JADWAL KEMAJUAN PEKERJAAN PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH TOTAL BOBOT BULAN - I BULAN - II PEKERJAAN (%) 1 2 3 4 1 2 3 4 I. PEKERJAAN PERSIAPAN 1 Pengukuran dan Pemasangan Bouwplank 46.40 M' 45,660.00 2,118,624.00 2 Pembersihan Awal dan Akhir Pekerjaan 1.00 unit 1,000,000.00 1,000,000.00 0.104 0.104 II. PEKERJAAN TANAH - - - - 1 Galian Tanah Pondasi 50.11 m3 50,750.00 2,543,138.33 0.265 2 Timbunan Tanah Bawah Lantai 55.52 m3 85,100.00 4,724,645.63 0.492 0.492 3 Urungan Kembali Bekas Galian 12.53 m3 16,910.00 211,844.68 0.022 0.006 0.006 0 Urungan Pasir Bawah Pondasi 2.57 m3 116,300.00 298,867.74 4 Urungan Pasir Bawah Lantai 22.21 m3 116,300.00 2,582,732.25 0.269 0.090 0.090 0.090 III. PEKERJAAN PASANGAN/BETON - - - - 1 Pas. Batu Gunung 22.49 m3 721,540.00 16,224,368.06 1.690 2 Pas. Batu Kosong / Astamping 5.14 m3 320,410.00 1,646,779.24 0.172 3 Sloof Beton 20/25 cm 6.42 m3 3,761,586.29 24,166,311.10 2.517 4 Kolom 50/60 cm 4.68 m3 4,154,544.52 19,443,268.35 2.025 5 Kolom Praktis 13/13 1.19 m' 7,784,412.65 9,251,058.27 6 Plat Lantai T = 12 cm 32.17 m3 5,494,125.62 176,733,934.20 18.410 3.682 3.682 7 Balok Lantai 20/30 cm 7.26 m3 5,790,825.29 42,035,600.79 4.379 0.876 8 Balok Lantai 30/50 cm 11.03 m3 3,815,448.54 42,065,320.14 4.382 IV. PEKERJAAN PASANGAN & PLESTERAN - - 1 Pasangan Dinding Bata 1 : 2 490.39 m2 113,180.00 55,502,736.33 2 Pasangan Dinding Bata 1 : 4 119.52 m2 103,940.00 12,423,033.53 1.294 3 Plesteran Dinding 1 : 2 980.79 m2 52,210.00 51,206,889.27 5.334 4 Plesteran Dinding 1 : 4 239.04 m2 47,480.00 11,349,733.15 1.182 5 Plesteran Kolom 1 : 3 26.30 m2 49,390.00 1,298,957.00 6 Plesteran Balok dan Plat Lantai 1 : 3 250.00 m2 49,390.00 12,347,500.00 1.286 V. PEKERJAAN LANTAI DAN KERAMIK - - 1 Rabat Beton Lantai 18.84 M3 592,030.00 11,155,917.31 2 Lantai Keramik 25 x 25 anti slip 161.98 m2 192,070.00 31,111,498.60 3.241 3 Keramik Dinding 25 x 33 528.52 m2 214,000.00 113,103,536.80 11.782 VI. PEKERJAAN KOSEN, PINTU & JENDELA - - 1 Kosen Pintu dan Ventilasi Aluminium 238.08 m' 177,380.00 42,230,630.40 4.399 2 Daun Pintu Aluminium 33.60 m2 951,260.00 31,962,336.00 3 Daun Ventilasi Aluminium + Kaca 16.32 m2 854,670.00 13,948,214.40 1.453 4 Memasang Engsel Ventilasi 144.00 bh 26,314.00 3,789,216.00 0.395 5 Memasang Engsel Pintu 72.00 bh 26,310.00 1,894,320.00 0.197 VII. PEKERJAAN ELEKTRIKAL - - 1 Lampu Hemat Energi 11 Watt 24.00 bh 85,000.00 2,040,000.00 0.212 2 Lampu Hemat Energi 45 Watt 16.00 bh 125,000.00 2,000,000.00 0.208 3 Saklar Ganda 6.00 bh 55,000.00 330,000.00 0.034 4 Saklar Tunggal 24.00 bh 45,000.00 1,080,000.00 0.112 5 Stop Kontak + Istalasi 3.00 ttk 160,300.00 480,900.00 6 Pekerjaan Titik Api + Instalasi 43.00 ttk 160,300.00 6,892,900.00 0.718 VIII. PEKERJAAN SANITASI - - - - 0 Septic Tank - - - - - 1 Galian 26.25 Unit 50,750.00 1,332,187.50 0.139 0.069 0.069

Upload: arama-artha

Post on 14-Jul-2016

137 views

Category:

Documents


29 download

TRANSCRIPT

JADWAL KEMAJUAN PEKERJAAN

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR

NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH TOTAL BOBOT

BULAN - I BULAN - II PEKERJAAN

(%) 1 2 3 4 1 2 3 4I. PEKERJAAN PERSIAPAN 1 Pengukuran dan Pemasangan Bouwplank 46.40 M' 45,660.00 2,118,624.00 2 Pembersihan Awal dan Akhir Pekerjaan 1.00 unit 1,000,000.00 1,000,000.00 0.104 0.104

II. PEKERJAAN TANAH - - - -

1 Galian Tanah Pondasi 50.11 m3 50,750.00 2,543,138.33 0.265

2 Timbunan Tanah Bawah Lantai 55.52 m3 85,100.00 4,724,645.63 0.492 0.492

3 Urungan Kembali Bekas Galian 12.53 m3 16,910.00 211,844.68 0.022 0.006 0.006

0 Urungan Pasir Bawah Pondasi 2.57 m3 116,300.00 298,867.74 4 Urungan Pasir Bawah Lantai 22.21 m3 116,300.00 2,582,732.25 0.269 0.090 0.090 0.090

III. PEKERJAAN PASANGAN/BETON - - - -

1 Pas. Batu Gunung 22.49 m3 721,540.00 16,224,368.06 1.690

2 Pas. Batu Kosong / Astamping 5.14 m3 320,410.00 1,646,779.24 0.172

3 Sloof Beton 20/25 cm 6.42 m3 3,761,586.29 24,166,311.10 2.517

4 Kolom 50/60 cm 4.68 m3 4,154,544.52 19,443,268.35 2.025

5 Kolom Praktis 13/13 1.19 m' 7,784,412.65 9,251,058.27 6 Plat Lantai T = 12 cm 32.17 m3 5,494,125.62 176,733,934.20 18.410 3.682 3.682

7 Balok Lantai 20/30 cm 7.26 m3 5,790,825.29 42,035,600.79 4.379 0.876

8 Balok Lantai 30/50 cm 11.03 m3 3,815,448.54 42,065,320.14 4.382

IV. PEKERJAAN PASANGAN & PLESTERAN - -

1 Pasangan Dinding Bata 1 : 2 490.39 m2 113,180.00 55,502,736.33 2 Pasangan Dinding Bata 1 : 4 119.52 m2 103,940.00 12,423,033.53 1.294

3 Plesteran Dinding 1 : 2 980.79 m2 52,210.00 51,206,889.27 5.334

4 Plesteran Dinding 1 : 4 239.04 m2 47,480.00 11,349,733.15 1.182

5 Plesteran Kolom 1 : 3 26.30 m2 49,390.00 1,298,957.00 6 Plesteran Balok dan Plat Lantai 1 : 3 250.00 m2 49,390.00 12,347,500.00 1.286

V. PEKERJAAN LANTAI DAN KERAMIK - -

1 Rabat Beton Lantai 18.84 M3 592,030.00 11,155,917.31 2 Lantai Keramik 25 x 25 anti slip 161.98 m2 192,070.00 31,111,498.60 3.241

3 Keramik Dinding 25 x 33 528.52 m2 214,000.00 113,103,536.80 11.782

VI. PEKERJAAN KOSEN, PINTU & JENDELA - -

1 Kosen Pintu dan Ventilasi Aluminium 238.08 m' 177,380.00 42,230,630.40 4.399

2 Daun Pintu Aluminium 33.60 m2 951,260.00 31,962,336.00 3 Daun Ventilasi Aluminium + Kaca 16.32 m2 854,670.00 13,948,214.40 1.453

4 Memasang Engsel Ventilasi 144.00 bh 26,314.00 3,789,216.00 0.395

5 Memasang Engsel Pintu 72.00 bh 26,310.00 1,894,320.00 0.197

VII. PEKERJAAN ELEKTRIKAL - -

1 Lampu Hemat Energi 11 Watt 24.00 bh 85,000.00 2,040,000.00 0.212

2 Lampu Hemat Energi 45 Watt 16.00 bh 125,000.00 2,000,000.00 0.208

3 Saklar Ganda 6.00 bh 55,000.00 330,000.00 0.034

4 Saklar Tunggal 24.00 bh 45,000.00 1,080,000.00 0.112

5 Stop Kontak + Istalasi 3.00 ttk 160,300.00 480,900.00 6 Pekerjaan Titik Api + Instalasi 43.00 ttk 160,300.00 6,892,900.00 0.718

VIII. PEKERJAAN SANITASI - - - -

0 Septic Tank - - - - -

1 Galian 26.25 Unit 50,750.00 1,332,187.50 0.139 0.069 0.069

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Row 110

2 Urugan Kembali 6.56 M3 16,910.00 110,971.88 0.012

3 Urugan Pasir 1.80 M3 116,300.00 209,340.00 0.022 0.005

4 Pasangan Bata 1 batu campuran 1 : 4 24.60 M2 213,800.00 5,259,480.00 5 Plesteran 1:2 24.60 M2 52,210.00 1,284,366.00 6 Kolom 23/23 0.61 M3 4,154,544.52 2,514,230.63 7 Sloff 1.06 M3 3,761,586.29 3,979,758.29 8 Ring Balok 0.08 M3 5,790,825.29 451,684.37 9 Plat Penutup 1.20 M3 5,494,125.62 6,592,950.75 10 Pipa Hawa 2.00 Set 100,000.00 200,000.00 0 Resapan - 1 Galian 18.00 M3 50,750.00 913,500.00 2 Urugan Kembali 4.50 M3 16,910.00 76,095.00 3 Kerkil/Batu berpori 5.00 M3 116,300.00 581,500.00 4 Pasir Urug 4.00 M3 116,300.00 465,200.00 5 Ijuk 40.00 Kg 30,000.00 1,200,000.00 6 Pipa Berpori 4" 8.00 M' 90,000.00 720,000.00 0 Bak Kontrol - 1 Galian 0.57 M3 50,750.00 28,738.71 2 Urugan Kembali 0.14 M3 16,910.00 2,393.95 3 Urugan Pasir 0.04 M3 116,300.00 5,066.03 4 Pasangan Batu Bata 1:2 2.88 M2 113,180.00 325,958.40 5 Beton Cor 0.09 M3 592,030.00 51,577.65 6 Plesteran 1:2 1.92 M2 52,210.00 100,243.20 7 Penutup Box 2.00 Unit 56,500.00 113,000.00 0 Saluran Pembuang - 1 Galian 10.89 M3 50,750.00 552,667.50 2 Urugan Kembali 2.72 M3 16,910.00 46,037.48 3 Urugan Pasir 0.99 M3 116,300.00 115,137.00 4 Pasangan Batu Bata 1:2 24.00 M2 113,180.00 2,716,320.00 5 Beton Cor 1.98 M3 592,030.00 1,172,219.40 6 Plesteran 1:2 36.00 M2 52,210.00 1,879,560.00 7 Grill Penutup Saluran 20.00 M' 163,000.00 3,260,000.00 0 Pekerjaan Perpipaan/Plumbing - 1 Memasang 1 M' Pipa Galvanis 1" 105.00 m' 68,600.00 7,203,000.00 2 Memasang 1 M' Pipa Galvanis 1/2" 91.00 m' 60,850.00 5,537,350.00 3 Memasang 1 M' Pipa PVC tipe AW Ø 3" 78.00 m' 54,770.00 4,272,060.00 4 Memasang 1 M' Pipa air kotor PVC tipe AW Ø 4" 113.50 m' 83,190.00 9,442,065.00 5 Kloset jongkok (Setara American Standart) 24.00 bh 374,580.00 8,989,920.00 6 Memasang 1 Buah Kran Ø ¾" Setara SAN-EI 106.00 bh 55,260.00 5,857,560.00 7 Floor Drain 44.00 bh 24,740.00 1,088,560.00

IX. PEKERJAAN PENGECATAN - 1 Mengecat Dinding Tembok 265.34 m2 30,510.00 8,095,596.62 I. PEKERJAAN TANAH -

DIVISI 1. - MOBILISASI 1.00 Ls 7,600,000.00 7,600,000.00 DIVISI 2. PEKERJAAN TANAH Galian Tanah dengan Alat Berat 891.15 m3 23,509.00 20,950,045.35 Galian Pondasi Penahan Tanah 17.82 m3 50,750.00 904,365.00 Urungan Kembali Bekas Galian 4.46 m3 16,910.00 75,334.05 PEKERJAAN PASANGAN DAN PAVING BLOCK - Pas. Batu Kosong / Astamping 3.24 m3 320,410.00 1,038,128.40 Pas. Batu Gunung Penahan Tanah 45.32 m3 721,540.00 32,696,585.10 Plesteran Campuran 1 : 4 83.58 m2 47,480.00 3,968,435.38 Pasangan paving block T. 8 cm 353.40 m2 155,140.00 54,826,476.00 0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Row 110

Jumlah Rp 960,000,476.19 66.75

Dibulatkan Rp 960,000,000.00

Rencana Progress Mingguan 0.104 - 0.095 0.095 0.159 0.562 3.682 4.563

Komulatif Rencana Progress Mingguan - 0.104 0.104 0.199 0.295 0.454 1.015 4.697 9.260

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Row 110

JADWAL KEMAJUAN PEKERJAAN

BULAN - III BULAN - IV BULAN - VKETERANGAN

1 2 3 4 1 2 3 4 1 2 3 4

0.132 0.132

0.006 0.006

0.423 0.423 0.423 0.423

0.172

0.629 0.629 0.629 0.629

0.506 0.506 0.506 0.506

3.682 3.682 3.682

0.876 0.876 0.876 0.876

0.876 0.876 0.876 0.876 0.876

- - -

1.294

1.778 1.778 1.778

0.296 0.296 0.296 0.296

0.643 0.643

- -

3.241

###

- - -

2.200 2.200

0.726 0.726

0.197 0.197

0.049 0.049 0.049 0.049

- -

0.106 0.106

0.069 0.069 0.069

0.017 0.017

0.112

0.359 0.359

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Row 110

0.012

0.005 0.005 0.005

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Row 110

4.986 4.986 5.130 3.689 2.264 2.087 3.029 5.106 4.933 2.823 ### 0.359

### ### ### ### ### ### ### ### ### ### ### 66.748

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Row 110

ANALISA HARGA SATUAN PEKERJAAN

A.2.2.1.4 : Pengukuran dan Pemasangan 1 m' Bowplank

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN1 Kayu Balok 5/7 (Klas III) m3 0.0120 2 Paku 2"-3" Kg 0.0200 3 Kayu Papan 3/20 (Klas III) m3 0.0070

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.2.2.1.9 : Pembersihan 1 m2 Lapangan dan Perataan

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.2.3.1.1 : Penggalian 1 M3 Tanah Biasa Sedalam 1 M

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7500 2 Mandor L04 Oh 0.0250

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.2.3.1.9 : Pengurugan Kembali 1 M3 Galian Tanah

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2500 2 Mandor L04 Oh 0.0083

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.2.3.1.11 : Pengurugan 1 M3 Dengan Pasir Urug

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Mandor L04 Oh 0.0100

JUMLAH HARGA TENAGA

B. BAHAN

Pasir Urug M3 1.2000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.2.3.1.11a : Pengurugan 1 M3 Dengan Tanah Urug (dipadatkan)

KOEFISIEN

NO. KOMPONEN KODE SATUAN KOEFISIEN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Mandor L04 Oh 0.0100

JUMLAH HARGA TENAGA

B. BAHAN

1 Tanah Timbun M3 1.2000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.3.2.1.1 : Pemasangan 1 M3 Pondasi Batu Belah Campuran 1 SP : 3 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.5000 2 Tukang Batu L02 Oh 0.7500 3 Kepala Tukang L03 Oh 0.0750 4 Mandor L04 Oh 0.0750

JUMLAH HARGA TENAGA

B. BAHAN

1 Batu Belah m3 1.2000 2 Semen Portland Kg 202.0000 3 Pasir Pasang m3 0.4850

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.3.1.1.9 : Pemasangan 1 M3 Batu Kosong (Aanstamping)

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7800 2 Tukang Batu L02 Oh 0.3900 3 Kepala Tukang L03 Oh 0.0390 4 Mandor L04 Oh 0.0390

JUMLAH HARGA TENAGA

B. BAHAN

1 Batu Belah m3 1.2000 2 Pasir Urug m3 0.4320

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.2 :

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

Membuat 1 M3 Beton Mutu Fc =9.8 Mpa (K125), Slump (12

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 276.0000 2 pasir Beton Kg 828.0000 3 Kerikil (Maks 30 mm) Kg 1,012.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.A.4.1.1.4 : Membuat 1 M3 Lantai Kerja Beton Mutu Fc =7.4 Mpa (K100), Slump (3-6) cm,w/c =0.87

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.2000 2 Tukang Batu L02 Oh 0.2000 3 Kepala Tukang L03 Oh 0.0200 4 Mandor L04 Oh 0.0600

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 230.0000 2 pasir Beton Kg 893.0000 3 Kerikil (Maks 30 mm) Kg 1,027.0000 4 Air Liter 200.0000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.5 :

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 326.0000 2 pasir Beton Kg 760.0000 3 Kerikil (Maks 30 mm) Kg 1,029.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.8 :

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 384.0000 2 pasir Beton Kg 692.0000 3 Kerikil (Maks 30 mm) Kg 1,039.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATAN

Membuat 1 M3 Beton Mutu Fc =14.5 Mpa (K175), Slump (12

Membuat 1 M3 Beton Mutu Fc =21.7 Mpa (K250), Slump (12

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.9 :

NO. KOMPONEN KODE SATUAN KOEFISIEN

A. TENAGA

1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 406.0000 2 pasir Beton Kg 684.0000 3 Kerikil (Maks 30 mm) Kg 1,026.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.35. : Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm

NO. KOMPONEN KODE SATUAN KOEFISIEN

A. TENAGA

1 Pekerja L01 Oh 0.1800 2 Tukang batu L02 Oh 0.0200 3 Tukang kayu L02 Oh 0.0200 4 Tukang besi L02 Oh 0.0200 5 Kepala Tukang L03 Oh 0.0060 6 Mandor L04 Oh 0.0090

Membuat 1 M3 Beton Mutu Fc =24.0 Mpa (K275), Slump (12

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 4.0000 2 pasir Beton Kg 0.0060 3 Kerikil (Maks 30 mm) Kg 0.0090 5 Kayu kelas III m³ 0.0020 6 Paku 5 cm - 12 cm Kg 0.0100 7 Besi beton polos Kg 3.0000 8 Kawat beton Kg 0.0450

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.17 : Pembesian 1 Kg Besi dengan Besi Polos

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0070 2 Tukang Batu L02 Oh 0.0070 3 Kepala Tukang L03 Oh 0.0007 4 Mandor L04 Oh 0.0004

JUMLAH HARGA TENAGA

B. BAHAN

1 Besi Beton Polos Kg 1.0500 2 Kawat Beton Kg 0.0150

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.17a : Pembesian 1 Kg Besi dengan Besi Ulir

KOEFISIENNO. KOMPONEN KODE SATUAN

KOEFISIEN

A. TENAGA

1 Pekerja L01 Oh 0.0070 2 Tukang Batu L02 Oh 0.0070 3 Kepala Tukang L03 Oh 0.0007 4 Mandor L04 Oh 0.0004

JUMLAH HARGA TENAGA

B. BAHAN

1 Besi Beton Ulir Kg 1.0500 2 Kawat Beton Kg 0.0150

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.1.1.20 : Pemasangan 1 M2 Bekisting Untuk Pondasi

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.5200 2 Tukang Kayu L02 Oh 0.2600 3 Kepala Tukang L03 Oh 0.0260 4 Mandor L04 Oh 0.0260

JUMLAH HARGA TENAGA

B. BAHAN

1 Kayu Kelas III m3 0.0400 2 Paku 5 - 10 cm Kg 0.3000 3 Minyak Bekisting Liter 0.1000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.21 : Pemasangan 1 M2 Bekisting Untuk Sloof

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.5200 2 Tukang Kayu L02 Oh 0.2600 3 Kepala Tukang L03 Oh 0.0260 4 Mandor L04 Oh 0.0260

JUMLAH HARGA TENAGA

B. BAHAN

1 Kayu Kelas III m3 0.0450 2 Paku 5 - 10 cm Kg 0.3000 3 Minyak Bekisting Liter 0.1000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.22 : Pemasangan 1 M2 Bekisting Untuk Kolom

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN

1 Kayu Kelas III m3 0.0400 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0150 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 2.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.23 : Pemasangan 1 M2 Bekisting Untuk Balok

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN

1 Kayu Kelas III m3 0.0400 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0180 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 2.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

Dolken Kayu Ø 8-10 cm - Pjg 4 m

Dolken Kayu Ø 8-10 cm - Pjg 4 m

A.4.1.1.24 : Pemasangan 1 M2 Bekisting Untuk Lantai

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN

1 Kayu Kelas III m3 0.0400 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0150 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 6.0000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.25 : Pemasangan 1 M2 Bekisting Untuk Dinding

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN

1 Kayu Kelas III m3 0.0300 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0200 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 3.0000 7 Penjaga Jarak Bekisting/spacer Bh 4.0000

JUMLAH HARGA BAHAN C. PERALATAN

Dolken Kayu Ø 8-10 cm - Pjg 4 m

Dolken Kayu Ø 8-10 cm - Pjg 4 m

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.26 : Pemasangan 1 M2 Bekisting Untuk Tangga

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN

1 Kayu Kelas III m3 0.0300 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.1500 4 Balok Kayu Kelas II m3 0.0150 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 2.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

REKAPITULASI PEKERJAAN BETON

Suplemen 1 1 M3 Beton Bertulang Sloof 20 x 25 cm

1.0000 Beton Mutu (K250) A.4.1.1.888.7814 Kg Besi Beton Ulir A.4.1.1.17a39.9516 Kg Besi Beton Polos A.4.1.1.1710.0000 Bekisting Untuk Sloof A.4.1.1.21

JUMLAH HARGA

Suplemen 21 M3 Beton Bertulang Kolom 50 x 60 cm

Dolken Kayu Ø 8-10 cm - Pjg 4 m

M3

M2

1.0000 Beton Mutu (K250) A.4.1.1.842.0890 Kg Besi Beton Ulir A.4.1.1.17a53.5977 Kg Besi Beton Polos A.4.1.1.1710.0000 Bekisting Untuk Kolom A.4.1.1.22

JUMLAH HARGA

Suplemen 31 M3 Beton Bertulang Kolom Praktis 13 x 13 cm

1.0000 Beton Mutu (K250) A.4.1.1.8291.0738 Kg Besi Beton Polos A.4.1.1.17

15.3846 Bekisting Untuk Kolom A.4.1.1.22JUMLAH HARGA

Suplemen 41 M3 Beton Bertulang Balok Lantai 20 x 30 cm

1.0000 Beton Mutu (K250) A.4.1.1.886.8290 Kg Besi Beton Ulir A.4.1.1.17a73.4365 Kg Besi Beton Polos A.4.1.1.1713.3333 Bekisting Untuk Balok A.4.1.1.23

JUMLAH HARGA

Suplemen 4.a1 M3 Beton Bertulang Balok Lantai 30 x 100 cm

1.0000 Beton Mutu (K250) A.4.1.1.868.7234 Kg Besi Beton Ulir A.4.1.1.17a34.1973 Kg Besi Beton Polos A.4.1.1.17

7.6667 Bekisting Untuk Balok A.4.1.1.23JUMLAH HARGA

Suplemen 51 M3 Plat Lantai Beton Bertulang tebal 12 cm

1.0000 Beton Mutu (K250) A.4.1.1.8205.5125 Kg Besi Beton Polos A.4.1.1.17

8.3000 Bekisting Untuk Plat LantaiA.4.1.1.24JUMLAH HARGA

A.4.4.1.3 : Pemasangan 1 M2 Dinding Bata Merah tebal 1 Batu Campuran 1 SP : 4 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.6000 2 Tukang Kayu L02 Oh 0.2000 3 Kepala Tukang L03 Oh 0.0200 4 Mandor L04 Oh 0.0300

