Number.: 6200092922)

74

MECH MAINT-BOILERS (SM5010200):

To perform repair lamellar seal HRSG G at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu.

Scope of works.

Open manhole

Erect internal scaffolding

Remove existing lamellar seal & machine bolts.

Install new lamellar seal & machine bolts.

Close manhole.

(Order Number: 3620213817)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

75

MECH MAINT-BOILERS (SM5010200):

To replace HHP vent valve HRSG G at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

Page 53: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

52 PROFIL SYARIKAT 2017

Perform Non-Destructive Testing.

Touch up painting as per approved procedure.

(Order Number: 3620213816)

(Contract No.: SM8Y150604 / 620012032)

76

MECH MAINT-BOILERS (SM5010200):

To repair MRO E PVC pipe leak at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Remove leaked PVC pipe spool.

Fabricate new spool.

Install new PVC MRO E pipe spool.

(Order Number: 3620213815)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

77

MECH MAINT-BOILERS (SM5010200):

To fabricate ice block eliminator ASU 2 at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Fabricate structure at using c channel and

galvanized grating.

Perform welding at grating and c channel.

Perform drill at designated area for machine bolt

holes.

Perform installation at site.

(Order Number: 3620213813)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

78

MECH MAINT-BOILERS (SM5010200):

To repair Preheater A leak at Utilities Kertih Plant

(UK), PGB, Kertih, Kemaman, Terengganu.

Scope of works.

Remove bolt nut & open preheater cover plate.

Perform gasket & bolt nut replacement.

Perform internal plate replacement.

Install preheater cover plate.

(Order Number: 3620213812)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Kerteh (UK)

79

MECH MAINT-BOILERS (SM5010200):

Rectify HRSG B Diverter Damper at Utility Gebeng

Plant (UG), PGB, Kuantan, Pahang.

Scope of Works:

To perform repair at detached diverter damper

frame.

To perform manual lifting & rigging activities to

reinstall damper frame.

To grind off/remove defects (crack) at structure

frame and perform build up weld complete with

DPT.

To perform tack weld at guide bar GT diffuser.

To remove and install new lamellar seal at bypass

stack

compartment.

(Order Number: 3620213200)

(Contract No.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Gebeng (UG)

80

MECH MAINT-BOILERS (SM5010200):

Demin Water BPC & PDH pipe cleaning at Utility

Gebeng Plant (UG), PGB, Kuantan, Pahang.

Scope of works.

Perform blinding deblinding.

Drop spool & valves.

Perform waterjetting inside clogged piping.

Replace all gasket & corroded stud bolt & nuts.

Install existing valves & spool.

(Order Number: 3620213197)

(Contract No.: SM8Y150510 / 620019030)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Gebeng (UG)

81

MECH MAINT-BOILERS (SM5010200):

HRSG C Eco Module bypass rectification at Utility

Gebeng Plant (UG), PGB, Kuantan Pahang

Scope of works:

Perform blinding deblinding, open manhole &

ventilation.

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Utility Gebeng (UG)

Page 54: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

53 PROFIL SYARIKAT 2017

Perform cutting on boiler wall.

Remove & hacking castable Module 13, 14 & 15 top

header.

Cut-off interconnecting line.

Perform lifting and install new interconnecting

bypass pipe.

Perform welding new bypass interconnecting M13

to M15 & end plate outlet interconnecting M14.

Perform Non-Destructive Testing.

Install castable, wall plate & insulation.

Close manhole & boxup.

(Order Number: 3620199291)

(Contract No.: SM8Y150510 / 620019030)

82

SPECIAL MAINT- HYDROJETTING (SS1130000):

PTLE STLE F-104 Cleaning for CF renewal at Petronas

Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,

Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning:

o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

SA Maintenance &

Services (M) S/B November 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 55: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

54 PROFIL SYARIKAT 2017

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the equipment

location or cleaning bay as instructed by

PCESB.

Re-painting or touch up painting as PTS and PCESB’s

procedure based on instruction by PCESB’s

representative. PTS 30.48.00.31-P (15.20.03): Protective

Coating and Linings

(Order Number: 3620212939)

(RFQ Number.: 6200092922)

83

SPECIAL MAINT- HYDROJETTING (SS1130000):

PTLE STLE Cleaning for CF renewal at Petronas

Chemicals Ethylene Sdn Bhd, Kertih, Kemaman,

Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning:

o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

SA Maintenance &

Services (M) S/B November 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 56: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

55 PROFIL SYARIKAT 2017

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the equipment

location or cleaning bay as instructed by

PCESB.

Re-painting or touch up painting as PTS and PCESB’s

procedure based on instruction by PCESB’s

representative. PTS 30.48.00.31-P (15.20.03):

Protective Coating and Linings

(Order Number: 3620212452)

(RFQ Number.: 6200092922)

84

MECH MAINT-FURNACES (SM5010500):

PR: soot cleaning & damper service

To perform maintenance work at Furnaces F6-0301 &

F6-0602 (Soot cleaning and damper service) at GPP-6,

Gas Processing Plant Complex B

Scope of Works:

Furnace F6-0602:-

o Perform necessary blinding as per approved

blind list

o Perform soot cleaning on radiant and

convection coils (required internal scaffolding)

o Perform blowers mechanical damper minor

servicing at site.

o To provide new gasket and replace corroded

stud bolts with new

o To do repair of castables inside of furnace if

required.

o Box-up furnace and deblind (use new gasket on

each open joints and manholes).

Furnace F6-0301

o Perform soot cleaning on convection coils from

outside platform thru available soot cleaning

flanges.

o Perform blowers mechanical damper greasing

thru grease nozzle

o Box-up furnace (use new gasket on each open

joints and manholes)

(Order No.: 4120128781)

(RFQ No.: 6200137342)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Gas Processing

Santong (GPS)

85

MECH MAINT-BOILERS (SM5010200):

Provision Of Manpower, Supervision, Tools, Equipment,

Material And Consumables For boiler / piping repair

works Qtr4, Gas Processing Kerteh, Gas Processing &

Utilities, Petronas Gas Bhd, Kerteh, Kemaman,

Terengganu.

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order Number: 4120126330)

(RFQ No.: SM8Y150815 / 6200128350)

SA Maintenance &

Services (M) S/B November 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

86 SPECIAL MAINT- HYDROJETTING (SS1130000):

Page 57: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

56 PROFIL SYARIKAT 2017

Blinding F103 at Petronas Chemicals Ethylene Sdn Bhd,

Kertih, Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning:

o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the equipment

location or cleaning bay as instructed by

PCESB.

Re-painting or touch up painting as PTS and PCESB’s

procedure based on instruction by PCESB’s

representative. PTS 30.48.00.31-P (15.20.03): Protective

Coating and Linings

(Order Number: 3620206078)

(RFQ Number.: 6200092922)

87 SPECIAL MAINT- REFRACTORY (SS1110000):

Blinding & PTLE F-101 Cleaning at Petronas Chemicals

Ethylene Sdn Bhd, Kertih, Kemaman, Terengganu.

SA Maintenance &

Services (M) S/B Oct 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 58: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

57 PROFIL SYARIKAT 2017

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

(Order Number: 3620206962)

(RFQ Number.: 6200092922)

88

MECH MAINT-BOILERS (SM5010200):

To replace drain valve HW HP/IP Bat Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu.

Scope of works.

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure.

(Order Number: 3620205973)

(Contract No.: SM8Y150604 / 620012032)

SA Maintenance &

Services (M) S/B October 2015

Petronas Gas Bhd

Utility Kerteh (UK)

89

MECH MAINT-BOILERS (SM5010200):

Provision Of Manpower, Supervision, Tools, Equipment,

Material And Consumables For Boiler F3-791, F4-791,

F3-761 & F3-771 Internal Inspection Overhaul And

Repair Work (Mechanical Package Boiler GPK for CF

renewal)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

SA Maintenance &

Services (M) S/B October 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

Page 59: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

58 PROFIL SYARIKAT 2017

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order Number: 4120126330)

90

METALLIC STRUCTURE/PIPING (SM5090100):

# Mechanical work & rejuvenation Demin Plant

Provision of manpower, supervision, tools, equipment,

materials and consumables for Demineralization plant

rejuvenation 2015 at Petronas Penapisan (Terengganu)

Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu.

5 units push button replacement

Gravel replacement within Demineralization plant

Concrete repair at outside border of

Demineralization plant

Cable tray replacement

To replace utility air piping

To install drain extension to DAC for ST 265

(Order No.: 4120125741)

(RFQ No.: 6200132449)

SA Maintenance &

Services (M) S/B October 2015

Petronas Penapisan

(T) Sdn Bhd

91

MECH MAINT-BOILERS (SM5010200):

Provision of manpower, supervision, tools, material,

and consumables for internal inspection overhauls and

repair work.

Auxiliary Boiler A5/6-1203

Auxiliary Boiler A6-1203

Waste Heat Boiler E6-1201B

Waste Heat Boiler E6-1201A

Waste Heat Boiler E5/6-1202

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up all auxiliary & waste heat

boilers

Perform cleaning works for DOSH inspection.

Perform testing and servicing and overhaul of

pressure safety valve (PSV), Block Valve (BV) and

check valve (CV).

Dismantling, cleaning and reinstall multi spud gas

burned c/w burned shield and duct burner element.

Re install the steam drum removed parts,box up and

close all boiler drum manholes and access door.

(Order No.: 4120123811)

(RFQ No.: 6200130886)

SA Maintenance &

Services (M) S/B

November 2015 –

January 2016

Petronas Gas Bhd

Gas Processing

Santong (GPS)

92

UNFIRED PRESSURE VESSEL: To Perform

Complete Mechanical Work Of Unfired Pressure Vessel

And Associated Equipment For Dosh Inspection At

Utilities Kertih, Terengganu Darul Iman

SA Maintenance &

Services (M) S/B Oct 2015

Petronas Gas Bhd

Utility Gebeng (UG)

93

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700):

UPV F package DOSH inspection

To Perform Complete Mechanical Work Of Unfired

Pressure Vessel (UPV-F) And Associated Equipment

For Dosh Inspection At Utilities Kertih, Terengganu

Darul Iman.

