2. daftar quantitas

Upload: ryanfakhrozie

Post on 07-Aug-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 2. Daftar Quantitas

    1/8

     

    ()

    ()

    1   1,000  850.000,00  850.000,00 

    2   1,000  350.000,00  350.000,00 

    3   1,000  1.646.890,56  1.646.890,56 

     

     

    1   2013 .2.3.1.1. 17,697  3 66.250,00  1.172.401,40 

    2   2013 .2.3.1.9. 5,800  3 22.040,00  127.832,00 

    3   2013 .2.3.1.11   5,208  3 151.420,00 788.595,36 

    4   2013 .2.3.1.11.   15,728  3 119.140,00  1.873.878,60 

     

     

    1  . 1 : 4   2013   .3.2.1.2.   15,138  3 1.122.507,50  16.992.518,54 

    2  1/2 . 1 : 4   2013   .4.4.1.9   2,373  2 106.859,00  253.576,40 

     

     

    1  15/20   2013   .4.1.1.29..   1,357  2 4.770.051,50  6.473.913,90 

    2    2013   .4.1.1.35.   61,200  ' 90.692,80  5.550.399,36 

    3  15/30   2013 .4.1.1.32. 0,191  3 6.327.121,50  1.208.480,21 

    4  2013 .4.1.1.36. 67,000  ' 114.863,50  7.695.854,50 

    5    2013   ..4.1.1.4.   2,109  3 1.055.435,95  2.225.914,43 

    6    2013   .4.1.1.32..   0,210  3 6.363.901,50  1.336.419,32 

    7    2013   .4.1.1.32..   0,547  3 6.363.901,50  3.481.054,12 

     

     

    1  1/2 . 1 : 4   2013   .4.4.1.9   166,959  2 106.859,00  17.841.071,78 

    2  40 40   2013 .4.4.3.34.. 62,340  2 234.597,30  14.624.795,68 

    3  40 40   2013 .4.4.3.34.. 7,344  2 241.227,30  1.771.573,30 

    4  . 1 : 4   2013   .4.4.2.4   336,918  2 58.758,30  19.796.728,92 

    5  / 2020   2013   .4.4.3.36.. 3,423  2 193.455,50  662.198,18 

     

     

    1  6/12   2013 .4.6.1.1.   0,724  3 9.531.435,000  6.900.758,94 

    2    2013 .4.6.1.5..   11,130  2 671.174,000  7.470.166,62 

    3    2013 .4.6.1.5.. 1,512  2 745.574,000  1.127.307,89 

    4    2013 .4.6.1.6.. 8,424  2 497.394,400  4.190.050,43 

    5    2013 .4.6.2.17.. 0,967  2 170.551,500  164.923,30 

    6    2013 .4.6.2.17.. 8,208  2 170.551,500  1.399.886,71 

    7    2013 .4.6.2.2. 6,000  251.315,000  1.507.890,00 

    8    2013 .4.6.2.5. 24,000  76.311,500  1.831.476,00 

    9    2013 .4.6.2.6. 30,000  54.611,500  1.638.345,00 

    10    6,000  30.000,000  180.000,00 

    11    15,000  15.000,000  225.000,00 

    12  2013   .4.6.2.9. 30,000  32.911,500  987.345,00 

    13  15,000  15.500,000  232.500,00 

     

     

    1    118,058  2 198.400,000  23.422.707,20 

    2    2013 .4.5.2.32. 118,058  2 132.285,000  15.617.302,53 

    3    2013   .4.5.2.36.   23,120  ' 70.667,500  1.633.832,60 

    4  =20 =8   2013   .4.6.1.21..   41,000  ' 58.580,000  2.401.780,00 

    5    2013 .4.6.1.19. 90,363  2 121.210,740  10.952.966,10 

    6  3,5   2013   .4.5.1.7..   90,363  2 43.757,500  3.954.058,97 

    7  2013 .4.5.1.9. 141,500  ' 32.606,500  4.613.819,75 

     

     

    1  +   9,000  215.000,00  1.935.000,00 

    2  + 3,000    215.000,00  645.000,00 

    3    9,000  54.000,00  486.000,00 

    4  + 1,000  215.000,00  215.000,00 

     

  • 8/19/2019 2. Daftar Quantitas

    2/8

     

    1 . 2013 .5.1.12.   1,000  573.575,00  573.575,00 

    2 .   2013 .5.1.1.19.   1,000  71.225,00  71.225,00 

    3 .   2013 .5.1.1.14.   1,000  32.855,00  32.855,00 

    4 . 3/4"   2013 .5.1.1.26.   16,000  ' 19.962,45  319.399,20 

    5 . 2"   2013 .5.1.1.29.   16,000  ' 43.062,88  689.006,00 

    6 . 4"   2013   .5.1.1.32. 8,000  ' 110.651,50  885.212,00 

    7 . 1,000  204.600,00  204.600,00 

    8 .

