LAPORAN KEMAJUAN PROJEK NO.17

‘JANUARI 2009’

PROJEK ADTEC TAIPING

KEMENTERIAN SUMBER MANUSIA

JABATAN KERJA RAYA MALAYSIA

KAMALBINA SDN. BHD

PEMILIK

PEGARAH PROJEK

KONTRAKTOR R&B

ADTEC TAIPING

LOKASI PROJEK

BANGUNAN PENTADBIRAN

BENGKEL TEK. MAKLUMAT& JAMIN KUALITI

DEWAN BESAR

PUSAT SUMBER

DEWAN KULIAH

LOBI UTAMA

KAFETERIA

MIKRO ELEKTRONIK

KOMPOSIT PLASTIK

M&E PLANT ROOM

1

TNB SUB

STATION

SERAMIK

M&E PLANT ROOM

2

GARAJ KENDERAAN

ASRAMA LELAKIASRAMA PEREMPUAN

DEWANMAKAN

SURAU

KELAS F

KELAS G

KUARTERSB, C, C&D

PELAN TAPAK ADTEC TAIPING

KEMAJUAN KERJA FIZIKAL

JADUAL : 60.55%SEBENAR : 58.46%KESELURUHAN : -2.09% (-3 HARI @LEWAT )

Jumlah Hari (Kontrak) : 729 hari

Jumlah Hari Terpakai : 604 hari

Baki Hari Tinggal : 125 hari

TARIKH LAPORAN : 08 JAN 2009

KEMAJUAN KERJA KEWANGAN

JADUAL : 64.16%SEBENAR : 59.42%KESELURUHAN : -4.74% (-16 HARI@LEWAT

)

TARIKH LAPORAN : 08 JAN 2009

Graf Kemajuan Kerja Keseluruhan Sehingga 8/1/2009

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Bulan

Pera

tus

%

% Kem. Fizikal J adual % Kem. Fizikal Sebenar

% Kem. Kewangan J adual % Kem. Kewangan Sebenar

% Kem. Fizikal J adual 0.00 0.48 1.04 2.56 4.19 6.12 7.70 9.98 13.53 18.44 20.82 23.34 26.09 29.06 30.76 33.81 36.84 41.32 43.00 47.08 60.55 74.17 87.80 98.95 100.00

% Kem. Fizikal Sebenar 0.00 2.59 5.28 7.56 9.30 11.64 13.12 15.62 18.74 22.53 26.73 29.56 32.40 35.71 37.09 41.47 45.77 46.74 50.89 55.19 58.46

% Kem. Kewangan J adual 0.00 0.94 2.05 3.93 5.77 8.92 10.71 13.46 17.45 22.24 25.62 27.75 31.15 34.56 35.93 39.26 42.63 45.59 48.62 52.35 64.16 77.62 89.39 99.09 100.00

% Kem. Kewangan Sebenar 0.00 3.97 6.30 13.91 15.50 17.58 17.26 19.52 22.30 25.93 30.26 32.79 35.32 38.47 38.97 43.62 47.34 48.16 52.42 56.36 59.42

16-05-07 25-06-07 24-07-07 20-08-07 13-09-07 18-10-07 09-11-07 05-12-07 12-01-08 21-02-08 27-03-08 15-04-08 29-05-08 08-07-08 15-07-08 22-08-08 19-09-08 28-10-08 14-11-08 04-12-08 08-01-09 15-02-09 15-03-09 15-04-09 13-05-09

Actual Physical 58.46%

Actual Financial

59.42%

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 96.48% 63.63% - 32.85%

JAN 09’ 98.98% 65.52% - 33.46%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 41.23%

FIRE FIGHTING 100.00% 15.85%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - DEWAN BESAR

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 21.87%

SUBMAIN CABLE 100.00% 76.86%

DB 100.00% 0.00%

LUMINAIRE 100.00% 0.00%

MAIN S/BOARD 100.00% 0.00%

LPS NA NA

PA 100.00% 4.65%

SMATV 100.00% 17.63%

CCTV NA NA

ICT 100.00% 12.65%

DEWAN BESAR

DEWAN BESAR

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 88.19% 75.93% -12.26%

JAN 09’ 93.25% 78.68% -14.57%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – LOBI

