30
SIARAN KHAS SABAH & SARAWAK 2 (UNTUK KERJA-KERJA PEMBINAAN BANGUNAN DAN STRUKTUR) (For Building and Structural Works) JABATAN PERANGKAAN MALAYSIA DEPARTMENT OF STATISTICS, MALAYSIA Special Release Tarikh: 10 Jun 2015 Date: 10 June 2015 MEI MAY 2015

Upload: phungthien

Post on 06-Feb-2018

364 views

Category:

Documents


15 download

TRANSCRIPT

Page 1: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

SIARAN KHAS

SABAH & SARAWAK

2

(UNTUK KERJA-KERJA PEMBINAAN BANGUNAN

DAN STRUKTUR)

(For Building and Structural Works)

JABATAN PERANGKAAN MALAYSIA

DEPARTMENT OF STATISTICS, MALAYSIA

Special Release

Tarikh: 10 Jun 2015

Date: 10 June 2015

MEI MAY

2015

Page 2: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

Ringkasan penemuan

Summary of findings

Jadual 1A : Indeks kos bahan binaan bangunan (Julai 2012=100) mengikut kategori 1

bangunan dan kawasan (tanpa bar keluli)

Table 1A : Buildings materials cost index (July 2012=100) by category of building and

region (without steel bars)

Jadual 1B : Indeks kos bahan binaan bangunan (Julai 2012=100) mengikut kategori 5

bangunan dan kawasan (termasuk bar keluli)

Table 1B : Buildings materials cost index (July 2012=100) by category of building and

region (with steel bars)

Jadual 2 : Indeks harga seunit bagi: 9

Table 2 : Unit price index for:

- Batu bata & dinding/Bricks & wall

- Kaca/Glass

- Batu baur/Aggregates

- Bahan siling/Ceiling materials

- Bahan bumbung/Roofing materials

- Cat/Paints

- Pasir/Sand

- Bahan kerja paip/Plumbing materials

- Jubin lantai & dinding/Floor & wall tiles

- Lengkapan kebersihan/Sanitary fittings

- Keratan keluli & logam/Steel & metal sections

- Kayu/Timber

- Papan lapis/Plywood

- Konkrit sedia bancuh/Ready mix concrete

- Barang besi/Ironmongeries

Lampiran A Jadual faktor pelarasan (Indeks tanpa bar keluli) 15

Appendix A Adjustment factor table (Index without steel bars)

Lampiran B Jadual faktor pelarasan (Indeks termasuk bar keluli) 16

Appendix B Adjustment factor table (Index with steel bars)

Lampiran C Contoh mengira indeks lama IKB (Julai 2007=100) dengan 17

menggunakan indeks baru IKB (Julai 2012=100)Appendix C Example for calculating the old BCI (July 2007=100) using the

new index BCI (July 2012=100)

Nota teknikal 19

Technical notes

Jadual tarikh pengeluaran Siaran Khas 2 (Untuk Kerja-kerja Pembinaan Bangunan 21

dan Struktur), Sabah & Sarawak, Januari-Disember 2015Schedule of release dates for Special Release 2 (For Building and Structural Works),

Sabah & Sarawak, January-December 2015

KANDUNGANCONTENTS

iii

Muka suratPage

i

Page 3: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

RINGKASAN PENEMUAN SUMMARY OF FINDINGS

Page 4: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

iii

Indeks Kos Bahan Binaan Bangunan

Mei 2015

Building Material Cost Index

May 2015

Sabah

Indeks Kos Bahan Binaan Bangunan (IKB)

(tanpa bar keluli dan termasuk bar keluli) pada

Mei 2015 bagi beberapa kategori bangunan di

Sabah mencatatkan peningkatan berbanding

April 2015. (Jadual 1A & 1B)

IKB (tanpa bar keluli) yang menunjukkan

perubahan sebanyak 0.1 peratus adalah

kategori bangunan (K.T.) satu tingkat di Kota

Kinabalu dan Tawau; bangunan (K.T.) 2-4

tingkat (berbumbung rata) di Kota Kinabalu dan

Tawau; bangunan (K.T.) 5 tingkat dan lebih

(untuk penginapan) di Sandakan dan bangunan

(K.T.) 5 tingkat dan lebih (untuk pejabat) di Kota

Kinabalu dan Sandakan. (Jadual 1A)

Manakala IKB (termasuk bar keluli) yang

menunjukkan peningkatan sebanyak

0.1 peratus adalah bagi kategori bangunan

(K.T.) satu tingkat di Kota Kinabalu; bangunan

(K.T.) 2-4 tingkat (berbumbung curam)

di semua kawasan; bangunan (K.T.) 5 tingkat

dan lebih (untuk penginapan) di Kota Kinabalu

dan Sandakan; dan bangunan (K.T.) 5 tingkat

dan lebih (untuk pejabat) di Kota Kinabalu.

(Jadual 1B)

Sebaliknya, IKB (tanpa bar keluli dan termasuk

bar keluli) bagi kerangka besi satu tingkat

(bangunan) dan kerangka besi satu tingkat

(menara sahaja) di Kota Kinabalu menunjukkan

penurunan berbanding bulan sebelumnya.

(Jadual 1A & 1B)

Sabah

The Building Material Cost Index (BCI)

(without steel bars and with steel bars) in May

2015 for several building categories in Sabah

recorded increases as compared to April

2015. (Table 1A & 1B)

The BCI (without steel bars) which showed

increases of 0.1 per cent were single storey

(R.C.) building in Kota Kinabalu and Tawau;

2-4 storey (R.C.) building (flat roof) in Kota

Kinabalu and Tawau; 5 storey and above

(R.C.) building (for accommodation) in

Sandakan and 5 storey and above (R.C.)

building (for office) in Kota Kinabalu and

Sandakan. (Table 1A)

Meanwhile BCI (with steel bars) which showed

increases of 0.1 per cent were single storey

(R.C.) building in Kota Kinabalu; 2-4 storey

(R.C.) building (pitched roof) in all regions; 5

storey and above (R.C.) building (for

accommodation) in Kota Kinabalu and

Sandakan; and 5 storey and above (R.C.)

building (for office) in Kota Kinabalu.

