PERENCANAAN :
GREEN SITE KAMPUS
KEMENTERIAN PEKERJAAN UMUM ,DAN
GEDUNG UTAMA
KEMENTERIAN PEKERJAAN UMUM
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 2/46
PEMILIK DAN PEMBERI TUGAS
PERENCANA
MANAJEMEN KONSTRUKSI
KONSIL GREEN BUILDING
PELAKSANA / KONTRAKTOR
PEMBANGUNAN GEDUNG UTAMA
KEMENTERIAN PEKERJAAN UMUM
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 3/46
i
SEBAGAI :
LANDMARK
KEBANGGAAN NASIONAL ,
DAN
BENCHMARKBANGUNAN GEDUNG NEGARA
REPUBLIK INDONESIA
BERBASIS KONSEP
GREEN SITE & GREEN BUILDING
SEHINGGA MENJADI LOW ENERGY CONSUMPTION BUILDING SERTA BERPERAN MENGURANGI
DAMPAK
GLOBAL WARMING
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 4/46
Green Site DesignKampus Kementerian Pekerjaan Umum
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 5/46
LEGENDA :
A. GED UTAMA (4 LT.)
B. 1. CIPTA KARYA & GED. MENTERI (8 LT.)
2.GED.BALIBANG & BPKSDM (8 LT.)
3.GEDUNG BINA MARGA (8 LT.)
C. GED. KEPEGAWAIAN (4 LT.)
D. GED. TATA RUANG (3 LT.)
E. GED. SDA (2 LT.)
F. GED. SDA (2 LT.)
G. GED. SDA & FASUM (2 LT.)
H. GED. TATA RUANG (2 LT.)
I. GED. BIRO KEUANGAN (2 LT.)
J. GED. PUSDATA (1 & 2 LT.)
K. KANTIN (1 LT.)
L. POLIKLINIK (2 LT.)
M. MASJID (2 LT.)
N. GARDU PLN
O. POWER HOUSE
P. GED. SDA &TARU (8LT)
A
B1
B2
B3
CDEF
G
H
I
JK
L
M
NO
P
Luas Total : 5,3846 Ha
Luas Ruang Terbangun : 19.827,70 M² (36,82 %)
Luas Ruang Terbuka (dengan perkerasan) : 22.210,27 M² (41,25 %)
Luas Ruang Hijau : 11.808,02 M² (21,93 %)
Eksisting Campus Kementerian Pekerjaan Umum
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 6/46
FILOSOFI ‘GREEN ENVIRONMENT’
ZERO RUN OFF:
Meminimalkan
buangan air hujan
ke luar kawasan
Pembuatan
detention pond /
swale
Pembuatanresapan setempat
Optimalisasi
jaringan saluran
drainase keliling
THERMAL
CONTROL :
Membentuk mikro
klimat
Dari tatanan
pola & pemilihan
vegetasi
Membentuksirkulasi udara
ruang luar yang
mengalir
Pengelolaan O2 &
CO2 dengan
penanaman
tanaman bertajukpadat & lebar
ECO FRIENDLY:
Pemilihan material
secara tepat
Meminimalkan
material alami
Memilih produk
finishing yg. poreus
Menyediakan &melengkapi sarana
bagi pejalan kaki
(termasuk
penyandang cacat)
RECYCLE
REDUSE
REUSE :
Penerapan sistem
pengelolaan
sampah tanaman
Penerapan
pengelolaan airtanah dengan baik
Mengurangi
penggunaan air
siram dgn.
meminimalkan
tanaman perdu
Efisiensipenggunaan daya
listrik utk.
Pencahayaan ruang
luar dg. Pemilihan
jenis lampu & sensor
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 7/46
Kawasan Campus
Green Campus Development
Green Site Concept Applications
“Green Site / Garden City” Concept: • High density development
• More greenery (RTH)
• Restrict movement of motorized vehicle
• Interconnected walkways• Zero Runoff
• Integrated Waste Management
• Integrated MEP system.