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 34.87%

SUBMAIN CABLE 100.00% 90.00%

DB 100.00% 0.00%

LUMINAIRE 100.00% 0.00%

MAIN S/BOARD NA NA

LPS NA NA

PA NA NA

SMATV NA NA

CCTV 100.00% 0.00%

ICT NA NA

LOBI UTAMA

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 66.43% 64.09% -2.34%

JAN 09’ 73.49% 66.39% -7.10%

MECHANICAL PLANNED

ACTUAL

AIR COND 27.78% 74.50%

FIRE FIGHTING 7.73% 44.64%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMA

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 15.98%

SUBMAIN CABLE 56.25% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 68.63% 6.36%

PA 0.00% 1.13%

SMATV NA NA

CCTV NA NA

ICT 87.16% 12.43%

DEWAN KULIAH UTAMA

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 77.77% 79.99% 2.22%

JAN 09’ 84.29% 84.41% 0.12%

MECHANICAL PLANNED

ACTUAL

AIR COND 53.14% 79.23%

FIRE FIGHTING 20.20% 87.69%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 54.76%

SUBMAIN CABLE 100.00% 88.87%

DB 100.00% 0.00%

LUMINAIRE 100.00% 0.00%

MAIN S/BOARD 100.00% 0.00%

LPS 87.53% 74.87%

PA 100.00% 2.53%

SMATV 98.41% 32.43%

CCTV NA NA

ICT 18.66% 5.42%

PUSAT SUMBER / PERPUSTAKAAN

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 74.06% 76.86% 2.80%

JAN 09’ 82.12% 77.52% -4.60%

MECHANICAL PLANNED

ACTUAL

AIR COND 38.59% 57.68%

FIRE FIGHTING 38.79% 32.97%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & PENGURUSAN SUMBER

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 65.76%

SUBMAIN CABLE 100.00% 79.76%

DB 28.57% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 16.67% 25.87%

LPS 64.21% 55.82%

PA 97.25% 18.30%

SMATV 78.64% 27.76%

CCTV 2.36% 4.54%

ICT 47.46% 1.23%

BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 68.75% 88.90% 20.15%

JAN 09’ 72.24% 89.11% 16.88%

MECHANICAL PLANNED

ACTUAL

AIR COND 0.00% 43.00%

FIRE FIGHTING 12.65% 24.86%

KITCHEN EQUIP. 0.00% 0.00%

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - KAFETARIA

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 50.00% 79.65%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD NA NA

LPS 39.17% 1.19%

PA 16.36% 14.65%

SMATV 33.53% 12.54%

CCTV NA NA

ICT 0.00% 67.65%

KAFETERIA

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 75.87% 83.53% 7.66%

JAN 09’ 79.02% 84.02% 5.01%

MECHANICAL PLANNED

ACTUAL

AIR COND 23.57% 66.78%

FIRE FIGHTING 27.70% 33.67%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI MAKLUMAT

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 62.65%

SUBMAIN CABLE 42.86% 28.96%

DB 0.00% 2.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 70.13% 52.65%

PA 77.09% 32.65%

SMATV 81.24% 27.54%

CCTV 30.77% 33.65%

ICT 18.50% 7.53%

BENGKEL TEKNOLOGI MAKLUMAT

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 67.06% 84.11% 17.06%

JAN 09’ 68.69% 86.03% 17.33%

MECHANICAL PLANNED

ACTUAL

AIR COND 11.35% 64.16%

FIRE FIGHTING 20.14% 50.54%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 47.85%

DUST CONTROL NA NA

PROCESS COOLING

0.00% 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 67.43%

SUBMAIN CABLE 0.00% 78.87%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 42.64% 52.87%

PA 0.00% 22.54%

SMATV NA NA

CCTV 0.00% 28.64%

ICT 0.00% 17.54%

BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 67.85% 80.57% 12.73%

JAN 09’ 71.23% 83.64% 12.41%

MECHANICAL PLANNED

ACTUAL

AIR COND 14.75% 56.54%

FIRE FIGHTING 15.26% 58.27%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 56.64%

DUST CONTROL 0.00% 23.76%

PROCESS COOLING

0.00 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 76.00%

SUBMAIN CABLE 0.00% 53.76%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 2.00%