(Table 1B)

However, the BCI (without steel bars and with

steel bars) for single storey steel frame

(building) and single storey steel frame (tower

only) in Kota Kinabalu showed a decrease in

Kota Kinabalu compared to the previous

month. (Table 1A & 1B)

Page 5: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

iv

Indeks harga seunit yang menunjukkan

perubahan di Kota Kinabalu adalah bahan siling

(1.1 mata); keratan keluli & logam (-1.7 mata)

dan bahan kerja paip (1.0 mata). Di Sandakan,

indeks harga seunit bagi bahan kerja paip dan

cat masing-masing meningkat sebanyak 0.6 dan

0.1 mata. Manakala di Tawau, indeks harga

seunit bagi bahan kerja paip sahaja yang

menunjukkan peningkatan sebanyak 1.0 mata.

(Jadual 2)

The unit price index that showed

changes in Kota Kinabalu were ceiling

materials (1.1 points); steel & metal sections

(-1.7 points) and plumbing materials

(1.0 points). In Sandakan, the unit price index

for plumbing materials and paints increased by

0.1 points respectively. Meanwhile in Tawau,

unit price index for plumbing materials only

showed an increase of 1.0 points. (Table 2)

Page 6: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

v

Sarawak

Indeks Kos Bahan Binaan Bangunan (IKB)

(tanpa bar keluli dan termasuk bar keluli) di

Kuching dan Miri mencatatkan peningkatan bagi

semua kategori bangunan berbanding April

2015. (Jadual 1A & 1B)

Walau bagaimanapun, IKB (termasuk bar keluli)

di Sibu menunjukkan penurunan bagi kategori

bangunan (K.T.) 2-4 tingkat (berbumbung

curam) dan cerucuk (K.T.) berbanding bulan

sebelumnya. Begitu juga IKB (tanpa bar keluli)

bagi cerucuk (K.T.) di Sibu yang mana turut

menunjukkan penurunan dalam tempoh yang

sama. (Jadual 1A & 1B)

Indeks harga seunit bahan binaan yang

menunjukkan perubahan di Sarawak adalah

pasir di Kuching (0.7 mata); batu bata & dinding

di Sibu (0.9 mata) dan Miri (-0.2 mata); keratan

keluli & logam di Kuching (2.3 mata) dan Miri

(-0.2 mata); bahan kerja paip di Kuching

(0.6 mata); jubin lantai & dinding di Kuching

(1.0 mata), Sibu (0.8 mata) dan Miri (0.4 mata);

lengkapan kebersihan di Kuching (1.0 mata) dan

Sibu (1.6 mata); kaca di Miri (1.5 mata); cat di

Kuching (0.2 mata) dan Sibu (-0.3 mata); konkrit

sedia bancuh di Sibu (-0.8 mata) dan Miri

(0.7 mata); dan barang besi di Kuching

(10.6 mata). (Jadual 2)

Sarawak

The BCI (without steel bars and with steel

bars) in Kuching and Miri registered increases

for all building categories as compared to April

2015. (Table 1A & 1B)

However, the BCI (with steel bars) in Sibu

showed decreases for 2-4 storey (R.C.)

building (pitched roof) and (R.C.) piling as

compared to the previous month. The BCI

(without steel bars) for (R.C.) piling in Sibu

also cited a decrease in the same period.

(Table 1A & 1B)

The unit price index of building materials that

showed changes at Sarawak were sand in

Kuching (0.7 points); bricks & wall in Sibu

(0.9 points) and Miri (-0.2 points);

steel & metal sections in Kuching (2.3 points)

and Miri (-0.2 points); plumbing materials in

Kuching (0.6 points); floor & wall tiles in

Kuching (1.0 points), Sibu (0.8 points) and

Miri (0.4 points); sanitary fittings in Kuching

(1.0 points) and Sibu (1.6 points); glass in

Miri (1.5 points); paints in Kuching (0.2 points)

and Sibu (-0.3 points); ready mix concrete in

Sibu (-0.8 points) and Miri (0.7 points); and

ironmongeries in Kuching (10.6 points).

(Table 2).

Page 7: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

INDEKS KOS BAHAN BINAAN BANGUNAN

(JULAI 2012=100) SABAH DAN SARAWAK

BUILDING MATERIALS COST INDEX (JULY 2012=100)

SABAH AND SARAWAK

(INDEKS TANPA BAR KELULI) (INDEX WITHOUT STEEL BARS)

Page 8: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-1-

(1) Bangunan (K.T.) 2014 Dis 100.9 102.6 100.0 101.9 100.9 100.2

Satu Tingkat 2015 Jan 101.0 102.6 100.0 101.9 100.7 100.2

Single - Storey (R.C.) Feb 101.0 102.7 100.0 102.0 100.7 100.2

Building Mac 101.0 102.7 100.0 102.1 100.7 99.8

Apr 103.7 107.3 101.5 105.6 105.4 104.0

Mei 103.8 107.3 101.6 106.1 105.4 104.2

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(2) Bangunan (K.T.) 2014 Dis 100.8 100.8 99.7 103.2 102.4 101.1

2−4 Tingkat 2015 Jan 100.9 100.8 99.7 103.2 102.2 101.1

(Berbumbung Rata) Feb 100.9 100.9 99.7 103.4 102.3 101.0

2−4 Storey (R.C.) Mac 100.9 100.9 99.7 103.6 102.3 100.5

Building (Flat Roof) Apr 103.7 105.1 101.6 107.4 107.1 104.7

Mei 103.8 105.1 101.7 108.0 107.1 104.9

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(3) Bangunan (K.T.) 2014 Dis 100.7 101.1 99.7 102.7 101.7 100.4