Natural Gas Surge Drum V1-2801A

Deaerator Storage Vessel V1-2103D

Deaerator Head (C1-2103D)

Natural Gas Heater E1-2102A

Main Instrument Air Receiver V1-2402B

Water Separator V1-2401B

Air Dryer Vessel V1-242B01B

SA Maintenance &

Services (M) S/B October 2015

Petronas Gas Bhd

Utility Kerteh (UK)

Page 60: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

59 PROFIL SYARIKAT 2017

Air Dryer Vessel V1-242B01A

o Perform blinding deblinding

o Open manhole & ventilation

o Remove internal fittings.

o Perform unloading media catalyst.

o Powertool cleaning & air blowing

o DOSH Inspection

o Touch up painting

o Perform loading media catalyst.

o Close manhole and boxup..

(Order Number: 4120123405)

(RFQ No.: 6200129358)

94

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE F-101 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

(Order Number: 3620209809)

(RFQ Number.: 6200092922)

SA Maintenance &

Services (M) S/B Oct 2015

Petronas Chemicals

Ethylene Sdn Bhd

95

MANPOWER SUPPLY- LABOUR SUPPLY

(SM2010100):

Provision Of Manpower, Supervision, Tools,

Equipments, Materials And Consumables To Perform

Castable& Burner Repair Of Acid Gas Oxidizer 2

(AGO-2) At KCS, Gas Processing Plant Complex A,

Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.

Refractory work

o Blind/deblind as per blind list

SA Maintenance &

Services (M) S/B Oct 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

Page 61: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

60 PROFIL SYARIKAT 2017

o Remove AGO-2 burner from burner throat to

gain access of confine space area inside AGO.

o Remove existing castable at defected area (both

layer).

o Inform PGB to perform inspection.

o Surface cleaning and install new castables.

Burner Work

o Remove the burner from burner throat in safe

manner to a safe place.

o Inform PGB to perform inspection prior any

repair commencement.

o Repair burner as per PGB requirement.

o Perform NDT at joints as per PGB requirement.

(To perform castable replacement)

(Order No.: 4120123228)

(RFQ No.: 6200131365)

96

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700) & HEAT EXCHANGERS,

CONDENSER & COOLER (SM5010400): Provision of manpower, supervision, equipment, tools,

materials, and consumables of mechanical shut down

works For LP & LLP FGRU (K5/6-1704 & K5/6-1705)

At Gas Processing Plant, Santong (GPS), Petronas Gas

Berhad (PGB), Terengganu Darul Iman.

FGRU SD UPV & AFC Cleaning

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

Erection & dismantling of scaffolding for

accessibility.

Open up and box up all vessels and Air Fin Cooler

(AFC).

Perform cleaning works for DOSH inspection.

Perform water jet cleaning work for Air Fin Cooler

(AFC).

(Order No.: 4120122006)

(RFQ No.: 6200129396)

SA Maintenance &

Services (M) S/B Sept – Oct 2015

Petronas Gas Bhd

Gas Processing

Santong (GPS)

97

MECH MAINT-BOILERS (SM5010200):

To Supply Manpower, Supervision, Tools, Equipment,

Material And Consumables For Boiler F2-771, F3-781,

F2-761 And F4-781 Internal Inspection Overhaul And

Repair Work

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order Number: 4120119511)

(RFQ No.: 6200126669)

SA Maintenance &

Services (M) S/B Sept 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

98

MECH MAINT – HOT INSULATION

(SM5120100): Provision Of Manpower, Supervision, Tools,

Equipments, Materials And Consumables To Perform

Castable& Burner Repair Of Acid Gas Oxidizer 4

SA Maintenance &

Services (M) S/B Sept – Oct 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

Page 62: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

61 PROFIL SYARIKAT 2017

(Ago-4) At Kcs, Gas Processing Plant Complex A,

Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.

(To perform castable repair)

Refractory work

o Blind/deblind as per blind list

o Remove AGO-2 burner from burner throat to

gain access of confine space area inside AGO.

o Remove existing castable at defected area (both

layer).

o Inform PGB to perform inspection.

o Surface cleaning and install new castables.

Burner Work

o Remove the burner from burner throat in safe

manner to a safe place.

o Inform PGB to perform inspection prior any

repair commencement.

o Repair burner as per PGB requirement.

o Perform NDT at joints as per PGB requirement.

(Order No.: 4120118147)

(RFQ No.: 6200124529)

99

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & PTLE F-103 Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu

PTLE: Primary Transfer Line Exchanger

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

(Order Number: 3620199488)

(RFQ Number.: 6200092922)

SA Maintenance &

Services (M) S/B Aug 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 63: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

62 PROFIL SYARIKAT 2017

100

HEAT EXCHANGERS, CONDENSER & COOLER

(SM5010400):

# To replace tube bundle

Provision of manpower, supervision, tools, equipment,

materials and consumables for E-21115 tube bundle

replacement at Petronas Penapisan (Terengganu) Sdn

Bhd (PPTSB) Kerteh, Kemaman, Terengganu.

To remove old HEX bundle using chain block

Cleaning of HEX bundle at PPTSB cleaning bay

Cleaning of HEX shell and channel head

To install new HEX bundle at site

Reinstall HEX channel head

To do hydro Test prior to line up

(Order No.: 4120119495)

(RFQ No.: 6200127514)

SA Maintenance &

Services (M) S/B August 2015

Petronas Penapisan

(T) Sdn Bhd (PPTSB)

101

HEAT EXCHANGERS, CONDENSER & COOLER

(SM5010400):

# To do online E21102 bank cleaning

Provision of manpower, supervision, tools, equipment,

materials and consumables of four (4) banks of E-21102

Air Fin coolers (AFC) at Petronas Penapisan

(Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman,

Terengganu.

Mobilization, site preparation, blinding, tube plugs

removal, tube bundle cleaning, post cleaning

inspection, re-fit tube plugs, testing / HT, deblind &

JIT, commissioning, demobilization and

housekeeping

(Order No.: 4120118485)

(RFQ No.: 6200125512)

SA Maintenance &

Services (M) S/B August 2015

Petronas Penapisan

(T) Sdn Bhd (PPTSB)

102

MECH MAINT-FURNACES(SM5010500): PR: Attemperator Rectification

To Perform Welding And Rectification Of Attemperator

& Its Associated Piping Works For Waste Heat Boiler

(WHB E6-1202A) At Gas Processing Santong (GPS),

Gas Processing & Utilities, Petronas Gas Bhd.

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle

Blind/deblind as per blind list

To fabricate new spool at workshop

To remove insulation at attemperator spool

To remove existing attemperator & install new

attemperator

To perform blasting painting for new attemperator

To perform NDT (PT & RT)

To perform Post Weld Heat Treatment (PWHT)

Perform Boiler HT

To reinstate insulation at the replaced pipe spool

(Order No.: 4120118488)

(RFQ No.: 6200124977)

SA Maintenance &

Services (M) S/B August 2015

Petronas Gas Bhd

Gas Processing

Santong (GPS)

103

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding & Deblinding at Petronas Chemicals Ethylene

Sdn Bhd, Kertih, Kemaman, Terengganu

(Order Number: 3620191641)

(RFQ Number.: 6200092922)

SA Maintenance &

Services (M) S/B July 2015

Petronas Chemicals

Ethylene Sdn Bhd

104

MECH MAINT-BOILERS (SM5010200):

To Perform Water By-Passing Economizer Module

M14 at HRSG C (PMD 15303), Utilities Gebeng.

Scope of works:

Perform blinding deblinding, open manhole &

ventilation.

Perform cutting on boiler wall.

Remove & hacking castable Module 13, 14 & 15 top

header.

Cut-off interconnecting line.

Perform lifting and install new interconnecting

SA Maintenance &

Services (M) S/B July - Aug 2015

Petronas Gas Bhd

Utility Gebeng (UG)

Page 64: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

63 PROFIL SYARIKAT 2017

bypass pipe.

Perform welding new bypass interconnecting M13

to M15 & end plate outlet interconnecting M14.

Perform Non-Destructive Testing.

Install castable, wall plate & insulation.

Close manhole & boxup

(Order No.: 3620199291)

105

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding PTLE & STLE Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning:

o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the

equipment location or cleaning bay as

instructed by PCESB.

SA Maintenance &

Services (M) S/B June 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 65: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

64 PROFIL SYARIKAT 2017

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 3620187398)

(RFQ Number.: 6200092922)

106

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding PTLE & STLE Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning: o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the

equipment location or cleaning bay as

instructed by PCESB.

o Re-painting or touch up painting as PTS and

SA Maintenance &

Services (M) S/B June 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 66: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

65 PROFIL SYARIKAT 2017

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 3620183902)

(RFQ Number.: 6200092922)

107

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700): To perform total of 25 UPV CF Mechanical Activity

(Stage B & C)

Scope of works:

Natural Gas Heater – 2 units

Natural Gas Surge Drum – 2 units

Deaerator Head – 2 units

Deaerator Storage Vessel – 2 units

Online Washing Skid Air Receiver – 1 unit

Air Dryer Vessel – 4 units

Main Instrument Air Receiver – 2 units

Condensate Cooler – 6 units

Potable Water Cartridge Filter – 2 units

Water Separator – 2 units

o Perform blinding deblinding

o Open manhole & ventilation

o Remove internal fittings.

o Remove plugs.

o Perform unloading media catalyst.

o Powertool cleaning & air blowing

o Perform waterjetting at 10,000 psi & air

blowing.

o DOSH Inspection

o Install plugs

o Touch up painting

o Perform loading media catalyst.

o Close manhole and boxup

(Order No.: 4120107212)

(RFQ Number.: 6200114808)

SA Maintenance &

Services (M) S/B June 2015

Petronas Gas Bhd

Utility Gebeng (UG)

108

MECH MAINT-BOILERS (SM5010200):

Servicing KCSBO HRSG CF Renewal Package at Gas

Processing Kerteh (GPK), Gas Processing & Utilities,

Petronas Gas Bhd. Kertih Terengganu.