JUMLAH HARGA TENAGA B. BAHAN

1 Bata Merah Bh 140.0000 2 Semen Portland Kg 26.5500 3 Pasir Pasang M3 0.0930

M3

M2

M3

M2

M3

M2

M3

M2

M3

M2

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.1.9 : Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 4 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Bata Merah Bh 70.0000 2 Semen Portland Kg 11.5000 3 Pasir Pasang M3 0.0430

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.1.7. : Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Bata Merah Bh 70.0000 2 Semen Portland Kg 18.9500 3 Pasir Pasang M3 0.0380

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.2.2. : Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Semen Portland Kg 10.2200 2 Pasir Pasang M3 0.0200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.2.3. : Pemasangan 1 M2 Plesteran 1 SP : 3 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150

4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Semen Portland Kg 7.7700 2 Pasir Pasang M3 0.0230

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.2.4 : Pemasangan 1 M2 Plesteran 1 SP : 4 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Semen Portland Kg 6.2400 2 Pasir Pasang M3 0.0240

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.35 : Pemasangan 1 M2 Lantai Keramik Ukuran 30 cm x 30 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7000 2 Tukang Kayu L02 Oh 0.3500 3 Kepala Tukang L03 Oh 0.0350 4 Mandor L04 Oh 0.0350

JUMLAH HARGA TENAGA B. BAHAN

1 Ubin Keramik 30 x 30 Bh 11.8700 2 Semen Portland Kg 10.0000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.36 : Pemasangan 1 M2 Lantai Keramik Ukuran 25 cm x 25 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7000 2 Tukang Kayu L02 Oh 0.3500 3 Kepala Tukang L03 Oh 0.0350 4 Mandor L04 Oh 0.0350

JUMLAH HARGA TENAGA B. BAHAN

1 Ubin Keramik 25 x 25 Bh 16.0000 2 Semen Portland Kg 10.0000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.55 : Pemasangan 1 M2 Dinding Keramik Ukuran 25 cm x 40 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.9000 2 Tukang Kayu L02 Oh 0.4500 3 Kepala Tukang L03 Oh 0.0450 4 Mandor L04 Oh 0.0145

JUMLAH HARGA TENAGA B. BAHAN

1 Ubin Keramik 25 x 40 Bh 10.0000 2 Semen Portland Kg 9.3000 3 Pasir Pasang M3 0.0180 4 Semen Warna kg 1.9400

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.6.1.5 : Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel, Kayu Kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.0000 2 Tukang Kayu L02 Oh 3.0000 3 Kepala Tukang L03 Oh 0.3000 4 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA B. BAHAN

1 Papan Kayu m3 0.0400 2 Lem Kayu Kg 0.5000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.6.1.20 : Pemasangan 1 M2 Rangka Langit-langit 60 x 60 cm, Kayu Kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2000 2 Tukang Kayu L02 Oh 0.3000 3 Kepala Tukang L03 Oh 0.0300 4 Mandor L04 Oh 0.0100

JUMLAH HARGA TENAGA B. BAHAN

1 Kaso-kaso 5/7 cm m3 0.0163 2 Paku Kayu 7 - 10 cm Kg 0.2500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.5.1.5 : Pemasangan 1 M2 Langit-langit Triplek ukuran (120 x 240) cm Tebal 3, 4, & 6 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA B. BAHAN

1 Triplek Lbr 0.3750 2 paku Triplek Kg 0.0300

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.5.1.9 : Pemasangan 1 M' List Langit-langit Kayu Profil

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0500 2 Tukang Kayu L02 Oh 0.0500 3 Kepala Tukang L03 Oh 0.0050 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 List Kayu Profil m 1.0500 2 Paku Kayu Kg 0.0100

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.7.1.10 : Pengecatan 1 M2 Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0200 2 Tukang Kayu L02 Oh 0.0630 3 Kepala Tukang L03 Oh 0.0063 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 Plamur Kg 0.1000 2 Cat Dasar Kg 0.1000 3 Cat Penutup Kg 0.2600

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.13 : Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120

4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA B. BAHAN

1 Keramik 60 x 60 Bh 3.1000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.1.7 : Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Bata Merah Bh 70.0000 2 Semen Portland Kg 18.9500 3 Pasir Pasang M3 0.0380

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.2.2 : Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN1 Semen Portland Kg 10.2240 2 Pasir Pasang M3 0.0200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.2.1.11 : Memasang 1 m kusen pintu alluminium

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0430 2 Tukang Khusus Alluminium L02 Oh 0.8000 3 Kepala Tukang L03 Oh 0.0800 4 Mandor L04 Oh 0.0040

JUMLAH HARGA TENAGA B. BAHAN1 Profil alluminium m 1.1000 2 Skrup fixer Buah 2.0000 3 Sealant Tube 0.0600

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.2.1.12 : Memasang 1 m² pintu alluminium strip lebar 8 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0850 2 Tukang Khusus Alluminium L02 Oh 0.0850 3 Kepala Tukang L03 Oh 0.0085 4 Mandor L04 Oh 0.0042

JUMLAH HARGA TENAGA B. BAHAN1 Profil alluminium m 4.4000 2 Alluminium strip m 14.6000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.2.1.13 : Memasang 1 m² pintu kaca rangka alluminium

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0850 2 Tukang Khusus Alluminium L02 Oh 0.0850 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN1 Profil alluminium m 4.4000 2 Profil kaca m 4.5000

3 Sealant Tube 0.2700 4 Kaca 5 mm m2 1.2000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.6.1.1 : Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 7.0000 2 Tukang Kayu L02 Oh 21.0000 3 Kepala Tukang L03 Oh 2.1000 4 Mandor L04 Oh 0.3500

JUMLAH HARGA TENAGA B. BAHAN

1 Balok Kayu m3 1.1000 2 Paku 10 cm Kg 1.2500 3 Lem Kayu Kg 1.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.6.1.6 : Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

KOEFISIEN

A. TENAGA

1 Pekerja L01 Oh 0.8000 2 Tukang Kayu L02 Oh 2.4000 3 Kepala Tukang L03 Oh 0.2400 4 Mandor L04 Oh 0.0400

JUMLAH HARGA TENAGA B. BAHAN

1 Papan Kayu m3 0.0240 2 Lem Kayu Kg 0.3000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.7.1.4. : Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0700 2 Tukang Cat L02 Oh 0.0090 3 Kepala Tukang L03 Oh 0.0060 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 Cat meni Kg 0.2000 2 Plamur kayu Kg 0.1500 3 Cat Dasar Kg 0.1700 4 Cat Penutup Kg 0.2600

5 Kuas Bh 0.0100 6 Kertas Amplas Lbr 0.2000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.6.2.5 : Pemasangan 1 buah engsel pintu

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0150 2 Tukang Cat L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0008

JUMLAH HARGA TENAGA B. BAHAN

1 Engsel Pintu Bh 1.00

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.36 : Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7000 2 Tukang Kayu L02 Oh 0.3500 3 Kepala Tukang L03 Oh 0.0350 4 Mandor L04 Oh 0.0350

JUMLAH HARGA TENAGA B. BAHAN

1 Ubin Keramik 20 x 20 Bh 26.5000 2 Semen Portland Kg 10.4000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.6200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.14 : Pemasangan 1 M2 Lantai Keramik Ukuran 40 cm x 40 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2500 2 Tukang Batu L02 Oh 0.1250 3 Kepala Tukang L03 Oh 0.0130 4 Mandor L04 Oh 0.0130

JUMLAH HARGA TENAGA B. BAHAN

1 Keramik 40 x 40 Bh 6.6300 2 Semen Portland Kg 9.8000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.3000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.54 : Pemasangan 1 m2 dinding keramik 20cm x 20cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.9000 2 Tukang Batu L02 Oh 0.4500 3 Kepala Tukang L03 Oh 0.0450 4 Mandor L04 Oh 0.0450

JUMLAH HARGA TENAGA B. BAHAN

1 Keramik 20 x 20 Bh 26.5000 2 Semen Portland Kg 9.3000 3 Pasir Pasang M3 0.0180 4 Semen Warna kg 1.9400

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1 19 : Pemasangan 1 buah kran diameter ½” atau 3/4”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0100 2 Tukang Batu L02 Oh 0.4000 3 Kepala Tukang L03 Oh 0.0400 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Kran air Bh 1.0000 2 Sealtape Bh 0.0250

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1 14. : Pemasangan 1 buah floor drain

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0100 2 Tukang Batu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Floor drain unit 1.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

SNI 91 - 0014 - 2007 (6.2 : 1 M2 Rangka kuda - kuda baja aluzing 55 % alumunium untuk metal

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1400 2 Tukang Besi L02 Oh 0.4000 3 Kepala Tukang L03 Oh 0.0400 4 Mandor L04 Oh 0.0700

JUMLAH HARGA TENAGA B. BAHAN

1 Profil C. 75. 75 m¹ 4.2602 Reng U 0.5 m¹ 4.9303 Baut truss buah 14.0004 Baut reng buah 11.000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.6.1.22 : Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.2000 3 Kepala Tukang L03 Oh 0.0200 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Papan kayu M3 0.0110 2 Paku 5 dan 7 cm Kg 0.0500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.6.1.19 : Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1500 2 Tukang Kayu L02 Oh 0.3000 3 Kepala Tukang L03 Oh 0.0300 4 Mandor L04 Oh 0.0750

JUMLAH HARGA TENAGA B. BAHAN

1 Kaso-kaso 5/7 cm m3 0.0154 2 Paku Kayu 7 - 10 cm Kg 0.2000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1.21 : Pemasangan 1 m pipa galvanis diameter 1"

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0540 2 Tukang Batu L02 Oh 0.0900 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0270

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa galvanis diameter 1" M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1.18. : Pemasangan 1 buah pipa galvanis diameter 1/2"

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.054 2 Tukang Batu L02 Oh 0.090 3 Kepala Tukang L03 Oh 0.009 4 Mandor L04 Oh 0.027

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa galvanis diameter 1/2" M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1 29. : Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0540 2 Tukang Batu L02 Oh 0.0900 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa PVC 2” M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1 31. : Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0810 2 Tukang Batu L02 Oh 0.1350 3 Kepala Tukang L03 Oh 0.0135 4 Mandor L04 Oh 0.0040

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa PVC 3” M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1 32. : Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0810 2 Tukang Batu L02 Oh 0.1350 3 Kepala Tukang L03 Oh 0.0135 4 Mandor L04 Oh 0.0040

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa PVC 4” M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.5.1.1.3 : Pemasangan 1 buah closet jongkok teraso

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.0000 2 Tukang Batu L02 Oh 1.5000 3 Kepala Tukang L03 Oh 0.1500 4 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA B. BAHAN

1 Closet jongkok Unit 1.0000 2 Semen Portland Kg 6.0000 3 Pasir pasang m³ 0.0100 4 Bata Merah Bh 7.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.5.1.7 : Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.0500 3 Kepala Tukang L03 Oh 0.0050 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Gypsum board Lbr 0.3640 2 Paku skrup Kg 0.1100

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

SNI-2839-2008-6.8 : 1 M' List Plafond Gypsum Profil

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0600 2 Tukang Kayu L02 Oh 0.0600 3 Kepala Tukang L03 Oh 0.0060 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 List Gypsum Profil m 1.0500 2 Tepung Gypsum Kg 0.1500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

SNI DT-91-0013-2007-6.8-A : 1 M2 Memasang rangka langit-langit Aluminium Profil "C"

KOEFISIENNO. KOMPONEN KODE SATUAN

KOEFISIEN

A. TENAGA

1 Pekerja L01 Oh 0.1500 2 Tukang Kayu L02 Oh 0.5000 3 Kepala Tukang L03 Oh 0.0500 4 Mandor L04 Oh 0.0080

JUMLAH HARGA TENAGA B. BAHAN

1 Baja Ringan M' 3.6000 2 Baut Bh 10.0000 3 Ramset Buah 1.0500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.54a : Pemasangan 1 m2 dinding granit 30cm x 60cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.9000 2 Tukang Batu L02 Oh 0.4500 3 Kepala Tukang L03 Oh 0.0450 4 Mandor L04 Oh 0.0450

JUMLAH HARGA TENAGA B. BAHAN

1 Granit Dinding 30x60 cm Anti Slip Bh 5.5560 2 Semen Portland Kg 9.3000 3 Pasir Pasang M3 0.0180 4 Semen Warna kg 1.9400

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.13a : Pemasangan 1 M2 Lantai Granit Ukuran 50 cm x 50 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA B. BAHAN

1 Granit 50 x 50 Bh 4.0000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.28 : Pemasangan 1 m’ plint Stepnoshing Granito Tile 10x60cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0900

2 Tukang Batu L02 Oh 0.0900 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA

B. BAHAN

1 Stepnoshing Granito Tile 10x60cm Bh 1.7000 2 Semen Portland Kg 1.1400 3 Pasir Pasang M3 0.0030 4 Semen Warna kg 0.1000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.13.a : Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA

B. BAHAN

1 Keramik 60 x 60 Bh 3.1000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.13.b : Pemasangan 1 M2 Lantai Keramik Ukuran 32 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA

B. BAHAN

1 Keramik 32 x 60 Bh 5.5000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

A.4.4.3.13c : Pemasangan 1 M2 Lantai Granit Ukuran 60 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA

B. BAHAN

1 Granit 60 x 60 Bh 3.1000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

ANL. TAKSIR : 1 M2 Memasang rangka langit-langit Baja Ringan

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1500 2 Tukang Batu L02 Oh 0.5000 3 Kepala Tukang L03 Oh 0.0500 4 Mandor L04 Oh 0.0080

JUMLAH HARGA TENAGA

B. BAHAN

1 Top Crosss Reil ( Baja ringan U) m1 2.0000 2 Ceiling Batten ( Baja ringan C ) m1 1.0000 3 Wall Angle ( Baja ringan / rangka pinggir L) m1 2.3400 4 Connectors Ceiling Batten to Top Cross pcs 4.0000 5 Sprring ( Suspension Clips) pcs 4.0000 6 Suspension Rods and Nut m1 2.5500 7 Suspension Braccket bh 4.0000 8 Sekrup bh 4.0000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

ANL. TAKSIR : 1 M2 Cat Kayu 1/2 Duco, ( 1 x Cat Manie + Dempul + 2 Cat Penutup )

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0700

2 Tukang Cat L02 Oh 0.0090 3 Kepala Tukang L03 Oh 0.0060 4 Mandor L04 Oh 0.0250

JUMLAH HARGA TENAGA B. BAHAN

1 Cat Manie Kayu Kg 0.2000 2 Dempul Sintetis Kg 0.3000 3 Cat Kayu Mengkilat Kg 0.4000 4 Cat Kayu Dasar Kg 0.1700 5 Minyak Cat liter 0.2000 6 Amplas lbr 0.4000 7 Kayu Perancah & Alat bantu Ls 1.0000 8 Sewa Compresor Jam 0.6250

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

ANL. G. 60 : 1 M2 Memasang Paving Block Beton

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.4000 2 Tukang Cat L02 Oh 0.1000

JUMLAH HARGA TENAGA B. BAHAN

1 Paving Block buah 46.0000 2 Pasir Pasang M3 0.1200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)E. OVERHEAD & PROFIT 10 %F. HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN PEKERJAAN

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 400.00

JUMLAH HARGA TENAGA 16,550.00

4,320,000.00 51,840.00 14,040.00 280.80

4,320,000.00 30,240.00

JUMLAH HARGA BAHAN 82,360.80

UMLAH HARGA PERALATAN 0.00 98,910.80

9,891.08 108,801.88

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 80,000.00 4,000.00

JUMLAH HARGA TENAGA 10,500.00

JUMLAH HARGA BAHAN 0.00

UMLAH HARGA PERALATAN 0.00 10,500.00

1,050.00 11,550.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 48,750.00 80,000.00 2,000.00

JUMLAH HARGA TENAGA 50,750.00

JUMLAH HARGA BAHAN 0.00

UMLAH HARGA PERALATAN 0.00 50,750.00

5,075.00 55,825.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 16,250.00 80,000.00 666.67

JUMLAH HARGA TENAGA 16,916.67

JUMLAH HARGA BAHAN 0.00

JUMLAH HARGA PERALATAN 0.00 16,916.67

1,691.67 18,608.34

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 80,000.00 800.00

JUMLAH HARGA TENAGA 20,300.00

80,000.00 96,000.00

JUMLAH HARGA BAHAN 96,000.00

UMLAH HARGA PERALATAN 0.00 116,300.00

11,630.00 127,930.00

HARGA JUMLAH

SATUAN HARGA(Rp) (Rp)

65,000.00 19,500.00 80,000.00 800.00

JUMLAH HARGA TENAGA 20,300.00

54,000.00 64,800.00

JUMLAH HARGA BAHAN 64,800.00

UMLAH HARGA PERALATAN 0.00 85,100.00

8,510.00 93,610.00

Pemasangan 1 M3 Pondasi Batu Belah Campuran 1 SP : 3 PP HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 97,500.00 85,000.00 63,750.00

115,000.00 8,625.00 80,000.00 6,000.00

JUMLAH HARGA TENAGA 175,875.00

162,000.00 194,400.00 1,350.00 272,700.00

162,000.00 78,570.00

JUMLAH HARGA BAHAN 545,670.00

UMLAH HARGA PERALATAN 0.00 721,545.00

72,154.50 793,699.50

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 50,700.00 85,000.00 33,150.00

115,000.00 4,485.00 80,000.00 3,120.00

JUMLAH HARGA TENAGA 91,455.00

162,000.00 194,400.00 80,000.00 34,560.00

JUMLAH HARGA BAHAN 228,960.00

UMLAH HARGA PERALATAN 0.00 320,415.00

32,041.50 352,456.50

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

Membuat 1 M3 Beton Mutu Fc =9.8 Mpa (K125), Slump (12±2) cm,w/c =0.78

JUMLAH HARGA TENAGA 140,485.00

1,350.00 372,600.00 100.29 83,036.57

77.78 78,711.11 50.00 10,750.00

JUMLAH HARGA BAHAN 545,097.68

UMLAH HARGA PERALATAN 0.00 685,582.68

68,558.27 754,140.95

Membuat 1 M3 Lantai Kerja Beton Mutu Fc =7.4 Mpa (K100), Slump (3-6) cm,w/c =0.87HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 78,000.00 85,000.00 17,000.00

115,000.00 2,300.00 80,000.00 4,800.00

JUMLAH HARGA TENAGA 102,100.00

1,350.00 310,500.00 100.29 89,555.14

77.78 79,877.78 50.00 10,000.00

JUMLAH HARGA BAHAN 489,932.92

UMLAH HARGA PERALATAN 0.00 592,032.92

59,203.29 651,236.21

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

JUMLAH HARGA TENAGA 140,485.00

1,350.00 440,100.00 100.29 76,217.14

77.78 80,033.33 50.00 10,750.00

JUMLAH HARGA BAHAN 607,100.47

UMLAH HARGA PERALATAN 0.00 747,585.47

74,758.55 822,344.02

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

JUMLAH HARGA TENAGA 140,485.00

1,350.00 518,400.00 100.29 69,397.71

77.78 80,811.11 50.00 10,750.00

JUMLAH HARGA BAHAN 679,358.82

Membuat 1 M3 Beton Mutu Fc =14.5 Mpa (K175), Slump (12±2) cm,w/c =0.66

Membuat 1 M3 Beton Mutu Fc =21.7 Mpa (K250), Slump (12±2) cm,w/c =0.56

UMLAH HARGA PERALATAN 0.00 819,843.82

81,984.38 901,828.20

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

140,485.00

1,350.00 548,100.00 100.29 68,595.43

77.78 79,800.00 50.00 10,750.00

707,245.43

0.00 847,730.43

84,773.04 932,503.47

Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 11,700.00 85,000.00 1,700.00 85,000.00 1,700.00 85,000.00 1,700.00

115,000.00 690.00 80,000.00 720.00

Membuat 1 M3 Beton Mutu Fc =24.0 Mpa (K275), Slump (12±2) cm,w/c =0.53

18,210.00

1,350.00 5,400.00 100.29 0.60

77.78 0.70 4,320,000.00 8,640.00

14,040.00 140.40 10,800.00 32,400.00 17,000.00 765.00

47,346.70

0.00 65,556.70

6,555.67 72,112.37

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 455.00 85,000.00 595.00

115,000.00 80.50 80,000.00 32.00

JUMLAH HARGA TENAGA 1,162.50

10,800.00 11,340.00 17,000.00 255.00

JUMLAH HARGA BAHAN 11,595.00

UMLAH HARGA PERALATAN 0.00 12,757.50

1,275.75 14,033.25

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 455.00 85,000.00 595.00

115,000.00 80.50 80,000.00 32.00

JUMLAH HARGA TENAGA 1,162.50

10,800.00 11,340.00 17,000.00 255.00

JUMLAH HARGA BAHAN 11,595.00

UMLAH HARGA PERALATAN 0.00 12,757.50

1,275.75 14,033.25

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 33,800.00 85,000.00 22,100.00

115,000.00 2,990.00 80,000.00 2,080.00

JUMLAH HARGA TENAGA 60,970.00

4,320,000.00 172,800.00 14,040.00 4,212.00

5,000.00 500.00

JUMLAH HARGA BAHAN 177,512.00

UMLAH HARGA PERALATAN 0.00 238,482.00

23,848.20 262,330.20 131,165.10

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 33,800.00 85,000.00 22,100.00

115,000.00 2,990.00 80,000.00 2,080.00

JUMLAH HARGA TENAGA 60,970.00

4,320,000.00 194,400.00 14,040.00 4,212.00

5,000.00 500.00

JUMLAH HARGA BAHAN 199,112.00

UMLAH HARGA PERALATAN 0.00 260,082.00

26,008.20 286,090.20 143,045.10

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 172,800.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 81,000.00

140,400.00 49,140.00 18,000.00 36,000.00

JUMLAH HARGA BAHAN 345,556.00

UMLAH HARGA PERALATAN 0.00 422,941.00

42,294.10 465,235.10 232,617.55

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 172,800.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 97,200.00

140,400.00 49,140.00 18,000.00 36,000.00

JUMLAH HARGA BAHAN 361,756.00

UMLAH HARGA PERALATAN 0.00 439,141.00

43,914.10 483,055.10 241,527.55

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 172,800.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 81,000.00

140,400.00 49,140.00 18,000.00 108,000.00

JUMLAH HARGA BAHAN 417,556.00

UMLAH HARGA PERALATAN 0.00 494,941.00

49,494.10 544,435.10 272,217.55

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 129,600.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 108,000.00

140,400.00 49,140.00 18,000.00 54,000.00

5,000.00 20,000.00 JUMLAH HARGA BAHAN 367,356.00

UMLAH HARGA PERALATAN 0.00 444,741.00

44,474.10 489,215.10 244,607.55

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 129,600.00 14,040.00 5,616.00

5,000.00 750.00 5,400,000.00 81,000.00

140,400.00 49,140.00 18,000.00 36,000.00

JUMLAH HARGA BAHAN 302,106.00

UMLAH HARGA PERALATAN 0.00 379,491.00

37,949.10 417,440.10 208,720.05

901,828.20 901,828.20 14,033.25 1,245,891.70 14,033.25 560,651.26

143,045.10 1,430,451.00 JUMLAH HARGA 4,138,822.17

901,828.20 901,828.20 14,033.25 590,644.95 14,033.25 752,149.43

232,617.55 2,326,175.50 JUMLAH HARGA 4,570,798.09

901,828.20 901,828.20 14,033.25 4,084,711.77

232,617.55 3,578,727.96 JUMLAH HARGA 8,565,267.94

901,828.20 901,828.20 14,033.25 1,218,493.62 14,033.25 1,030,552.39

241,527.55 3,220,367.33 JUMLAH HARGA 6,371,241.55

901,828.20 901,828.20 14,033.25 964,412.46 14,033.25 479,899.02

241,527.55 1,851,711.22 JUMLAH HARGA 4,197,850.91

901,828.20 901,828.20 14,033.25 2,884,008.56

272,217.55 2,259,405.67 JUMLAH HARGA 6,045,242.43

Pemasangan 1 M2 Dinding Bata Merah tebal 1 Batu Campuran 1 SP : 4 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 39,000.00 85,000.00 17,000.00

115,000.00 2,300.00 80,000.00 2,400.00

JUMLAH HARGA TENAGA 60,700.00

730.00 102,200.00 1,350.00 35,842.50

162,000.00 15,066.00

JUMLAH HARGA BAHAN 153,108.50

UMLAH HARGA PERALATAN 0.00 213,808.50

21,380.85 235,189.35

Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 4 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 30,350.00