2−4 Tingkat 2015 Jan 100.7 101.2 99.7 102.7 101.5 100.5

(Berbumbung Curam) Feb 100.7 101.2 99.7 102.8 101.6 100.4

2−4 Storey (R.C.) Mac 100.7 101.3 99.7 103.0 101.6 99.9

Building (Pitched Roof) Apr 103.4 105.4 101.4 107.0 106.7 104.4

Mei 103.4 105.4 101.4 107.6 106.7 104.6

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note:

K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

(July 2012=100)

K

Kawasan*

Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

(tanpa bar keluli)

Table 1A: Building materials cost index by category of building and region (without steel bars)

Region

(Julai 2012=100)

* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

H IG L

PeriodSabah Sarawak

Kategori bangunan Tempoh

Category of buildingJ

Page 9: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-2-

(4) Bangunan (K.T.) 2014 Dis 100.5 100.4 99.4 102.7 101.8 100.4

5 Tingkat dan Lebih 2015 Jan 100.5 100.4 99.4 102.7 101.6 100.5

(Untuk Penginapan) Feb 100.5 100.5 99.4 102.9 101.7 100.4

5 Storey and Above Mac 100.5 100.5 99.4 103.1 101.7 99.9

(R.C.) Building Apr 103.3 104.4 101.2 107.1 106.8 104.3

(For Accommodation) Mei 103.3 104.5 101.2 107.7 106.8 104.6

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(5) Bangunan (K.T.) 2014 Dis 99.9 100.0 99.1 102.7 101.9 100.3

5 Tingkat dan Lebih 2015 Jan 100.0 100.0 99.1 102.7 101.7 100.4

(Untuk Pejabat) Feb 100.0 100.1 99.1 102.9 101.8 100.3

5 Storey and Above Mac 99.9 100.1 99.1 103.0 101.8 99.8

(R.C.) Building Apr 102.8 104.8 100.8 107.2 106.9 104.3

(For Office) Mei 102.9 104.9 100.8 107.8 106.9 104.5

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(6) Bangunan Kayu 2014 Dis 99.9 101.4 99.6 100.8 100.1 100.5

Timber Building 2015 Jan 99.9 101.5 99.6 100.8 100.1 100.5

Feb 99.9 101.5 99.6 100.8 100.1 100.5

Mac 99.9 101.5 99.6 100.9 100.1 100.5

Apr 101.0 103.9 99.9 102.8 102.6 102.9

Mei 101.0 103.9 99.9 103.1 102.6 102.9

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note:

K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

(July 2012=100)

* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

Kategori bangunan Tempoh

JG

Category of buildingSarawak

H I K L

Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

(tanpa bar keluli) (samb.)

Table 1A: Building materials cost index by category of building and region (without steel bars) (cont'd)

Region

Period

(Julai 2012=100)

Sabah

Kawasan*

Page 10: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-3-

(7) Cerucuk Kayu 2014 Dis 100.0 100.0 100.0 na na na

Timber Piling 2015 Jan 100.0 100.0 100.0 na na na

Feb 100.0 100.0 100.0 na na na

Mac 100.0 100.0 100.0 na na na

Apr 100.0 100.0 100.0 na na na

Mei 100.0 100.0 100.0 na na na

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(8) Cerucuk K.T. 2014 Dis 100.6 99.4 100.9 104.7 104.4 99.6

R.C. Piling 2015 Jan 100.6 99.4 100.9 104.7 103.4 99.6

Feb 100.6 99.4 100.9 104.6 103.4 99.5

Mac 100.6 99.4 100.9 104.6 103.4 97.5

Apr 101.4 100.0 101.6 109.3 108.9 102.4

Mei 101.4 100.0 101.6 109.7 108.4 103.0

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(9) Kerangka Besi 2014 Dis 99.0 101.4 99.6 99.9 98.8 97.8

Satu Tingkat 2015 Jan 99.1 101.5 99.6 99.9 98.4 97.9

(Bangunan) Feb 99.1 101.5 99.6 100.0 98.4 97.7

Single Storey Mac 99.0 101.5 99.6 100.0 98.4 97.4

Steel Frame Apr 101.3 105.2 100.1 103.0 103.5 101.6

(Building) Mei 100.5 105.2 100.1 104.0 103.5 101.6

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note:

na = Tidak diperoleh/Not available

(July 2012=100)

LJG KH I

Region

* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

Sabah SarawakTempoh

(tanpa bar keluli) (samb.)

Table 1A: Building materials cost index by category of building and region (without steel bars) (cont'd)

(Julai 2012=100)

Kawasan*

Kategori bangunan

Category of building Period

Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

Page 11: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-4-

(10) Kerangka Besi 2014 Dis 98.4 99.0 100.0 na na na

Satu Tingkat 2015 Jan 98.5 99.0 100.0 na na na

(Menara Sahaja) Feb 98.5 99.0 100.0 na na na

Single Storey Mac 98.4 99.0 100.0 na na na

Steel Frame Apr 100.8 101.2 100.1 na na na

(Tower Only) Mei 99.2 101.2 100.1 na na na

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note:

K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

na = Tidak diperoleh/Not available

* Kawasan/Region

G = Kota Kinabalu J = Kuching

H = Sandakan K = Sibu

I = Tawau L = Miri

(Julai 2012=100)

(tanpa bar keluli) (samb.)