(Order No.: 4120107887)

(RFQ Number.: 6200115292)

SA Maintenance &

Services (M) S/B July - Aug 2015

Petronas Gas Bhd

Utility Gebeng (UG)

109

PRESSURE & UNPRESSURIZED VESSEL

(SM5010700):

To perform total of 25 UPV CF Mechanical Activity

(Stage A)

Scope of works:

Natural Gas Heater – 2 units

Natural Gas Surge Drum – 2 units

Deaerator Head – 2 units

Deaerator Storage Vessel – 2 units

Online Washing Skid Air Receiver – 1 unit

Air Dryer Vessel – 4 units

Main Instrument Air Receiver – 2 units

Condensate Cooler – 6 units

Potable Water Cartridge Filter – 2 units

Water Separator – 2 units

o Perform blinding deblinding

o Open manhole & ventilation

o Remove internal fittings.

o Remove plugs.

o Perform unloading media catalyst.

o Powertool cleaning & air blowing

o Perform waterjetting at 10,000 psi & air

blowing.

o DOSH Inspection

o Install plugs

o Touch up painting

o Perform loading media catalyst.

SA Maintenance &

Services (M) S/B May 2015

Petronas Gas Bhd

Utility Gebeng (UG)

Page 67: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

66 PROFIL SYARIKAT 2017

o Close manhole and boxup

(Order No.: 4120105893)

(RFQ Number.: 6200114153)

110

MECH MAINT-FURNACES

(SM5010500):

To perform maintenance work at 3 units of Furnace F-

301, F-601 & F-602 GPP-5 SD (Soot Cleaning & Service

Damper) at Gas Processing Santong (GPS), Tok Arun,

Paka

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up manhole for furnace.

Erection & dismantling of scaffolding inside furnace

for soot cleaning works.

Perform soot cleaning works at convection & radiant

coil inside furnace.

To do castable repair if required.

Perform servicing of blower damper for all furnace

(Order No.: 4120104518)

(RFQ Number.: 6200111329)

SA Maintenance &

Services (M) S/B May 2015

Petronas Gas Bhd

Gas Processing

Santong (GPS)

111

MAIN MAINT-MECHANICAL VALVE

(SM5030100):

To Supply Piping Material and Perform Valve and

Flange Installation for Main Air Compressor B and Gas

Argon Compressor at ASU2 during TA 2015

Scope of works:

To fabricate new spool at contractor’s workshop

To remove insulation at existing spool

To remove old pipe spool & install new spool

To perform blasting painting for new pipe spool

To supply manpower & equipment to install pipe

spool at site

To perform Post Weld Heat Treatment (PWHT)

To perform NDT (PT & RT)

To reinstate insulation at the replaced pipe spool

(Order No.: 4120101862)

(RFQ No.: 6200105411)

SA Maintenance &

Services (M) S/B

07.05.2015 –

19.05.2015

Petronas Gas Bhd

Utility Kerteh (UK)

112

METALLIC STRUCTURE/PIPING (SM5090100):

To replace 2 Flanges of 20” 600# IP Steam Line and 4

Flanges of 10” 2500# HHP Steam Line during TA

2015

To remove insulation at flanges area

To remove old flanges & install new flanges at the

intended line

To perform blasting painting for 2 unit of 20” 600#

& 4 unit of 10” 2500# flanges

To supply manpower & equipment to install flanges

at site

To perform Post Weld Heat Treatment (PWHT)

To perform NDT (PT & RT)

To reinstate insulation at the replaced flanges

(Order No.: 4120098985)

(RFQ No.: 6200104233)

SA Maintenance &

Services (M) S/B

14.05.2015 –

20.05.2015

Petronas Gas Bhd

Utility Kerteh (UK)

113

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding PTLE & STLE Cleaning F103 for CF renewal

at Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

SA Maintenance &

Services (M) S/B March 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 68: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

67 PROFIL SYARIKAT 2017

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning: o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the

equipment location or cleaning bay as

instructed by PCESB.

Re-painting or touch up painting as PTS and PCE SB’s

procedure based on instruction by PCESB’s

representative. PTS 30.48.00.31-P (15.20.03):

Protective Coating and Linings

(Order Number: 3620172711)

(RFQ Number.: 6200092922)

114

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding PTLE & STLE Cleaning E102/112 for CF

renewal at Petronas Chemicals Ethylene Sdn Bhd,

Kertih, Kemaman, Terengganu.

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

SA Maintenance &

Services (M) S/B March 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 69: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

68 PROFIL SYARIKAT 2017

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning:

o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning:

o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the

equipment location or cleaning bay as

instructed by PCESB.

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 3620172141)

(RFQ Number.: 6200092922)

115

MECH MAINT-BOILERS (SM5010200):

To supply manpower, materials, and equipment to

perform hydrostatic test at HRSG B Utility Gebeng

Plant (UG), PGB.

Scope of works:

Perform blinding deblinding as per EIS

Perform drop spool.

Cut/off remove valves (capping point).

Perform capping process.

Fill up water inside boiler.

Pre-HT.

DOSH Inspection (HT).

Drain water from boiler.

Perform decapping process.

Perform Non-Destructive Testing.

Boxup.

SA Maintenance &

Services (M) S/B March 2015

Petronas Gas Bhd

Utility Gebeng (UG)

Page 70: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

69 PROFIL SYARIKAT 2017

(Order No.: 4120103285)

(RFQ No.: 6200111001)

116

MECH MAINT-BOILERS (SM5010200): PR# Rectification Attemperator Piping

To Perform Welding And Rectification Of Attemperator

& Its Associated Piping Works For Waste Heat Boiler

(WHB E6-1201A) At Gas Processing Santong (GPS),

Gas Processing & Utilities, Petronas Gas Bhd.

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle

Blind/deblind as per blind list

To fabricate new spool at workshop

To remove insulation at attemperator spool

To remove existing attemperator & install new

attemperator

To perform blasting painting for new attemperator

To perform NDT (PT & RT)

To perform Post Weld Heat Treatment (PWHT)

Perform Boiler HT

To reinstate insulation at the replaced pipe spool

(Order No.: 4120098922)

(RFQ No.: 6200104678)

SA Maintenance &

Services (M) S/B February 2015

Petronas Gas Bhd

Gas Processing

Santong (GPS)

117

MECH MAINT-BOILERS (SM5010200): PR: To Replace Attemperator Piping

To Perform Welding And Rectification Of Attemperator

& Its Associated Piping Works For Waste Heat Boiler

(WHB E5/6-1201) At Gas Processing Santong (GPS),

Gas Processing & Utilities, Petronas Gas Bhd.

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle

Blind/deblind as per blind list

To fabricate new spool at workshop

To remove insulation at attemperator spool

To remove existing attemperator & install new

attemperator

To perform blasting painting for new attemperator

To perform NDT (PT & RT)

To perform Post Weld Heat Treatment (PWHT)

Perform Boiler HT

To reinstate insulation at the replaced pipe spool

(Order No.: 4120099824)

(RFQ No.: 6200106843)

SA Maintenance &

Services (M) S/B February 2015

Petronas Gas Bhd

Gas Processing

Santong

118

MECH MAINT-BOILERS (SM5010200):

To Supply Manpower, Materials, and Equipment to

Perform Hydrostatic Test at HRSG Unit D, F, And G and

Lube Oil Cooler Cleaning at GT Unit D, F, And G at

Utility Kertih Plant (UK).

Scope of works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely

Perform blinding deblinding as per EIS

Drop spool.

Cut/off remove valves (capping point).

Perform capping process.

Fill up water.

Pre-HT.

DOSH Inspection (HT).

Drain water.

Perform decapping process.

Perform Non-Destructive Testing

(Order No.: 4120097833)

SA Maintenance &

Services (M) S/B

GT/HRSG-D:

09.02.2015 –

03.03.2015

GT/HRSG-G:

GT/HRSG-F:

Petronas Gas Bhd

Utility Kerteh (UK)

Page 71: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

70 PROFIL SYARIKAT 2017

(RFQ No.: 6200104281)

119

MECH MAINT-BOILERS (SM5010200):

Provision of manpower, supervision, tools, material,

and consumables for internal inspection overhauls and

repair work.

Waste Heat Boiler E5/6-1202

Waste Heat Boiler E5/6-1202

Waste Heat Boiler E5-1201B

Waste Heat Boiler E6-1202A

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up all waste heat boilers

Perform cleaning works for DOSH inspection.

Perform testing and servicing and overhaul of

pressure safety valve (PSV), Block Valve (BV) and

check valve (CV).

Dismantling, cleaning and reinstall multi spud gas

burned c/w burned shield and duct burner element.

Re install the steam drum removed parts,box up and

close all boiler drum manholes and access door.

(Order Number: 4120099225)

(RFQ No.: 6200106712)

SA Maintenance &

Services (M) S/B

February – July

2015

Petronas Gas Bhd

Gas Processing

Santong (GPS)

120

SPECIAL MAINT- HYDROJETTING (SS1130000):

Blinding PTLE & STLE Cleaning for CF renewal at

Petronas Chemicals Ethylene Sdn Bhd, Kertih,

Kemaman, Terengganu

PTLE: Primary Transfer Line Exchanger

STLE: Secondary Transfer Line Exchanger

Scope Of Works:

Supply / provide skilled and competent manpower,

equipment, material, consumables, and tools for

execution of the WORKS.

There ar two (2) numbers of PTLE for each furnace,

identified as ET-0-E-101 A/B for furnace F-101,

ET-0-E-102 A/B for furnace F-102 with similar

tagging until Furnace F-106. Each PTLE (both A

and B units) shall be cleaned by mechanical means

and/or hidro-jetting method two (2) times per year

basis.