730.00 51,100.00 1,350.00 15,525.00

162,000.00 6,966.00 JUMLAH HARGA BAHAN 73,591.00

UMLAH HARGA PERALATAN 0.00 103,941.00

10,394.10 114,335.10

Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 30,350.00

730.00 51,100.00 1,350.00 25,582.50

162,000.00 6,156.00 JUMLAH HARGA BAHAN 82,838.50

UMLAH HARGA PERALATAN 0.00 113,188.50

11,318.85 124,507.35

Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 13,797.00 162,000.00 3,240.00

JUMLAH HARGA BAHAN 17,037.00

UMLAH HARGA PERALATAN 0.00 52,212.00

5,221.20 57,433.20

Pemasangan 1 M2 Plesteran 1 SP : 3 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00

80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 10,489.50 162,000.00 3,726.00

JUMLAH HARGA BAHAN 14,215.50

UMLAH HARGA PERALATAN 0.00 49,390.50

4,939.05 54,329.55

Pemasangan 1 M2 Plesteran 1 SP : 4 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 8,424.00 162,000.00 3,888.00

JUMLAH HARGA BAHAN 12,312.00

UMLAH HARGA PERALATAN 0.00 47,487.00

4,748.70 52,235.70

Pemasangan 1 M2 Lantai Keramik Ukuran 30 cm x 30 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 45,500.00 85,000.00 29,750.00

115,000.00 4,025.00 80,000.00 2,800.00

JUMLAH HARGA TENAGA 82,075.00

5,459.14 64,800.00 1,350.00 13,500.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 89,802.00

UMLAH HARGA PERALATAN 0.00 171,877.00

17,187.70 189,064.70

Pemasangan 1 M2 Lantai Keramik Ukuran 25 cm x 25 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 45,500.00 85,000.00 29,750.00

115,000.00 4,025.00 80,000.00 2,800.00

JUMLAH HARGA TENAGA 82,075.00

5,312.50 85,000.00 1,350.00 13,500.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 110,002.00

UMLAH HARGA PERALATAN 0.00 192,077.00

19,207.70 211,284.70

Pemasangan 1 M2 Dinding Keramik Ukuran 25 cm x 40 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 58,500.00 85,000.00 38,250.00

115,000.00 5,175.00 80,000.00 1,160.00

JUMLAH HARGA TENAGA 103,085.00

9,000.00 90,000.00 1,350.00 12,555.00

162,000.00 2,916.00 2,808.00 5,447.52

JUMLAH HARGA BAHAN 110,918.52

UMLAH HARGA PERALATAN 0.00 214,003.52

21,400.35 235,403.87

Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel, Kayu Kelas IIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 65,000.00 85,000.00 255,000.00

115,000.00 34,500.00 80,000.00 4,000.00

JUMLAH HARGA TENAGA 358,500.00

5,400,000.00 216,000.00 6,000.00 3,000.00

JUMLAH HARGA BAHAN 219,000.00

UMLAH HARGA PERALATAN 0.00 577,500.00

57,750.00 635,250.00

Pemasangan 1 M2 Rangka Langit-langit 60 x 60 cm, Kayu Kelas II HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 13,000.00 85,000.00 25,500.00

115,000.00 3,450.00 80,000.00 800.00

JUMLAH HARGA TENAGA 42,750.00

5,400,000.00 88,020.00 14,040.00 3,510.00

JUMLAH HARGA BAHAN 91,530.00

UMLAH HARGA PERALATAN 0.00 134,280.00

13,428.00 147,708.00

Pemasangan 1 M2 Langit-langit Triplek ukuran (120 x 240) cm Tebal 3, 4, & 6 mm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 4,000.00

JUMLAH HARGA TENAGA 20,150.00

70,200.00 26,325.00 14,040.00 421.20

JUMLAH HARGA BAHAN 26,746.20

UMLAH HARGA PERALATAN 0.00 46,896.20

4,689.62 51,585.82

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,250.00 85,000.00 4,250.00

115,000.00 575.00 80,000.00 240.00

JUMLAH HARGA TENAGA 8,315.00

10,000.00 10,500.00 14,040.00 140.40

JUMLAH HARGA BAHAN 10,640.40

UMLAH HARGA PERALATAN 0.00 18,955.40

1,895.54 20,850.94

Pengecatan 1 M2 Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 1,300.00 85,000.00 5,355.00

115,000.00 724.50 80,000.00 240.00

JUMLAH HARGA TENAGA 7,619.50

54,000.00 5,400.00 48,600.00 4,860.00 48,600.00 12,636.00

JUMLAH HARGA BAHAN 22,896.00

UMLAH HARGA PERALATAN 0.00 30,515.50

3,051.55 33,567.05

Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00

80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

90,000.00 279,000.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 303,462.00

UMLAH HARGA PERALATAN 0.00 331,602.00

33,160.20 364,762.20

Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 30,350.00

730.00 51,100.00 1,350.00 25,582.50

162,000.00 6,156.00

JUMLAH HARGA BAHAN 82,838.50

UMLAH HARGA PERALATAN 0.00 113,188.50

11,318.85 124,507.35

Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 13,802.40 162,000.00 3,240.00

JUMLAH HARGA BAHAN 17,042.40

UMLAH HARGA PERALATAN 0.00 52,217.40

5,221.74 57,439.14

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 2,795.00 85,000.00 68,000.00

115,000.00 9,200.00 80,000.00 320.00

JUMLAH HARGA TENAGA 80,315.00

140,000.00 154,000.00 450.00 900.00

194,100.00 11,646.00

JUMLAH HARGA BAHAN 166,546.00

UMLAH HARGA PERALATAN 0.00 246,861.00

24,686.10 271,547.10

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,525.00 85,000.00 7,225.00

115,000.00 977.50 80,000.00 336.00

JUMLAH HARGA TENAGA 14,063.50

140,000.00 616,000.00 22,000.00 321,200.00

JUMLAH HARGA BAHAN 937,200.00

UMLAH HARGA PERALATAN 0.00 951,263.50

95,126.35 1,046,389.85

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,525.00 85,000.00 7,225.00

115,000.00 1,035.00 80,000.00 400.00

JUMLAH HARGA TENAGA 14,185.00

140,000.00 616,000.00 8,000.00 36,000.00

194,100.00 52,407.00 113,400.00 136,080.00

JUMLAH HARGA BAHAN 840,487.00

UMLAH HARGA PERALATAN 0.00 854,672.00

85,467.20 940,139.20

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas IHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 455,000.00 85,000.00 1,785,000.00

115,000.00 241,500.00 80,000.00 28,000.00

JUMLAH HARGA TENAGA 2,509,500.00

6,480,000.00 7,128,000.00 14,040.00 17,550.00 21,600.00 21,600.00

JUMLAH HARGA BAHAN 7,167,150.00

UMLAH HARGA PERALATAN 0.00 9,676,650.00

967,665.00 ###

Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas IIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 52,000.00 85,000.00 204,000.00

115,000.00 27,600.00 80,000.00 3,200.00

JUMLAH HARGA TENAGA 286,800.00

5,400,000.00 129,600.00 21,600.00 6,480.00

JUMLAH HARGA BAHAN 136,080.00

UMLAH HARGA PERALATAN 0.00 422,880.00

42,288.00 465,168.00

Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 4,550.00 85,000.00 765.00

115,000.00 690.00 80,000.00 240.00

JUMLAH HARGA TENAGA 6,245.00

21,600.00 4,320.00 54,000.00 8,100.00 54,000.00 9,180.00 54,000.00 14,040.00

15,000.00 150.00 5,400.00 1,080.00

JUMLAH HARGA BAHAN 36,870.00

UMLAH HARGA PERALATAN 0.00 43,115.00

4,311.50 47,426.50

Pemasangan 1 buah engsel pintuHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 975.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 64.00

JUMLAH HARGA TENAGA 15,514.00

10,800.00 10,800.00

JUMLAH HARGA BAHAN 10,800.00

UMLAH HARGA PERALATAN 0.00 26,314.00

2,631.40 28,945.40

Pemasangan 1m2 lantai keramik ukuran 20cm x 20cmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 45,500.00 85,000.00 29,750.00

115,000.00 4,025.00 80,000.00 2,800.00

JUMLAH HARGA TENAGA 82,075.00

3,200.00 84,800.00 1,350.00 14,040.00

162,000.00 7,290.00 2,808.00 4,548.96

JUMLAH HARGA BAHAN 110,678.96

UMLAH HARGA PERALATAN 0.00 192,753.96

19,275.40 212,029.36

Pemasangan 1 M2 Lantai Keramik Ukuran 40 cm x 40 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 16,250.00 85,000.00 10,625.00

115,000.00 1,495.00 80,000.00 1,040.00

JUMLAH HARGA TENAGA 29,410.00

22,400.00 148,512.00 1,350.00 13,230.00

162,000.00 7,290.00 2,808.00 3,650.40

JUMLAH HARGA BAHAN 172,682.40

UMLAH HARGA PERALATAN 0.00 202,092.40

20,209.24 222,301.64

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 58,500.00 85,000.00 38,250.00

115,000.00 5,175.00 80,000.00 3,600.00

JUMLAH HARGA TENAGA 105,525.00

3,200.00 84,800.00 1,350.00 12,555.00

162,000.00 2,916.00 2,808.00 5,447.52

JUMLAH HARGA BAHAN 105,718.52

UMLAH HARGA PERALATAN 0.00 211,243.52

21,124.35 232,367.87

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 650.00 85,000.00 34,000.00

115,000.00 4,600.00 80,000.00 400.00

JUMLAH HARGA TENAGA 39,650.00

15,500.00 15,500.00 4,500.00 112.50

JUMLAH HARGA BAHAN 15,612.50

UMLAH HARGA PERALATAN 0.00 55,262.50

5,526.25 60,788.75

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 650.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 400.00

JUMLAH HARGA TENAGA 10,700.00

14,040.00 14,040.00

JUMLAH HARGA BAHAN 14,040.00

UMLAH HARGA PERALATAN 0.00 24,740.00

2,474.00 27,214.00

1 M2 Rangka kuda - kuda baja aluzing 55 % alumunium untuk metalHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,100.00 85,000.00 34,000.00

115,000.00 4,600.00 80,000.00 5,600.00

JUMLAH HARGA TENAGA 53,300.00

25,000.00 106,500.00 10,000.00 49,300.00

350.00 4,900.00 350.00 3,850.00

JUMLAH HARGA BAHAN 164,550.00

UMLAH HARGA PERALATAN 0.00 217,850.00

21,785.00 239,635.00

Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas IIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 17,000.00

115,000.00 2,300.00 80,000.00 400.00

JUMLAH HARGA TENAGA 26,200.00

5,400,000.00 59,400.00 14,040.00 702.00

JUMLAH HARGA BAHAN 60,102.00

UMLAH HARGA PERALATAN 0.00 86,302.00

8,630.20 94,932.20

Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau IIIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,750.00 85,000.00 25,500.00

115,000.00 3,450.00 80,000.00 6,000.00

JUMLAH HARGA TENAGA 44,700.00

4,320,000.00 66,528.00 14,040.00 2,808.00

JUMLAH HARGA BAHAN 69,336.00

UMLAH HARGA PERALATAN 0.00 114,036.00

11,403.60 125,439.60

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,510.00 85,000.00 7,650.00

115,000.00 1,035.00 80,000.00 2,160.00

JUMLAH HARGA TENAGA 14,355.00

35,000.00 42,000.00 35,000.00 12,250.00

JUMLAH HARGA BAHAN 54,250.00

UMLAH HARGA PERALATAN 0.00 68,605.00

6,860.50 75,465.50

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,510.00 85,000.00 7,650.00

115,000.00 1,035.00 80,000.00 2,160.00

JUMLAH HARGA TENAGA 14,355.00

30,000.00 36,000.00 30,000.00 10,500.00

JUMLAH HARGA BAHAN 46,500.00

UMLAH HARGA PERALATAN 0.00 60,855.00

6,085.50 66,940.50

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,510.00 85,000.00 7,650.00

115,000.00 1,035.00 80,000.00 240.00

JUMLAH HARGA TENAGA 12,435.00

12,960.00 15,552.00 12,960.00 4,536.00

JUMLAH HARGA BAHAN 20,088.00

UMLAH HARGA PERALATAN 0.00 32,523.00

3,252.30 35,775.30

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,265.00 85,000.00 11,475.00

115,000.00 1,552.50 80,000.00 320.00

JUMLAH HARGA TENAGA 18,612.50

23,333.33 28,000.00 23,333.33 8,166.67

JUMLAH HARGA BAHAN 36,166.67

UMLAH HARGA PERALATAN 0.00 54,779.17

5,477.92 60,257.09

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,265.00 85,000.00 11,475.00

115,000.00 1,552.50 80,000.00 320.00

JUMLAH HARGA TENAGA 18,612.50

41,666.67 50,000.00 41,666.67 14,583.33

JUMLAH HARGA BAHAN 64,583.33

UMLAH HARGA PERALATAN 0.00 83,195.83

8,319.58 91,515.41

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 65,000.00 85,000.00 127,500.00

115,000.00 17,250.00 80,000.00 4,000.00

JUMLAH HARGA TENAGA 213,750.00

412,000.00 412,000.00 1,350.00 8,100.00

162,000.00 1,620.00 730.00 5,110.00

JUMLAH HARGA BAHAN 426,830.00

UMLAH HARGA PERALATAN 0.00

640,580.00 64,058.00

704,638.00

Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 4,250.00

115,000.00 575.00 80,000.00 400.00

JUMLAH HARGA TENAGA 11,725.00

80,000.00 29,120.00 33,400.00 3,674.00

JUMLAH HARGA BAHAN 32,794.00

UMLAH HARGA PERALATAN 0.00 44,519.00

4,451.90 48,970.90

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,900.00 85,000.00 5,100.00

115,000.00 690.00 80,000.00 240.00

JUMLAH HARGA TENAGA 9,930.00

18,000.00 18,900.00 15,000.00 2,250.00

JUMLAH HARGA BAHAN 21,150.00

UMLAH HARGA PERALATAN 0.00 31,080.00

3,108.00 34,188.00

1 M2 Memasang rangka langit-langit Aluminium Profil "C"HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,750.00 85,000.00 42,500.00

115,000.00 5,750.00 80,000.00 640.00

JUMLAH HARGA TENAGA 58,640.00

10,000.00 36,000.00 250.00 2,500.00

5,600.00 5,880.00

JUMLAH HARGA BAHAN 44,380.00

UMLAH HARGA PERALATAN 0.00 103,020.00

10,302.00 113,322.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 58,500.00 85,000.00 38,250.00

115,000.00 5,175.00 80,000.00 3,600.00

JUMLAH HARGA TENAGA 105,525.00

65,000.00 361,140.00 1,350.00 12,555.00

162,000.00 2,916.00 2,808.00 5,447.52

JUMLAH HARGA BAHAN 382,058.52

UMLAH HARGA PERALATAN 0.00 487,583.52

48,758.35 536,341.87

Pemasangan 1 M2 Lantai Granit Ukuran 50 cm x 50 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

160,000.00 640,000.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 664,462.00

UMLAH HARGA PERALATAN 0.00 692,602.00

69,260.20 761,862.20

Pemasangan 1 m’ plint Stepnoshing Granito Tile 10x60cmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,850.00

85,000.00 7,650.00 115,000.00 1,035.00

80,000.00 400.00

JUMLAH HARGA TENAGA 14,935.00

185,500.00 315,350.00 1,350.00 1,539.00

162,000.00 486.00 2,808.00 280.80

JUMLAH HARGA BAHAN 317,655.80

UMLAH HARGA PERALATAN 0.00 332,590.80

33,259.08 365,849.88

Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

90,000.00 279,000.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 303,462.00

UMLAH HARGA PERALATAN 0.00 331,602.00

33,160.20 364,762.20

Pemasangan 1 M2 Lantai Keramik Ukuran 32 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

153,817.60 845,996.80 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 870,458.80

UMLAH HARGA PERALATAN 0.00 898,598.80

89,859.88 988,458.68

Pemasangan 1 M2 Lantai Granit Ukuran 60 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

174,500.00 540,950.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 565,412.00

UMLAH HARGA PERALATAN 0.00 593,552.00

59,355.20 652,907.20

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,750.00 85,000.00 42,500.00

115,000.00 5,750.00 80,000.00 640.00

JUMLAH HARGA TENAGA 58,640.00

15,000.00 30,000.00 12,000.00 12,000.00

9,000.00 21,060.00 7,000.00 28,000.00 6,400.00 25,600.00 6,000.00 15,300.00 4,400.00 17,600.00

450.00 1,800.00

JUMLAH HARGA BAHAN 151,360.00

UMLAH HARGA PERALATAN 0.00 210,000.00

21,000.00 231,000.00

1 M2 Cat Kayu 1/2 Duco, ( 1 x Cat Manie + Dempul + 2 Cat Penutup )HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 4,550.00

85,000.00 765.00 115,000.00 690.00

80,000.00 2,000.00

JUMLAH HARGA TENAGA 8,005.00

21,600.00 4,320.00 19,440.00 5,832.00 54,000.00 21,600.00 54,000.00 9,180.00 16,500.00 3,300.00

5,400.00 2,160.00 18,000.00 18,000.00 60,000.00 37,500.00

JUMLAH HARGA BAHAN 101,892.00

UMLAH HARGA PERALATAN 0.00 109,897.00

10,989.70 120,886.70

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 26,000.00 85,000.00 8,500.00

JUMLAH HARGA TENAGA 34,500.00

2,200.00 101,200.00 162,000.00 19,440.00

JUMLAH HARGA BAHAN 120,640.00

UMLAH HARGA PERALATAN 0.00 155,140.00

15,514.00 170,654.00

PROGRAM TERBILANG

SEWA PERALATAN KANTOR

Bilangan Yang DTrilyunRatus MilyarPuluhan MilyarRatus JutaPuluhan Juta

- Rupiah - sen Ratus Ribu1 Satu 10.00 Sepuluh 0.01 satu Puluhan Ribu2 Dua 20.00 Dua Puluh 0.01 satu Ratusan3 Tiga 30.00 Tiga Puluh 0.01 satu Puluhan4 Empat 40.00 Empat Puluh 0.01 satu Rupiah5 Lima 50.00 Lima Puluh 0.01 satu Sen6 Enam 60.00 Enam Puluh 0.02 dua7 Tujuh 70.00 Tujuh Puluh 0.02 dua8 Delapan 80.00 Delapan Puluh 0.02 dua9 Sembilan 90.00 Sembilan Puluh 0.02 dua Terbilang:

10 Sepuluh 100.00 Seratus 0.02 duaSembilan Ratus Enam Puluh Juta Rupiah

11 Sebelas 200.00 Dua Ratus 0.02 dua12 Dua Bela 300.00 Tiga Ratus 0.02 dua13 Tiga Bela 400.00 Empat Ratus 0.02 dua Note: Don't change any thing without confirmation. It could be dangerous !!!14 Empat Be 500.00 Lima Ratus 0.02 dua15 Lima Bela 600.00 Enam Ratus 0.02 dua How to Use16 Enam Bel 700.00 Tujuh Ratus 0.03 tiga17 Tujuh Bel 800.00 Delapan Ratus 0.03 tiga18 Delapan B 900.00 Sembilan Ratus 0.03 tiga19 Sembilan 1,000.00 Seribu 0.03 tiga20 Dua Pulu 2,000.00 Dua Ribu 0.03 tiga21 Dua Puluh 3,000.00 Tiga Ribu 0.03 tiga SEWA MOBIL22 Dua Pulu 4,000.00 Empat Ribu 0.03 tiga

23 Dua Puluh 5,000.00 Lima Ribu 0.03 tiga Bilangan Yang D24 Dua Pulu 6,000.00 Enam Ribu 0.03 tiga Trilyun25 Dua Pulu 7,000.00 Tujuh Ribu 0.03 tiga Ratus Milyar26 Dua Pulu 8,000.00 Delapan Ribu 0.04 empat Puluhan Milyar27 Dua Puluh 9,000.00 Sembilan Ribu 0.04 empat Ratus Juta28 Dua Pulu 10,000.00 Sepuluh Ribu 0.04 empat Puluhan Juta29 Dua Puluh 11,000.00 Sebelas Ribu 0.04 empat Ratus Ribu30 Tiga Pulu 12,000.00 Dua Belas Ribu 0.04 empat Puluhan Ribu31 Tiga Pulu 13,000.00 Tiga Belas Ribu 0.04 empat Ratusan32 Tiga Pulu 14,000.00 Empat Belas Ribu0.04 empat Puluhan33 Tiga Pulu 15,000.00 Lima Belas Ribu 0.04 empat Rupiah

Hasil (akan keluar otomatis).

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

34 Tiga Pulu 16,000.00 Enam Belas Ribu 0.04 empat Sen35 Tiga Pulu 17,000.00 Tujuh Belas Ribu 0.04 empat36 Tiga Pul 18,000.00 Delapan Belas Ri 0.05 lima37 Tiga Pulu 19,000.00 Sembilan Belas R0.05 lima38 Tiga Pulu 20,000.00 Dua Puluh Ribu 0.05 lima Terbilang:39 Tiga Pulu 21,000.00 Dua Puluh Satu R0.05 lima Empat Juta Tiga Ratus Ribu Rupiah40 Empat Pu 22,000.00 Dua Puluh Dua R 0.05 lima41 Empat Pul 23,000.00 Dua Puluh Tiga R0.05 lima42 Empat Pu 24,000.00 Dua Puluh Empat0.05 lima Note: Don't change any thing without confirmation. It could be dangerous !!!43 Empat Pul 25,000.00 Dua Puluh Lima R0.05 lima44 Empat Pu 26,000.00 Dua Puluh Enam 0.05 lima How to Use45 Empat Pu 27,000.00 Dua Puluh Tujuh 0.05 lima46 Empat Pu 28,000.00 Dua Puluh Delapa0.06 enam47 Empat Pul 29,000.00 Dua Puluh Sembil0.06 enam48 Empat Pu 30,000.00 Tiga Puluh Ribu 0.06 enam49 Empat Pu 31,000.00 Tiga Puluh Satu 0.06 enam50 Lima Pulu 32,000.00 Tiga Puluh Dua R0.06 enam51 Lima Pulu 33,000.00 Tiga Puluh Tiga R0.06 enam SEWA KENDERAAN RODA DUA52 Lima Pul 34,000.00 Tiga Puluh Empat0.06 enam

53 Lima Pulu 35,000.00 Tiga Puluh Lima 0.06 enam Bilangan Yang D54 Lima Pul 36,000.00 Tiga Puluh Enam 0.06 enam Trilyun55 Lima Pulu 37,000.00 Tiga Puluh Tujuh 0.06 enam Ratus Milyar56 Lima Pul 38,000.00 Tiga Puluh Delap 0.07 tujuh Puluhan Milyar57 Lima Pulu 39,000.00 Tiga Puluh Sembi0.07 tujuh Ratus Juta58 Lima Pulu 40,000.00 Empat Puluh Ribu0.07 tujuh Puluhan Juta59 Lima Pulu 41,000.00 Empat Puluh Satu0.07 tujuh Ratus Ribu60 Enam Pul 42,000.00 Empat Puluh Dua0.07 tujuh Puluhan Ribu61 Enam Pul 43,000.00 Empat Puluh Tiga0.07 tujuh Ratusan62 Enam Pul 44,000.00 Empat Puluh Emp0.07 tujuh Puluhan63 Enam Pulu 45,000.00 Empat Puluh Lima0.07 tujuh Rupiah64 Enam Pul 46,000.00 Empat Puluh Ena 0.07 tujuh Sen65 Enam Pul 47,000.00 Empat Puluh Tuju0.07 tujuh66 Enam Pul 48,000.00 Empat Puluh Del 0.08 delapan67 Enam Pul 49,000.00 Empat Puluh Sem0.08 delapan68 Enam Pul 50,000.00 Lima Puluh Ribu 0.08 delapan Terbilang:69 Enam Pul 51,000.00 Lima Puluh Satu 0.08 delapan Enam Ratus Ribu Rupiah70 Tujuh Pul 52,000.00 Lima Puluh Dua R0.08 delapan71 Tujuh Pul 53,000.00 Lima Puluh Tiga 0.08 delapan72 Tujuh Pul 54,000.00 Lima Puluh Empat0.08 delapan Note: Don't change any thing without confirmation. It could be dangerous !!!73 Tujuh Pul 55,000.00 Lima Puluh Lima 0.08 delapan74 Tujuh Pul 56,000.00 Lima Puluh Enam0.08 delapan How to Use75 Tujuh Pul 57,000.00 Lima Puluh Tujuh 0.08 delapan76 Tujuh Pu 58,000.00 Lima Puluh Delap0.09 sembilan77 Tujuh Pul 59,000.00 Lima Puluh Sembi0.09 sembilan78 Tujuh Pul 60,000.00 Enam Puluh Ribu 0.09 sembilan79 Tujuh Pul 61,000.00 Enam Puluh Satu 0.09 sembilan80 Delapan P 62,000.00 Enam Puluh Dua 0.09 sembilan81 Delapan P 63,000.00 Enam Puluh Tiga 0.09 sembilan SEWA GEDUNG KANTOR82 Delapan 64,000.00 Enam Puluh Empa0.09 sembilan

83 Delapan P 65,000.00 Enam Puluh Lima0.09 sembilan Bilangan Yang D

Hasil (akan keluar otomatis).