Table 1A: Building materials cost index by category of building and region (without steel bars) (cont'd)

PeriodI JH

(July 2012=100)

G L

Kategori bangunan Tempoh

K

Sabah Sarawak

Region

Category of building

Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

Kawasan*

Page 12: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

INDEKS KOS BAHAN BINAAN BANGUNAN (JULAI 2012=100)

SABAH DAN SARAWAK

BUILDING MATERIALS COST INDEX (JULY 2012=100)

SABAH AND SARAWAK

(INDEKS TERMASUK BAR KELULI) (INDEX WITH STEEL BARS)

Page 13: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-5-

(1) Bangunan (K.T.) 2014 Dis 98.9 101.2 100.0 100.1 99.1 100.2

Satu Tingkat 2015 Jan 98.9 101.1 100.0 100.1 98.5 100.2

Single - Storey (R.C.) Feb 98.9 101.2 100.0 100.2 98.6 100.1

Building Mac 98.9 101.2 100.0 100.3 98.6 99.8

Apr 101.5 105.5 100.9 103.8 103.0 104.3

Mei 101.6 105.5 100.9 104.3 103.0 104.5

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(2) Bangunan (K.T.) 2014 Dis 98.6 99.6 99.7 100.7 99.9 100.8

2−4 Tingkat 2015 Jan 98.6 99.5 99.7 100.7 99.2 100.8

(Berbumbung Rata) Feb 98.6 99.6 99.7 100.8 99.2 100.8

2−4 Storey (R.C.) Mac 98.6 99.6 99.7 101.0 99.2 100.3

Building (Flat Roof) Apr 101.3 103.5 100.9 104.8 103.6 104.9

Mei 101.3 103.5 100.9 105.3 103.6 105.1

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(3) Bangunan (K.T.) 2014 Dis 98.9 100.1 99.7 100.4 99.5 100.3

2−4 Tingkat 2015 Jan 98.9 100.1 99.7 100.4 98.8 100.3

(Berbumbung Curam) Feb 98.9 100.1 99.7 100.5 98.8 100.3

2−4 Storey (R.C.) Mac 98.9 100.2 99.7 100.7 98.8 99.9

Building (Pitched Roof) Apr 101.4 104.0 100.8 104.6 103.6 104.7

Mei 101.5 104.1 100.9 105.2 103.5 104.9

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note: K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

Kawasan*

(Julai 2012=100)

(July 2012=100)

Jadual 1B : Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

(termasuk bar keluli)

Table 1B : Building materials cost index by category of building and region (with steel bars)

Region

Category of building PeriodSabah

Kategori bangunan TempohSarawak

G H I J K L

* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B

Page 14: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-6-

(4) Bangunan (K.T.) 2014 Dis 98.1 99.1 99.4 100.3 99.4 100.3

5 Tingkat dan Lebih 2015 Jan 98.2 99.1 99.4 100.3 98.6 100.3

(Untuk Penginapan) Feb 98.2 99.1 99.4 100.4 98.7 100.3

5 Storey and Above Mac 98.2 99.2 99.4 100.5 98.7 99.8

(R.C.) Building Apr 100.7 102.8 100.5 104.5 103.4 104.7

(For Accommodation) Mei 100.8 102.9 100.5 105.1 103.4 104.9

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(5) Bangunan (K.T.) 2014 Dis 97.3 98.7 99.2 100.2 99.5 100.2

5 Tingkat dan Lebih 2015 Jan 97.3 98.6 99.2 100.3 98.7 100.2

(Untuk Pejabat) Feb 97.3 98.6 99.2 100.4 98.8 100.2

5 Storey and Above Mac 97.3 98.6 99.2 100.5 98.8 99.8

(R.C.) Building Apr 99.9 102.9 100.1 104.6 103.5 104.6

(For Office) Mei 100.0 102.9 100.1 105.2 103.5 104.8

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(6) Bangunan Kayu 2014 Dis 99.7 101.3 99.6 100.6 99.9 100.5

Timber Building 2015 Jan 99.8 101.3 99.6 100.7 99.9 100.5

Feb 99.8 101.4 99.6 100.7 99.9 100.4

Mac 99.8 101.4 99.6 100.8 99.9 100.5

Apr 100.8 103.8 99.9 102.6 102.4 102.9

Mei 100.8 103.8 99.9 103.0 102.4 103.0

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note: K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

Jadual 1B : Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

Region

(termasuk bar keluli) (samb.)

Table 1B : Building materials cost index by category of building and region (with steel bars) (cont'd)

(Julai 2012=100)

(July 2012=100)

Kawasan*

Kategori bangunan Tempoh

Category of building PeriodSabah Sarawak

K LJG H I

* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B

Page 15: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-7-

(7) Cerucuk Kayu 2014 Dis 100.0 100.0 100.0 na na na

Timber Piling 2015 Jan 100.0 100.0 100.0 na na na

Feb 100.0 100.0 100.0 na na na

Mac 100.0 100.0 100.0 na na na

Apr 100.0 100.0 100.0 na na na

Mei 100.0 100.0 100.0 na na na

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(8) Cerucuk K.T. 2014 Dis 93.8 96.5 100.1 98.8 98.3 99.7

R.C. Piling 2015 Jan 93.8 96.3 100.1 98.8 96.7 99.7

Feb 93.8 96.3 100.1 98.8 96.7 99.6

Mac 93.8 96.3 100.1 98.8 96.7 98.6

Apr 95.2 98.0 99.4 103.1 101.1 104.0

Mei 95.2 98.0 99.4 103.5 100.8 104.2

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(9) Kerangka Besi 2014 Dis 98.7 101.2 99.6 99.3 98.2 98.0

Satu Tingkat 2015 Jan 98.7 101.2 99.6 99.3 97.6 98.0

(Bangunan) Feb 98.7 101.2 99.6 99.3 97.6 97.8

Single Storey Mac 98.7 101.3 99.6 99.3 97.6 97.6

Steel Frame Apr 100.9 104.9 100.0 102.4 102.5 101.9

(Building) Mei 100.1 104.9 100.0 103.4 102.6 102.0

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note: na = Tidak diperoleh/Not available

(termasuk bar keluli) (samb.)

Table 1B : Building materials cost index by category of building and region (with steel bars) (cont'd)

Jadual 1B : Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

Sarawak

(Julai 2012=100)

(July 2012=100)

Kategori bangunan

Kawasan*

RegionTempoh

Category of building PeriodG I

Sabah

K LJH

* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B

Page 16: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-8-

(10) Kerangka Besi 2014 Dis 98.3 98.9 100.0 na na na

Satu Tingkat 2015 Jan 98.4 98.9 100.0 na na na

(Menara Sahaja) Feb 98.4 98.9 100.0 na na na

Single Storey Mac 98.2 98.9 100.0 na na na

Steel Frame Apr 100.6 101.1 100.1 na na na

(Tower Only) Mei 99.1 101.1 100.1 na na na

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Nota/Note: K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete na = Tidak diperoleh/Not available

* Kawasan/Region G = Kota Kinabalu J = Kuching

H = Sandakan K = Sibu

I = Tawau L = Miri

(Julai 2012=100)

(July 2012=100)

Jadual 1B : Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan

(termasuk bar keluli) (samb.)