Each furnace also consists of one (1) number of

STLE. Every STLE shall be cleaned by hydro-

jetting method on one (1) time per year basis.

Shall install and remove blind(s) as per Equipment

Isolation Sheet (EIS)for the purpose of positive

isolation and pressure testing of equipment and

system of the WORKS.

Perform manual lifting and rigging activities to

facilitate the WORKS.

Perform preventive maintenance work at associated

equipment such as Transfer Line Valve (TLV) /

Docoke Valve (DV) during cleaning activity.

Perform cleaning and housekeeping of packaged

equipment and surrounding areas to the satisfaction

of PCESB upon completion of each WORKS.

Primary Transfer Line Exchanger (PTLE)

cleaning: o PTLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of top and bottom cones including

opening of Coke Catcher.

o Cleaning of coke by mechanical means or

hydro-jetting method (10,000 psi UHPWJT) at

cones, tubes, and coke catcher as instructed by

PCESB.

o Facilitate inspection / NDT work such as

preparation for Internal Rotating Inspection

(IRIS).

SA Maintenance &

Services (M) S/B January 2015

Petronas Chemicals

Ethylene Sdn Bhd

Page 72: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

71 PROFIL SYARIKAT 2017

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

o Closing and reinstallation of the cones and coke

catcher; followed by pressure testing (Coil Test

and Leak Test on the system.

Secondary Transfer Line Exchanger (STLE)

cleaning: o STLE cleaning shall be completed within three

(3) days inclusive blinding and deblinding.

o Removal of channel and the tube bundle to

facilitate cleaning work.

o Hydro-jetting of both shell and tube bundle

(internal & external) using hydro-jetting

method (10,000 psi UHPWJT) at the

equipment location or cleaning bay as

instructed by PCESB.

o Re-painting or touch up painting as PTS and

PCESB’s procedure based on instruction by

PCESB’s representative. PTS 30.48.00.31-P

(15.20.03): Protective Coating and Linings

(Order Number: 3620157218)

(RFQ Number.: 6200092922)

121

MECH MAINT-BOILERS

(SM5010200): Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler WHRU#2 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Main Mechanical Package WHRU #2)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order No.: 4120094738)

(RFQ No.: 6200101309)

SA Maintenance &

Services (M) S/B January 2015

Petronas Gas Bhd

Gas Processing

Kerteh

122

MECH MAINT-BOILERS

(SM5010200): Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler WHRU#1 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Main Mechanical Package WHRU #1)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

SA Maintenance &

Services (M) S/B January 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

Page 73: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

72 PROFIL SYARIKAT 2017

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order No.: 4120094739)

(RFQ No.: 6200101363/SM4Y141218)

123

MECH MAINT-BOILERS

(SM5010200):

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler F2-781 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Main Mechanical Package F2-781)

(Order No.: 4120094760)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(RFQ No.: 6200101364/SM4Y141219)

SA Maintenance &

Services (M) S/B January 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

124

MECH MAINT-BOILERS

(SM5010200): Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler F4-781 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Main Mechanical Package F4-781)

(Order No.: 4120094761)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(RFQ No.: 6200101366/SM4Y141220)

SA Maintenance &

Services (M) S/B January 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

Page 74: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

73 PROFIL SYARIKAT 2017

125

MECH MAINT-BOILERS

(SM5010200):

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler F4-761 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Main Mechanical Package F4-761)

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order No.: 4120094762)

(RFQ No.: 6200101367/SM4Y141221)

SA Maintenance &

Services (M) S/B January 2015

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

126

METALLIC STRUCTURE/PIPING

(SM5090100):

PR# To Fabricate Floater Aerator

To fabricate new floater c/w platform, installation and

commissioning Aerator (Aeration Basin) at Gas

Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

To fabricate new floater c/w platform as per material

requirement at workshop.

To perform blasting painting as per coating system

approved by client for floater,

To perform NDT (PT)

To perform leak test on floater.

To install aerator at site.

(Order No.: 4120092301)

(RFQ No.: 6200098464)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Gas Processing

Santong (GPS)

127

MECH MAINT-BOILERS

(SM5010200): PR# To perform servicing renew Boiler CF

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler E5-1201A internal

inspection overhaul and repair work for Gas Processing

Plant Santong, Petronas Gas Bhd, Terengganu.

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up waste heat boilers

Perform cleaning works for DOSH inspection.

Perform testing and servicing and overhaul of

pressure safety valve (PSV), Block Valve (BV) and

check valve (CV).

Re install the steam drum removed parts,box up and

close all boiler drum manholes and access door.

(Order No.: 4120090952)

(RFQ No.: 6200098271)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Gas Processing

Santong (GPS)

Page 75: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

74 PROFIL SYARIKAT 2017

128

HEAT EXCHANGER, CONDENSERS & COOLER

(SM5010400):

PR# To Plugging Leaking Tube S/Condenser

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform inspection and

plugging tube Exchanger Steam Condenser for Gas

Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

Carry out the preparing inspection, perform leak

test and plugging tube eight (8) unit Bundle Air

Cooled Steam Condenser (Unit 11)

Fabricate plug tube as per sizing and material

requirement.

(Order No.: 4120093105)

(RFQ No.: 6200099531)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Gas Processing

Santong (GPS)

129

MECH MAINT-LINED PIPE

(SM5090300):

PR# Rectification Letdown & Piping

To perform welding and rectification piping works at Gas

Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

To rectify let-down piping

To rectify WWS piping

Butt weld 16”

(Order No.: 4120091319)

(RFQ No.: 6200098269)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Gas Processing

Santong (GPS)

130

MECH MAINT-BOILERS

(SM5010200): PR# HRSG CF Renewal UG

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical work of HRSG and associated equipment for

DOSH inspection at Utilities Kertih Plant (UK), PGB,

Kertih, Kemaman, Terengganu.

Scope of works:

Heat Recovery Steam Generator B (F1-211B01)

Compressed Air Receiver B (V1-211B04)

Gas Final Scrubber (V1-211B02)

Air Cooled Heat Exchanger (E1-211B01)

o Perform blinding deblinding

o Perform cleaning and works as per SOE

o Perform testing and servicing of pressure relief

valve

o Perform waterjetting at 10,000 psi & air

blowing

o DOSH Inspection

o Perform flange tightening using manual torque

wrench.

(Order No.: 4120084797)

(RFQ No.: 6200092118)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Utility Kerteh (UK)

131

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP C

To perform blinding deblinding line HHP/HP C at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

Scope of works:

Unbolt nut using controlled bolting (HTW)

Replace new gasket.

Install new studbolt & nuts.

Perform flange tightening using controlled bolting

(HTW)

(Order No.: 3620152259)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Utility Kerteh (UK)

132

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP A

To perform blinding deblinding line HHP/HP A at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu.

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Utility Kerteh (UK)

Page 76: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

75 PROFIL SYARIKAT 2017

Scope of works:

Unbolt nut using controlled bolting (HTW)

Replace new gasket.

Install new studbolt & nuts.

Perform flange tightening using controlled bolting

(HTW)

(Order No.: 3620152258)

(Contract No.: SM5Y150604)

134

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: To perform blind/deblind HHP/HP B

To perform blinding deblinding line HHP/HP B at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

Scope of works:

Unbolt nut using controlled bolting (HTW)

Replace new gasket.

Install new studbolt & nuts.

Perform flange tightening using controlled bolting

(HTW)

(Order No.: 3620151999)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Utility Kerteh (UK)

135

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: To supply 6CBD elbow set

To supply 6 set of CBD elbow for HRSG at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

(Order No.: 3620151907)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Utility Kerteh (UK)

136

MECH MAINT-BOILERS

(SM5010200):

PR# SAMtn: To replace 6CBD elbow

To replace CBD elbow HRSG C & F at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works:

Erect scaffolding at designated area

Delag insulation

Cut-off/remove existing/defected CBD elbow

Fit-up & weld new CBD elbow as per approved

procedure.

Perform Non-Destructive Testing.

(Order No.: 3620152261)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B December 2014

Petronas Gas Bhd

Utility Kerteh (UK)

137

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: To replace 14” vlv HHPstm OPTIMAL

To perform defect rectification for HRSG D, B and

preheater unit A at Utilities Kertih Plant (UK), PGB,

Kertih, Kemaman, Terengganu

(Order No.: 3620152260)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B

December 2014 Petronas Gas Bhd

Utility Kerteh (UK)

138

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: To replace 6 valves at HRSG C

To perform defect rectification at HRSG C, Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620143584)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B November 2014

Petronas Gas Bhd

Utility Kerteh (UK)

139

MECH MAINT-BOILERS

(SM5010200):

PR# SAMtn: To rplc vlv to PICA-1F57

To replace isolation valve to PICA57 at HRSG G,

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

SA Maintenance &

Services (M) S/B November 2014

Petronas Gas Bhd

Utility Kerteh (UK)

Page 77: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

76 PROFIL SYARIKAT 2017

Scope of works.

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620143583)

(Contract No.: SM5Y150604)

140

MECH MAINT-BOILERS

(SM5010200):

PR# SAMtn: To rplc vlv CBD 1st vent vlv HRSG G

To replace CBD line vent 1st valve at HRSG G, Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620143582)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B November 2014

Petronas Gas Bhd

Utility Kerteh (UK)

141

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: To rplc CBD/IBD Elbow HRSG F

To perform defect rectification at HRSG F, Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works.

Cut-off/remove defected elbow.

Install/weld new elbow as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620143581)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B November 2014

Petronas Gas Bhd

Utility Kerteh (UK)

142

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HP/IPB HTW resurfc flng HP side

To perform HTW at HP/IP Letdown B at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Scope of works:

Unbolt nut using controlled bolting (HTW)

Replace new gasket.

Install new studbolt & nuts.