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

Hasil (akan keluar otomatis).

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

84 Delapan 66,000.00 Enam Puluh Enam0.09 sembilan Trilyun85 Delapan P 67,000.00 Enam Puluh Tujuh0.09 sembilan Ratus Milyar86 Delapan 68,000.00 Enam Puluh Dela 0.10 sepuluh Puluhan Milyar87 Delapan P 69,000.00 Enam Puluh Semb0.10 sepuluh Ratus Juta88 Delapan P 70,000.00 Tujuh Puluh Ribu 0.10 sepuluh Puluhan Juta89 Delapan P 71,000.00 Tujuh Puluh Satu 0.10 sepuluh Ratus Ribu90 Sembilan 72,000.00 Tujuh Puluh Dua 0.10 sepuluh Puluhan Ribu91 Sembilan 73,000.00 Tujuh Puluh Tiga 0.10 sepuluh Ratusan92 Sembilan 74,000.00 Tujuh Puluh Empa0.10 sepuluh Puluhan93 Sembilan 75,000.00 Tujuh Puluh Lima 0.10 sepuluh Rupiah94 Sembilan 76,000.00 Tujuh Puluh Enam0.10 sepuluh Sen95 Sembilan 77,000.00 Tujuh Puluh Tuju 0.10 sepuluh96 Sembilan 78,000.00 Tujuh Puluh Dela 0.11 sebelas97 Sembilan 79,000.00 Tujuh Puluh Semb0.11 sebelas98 Sembilan 80,000.00 Delapan Puluh Ri 0.11 sebelas Terbilang:99 Sembilan 81,000.00 Delapan Puluh Sa0.11 sebelas Lima Juta Rupiah

82,000.00 Delapan Puluh Du0.11 sebelas 83,000.00 Delapan Puluh Ti 0.11 sebelas 84,000.00 Delapan Puluh E 0.11 sebelas Note: Don't change any thing without confirmation. It could be dangerous !!! 85,000.00 Delapan Puluh Li 0.11 sebelas 86,000.00 Delapan Puluh E 0.11 sebelas How to Use 87,000.00 Delapan Puluh Tu0.11 sebelas 88,000.00 Delapan Puluh De0.12 Dua belas 89,000.00 Delapan Puluh Se0.12 Dua belas 90,000.00 Sembilan Puluh R0.12 Dua belas 91,000.00 Sembilan Puluh S0.12 Dua belas Rekap 92,000.00 Sembilan Puluh D0.12 Dua belas

93,000.00 Sembilan Puluh T0.12 Dua belas Bilangan Yang D 94,000.00 Sembilan Puluh 0.12 Dua belas Trilyun 95,000.00 Sembilan Puluh L0.12 Dua belas Ratus Milyar 96,000.00 Sembilan Puluh 0.12 Dua belas Puluhan Milyar 97,000.00 Sembilan Puluh T0.12 Dua belas Ratus Juta 98,000.00 Sembilan Puluh D0.13 Tiga belas Puluhan Juta 99,000.00 Sembilan Puluh S0.13 Tiga belas Ratus Ribu 100,000.00 Seratus 0.13 Tiga belas Puluhan Ribu 200,000.00 Dua Ratus 0.13 Tiga belas Ratusan 300,000.00 Tiga Ratus 0.13 Tiga belas Puluhan 400,000.00 Empat Ratus 0.13 Tiga belas Rupiah 500,000.00 Lima Ratus 0.13 Tiga belas Sen 600,000.00 Enam Ratus 0.13 Tiga belas 700,000.00 Tujuh Ratus 0.13 Tiga belas 800,000.00 Delapan Ratus 0.13 Tiga belas 900,000.00 Sembilan Ratus 0.14 Empat belas Terbilang: 1,000,000.00 Satu Juta 0.14 Empat belas Tiga Puluh Enam Juta Lima Ratus Empat Puluh Dua Ribu Empat Ratus Empat PuluhRupiah 2,000,000.00 Dua Juta 0.14 Empat belas 3,000,000.00 Tiga Juta 0.14 Empat belas 4,000,000.00 Empat Juta 0.14 Empat belas Note: Don't change any thing without confirmation. It could be dangerous !!! 5,000,000.00 Lima Juta 0.14 Empat belas 6,000,000.00 Enam Juta 0.14 Empat belas How to Use 7,000,000.00 Tujuh Juta 0.14 Empat belas

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

Hasil (akan keluar otomatis).

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

Hasil (akan keluar otomatis).

8,000,000.00 Delapan Juta 0.14 Empat belas 9,000,000.00 Sembilan Juta 0.14 Empat belas 10,000,000.00 Sepuluh Juta 0.15 Lima belas 11,000,000.00 Sebelas Juta 0.15 Lima belas 12,000,000.00 Dua Belas Juta 0.15 Lima belas 13,000,000.00 Tiga Belas Juta 0.15 Lima belas 14,000,000.00 Empat Belas Juta0.15 Lima belas 15,000,000.00 Lima Belas Juta 0.15 Lima belas 16,000,000.00 Enam Belas Juta 0.15 Lima belas 17,000,000.00 Tujuh Belas Juta 0.15 Lima belas 18,000,000.00 Delapan Belas Ju0.15 Lima belas 19,000,000.00 Sembilan Belas J 0.15 Lima belas 20,000,000.00 Dua Puluh Juta 0.16 Enam belas 21,000,000.00 Dua Puluh Satu J 0.16 Enam belas 22,000,000.00 Dua Puluh Dua Ju0.16 Enam belas 23,000,000.00 Dua Puluh Tiga J 0.16 Enam belas 24,000,000.00 Dua Puluh Empat 0.16 Enam belas 25,000,000.00 Dua Puluh Lima J0.16 Enam belas 26,000,000.00 Dua Puluh Enam 0.16 Enam belas 27,000,000.00 Dua Puluh Tujuh 0.16 Enam belas 28,000,000.00 Dua Puluh Delapa0.16 Enam belas 29,000,000.00 Dua Puluh Sembil0.16 Enam belas 30,000,000.00 Tiga Puluh Juta 0.17 Tujuh belas 31,000,000.00 Tiga Puluh Satu J0.17 Tujuh belas 32,000,000.00 Tiga Puluh Dua J 0.17 Tujuh belas 33,000,000.00 Tiga Puluh Tiga J 0.17 Tujuh belas 34,000,000.00 Tiga Puluh Empat0.17 Tujuh belas 35,000,000.00 Tiga Puluh Lima J0.17 Tujuh belas 36,000,000.00 Tiga Puluh Enam 0.17 Tujuh belas 37,000,000.00 Tiga Puluh Tujuh 0.17 Tujuh belas 38,000,000.00 Tiga Puluh Delap 0.17 Tujuh belas 39,000,000.00 Tiga Puluh Sembi0.17 Tujuh belas 40,000,000.00 Empat Puluh Juta0.18 Delapan belas 41,000,000.00 Empat Puluh Satu0.18 Delapan belas 42,000,000.00 Empat Puluh Dua 0.18 Delapan belas 43,000,000.00 Empat Puluh Tiga0.18 Delapan belas 44,000,000.00 Empat Puluh Emp0.18 Delapan belas 45,000,000.00 Empat Puluh Lima0.18 Delapan belas 46,000,000.00 Empat Puluh Ena 0.18 Delapan belas 47,000,000.00 Empat Puluh Tuju0.18 Delapan belas 48,000,000.00 Empat Puluh Dela0.18 Delapan belas 49,000,000.00 Empat Puluh Semb0.18 Delapan belas 50,000,000.00 Lima Puluh Juta 0.19 Sembilan belas 51,000,000.00 Lima Puluh Satu 0.19 Sembilan belas 52,000,000.00 Lima Puluh Dua J0.19 Sembilan belas 53,000,000.00 Lima Puluh Tiga J0.19 Sembilan belas 54,000,000.00 Lima Puluh Empat0.19 Sembilan belas 55,000,000.00 Lima Puluh Lima 0.19 Sembilan belas 56,000,000.00 Lima Puluh Enam0.19 Sembilan belas 57,000,000.00 Lima Puluh Tujuh 0.19 Sembilan belas

58,000,000.00 Lima Puluh Delap0.19 Sembilan belas 59,000,000.00 Lima Puluh Sembi0.19 Sembilan belas 60,000,000.00 Enam Puluh Juta 0.20 dua puluh 61,000,000.00 Enam Puluh Satu 0.20 dua puluh 62,000,000.00 Enam Puluh Dua 0.20 dua puluh 63,000,000.00 Enam Puluh Tiga 0.20 dua puluh 64,000,000.00 Enam Puluh Empa0.20 dua puluh 65,000,000.00 Enam Puluh Lima0.20 dua puluh 66,000,000.00 Enam Puluh Enam0.20 dua puluh 67,000,000.00 Enam Puluh Tujuh0.20 dua puluh 68,000,000.00 Enam Puluh Dela 0.20 dua puluh 69,000,000.00 Enam Puluh Semb0.20 dua puluh 70,000,000.00 Tujuh Puluh Juta 0.21 dua puluh Satu 71,000,000.00 Tujuh Puluh Satu 0.21 dua puluh Satu 72,000,000.00 Tujuh Puluh Dua 0.21 dua puluh Satu 73,000,000.00 Tujuh Puluh Tiga 0.21 dua puluh Satu 74,000,000.00 Tujuh Puluh Empa0.21 dua puluh Satu 75,000,000.00 Tujuh Puluh Lima 0.21 dua puluh Satu 76,000,000.00 Tujuh Puluh Enam0.21 dua puluh Satu 77,000,000.00 Tujuh Puluh Tujuh0.21 dua puluh Satu 78,000,000.00 Tujuh Puluh Dela 0.21 dua puluh Satu 79,000,000.00 Tujuh Puluh Semb0.21 dua puluh Satu 80,000,000.00 Delapan Puluh Ju0.22 dua puluh Dua 81,000,000.00 Delapan Puluh Sa0.22 dua puluh Dua 82,000,000.00 Delapan Puluh Du0.22 dua puluh Dua 83,000,000.00 Delapan Puluh Ti 0.22 dua puluh Dua 84,000,000.00 Delapan Puluh Em0.22 dua puluh Dua 85,000,000.00 Delapan Puluh Li 0.22 dua puluh Dua 86,000,000.00 Delapan Puluh E 0.22 dua puluh Dua 87,000,000.00 Delapan Puluh Tu0.22 dua puluh Dua 88,000,000.00 Delapan Puluh De0.22 dua puluh Dua 89,000,000.00 Delapan Puluh Se0.22 dua puluh Dua 90,000,000.00 Sembilan Puluh J 0.23 dua puluh Tiga 91,000,000.00 Sembilan Puluh S0.23 dua puluh Tiga 92,000,000.00 Sembilan Puluh D0.23 dua puluh Tiga 93,000,000.00 Sembilan Puluh T0.23 dua puluh Tiga 94,000,000.00 Sembilan Puluh E0.23 dua puluh Tiga 95,000,000.00 Sembilan Puluh L0.23 dua puluh Tiga 96,000,000.00 Sembilan Puluh 0.23 dua puluh Tiga 97,000,000.00 Sembilan Puluh T0.23 dua puluh Tiga 98,000,000.00 Sembilan Puluh D0.23 dua puluh Tiga 99,000,000.00 Sembilan Puluh S0.23 dua puluh Tiga

### Seratus 0.24 dua puluh Empat### Dua Ratus 0.24 dua puluh Empat### Tiga Ratus 0.24 dua puluh Empat### Empat Ratus 0.24 dua puluh Empat### Lima Ratus 0.24 dua puluh Empat### Enam Ratus 0.24 dua puluh Empat### Tujuh Ratus 0.24 dua puluh Empat### Delapan Ratus 0.24 dua puluh Empat

### Sembilan Ratus 0.24 dua puluh Empat### Satu Milyar 0.24 dua puluh Empat### Dua Milyar 0.25 dua puluh Lima### Tiga Milyar 0.25 dua puluh Lima### Empat Milyar 0.25 dua puluh Lima### Lima Milyar 0.25 dua puluh Lima### Enam Milyar 0.25 dua puluh Lima### Tujuh Milyar 0.25 dua puluh Lima### Delapan Milyar 0.25 dua puluh Lima### Sembilan Milyar 0.25 dua puluh Lima### Sepuluh Milyar 0.25 dua puluh Lima### Sebelas Milyar 0.25 dua puluh Lima### Dua Belas Milyar 0.26 dua puluh Enam### Tiga Belas Milyar 0.26 dua puluh Enam### Empat Belas Mily 0.26 dua puluh Enam### Lima Belas Milyar0.26 dua puluh Enam### Enam Belas Milya0.26 dua puluh Enam### Tujuh Belas Milya0.26 dua puluh Enam### Delapan Belas Mi0.26 dua puluh Enam### Sembilan Belas Mi0.26 dua puluh Enam### Dua Puluh Milyar 0.26 dua puluh Enam### Dua Puluh Satu M0.26 dua puluh Enam### Dua Puluh Dua Mi0.27 dua puluh Tujuh### Dua Puluh Tiga Mi0.27 dua puluh Tujuh### Dua Puluh Empat 0.27 dua puluh Tujuh### Dua Puluh Lima M0.27 dua puluh Tujuh### Dua Puluh Enam M0.27 dua puluh Tujuh### Dua Puluh Tujuh M0.27 dua puluh Tujuh### Dua Puluh Delapa0.27 dua puluh Tujuh### Dua Puluh Sembil0.27 dua puluh Tujuh### Tiga Puluh Milyar 0.27 dua puluh Tujuh### Tiga Puluh Satu M0.27 dua puluh Tujuh### Tiga Puluh Dua Mi0.28 dua puluh Delapan### Tiga Puluh Tiga M0.28 dua puluh Delapan### Tiga Puluh Empat0.28 dua puluh Delapan### Tiga Puluh Lima M0.28 dua puluh Delapan### Tiga Puluh Enam 0.28 dua puluh Delapan### Tiga Puluh Tujuh 0.28 dua puluh Delapan### Tiga Puluh Delapa0.28 dua puluh Delapan### Tiga Puluh Sembil0.28 dua puluh Delapan### Empat Puluh Mily 0.28 dua puluh Delapan### Empat Puluh Satu0.28 dua puluh Delapan### Empat Puluh Dua 0.29 dua puluh Sembilan### Empat Puluh Tiga0.29 dua puluh Sembilan### Empat Puluh Empa0.29 dua puluh Sembilan### Empat Puluh Lima0.29 dua puluh Sembilan### Empat Puluh Ena 0.29 dua puluh Sembilan### Empat Puluh Tuju0.29 dua puluh Sembilan### Empat Puluh Dela0.29 dua puluh Sembilan### Empat Puluh Semb0.29 dua puluh Sembilan

### Lima Puluh Milyar0.29 dua puluh Sembilan### Lima Puluh Satu M0.29 dua puluh Sembilan### Lima Puluh Dua M0.30 tiga puluh### Lima Puluh Tiga M0.30 tiga puluh### Lima Puluh Empat0.30 tiga puluh### Lima Puluh Lima 0.30 tiga puluh### Lima Puluh Enam 0.30 tiga puluh### Lima Puluh Tujuh 0.30 tiga puluh### Lima Puluh Delap0.30 tiga puluh### Lima Puluh Sembi0.30 tiga puluh### Enam Puluh Milya0.30 tiga puluh### Enam Puluh Satu 0.30 tiga puluh### Enam Puluh Dua M0.31 tiga puluh Satu### Enam Puluh Tiga 0.31 tiga puluh Satu### Enam Puluh Empa0.31 tiga puluh Satu### Enam Puluh Lima 0.31 tiga puluh Satu### Enam Puluh Enam0.31 tiga puluh Satu### Enam Puluh Tujuh0.31 tiga puluh Satu### Enam Puluh Delap0.31 tiga puluh Satu### Enam Puluh Sembi0.31 tiga puluh Satu### Tujuh Puluh Milya0.31 tiga puluh Satu### Tujuh Puluh Satu 0.31 tiga puluh Satu### Tujuh Puluh Dua 0.32 tiga puluh Dua### Tujuh Puluh Tiga 0.32 tiga puluh Dua### Tujuh Puluh Empa0.32 tiga puluh Dua### Tujuh Puluh Lima 0.32 tiga puluh Dua### Tujuh Puluh Enam0.32 tiga puluh Dua### Tujuh Puluh Tujuh0.32 tiga puluh Dua### Tujuh Puluh Dela 0.32 tiga puluh Dua### Tujuh Puluh Semb0.32 tiga puluh Dua### Delapan Puluh Mi0.32 tiga puluh Dua### Delapan Puluh Sa0.32 tiga puluh Dua### Delapan Puluh Du0.33 tiga puluh Tiga### Delapan Puluh Tig0.33 tiga puluh Tiga### Delapan Puluh Em0.33 tiga puluh Tiga### Delapan Puluh Li 0.33 tiga puluh Tiga### Delapan Puluh En0.33 tiga puluh Tiga### Delapan Puluh Tu0.33 tiga puluh Tiga### Delapan Puluh De0.33 tiga puluh Tiga### Delapan Puluh Se0.33 tiga puluh Tiga### Sembilan Puluh M0.33 tiga puluh Tiga### Sembilan Puluh S0.33 tiga puluh Tiga### Sembilan Puluh D0.34 tiga puluh Empat### Sembilan Puluh Ti0.34 tiga puluh Empat### Sembilan Puluh E0.34 tiga puluh Empat### Sembilan Puluh L0.34 tiga puluh Empat### Sembilan Puluh E0.34 tiga puluh Empat### Sembilan Puluh T0.34 tiga puluh Empat### Sembilan Puluh D0.34 tiga puluh Empat### Sembilan Puluh S0.34 tiga puluh Empat

### Seratus 0.34 tiga puluh Empat### Dua Ratus 0.34 tiga puluh Empat### Tiga Ratus 0.35 tiga puluh Lima### Empat Ratus 0.35 tiga puluh Lima### Lima Ratus 0.35 tiga puluh Lima### Enam Ratus 0.35 tiga puluh Lima### Tujuh Ratus 0.35 tiga puluh Lima### Delapan Ratus 0.35 tiga puluh Lima### Sembilan Ratus 0.35 tiga puluh Lima### Satu Trilyun 0.35 tiga puluh Lima### Dua Trilyun 0.35 tiga puluh Lima### Tiga Trilyun 0.35 tiga puluh Lima### Empat Trilyun 0.36 tiga puluh Enam### Lima Trilyun 0.36 tiga puluh Enam### Enam trilyun 0.36 tiga puluh Enam### Tujuh Trilyun 0.36 tiga puluh Enam### Delapan Trilyun 0.36 tiga puluh Enam### Sembilan Trilyun 0.36 tiga puluh Enam### Sepuluh Trilyun 0.36 tiga puluh Enam

0.36 tiga puluh Enam0.36 tiga puluh Enam0.36 tiga puluh Enam0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.37 tiga puluh Tujuh0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.38 tiga puluh Delapan0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan

0.39 tiga puluh Sembilan0.39 tiga puluh Sembilan0.40 empat puluh0.40 empat puluh0.40 empat puluh0.40 empat puluh0.40 empat puluh0.40 empat puluh0.40 empat puluh0.40 empat puluh0.40 empat puluh0.40 empat puluh0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.41 empat puluh Satu0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.42 empat puluh Dua0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.43 empat puluh Tiga0.44 empat puluh Empat0.44 empat puluh Empat0.44 empat puluh Empat0.44 empat puluh Empat0.44 empat puluh Empat0.44 empat puluh Empat0.44 empat puluh Empat0.44 empat puluh Empat

0.44 empat puluh Empat0.44 empat puluh Empat0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.45 empat puluh Lima0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.46 empat puluh Enam0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.47 empat puluh Tujuh0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.48 empat puluh Delapan0.49 empat puluh Sembilan0.49 empat puluh Sembilan0.49 empat puluh Sembilan0.49 empat puluh Sembilan0.49 empat puluh Sembilan0.49 empat puluh Sembilan0.49 empat puluh Sembilan0.49 empat puluh Sembilan

0.49 empat puluh Sembilan0.49 empat puluh Sembilan0.50 lima puluh0.50 lima puluh0.50 lima puluh0.50 lima puluh0.50 lima puluh0.50 lima puluh0.50 lima puluh0.50 lima puluh0.50 lima puluh0.50 lima puluh0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.51 lima puluh Satu0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.52 lima puluh Dua0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.53 lima puluh Tiga0.54 lima puluh Empat0.54 lima puluh Empat0.54 lima puluh Empat0.54 lima puluh Empat0.54 lima puluh Empat0.54 lima puluh Empat0.54 lima puluh Empat0.54 lima puluh Empat

0.54 lima puluh Empat0.54 lima puluh Empat0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.55 lima puluh Lima0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.56 lima puluh Enam0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.57 lima puluh Tujuh0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.58 lima puluh Delapan0.59 lima puluh Sembilan0.59 lima puluh Sembilan0.59 lima puluh Sembilan0.59 lima puluh Sembilan0.59 lima puluh Sembilan0.59 lima puluh Sembilan0.59 lima puluh Sembilan0.59 lima puluh Sembilan

0.59 lima puluh Sembilan0.59 lima puluh Sembilan0.60 enam puluh0.60 enam puluh0.60 enam puluh0.60 enam puluh0.60 enam puluh0.60 enam puluh0.60 enam puluh0.60 enam puluh0.60 enam puluh0.60 enam puluh0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.61 enam puluh Satu0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.62 enam puluh Dua0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.63 enam puluh Tiga0.64 enam puluh Empat0.64 enam puluh Empat0.64 enam puluh Empat0.64 enam puluh Empat0.64 enam puluh Empat0.64 enam puluh Empat0.64 enam puluh Empat0.64 enam puluh Empat

0.64 enam puluh Empat0.64 enam puluh Empat0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.65 enam puluh Lima0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.66 enam puluh Enam0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.67 enam puluh Tujuh0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.68 enam puluh Delapan0.69 enam puluh Sembilan0.69 enam puluh Sembilan0.69 enam puluh Sembilan0.69 enam puluh Sembilan0.69 enam puluh Sembilan0.69 enam puluh Sembilan0.69 enam puluh Sembilan0.69 enam puluh Sembilan

0.69 enam puluh Sembilan0.69 enam puluh Sembilan0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.70 tujuh puluh0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.71 tujuh puluh Satu0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.72 tujuh puluh Dua0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.73 tujuh puluh Tiga0.74 tujuh puluh Empat0.74 tujuh puluh Empat0.74 tujuh puluh Empat0.74 tujuh puluh Empat0.74 tujuh puluh Empat0.74 tujuh puluh Empat0.74 tujuh puluh Empat0.74 tujuh puluh Empat

0.74 tujuh puluh Empat0.74 tujuh puluh Empat0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.75 tujuh puluh Lima0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.76 tujuh puluh Enam0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.77 tujuh puluh Tujuh0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.78 tujuh puluh Delapan0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan

0.79 tujuh puluh Sembilan0.79 tujuh puluh Sembilan0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.80 delapan puluh0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.81 delapan puluh Satu0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.82 delapan puluh Dua0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.83 delapan puluh Tiga0.84 delapan puluh Empat0.84 delapan puluh Empat0.84 delapan puluh Empat0.84 delapan puluh Empat0.84 delapan puluh Empat0.84 delapan puluh Empat0.84 delapan puluh Empat0.84 delapan puluh Empat

0.84 delapan puluh Empat0.84 delapan puluh Empat0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.85 delapan puluh Lima0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.86 delapan puluh Enam0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.87 delapan puluh Tujuh0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.88 delapan puluh Delapan0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan

0.89 delapan puluh Sembilan0.89 delapan puluh Sembilan0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.90 sembilan puluh0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.91 sembilan puluh Satu0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.92 sembilan puluh Dua0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.93 sembilan puluh Tiga0.94 sembilan puluh Empat0.94 sembilan puluh Empat0.94 sembilan puluh Empat0.94 sembilan puluh Empat0.94 sembilan puluh Empat0.94 sembilan puluh Empat0.94 sembilan puluh Empat0.94 sembilan puluh Empat

0.94 sembilan puluh Empat0.94 sembilan puluh Empat0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.95 sembilan puluh Lima0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.96 sembilan puluh Enam0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.97 sembilan puluh Tujuh0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.98 sembilan puluh Delapan0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan

0.99 sembilan puluh Sembilan0.99 sembilan puluh Sembilan1.001.001.001.001.00

PROGRAM TERBILANG

SEWA PERALATAN KANTOR

960,000,000.00 - - - 900,000,000.00 Sembilan Ratus 60,000,000.00 Enam Puluh Juta - - - - - Rupiah - -

Cek Bilangan 960,000,000.00 ok!