    .   2013 .2.3.1.1.   5,008  3 66.250,00  331.780,00 

      2013 .2.3.1.11.   0,138  3 151.420,00  20.895,96 

      2013 ..4.1.1.4.   0,220  3 1.055.435,95  232.195,91 

    . 1/2 . 1:4   2013 .4.4.1.9   12,570  2 106.859,00  1.343.217,63 

    1 : 4 2013 .4.4.2.4   11,145  3 58.758,30  654.861,26 

    2013 .4.1.1.32..   0,436  3 6.363.901,50  2.774.661,05 

    . 4"   2013 .5.1.1.32.   4,000  ' 110.651,50  442.606,00 

     

    1  2013 .4.7.1.10..   333,918  2 19.846,35  6.627.053,50 

    2  2013 .4.7.1.10..   98,563  2 19.846,35  1.956.115,79 

    3  2013 .4.7.1.4..   66,281  2 40.458,00  2.681.596,70 

     

     

     

    1   2013 .2.3.1.1. 8,844  3 66.250,00  585.915,00 2   2014 .2.3.1.9   2,948  3 22.040,00  64.973,92 

    3 2015 2.3.1.11.   0,884  3 151.420,00  133.855,28 

     

    1 . 1 : 4 2013 .3.2.1.2. 9,618  3 1.122.507,50  10.796.277,13 

     

     

     

     

     

     

    %

    %

    %

    %

  • 8/19/2019 2. Daftar Quantitas

    3/8

    AHSPCK-2013 A.2.3.1.1. Penggalian 1 M3 Tanah Biasa Sedalam 1 m'

    Pekerja OH 0,7500 84.000,00  63.000,00 

    Mandor OH 0,0250 130.000,00  3.250,00 

    66.250,00 

    AHSPCK-2013 A.2.3.1.9. Pengurungan Kembali 1 M3 Galian Tanah

    Pekerja OH 0,2500 84.000,00  21.000,00 

    Mandor OH 0,0080 130.000,00  1.040,00 

    22.040,00 

    AHSPCK-2013 A.2.3.1.11. Pengurugan 1 M3 Dengan Pasir Urug

    Parir Urug M3 1,2000 104.100,00  124.920,00 

    Pekerjaan OH 0,3000 84.000,00  25.200,00 

    Mandor OH 0,0100 130.000,00  1.300,00 

    151.420,00 

    AHSPCK-2013 A.2.3.1.11.a. Pengurungan 1 M3 Dengan Tanah urug

    Tanah Urug M3 1,2000 77.200,00  92.640,00 

    Pekerjaan OH 0,3000 84.000,00  25.200,00 

    Mandor OH 0,0100 130.000,00  1.300,00 

    119.140,00 

    AHSPCK-2013 A.3.2.1.2. Pemasangan 1 M3 Pondasi Batu Belah Campuran 1SP : 4 PP

    Batu Belah M3 1,2000 480.000,00  576.000,00 

    Semen pc Kg 163,0000 1.620,00  264.060,00 

    Pasir Pasang M3 0,5200 98.000,00  50.960,00 

    Pekerja OH 1,5000 84.000,00  126.000,00 

    Tukang batu OH 0,7500 115.000,00  86.250,00 

    Kepala Tukang OH 0,0750 126.500,00  9.487,50 

    Mandor OH 0,0750 130.000,00  9.750,00 

    1.122.507,50 

    AHSPCK-2013 A.A.4.1.1.4. Membuat 1 M3 Lantai Kerja Beton Mutu fc= 7,4 Mpa (K 100), Slump (3-6) cm, w/c =0,87

    Portland Cement Kg 230,0000 1.620,00  372.600,00 

    Pasir Beton Kg 893,0369 74,36  66.403,81 

    Kerikil (max. 30 mm) Kg 1027,0065 450,15  462.302,15 

    Air Liter 200,0000 100,00  20.000,00 

    Pekerja Oh 1,2000 84.000,00  100.800,00 

    Tukang batu Oh 0,2000 115.000,00  23.000,00 

    Kepala Tukang Oh 0,0200 126.500,00  2.530,00 

    Mandor Oh 0,0600 130.000,00  7.800,00 

    1.055.435,95 

    AHSPCK-2013 A.4.1.1.29.a. Membuat 1 M3 sloof Beton Bertulang (150 kg besi + bekisting), Uk. 15x18 cm

    Kayu kelas III M3 0,2700 1.800.000,00  486.000,00 

    Paku 5 - 12 cm Kg 2,0000 16.150,00  32.300,00 

    Minyak Bikisting Liter 0,6000 7.000,00  4.200,00 

    Besi Polos Kg 157,5000 13.800,00  2.173.500,00 

    Kawat Beton Kg 3,0000 20.100,00  60.300,00 

    Semen pc Kg 336,0000 1.620,00  544.320,00 

    Pasir Beton M3 0,5400 98.000,00  52.920,00 

    Kerikil M3 0,8100 607.700,00  492.237,00 

    Pekerja Oh 5,6500 84.000,00  474.600,00 

    Tukang batu Oh 0,2750 115.000,00  31.625,00 

    Tukang kayu Oh 1,5600 115.000,00  179.400,00 

    Tukang besi Oh 1,4000 115.000,00  161.000,00 Kepala Tukang Oh 0,3230 126.500,00  40.859,50 