Perform flange tightening using controlled bolting

(HTW

(Order No.: 36200135434)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B November 2014

Petronas Gas Bhd

Utility Kerteh (UK)

143

MECH MAINT-BOILERS

(SM5010200): PR# Boiler D Tube Rectification

Provision of manpower, supervision, tools, equipment,

materials and consumables for tube rectification at Boiler

D, Utility Gebeng, Pahang Darul Makmur.

Capping De-capping, Top roof plate

Swing module

Remove partial tube & plugging activity

PWHT, DPT, RT

HT

(Order No.: 4120085737)

(RFQ No.: 6200094451)

SA Maintenance &

Services (M) S/B October 2014

Petronas Gas Bhd

Gas Processing

Gebeng (UG)

144

MECH MAINT-BOILERS

(SM5010200): PR# Servicing for HRSG CF Renewal (UK)

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical work of HRSG E & HRSG G and

associated equipment for DOSH inspection, Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

HRSG E

o Heat Recovery Steam Generator (PMD12375)

o Compressed Air Receiver (PMT127577)

o Gas Final Scrubber (PMT127610)

SA Maintenance &

Services (M) S/B October 2014

Petronas Gas Bhd

Gas Processing

Gebeng (UG)

Page 78: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

77 PROFIL SYARIKAT 2017

o Air Cooled Heat Exchanger (TG PMT4668)

Perform blinding deblinding

Perform cleaning and works as per SOE

Perform testing and servicing of pressure

relief valve

Perform waterjetting at 10,000 psi & air

blowing

DOSH Inspection

Perform flange tightening using manual

torque wrench

HRSG G

o Heat Recovery Steam Generator (PMD12377)

o Compressed Air Receiver (PMT127587)

o Gas Final Scrubber (PMT127612)

o Air Cooled Heat Exchanger

Perform blinding deblinding

Perform cleaning and works as per SOE

Perform testing and servicing of pressure

relief valve

Perform waterjetting at 10,000 psi & air

blowing

DOSH Inspection

Perform flange tightening using manual

torque wrench

(Order No.: 4120084143)

(RFQ No.: 6200091519)

145

MECH MAINT-BOILERS

(SM5010200):

PR# Overhaul Boiler CF Mechanical Package

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical equipment for DOSH inspection at Boiler

D, Utility Gebeng, Pahang Darul Makmur.

Heat Recovery Steam Generator

Steam Drum

Blowdown tank

Swing Module

o Perform blinding deblinding

o Perform swing module for accessibility

o Perform cleaning and works as per SOE

o Perform testing and servicing of pressure relief

valve

o DOSH Inspection

o Perform flange tightening using manual torque

wrench

(Order No.: 4120081922)

(RFQ No.: 6200089500)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Gas Processing

Gebeng (UG)

146

HEAT EXCHANGER, CONDENSERS & COOLER

(SM5010400): PR# Rectification job for GPP2 T2-622/T2-701

Provision of manpower, supervision, tools, equipment,

materials and consumables for unit T2-622 and T2-701

rectfification at GPP-2, Gas Processing Plant Kerteh,

Petronas Gas Bhd, Terengganu.

Scaffolding erection – working platform, access to

blinding activity, channel heads removal, etc

Remove insulation – blinding activity, channel

heads removal

Blinding activity as per EIS

Remove channel heads (front & back).

Lifting activity for front and back channel heads

Prepare surface preparation on channel heads, tubes

and tube sheet using ultrahigh pressure water

jetting 40,000 psi

Drying tubes and tube sheet using air blow

Perform tube pneumatic leak test (shell side) @

10barg

Tube rectification – tube plugging & seal weld

Hydrostatic Test @ 1.3 of Design Pressure

Powerbrush cleaning on tube sheet, & touch painting

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

Page 79: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

78 PROFIL SYARIKAT 2017

Install back channel heads (front & back).

Deblind, dismantle scaffolding & housekeeping.

(Order No.: 4120081227)

(RFQ No.: 6200086283)

147

METALLIC STRUCTURE/PIPING

(SM5090100): PR# Supply and replace hydrogen piping

To perform piping replacement for ASU2 Hydrogen

Line 40-H-24520-ECH20 at Utilities Kertih Plant (UK),

PGB, Kertih, Kemaman, Terengganu.

To fabricate new pipe spool at contractor’s

workshop

To remove old spool & install new spool

To perform blasting painting for new pipe spool

To supply manpower & equipment to install pipe

spool at site

To perform NDT (PT & RT)

To perform Hydrostatic Test for new spool

(Order No.: 4120081092)

(RFQ No.: 6200088518)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

148

METALLIC STRUCTURE/PIPING

(SM5090100):

PR# SEDAR External services

To perform rectification works for Mix Bed Exchanger

Stainless Steel piping at Demin Plant, Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu.

To perform pipe survey & data consolidation

To perform grind & build up weld at defected area

To perform touch up painting at all spool

To supply manpower & equipment for rectification

works at site

To perform NDT (PT)

(Order No.: 4120081091)

(RFQ No.: 6200088508)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

149

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HRSG E: To replace IBD valve#1

PR# SAMtn: To rectify leak at Preheater A

PR# SAMtn: Repair damper face detach

PR# SAMtn: rplc cbdvlv#1, IBD elbow, IBDvlv1

PR# SAMtn: Resurface flange vlv LP stmhdr rvB

PR# SAMtn: To replace MSV bypass manual vlv

To perform defect rectification at HRSG’s at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

(Order No.: 3620130597)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

150

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HRSG G: To replace CBD elbow

To replace CBD elbow for HRSG G at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Cut-off/remove defected elbow.

Install/weld new elbow as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620129293)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

151

MECH MAINT-BOILERS

(SM5010200):

PR# SAMtn: HRSG E: To replace IBD valve #2

To replace 1-1/2 Y-type Globe Valve for HRSG E at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620129292)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

Page 80: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

79 PROFIL SYARIKAT 2017

152

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HRSG E: To replace CBD elbow

To replace CBD elbow for HRSG E at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Cut-off/remove defected elbow.

Install/weld new elbow as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620129291)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

153

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HRSG E HT package

To perform hydrostatic test for HRSG E during CF

renewal at Utilities Kertih Plant (UK), PGB, Kertih,

Kemaman, Terengganu

Scope of works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely

Perform blinding deblinding as per EIS

Cut/off remove valves (capping point).

Perform capping process.

Fill up water.

Pre-HT.

DOSH Inspection (HT).

Drain water.

Perform decapping process.

Perform Non-Destructive Testing

(Order No.: 3620129288)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

154

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: to rectify leak at HRSG C CBD bypass

To replace 1” pipe at CBD bypass line HRSG C at

Utilities Kertih Plant (UK), PGB, Kertih, Kemaman,

Terengganu

Cut-off/remove defected piping.

Install/weld new pipe as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620129289)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B September 2014

Petronas Gas Bhd

Utility Kerteh (UK)

155

MECH MAINT-BOILERS

(SM5010200): PR# F2-781 Tube Leak Repair

Provision of manpower, supervision, tools, equipment,

materials and consumables for tube leaks repair of F2-

781 Auxiliary Boiler, Gas Processing Plant Kerteh,

Petronas Gas Bhd, and Terengganu Darul Iman.

Blinding activity as per EIS

Boiler wall casing & castable/refractory removal

Cut generating tubes

Fabricate plugs

Procure generating tubes

Bending tube (BSW integral fins)

Grind, reweld, DPT SH tubes

PWHT

Welding of 44 plugs

Pre-HT

Provision for repair

Pre-HT

Reinstate castable on SH

Removal of plugs

Tube stub collapsed tube area

Install 7 expand tubes

SA Maintenance &

Services (M) S/B August 2014

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

Page 81: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

80 PROFIL SYARIKAT 2017

Fin weldings for BSW

Pre-HT

HT with DOSH

Saturated box castable & casing installation

Boxup, deblind &housekeeping.

(Order No.: 4120077942)

(RFQ No.: 6200085498)

156

MECH MAINT-FURNACES

(SM5010500): PR# To perform internal inspection

Provision of manpower, supervision, tools, equipment,

materials and consumables for S-707 inspection &

rectification at GPP-1, Gas Processing Plant Kerteh,

Petronas Gas Bhd, Terengganu Darul Iman.

Lifting & rigging as per approved procedure

Blinding activity as per EIS

To open up S-707 – dismantling the silencer cover

and internal of blower R-707 A/B, blower R-706 &

damper/ducting/internal blower R-707A/B

Perform bolting/debolting,

Perform manual / mechanical cleaning

Rectification works of attachment

NDT

Boxup, deblind &housekeeping.

(Order No.: 4120077738)

(RFQ No.: 6200086276)

SA Maintenance &

Services (M) S/B August 2014

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

157

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HRSG F LG LHS vlv #1&#2 rplcement

To replace LG LHS valve for HRSG F at Utilities

Kertih Plant (UK), PGB, Kertih, Kemaman, Terengganu

Cut-off/remove defected valves.

Install/weld new valves as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620121192)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B July 2014

Petronas Gas Bhd

Utility Kerteh (UK)

158

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: Fabricate&install autodrain line

To fabricate and install autodrain line at Utilities Kertih

Plant (UK), PGB, Kertih, Kemaman, Terengganu

Cut-off/remove defected piping.

Install/weld new pipe as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620121191)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B July 2014

Petronas Gas Bhd

Utility Kerteh (UK)

159

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HRSG D desupvlvBFWinlet chkvlv

To replace Desuperheater Valve BFW inlet Check

Valve for HRSG D at Utilities Kertih Plant (UK), PGB,

Kertih, Kemaman, Terengganu

Cut-off/remove defected valve.

Install/weld new valve as per approved procedure.

Perform Non-Destructive Testing.