Sembilan Ratus Enam Puluh Juta Rupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!

1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi3. Have a nice season

4,300,000.00 - - - - 4,000,000.00 Empat Juta 300,000.00 Tiga Ratus - Ribu - - - Rupiah

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

- -

Cek Bilangan 4,300,000.00 ok!

Empat Juta Tiga Ratus Ribu Rupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!

1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi3. Have a nice season

SEWA KENDERAAN RODA DUA

600,000.00 - - - - - 600,000.00 Enam Ratus - Ribu - - - Rupiah - -

Cek Bilangan 600,000.00 ok!

Enam Ratus Ribu Rupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!

1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi3. Have a nice season

SEWA GEDUNG KANTOR

5,000,000.00

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

- - - - 5,000,000.00 Lima Juta - - - - - Rupiah - -

Cek Bilangan 5,000,000.00 ok!

Lima Juta Rupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!

1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi3. Have a nice season

36,542,440.00 - - - - 36,000,000.00 Tiga Puluh Enam Juta 500,000.00 Lima Ratus 42,000.00 Empat Puluh Dua Ribu 400.00 Empat Ratus 40.00 Empat Puluh - Rupiah - -

Cek Bilangan 36,542,440.00 ok!

Tiga Puluh Enam Juta Lima Ratus Empat Puluh Dua Ribu Empat Ratus Empat PuluhRupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!

1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

Masukkan nilai angka yang dimaksud (akan diterjemahkan dalam huruf)

Hasil (akan keluar otomatis).

3. Have a nice season

REKAPITULASI

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR SUB PEKERJAAN : PEKERJAAN REKAP KESELURUHAN

NO URAIAN KEGIATAN

I. PEKERJAAN TEMPAT WUDHUK

II. PEKERJAAN LANSCAPING

JUMLAH

DIBULATKAN

Terbilang : Sembilan Ratus Enam Puluh Juta Rupiah

Banda Aceh, 10 Agustus 2015

Ketua Panitia Pembangunan Mesjid Jamik Bukit Baro Konsultan Perencana

Kecamatan Montasik Kabupaten Aceh Besar CV MULTI CIPTA KONSULTAN

ANSARI MUHAMMAD, S.Pt Ir. T. I S H A K

Direktur

Imam Mesjid Imam Mukim

Tgk. H. ZAINUN ISHAK NIRWANSYAH RASYID, ST,Mt

REKAPITULASI

: RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

JUMLAH

837,941,106.92

122,059,369.28

960,000,476.19

960,000,000.00

Sembilan Ratus Enam Puluh Juta Rupiah

Banda Aceh, 10 Agustus 2015

Konsultan Perencana

CV MULTI CIPTA KONSULTAN

Ir. T. I S H A K

Direktur

Imam Mukim

NIRWANSYAH RASYID, ST,Mt

REKAPITULASI

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR

SUB PEKERJAAN : PEKERJAAN LANSCAPING

NO URAIAN KEGIATAN

I. PEKERJAAN TANAH

II. PEKERJAAN PASANGAN DAN PAVING BLOCK

Ketua Panitia Pembangunan Mesjid Jamik Bukit Baro

Kecamatan Montasik Kabupaten Aceh Besar

ANSARI MUHAMMAD, S.Pt

Imam Mesjid

Tgk. H. ZAINUN ISHAK

REKAPITULASI

: RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

: KECAMATAN MONTASIK KABUPATEN ACEH BESAR

URAIAN KEGIATAN JUMLAH

29,529,744.40

92,529,624.88

SUB JUMLAH 122,059,369.28

Banda Aceh, 10 Agustus 2015

Konsultan Perencana

CV MULTI CIPTA KONSULTAN

Ir. T. I S H A K

Direktur

Imam Mukim

NIRWANSYAH RASYID, ST,Mt

REKAPITULASI

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR

SUB PEKERJAAN : PEKERJAAN TEMPAT WUDHUK

NO URAIAN KEGIATAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH

III. PEKERJAAN PASANGAN/BETON

IV. PEKERJAAN PASANGAN & PLESTERAN

V. PEKERJAAN LANTAI DAN KERAMIK

VI. PEKERJAAN KOSEN, PINTU & JENDELA

VII. PEKERJAAN ELEKTRIKAL

VIII. PEKERJAAN SANITASI

IX. PEKERJAAN PENGECATAN

SUB JUMLAH

Banda Aceh, 10 Agustus 2015

Ketua Panitia Pembangunan Mesjid Jamik Bukit Baro Konsultan Perencana

Kecamatan Montasik Kabupaten Aceh Besar CV MULTI CIPTA KONSULTAN

ANSARI MUHAMMAD, S.Pt Ir. T. I S H A K

Direktur

Imam Mesjid Imam Mukim

Tgk. H. ZAINUN ISHAK NIRWANSYAH RASYID, ST,Mt

REKAPITULASI

: RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

JUMLAH

3,118,624.00

10,361,228.62

331,566,640.15

144,128,849.28

155,370,952.71

93,824,716.80

12,823,800.00

78,650,698.74

8,095,596.62

837,941,106.92

Banda Aceh, 10 Agustus 2015

Konsultan Perencana

CV MULTI CIPTA KONSULTAN

Ir. T. I S H A K

Direktur

Imam Mukim

NIRWANSYAH RASYID, ST,Mt

RENCANA ANGGARAN BIAYA

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR

SUB PEKERJAAN : PEKERJAAN LANSCAPING

NO URAIAN PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5

I. PEKERJAAN TANAH

DIVISI 1. - MOBILISASI 1.00 Ls 1.2

DIVISI 2. PEKERJAAN TANAH

1 Galian Tanah dengan Alat Berat 891.15 m3 2.1 (1)

2 Galian Pondasi Penahan Tanah 17.82 m3 A.2.3.1.1

3 Urungan Kembali Bekas Galian 4.46 m3 A.2.3.1.9

II. PEKERJAAN PASANGAN DAN PAVING BLOCK

1 Pas. Batu Kosong / Astamping 3.24 m3 A.3.1.1.9

2 Pas. Batu Gunung Penahan Tanah 45.32 m3 A.3.2.1.1

3 Plesteran Campuran 1 : 4 83.58 m2 A.4.4.2.4

4 Pasangan paving block T. 8 cm 353.40 m2 ANL. G. 60

RENCANA ANGGARAN BIAYA

: RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

HARGA SATUAN JUMLAH TOTAL

6 7

7,600,000.00 7,600,000.00

23,509.00 20,950,045.35

50,750.00 904,365.00

16,910.00 75,334.05

Sub Jumlah 29,529,744.40

320,410.00 1,038,128.40

721,540.00 32,696,585.10

47,480.00 3,968,435.38

155,140.00 54,826,476.00

Sub Jumlah 92,529,624.88

DAFTAR KUANTITAS DAN HARGA

Pekerjaan : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR SUB PEKERJAAN : PEKERJAAN LANSCAPING

Uraian

No. Mata

SatuanPerkiraan

Pembayaran Kuantitas

a b c d

DIVISI 1. - MOBILISASI 1.2 Mobilisasi Lump sum 1.00

DIVISI 2. DRAINASE 2.1 Pekerjaan Galian untuk Selokan Drainase dan Saluran A 0.002.2 Pekerjaan Pasangan Batu dengan Mortar 0.00

2.3 (1) Gorong-Gorong Pipa Beton Bertulang, Diameter Dala 0.002.3 (2) Gorong-Gorong Pipa Beton Bertulang, Diameter Dala 0.002.3 (3) Gorong-Gorong Pipa Beton Bertulang, Diameter Dalam 0.00

DIVISI 2. PEKERJAAN TANAH 2.1 (1) Galian Biasa 488.00 3.1 (2) Galian Batu 0.003.1 (3) Galian Struktur dengan Kedalaman 0 - 2 meter 0.003.1 (4) Galian Struktur dengan Kedalaman 2 - 4 meter 0.002.1 (5) Galian Struktur dengan Kedalaman 4 - 6 meter 0.003.1 (8) Biaya Tambahan untuk Galian Struktur Bila Lokasi Gali 0.002.2 (1) Timbunan Biasa 0.003.2 (2) Timbunan Pilihan 0.003.2 (3) Timbunan Pilihan di Atas Tanah Rawa (diukur di atas ba 0.00

3.3 Penyiapan Badan Jalan 0.00

DIVISI 3. PERKERASAN BERBUTIR 3.1 (1) Lapis Pondasi Agregat Kelas B 0.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M3

M3

M1

M1

M1

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M3

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DAFTAR KUANTITAS DAN HARGA

: RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

Harga Jumlah Satuan Harga-Harga

(Rupiah) (Rupiah) e f = (d x e)

7,600,000.00 7,600,000.00

7,600,000.00

- - - - - - - - - -

-

23,509.00 11,472,392.00 - - - - - - - -

- 14,412.00 - - - - - - -

11,472,392.00

- -

-

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

ITEM PEMBAYARAN NO. : 1.2JENIS PEKERJAAN : MOBILISASI

Lembar 1.2-1 HARGA JUMLAH

No. U R A I A N SATUAN VOL. SATUAN HARGA (Rp.) (Rp.)

A. PERALATAN Ls1 MOTOR GRADER >100 HP2 DUMP TRUCK 3-4 M3 2 400,000.00 800,000.00 3 EXCAVATOR 80-140 HP 1 3,000,000.00 3,000,000.00 4 VIBRATORY ROLLER 5-8 T. -

Jumlah 3,800,000.00

B. MOBILISASI LAINNYAB.I. PEKERJAAN DARURAT

3 Papan Nama Proyek Buah -

B.II. LAIN-LAIN 1 Komunikasi Lapangan Lengkap Set -

Jumlah -

C. DEMOBILISASI LS 1 3,800,000.00 3,800,000.00

Jumlah 3,800,000.00

Total Biaya Mobilisasi 7,600,000.00

Catatan Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan labaserta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. : 1.2JENIS PEKERJAAN : MOBILISASI

Lembar 1.2-2 KODE HARGA JUMLAH

No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA (Rp.) (Rp.)

A. PERALATAN

1 DUMP TRUCK 3-4 M3 E08 Unit 2 400,000.00 800,000.00 2 EXCAVATOR 80-140 HP E10 Unit 1 2,500,000.00 2,500,000.00 3 MOTOR GRADER >100 HP E13 Unit 1 - - 4 VIBRATORY ROLLER 5-8 T. E19 Unit 1 - -

Total untuk Item B pada Lembar 1 3,300,000.00

ITEM PEMBAYARAN NO. : 2.1 (1) Analisa EI-311JENIS PEKERJAAN : Galian BiasaSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : halaman SMA Unggul 3 Kondisi lokasi : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA 1 Tanah yang dipotong umumnya bukit 2 Penggalian dilakukan dengan menggunakan Excavator 3

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHANBahan timbunan = 1 x Fk (M08) 1.20 M3

2. ALAT 2.a. EXCAVATOR (E10)

Kapasitas Bucket V 0.90 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.75 -

Waktu siklus Ts1 menit- Menggali / memuat T1 0.50 menit- Lain-lain T2 0.25 menit

Ts1 0.75 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 40.50 M3/JamTs1 x Fh

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0247 Jam

2.b. DUMP TRUCK (E08)Kapasitas bak V 4.00 M3Faktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 20.00 KM/JamKecepatan rata-rata kosong v2 40.00 KM/JamWaktu siklus Ts2 menit Note: 1- Waktu tempuh isi = (L : v1) x 60 T1 0.00 menit- Waktu tempuh kosong = (L : v2) x 60 T2 0.00 menit- Muat = (V : Q1) x 60 T3 5.93 menit- Lain-lain T4 1.00 menit

Ts2 6.93 menitBerlanjut ke halaman berikut

Selanjutnya Excavator membuang material disekitar lokasi pekerjaan

Analisa EI-311

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR SUB PEKERJAAN : PEKERJAAN LANSCAPING

Tahun : 2015 JENIS PEKERJAAN : Galian Biasa SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0494 7,300.00 360.49 2. Mandor (L03) Jam 0.0247 11,100.00 274.07

JUMLAH HARGA TENAGA 634.57

B. BAHAN

1. Bahan timbunan (M08) M3 1.2000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0247 467,847.88 11,551.80 2. Dump Truck (E08) Jam 0.0417 218,368.13 9,110.85 3. Alat Bantu Ls 1.0000 75.00 75.00

JUMLAH HARGA PERALATAN 20,737.65

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 21,372.22 E. OVERHEAD & PROFIT 10.0 % x D 2,137.22 F. HARGA SATUAN PEKERJAAN ( D + E ) 23,509.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 2.1 (1) Analisa EI-311JENIS PEKERJAAN : Galian BiasaSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 23.97 M3/Jam Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.0417 Jam

2.d. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Sekop- Keranjang

3. TENAGAProduksi menentukan : EXCAVATOR Q1 40.50 M3/JamProduksi Galian / hari = Tk x Q1 Qt 324.00 M3Kebutuhan tenaga :

- Pekerja P 2.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.0494 Jam- Mandor = (Tk x M) : Qt (L03) 0.0247 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 23,509.00 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : 1 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 0.00 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 3.1 (2) Analisa EI-312JENIS PEKERJAAN : Galian BatuSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Pekerjaan dilakukan secara manual 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi Jalan : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA 1 Batu yg dipotong umumnya berada disisi jalan 2 Penggalian dilakukan dengan Excavator, Compresor

dan Jack Hammer, dimuat ke dlm Truk dengan Loader. 3 Dump Truck membuang material hasil galian keluar

lokasi jalan sejauh : L 1.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHANTidak ada bahan yang diperlukan

2. ALAT 2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)

Produksi per jam Q1 8.00 M3 / Jam

Koefisien Alat / m3 = 1 : Q1 (E05/26) 0.1250 Jam

2.b. DUMP TRUCK (E08)Kaasitas bak V 4.00 M3Faktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 20.00 KM/JamKecepatan rata-rata kosong v2 40.00 KM/JamWaktu siklus Ts1 menit- Waktu tempuh isi = (L : v1) x 60 T1 3.00 menit- Waktu tempuh kosong = (L : v2) x 60 T2 1.50 menit- Muat = (V : Q1) x 60 T3 30.00 menit- Lain-lain T4 2.00 menit

Ts1 36.50 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 4.55 M3 / Jam Fk x Ts1

Note: 1Koefisien Alat / m3 = 1 : Q2 (E08) 0.2199 Jam

Berlanjut ke halaman berikut

Analisa EI-312

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PROYEK : Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh BesarNo. PAKET KONTRAKNAMA PAKET : 2012PROP / KAB / KODYA : ITEM PEMBAYARAN NO. : 3.1 (2) PERKIRAAN VOL. PEK. : 0.00 JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) : 0.00 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2500 7,300.00 1,825.00 2. Mandor (L03) Jam 0.1250 11,100.00 1,387.50

JUMLAH HARGA TENAGA 3,212.50

B. BAHAN

(E05/26/10/15)

JUMLAH HARGA BAHAN 0.00

C. PERALATAN1. Compressor (E05) Jam 0.1250 166,716.39 20,839.55 2. Jack Hammer (E26) Jam 0.1250 55,605.32 6,950.67 3. Wheel Loader (E15) Jam 0.1250 334,125.00 41,765.62 4. Excavator (E10) Jam 0.1250 467,847.88 58,480.99 5 Dump Truck (E08) Jam 0.2199 218,368.13 48,014.68

Alat bantu Ls 1.0000 225.00 225.00

JUMLAH HARGA PERALATAN 176,276.50

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 179,489.00 E. OVERHEAD & PROFIT 10.0 % x D 17,948.90 F. HARGA SATUAN PEKERJAAN ( D + E ) 197,438.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 3.1 (2) Analisa EI-312JENIS PEKERJAAN : Galian BatuSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Pahat / Tatah = 2 buah- Palu Besar = 2 buah

3. TENAGAProduksi menentukan : JACK HAMMER Q1 8.00 M3/JamProduksi Galian / hari = Tk x Q1 Qt 64.00 M3Kebutuhan tenaga :

- Pekerja P 2.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.2500 Jam- Mandor = (Tk x M) : Qt (L03) 0.1250 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 197,438.00 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 0.00 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 3.1 (3) Analisa EI-313JENIS PEKERJAAN : Galian Struktur Kedalaman 0-2 MSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Pekerjaan dilakukan secara manual 2 Lokasi pekerjaan : sekitar jembatan 3 Kondisi Jalan : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fh 1.20 - 6 Uk 0.00 %/M3

II. METHODE PELAKSANAAN 1 Tanah yang dipotong berada disekitar lokasi 2 Penggalian dilakukan dengan menggunakan alat

Excavator 3 Bulldozer mengangkut/mengusur hasil galian ke tempat

pembuangan di sekitar lokasi pekerjaan L 0.0750 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN= Uk x 1M3 (EI-322) 0.00 M3

2. ALAT 2.a. EXCAVATOR (E10)

Kapasitas Bucket V 0.90 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.75 -Faktor kedalaman Fd 0.80 -Berat isi material Bim 0.85 -

Waktu siklus- Menggali / memuat Te1 0.50 menit- Lain-lain Te2 0.25 menit

Te 0.75 menit

Kap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 27.54 M3/JamTe x Fh

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0363 Jam

2.a. BULLDOZER (E04)Faktor blade Fb 0.90 -Faktor efisiensi alat Fa 0.83 -Kecepatan maju F 3.00 Km/JamKecepatan mundur R 4.00 Km/JamLebar Blade B 3.00 M

` Tinggi blade H 1.20 M Note: 1Jarak Gusur L 75.00 M

Volume 1 kali gusur = H^2 x B x Fb V 3.89 M3 Loose

Berlanjut ke halaman berikut

Pengurugan kembali (backfill) untuk struktur

- Urugan Pilihan (untuk backfill)

Analisa EI-313

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PROYEK : Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh BesarNo. PAKET KONTRAKNAMA PAKET : 2012PROP / KAB / KODYA : ITEM PEMBAYARAN NO. : 3.1 (3) PERKIRAAN VOL. PEK. : 0.00 JENIS PEKERJAAN : Galian Struktur Kedalaman 0-2 M TOTAL HARGA (Rp.) : 0.00 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.000

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1452 7,300.00 1,060.28 2. Mandor (L03) Jam 0.0363 11,100.00 403.05

JUMLAH HARGA TENAGA 1,463.33

B. BAHAN

1. Urugan Pilihan (EI-322) M3 0.0000 131,304.51 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN1. Excavator (E10) Jam 0.0363 467,847.88 16,987.94 2. Bulldozer (E04) Jam 0.0172 479,476.02 8,246.23 3. Alat bantu Ls 1.0000 100.00 100.00

JUMLAH HARGA PERALATAN 25,334.17

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 26,797.50 E. OVERHEAD & PROFIT 10.0 % x D 2,679.75 F. HARGA SATUAN PEKERJAAN ( D + E ) 29,477.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 3.1 (3) Analisa EI-313JENIS PEKERJAAN : Galian Struktur Kedalaman 0-2 MSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Waktu Siklus- Maju = (L x 60) / (F x 1000) Tb1 1.50 menit- Mundur = (L x 60) / (R x 1000) Tb2 1.13 menit- Lain-lain Tb3 0.15 menit

Tb 2.78 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 58.14 M3 / Jam Tb x Fh

Koefisien Alat / M3 = 1 : Q2 (E04) 0.0172 Jam

2.d. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Pacul = 2 buah- Sekop = 2 buah

3. TENAGAProduksi menentukan : EXCAVATOR Q1 27.54 M3/JamProduksi Galian / hari = Tk x Q1 Qt 220.32 M3Kebutuhan tenaga :

- Pekerja P 4.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.1452 Jam- Mandor = (Tk x M) : Qt (L03) 0.0363 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 29,477.00 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 403.05 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 3.1 (4) Analisa EI-314JENIS PEKERJAAN : Galian Struktur Kedalaman 2-4 MSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Pekerjaan dilakukan secara manual 2 Lokasi pekerjaan : sekitar jembatan 3 Kondisi Jalan : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fh 1.20 - 6 Uk 0.00 %/M3

II. METHODE PELAKSANAAN 1 Tanah yang dipotong berada disekitar jembatan 2 Penggalian dilakukan dengan menggunakan alat

Excavator 3 Bulldozer mengangkut/mengusur hasil galian ke tempat

pembuangan di sekitar lokasi pekerjaan L 0.0750 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN= Uk x 1M3 (EI-322) 0.00 M3

2. ALAT 2.a. EXCAVATOR (E10)

Kapasitas Bucket V 0.90 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.75 -Faktor kedalaman Fd 0.65 -Berat isi material Bim 0.85 -

Waktu siklus- Menggali / memuat Te1 0.90 menit- Lain-lain Te2 0.25 menit

Te 1.15 menit

Kap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 14.59 M3/JamTe x Fh

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0685 Jam

2.a. BULLDOZER (E04)Faktor blade Fb 0.90 -Faktor efisiensi alat Fa 0.83 -Kecepatan maju F 3.00 Km/JamKecepatan mundur R 4.00 Km/JamLebar Blade B 3.00 M

` Tinggi blade H 1.20 M Note: 1Jarak Gusur L 75.00 M

Volume 1 kali gusur = H^2 x B x Fb V 3.89 M3 Loose

Berlanjut ke halaman berikut

Pengurugan kembali (backfill) untuk struktur

- Urugan Pilihan (untuk backfill)

Analisa EI-314

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PROYEK : Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh BesarNo. PAKET KONTRAK : AcehNAMA PAKET : 2012PROP / KAB / KODYA : ITEM PEMBAYARAN NO. : 3.1 (4) PERKIRAAN VOL. PEK. : 0.00 JENIS PEKERJAAN : Galian Struktur Kedalaman 2-4 M TOTAL HARGA (Rp.) : 0.00 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.6853 7,300.00 5,002.33 2. Mandor (L03) Jam 0.0685 11,100.00 760.63

JUMLAH HARGA TENAGA 5,762.96

B. BAHAN

1. Urugan Pilihan (EI-322) M3 0.0000 131,304.51 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN1. Excavator (E10) Jam 0.0685 467,847.88 32,059.29 2. Bulldozer (E04) Jam 0.0172 479,476.02 8,246.23 3. Alat bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 40,505.52

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 46,268.48 E. OVERHEAD & PROFIT 10.0 % x D 4,626.85 F. HARGA SATUAN PEKERJAAN ( D + E ) 50,895.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 3.1 (4) Analisa EI-314JENIS PEKERJAAN : Galian Struktur Kedalaman 2-4 MSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Waktu Siklus- Maju = (L x 60) / (F x 1000) Tb1 1.50 menit- Mundur = (L x 60) / (R x 1000) Tb2 1.13 menit- Lain-lain Tb3 0.15 menit

Tb 2.78 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 58.14 M3 / Jam Tb x Fh

Koefisien Alat / M3 = 1 : Q2 (E04) 0.0172 Jam

2.d. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Pacul = 2 buah- Sekop = 2 buah

3. TENAGAProduksi menentukan : EXCAVATOR Q1 14.59 M3/JamProduksi Galian / hari = Tk x Q1 Qt 116.75 M3Kebutuhan tenaga :

- Pekerja P 10.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.6853 Jam- Mandor = (Tk x M) : Qt (L03) 0.0685 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 50,895.00 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 760.63 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 3.1 (5) Analisa EI-315JENIS PEKERJAAN : Galian Struktur Kedalaman 4-6 MSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Pekerjaan dilakukan secara manual 2 Lokasi pekerjaan : sekitar jembatan 3 Kondisi Jalan : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fh 1.20 - 6 Uk 50.00 %/M3

II. METHODE PELAKSANAAN 1 Tanah / batu yang dipotong berada disekitar jembatan 2 Penggalian dilakukan dengan mgenggunakan alat