    Mandor Oh 0,2830 130.000,00  36.790,00 

    4.770.051,50 

    AHSPCK-2013 A.4.1.1.36. Membuat 1 M' Ring Blok Bertulang (10 x 15) cm

    Kayu Kelas III M3 0,0030 1.800.000,00  5.400,00 

    Paku 5-12 cm Kg 0,0200 16.150,00  323,00 

    Besi Polos Kg 3,6000 13.800,00  49.680,00 

    Kawat Beton Kg 0,0500 20.100,00  1.005,00 

    Semen PC Kg 5,5000 1.620,00  8.910,00 

    Pasir Beton M3 0,0090 98.000,00  882,00 

    Kerikil M3 0,0150 607.700,00  9.115,50 

    Pekerja Oh 0,2970 84.000,00  24.948,00 

    Tukang Batu Oh 0,0330 115.000,00  3.795,00 

    Tukang Kayu Oh 0,0330 115.000,00  3.795,00 

    Tukang Besi Oh 0,0330 115.000,00  3.795,00 

    Kepala Tukang Oh 0,0100 126.500,00  1.265,00 

    Mandor Oh 0,0150 130.000,00  1.950,00 114.863,50 

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    DAFTAR ANALISA

    Kebutuhan satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

    Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

  • 8/19/2019 2. Daftar Quantitas

    4/8

    AHSPCK-2013 A.4.1.1.32. Membuat 1 M3 Kolom Beton Bertulang (150 kg besi + bekisting)

    Kayu Kelas III M3 0,3200 1.800.000,00  576.000,00 

    Paku 5 - 12 cm Kg 3,2000 16.150,00  51.680,00 

    Minyak bekisting Liter 1,6000 7.000,00  11.200,00 

    Besi Polos Kg 157,5000 13.800,00  2.173.500,00 

    Kawat Beton Kg 2,2500 20.100,00  45.225,00 

    Semen PC Kg 336,0000 1.620,00  544.320,00 

    Pasir Beton M3 0,5400 98.000,00  52.920,00 

    Kerikil M3 0,8100 607.700,00  492.237,00 

    Kayu Kelas III M3 0,1200 1.800.000,00  216.000,00 

    Playwood 9 mm Lembar 2,8000 176.000,00  492.800,00 

    dolken kayu ϕ (8-10) cm Batang 32,0000 21.000,00  672.000,00 

    Pekerja Oh 6,3500 84.000,00  533.400,00 

    Tukang batu Oh 0,2750 115.000,00  31.625,00 

    Tukang kayu Oh 1,6500 115.000,00  189.750,00 

    Tukang Besi Oh 1,4000 115.000,00  161.000,00 

    Kepala Tukang Oh 0,3330 126.500,00  42.124,50 

    Mandor Oh 0,3180 130.000,00  41.340,00 

    6.327.121,50 

    AHSPCK-2013 A.4.1.1.35. Membuat 1 M' Kolom Praktis Beton Bertulang (11 x 11) cm

    Kayu Kelas III 0,0020  1.800.000,00  3.600,00 

    Paku 5-12 cm 0,0100  16.150,00  161,50 

    Besi Polos 3,0000  13.800,00  41.400,00 

    Kawat Beton 0,4500  20.100,00  9.045,00 

    Semen PC 4,0000  1.620,00  6.480,00 

    Pasir Beton 0,0060  98.000,00  588,00 

    Kerikil 0,0090  607.700,00  5.469,30 

    Pekerja 0,1800  84.000,00  15.120,00 

    Tukang batu 0,0200  115.000,00  2.300,00 

    Tukang kayu 0,0200  115.000,00  2.300,00 

    Tukang Besi 0,0200  115.000,00  2.300,00 

    Kepala Tukang 0,0060  126.500,00  759,00 

    Mandor 0,0090  130.000,00  1.170,00 

    90.692,80 

    AHSPCK-2013 A.4.1.1.32.a. Membuat 1 M3 Plat Beton Bertulang (150 kg besi + bakesting)

    Papan Kelas III M3 0,3200  1.800.000,00  576.000,00 

    Paku 5 - 12 cm Kg 3,2000  16.150,00  51.680,00 

    Minyak Bekisting Liter 0,2000  7.000,00  1.400,00 

    Besi Polos Kg 157,5000  13.800,00  2.173.500,00 

    Kawat beton Kg 2,2500  20.100,00  45.225,00 

    Semen PC Kg 336,0000  1.620,00  544.320,00 

    Pasir beton M3 0,5400  98.000,00  52.920,00 

    Kerikil M3 0,8100  607.700,00  492.237,00 

    Kayu kelas II balok M3 0,1200  3.723.100,00  446.772,00 

    Plywood 9 mm Lembar 2,8000  176.000,00  492.800,00 dolken kayu ϕ (8-10) cm Batang 32,0000  21.000,00  672.000,00 