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 8/46
Green Campus development plan More greenery, walkways
PUSAT DATA &
PUSKOMPU
GED. Utama
GED.
TATA
RUANG
GED.
SDA
GED.
PARKIR
MASJID
GED.
CIPTA KARYA
BINA MARGA
BPKSDM
BALITBANG
& GED.
PARKIR
SERBAGUNA
GED.
Herigage
2
1
3
5
6
7
8
4
“Green Site / Garden City” concept: • High density development
• More greenery (RTH)• Restrict movement of motorized vehicle
• Interconnected walkways
• Zero Runoff
• Integrated Waste Management
• Integrated MEP system.
Luas Total : 5,3846 Ha
Luas Ruang Terbangun : 19.827,70 M² (36,82 %)
Luas Ruang Terbuka
(dengan perkerasan) : 22.210,27 M² (41,25 %)Luas Ruang Hijau : 11.808,02 M² (21,93 %)
SEBELUM (MASTERPLAN AWAL)
Luas Total : 5,3846 Ha
Luas Ruang Terbangun : 18.243,64 M² (33,88 %)
Luas Ruang Terbuka
(dengan perkerasan) : 17.541,20 M² (32,58 %)Luas Ruang Hijau : 18.061,16 M² (33,54 %)
SESUDAH (PENYESUAIAN – 2009)
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 9/46
Green Campus development plan More trees, better microclimate
100 Pohon menyerap CO2 8 ton / tahun (Simpson and Mc Pherson)
Perpohon dapat menyerap 75% Partikel debu
½ ha RTH, dapat menahan aliran permukaan akibat hujan dan
meresapkan air ke dalam tanah 10,219 m3/tahun (Urban forest 2002)
Menyerap 80 % dari radiasi matahari
evaporasi dan transpirasi
“Green Site / Garden City” concept: • High density development
• More greenery (RTH)• Restrict movement of motorized vehicle
• Interconnected walkways
• Zero Runoff
• Integrated Waste Management
• Integrated MEP system.
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 10/46
Iklim Micro
THERMAL CONTROL : Pola Tata Vegetasi membentuk mikro klimat , mereduksi
radiasi matahari & memberi kontribusi
suplai O2.
100 Pohon menyerap CO2 8 ton / tahun
(Simpson and Mc Pherson)
Perpohon dapat menyerap 75% Partikel debu
½ ha RTH, dapat menahan aliran permukaan akibat
hujan dan meresapkan air ke dalam tanah 10,219m3/tahun (Urban forest 2002)
Better - Micro Climate
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 11/46
Legenda :Jalur pedestrian dengan canopy
Jalur pedestrian terbuka
Jalur Kendaraan & Ged Parkir
P
P
More greenery, walkways•Restrict movement of motorized vehicle
•Interconnected walkways
“Green Site/Garden City” concept: • High density development
• More greenery (RTH)
• Restrict movement of motorized vehicle
• Interconnected walkways
• Zero Runoff
• Integrated Waste Management
• Integrated MEP system.
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 12/46
Green Campus development plan More greenery, walkways
ILUSTRASI
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 13/46
PUSAT DATA &
PUSKOMPU
GED. MENTRI
GED.
TATARUANG
GED.
SDA
GED.
PARKIR
MASJID
GED.
CIPTA KARYA
BINA MARGA
BPKSDM
BALITBANG
& GED.
PARKIR
SERBAGUNA
GED.
UTAMA
2
1
3
5
6
7
8
4
Drainage air hujan kawasan menggunakan
ring sistem, dialirkan ke area / taman
resapan dan sumur resapan
= POND / AREA
RESAPAN AIR HUJAN
= SUMUR RESAPAN
Green Campus development plan Zero Runoff
“Green Site/Garden City” concept: • High density development
• More greenery (RTH)• Restrict movement of motorized vehicle
• Interconnected walkways
• Zero Runoff
• Integrated Waste Management
• Integrated MEP system.