Table 1B : Building materials cost index by category of building and region (with steel bars) (cont'd)

Category of building Period Sabah SarawakKategori bangunan Tempoh

Kawasan*

J

Region

K LG H I

Page 17: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

INDEKS HARGA SEUNIT BAHAN BINAAN BANGUNAN

(JULAI 2012=100) SABAH DAN SARAWAK

UNIT PRICE INDEX FOR BUILDING MATERIALS

(JULY 2012=100) SABAH AND SARAWAK

Page 18: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-9-

(1) Batu Bata & 2014 Dis 100.4 102.1 100.0 100.6 101.8 102.1

Dinding 2015 Jan 100.4 102.1 100.0 100.6 101.7 102.1

Bricks & Wall Feb 100.4 102.1 100.0 100.6 101.7 102.1

Mac 100.4 102.1 100.0 100.6 101.7 102.1

Apr 103.0 109.6 102.9 106.2 108.7 106.1

Mei 103.0 109.6 102.9 106.2 109.6 105.9

Jun

Jul

Ogos

Sept

Okt

Nov

(2) Kaca 2014 Dis 99.5 99.9 100.0 103.6 105.1 100.0

Glass 2015 Jan 99.5 99.9 100.0 103.6 105.1 100.2

Feb 99.5 99.9 100.0 103.6 105.1 100.2

Mac 99.5 99.9 100.0 103.6 105.1 100.2

Apr 102.0 108.8 100.0 114.6 111.9 106.2

Mei 102.0 108.8 100.0 114.6 111.9 107.7

Jun

Jul

Ogos

Sept

Okt

Nov

(3) Batu Baur 2014 Dis 101.9 102.8 100.4 102.1 103.0 100.4

Aggregates 2015 Jan 101.9 102.8 100.4 102.1 103.0 100.4

Feb 101.2 102.8 100.4 102.1 103.0 100.4

Mac 101.2 102.8 100.4 102.1 103.0 100.4

Apr 102.4 108.9 101.0 108.3 107.1 106.4

Mei 102.4 108.9 101.0 108.3 107.1 106.4

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

sand, plumbing materials, floor & wall tiles, sanitary fittings, steel & metal sections, timber, plywood,

cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli &

logam, kayu, papan lapis, konkrit sedia bancuh dan barang besi

Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood,

(Julai 2012=100)

K L

Sabah

Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,

ready mix concrete and ironmongery

(July 2012=100)Kawasan*

Region

SarawakPerkara Tempoh

Item Period

Bahan binaan

Building materials

I JG H

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

Page 19: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-10-

(4) Bahan Siling 2014 Dis 100.4 104.9 100.0 100.0 102.7 100.0

Ceiling Materials 2015 Jan 100.4 104.9 100.0 100.0 102.7 100.0

Feb 100.4 104.9 100.0 100.0 102.7 100.0

Mac 100.4 104.9 100.0 100.0 102.7 100.0

Apr 105.2 117.4 100.0 94.9 101.9 101.7

Mei 106.3 117.4 100.0 94.9 101.9 101.7

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(5) Bahan Bumbung 2014 Dis 100.4 116.8 100.0 100.4 96.5 100.3

Roofing Materials 2015 Jan 100.4 116.8 100.0 100.4 96.5 100.3

Feb 100.4 116.8 100.0 100.4 96.5 100.3

Mac 100.4 116.8 100.0 100.4 96.5 100.8

Apr 103.2 123.8 100.0 104.8 102.3 106.1

Mei 103.2 123.8 100.0 104.8 102.3 106.1

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(6) Cat 2014 Dis 102.2 100.3 102.4 99.0 99.1 104.0

Paints 2015 Jan 102.2 100.5 102.4 99.1 99.8 104.0

Feb 102.3 100.9 102.4 99.2 99.8 104.0

Mac 102.3 100.9 102.4 99.3 99.8 104.0

Apr 106.1 104.1 105.7 102.5 105.6 109.5

Mei 106.1 104.2 105.7 102.7 105.3 109.5

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Region

(Julai 2012=100)

(July 2012=100)

Kawasan*

Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand, plumbing materials, floor & wall tiles, sanitary fittings, steel & metal sections, timber, plywood,

cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli &

logam, kayu, papan lapis, konkrit sedia bancuh dan barang besi (samb.)

ready mix concrete and ironmongery (cont'd)

Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,

Perkara Tempoh

I J

Item PeriodSabah Sarawak

K L

Bahan binaan

Building materials

G H

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

Page 20: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-11-

(7) Pasir 2014 Dis 105.1 98.1 100.0 99.2 100.0 97.7

Sand 2015 Jan 105.1 98.1 100.0 99.2 100.0 97.7

Feb 105.1 98.1 100.0 99.2 100.0 97.7

Mac 105.1 98.1 100.0 99.2 100.0 97.7

Apr 105.5 100.6 100.0 102.1 106.0 100.6

Mei 105.5 100.6 100.0 102.8 106.0 100.6

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(8) Bahan Kerja Paip 2014 Dis 105.1 100.8 99.2 105.0 100.1 104.7

Plumbing Materials 2015 Jan 105.6 101.1 99.2 105.0 100.1 104.7

Feb 105.6 102.2 99.2 105.0 100.1 104.7

Mac 105.6 103.3 99.2 105.0 100.1 104.7

Apr 107.3 106.8 100.6 107.9 106.2 109.7

Mei 108.3 107.4 101.6 108.5 106.2 109.7

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(9) Jubin Lantai 2014 Dis 104.5 98.9 104.3 109.5 100.0 104.4

& Dinding 2015 Jan 104.5 99.0 104.3 109.5 101.7 104.4

Floor & Feb 104.5 99.0 104.3 112.1 103.0 104.4

Wall Tiles Mac 104.5 99.0 104.3 114.4 103.0 105.4

Apr 106.2 110.1 104.8 119.2 109.8 112.1

Mei 106.2 110.1 104.8 120.2 110.6 112.5

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

ready mix concrete and ironmongery (cont'd)

(Julai 2012=100)

cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli &

logam, kayu, papan lapis, konkrit sedia bancuh dan barang besi (samb.)

Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand, plumbing materials, floor & wall tiles, sanitary fittings, steel & metal sections, timber, plywood,

Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,

(July 2012=100)

Kawasan*

Region

Item PeriodSabah Sarawak

Perkara Tempoh

Bahan binaan

Building materials

G H K LI J

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

Page 21: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-12-

(10) Lengkapan 2014 Dis 104.8 100.0 102.7 104.4 100.0 101.9

Kebersihan 2015 Jan 105.1 100.2 102.7 104.4 100.0 101.9

Sanitary Fittings Feb 105.1 100.6 102.7 104.2 100.0 101.9

Mac 105.1 101.0 102.7 106.6 100.0 101.9

Apr 108.9 105.5 102.4 110.1 106.0 105.6

Mei 108.9 105.5 102.4 111.1 107.6 105.6

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(11) Keratan Keluli & 2014 Dis 98.2 99.0 100.0 94.2 93.2 90.3

Logam 2015 Jan 98.3 99.0 100.0 94.2 91.9 90.3

Steel & Metal Feb 98.3 99.0 100.0 94.1 91.9 89.6

Sections Mac 98.1 99.0 100.0 93.6 91.9 89.4

Apr 100.6 101.2 100.0 94.8 97.1 92.5

Mei 98.9 101.2 100.0 97.1 97.1 92.3

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(12a) Kayu 2014 Dis 100.0 100.0 100.0 100.0 100.0 100.0

Timber 2015 Jan 100.0 100.0 100.0 100.0 100.0 100.0

Feb 100.0 100.0 100.0 100.0 100.0 100.0

Mac 100.0 100.0 100.0 100.0 100.0 100.0

Apr 100.0 100.0 100.0 100.0 100.0 100.0

Mei 100.0 100.0 100.0 100.0 100.0 100.0

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,

ready mix concrete and ironmongery (cont'd)

(Julai 2012=100)

cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli &

logam, kayu, papan lapis, konkrit sedia bancuh dan barang besi (samb.)

Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood,

SarawakPerkara Tempoh

sand, plumbing materials, floor & wall tiles, sanitary fittings, steel & metal sections, timber, plywood,

(July 2012=100)

Kawasan*

Region

Building materials

G H

Item PeriodSabah

K LI J

Bahan binaan

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

Page 22: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

-13-

(12b) Papan Lapis 2014 Dis 82.9 82.9 82.9 103.5 103.5 103.5

Plywood 2015 Jan 82.9 82.9 82.9 103.5 103.5 103.5

Feb 82.9 82.9 82.9 103.5 103.5 103.5

Mac 82.9 82.9 82.9 103.5 103.5 103.5

Apr 82.9 82.9 82.9 103.5 103.5 103.5

Mei 82.9 82.9 82.9 103.5 103.5 103.5

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(13) Konkrit Sedia Bancuh 2014 Dis 101.0 100.0 102.1 107.1 107.0 101.3

Ready Mix Concrete 2015 Jan 101.0 100.0 102.1 107.1 105.9 101.3

Feb 101.0 100.0 102.1 107.1 105.9 101.3

Mac 101.0 100.0 102.1 107.1 105.9 98.6

Apr 101.0 100.0 102.1 113.2 112.2 104.5

Mei 101.0 100.0 102.1 113.2 111.4 105.2

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

(14) Barang Besi 2014 Dis 101.1 102.6 100.0 100.0 101.7 100.0

Ironmongery 2015 Jan 101.1 102.6 100.0 100.0 101.7 100.0

Feb 101.1 102.6 100.0 100.0 101.7 100.0

Mac 101.1 102.6 100.0 100.0 101.7 100.0

Apr 101.6 111.0 100.0 100.0 100.3 106.3

Mei 101.6 111.0 100.0 110.6 100.3 106.3

Jun

Jul

Ogos

Sept

Okt

Nov

Dis

* Kawasan/Region G = Kota Kinabalu J = Kuching

H = Sandakan K = Sibu

I = Tawau L = Miri

Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,

Sarawak

ready mix concrete and ironmongery (cont'd)

(Julai 2012=100)

cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli &

Building materials

Perkara Tempoh

I

logam, kayu, papan lapis, konkrit sedia bancuh dan barang besi (samb.)

Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand, plumbing materials, floor & wall tiles, sanitary fittings, steel & metal sections, timber, plywood,

(July 2012=100)

Kawasan*

Bahan binaan

G H

Region

J K L

Item PeriodSabah

Page 23: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

LAMPIRAN

APPENDIX

Page 24: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

Kategori

Category

G H I J K L

1. Bangunan (K.T.) 1.1575 1.1140 1.0889 1.1373 1.1382 1.1451

Satu Tingkat

Single Storey (R.C.)

Building

2. Bangunan (K.T.) 1.1683 1.1320 1.1039 1.1277 1.1283 1.1417

2−4 Tingkat

(Berbumbung Rata)

2−4 Storey (R.C.)

Building (Flat Roof)

3. Bangunan (K.T.) 1.1645 1.1270 1.1019 1.1491 1.1449 1.1600

2−4 Tingkat

(Berbumbung Curam)

2−4 Storey (R.C.)