LPS 38.74% 55.87%

PA 0.00% 23.75%

SMATV NA NA

CCTV 0.00% 29.76%

ICT 0.00% 13.43%

BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 68.02% 79.88% 11.86%

JAN 09’ 71.02% 79.96% 8.84%

MECHANICAL PLANNED

ACTUAL

AIR COND 3.41% 43.14%

FIRE FIGHTING 17.84% 53.54%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 57.62%

DUST CONTROL 0.00% 25.76%

PROCESS COOLING

0.00% 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 65.64%

SUBMAIN CABLE 0.00% 84.78%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 35.83% 56.98%

PA 0.00% 19.64%

SMATV NA NA

CCTV 0.00% 32.65%

ICT 0.00% 17.84%

BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 70.13% 73.47% 3.35%

JAN 09’ 77.16% 77.74% 0.58%

MECHANICAL PLANNED

ACTUAL

AIR COND 6.16% 53.26%

FIRE FIGHTING 16.68% 35.74%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 17.14% 12.00%

DUST CONTROL 6.56% 16.76%

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN KUALITI

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 71.43% 67.45%

SUBMAIN CABLE 0.00% 79.65%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 2.00%

LPS 40.33% 63.75%

PA 17.55% 27.43%

SMATV 19.51% 22.31%

CCTV 9.64% 29.64%

ICT 5.05% 13.56%

BENGKEL KEJ. JAMINAN KUALITI

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 68.59% 77.02% 8.07%

JAN 09’ 72.73% 78.27% 5.54%

MECHANICAL PLANNED

ACTUAL

AIR COND 0.00% 65.87%

FIRE FIGHTING 7.77% 35.36%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 0.00% 34.76%

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO ELEKTRONIK

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 17.86% 45.76%

SUBMAIN CABLE 0.00% 12.87%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 35.43% 55.75%

PA 0.00% 23.75%

SMATV 0.00% 24.05%

CCTV 10.44% 26.75%

ICT 0.00% 8.65%

BENGKEL MIKRO ELEKTRONIK

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 74.99% 95.35% 20.37%

JAN 09’ 80.19% 96.63% 16.44%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 90.00%

SUBMAIN CABLE 100.00% 90.00%

DB 100.00% 75.00%

LUMINAIRE 0.00% 65.00%

MAIN S/BOARD 71.43% 0.00%

LPS 75.01% 0.00%

PA NA NA

SMATV 66.12% 37.53%

CCTV 52.44% 12.65%

ICT 100.00% 57.76%

KUARTERS KELAS ‘B’

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 67.99% 96.06% 28.07%

JAN 09’ 81.59% 96.76% 15.16%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 90.48% 90.00%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 75.00%

LUMINAIRE 0.00% 65.00%

MAIN S/BOARD 0.00% 0.00%

LPS 56.21% 0.00%

PA NA NA

SMATV 31.94% 42.53%

CCTV NA NA

ICT 74.38% 17.85%

KUARTERS KELAS ‘C’

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 64.72% 95.45% 30.73%

JAN 09’ 69.32% 96.38% 27.06%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 90.00%

SUBMAIN CABLE 91.67% 90.00%

DB 0.00% 75.00%

LUMINAIRE 0.00% 65.00%

MAIN S/BOARD 0.00% 0.00%

LPS 76.69% 0.00%

PA NA NA

SMATV 63.36% 42.86%

CCTV NA NA

ICT 100.00% 65.65%

KUARTERS KELAS ‘C’ + ‘D’

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 70.42% 89.51% 19.09%

JAN 09’ 73.69% 91.08% 17.39%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 70.48% 90.00%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 80.00%

MAIN S/BOARD 0.00% 0.00%

LPS 88.27% 43.58%

PA NA NA

SMATV 93.03% 55.64%

CCTV NA NA

ICT 100.00% 33.12%

KUARTERS KELAS ‘F’ ( 4 TINGKAT )

KUARTERS KELAS ‘F’ ( 5 TINGKAT )

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 71.62% 92.42% 20.80%

JAN 09’ 73.24% 92.63% 19.39%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G (1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT)

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 77.14% 90.00%

SUBMAIN CABLE 0.00% 90.00%

DB 0.00% 0.00%

LUMINAIRE 0.00% 90.00%

MAIN S/BOARD 0.00% 0.00%

LPS 97.10% 56.32%

PA NA NA

SMATV 97.10% 56.32%

CCTV NA NA

ICT 100.00% 29.36%

KUARTERS KELAS ‘G’ ( 5 TINGKAT )