Excavator 3 Bulldozer mengankut/mengusur hasil galian ke tempat

pembuangan dilokasi sekitar jembatan L 0.0750 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN= Uk x 1M3 (EI-322) 0.50 M3

2. ALAT 2.a. EXCAVATOR (E10)

Kapasitas Bucket V 0.90 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.75 -Faktor kedalaman Fd 0.65 -Berat isi material Bim 0.85 -

Waktu siklus- Menggali / memuat Te1 0.65 menit- Lain-lain Te2 0.25 menit

Te 0.90 menit

Kap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 18.65 M3/JamTe x Fh

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0536 Jam

2.a. BULLDOZER (E04)Faktor blade Fb 0.90 -Faktor efisiensi alat Fa 0.83 -Kecepatan maju F 3.00 Km/JamKecepatan mundur R 4.00 Km/JamLebar Blade B 3.00 M

` Tinggi blade H 1.20 M Note: 1Jarak Gusur L 75.00 M

Volume 1 kali gusur = H^2 x B x Fb V 3.89 M3 Loose

Berlanjut ke halaman berikut

Pengurugan kembali (backfill) untuk struktur

- Urugan Pilihan (untuk backfill)

Analisa EI-315

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PROYEK : Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh BesarNo. PAKET KONTRAKNAMA PAKET : 2012PROP / KAB / KODYA : ITEM PEMBAYARAN NO. : 3.1 (5) PERKIRAAN VOL. PEK. : 0.00 JENIS PEKERJAAN : Galian Struktur Kedalaman 4-6 M TOTAL HARGA (Rp.) : 0.00 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.6435 7,300.00 4,697.84 2. Mandor (L03) Jam 0.0536 11,100.00 595.27

JUMLAH HARGA TENAGA 5,293.11

B. BAHAN

1. Urugan Pilihan (EI-322) M3 0.5000 131,304.51 65,652.26

JUMLAH HARGA BAHAN 65,652.26

C. PERALATAN1. Excavator (E10) Jam 0.0536 467,847.88 25,089.88 2. Bulldozer (E04) Jam 0.0172 479,476.02 8,246.23 3. Alat bantu Ls 1.0000 250.00 250.00

JUMLAH HARGA PERALATAN 33,586.11

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 104,531.48 E. OVERHEAD & PROFIT 10.0 % x D 10,453.15 F. HARGA SATUAN PEKERJAAN ( D + E ) 114,985.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 3.1 (5) Analisa EI-315JENIS PEKERJAAN : Galian Struktur Kedalaman 4-6 MSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Waktu Siklus- Maju = (L x 60) / (F x 1000) Tb1 1.50 menit- Mundur = (L x 60) / (R x 1000) Tb2 1.13 menit- Lain-lain Tb3 0.15 menit

Tb 2.78 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 58.14 M3 / Jam Tb x Fh

Koefisien Alat / M3 = 1 : Q2 (E04) 0.0172 Jam

2.d. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Pacul = 2 buah- Sekop = 2 buah

3. TENAGAProduksi menentukan : EXCAVATOR Q1 18.65 M3/JamProduksi Galian / hari = Tk x Q1 Qt 149.18 M3Kebutuhan tenaga :

- Pekerja P 12.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.6435 Jam- Mandor = (Tk x M) : Qt (L03) 0.0536 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 114,985.00 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 595.27 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 2.2 (1) Analisa EI-321JENIS PEKERJAAN : Timbunan BiasaSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

1 Pekerjaan dilakukan secara mekanis 2 Lokasi pekerjaan : halaman SMA Unggul 3 Kondisi lokasi : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fk 1.20 - 6 Tebal hamparan padat t 0.15 M

II. URUTAN KERJA

1 Dump Truck mengangkut ke lapangan dengan jarakquari ke lapangan L 0.60 Km

2 Bulldozer mengankut/mengusur hasil pengangkutan L 0.0750 Kmke tempat penimbunan dilokasi halaman gedung

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN1.a. Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit

2. ALAT2.a. BULLDOZER (E04)

Faktor blade Fb 0.90 -Faktor efisiensi alat Fa 0.83 -Kecepatan maju F 3.00 Km/JamKecepatan mundur R 4.00 Km/JamLebar Blade B 3.00 MTinggi blade H 1.20 MJarak Gusur L 75.00 M

Volume 1 kali gusur = H^2 x B x Fb V 3.89 M3

Waktu Siklus- Maju = (L x 60) / (F x 1000) Tb1 1.50 menit- Mundur = (L x 60) / (R x 1000) Tb2 1.13 menit- Lain-lain Tb3 0.15 menit

Tb 2.78 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 58.14 M3 / Jam Tb x Fh

Koefisien Alat / M3 = 1 : Q2 (E04) 0.0172 Jam

2.b. DUMP TRUCK (E08)Kapasitas bak V 4.00 M3Faktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 20.00 KM/JamKecepatan rata-rata kosong v2 40.00 KM/JamWaktusiklus : Ts2- Waktu tempuh isi = (L : v1) x 60 T1 1.80 menit- Waktu tempuh kosong = (L : v2) x 60 T2 0.90 menit- Lain-lain T3 3.00 menit

Ts2 5.70 menit

Analisa EI-321

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

Instansi Dinas Pendidikan Kabupaten Aceh Besar Pekerjaan Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh Besar Lokasi Kecamatan Indrapuri Kabupaten Aceh Besar Provinsi AcehJENIS PEKERJAAN : Timbunan BiasaSATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0344 7,300.00 251.10 2. Mandor (L02) Jam 0.0172 11,100.00 190.90

JUMLAH HARGA TENAGA 442.00

B. BAHAN

1. Bahan timbunan (M08) M3 1.2000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN1 Motor Grader (E13) Jam 0.0068 361,057.69 2,451.63 2 Dump Truck (E08) Jam 0.0343 218,368.13 7,498.18 3 Vibrator Roller (E19) Jam 0.0111 239,400.16 2,660.00 4 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 12,659.81

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,101.81 E. OVERHEAD & PROFIT 10.0 % x D 1,310.18

Kapasitas Produksi / Jam = V x Fa x 60 Q2 29.12 M3 Fk x Ts2 Note: 1

Koefisien Alat / M3 = 1 : Q2 (E08) 0.0343 Jam

Berlanjut ke halaman berikut

F. HARGA SATUAN PEKERJAAN ( D + E ) 14,412.00 Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

berat untuk bahan-bahan.2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor

mata pembayaran.3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 2.2 (1) Analisa EI-321JENIS PEKERJAAN : Timbunan BiasaSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

2.c. MOTOR GRADER (E13)Panjang hamparan Lh 50.00 MLebar Efektif kerja Blade b 2.40 MFaktor Efisiensi Alat Fa 0.75 -Kecepatan rata-rata alat v 5.00 Km / JamJumlah lintasan n 5 lintasanWaktu siklus Ts3- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.60 menit- Lain-lain T2 0.50 menit

Ts3 1.10 menit

Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 147.27 M3 n x Ts3

Koefisien Alat / M3 = 1 : Q3 (E13) 0.0068 Jam

2.d. VIBRATOR ROLLER (E19)Kecepatan rata-rata alat v 4.00 Km / JamLebar efektif pemadatan b 1.20 MJumlah lintasan n 6.00 lintasanFaktor efisiensi alat Fa 0.75 -

Kapasitas Prod./Jam (v x 1000) x b x t x Fa Q4 90.00 M3n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0111 Jam

2.e. WATER TANK TRUCK (E23)Volume tangki air V 4.00 M3Kebutuhan air / M3 material padat Wc 0.07 M3Pengisian Tangki / jam n 3.00 kaliFaktor efisiensi alat Fa 0.75 - Baik

Kapasitas Produksi / Jam = V x n x Fa Q5 128.57 M3 Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0078 Jam

KETERANGAN

2.f. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Sekop = 3 buah

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. : 2.2 (1) Analisa EI-321JENIS PEKERJAAN : Timbunan BiasaSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

3. TENAGAProduksi menentukan : BULLDOZER Q1 58.14 M3/JamProduksi Timbunan / hari = Tk x Q1 Qt 465.16 M3Kebutuhan tenaga :

- Pekerja P 2.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.0344 Jam- Mandor = (Tk x M) : Qt (L02) 0.0172 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 14,412.00 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 0.00 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 3.2 (2) Analisa EI-322JENIS PEKERJAAN : Timbunan PilihanSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Pekerjaan dilakukan secara mekanis 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi Jalan : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fk 1.20 - 6 Tebal hamparan padat t 0.15 M

II. URUTAN KERJA 1 Whell Loader memuat material ke dalam Dump Truck 2 Dump Truck mengangkut ke lapangan dengan jarak

quari ke lapangan L 1.00 Km 3 Material dihampar dengan menggunakan Motor Grader 4 Hamparan material disiram air dengan Watertank Truck

(sebelum pelaksanaan pemadatan) dan dipadatkandengan menggunakan Vibro Roller

5 Selama pemadatan sekelompok pekerja akanmerapikan tepi hamparan dan level permukaandengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN1.a. Bahan pilihan = 1 x Fk (M09) 1.20 M3

2. ALAT2.a. WHELL LOADER (E15)

Kapasitas Bucket V 1.50 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi Alat Fa 0.75 -Waktu sklus Ts1 menit- Muat T1 0.25 menit- Lain-lain T2 0.08 menit

Ts1 0.33 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 151.88 M3 Fk x Ts1

Koefisienalat / M3 = = 1 : Q1 (E15) 0.0066 Jam

2.b. DUMP TRUCK (E09)Kapasitas bak V 6.00 M3Faktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 20.00 Km / JamKecepatan rata-rata kosong v2 40.00 Km / JamWaktusiklus : Ts2- Waktu tempuh isi = (L : v1) x 60 T1 3.00 menit- Waktu tempuh kosong = (L : v2) x 60 T2 1.50 menit Note: 1- Lain-lain T3 1.00 menit

Ts2 5.50 menit

Berlanjut ke halaman berikut

Analisa EI-322

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PROYEK : Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh BesarNo. PAKET KONTRAK : AcehNAMA PAKET : 2012PROP / KAB / KODYA : ITEM PEMBAYARAN NO. : 3.2 (2) PERKIRAAN VOL. PEK. : 0.00 JENIS PEKERJAAN : Timbunan Pilihan TOTAL HARGA (Rp.) : 0.00 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0132 7,300.00 96.13 2. Mandor (L03) Jam 0.0066 11,100.00 73.09

JUMLAH HARGA TENAGA 169.22

B. BAHAN

1. Bahan pilihan (M09) M3 1.2000 95,000.00 114,000.00

JUMLAH HARGA BAHAN 114,000.00

C. PERALATAN1. Wheel Loader (E15) Jam 0.0066 334,125.00 2,200.00 2. Dump Truck (E09) Jam 0.0221 308,378.85 6,811.58 3. Motor Grader (E13) Jam 0.0079 361,057.69 2,852.80 3. Vibro Roller (E19) Jam 0.0119 239,400.16 2,837.34 4. Water Tanker (E23) Jam 0.0078 237,553.69 1,847.64 5. Alat Bantu Ls 1.0000 585.94 585.94

JUMLAH HARGA PERALATAN 17,135.29

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 131,304.51 E. OVERHEAD & PROFIT 10.0 % x D 13,130.45 F. HARGA SATUAN PEKERJAAN ( D + E ) 144,435.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 3.2 (2) Analisa EI-322JENIS PEKERJAAN : Timbunan PilihanSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 45.27 M3 Fk x Ts2

Koefisien Alat / m3 = 1 : Q2 (E08) 0.0221 Jam

2.c. MOTOR GRADER (E13)Panjang hamparan Lh 50.00 mLebar Efektif kerja Blade b 2.40 mFaktor Efisiensi Alat Fa 0.75 -Kecepatan rata-rata alat v 5.00 Km / JamJumlah lintasan n 4.00 lintasanWaktu siklus Ts3- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.60 menit- Lain-lain T2 1.00 menit

Ts3 1.60 menit

Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 126.56 M3 / Jam n x Ts3

Koefisien Alat / m3 = 1 : Q3 (E13) 0.0079 Jam

2.d. VIBRATOR ROLLER (E19)Kecepatan rata-rata alat v 2.50 Km / jamLebar efektif pemadatan b 1.20 MJumlah lintasan n 4.00 lintasanFaktor efisiensi alat Fa 0.75 -

Kapasitas Prod./Jam (v x 1000) x b x t x Fa Q4 84.38 M3n

Koefisien Alat / m3 = 1 : Q4 (E19) 0.0119 Jam

2.e. WATER TANK TRUCK (E23)Volume tangki air V 4.00 M3Kebutuhan air / M3 material padat Wc 0.07 M3Pengisian Tangki / jam n 3.00 kaliFaktor efisiensi alat Fa 0.75 -

Kapasitas Produksi / Jam = V x n x Fa Q5 128.57 M3 Wc

Koefisien Alat / m3 = 1 : Q5 (E23) 0.0078 Jam

2.f. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Sekop = 3 buah

Berlanjut ke halaman berikut

KETERANGAN

ITEM PEMBAYARAN NO. : 3.2 (2) Analisa EI-322JENIS PEKERJAAN : Timbunan PilihanSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

3. TENAGAProduksi menentukan : WHELL LOADER Q1 151.88 M3/JamProduksi Timbunan / hari = Tk x Q1 Qt 1,215.00 M3Kebutuhan tenaga :

- Pekerja P 2.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.0132 Jam- Mandor = (Tk x M) : Qt (L03) 0.0066 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 144,435.00 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 0.00 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 3.2 (3) Analisa EI-323JENIS PEKERJAAN : Timb. Pilihan Di Atas Tnh. RawaSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Pekerjaan dilakukan secara mekanis 2 Lokasi pekerjaan : di atas tanah rawa 3 Kondisi Jalan : sedang / baik 4 Jam kerja efektif per-hari Tk 8.00 Jam 5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA

1 Whell Loader memuat ke dalam Dump Truck 2 Dump Truck mengangkut material pilihan

ke lapangan dimana : jarak quari ke lapangan L 10.00 Km 3 Dump Truck menuang material pilihan di lokasi rawa

yang telah ditetapkan mulai dari tepian rawa hinggapermukaan timbunan mencapai permukaan air rawa.

4 Sekelompok pekerja merapikan timbunan 5 Geotekstil atau batangan kayu (bila diperlukan)

dianggap telah terpasang

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN1.a. Bahan pilihan (M09) 1.00 M3

2. ALAT

2.a. DUMP TRUCK (E09)Kapasitas bak V 4.44 M3Faktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 20.00 KM/JamKecepatan rata-rata kosong v2 40.00 KM/JamWaktusiklus : Ts2- Waktu tempuh isi = (L : v1) x 60 T1 30.00 menit- Waktu tempuh kosong = (L : v2) x 60 T2 15.00 menit- Lain-lain T3 3.00 menit

Ts1 48.00 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q1 4.61 M3/JamTs1

Koefisien Alat / M3 = 1 : Q1 (E08) 0.2169 Jam

2.b. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sump- Sekop = 3 buah

Note: 1

Analisa EI-323

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PROYEK : Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh BesarNo. PAKET KONTRAK : AcehNAMA PAKET : 2012PROP / KAB / KODYA : ITEM PEMBAYARAN NO. : 3.2 (3) PERKIRAAN VOL. PEK. : 0.00 JENIS PEKERJAAN : Timb. Pilihan Di Atas Tnh. Rawa TOTAL HARGA (Rp.) : 0.00 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.4337 7,300.00 3,166.27 2. Mandor (L02) Jam 0.2169 11,100.00 2,407.23

JUMLAH HARGA TENAGA 5,573.49

B. BAHAN

1. Bahan pilihan (M (M09) M3 1.0000 95,000.00 95,000.00

JUMLAH HARGA BAHAN 95,000.00

C. PERALATAN1. Dump Truck (E08) Jam 0.2169 218,368.13 47,356.94 2. Whell Loader (E15) Jam 0.0165 334,125.00 5,500.00 3. Alat Bantu Ls 1.0000 100.00 100.00

JUMLAH HARGA PERALATAN 52,956.94

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 153,530.44 E. OVERHEAD & PROFIT 10.0 % x D 15,353.04 F. HARGA SATUAN PEKERJAAN ( D + E ) 168,883.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Berlanjut ke halaman berikut

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 3.2 (3) Analisa EI-323JENIS PEKERJAAN : Timb. Pilihan Di Atas Tnh. RawaSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

2.c. WHELL LOADER (E15)Kapasitas Bucket V 1.50 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi Alat Fa 0.75 -Waktu sklus Ts1 menit- Muat T1 0.50 menit- Lain-lain T2 0.50 menit

Ts2 1.00 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q2 60.75 M3Ts1

Koefisienalat / M3 = 1 : Q2 (E15) 0.0165 Jam

3. TENAGAProduksi menentukan : DUMP TRUCK Q1 4.61 M3/JamProduksi Timbunan / hari = Tk x Q1 Qt 36.89 M3Asumsi permukaan hamparan di permukaan rawa :

Kebutuhan tenaga :- Pekerja P 2.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt (L01) 0.4337 Jam- Mandor = (Tk x M) : Qt (L02) 0.2169 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 168,883.00 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 0.00 M3

KETERANGAN

ITEM PEMBAYARAN NO. : 3.3 Analisa EI-33JENIS PEKERJAAN : Penyiapan Lahan (Land Claring)SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Pekerjaan dilaksanakan hanya pada tanah galian 2 Pekerjaan dilakukan secara mekanis 3 Lokasi pekerjaan : sepanjang jalan 4 Kondisi Jalan : jelek / belum padat 5 Jam kerja efektif per-hari Tk 8.00 Jam

II. URUTAN KERJA 1 Motor Grader meratakan permukaan hasil galian 2 Vibro Roller memadatkan permukaan yang telah

diratakan oleh Motor Grader 3 Sekelompok pekerja akan membantu meratakan

badan jalan dengan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN

Tidak diperlukan bahan / material

2. ALAT2.a. MOTOR GRADER (E13)

Panjang operasi grader sekali jalan Lh 50.00 MLebar Efektif kerja Blade b 2.40 MFaktor Efisiensi Alat Fa 0.75 -Kecepatan rata-rata alat v 5.00 Km / JamJumlah lintasan n 6.00 lintasanWaktu siklus Ts1- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.60 menit- Lain-lain T2 1.00 menit

Ts1 1.60 menit

Kapasitas Produksi / Jam = Lh x b x Fa x 60 Q1 562.50 M2 n x Ts

Koefisien Alat / m2 = 1 : Q1 (E13) 0.0018 Jam

2.b. VIBRATOR ROLLER (E19)Kecepatan rata-rata alat v 3.00 Km / jamLebar efektif pemadatan b 1.20 MJumlah lintasan n 8.00 lintasanFaktor efisiensi alat Fa 0.75 -

Note: 1Kapasitas Produksi / Jam = (v x 1000) x b x Fa Q2 337.50 M2

n

Koefisien Alat / m2 = 1 : Q2 (E19) 0.0030 Jam

Berlanjut ke halaman berikut

Analisa EI-33

FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KETERANGAN

PROYEK : Penimbunan Halaman SMA Negeri Unggul Ali Hasjmy Kabupaten Aceh BesarNo. PAKET KONTRAK : AcehNAMA PAKET : 2012PROP / KAB / KODYA : ITEM PEMBAYARAN NO. : 3.3 PERKIRAAN VOL. PEK. : 0.00 JENIS PEKERJAAN : Penyiapan Lahan (Land Claring) TOTAL HARGA (Rp.) : 0.00 SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAHNO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0059 7,300.00 43.26 2. Mandor (L02) jam 0.0030 11,100.00 32.89

JUMLAH HARGA TENAGA 76.15

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN1. Motor Grader (E13) jam 0.0018 361,057.69 641.88 2. Vibro Roller (E19) jam 0.0030 239,400.16 709.33 3. Water Tanker (E23) jam 0.0078 237,553.69 1,847.64 4. Alat Bantu Ls 1.0000 78.55 78.55

JUMLAH HARGA PERALATAN 3,277.40

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,353.55 E. OVERHEAD & PROFIT 10.0 % x D 335.36 F. HARGA SATUAN PEKERJAAN ( D + E ) 3,689.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

ITEM PEMBAYARAN NO. : 3.3 Analisa EI-33JENIS PEKERJAAN : Penyiapan Lahan (Land Claring)SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

2.c. WATER TANK TRUCK (E23)Volume tangki air V 4.00 M3Kebutuhan air / M3 material padat Wc 0.07 M3Pengisian Tangki / jam n 3.00 kaliFaktor efisiensi alat Fa 0.75 -

Kapasitas Produksi / Jam = V x n x Fa Q3 128.57 M3 Wc

Koefisien Alat / m3 = 1 : Q3 (E23) 0.0078 Jam

2.d. ALAT BANTUDiperlukan alat-alat bantu kecil Lump Sum- Sekop = 3 buah

3. TENAGAProduksi menentukan : VIBRATORY ROLLER Q2 337.50 M2/JamProduksi Pekerjaan / hari = Tk x Q1 Qt 2,700.00 M2Kebutuhan tenaga :

- Pekerja P 2.00 orang- Mandor M 1.00 orang

Koefisien tenaga / M2- Pekerja = (Tk x P) : Qt (L01) 0.0059 Jam- Mandor = (Tk x M) : Qt (L02) 0.0030 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 3,689.00 / M2

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 0.00 M2

KETERANGAN

RENCANA ANGGARAN BIAYA

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR SUB PEKERJAAN : PEKERJAAN TEMPAT WUDHUK