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 14/46
Sampah basah, sampah organik seperti ; daun, sisa sayur,
sisa makanan, daging, tulang –tulang ikan/ayam, kulit buah-buahan,
direncanakan di olah dengan menggunakan komposter
Integrated waste management recycle
“Green Site/ Garden City” concept: • High density development
• More greenery (RTH)
• Restrict movement of motorized vehicle• Interconnected walkways
• Zero Runoff
• Integrated Waste Management
• Integrated MEP system.
Sampah kering, sampah anorganik, tidak dapat di daur
ulang secara alami dan cepat oleh tanah seperti ;
1. Botol kaca, gelas, piring.
2. Kain, plastik, styrofoam.
3. Kaleng.
4. B3 (Bahan Beracun Berbahaya)5. Karet, kulit, kulit artificial
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 15/46
Integrated MEP system more effective & efficient
Local Security Control
Master
Security Control
Local Security Control
Local Security Control
Local Security Control
Local Security ControlLocal Security Control
Local Security Control
Local Security Control
“Green Site/ Garden City” concept: • High density development
•
More greenery (RTH)• Restrict movement of motorized vehicle
• Interconnected walkways
• Zero Runoff
• Integrated Waste Management
• Integrated MEP system.
Power grid
Water waste/grey water
Fire fighting system
Clean water
Security system
Communication system
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 16/46
Identifikasi Infrastruktur Bawah Tanah & DisainLansekap Kampus Kementerian Pekerjaan Umum
LED
AVAILABLE SPACE
PARKING
Identifikasi Infrastruktur Bawah Tanah & DisainLansekap Kampus Kementerian Pekerjaan Umum
Rencana
Parking Management
R
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 17/46
Sundial
Identifikasi Infrastruktur Bawah Tanah & DisainLansekap Kampus Kementerian Pekerjaan Umum
SUNDIAL
JAM - MATAHARI
Identifikasi Infrastruktur Bawah Tanah & DisainLansekap Kampus Kementerian Pekerjaan Umum
Rencana
Jam Matahari - Sundial
R
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 18/46
Parkir Sepeda
Identifikasi Infrastruktur Bawah Tanah & DisainLansekap Kampus Kementerian Pekerjaan Umum
Rencana
Parkir Sepeda – Bike Rack
R
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 19/46
Bangku Taman
Tempat Sampah
Identifikasi Infrastruktur Bawah Tanah & DisainLansekap Kampus Kementerian Pekerjaan Umum
Rencana
Bangku taman dan tempat sampah
R
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 20/46
Rencana
Drinking Water Facilities
Fasilitas Penyediaan Air Minum pada :
Interior : bisa sbg elemen pendukung desain Interior
Eksterior: bisa sbg elemen estetis pada penataan lansekap
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 21/46
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 22/46
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 23/46
GREEN BUILDING
DESIGN
GEDUNG UTAMAKEMENTERIAN PEKERJAAN UMUM
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 24/46
Original block plan:
Larger area of the building is oriented to
east and west
Building form & orientation
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 25/46
Horizontalroof
Vertical
South
Vertical
East &
West
Vertical
North
Building form & orientation
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 26/46
Original building form Modified building form
Modified Building form:
1. Reduced surface exposure of the working spaces to east and west sun
2. Narrow building form improve daylight performance
Building form & orientation minimize exposure to east and west solar radiation
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 27/46
Building form & orientation orienting windows to north and south
Opaque walls Windows glass
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 28/46
Return air
thermal insulation
Daylighting light shelves for better daylight distribution
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 29/46
Daylighting Mockup light shelves