KUARTERS KELAS ‘G’ ( 4 TINGKAT )

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 93.89% 92.14% -1.75%

JAN 09’ 96.42% 94.87% -1.55%

MECHANICAL PLANNED

ACTUAL

AIR COND 80.00% 85.00%

FIRE FIGHTING 48.65% 39.65%

KITCHEN EQUIP. 0.00% 0.00%

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 78.76%

SUBMAIN CABLE 100.00% 5.87%

DB 100.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 100.00% 0.00%

LPS 100.00% 0.00%

PA 100.00% 8.53%

SMATV 100.00% 58.65%

CCTV NA NA

ICT 100.00% 0.00%

DEWAN MAKAN

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 76.37% 89.04% 12.68%

JAN 09’ 81.74% 91.05% 9.30%

MECHANICAL PLANNED

ACTUAL

AIR COND 50.00% 12.34%

FIRE FIGHTING 38.16% 67.75%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & B

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 39.29% 80.43%

SUBMAIN CABLE 0.00% 25.97%

DB 0.00% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 60.27% 32.87%

PA 49.93% 17.74%

SMATV 38.80% 43.53%

CCTV 18.72% 21.65%

ICT 81.53% 7.32%

ASRAMA LELAKI A & B

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 65.45% 90.09% 24.63%

JAN 09’ 72.72% 93.81% 21.09%

MECHANICAL PLANNED

ACTUAL

AIR COND 0.00% 12.43%

FIRE FIGHTING 21.14% 68.94%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & D

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 55.95% 90.56%

SUBMAIN CABLE 0.00% 32.87%

DB 0.00% 0.00%

LUMINAIRE 0.00% 45.87%

MAIN S/BOARD 0.00% 0.00%

LPS 51.58% 32.53%

PA 0.00% 21.43%

SMATV 0.00% 42.56%

CCTV 0.00% 24.65%

ICT 0.08% 16.54%

ASRAMA PEREMPUAN C & D

MONTH PLANNED ACTUAL AHEAD / DELAY

DEC 08’ 63.83% 71.39% 7.57%

JAN 09’ 74.66% 78.73% 4.07%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 0.00% 0.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - SURAU

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 0.00% 16.89%

SUBMAIN CABLE 0.00% 90.00%

DB NA NA

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 0.00% 0.00%

LPS 32.45% 34.93%

PA 0.00% 3.25%

SMATV NA NA

CCTV NA NA

ICT NA NA

SURAU

MONTH PLANNED ACTUAL AHEAD / DELAY

JAN 09’ 79.98% 87.62% 7.64%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 0.00% 0.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - ASTAKA

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 90.00%

SUBMAIN CABLE 100.00% 90.00%

DB 85.71% 0.00%

LUMINAIRE 0.00% 0.00%

MAIN S/BOARD 50.00% 0.00%

LPS 59.67% 0.00%

PA 100.00% 1.91%

SMATV NA NA

CCTV NA NA

ICT NA NA

BANGUNAN SOKONGAN

ASTAKA

MONTH PLANNED ACTUAL AHEAD / DELAY

JAN 09’ 73.27% 88.10% 14.83%

MECHANICAL PLANNED

ACTUAL

AIR COND 89.98% 60.96%

FIRE FIGHTING 2.78% 0.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. 0.00% 0.00%

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 87.76%

SUBMAIN CABLE 100.00% 0.00%

DB 100.00% 0.00%

LUMINAIRE 0.00% 15.00%

MAIN S/BOARD 87.50% 35.67%

LPS NA NA

PA NA NA

SMATV NA NA

CCTV NA NA

ICT NA NA

BANGUNAN SOKONGAN

M&E PLANT ROOM - BENGKEL

BANGUNAN SOKONGAN

M&E PLANT ROOM – PUSAT SUMBER

PEMBINAAN PINTU MASUK UTAMA

BANGUNAN SOKONGAN

GARAJ KENDERAAN

ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK

WAKAF

LALUAN BERBUMBUNG

OPEN PLAZA

KERJA INFRA – JALAN UTAMA

GELANGGANG PERMAINAN - FUTSAL

COATED CHAIN LINK FENCING

M&E INSTALLATION

M&E INSTALLATION

M&E INSTALLATION

M&E INSTALLATION

• SEKIAN TERIMA KASIH