    Pekerja Oh 5,3000  84.000,00  445.200,00 

    Tukang Batu Oh 0,2750  115.000,00  31.625,00 

    Tukang Kayu Oh 1,3000  115.000,00  149.500,00 

    Tukang Besi Oh 1,0500  115.000,00  120.750,00 

    Kepala Tukang Oh 0,2650  126.500,00  33.522,50 

    Mandor Oh 0,2650  130.000,00  34.450,00 

    6.363.901,50 

    AHSPCK-2013 A.4.4.1.9. Pemasangan 1 m2 Dinding Bata Merah ( 5 x 11 x 22 ) cm Tebal 1/2 Batu Campuran 1 SP : 4 PP

    Bata Merah Buah 70,0000  630,00  44.100,00 

    Portland cement Kg 11,5000  1.620,00  18.630,00 

    Pasir Pasang M3 0,0430  98.000,00  4.214,00 

    Pekerja Oh 0,3000  84.000,00  25.200,00 

    Tukang batu Oh 0,1000  115.000,00  11.500,00 

    Kepala Tukang Oh 0,0100  126.500,00  1.265,00 

    Mandor Oh 0,0150  130.000,00  1.950,00 

    106.859,00 

    AHSPCK-2013 A.4.4.2.4. Pemasangan Plesteran 1 PC : 4 PP tebal 15 mm

    Portland cement Kg 6,2400  1.620,00  10.108,80 

    Pasir pasang M3 0,0240  98.000,00  2.352,00 

    Pekerja Oh 0,3000  84.000,00  25.200,00 

    Tukang batu Oh 0,1500  115.000,00  17.250,00 

    Kepala Tukang Oh 0,0150  126.500,00  1.897,50 

    Mandor Oh 0,0150  130.000,00  1.950,00 

    58.758,30 

    AHSPCK-2013 A.4.7.1.10.a. Pengecetan 1 M2 tembok Baru (1 lapis cat dasar, 2 lapis cat penutup)

    Cat Dasar Kg 0,1000  27.040,00  2.704,00 

    Cat Penutup Kg 0,2600  27.040,00  7.030,40 

    Pekerja Oh 0,0200  84.000,00  1.680,00 

    Tukang Cat Oh 0,0630  115.000,00  7.245,00 

    Kepala Tukang Oh 0,0063  126.500,00  796,95 

    Mandor Oh 0,0030  130.000,00  390,00 

    19.846,35 

    AHSPCK-2013 A.4.7.1.10.a. Pengecetan 1 M2 tembok Baru (1 lapis cat dasar, 2 lapis cat penutup)

    Cat Dasar Kg 0,1000  48.000,00  4.800,00 

    Cat Penutup Kg 0,2600  48.000,00  12.480,00 

    Pekerja Oh 0,0200  84.000,00  1.680,00 

    Tukang Cat Oh 0,0630  115.000,00  7.245,00 

    Kepala Tukang Oh 0,0063  126.500,00  796,95 

    Mandor Oh 0,0030  130.000,00  390,00 

    27.391,95 

    Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

  • 8/19/2019 2. Daftar Quantitas

    5/8

    AHSPCK-2013 A.4.7.1.4.a. Pengecetan 1 M2 Bidang Kayu Baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