Touch up painting as per approved procedure

(Order No.: 3620121190)

(Contract No.: SM5Y150604)

SA Maintenance &

Services (M) S/B July 2014

Petronas Gas Bhd

Utility Kerteh (UK)

160

MECH MAINT-BOILERS

(SM5010200): PR# SAMtn: HRSG B HT package

To perform hydrostatic test for HRSG F during CF

renewal at Utilities Kertih Plant (UK), PGB, Kertih,

Kemaman, Terengganu

Scope of works:

SA Maintenance &

Services (M) S/B July 2014

Petronas Gas Bhd

Utility Kerteh (UK)

Page 82: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

81 PROFIL SYARIKAT 2017

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely

Perform blinding deblinding as per EIS

Cut/off remove valves (capping point).

Perform capping process.

Fill up water.

Pre-HT.

DOSH Inspection (HT).

Drain water.

Perform decapping process.

Perform Non-Destructive Testing

(Order No.: 3620121188)

(Contract No.: SM5Y150604)

161

MECH MAINT-FURNACES

(SM5010500): PR# Wall Rupture Repair

To perform repair works at Acid Gas Incinerator A5-

0202, Gas Processing Plant Santong, Petronas Gas Bhd,

Terengganu Darul Iman

Mob/demob Tools/equipments

Circumferential wall repair

Compensator repair

Burner refractory repair

Guide plate repair

Reinstate wall insulation

Burner vane crack repair

Preheater leak repair

Preheater refractory repair

(Order No.: 4120070967)

(RFQ No.: 6200074135)

SA Maintenance &

Services (M) S/B June 2014

Petronas Gas Bhd

Gas Processing

Santong (GPS)

162

BUILDING & STRUCTURE CONSTRUCTION

REPAIR & MAINTENANCE

(SC2030500): PR# Wall Rupture Repair

To perform repair works at Acid Gas Incinerator A5-

0202, Gas Processing Plant Santong, Petronas Gas Bhd,

Terengganu Darul Iman

Mob/demob Tools/equipments

Circumferential wall repair

Compensator repair

Burner refractory repair

Guide plate repair

Reinstate wall insulation

Burner vane crack repair

Preheater leak repair

Preheater refractory repair

(Order No.: 4120070967)

(RFQ No.: 6200074135)

SA Maintenance &

Services (M) S/B June 2014

Petronas Gas Bhd

Gas Processing

Santong (GPS)

163

MECH MAINT-BOILERS

(SM5010200): PR# Boiler Overhaul DOSH CF

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical equipment for DOSH inspection for Boiler

at Gas Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

Scope of Works:

Perform Blinding & De-Blinding works as per blind

list.

Open up and box up waste heat boilers

Perform cleaning works for DOSH inspection.

Perform testing and servicing and overhaul of

pressure safety valve (PSV), Block Valve (BV) and

check valve (CV).

Re install the steam drum removed parts,box up and

close all boiler drum manholes and access door.

(Order No.: 3620086452)

Local Engineering

(M) Sdn Bhd December 2013

Petronas Gas Bhd

Gas Processing

Santong (GPS)

Page 83: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

82 PROFIL SYARIKAT 2017

164

MECH MAINT-BOILERS

(SM5010200):

PR# Boiler Overhaul DOSH CF

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical equipment for DOSH inspection for Boiler

D at Utilities Kertih Plant (UK), PGB, Kertih,

Kemaman, Terengganu.

Heat Recovery Steam Generator

Steam Drum

Blowdown tank

Swing Module

o Perform blinding deblinding

o Perform swing module for accessibility

o Perform cleaning and works as per SOE

o Perform testing and servicing of pressure relief

valve

o DOSH Inspection

o Perform flange tightening using manual torque

wrench

(Order No.: 3620042385)

Local Engineering

(M) Sdn Bhd February 2013

Petronas Gas Bhd

Utility Kerteh (UK)

165

MECH MAINT-BOILERS

(SM5010200): PR# Boiler Boiler DOSH overhaul for F4-771 DOSH

CF

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical equipment for DOSH inspection for Boiler

at Gas Processing Plant Kerteh, Petronas Gas Bhd,

Terengganu

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum.

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order No.: 3620082321)

(RFQ No.: LQ-PGB(A)-0244/13)

Local Engineering

(M) Sdn Bhd December 2013

Petronas Gas Bhd

Gas Processing

Kerteh

166

RETUBING: To repair leak boiler tube

Tube Leak Repair

Provision of manpower, supervision, tools, equipment,

materials and consumables for tube leaks repair of F2-

781 Auxiliary Boiler, Gas Processing Plant Kerteh,

Petronas Gas Bhd, Terengganu Darul Iman.

Blinding activity as per EIS

Boiler wall casing & castable/refractory removal

Cut generating tubes

Fabricate plugs

Procure generating tubes

Bending tube (BSW integral fins)

Grind, reweld, DPT SH tubes

PWHT

Welding of 44 plugs

Pre-HT

Provision for repair

Pre-HT

Local Engineering

(M) Sdn Bhd Dec 2013

Petronas Gas Bhd

Gas Processing

Kerteh

Page 84: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

83 PROFIL SYARIKAT 2017

Reinstate castable on SH

Removal of plugs

Tube stub collapsed tube area

Install 7 expand tubes

Fin weldings for BSW

Pre-HT

HT with DOSH

Saturated box castable & casing installation

Boxup, deblind &housekeeping

(Order No.: 3620073316)

(RFQ No.: LQ-PGB(A)-0162/13)

167

Internal inspect & overhaul WH boiler

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical equipment for DOSH inspection for Boiler

at Gas Processing Plant Kerteh, Petronas Gas Bhd,

Terengganu

Scope of Works:

Supply sufficient manpower, equipment, tools and

consumables/materials to execute the work

satisfactorily and safely.

Scaffolding erection/dismantle – internal / external

Blind/deblind as per blind list

Manhole opening and ventilation.

External/internal fittings removal/installation works

PSV’s removal / servicing / testing (bench test) /

installation.

Block Valve’s removal / servicing / installation

Level Gauge’s removal / servicing / installation

Internal cleaning (waterjet cleaning, power tools, air

blowing, vacuum, etc) – Furnace / Super heater /

Steam Drum / Mud Drum

Castable and cladding minor repair

Minor repair; DOSH & NonDOSH repair within 2

days

Boiler Box-up activity and Housekeeping

(Order No.: 3620082292)

Local Engineering

(M) Sdn Bh Dec 2013

Petronas Gas Bhd

Gas Processing

Kerteh

168

RETUBING: To repair leak boiler tube

Tube Leak Repair

Provision of manpower, supervision, tools, equipment,

materials and consumables for tube leaks repair of F2-

781 Auxiliary Boiler, Gas Processing Plant Kerteh,

Petronas Gas Bhd, Terengganu Darul Iman.

Blinding activity as per EIS

Boiler wall casing & castable/refractory removal

Cut generating tubes

Fabricate plugs

Procure generating tubes

Bending tube (BSW integral fins)

Grind, reweld, DPT SH tubes

PWHT

Welding of 44 plugs

Pre-HT

Provision for repair

Pre-HT

Reinstate castable on SH

Removal of plugs

Tube stub collapsed tube area

Install 7 expand tubes

Fin weldings for BSW

Pre-HT

HT with DOSH

Saturated box castable & casing installation

Boxup, deblind &housekeeping

(Order No.: 3620073316)

(RFQ No.: LQ-PGB(A)-0162/13)

Local Engineering

(M) Sdn Bhd Dec 2013

Petronas Gas Bhd

Gas Processing

Kerteh

Page 85: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

84 PROFIL SYARIKAT 2017

169

Tube Leak Rectification For F3-791, PGB

Tube Leak Repair

Provision of manpower, supervision, tools, equipment,

materials and consumables for tube leaks repair of F3-

791 Auxiliary Boiler, Gas Processing Plant Kerteh,

Petronas Gas Bhd, Terengganu Darul Iman.

Blinding activity as per EIS

Boiler wall casing & castable/refractory removal

Cut generating tubes

Fabricate plugs

Procure generating tubes

Bending tube (BSW integral fins)

Grind, reweld, DPT SH tubes

PWHT

Welding of 44 plugs

Pre-HT

Provision for repair

Pre-HT

Reinstate castable on SH

Removal of plugs

Tube stub collapsed tube area

Install 7 expand tubes

Fin weldings for BSW

Pre-HT

HT with DOSH

Saturated box castable & casing installation

Boxup, deblind &housekeeping

(Order No.: 3620086329)

(RFQ No.: LQ-PGB(A)-210/13)

Local Engineering

(M) Sdn Bhd Nov 2013

Petronas Gas Bhd

Gas Processing

Kerteh

170

CASTABLE: To Perform Ago2 Castable Repair At

GPP-2, PGB

Provision Of Manpower, Supervision, Tools,

Equipments, Materials And Consumables To Perform

Castable& Burner Repair Of Acid Gas Oxidizer 2

(AGO-2) At KCS, Gas Processing Plant Complex A,

Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.

(To perform castable replacement)

Refractory work

o Blind/deblind as per blind list

o Remove AGO-2 burner from burner throat to

gain access of confine space area inside AGO.

o Remove existing castable at defected area (both

layer).

o Inform PGB to perform inspection.

o Surface cleaning and install new castables.

Burner Work

o Remove the burner from burner throat in safe

manner to a safe place.

o Inform PGB to perform inspection prior any

repair commencement.

o Repair burner as per PGB requirement.

o Perform NDT at joints as per PGB requirement.

(Order No.: 4120033626)

(RFQ No.: SM1B130130)

Local Engineering

(M) Sdn Bhd Oct – Nov 2013

Petronas Gas Bhd

Gas Processing

Kerteh

171

BOILER OVERHAUL:Boiler Overhaul Works For

F3-791, PGB

PR# F3-791 Boiler Overhaul of F3-781 Auxiliary

Boiler, Gas Processing Kerteh (GPK), PGB, Kerteh,

Kemaman, Terengganu.