PEMANFAATAN SINAR MATAHARI
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 30/46
Sinar matahari
Sinar matahari
14000.00
Daylight sensor
PEMBANGUNAN GEDUNG MENTERI
KEMENTERIAN PEKERJAAN UMUMPEMANFAATAN SINAR MATAHARI
Dengan dikombinasikan daylight sensors untuk area kerja dan motion sensors untuk
area publik(toilet) terbukti bisa menghemat energi 13%
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 31/46
Translucent interior partitions better daylight distribution
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 32/46
0
10
20
30
40
50
60
70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Pre-Design
Design01
Design02Design03
Design04
Solar Gain Exterior Windows (kW)
0(Pre-Design) Clear Glass no
Insulation
1 Clear Glass no Insulation
2 Stopsol Darkblue no Insulation
3 Stopsol Darkblue + Insulation
4 Stopsol Darkblue + Insulation +Shading
T t l C li (kW)
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 33/46
Total Cooling (kW)
-180
-160
-140
-120
-100
-80
-60
-40
-20
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Pre-Design
Design01
Design02
Design03
Design04
0(Pre-Design) Clear Glass no
Insulation
1 Clear Glass no Insulation
2 Stopsol Darkblue no Insulation
3 Stopsol Darkblue + Insulation
4 Stopsol Darkblue + Insulation +Shading
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 34/46
Daylight Performance narrow building span & light shelves
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 35/46
TIME SCHEDULE , DAY LIGHT (LUX SENSOR) &
MOTION SENSOR
Automatic Lighting Control Zone saving electric lighting energy consumption > 30%
LAYOUT ZONE AC
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 36/46
LAYOUT ZONE ACPEMBANGUNAN GEDUNG MENTERI
KEMENTERIAN PEKERJAAN UMUM
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 37/46
G b i ll i
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 38/46
sink
Clean water
tank
shower
wudhu
Grey water tank
toilet
Grey water
Roof tank
garden
Bio
tankTo the ground
Rain Makeup
cooling
tower
Grey water system substantially save water consumption
G t t b t ti ll t ti
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 39/46
Pemakaian / Kebutuhan air bersih (A) :180 m3/hari
Recycling air kotor dan buangan (B)
dari STP (120 m3/hari) : 80 m3/hari
Air condensate dari AC : 5 m3/hari
Air hujan : 40 m3/hari
Air wudhu : 25 m3/hari
Total : 150 m3/hari
Penggunaan kembali air buangan
Flushing WC, urinoir : 45 m3/hari
Siram taman/landscape : 15 m3/hari
Total : 60 m3/hari
Sisa air buangan masuk ke resapan
Air Bersih yang dihemat B : A = 83% (termasuk air hujan).
Air Bersih yang dihemat = 61% (tanpa air hujan)
Grey water system substantially save water consumption
Material & resources : use environmentally friendly materials
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 40/46
Material & resources : use environmentally friendly materials
• Local products
• Sustainable
• Low energy• Recyclable / eco friendly
• Non toxic
Most building materials meet
ISO 14001 standards and
requirements
PEMBANGUNAN GEDUNG MENTERI C O R E T I P I K A L
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 41/46
LIFT DIFABEL
TOILET DIFABEL
GENDER
JALUR DIFABLE
LIFT SERVICE
PEMBANGUNAN GEDUNG MENTERI
KEMENTERIAN PEKERJAAN UMUMC O R E T I P I K A L
Encourage bike to work Provide bicycle racks and shower rooms
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 42/46
Encourage bike to work Provide bicycle racks and shower rooms
PEMBANGUNAN GEDUNG MENTERI P O T O N G A N
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 43/46
PEMBANGUNAN GEDUNG MENTERI
KEMENTERIAN PEKERJAAN UMUMP O T O N G A N
Jalur pejalan kaki
dan difabel
Jalur pencapaian
dr gedung Parkir
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 44/46
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 45/46
7/22/2019 Green Building - Kementerian PU
http://slidepdf.com/reader/full/green-building-kementerian-pu 46/46