    Plamir Kayu Kg 0,1500  70.050,0000  10.507,50 

    Cat Dasar Kg 0,1700  47.150,0000  8.015,50 

    Cat Penutup Kg 0,2600  53.350,0000  13.871,00 

    Pekerja Oh 0,0700  84.000,0000  5.880,00 

    Tukang Cat Oh 0,0090  115.000,0000  1.035,00 

    Kepala Tukang Oh 0,0060  126.500,0000  759,00 

    Mandor Oh 0,0030  130.000,0000  390,00 

    40.458,00 

    AHSPCK-2013 A.4.4.3.34.a. Pemasangan 1 M2 Lantai Keramik Ukuran 40x40 cm, kasar

    Ubin Keramik Bh 6,6300  16.666,67  110.500,00 

    Semen Portland Kg 8,1900  1.620,00  13.267,80 

    Pasir Pasang M3 0,0450  98.000,00  4.410,00 

    Semen Putih Kg 1,6200  3.100,00  5.022,00 

    Pekerja Oh 0,7000  84.000,00  58.800,00 

    Tukang batu Oh 0,3500  115.000,00  40.250,00 

    Kepala Tukang Oh 0,0350  126.500,00  4.427,50 

    Mandor Oh 0,0350  130.000,00  4.550,00 

    241.227,30 

    AHSPCK-2013 A.4.4.3.34.b. Pemasangan 1 m2 Lantai Keramik Ukuran 40x40 cm, polos

    Ubin Keramik Bh 6,6300  15.666,67  103.870,00 

    Semen Portland Kg 8,1900  1.620,00  13.267,80 

    Pasir Pasang M3 0,0450  98.000,00  4.410,00 

    Semen Putih Kg 1,6200  3.100,00  5.022,00 

    Pekerja Oh 0,7000  84.000,00  58.800,00 

    Tukang batu Oh 0,3500  115.000,00  40.250,00 

    Kepala Tukang Oh 0,0350  126.500,00  4.427,50 

    Mandor Oh 0,0350  130.000,00  4.550,00 

    234.597,30 

    AHSPCK-2013 A.4.4.3.36.a. Pemasangan 1 m2 Lantai Keramik Ukuran 20x20 cm

    Ubin Keramik Bh 26,5000  2.232,00  59.148,00 

    Semen Portland Kg 10,4000  1.620,00  16.848,00 

    Pasir Pasang M3 0,0450  98.000,00  4.410,00 

    Semen Putih Kg 1,6200  3.100,00  5.022,00 

    Pekerja Oh 0,7000  84.000,00  58.800,00 

    Tukang batu Oh 0,3500  115.000,00  40.250,00 

    Kepala Tukang Oh 0,0350  126.500,00  4.427,50 

    Mandor Oh 0,0350  130.000,00  4.550,00 

    193.455,50 

    AHSPCK-2013 A.4.6.1.1.a. Pembuatan & Pemasangan 1 M3 Kusen Pintu dan Jendela, Kayu Kelas I

    Balok Kayu M3 1,1000  5.583.100,00  6.141.410,00 

    Paku Kg 1,2500  22.300,00  27.875,00 

    Lem Kayu Kg 1,0000  48.000,00  48.000,00 

    Pekerja Oh 7,0000  84.000,00  588.000,00 

    Tukang kayu Oh 21,0000  115.000,00  2.415.000,00 

    Kepala Tukang Oh 2,1000  126.500,00  265.650,00 

    Mandor Oh 0,3500  130.000,00  45.500,00 

    9.531.435,00 

    AHSPCK-2013 A.4.6.1.5.a. Pembuatan dan Pemasangan 1 M2 Pintu Panel, Kayu Ulin

    Papan Ulin M3 0,0400 6.203.100,00  248.124,00 

    Lem Kayu Kg 0,5000 48.000,00  24.000,00 

    Pekerja Oh 1,0000 84.000,00  84.000,00 

    Tukang Kayu Oh 3,0000 115.000,00  345.000,00 

    Kepala Tukang Oh 0,3000 126.500,00  37.950,00 

    Mandor Oh 0,0500 130.000,00  6.500,00 

    745.574,00 

    AHSPCK-2013 A.4.6.1.5.b. Pembuatan dan Pemasangan 1 M2 Pintu Panel, Kayu Kelas II

    Papan Kayu Kelas II M3 0,0400 4.343.100,00  173.724,00 

    Lem Kayu Kg 0,5000 48.000,00  24.000,00 

    Pekerja Oh 1,0000 84.000,00  84.000,00 

    Tukang Kayu Oh 3,0000 115.000,00  345.000,00 

    Kepala Tukang Oh 0,3000 126.500,00  37.950,00 

    Mandor Oh 0,0500 130.000,00  6.500,00 

    671.174,00 

    AHSPCK-2013 A.4.6.1.6.b. Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Kaca, Kayu Kelas II