Perform all necessary blinding/deblinding for

hotspot repair

Provide necessary access for all inspection and

repair activities, including confined space entry for

steam drum, mud drum and furnace.

Removal of furnace rear wall components including

insulation cladding, mineral wool, rear wall casing,

rear wall refractory and rear wall tie bar (C

Channel).

Perform procurement, fabrication and installation of

Local Engineering

(M) Sdn Bhd October 2013

Petronas Gas Bhd

Gas Processing

Kerteh

Page 86: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

85 PROFIL SYARIKAT 2017

furnace rear components including refractory

anchors, rear wall refractory, rear wall tie-bar, rear

wall casing, mineral wool insulation, insulation

cladding & painting.

Provisional scope depends on as found condition which

covers for top furnace refractory repair

(Order No.: 3620086329)

(RFQ No.: LQ-PGB(A)-0210/13)

172

BOILER OVERHAUL:Boiler Overhaul F-4001,

PPTSB

Provision of manpower, supervision, tools, equipment,

materials and consumables for overhaul of mixed LPG

bullet which inclusive of equipment blinding and de-

blinding, ventilation, internal cleaning, internal

scaffolding erection and removal, blasting, power

brushing and maintenance painting for internal and

external of bullet and hydrostatic testing at Petronas

Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh,

Kemaman, Terengganu.

To carry out blinding works for the bullet as per

PPTSB instruction

To perform cleaning and gas freeing the bullet

To perform erection and removal of internal

scaffolding (purple shaded area as per scaffolding

drawing attached)

To power tool at weldment (at the yellow, green, and

purple shaded area – both drawings)

To blast the internal bottom (clock location no5 to

no7) and paint as per PTS 13A

To replace piping and valve as per Inspection

Worklist

HSE Resources

Sdn Bhd Sept 2013 PPTSB

173

BUILDING & STRUCTURE CONSTRUCTION

REPAIR AND MAINTENANCE

(SC2030500): To provide all necessary manpower, materials, tools,

equipment, and consumables for replace & install new

roofing for HSE Cabin CUFK, Centralised Utility

Facilities (CUF) Kerteh, Petronas Gas Bhd, Kerteh,

Terengganu Darul Iman

Mob/demob Tools/equipments

Dismantle the existing roof

To install new arch (roof structure)

To install new roof

To concrete the floor between the 2 cabin

To install new complete wiring for lamp & fan +

plug point

Housekeeping

(Order No.: 4120035379)

(RFQ No.: 6200037576)

SA Maintenance &

Services (M) S/B September 2013

Petronas Gas Bhd

Gas

Centralised Utility

Facilities (CUF)

Kerteh

174

MACHINING & FABRICATION WORKSHOP

(SM5080000):

PR# Tagging and labelling at process area

To provide all necessary manpower, materials, tools,

equipment, and consumables for tagging and labelling

work for ZONE 1 area, Gas Processing Plant Complex

B, Petronas Gas Bhd, Tok arun, Terengganu Darul

Iman

Mob/demob Tools/equipments

Painting 288 location as per current size in site

(Alphabet Black color & Background Yellow

Color)

Steel plate Engrave 106 location as per current size

in site (Alphabet Black color & Background White

Color)

Plastic plate Engrave 251 location as per current

size in site (Alphabet Engrave)

(Order No.: 4120037027)

(RFQ No.: 6200039496)

SA Maintenance &

Services (M) S/B September 2013

Petronas Gas Bhd

Gas Processing Plant

Complex B, Tok arun

Page 87: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

86 PROFIL SYARIKAT 2017

175

OFFICE ADMIN SERVICE - PAINTING

(SC1030100):

PR# Sampling signage KR2B

Design, fabricate, deliver and install operational signage

for Petronas Penapisan (Terengganu) Sdn Bhd /

Aromatics Malaysia Sdn Bhd at KR-2B Aromatics

complex, Terengganu Darul Iman

Sampling signage, size 4’ x 3’, material Aluminum

with reflective sticker.

(Order No.: 4120036419)

(RFQ No.: 6200037761)

SA Maintenance &

Services (M) S/B September 2013

Petronas Penapisan

(Terengganu) Sdn

Bhd

176

CASTABLE: To perform AGO2 castable repair

Provision Of Manpower, Supervision, Tools,

Equipments, Materials And Consumables To Perform

Castable& Burner Repair Of Acid Gas Oxidizer 2

(AGO-2) At KCS, Gas Processing Plant Complex A,

Gpp-A, Petronas Gas Bhd, Kerteh, Terengganu.

To perform castable replacement)

Refractory work

o Blind/deblind as per blind list

o Remove AGO-2 burner from burner throat to

gain access of confine space area inside AGO.

o Remove existing castable at defected area (both

layer).

o Inform PGB to perform inspection.

o Surface cleaning and install new castables.

Burner Work

o Remove the burner from burner throat in safe

manner to a safe place.

o Inform PGB to perform inspection prior any

repair commencement.

o Repair burner as per PGB requirement.

Perform NDT at joints as per PGB requirement

Local Engineering

(M) Sdn Bhd Aug 2013

Petronas Gas Bhd

Gas Processing

Kerteh

177

GENERAL STRUCTURE / BUILDING PAINTING

PASSO PROGRAM – PUMP BASEMENT

PAINTING

(SC2130100):

To provide all necessary manpower, materials, tools,

equipment, and consumables for BT1 PASSO Pump

basement project at Petronas Penapisan (Terengganu)

Sdn Bhd, Terengganu Darul Iman

Mob/demob Tools/equipments

Removal and dismantling of old corroded structure.

Installation and painting of new structures as per

original design.

The badly corroded structure shall be replace with

new including but not limited to handrail,

ladder,cable tray support, wooden spacer, support

plate, support beam, bolt/nut, grating, pipe clip,

spacer, and etc.

Carry out NDT such as DPT on the welding joints

of the new structure.

Carry out hot dipped galvanizing work for the new

structure after completed fabrication and all the

required testing.

Carry out painting for the new structure after

completion of hot dipped galvanizing work.

New structure shall be painted as per existing color.

(Order No.: 4120028564)

(RFQ No.: 6200032116)

SA Maintenance &

Services (M) S/B July 2013

Petronas Penapisan

(Terengganu) Sdn

Bhd

178

BUILDING & STRUCTURE CONSTRUCTION

REPAIR AND MAINTENANCE

(SC2030500): To provide all necessary manpower, materials, tools,

equipment, and consumables for replace & install new

roofing for HSE Cabin CUFK, Centralised Utility

Facilities (CUF) Kerteh, Petronas Gas Bhd, Kerteh,

Terengganu Darul Iman

Mob/demob Tools/equipments

Dismantle the existing roof

SA Maintenance &

Services (M) S/B July 2013

Petronas Gas Bhd

Gas

Centralised Utility

Facilities (CUF)

Kerteh

Page 88: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

87 PROFIL SYARIKAT 2017

To install new arch (roof structure)

To install new roof

To concrete the floor between the 2 cabin

To install new complete wiring for lamp & fan +

plug point

Housekeeping

(Order No.: 4120048093)

(RFQ No.: 6200045354)

179

GENERAL STRUCTURE / BUILDING PAINTING

(SC2130100): PR# Structure repair at PE-1/2-S-320

To provide all necessary manpower, materials, tools,

equipment, and consumables for BT1 PASSO Pump

basement project at Petronas Penapisan (Terengganu)

Sdn Bhd, Terengganu Darul Iman

(Order No.: 4120029587)

(RFQ No.: 6200031489)

SA Maintenance &

Services (M) S/B

July 2013

Petronas Chemicals

Polyethylene Sdn

Bhd

180

RETUBING: Repair Boiler D

PR# Boiler D Tube Rectification

Provision of manpower, supervision, tools, equipment,

materials and consumables for tube rectification at

Boiler D, Utility Gebeng, Pahang Darul Makmur.

Capping De-capping, Top roof plate

Swing module

Remove partial tube & plugging activity

PWHT, DPT, RT

HT

(Order No.: 3620053654)

Local Engineering

(M) Sdn Bhd April 2013

Petronas Gas Bhd

Utility Gebeng

181

To perform boiler overhaul

PR# F4-761 Boiler Overhaul of F4-761 Auxiliary

Boiler, Gas Processin (GPK), PGB, Kerteh, Kemaman,

Terengganu.

Perform all necessary blinding/deblinding for

hotspot repair

Provide necessary access for all inspection and

repair activities, including confined space entry for

steam drum, mud drum and furnace.

Removal of furnace rear wall components including

insulation cladding, mineral wool, rear wall casing,

rear wall refractory and rear wall tie bar (C

Channel).

Perform procurement, fabrication and installation of

furnace rear components including refractory

anchors, rear wall refractory, rear wall tie-bar, rear

wall casing, mineral wool insulation, insulation

cladding & painting.

(Order No.: 3620053654)

(RFQ No.: LQ-PGB(A)-0094/13)

Local Engineering

(M) Sdn Bhd May 2013

Petronas Gas Bhd

Gas Processing

Kerteh

182

RETUBING: Repair Boiler D

PR# To do SH tube defining activity

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform defining activity

of superheater tube for Waste Heat Boiler (1 unit) at

Gas Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

Local Engineering

(M) Sdn Bhd April 2013

Petronas Gas Bhd

Utility Gebeng

183

Boiler Overhaul & DOSH Inspection

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler internal inspection

overhaul and repair work for Gas Processing Plant

Kerteh, Petronas Gas Bhd, Terengganu.

Local Engineering

(M) Sdn Bhd March 2013

Petronas Gas Bhd

Gas Processing

Kerteh

184 To repair, fabricate and install P6-0201B Lube Oil

Cooler Structure

Local Engineering

(M) Sdn Bhd March 2013

Petronas Gas Bhd

Gas Processing

Santong

185

Internal Inspect & overhaul w heat boiler

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler WHRU#1 internal

inspection overhaul and repair work for Utility Gebeng,

Petronas Gas Bhd.