NO URAIAN PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5

I. PEKERJAAN PERSIAPAN

1 Pengukuran dan Pemasangan Bouwplank 46.40 M' A.2.2.1.4

2 Pembersihan Awal dan Akhir Pekerjaan 1.00 unit Taksir

II. PEKERJAAN TANAH

1 Galian Tanah Pondasi 50.11 m3 A.2.3.1.1

2 Timbunan Tanah Bawah Lantai 55.52 m3 A.2.3.1.11a

3 Urungan Kembali Bekas Galian 12.53 m3 A.2.3.1.9

Urungan Pasir Bawah Pondasi 2.57 m3 A.2.3.1.11

4 Urungan Pasir Bawah Lantai 22.21 m3 A.2.3.1.11

III. PEKERJAAN PASANGAN/BETON

1 Pas. Batu Gunung 22.49 m3 A.3.2.1.1

2 Pas. Batu Kosong / Astamping 5.14 m3 A.3.1.1.9

3 Sloof Beton 20/25 cm 6.42 m3 Suplemen 1

4 Kolom 50/60 cm 4.68 m3 Suplemen 2

5 Kolom Praktis 13/13 1.19 m' Suplemen 3

6 Plat Lantai T = 12 cm 32.17 m3 Suplemen 5

7 Balok Lantai 20/30 cm 7.26 m3 Suplemen 4

8 Balok Lantai 30/50 cm 11.03 m3 Suplemen 4.a

IV. PEKERJAAN PASANGAN & PLESTERAN

1 Pasangan Dinding Bata 1 : 2 490.39 m2 A.4.4.1.7.

2 Pasangan Dinding Bata 1 : 4 119.52 m2 A.4.4.1.9

3 Plesteran Dinding 1 : 2 980.79 m2 A.4.4.2.2.

4 Plesteran Dinding 1 : 4 239.04 m2 A.4.4.2.4

5 Plesteran Kolom 1 : 3 26.30 m2 A.4.4.2.3.

6 Plesteran Balok dan Plat Lantai 1 : 3 250.00 m2 A.4.4.2.3.

V. PEKERJAAN LANTAI DAN KERAMIK

NO URAIAN PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5

1 Rabat Beton Lantai 18.84 M3 A.A.4.1.1.4

2 Lantai Keramik 25 x 25 anti slip 161.98 m2 A.4.4.3.36

3 Keramik Dinding 25 x 33 528.52 m2 A.4.4.3.55

VI. PEKERJAAN KOSEN, PINTU & JENDELA

1 Kosen Pintu dan Ventilasi Aluminium 238.08 m' A.4.2.1.11

2 Daun Pintu Aluminium 33.60 m2 A.4.2.1.12

3 Daun Ventilasi Aluminium + Kaca 16.32 m2 A.4.2.1.13

4 Memasang Engsel Ventilasi 144.00 bh A.4.6.2.5

5 Memasang Engsel Pintu 72.00 bh A.4.6.2.5

NO URAIAN PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5

VII. PEKERJAAN ELEKTRIKAL

1 Lampu Hemat Energi 11 Watt 24.00 bh Taksir

2 Lampu Hemat Energi 45 Watt 16.00 bh Taksir

3 Saklar Ganda 6.00 bh Taksir

4 Saklar Tunggal 24.00 bh Taksir

5 Stop Kontak + Istalasi 3.00 ttk Taksir

6 Pekerjaan Titik Api + Instalasi 43.00 ttk Taksir

VIII. PEKERJAAN SANITASI

Septic Tank

1 Galian 13.13 Unit A.2.3.1.1

2 Urugan Kembali 3.28 M3 A.2.3.1.9

3 Urugan Pasir 0.90 M3 A.2.3.1.11

4 Pasangan Bata 1 batu campuran 1 : 4 12.30 M2 A.4.4.1.3

5 Plesteran 1:2 12.30 M2 A.4.4.2.2.

6 Kolom 23/23 0.30 M3 Suplemen 2

7 Slof 0.53 M3 Suplemen 1

8 Ring Balok 0.04 M3 Suplemen 4

9 Plat Penutup 0.60 M3 Suplemen 5

10 Pipa Hawa 1.00 Set Taksir

Untuk 2 Unit

Resapan

1 Galian 9.00 M3 A.2.3.1.1

2 Urugan Kembali 2.25 M3 A.2.3.1.9

3 Kerkil/Batu berpori 2.50 M3 A.2.3.1.11

4 Pasir Urug 2.00 M3 A.2.3.1.11

5 Ijuk 20.00 Kg Taksir

6 Pipa Berpori 4" 4.00 M' Taksir

Untuk 2 Unit

Bak Kontrol

1 Galian 0.28 M3 A.2.3.1.1

2 Urugan Kembali 0.07 M3 A.2.3.1.9

3 Urugan Pasir 0.02 M3 A.2.3.1.11

4 Pasangan Batu Bata 1:2 1.44 M2 A.4.4.1.7.

5 Beton Cor 0.04 M3 A.A.4.1.1.4

6 Plesteran 1:2 0.96 M2 A.4.4.2.2.

NO URAIAN PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5

7 Penutup Box 1.00 Unit Taksir

Untuk 2 Unit

Saluran Pembuang

1 Galian 10.89 M3 A.2.3.1.1

2 Urugan Kembali 2.72 M3 A.2.3.1.9

3 Urugan Pasir 0.99 M3 A.2.3.1.11

4 Pasangan Batu Bata 1:2 24.00 M2 A.4.4.1.7.

5 Beton Cor 1.98 M3 A.A.4.1.1.4

6 Plesteran 1:2 36.00 M2 A.4.4.2.2.

7 Grill Penutup Saluran 20.00 M' Taksir

Pekerjaan Perpipaan/Plumbing

1 Memasang 1 M' Pipa Galvanis 1" 105.00 m' A.5.1.1.21

2 Memasang 1 M' Pipa Galvanis 1/2" 91.00 m' A.5.1.1.18.

3 Memasang 1 M' Pipa PVC tipe AW Ø 3" 78.00 m' A.5.1.1 31.

4 Memasang 1 M' Pipa air kotor PVC tipe AW Ø 4 113.50 m' A.5.1.1 32.

5 Kloset jongkok (Setara American Standart) 24.00 bh A.5.1.1.3

6 Memasang 1 Buah Kran Ø ¾" Setara SAN-EI 106.00 bh A.5.1.1 19

7 Floor Drain 44.00 bh A.5.1.1 14.

IX. PEKERJAAN PENGECATAN

1 Mengecat Dinding Tembok 265.34 m2 A.4.7.1.10

RENCANA ANGGARAN BIAYA

: RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO

HARGA SATUAN JUMLAH TOTAL

6 7

45,660.00 2,118,624.00

1,000,000.00 1,000,000.00

Sub Jumlah-I 3,118,624.00

50,750.00 2,543,138.33

85,100.00 4,724,645.63

16,910.00 211,844.68

116,300.00 298,867.74

116,300.00 2,582,732.25

Sub Jumlah-II 10,361,228.62

721,540.00 16,224,368.06

320,410.00 1,646,779.24

3,761,586.29 24,166,311.10

4,154,544.52 19,443,268.35

7,784,412.65 9,251,058.27

5,494,125.62 176,733,934.20

5,790,825.29 42,035,600.79

3,815,448.54 42,065,320.14

Sub Jumlah-III 331,566,640.15

113,180.00 55,502,736.33

103,940.00 12,423,033.53

52,210.00 51,206,889.27

47,480.00 11,349,733.15

49,390.00 1,298,957.00

49,390.00 12,347,500.00

Sub Jumlah-IV 144,128,849.28

HARGA SATUAN JUMLAH TOTAL

6 7

592,030.00 11,155,917.31

192,070.00 31,111,498.60

214,000.00 113,103,536.80

Sub Jumlah-V 155,370,952.71

177,380.00 42,230,630.40

951,260.00 31,962,336.00

854,670.00 13,948,214.40

26,314.00 3,789,216.00

26,310.00 1,894,320.00

Sub Jumlah-VI 93,824,716.80

HARGA SATUAN JUMLAH TOTAL

6 7

85,000.00 2,040,000.00

125,000.00 2,000,000.00

55,000.00 330,000.00

45,000.00 1,080,000.00

160,300.00 480,900.00

160,300.00 6,892,900.00

Sub Jumlah-VII 12,823,800.00

50,750.00 666,093.75

16,910.00 55,485.94

116,300.00 104,670.00

213,800.00 2,629,740.00

52,210.00 642,183.00

4,154,544.52 1,257,115.32

3,761,586.29 1,989,879.15

5,790,825.29 225,842.19

5,494,125.62 3,296,475.37

100,000.00 100,000.00

10,967,484.71

21,934,969.42

50,750.00 456,750.00

16,910.00 38,047.50

116,300.00 290,750.00

116,300.00 232,600.00

30,000.00 600,000.00

90,000.00 360,000.00

1,978,147.50

3,956,295.00

50,750.00 14,369.36

16,910.00 1,196.97

116,300.00 2,533.01

113,180.00 162,979.20

592,030.00 25,788.83

52,210.00 50,121.60

HARGA SATUAN JUMLAH TOTAL

6 7

56,500.00 56,500.00

313,488.97

626,977.94

50,750.00 552,667.50

16,910.00 46,037.48

116,300.00 115,137.00

113,180.00 2,716,320.00

592,030.00 1,172,219.40

52,210.00 1,879,560.00

163,000.00 3,260,000.00

Sub Jumlah 9,741,941.38

68,600.00 7,203,000.00

60,850.00 5,537,350.00

54,770.00 4,272,060.00

83,190.00 9,442,065.00

374,580.00 8,989,920.00

55,260.00 5,857,560.00

24,740.00 1,088,560.00

Sub Jumlah 42,390,515.00

Sub Jumlah-VIII 78,650,698.74

30,510.00 8,095,596.62

Sub Jumlah-IX 8,095,596.62

ANALISA HARGA SATUAN PEKERJAAN

A.2.2.1.4 : Pengukuran dan Pemasangan 1 m' Bowplank

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN1 Kayu Balok 5/5 (Klas III) m3 0.0019 2 Paku 2"-3" Kg 0.0200 3 Kayu Papan 2/20 (Klas III) m3 0.0048

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.2.2.1.9 : Pembersihan 1 m2 Lapangan dan Perataan

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.2.3.1.1 : Penggalian 1 M3 Tanah Biasa Sedalam 1 M

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7500 2 Mandor L04 Oh 0.0250

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.2.3.1.9 : Pengurugan Kembali 1 M3 Galian Tanah

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2500 2 Mandor L04 Oh 0.0083

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.2.3.1.11 : Pengurugan 1 M3 Dengan Pasir Urug

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Mandor L04 Oh 0.0100

JUMLAH HARGA TENAGA

B. BAHAN

Pasir Urug M3 1.2000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.2.3.1.11a : Pengurugan 1 M3 Dengan Tanah Urug (dipadatkan)

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Mandor L04 Oh 0.0100

JUMLAH HARGA TENAGA

B. BAHAN

1 Tanah Timbun M3 1.2000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.3.2.1.1 : Pemasangan 1 M3 Pondasi Batu Belah Campuran 1 SP : 3 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.5000 2 Tukang Batu L02 Oh 0.7500 3 Kepala Tukang L03 Oh 0.0750 4 Mandor L04 Oh 0.0750

JUMLAH HARGA TENAGA

B. BAHAN

1 Batu Belah m3 1.2000 2 Semen Portland Kg 202.0000 3 Pasir Pasang m3 0.4850

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.3.1.1.9 : Pemasangan 1 M3 Batu Kosong (Aanstamping)

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7800 2 Tukang Batu L02 Oh 0.3900 3 Kepala Tukang L03 Oh 0.0390 4 Mandor L04 Oh 0.0390

JUMLAH HARGA TENAGA

B. BAHAN

1 Batu Belah m3 1.2000 2 Pasir Urug m3 0.4320

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.1.1.2 :

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 276.0000 2 pasir Beton Kg 828.0000 3 Kerikil (Maks 30 mm) Kg 1,012.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.A.4.1.1.4 : Membuat 1 M3 Lantai Kerja Beton Mutu Fc =7.4 Mpa (K100), Slump (3-6) cm,w/c =0.87

KOEFISIENNO. KOMPONEN KODE SATUAN

Membuat 1 M3 Beton Mutu Fc =9.8 Mpa (K125), Slump (12

A. TENAGA

1 Pekerja L01 Oh 1.2000 2 Tukang Batu L02 Oh 0.2000 3 Kepala Tukang L03 Oh 0.0200 4 Mandor L04 Oh 0.0600

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 230.0000 2 pasir Beton Kg 893.0000 3 Kerikil (Maks 30 mm) Kg 1,027.0000 4 Air Liter 200.0000

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.1.1.5 :

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Portland Kg 326.0000 2 pasir Beton Kg 760.0000 3 Kerikil (Maks 30 mm) Kg 1,029.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.1.1.8 :

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

JUMLAH HARGA TENAGA

B. BAHAN

Membuat 1 M3 Beton Mutu Fc =14.5 Mpa (K175), Slump (12±2) cm,w/c =0.66

Membuat 1 M3 Beton Mutu Fc =21.7 Mpa (K250), Slump (12

1 Semen Portland Kg 384.0000 2 pasir Beton Kg 692.0000 3 Kerikil (Maks 30 mm) Kg 1,039.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.1.1.9 :

NO. KOMPONEN KODE SATUAN KOEFISIEN

A. TENAGA1 Pekerja L01 Oh 1.6500 2 Tukang Batu L02 Oh 0.2750 3 Kepala Tukang L03 Oh 0.0280 4 Mandor L04 Oh 0.0830

JUMLAH HARGA TENAGA B. BAHAN1 Semen Portland Kg 406.0000 2 pasir Beton Kg 684.0000 3 Kerikil (Maks 30 mm) Kg 1,026.0000 4 Air Liter 215.0000

JUMLAH HARGA BAHAN

C. PERALATANJUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.1.1.35. : Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm

NO. KOMPONEN KODE SATUAN KOEFISIEN

A. TENAGA1 Pekerja L01 Oh 0.1800 2 Tukang batu L02 Oh 0.0200 3 Tukang kayu L02 Oh 0.0200 4 Tukang besi L02 Oh 0.0200 5 Kepala Tukang L03 Oh 0.0060 6 Mandor L04 Oh 0.0090

JUMLAH HARGA TENAGA

B. BAHAN1 Semen Portland Kg 4.0000 2 pasir Beton Kg 0.0060 3 Kerikil (Maks 30 mm) Kg 0.0090 5 Kayu kelas III m³ 0.0020 6 Paku 5 cm - 12 cm Kg 0.0100

Membuat 1 M3 Beton Mutu Fc =24.0 Mpa (K275), Slump (12

7 Besi beton polos Kg 3.0000 8 Kawat beton Kg 0.0450

JUMLAH HARGA BAHAN

C. PERALATANJUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.1.1.17 : Pembesian 1 Kg Besi dengan Besi Polos

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0070 2 Tukang Batu L02 Oh 0.0070 3 Kepala Tukang L03 Oh 0.0007 4 Mandor L04 Oh 0.0004

JUMLAH HARGA TENAGA B. BAHAN1 Besi Beton Polos Kg 1.0500 2 Kawat Beton Kg 0.0150

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.1.1.17a : Pembesian 1 Kg Besi dengan Besi Ulir

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0070 2 Tukang Batu L02 Oh 0.0070 3 Kepala Tukang L03 Oh 0.0007 4 Mandor L04 Oh 0.0004

JUMLAH HARGA TENAGA

B. BAHAN

1 Besi Beton Ulir Kg 1.0500 2 Kawat Beton Kg 0.0150

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)

F. HARGA SATUAN PEKERJAAN

A.4.1.1.20 : Pemasangan 1 M2 Bekisting Untuk Pondasi

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.5200 2 Tukang Kayu L02 Oh 0.2600 3 Kepala Tukang L03 Oh 0.0260 4 Mandor L04 Oh 0.0260

JUMLAH HARGA TENAGA B. BAHAN1 Kayu Kelas III m3 0.0400 2 Paku 5 - 10 cm Kg 0.3000 3 Minyak Bekisting Liter 0.1000

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.21 : Pemasangan 1 M2 Bekisting Untuk Sloof

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.5200 2 Tukang Kayu L02 Oh 0.2600 3 Kepala Tukang L03 Oh 0.0260 4 Mandor L04 Oh 0.0260

JUMLAH HARGA TENAGA B. BAHAN1 Kayu Kelas III m3 0.0450 2 Paku 5 - 10 cm Kg 0.3000 3 Minyak Bekisting Liter 0.1000

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.22 : Pemasangan 1 M2 Bekisting Untuk Kolom

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA

B. BAHAN1 Kayu Kelas III m3 0.0400 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0150 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 2.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.23 : Pemasangan 1 M2 Bekisting Untuk Balok

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN1 Kayu Kelas III m3 0.0400 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0180 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 2.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.24 : Pemasangan 1 M2 Bekisting Untuk Lantai

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN1 Kayu Kelas III m3 0.0400 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0150 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 6.0000

JUMLAH HARGA BAHAN

Dolken Kayu Ø 8-10 cm - Pjg 4 m

Dolken Kayu Ø 8-10 cm - Pjg 4 m

Dolken Kayu Ø 8-10 cm - Pjg 4 m

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.25 : Pemasangan 1 M2 Bekisting Untuk Dinding

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN

1 Kayu Kelas III m3 0.0300 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.2000 4 Balok Kayu Kelas II m3 0.0200 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 3.0000 7 Penjaga Jarak Bekisting/spacer Bh 4.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

A.4.1.1.26 : Pemasangan 1 M2 Bekisting Untuk Tangga

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.6600 2 Tukang Kayu L02 Oh 0.3300 3 Kepala Tukang L03 Oh 0.0330 4 Mandor L04 Oh 0.0330

JUMLAH HARGA TENAGA B. BAHAN1 Kayu Kelas III m3 0.0300 2 Paku 5 - 12 cm Kg 0.4000 3 Minyak Bekisting Liter 0.1500 4 Balok Kayu Kelas II m3 0.0150 5 Plywood Tebal 9 mm Lbr 0.3500 6 Batang 2.0000

JUMLAH HARGA BAHAN C. PERALATAN

Dolken Kayu Ø 8-10 cm - Pjg 4 m

Dolken Kayu Ø 8-10 cm - Pjg 4 m

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN G. UNTUK 2 X PAKAI

REKAPITULASI PEKERJAAN BETON

Suplemen 1 1 M3 Beton Bertulang Sloof 20 x 25 cm

1.0000 Beton Mutu (K250) A.4.1.1.888.7814 Kg Besi Beton Ulir A.4.1.1.17a39.9516 Kg Besi Beton Polos A.4.1.1.1710.0000 Bekisting Untuk Sloof A.4.1.1.21

JUMLAH HARGA

Suplemen 21 M3 Beton Bertulang Kolom 50 x 60 cm

1.0000 Beton Mutu (K250) A.4.1.1.842.0890 Kg Besi Beton Ulir A.4.1.1.17a53.5977 Kg Besi Beton Polos A.4.1.1.1710.0000 Bekisting Untuk Kolom A.4.1.1.22

JUMLAH HARGA

Suplemen 31 M3 Beton Bertulang Kolom Praktis 13 x 13 cm

1.0000 Beton Mutu (K250) A.4.1.1.8291.0738 Kg Besi Beton Polos A.4.1.1.17

15.3846 Bekisting Untuk Kolom A.4.1.1.22JUMLAH HARGA

Suplemen 41 M3 Beton Bertulang Balok Lantai 20 x 30 cm

1.0000 Beton Mutu (K250) A.4.1.1.886.8290 Kg Besi Beton Ulir A.4.1.1.17a73.4365 Kg Besi Beton Polos A.4.1.1.1713.3333 Bekisting Untuk Balok A.4.1.1.23

JUMLAH HARGASuplemen 4.a1 M3 Beton Bertulang Balok Lantai 30 x 100 cm

1.0000 Beton Mutu (K250) A.4.1.1.868.7234 Kg Besi Beton Ulir A.4.1.1.17a34.1973 Kg Besi Beton Polos A.4.1.1.17

7.6667 Bekisting Untuk Balok A.4.1.1.23JUMLAH HARGA

Suplemen 51 M3 Plat Lantai Beton Bertulang tebal 12 cm

1.0000 Beton Mutu (K250) A.4.1.1.8205.5125 Kg Besi Beton Polos A.4.1.1.17

8.3000 Bekisting Untuk Plat LantaiA.4.1.1.24JUMLAH HARGA

A.4.4.1.3 : Pemasangan 1 M2 Dinding Bata Merah tebal 1 Batu Campuran 1 SP : 4 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

M3

M2

M3

M2

M3

M2

M3

M2

M3

M2

M3

M2

A. TENAGA1 Pekerja L01 Oh 0.6000 2 Tukang Kayu L02 Oh 0.2000 3 Kepala Tukang L03 Oh 0.0200 4 Mandor L04 Oh 0.0300

JUMLAH HARGA TENAGA B. BAHAN1 Bata Merah Bh 140.0000 2 Semen Portland Kg 26.5500 3 Pasir Pasang M3 0.0930

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.1.9 : Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 4 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN1 Bata Merah Bh 70.0000 2 Semen Portland Kg 11.5000 3 Pasir Pasang M3 0.0430

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.1.7. : Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN1 Bata Merah Bh 70.0000 2 Semen Portland Kg 18.9500 3 Pasir Pasang M3 0.0380

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.2.2. : Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Semen Portland Kg 10.2200 2 Pasir Pasang M3 0.0200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.2.3. : Pemasangan 1 M2 Plesteran 1 SP : 3 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Semen Portland Kg 7.7700 2 Pasir Pasang M3 0.0230

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.2.4 : Pemasangan 1 M2 Plesteran 1 SP : 4 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Semen Portland Kg 6.2400 2 Pasir Pasang M3 0.0240

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.35 : Pemasangan 1 M2 Lantai Keramik Ukuran 30 cm x 30 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7000 2 Tukang Kayu L02 Oh 0.3500 3 Kepala Tukang L03 Oh 0.0350 4 Mandor L04 Oh 0.0350

JUMLAH HARGA TENAGA B. BAHAN

1 Ubin Keramik 30 x 30 Bh 11.8700 2 Semen Portland Kg 10.0000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.36 : Pemasangan 1 M2 Lantai Keramik Ukuran 25 cm x 25 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7000 2 Tukang Kayu L02 Oh 0.3500 3 Kepala Tukang L03 Oh 0.0350 4 Mandor L04 Oh 0.0350

JUMLAH HARGA TENAGA B. BAHAN1 Ubin Keramik 25 x 25 Bh 16.0000 2 Semen Portland Kg 10.0000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.55 : Pemasangan 1 M2 Dinding Keramik Ukuran 25 cm x 33 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.9000 2 Tukang Kayu L02 Oh 0.4500 3 Kepala Tukang L03 Oh 0.0450 4 Mandor L04 Oh 0.0145

JUMLAH HARGA TENAGA B. BAHAN

1 Ubin Keramik 25 x 33 Bh 12.1212 2 Semen Portland Kg 9.3000 3 Pasir Pasang M3 0.0180 4 Semen Warna kg 1.9400

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.6.1.5 : Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel, Kayu Kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.0000 2 Tukang Kayu L02 Oh 3.0000 3 Kepala Tukang L03 Oh 0.3000 4 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA B. BAHAN

1 Papan Kayu m3 0.0400 2 Lem Kayu Kg 0.5000

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.6.1.20 : Pemasangan 1 M2 Rangka Langit-langit 60 x 60 cm, Kayu Kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.2000 2 Tukang Kayu L02 Oh 0.3000 3 Kepala Tukang L03 Oh 0.0300 4 Mandor L04 Oh 0.0100

JUMLAH HARGA TENAGA B. BAHAN1 Kaso-kaso 5/7 cm m3 0.0163 2 Paku Kayu 7 - 10 cm Kg 0.2500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.5.1.5 : Pemasangan 1 M2 Langit-langit Triplek ukuran (120 x 240) cm Tebal 3, 4, & 6 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA B. BAHAN

1 Triplek Lbr 0.3750 2 paku Triplek Kg 0.0300

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.5.1.9 : Pemasangan 1 M' List Langit-langit Kayu Profil

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0500 2 Tukang Kayu L02 Oh 0.0500 3 Kepala Tukang L03 Oh 0.0050 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 List Kayu Profil m 1.0500 2 Paku Kayu Kg 0.0100

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.7.1.10 : Pengecatan 1 M2 Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0200 2 Tukang Kayu L02 Oh 0.0630 3 Kepala Tukang L03 Oh 0.0063 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 Plamur Kg 0.1000 2 Cat Dasar Kg 0.1000 3 Cat Penutup Kg 0.2600

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.13 : Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA B. BAHAN

1 Keramik 60 x 60 Bh 3.1000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.1.7 : Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PP

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN

1 Bata Merah Bh 70.0000 2 Semen Portland Kg 18.9500 3 Pasir Pasang M3 0.0380

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.2.2 : Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.3000 2 Tukang Kayu L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0150

JUMLAH HARGA TENAGA B. BAHAN1 Semen Portland Kg 10.2240 2 Pasir Pasang M3 0.0200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.2.1.11 : Memasang 1 m kusen pintu alluminium

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0430 2 Tukang Khusus Alluminium L02 Oh 0.0800 3 Kepala Tukang L03 Oh 0.0080 4 Mandor L04 Oh 0.0040

JUMLAH HARGA TENAGA B. BAHAN1 Profil alluminium m 1.1000 2 Skrup fixer Buah 2.0000 3 Sealant Tube 0.0600

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.2.1.12 : Memasang 1 m² pintu alluminium strip lebar 8 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0850 2 Tukang Khusus Alluminium L02 Oh 0.0850 3 Kepala Tukang L03 Oh 0.0085 4 Mandor L04 Oh 0.0042

JUMLAH HARGA TENAGA B. BAHAN1 Profil alluminium m 4.4000 2 Alluminium strip m 14.6000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.2.1.13 : Memasang 1 m² pintu kaca rangka alluminium

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0850

2 Tukang Khusus Alluminium L02 Oh 0.0850 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN1 Profil alluminium m 4.4000 2 Profil kaca m 4.5000 3 Sealant Tube 0.2700 4 Kaca 5 mm m2 1.2000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.6.1.1 : Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 7.0000 2 Tukang Kayu L02 Oh 21.0000 3 Kepala Tukang L03 Oh 2.1000 4 Mandor L04 Oh 0.3500

JUMLAH HARGA TENAGA B. BAHAN1 Balok Kayu m3 1.1000 2 Paku 10 cm Kg 1.2500 3 Lem Kayu Kg 1.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.6.1.6 : Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.8000 2 Tukang Kayu L02 Oh 2.4000 3 Kepala Tukang L03 Oh 0.2400 4 Mandor L04 Oh 0.0400

JUMLAH HARGA TENAGA B. BAHAN

1 Papan Kayu m3 0.0240 2 Lem Kayu Kg 0.3000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.7.1.4. : Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0700 2 Tukang Cat L02 Oh 0.0090 3 Kepala Tukang L03 Oh 0.0060 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN1 Cat meni Kg 0.2000 2 Plamur kayu Kg 0.1500 3 Cat Dasar Kg 0.1700 4 Cat Penutup Kg 0.2600 5 Kuas Bh 0.0100 6 Kertas Amplas Lbr 0.2000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.6.2.5 : Pemasangan 1 buah engsel pintu

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0150 2 Tukang Cat L02 Oh 0.1500 3 Kepala Tukang L03 Oh 0.0150 4 Mandor L04 Oh 0.0008

JUMLAH HARGA TENAGA B. BAHAN

1 Engsel Pintu Bh 1.00

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.36 : Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.7000 2 Tukang Kayu L02 Oh 0.3500 3 Kepala Tukang L03 Oh 0.0350 4 Mandor L04 Oh 0.0350