    Papan Kayu kelas II M3 0,0240 4.343.100,00  104.234,40 

    Lem Kayu Kg 0,3000 48.000,00  14.400,00 

    Pekerja Oh 0,8000 84.000,00  67.200,00 

    Tukang Kayu Oh 2,4000 115.000,00  276.000,00 

    Kepala Tukang Oh 0,2400 126.500,00  30.360,00 

    Mandor Oh 0,0400 130.000,00  5.200,00 

    497.394,40 

    AHSPCK-2013 A.4.6.2.17.a. Pemasangan 1 M2 Kaca Bening Tb. 5 mm

    Kaca Bening Tb. 5 mm M2 1,1000 136.400,00  150.040,00 

    Pekerja Oh 0,0150 84.000,00  1.260,00 

    Tukang Kayu Oh 0,1500 115.000,00  17.250,00 

    Kepala Tukang Oh 0,0150 126.500,00  1.897,50 

    Mandor Oh 0,0008 130.000,00  104,00 

    170.551,50 

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

  • 8/19/2019 2. Daftar Quantitas

    6/8

    AHSPCK-2013 A.4.5.2.32. Pemasangan 1 M2 Atap Genteng Metal

    Genteng Metal M2 1,0200 94.500,00  96.390,00 

    Paku Genteng Metal Kg 0,2000 31.000,00  6.200,00 

    Pekerja Oh 0,2000 84.000,00  16.800,00 

    Tukang Kayu Oh 0,1000 115.000,00  11.500,00 

    Kepala Tukang Oh 0,0100 126.500,00  1.265,00 

    Mandor Oh 0,0010 130.000,00  130,00 

    132.285,00 

    AHSPCK-2013 A.4.5.2.36. Pemasangan 1 M' Nok/Bubungan Genteng Metal

    Nok Genteng Metal Buah 1,1000 24.800,00  27.280,00 

    Paku Genteng Metal Kg 0,0500 31.000,00  1.550,00 

    Pekerja Oh 0,2500 84.000,00  21.000,00 

    Tukang Kayu Oh 0,1500 115.000,00  17.250,00 

    Kepala Tukang Oh 0,0150 126.500,00  1.897,50 

    Mandor Oh 0,0130 130.000,00  1.690,00 

    70.667,50 

    AHSPCK-2013 A.4.6.1.19. Pemasangan 1 M2 Rangka Langit-Langit (50 x100) cm, Kayu Kls. II

    Kaso-kaso 5x5 cm M3 0,0154  3.723.100,00  57.335,74 

    Paku Kayu Kg 0,2000  16.150,00  3.230,00 

    Pekerja Oh 0,1500  84.000,00  12.600,00 

    Tukang Kayu Oh 0,3000  115.000,00  34.500,00 

    Kepala Tukang Oh 0,0300  126.500,00  3.795,00 

    Mandor Oh 0,0750  130.000,00  9.750,00 

    121.210,74 

    AHSPCK-2013 A.4.5.1.7.a.

    Kalsiboard Lembar 0,3640 68.750,00  25.025,00 

    Paku skrup Kg 0,1100  30.000,00  3.300,00 

    Pekerja Oh 0,1000  84.000,00  8.400,00 

    Tukang Kayu Oh 0,0500  115.000,00  5.750,00 

    Kepala Tukang Oh 0,0050  126.500,00  632,50 

    Mandor Oh 0,0050  130.000,00  650,00 

    43.757,50 

    AHSPCK-2013 A.4.6.2.2. Pemasangan 1 Buah Kunci Tanam Biasa

    Kunci tanam Bh 1,0000 186.000,00  186.000,00 

    Pekerja Oh 0,0100 84.000,00  840,00 

    Tukang Kayu Oh 0,5000 115.000,00  57.500,00 

    Kepala Tukang Oh 0,0500 126.500,00  6.325,00 

    Mandor Oh 0,0050 130.000,00  650,00 

    251.315,00 

    AHSPCK-2013 A.4.6.2.5.

    Engsel Pintu Bh 1,0000 55.800,00  55.800,00 

    Pekerja Oh 0,0150 84.000,00  1.260,00 

    Tukang Kayu Oh 0,1500 115.000,00  17.250,00 

    Kepala Tukang Oh 0,0150 126.500,00  1.897,50 

    Mandor Oh 0,0008 130.000,00  104,00 

    76.311,50 

    AHSPCK-2013 A.4.6.2.6.

    Engsel Jendela Bh 1,0000 34.100,00  34.100,00 

    Pekerja Oh 0,0150 84.000,00  1.260,00 

    Tukang Kayu Oh 0,1500 115.000,00  17.250,00 

    Kepala Tukang Oh 0,0150 126.500,00  1.897,50 

    Mandor Oh 0,0008 130.000,00  104,00 

    54.611,50 

    AHSPCK-2013 A.4.6.2.9, Pemasangan 1Buah kalt angin

    Kait Angin Bh 1,0000 12.400,00  12.400,00 

    Pekerja Oh 0,0150 84.000,00  1.260,00 

    Tukang Kayu Oh 0,1500 115.000,00  17.250,00 

    Kepala Tukang Oh 0,0150 126.500,00  1.897,50 

    Mandor Oh 0,0008 130.000,00  104,00 

    32.911,50 

    AHSPCK-2013 A.4.6.1.21.a Pemasangan 1 M' Listplank nusa plank Ukuran (2 x 20) cm,

    Papan calsiedplank M' 1,0500 20.000,00  21.000,00 

    Paku fischer kalsiedboard Kg 0,1000 30.000,00  3.000,00 

    Pekerja Oh 0,1000 84.000,00  8.400,00 

    Tukang Kayu Oh 0,2000 115.000,00  23.000,00 

    Kepala Tukang Oh 0,0200 126.500,00  2.530,00 

    Mandor Oh 0,0050 130.000,00  650,00 

    58.580,00 

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Pemasangan 1 M2 Langit - Langit Kalsiboard Ukuran ( 120 x 240) cm

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Pemasangan 1 Buah Engsel Pintu

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Pemasangan 1Buah engsel jendela kupu-kupu