Building (Pitched Roof)

4. Bangunan (K.T.) 1.1713 1.1330 1.1069 1.1450 1.1477 1.1580

5 Tingkat dan Lebih

(Untuk Penginapan)

5 Storey and Above

(R.C.) Building

(For Accommodation)

5. Bangunan (K.T.) 1.1775 1.1360 1.1088 1.1510 1.1528 1.1670

5 Tingkat dan Lebih

(Untuk Pejabat)

5 Storey and Above

(R.C.) Building (for Office)

6. Bangunan Kayu

Timber Buildings 1.1417 1.1150 1.1079 1.0621 1.0634 1.0580

7. Cerucuk Kayu

Timber Piling 1.1080 1.1080 1.1080 n.a. n.a. n.a.

8. Cerucuk (K.T)

(R.C.) Piling 1.1534 1.2112 1.2000 1.1456 1.1556 1.1568

9. Kerangka Besi

Satu Tingkat (Bangunan) 1.1334 1.1231 1.1039 1.1037 1.1369 1.1310

Single Storey

Steel (Building)

10. Kerangka Besi

Satu Tingkat 1.0998 1.1214 1.0920 n.a. n.a. n.a.

(Menara Sahaja)

Single Storey

Steel (Tower Only)

Nota/Note:

K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

n.a. = Tidak diperoleh/Not available

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

Lampiran A

Appendix A

Faktor pelarasan mengikut kawasan*

Adjustment factor by region*

Sabah Sarawak

Jadual faktor pelarasan (Indeks tanpa bar keluli)

Adjustment factor table (Index without steel bars)

15

Page 25: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

Kategori

Category

G H I J K L

1. Bangunan (K.T.) 1.1532 1.1085 1.0985 1.1578 1.1701 1.1599

Satu Tingkat

Single Storey (R.C.)

Building

2. Bangunan (K.T.) 1.1612 1.1221 1.1110 1.1549 1.1694 1.1605

2−4 Tingkat

(Berbumbung Rata)

2−4 Storey (R.C.)

Building (Flat Roof)

3. Bangunan (K.T.) 1.1601 1.1200 1.1080 1.1690 1.1784 1.1732

2−4 Tingkat

(Berbumbung Curam)

2−4 Storey (R.C.)

Building (Pitched Roof)

4. Bangunan (K.T.) 1.1642 1.1228 1.1140 1.1684 1.1846 1.1722

5 Tingkat dan Lebih

(Untuk Penginapan)

5 Storey and Above

(R.C.) Building

(For Accommodation)

5. Bangunan (K.T.) 1.1672 1.1225 1.1171 1.1735 1.1896 1.1802

5 Tingkat dan Lebih

(Untuk Pejabat)

5 Storey and Above

(R.C.) Building (for Office)

6. Bangunan Kayu 1.1410 1.1148 1.1088 1.0660 1.0673 1.0613

Timber Buildings

7. Cerucuk Kayu 1.1080 1.1080 1.1080 n.a. n.a. n.a.

Timber Piling

8. Cerucuk (K.T) 1.1670 1.1389 1.1792 1.1818 1.1955 1.1637

(R.C.) Piling

9. Kerangka Besi 1.1335 1.1217 1.1053 1.1167 1.1513 1.1395

Satu Tingkat (Bangunan)

Single Storey

Steel (Building)

10. Kerangka Besi 1.1001 1.1216 1.0930 n.a. n.a. n.a.

Satu Tingkat

(Menara Sahaja)

Single Storey

Steel (Tower Only)

Nota/Note:

K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

n.a. = Tidak diperoleh/Not available

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

Sabah Sarawak

Lampiran B

Appendix B

Jadual faktor pelarasan (Indeks termasuk bar keluli)

Adjustment factor table (Index with steel bars)

Faktor pelarasan mengikut kawasan*

Adjustment factor by region*

16

Page 26: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

Lampiran C Appendix C

17

Contoh pengiraan indeks IKB (Julai

2007=100) dengan menggunakan

indeks baru IKB (Julai 2012=100)

Example for calculating the old BCI

(July 2007=100) using the new index

BCI (July 2012=100)

(i) Contoh mengira indeks lama (tanpa bar

keluli) bagi bulan Januari 2013 untuk

kategori Bangunan (K.T) Satu Tingkat bagi

kawasan Kota Kinabalu adalah seperti

berikut:

j I lama Januari 2013 = FP (seperti di

Lampiran A) x j I baru Januari 2013

iaitu, Indeks lama Januari 2013

= 1.1575 x 100.4

= 116.2130

= 116.2

(ii) Contoh mengira indeks lama (termasuk

bar keluli) bagi bulan Januari 2013 untuk

kategori Cerucuk K.T bagi kawasan Miri

adalah seperti berikut:

j I lama Januari 2013 = FP (seperti di

Lampiran B) x j I baru Januari 2013

iaitu, Indeks lama Januari 2013

= 1.1637 x 99.2

= 115.4390

= 115.4

di mana,

FP = Faktor Pelarasan

j I = Indeks bagi kategori bangunan j

j = 1, ……

(i) Example for calculating the old index

(without steel bars) for the month of

January 2013 for Single-Storey (R.C)

Building in Kota Kinabalu is as follows:

Old j I for January 2013 = AF (as in

Appendix A) x new j I for January 2013

i.e. old Index for January 2013

= 1.1575 x 100.4

= 116.2130

= 116.2

(ii) Example for calculating the old index

(with steel bars) for the month of January

2013 for R.C Piling in Miri is as follows:

Old j I for January 2013 = AF (as in

Appendix B) x new j I for January 2013

i.e. old Index for January 2013

= 1.1637 x 99.2

= 115.4390

= 115.4

where,

AF = Adjustment Factor

j I = Index for building category j

j = 1, ……

Page 27: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

NOTA TEKNIKAL

TECHNICAL NOTES

Page 28: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

19

Nota teknikal Indeks Kos Bahan Binaan

Bangunan Sabah dan Sarawak

(Julai 2012=100)

Technical notes on Building Materials

Cost Index for Sabah and Sarawak

(July 2012=100)

Indeks Kos Bahan Binaan Bangunan (IKB)

adalah suatu indeks yang dibentuk untuk

mengukur kadar perubahan purata harga 15

bahan binaan terpilih yang digunakan dalam 10

kategori bangunan di Sabah untuk 3 kawasan

iaitu Kota Kinabalu, Sandakan dan Tawau serta

8 kategori bangunan di Sarawak untuk 3

kawasan iaitu Kuching, Sibu dan Miri. IKB

dibentuk berasaskan formula Laspeyres.