Local Engineering

(M) Sdn Bhd Feb 2013

Petronas Gas Bhd

Utility Gebeng

Page 89: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

88 PROFIL SYARIKAT 2017

186

F3-781 Boiler overhaul and tube rectify

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler F2-781 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Order No.: 3620073313)

(RFQ No.: LQ-PGB(A)-0174/13)

Local Engineering

(M) Sdn Bhd July 2013

Petronas Gas Bhd

Gas Processing

Kerteh

187

Smallbore rectification for GPP 4 SD

Provision of Piping Work Services for GPP4 Shutdown

2012.

TMM Engineering

Sdn Bhd May – June 2012

Petronas Gas Bhd

Gas Processing

Kerteh

188

F4-761 Boiler overhaul and tube rectify

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler F4-761 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Order No.: 3620067225)

(RFQ No.: LQ-PGB(A)-0094/13)

Local Engineering

(M) Sdn Bhd June 2012

Petronas Gas Bhd

Gas Processing

Kerteh

189

To rectify defect parts/welding works

PR# Rectification Letdown & Piping

To perform welding and rectification piping works at

Gas Processing Plant Santong, Petronas Gas Bhd,

Terengganu.

Local Engineering

(M) Sdn Bhd July 2012

Petronas Gas Bhd

Gas Processing

Santong

190

Boiler Overhaul & DOSH Inspection

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler internal inspection

overhaul and repair work for Gas Processing Plant

Kerteh, Petronas Gas Bhd, Terengganu.

Local Engineering

(M) Sdn Bhd

June 2012

Petronas Gas Bhd

Gas Processing

Santong

191

BOILER OVERHAUL:F2-781 Boiler overhaul and

tube rectify

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler F2-781 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Order No.: 3620073313)

(RFQ No.: LQ-PGB(A)-0174/13)

Local Engineering July 2012

Petronas Gas Bhd

Gas Processing

Kerteh

192

BOILER OVERHAUL:F2-791 Boiler Overhaul

Provision of manpower, supervision, tools, equipment,

materials and consumables for Boiler F2-791 internal

inspection overhaul and repair work for Gas Processing

Plant Kerteh, Petronas Gas Bhd, Terengganu.

(Order No.: 3620073313)

(RFQ No.: LQ-PGB(A)-0174/13)

Local Engineering

(M) Sdn Bhd

Aug 2012

Petronas Gas Bhd

Gas Processing

Kerteh

193

Boiler activities during PRR GPP3

Provision of manpower, supervision, equipment, tools,

materials, and consumables for boiler activity during

shut down works At Gas Processing Plant, Kerteh

(GPK), Petronas Gas Berhad (PGB), Terengganu Darul

Iman.

Local Engineering

(M) Sdn Bhd Oct 2012

Petronas Gas Bhd

Gas Processing

Kerteh

194

Additional for F4-791 wall repair

To perform repair activity at F4-791 wall at Gas

Processing Plant Kerteh, Petronas Gas Bhd, Terengganu

(Order No.: 3200120663)

(RFQ No.: LQ-PGB(A)-0231/12)

Local Engineering

(M) Sdn Bhd Dec 2012

Petronas Gas Bhd

Gas Processing

Kerteh

195

BOILER OVERHAUL:Boiler DOSH overhaul for F4-

771

PR# Boiler Boiler DOSH overhaul for F4-771 DOSH

CF

Provision of manpower, supervision, tools, equipment,

materials and consumables to perform complete

mechanical equipment for DOSH inspection for Boiler

at Gas Processing Plant Kerteh, Petronas Gas Bhd,

Terengganu

Local Engineering

(M) Sdn Bhd Dec 2012

Petronas Gas Bhd

Gas Processing

Kerteh

196

GENERAL STRUCTURE / BUILDING PAINTING

(SC2130100):

PR# Provision of TCOT Washroom Refurbishment PR#

PR# Provision 10% for optional scope (TCOT & OSC)

(Order No.: 3310131161)

(RFQ No.:)

SA Maintenance &

Services (M) S/B

June 2011

Petronas Carigali Sdn

Bhd

Page 90: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

89 PROFIL SYARIKAT 2017

REKOD PENGALAMAN KERJA SEMASA

Id Description Client / Main

Contractor

Contract

Period Plant Owner

A. MECH MAINT-BOILERS

(SM5010200):

TERM CONTRACT for provision of

manpower, material, equipment &necessary facilities for Equipment Cleaning of Heat

Exchanger at Petronas Chemicals Olefins Sdn

Bhd, Petronas Chemicals Glycols Sdn Bhd

and Petronas Derivatives Sdn Bhd, Kerteh, Terengganu.

(Contract No.: DTC-

KTH/PCDSB/2016/0091)

(BID No.: DTC-KTH/PCDSB/2016/0091)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M)

S/B

01.10.2016

30.09.2018

Petronas Chemical Derivatives Sdn

Bhd.

(PCOGD)

B. MECH MAINT-BOILERS

(SM5010200): TERM CONTRACT for provision of

manpower, material, equipment & services

for GPU Boiler Overhaul and Repair Work for Gas Processing and Utilities

(GPU),Petronas Gas Bhd

(Contract No.: DTC-KTH/PGB-

GPU/2016/0142)

(BID No.: DTC-KTH/PGB-

GPU/2016/0142)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M) S/B

01.10.2016

– 30.09.2018

Petronas Gas Bhd,

Gas Processing Kerteh (GPK)

C. MECH MAINT-BOILERS

(SM5010200):

TERM CONTRACT for provision of manpower, material, equipment & services

for Boiler Repair Works for Utilities Gebeng

(UG), Petronas Gas Bhd.

(Contract No.: SM4Y160505/6200154645)

(BID No.: 6200154645)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M)

S/B

19.07.2016

18.07.2017

Petronas Gas Bhd

Utility Gebeng

(UG)

D. MECH MAINT-FURNACES

(SM5010500):

TERM CONTRACT for E-21102 AFC

Tubes Internal Cleaning for Petronas

Penapisan (Terengganu) Sdn Bhd (PPTSB) Kerteh, Kemaman, Terengganu.

(Contract No.: RFX 6200138215)

(BID No.: 6200138215)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M) S/B

10.02.2016

– 09.02.2018

Petronas

Penapisan (T) Sdn Bhd (PPTSB)

Page 91: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

90 PROFIL SYARIKAT 2017

E. MECH MAINT-BOILERS

(SM5010200): TERM CONTRACT for supply of material

and manpower for Boiler Repair Works for

Gas Processing Plant Kerteh (GPK),

Petronas Gas Bhd.

(Contract No.: SM8Y150815)

(BID No.: 6200128350)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M)

S/B

26.10.2015

26.10.2016

Petronas Gas Bhd

Gas Processing

Kerteh (GPK)

F. MECH MAINT-FURNACES

(SM5010500):

TERM CONTRACT for Primary and

Secondary Transfer Line Exchanger (PTLE & STLE) Maintenance Cleaning by means of

Hydrojetting for Petronas Chemical Ethylene

Sdn Bhd (PCESB), Kerteh, Kemaman, Terengganu.

(Contract No.: RFX6200092922)

(BID No.: 6200092922)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M)

S/B

15.12.2014

14.12.2016

Petronas Chemical

Ethylene Sdn Bhd

(PCESB)

G. MECH MAINT-BOILERS

(SM5010200):

TERM CONTRACT for supply of material and manpower for Boiler Repair Works for

Utilities Kertih Plant (UK), PGB, Kertih,

Kemaman, Terengganu, Petronas Gas Bhd.

(Contract No.: SM8Y150604)

(BID No.: 6200122032)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M)

S/B

01.08.2015

31.07.2016

Petronas Gas Bhd

Utility Kerteh

(UK)

H. MECH MAINT-BOILERS

(SM5010200):

TERM CONTRACT for supply of material

and manpower for Boiler Repair Works for

Utility Gebeng Plant (UG), Petronas Gas Bhd (PGB), Kuantan, Pahang.

(Contract No.: SM8Y150510)

(BID No.: 6200119030)

(Contract Value: RM500k and Above)

SA Maintenance

& Services (M) S/B

01.07.2015

– 30.06.2016

Petronas Gas Bhd

Utility Gebeng (UG)

Page 92: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

91 PROFIL SYARIKAT 2017

ANUGERAH PENCAPAIAN PRESTASI (HSE Performance achievement awards)

Page 93: PROFIL SYARIKAT 2017 - samase.com.mysamase.com.my/muaturun/PROFIL SYARIKAT 2017 (BM).pdf · perkhidmatan khususnya didalam bidang kepakaran kami iaitu Pembaikpulih Dandang Stim &

92 PROFIL SYARIKAT 2017

IKRAR INTEGRITI MALAYSIA

Kami, Rakyat Malaysia Merdeka, Berwawasan Berdaulat Dengan Tulus

dan Suci Hati, Berikrar, Memantap dan Memperkukuhkan, Maruah dan

Integriti Kami, Keluarga Dan Masyarakat, Agama, Bangsa dan Negara

Kami.Ke Arah Kualiti Kami Akan:

Mematuhi Sepenuhnya Perlembagaan Persekutuan, Undang-undang

dan Peraturan Semasa.

Mematuhi dan Mengamalkan Prinsip-prinsip Rukun Negara.

Sentiasa Berusaha Memupuk dan Mengamalkan Nilai-Nilai Murni,

Etika dan Integriti.

Bekerjasama Sepenuhnya Dengan Mana-Mana Pihak Untuk

Mencegah Sebarang Perlakuan Jenayah,Salah Laku Dan Perbuatan

Tidak Berintegriti.

Bertindak Tegas Terhadap Mereka Yang Melanggar Undang-

Undang Dan Peraturan.

Bertindak Tegas Terhadap Mereka Yang Cuba Mengugat

Integriti,Imej Masyarakat dan Negara.

Secara Kolektif dan Berterusan Membudayakan Integriti Masyarakat

Malaysia