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

  • 8/19/2019 2. Daftar Quantitas

    7/8

    AHSPCK-2013 A. 4.5.1.9. Pemasangan 1 M' Lits Langit-Langit Kayu Profil

    Lits kayu profil M' 1,0500 20.450,00  21.472,50 

    paku Kg 0,0100 16.150,00  161,50 

    Pekerja Oh 0,0500 84.000,00  4.200,00 

    Tukang Kayu Oh 0,0500 115.000,00  5.750,00 

    Kepala Tukang Oh 0,0050 126.500,00  632,50 

    Mandor Oh 0,0030 130.000,00  390,00 

    32.606,50 

    AHSPCK-2013 A. 5.1.12. Pemasangan 1 buah kloset jongkok porslen

    Kloset jongkok Bh 1,0000 266.600,00  266.600,00 

    Semen PC Kg 6,0000 1.620,00  9.720,00 

    Pasir pasang M3 0,0100 98.000,00  980,00 

    Pekerja Oh 1,0000 84.000,00  84.000,00 

    Tukang Kayu Oh 1,5000 115.000,00  172.500,00 

    Kepala Tukang Oh 0,1500 126.500,00  18.975,00 

    Mandor Oh 0,1600 130.000,00  20.800,00 

    573.575,00 

    AHSPCK-2013 A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"

    Kran air Bh 1,0000 18.600,00  18.600,00 

    seal tape Bh 0,0250 3.000,00  75,00 

    Pekerja Oh 0,0100 84.000,00  840,00 

    Tukang Kayu Oh 0,4000 115.000,00  46.000,00 

    Kepala Tukang Oh 0,0400 126.500,00  5.060,00 

    Mandor Oh 0,0050 130.000,00  650,00 

    71.225,00 

    AHSPCK-2013 A. 5.1.1.14. Pemasangan 1 buah floor drain

    Floor drain Bh 1,0000 18.600,00  18.600,00 

    Pekerja Oh 0,0100 84.000,00  840,00 

    Tukang Kayu Oh 0,1000 115.000,00  11.500,00 

    Kepala Tukang Oh 0,0100 126.500,00  1.265,00 

    Mandor Oh 0,0050 130.000,00  650,00 

    32.855,00 

    AHSPCK-2013 A. 5.1.1.26. Pemasangan 1m' pipa PVC tipe AW dia 3/4"

    Pipa PVC 3/4" M 1,2000 6.820,00  8.184,00 

    Perlengkapan % 0,3500 2.387,00  835,45 

    Pekerja Oh 0,0360 84.000,00  3.024,00 

    Tukang Kayu Oh 0,0600 115.000,00  6.900,00 

    Kepala Tukang Oh 0,0060 126.500,00  759,00 

    Mandor Oh 0,0020 130.000,00  260,00 19.962,45 

    AHSPCK-2013 A. 5.1.1.29. Pemasangan 1m' pipa PVC tipe AW dia 2"

    Pipa PVC 2" M 1,2000 20.150,00  24.180,00 

    Perlengkapan % 0,3500 7.052,50  2.468,38 

    Pekerja Oh 0,0540 84.000,00  4.536,00 

    Tukang Kayu Oh 0,0900 115.000,00  10.350,00 

    Kepala Tukang Oh 0,0090 126.500,00  1.138,50 

    Mandor Oh 0,0030 130.000,00  390,00 

    43.062,88 

    AHSPCK-2013 A. 5.1.1.32. Pemasangan 1m' pipa PVC tipe AW dia 4"

    Pipa PVC 4" M 1,2000 65.100,00  78.120,00 

    Perlengkapan % 0,3500 22.785,00  7.974,75 

    Pekerja Oh 0,0810 84.000,00  6.804,00 

    Tukang Kayu Oh 0,1350 115.000,00  15.525,00 Kepala Tukang Oh 0,0135 126.500,00  1.707,75 

    Mandor Oh 0,0040 130.000,00  520,00 

    110.651,50 

    Penawar,

    CV. JAYA BERSATU

    HALILI HASBULLAH

    Direktur

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.) Jumlah (Rp.)

    Jumlah (Rp.)

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

     Bahan

    Tenaga Kerja

    Jumlah harga per satuan pekerjaan

    Kebutuhan Satuan Index Harga satuan Bahan/Upah (Rp.)