IKB digunakan dalam Pelaksanaan Syarat

Perubahan Harga dalam kontrak-kontrak kerja

bangunan kerajaan sahaja. Spesifikasi dan

pemberat untuk 15 bahan binaan terpilih

mengikut kategori bangunan disediakan oleh

Jabatan Kerja Raya (JKR).

Anggaran 1700 sebutharga dipungut setiap

bulan daripada lebih kurang 300 outlet untuk

175 jenis spesifikasi bahan binaan terpilih.

Bermula penerbitan Januari 2013, indeks ini

berasaskan kepada tahun asas yang ditukar

daripada (Julai 2007=100) kepada (Julai

2012=100) serta pemilihan spesifikasi bahan

binaan dan pemberat yang dikemaskini oleh

JKR.

Bagi kontrak-kontrak yang telah ditandatangani

sebelum Januari 2013, sila lihat ‘Jadual Faktor

Pelarasan’ (Lampiran A dan B) dan ‘Contoh

mengira Indeks Lama Kos Bahan Binaan

Bangunan’ (Lampiran C) untuk panduan dalam

Pelaksanaan Syarat Perubahan Harga. Bagi

kontrak-kontrak mulai Januari 2013 dan

seterusnya, indeks baru hendaklah digunakan

terus tanpa sebarang pelarasan.

The Building Materials Cost Index (BCI) is an

index designed to measure the average rate of

change in prices for 15 selected building

materials utilized in 10 building categories in

Sabah for 3 regions, namely Kota Kinabalu,

Sandakan and Tawau and 8 building

categories in Sarawak for 3 regions, namely

Kuching, Sibu and Miri. The BCI is based on

the Laspeyres formula.

The BCI is used in Special Provisions to the

Conditions of Contract (Variation of Price) in

government building contracts only. The

specifications and weightage for 15 selected

building materials according to building

categories are provided by Public Works

Department (JKR).

Approximately 1700 price quotations are

collected monthly from 300 outlets for 175

selected building material specifications.

Starting from January 2013 publication, the

series is based on the revised base year which

has been changed from (July 2007=100) to

(July 2012=100) as well as the selection of

new building material specifications and

weightage updated by JKR.

For contracts signed before January 2013,

please refer to the ‘Adjustment Factor Table’

(Appendix A and B) and the ‘Example for

calculating The Old Building Materials Cost

Index’ (Appendix C) for the implementation of

the Variation of Price. For contracts

commencing January 2013 and thereafter, the

new index is to be used without any further

adjustment.

Page 29: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

20

Pengiraan perubahan indeks

IKB mengukur perubahan harga dari suatu

tempoh rujukan yang ditetapkan, iaitu (Julai

2012=100).

Pergerakan IKB dari satu bulan ke satu bulan

yang lain dinyatakan sebagai perubahan

peratus dan bukan perubahan mata indeks

(index points) kerana perubahan mata indeks

dipengaruhi oleh aras indeks yang berkaitan

dengan tempoh asasnya, manakala perubahan

peratus tidak mempunyai pengaruh sedemikian.

Contoh berikut menunjukkan cara pengiraan

perubahan peratus mata indeks dan perubahan

peratus.

Perubahan Mata Indeks

Indeks Kos Bahan Binaan Bangunan 130.5

Tolak indeks sebelumnya 129.3

1.2

Perubahan Peratus

Perubahan mata indeks dibahagi dengan

indeks sebelumnya, didarab dengan 100.

Index change calculation

The BCI measures price changes from a

designated period, i.e. (July 2012=100).

Movements of the BCI from one month to

another are expressed as percentage changes

rather than changes in index points because

index point changes are affected by the level

of the index in relation to its base period while

percentage changes are not. The following

example illustrates the computation of index

point and percentage changes.

Index Point Change

Building Materials Cost Index 130.5

Less previous index 129.3

1.2

Percentage Change

Index point difference divided by the previous

index, multiplied by 100.

Page 30: SIARAN KHAS Special Release 2 - dosm.gov.my · PDF filedan bahan kerja paip (1.0 mata). Di Sandakan, indeks harga seunit bagi bahan kerja paip dan cat masing-masing meningkat sebanyak

Bulan Rujukan Tarikh

Reference Month Date

Januari 2015 10 Februari 2015

January 2015 10 February 2015

Februari 2015 10 Mac 2015

February 2015 10 March 2015

Mac 2015 10 April 2015

March 2015 10 April 2015

April 2015 11 Mei 2015

April 2015 11 May 2015

Mei 2015 10 Jun 2015

May 2015 10 June 2015

Jun 2015 10 Julai 2015

June 2015 10 July 2015

Julai 2015 10 Ogos 2015

July 2015 10 August 2015

Ogos 2015 10 September 2015

August 2015 10 September 2015

September 2015 12 Oktober 2015

September 2015 12 October 2015

Oktober 2015 11 November 2015

October 2015 11 November 2015

November 2015 10 Disember 2015

November 2015 10 December 2015

Disember 2015 11 Januari 2016

December 2015 11 January 2016

BANGUNAN DAN STRUKTUR), SABAH & SARAWAK, JANUARI - DISEMBER 2015

JADUAL TARIKH PENGELUARAN SIARAN KHAS 2 (UNTUK KERJA-KERJA PEMBINAAN

SCHEDULE OF RELEASE DATES FOR SPECIAL RELEASE 2 (FOR BUILDING AND

STRUCTURAL WORKS), SABAH & SARAWAK, JANUARY - DECEMBER 2015

-21-