  • 8/19/2019 2. Daftar Quantitas

    8/8

    A. UPAH PEKERJA

    1 Mandor Org / Hr 130.000,00 

    2 Kepala Tukang Batu Org / Hr 125.000,00 

    3 Tukang Batu Org / Hr 113.000,00 

    4 Kepala Tukang Kayu Org / Hr 125.000,00 

    5 Tukang Kayu Org / Hr 113.000,00 

    6 Kepala Tukang Besi Org / Hr 125.000,00 

    7 Tukang Besi Org / Hr 113.000,00 

    8 Kepala Tukang Cat Org / Hr 125.000,00 

    9 Tukang Cat Org / Hr 113.000,00 

    10 Pekerja Org / Hr 84.000,00 

    B. MATERIAL

    II. BAHAN

    1 Atap Metal 40x140 cm ( 1 M2=2 Lbr) Lembar 47.250,00 

    # Atap Metal M2 94.500,00 

    2 Bubungan atap genteng metal Bh 24.800,00 

    3 Pasir Beton M3 98.000,00 

    # Pasir Beton Kg 70,000 

    4 Pasir Urug M3 98.000,00 

    5 Tanah Timbunan M3 77.200,00 

    6 Batu Pecah 2-3 cm M3 607.700,00 

    # Pagar Batu Pecah 2-3cm Kg 450,145 

    7 Bata Merah Bh 630,00 

    8 Batu Belah M3 480.000,00 

    9 Semen PC ( Isi 50Kg/Zak) Zak 81.000,00 

    # Semen PC (Isi 50 Kg/Zak) Kg 1.620,00 

    10 Besi Beton Polos Kg 13.800,00 

    11 Besi Beugel Kg 26.100,00 12 Besi Strip 4 mm - 20 cm Kg 26.100,00 

    13 Mur/Baut Kg 34.800,00 

    14 Balok Kayu Ulin M3 5.583.100,00 

    15 Balok Kayu Kelas II M3 3.723.100,00 

    16 Papan Ulin 2/20 M3 6.203.100,00 

    17 Papan kayu kelas II M3 4.343.100,00 

    18 Kayu Dolken ( Bulat Panjang 4 m) M' 5.250,00 

    # Kayu Dolken ( Bulat Panjang 4 m) Btg 21.000,00 

    19 Kayu Perancah/ Begisting M3 1.800.000,00 

    20 Palywood 3 mm Lembar 62.000,00 

    21 Palywood 9 mm Lembar 176.000,00 

    22 Cat Tembok Kg 27.040,00 

    23 Cat Kilap Kayu Kg 53.350,00 

    24 Cat Kayu Dasar Kg 47.150,00 

    25 Plamur Tembok Kg 47.120,00 

    26 Cat Minie Kg 124.000,00 

    27 Dempul Kayu Kg 70.050,00 

    28 Air Liter 100,00 

    29 Paku Kayu Kg 16.150,00 

    30 Paku Ulin Kg 22.300,00 

    31 Paku plywood/teakwood Kg 27.300,00 

    32 Paku Atap Metal Kg 31.000,00 

    33 Lem Kayu Kg 48.000,00 

    34 Kawat Beton Kg 20.100,00 

    35 Kaca Bening M2 136.400,00 

    36 Minyak Tanah Liter 7.000,00 

    37 Semen Putih Zak 124.000,00 

    # Semen Putih Kg 3.100,00 

    38 Lampu SI. 23 Watt Buah 54.000,00 

    39 Keramik 20x20 M2 55.800,00 

    #Keramik 20x20 Buah 2.232,00 

    40 Keramik 20x25 M2 55.800,00 

    #Keramik 20x25 Buah 2.790,00 

    41 Kloset jongkok Buah 266.600,00 

    42 Ember bak mandi Buah 204.600,00 

    43 Pipa PVC 2" AW Batang 80.600,00 

    #Pipa PVC 2" AW M' 20.150,00 

    44 Pipa PVC 3/4" AW Batang 27.280,00 

    #Pipa PVC 3/4" AW M' 6.820,00 

    45 Pipa PVC 4" AW Batang 260.400,00 

    #Pipa PVC 4" AW M' 65.100,00 

    46 Floor drain Buah 18.600,00 

    47 Kran air Buah 18.600,00 

    48 Seal tape Buah 3.000,00 

    49 MCB Buah 65.000,00 

    50 Kunci Tanam Kuningan Buah 186.000,00 

    51 Engsel Pintu 5 M' Buah 55.800,00 

    52 Engsel Jendela DPJ 3" Buah 34.100,00 

    53 Hak Angin Besar Kuningan Buah 12.400,00 

    54 Grendel Jendela Buah 15.000,00 

    55 Grendel Pintu Buah 30.000,00 

    56 Tarikan Jendela Buah 15.500,00 

    57 Rooster beton Buah 22.000,00 

    58 Keramik 40x40 kasar M2 100.000,00 

    #Keramik 40x40 kasar Buah 16.666,67 

    59 Keramik 40x40 Polos M2 94.000,00 

    #Keramik 40x40 Polos Buah 15.666,67 

    60 Listplank calsied t=8mm M' 20.000,00 

    61 Paku Kalsiedboard Kg 30.000,00 

    62 List profil kayu kelas II M' 20.450,00 

    63 Calsiedboard 3,5mm/ Nusaboard/ Seteranya Lembar 68.750,00 

    64 Talang datar seng plat BJLS 27 lebar 30 cm M' 17.350,00 

    Penawar,

    CV. JAYA BERSATU

    HALILI HASBULLAH

    Direktur

    No. KETERANGAN SATUAN HARGA (Rp.)

    DAFTAR HARGA SATUAN UPAH DAN BAHAN

    No. KETERANGAN SATUAN HARGA (Rp.)