JUMLAH HARGA TENAGA B. BAHAN1 Ubin Keramik 20 x 20 Bh 26.5000 2 Semen Portland Kg 10.4000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.6200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.14 : Pemasangan 1 M2 Lantai Keramik Ukuran 40 cm x 40 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2500 2 Tukang Batu L02 Oh 0.1250 3 Kepala Tukang L03 Oh 0.0130 4 Mandor L04 Oh 0.0130

JUMLAH HARGA TENAGA B. BAHAN

1 Keramik 40 x 40 Bh 6.6300 2 Semen Portland Kg 9.8000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.3000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.54 : Pemasangan 1 m2 dinding keramik 20cm x 20cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.9000 2 Tukang Batu L02 Oh 0.4500 3 Kepala Tukang L03 Oh 0.0450 4 Mandor L04 Oh 0.0450

JUMLAH HARGA TENAGA B. BAHAN

1 Keramik 20 x 20 Bh 26.5000 2 Semen Portland Kg 9.3000 3 Pasir Pasang M3 0.0180 4 Semen Warna kg 1.9400

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1 19 : Pemasangan 1 buah kran diameter ½” atau 3/4”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0100 2 Tukang Batu L02 Oh 0.4000 3 Kepala Tukang L03 Oh 0.0400 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Kran air Bh 1.0000 2 Sealtape Bh 0.0250

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1 14. : Pemasangan 1 buah floor drain

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0100 2 Tukang Batu L02 Oh 0.1000 3 Kepala Tukang L03 Oh 0.0100 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Floor drain unit 1.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

SNI 91 - 0014 - 2007 (6.2 : 1 M2 Rangka kuda - kuda baja aluzing 55 % alumunium untuk metal

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1400 2 Tukang Besi L02 Oh 0.4000 3 Kepala Tukang L03 Oh 0.0400 4 Mandor L04 Oh 0.0700

JUMLAH HARGA TENAGA B. BAHAN

1 Profil C. 75. 75 m¹ 4.2602 Reng U 0.5 m¹ 4.9303 Baut truss buah 14.0004 Baut reng buah 11.000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.6.1.22 : Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.2000 3 Kepala Tukang L03 Oh 0.0200 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Papan kayu M3 0.0110 2 Paku 5 dan 7 cm Kg 0.0500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.6.1.19 : Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1500 2 Tukang Kayu L02 Oh 0.3000 3 Kepala Tukang L03 Oh 0.0300 4 Mandor L04 Oh 0.0750

JUMLAH HARGA TENAGA B. BAHAN1 Kaso-kaso 5/7 cm m3 0.0154 2 Paku Kayu 7 - 10 cm Kg 0.2000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1.21 : Pemasangan 1 m pipa galvanis diameter 1"

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0540 2 Tukang Batu L02 Oh 0.0900 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0270

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa galvanis diameter 1" M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1.18. : Pemasangan 1 buah pipa galvanis diameter 1/2"

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.054 2 Tukang Batu L02 Oh 0.090 3 Kepala Tukang L03 Oh 0.009 4 Mandor L04 Oh 0.027

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa galvanis diameter 1/2" M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1 29. : Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0540 2 Tukang Batu L02 Oh 0.0900 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN1 Pipa PVC 2” M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1 31. : Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0810 2 Tukang Batu L02 Oh 0.1350 3 Kepala Tukang L03 Oh 0.0135 4 Mandor L04 Oh 0.0040

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa PVC 3” M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1 32. : Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0810 2 Tukang Batu L02 Oh 0.1350 3 Kepala Tukang L03 Oh 0.0135 4 Mandor L04 Oh 0.0040

JUMLAH HARGA TENAGA B. BAHAN

1 Pipa PVC 4” M 1.2000 2 Perlengkapan % 35.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.5.1.1.3 : Pemasangan 1 buah closet jongkok teraso

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 1.0000

2 Tukang Batu L02 Oh 1.5000 3 Kepala Tukang L03 Oh 0.1500 4 Mandor L04 Oh 0.0500

JUMLAH HARGA TENAGA B. BAHAN

1 Closet jongkok Unit 1.0000 2 Semen Portland Kg 6.0000 3 Pasir pasang m³ 0.0100 4 Bata Merah Bh 7.0000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.5.1.7 : Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1000 2 Tukang Kayu L02 Oh 0.0500 3 Kepala Tukang L03 Oh 0.0050 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN

1 Gypsum board Lbr 0.3640 2 Paku skrup Kg 0.1100

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

SNI-2839-2008-6.8 : 1 M' List Plafond Gypsum Profil

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0600 2 Tukang Kayu L02 Oh 0.0600 3 Kepala Tukang L03 Oh 0.0060 4 Mandor L04 Oh 0.0030

JUMLAH HARGA TENAGA B. BAHAN

1 List Gypsum Profil m 1.0500 2 Tepung Gypsum Kg 0.1500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

SNI DT-91-0013-2007-6.8-A : 1 M2 Memasang rangka langit-langit Aluminium Profil "C"

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1500 2 Tukang Kayu L02 Oh 0.5000

3 Kepala Tukang L03 Oh 0.0500 4 Mandor L04 Oh 0.0080

JUMLAH HARGA TENAGA B. BAHAN

1 Baja Ringan M' 3.6000 2 Baut Bh 10.0000 3 Ramset Buah 1.0500

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.54a : Pemasangan 1 m2 dinding granit 30cm x 60cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.9000 2 Tukang Batu L02 Oh 0.4500 3 Kepala Tukang L03 Oh 0.0450 4 Mandor L04 Oh 0.0450

JUMLAH HARGA TENAGA B. BAHAN

1 Granit Dinding 30x60 cm Anti Slip Bh 5.5560 2 Semen Portland Kg 9.3000 3 Pasir Pasang M3 0.0180 4 Semen Warna kg 1.9400

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.13a : Pemasangan 1 M2 Lantai Granit Ukuran 50 cm x 50 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA

B. BAHAN1 Granit 50 x 50 Bh 4.0000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna kg 1.5000

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.28 : Pemasangan 1 m’ plint Stepnoshing Granito Tile 10x60cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA1 Pekerja L01 Oh 0.0900 2 Tukang Batu L02 Oh 0.0900 3 Kepala Tukang L03 Oh 0.0090 4 Mandor L04 Oh 0.0050

JUMLAH HARGA TENAGA B. BAHAN1 Stepnoshing Granito Tile 10x60cm Bh 1.7000 2 Semen Portland Kg 1.1400 3 Pasir Pasang M3 0.0030 4 Semen Warna kg 0.1000

JUMLAH HARGA BAHAN

C. PERALATANUMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.13.a : Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA

B. BAHAN

1 Keramik 60 x 60 Bh 3.1000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.13.b : Pemasangan 1 M2 Lantai Keramik Ukuran 32 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA

B. BAHAN

1 Keramik 32 x 60 Bh 5.5000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

A.4.4.3.13c : Pemasangan 1 M2 Lantai Granit Ukuran 60 cm x 60 cm

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.2400 2 Tukang Batu L02 Oh 0.1200 3 Kepala Tukang L03 Oh 0.0120 4 Mandor L04 Oh 0.0120

JUMLAH HARGA TENAGA

B. BAHAN

1 Granit 60 x 60 Bh 3.1000 2 Semen Portland Kg 9.6000 3 Pasir Pasang M3 0.0450 4 Semen Warna Kg 1.5000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

ANL. TAKSIR : 1 M2 Memasang rangka langit-langit Baja Ringan

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.1500 2 Tukang Batu L02 Oh 0.5000 3 Kepala Tukang L03 Oh 0.0500 4 Mandor L04 Oh 0.0080

JUMLAH HARGA TENAGA

B. BAHAN

1 Top Crosss Reil ( Baja ringan U) m1 2.0000 2 Ceiling Batten ( Baja ringan C ) m1 1.0000 3 Wall Angle ( Baja ringan / rangka pinggir L) m1 2.3400 4 Connectors Ceiling Batten to Top Cross pcs 4.0000 5 Sprring ( Suspension Clips) pcs 4.0000 6 Suspension Rods and Nut m1 2.5500 7 Suspension Braccket bh 4.0000 8 Sekrup bh 4.0000

JUMLAH HARGA BAHAN

C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

ANL. TAKSIR : 1 M2 Cat Kayu 1/2 Duco, ( 1 x Cat Manie + Dempul + 2 Cat Penutup )

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.0700 2 Tukang Cat L02 Oh 0.0090 3 Kepala Tukang L03 Oh 0.0060 4 Mandor L04 Oh 0.0250

JUMLAH HARGA TENAGA B. BAHAN

1 Cat Manie Kayu Kg 0.2000 2 Dempul Sintetis Kg 0.3000 3 Cat Kayu Mengkilat Kg 0.4000 4 Cat Kayu Dasar Kg 0.1700 5 Minyak Cat liter 0.2000 6 Amplas lbr 0.4000 7 Kayu Perancah & Alat bantu Ls 1.0000 8 Sewa Compresor Jam 0.6250

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

ANL. G. 60 : 1 M2 Memasang Paving Block Beton

KOEFISIENNO. KOMPONEN KODE SATUAN

A. TENAGA

1 Pekerja L01 Oh 0.4000 2 Tukang Cat L02 Oh 0.1000

JUMLAH HARGA TENAGA B. BAHAN

1 Paving Block buah 46.0000 2 Pasir Pasang M3 0.1200

JUMLAH HARGA BAHAN C. PERALATAN

UMLAH HARGA PERALATAN

D. JUMLAH (A + B + C)F. HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN PEKERJAAN

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 400.00

JUMLAH HARGA TENAGA 16,550.00

4,320,000.00 8,100.00 14,040.00 280.80

4,320,000.00 20,736.00

JUMLAH HARGA BAHAN 29,116.80

UMLAH HARGA PERALATAN 0.00 45,666.80

45,660.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 80,000.00 4,000.00

JUMLAH HARGA TENAGA 10,500.00

JUMLAH HARGA BAHAN 0.00

UMLAH HARGA PERALATAN 0.00 10,500.00

10,500.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 48,750.00 80,000.00 2,000.00

JUMLAH HARGA TENAGA 50,750.00

JUMLAH HARGA BAHAN 0.00

UMLAH HARGA PERALATAN 0.00 50,750.00

50,750.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 16,250.00 80,000.00 666.67

JUMLAH HARGA TENAGA 16,916.67

JUMLAH HARGA BAHAN 0.00

JUMLAH HARGA PERALATAN 0.00 16,916.67

16,910.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 80,000.00 800.00

JUMLAH HARGA TENAGA 20,300.00

80,000.00 96,000.00

JUMLAH HARGA BAHAN 96,000.00

UMLAH HARGA PERALATAN 0.00 116,300.00

116,300.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 80,000.00 800.00

JUMLAH HARGA TENAGA 20,300.00

54,000.00 64,800.00

JUMLAH HARGA BAHAN 64,800.00

UMLAH HARGA PERALATAN 0.00 85,100.00

85,100.00

Pemasangan 1 M3 Pondasi Batu Belah Campuran 1 SP : 3 PP HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 97,500.00 85,000.00 63,750.00

115,000.00 8,625.00 80,000.00 6,000.00

JUMLAH HARGA TENAGA 175,875.00

162,000.00 194,400.00 1,350.00 272,700.00

162,000.00 78,570.00

JUMLAH HARGA BAHAN 545,670.00

UMLAH HARGA PERALATAN 0.00 721,545.00

721,540.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 50,700.00 85,000.00 33,150.00

115,000.00 4,485.00 80,000.00 3,120.00

JUMLAH HARGA TENAGA 91,455.00

162,000.00 194,400.00 80,000.00 34,560.00

JUMLAH HARGA BAHAN 228,960.00

UMLAH HARGA PERALATAN 0.00 320,415.00

320,410.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

JUMLAH HARGA TENAGA 140,485.00

1,350.00 372,600.00 100.29 83,036.57

77.78 78,711.11 50.00 10,750.00

JUMLAH HARGA BAHAN 545,097.68

UMLAH HARGA PERALATAN 0.00 685,582.68

685,580.00

Membuat 1 M3 Lantai Kerja Beton Mutu Fc =7.4 Mpa (K100), Slump (3-6) cm,w/c =0.87HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

Membuat 1 M3 Beton Mutu Fc =9.8 Mpa (K125), Slump (12±2) cm,w/c =0.78

65,000.00 78,000.00 85,000.00 17,000.00

115,000.00 2,300.00 80,000.00 4,800.00

JUMLAH HARGA TENAGA 102,100.00

1,350.00 310,500.00 100.29 89,555.14

77.78 79,877.78 50.00 10,000.00

JUMLAH HARGA BAHAN 489,932.92

UMLAH HARGA PERALATAN 0.00 592,032.92

592,030.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

JUMLAH HARGA TENAGA 140,485.00

1,350.00 440,100.00 100.29 76,217.14

77.78 80,033.33 50.00 10,750.00

JUMLAH HARGA BAHAN 607,100.47

UMLAH HARGA PERALATAN 0.00 747,585.47

747,580.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

JUMLAH HARGA TENAGA 140,485.00

Membuat 1 M3 Beton Mutu Fc =14.5 Mpa (K175), Slump (12±2) cm,w/c =0.66

Membuat 1 M3 Beton Mutu Fc =21.7 Mpa (K250), Slump (12±2) cm,w/c =0.56

1,350.00 518,400.00 100.29 69,397.71

77.78 80,811.11 50.00 10,750.00

JUMLAH HARGA BAHAN 679,358.82

UMLAH HARGA PERALATAN 0.00 819,843.82

819,840.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 107,250.00 85,000.00 23,375.00

115,000.00 3,220.00 80,000.00 6,640.00

140,485.00

1,350.00 548,100.00 100.29 68,595.43

77.78 79,800.00 50.00 10,750.00

707,245.43

0.00 847,730.43

847,730.00

Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 11,700.00 85,000.00 1,700.00 85,000.00 1,700.00 85,000.00 1,700.00

115,000.00 690.00 80,000.00 720.00

18,210.00

1,350.00 5,400.00 100.29 0.60

77.78 0.70 4,320,000.00 8,640.00

14,040.00 140.40

Membuat 1 M3 Beton Mutu Fc =24.0 Mpa (K275), Slump (12±2) cm,w/c =0.53

10,800.00 32,400.00 17,000.00 765.00

47,346.70

0.00 65,556.70

65,550.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 455.00 85,000.00 595.00

115,000.00 80.50 80,000.00 32.00

JUMLAH HARGA TENAGA 1,162.50

10,800.00 11,340.00 17,000.00 255.00

JUMLAH HARGA BAHAN 11,595.00

UMLAH HARGA PERALATAN 0.00 12,757.50

12,750.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 455.00 85,000.00 595.00

115,000.00 80.50 80,000.00 32.00

JUMLAH HARGA TENAGA 1,162.50

10,800.00 11,340.00 17,000.00 255.00

JUMLAH HARGA BAHAN 11,595.00

UMLAH HARGA PERALATAN 0.00 12,757.50

12,750.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 33,800.00 85,000.00 22,100.00

115,000.00 2,990.00 80,000.00 2,080.00

JUMLAH HARGA TENAGA 60,970.00

4,320,000.00 172,800.00 14,040.00 4,212.00

5,000.00 500.00 JUMLAH HARGA BAHAN 177,512.00

UMLAH HARGA PERALATAN 0.00 238,482.00

238,480.00 119,240.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 33,800.00 85,000.00 22,100.00

115,000.00 2,990.00 80,000.00 2,080.00

JUMLAH HARGA TENAGA 60,970.00

4,320,000.00 194,400.00 14,040.00 4,212.00

5,000.00 500.00 JUMLAH HARGA BAHAN 199,112.00

UMLAH HARGA PERALATAN 0.00 260,082.00

260,080.00 130,040.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 172,800.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 81,000.00

140,400.00 49,140.00 18,000.00 36,000.00

JUMLAH HARGA BAHAN 345,556.00

UMLAH HARGA PERALATAN 0.00 422,941.00

422,940.00 211,470.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 172,800.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 97,200.00

140,400.00 49,140.00 18,000.00 36,000.00

JUMLAH HARGA BAHAN 361,756.00

UMLAH HARGA PERALATAN 0.00 439,141.00

439,140.00 219,570.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 172,800.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 81,000.00

140,400.00 49,140.00 18,000.00 108,000.00

JUMLAH HARGA BAHAN 417,556.00

UMLAH HARGA PERALATAN 0.00 494,941.00

494,940.00 247,470.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 129,600.00 14,040.00 5,616.00

5,000.00 1,000.00 5,400,000.00 108,000.00

140,400.00 49,140.00 18,000.00 54,000.00

5,000.00 20,000.00 JUMLAH HARGA BAHAN 367,356.00

UMLAH HARGA PERALATAN 0.00 444,741.00

444,740.00 222,370.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 42,900.00 85,000.00 28,050.00

115,000.00 3,795.00 80,000.00 2,640.00

JUMLAH HARGA TENAGA 77,385.00

4,320,000.00 129,600.00 14,040.00 5,616.00

5,000.00 750.00 5,400,000.00 81,000.00

140,400.00 49,140.00 18,000.00 36,000.00

JUMLAH HARGA BAHAN 302,106.00

UMLAH HARGA PERALATAN 0.00 379,491.00

379,490.00 189,745.00

819,840.00 819,840.00 12,750.00 1,131,962.96 12,750.00 509,383.33

130,040.00 1,300,400.00 JUMLAH HARGA 3,761,586.29

819,840.00 819,840.00 12,750.00 536,634.29 12,750.00 683,370.23

211,470.00 2,114,700.00 JUMLAH HARGA 4,154,544.52

819,840.00 819,840.00 12,750.00 3,711,191.29

211,470.00 3,253,381.36 JUMLAH HARGA 7,784,412.65

819,840.00 819,840.00 12,750.00 1,107,070.25 12,750.00 936,315.04

219,570.00 2,927,600.00 JUMLAH HARGA 5,790,825.29

819,840.00 819,840.00 12,750.00 876,223.18 12,750.00 436,015.36

219,570.00 1,683,370.00 JUMLAH HARGA 3,815,448.54

819,840.00 819,840.00 12,750.00 2,620,284.62

247,470.00 2,054,001.00 JUMLAH HARGA 5,494,125.62

Pemasangan 1 M2 Dinding Bata Merah tebal 1 Batu Campuran 1 SP : 4 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 39,000.00 85,000.00 17,000.00

115,000.00 2,300.00 80,000.00 2,400.00

JUMLAH HARGA TENAGA 60,700.00

730.00 102,200.00 1,350.00 35,842.50

162,000.00 15,066.00 JUMLAH HARGA BAHAN 153,108.50

UMLAH HARGA PERALATAN 0.00 213,808.50

213,800.00

Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 4 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 30,350.00

730.00 51,100.00 1,350.00 15,525.00

162,000.00 6,966.00 JUMLAH HARGA BAHAN 73,591.00

UMLAH HARGA PERALATAN 0.00 103,941.00

103,940.00

Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 30,350.00

730.00 51,100.00 1,350.00 25,582.50

162,000.00 6,156.00 JUMLAH HARGA BAHAN 82,838.50

UMLAH HARGA PERALATAN 0.00 113,188.50

113,180.00

Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 13,797.00 162,000.00 3,240.00

JUMLAH HARGA BAHAN 17,037.00

UMLAH HARGA PERALATAN 0.00 52,212.00

52,210.00

Pemasangan 1 M2 Plesteran 1 SP : 3 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 10,489.50 162,000.00 3,726.00

JUMLAH HARGA BAHAN 14,215.50

UMLAH HARGA PERALATAN 0.00 49,390.50

49,390.00

Pemasangan 1 M2 Plesteran 1 SP : 4 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 8,424.00 162,000.00 3,888.00

JUMLAH HARGA BAHAN 12,312.00

UMLAH HARGA PERALATAN 0.00 47,487.00

47,480.00

Pemasangan 1 M2 Lantai Keramik Ukuran 30 cm x 30 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 45,500.00 85,000.00 29,750.00

115,000.00 4,025.00 80,000.00 2,800.00

JUMLAH HARGA TENAGA 82,075.00

5,459.14 64,800.00 1,350.00 13,500.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 89,802.00

UMLAH HARGA PERALATAN 0.00 171,877.00

171,870.00

Pemasangan 1 M2 Lantai Keramik Ukuran 25 cm x 25 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 45,500.00 85,000.00 29,750.00

115,000.00 4,025.00 80,000.00 2,800.00

JUMLAH HARGA TENAGA 82,075.00

5,312.50 85,000.00 1,350.00 13,500.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 110,002.00

UMLAH HARGA PERALATAN 0.00 192,077.00

192,070.00

Pemasangan 1 M2 Dinding Keramik Ukuran 25 cm x 33 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 58,500.00 85,000.00 38,250.00

115,000.00 5,175.00 80,000.00 1,160.00

JUMLAH HARGA TENAGA 103,085.00

7,425.00 90,000.00 1,350.00 12,555.00

162,000.00 2,916.00 2,808.00 5,447.52

JUMLAH HARGA BAHAN 110,918.52

UMLAH HARGA PERALATAN 0.00 214,003.52

214,000.00

Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel, Kayu Kelas IIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 65,000.00 85,000.00 255,000.00

115,000.00 34,500.00 80,000.00 4,000.00

JUMLAH HARGA TENAGA 358,500.00

5,400,000.00 216,000.00 6,000.00 3,000.00

JUMLAH HARGA BAHAN 219,000.00

UMLAH HARGA PERALATAN 0.00 577,500.00

577,500.00

Pemasangan 1 M2 Rangka Langit-langit 60 x 60 cm, Kayu Kelas II HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 13,000.00 85,000.00 25,500.00

115,000.00 3,450.00 80,000.00 800.00

JUMLAH HARGA TENAGA 42,750.00

5,400,000.00 88,020.00 14,040.00 3,510.00

JUMLAH HARGA BAHAN 91,530.00

UMLAH HARGA PERALATAN 0.00 134,280.00

134,280.00

Pemasangan 1 M2 Langit-langit Triplek ukuran (120 x 240) cm Tebal 3, 4, & 6 mm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 4,000.00

JUMLAH HARGA TENAGA 20,150.00

70,200.00 26,325.00 14,040.00 421.20

JUMLAH HARGA BAHAN 26,746.20

UMLAH HARGA PERALATAN 0.00 46,896.20

46,890.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,250.00 85,000.00 4,250.00

115,000.00 575.00 80,000.00 240.00

JUMLAH HARGA TENAGA 8,315.00

10,000.00 10,500.00 14,040.00 140.40

JUMLAH HARGA BAHAN 10,640.40

UMLAH HARGA PERALATAN 0.00 18,955.40

18,950.00

Pengecatan 1 M2 Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 1,300.00 85,000.00 5,355.00

115,000.00 724.50 80,000.00 240.00

JUMLAH HARGA TENAGA 7,619.50

54,000.00 5,400.00 48,600.00 4,860.00 48,600.00 12,636.00

JUMLAH HARGA BAHAN 22,896.00

UMLAH HARGA PERALATAN 0.00 30,515.50

30,510.00

Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

90,000.00 279,000.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 303,462.00

UMLAH HARGA PERALATAN 0.00 331,602.00

331,600.00

Pemasangan 1 M2 Dinding Bata Merah tebal 1/2 Batu Campuran 1 SP : 2 PPHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 30,350.00

730.00 51,100.00 1,350.00 25,582.50

162,000.00 6,156.00

JUMLAH HARGA BAHAN 82,838.50

UMLAH HARGA PERALATAN 0.00 113,188.50

113,180.00

Pemasangan 1 M2 Plesteran 1 SP : 2 PP Tebal 15 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 19,500.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 1,200.00

JUMLAH HARGA TENAGA 35,175.00

1,350.00 13,802.40 162,000.00 3,240.00

JUMLAH HARGA BAHAN 17,042.40

UMLAH HARGA PERALATAN 0.00 52,217.40

52,210.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 2,795.00 85,000.00 6,800.00

115,000.00 920.00 80,000.00 320.00

JUMLAH HARGA TENAGA 10,835.00

140,000.00 154,000.00 450.00 900.00

194,100.00 11,646.00

JUMLAH HARGA BAHAN 166,546.00

UMLAH HARGA PERALATAN 0.00 177,381.00

177,380.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,525.00 85,000.00 7,225.00

115,000.00 977.50 80,000.00 336.00

JUMLAH HARGA TENAGA 14,063.50

140,000.00 616,000.00 22,000.00 321,200.00

JUMLAH HARGA BAHAN 937,200.00

UMLAH HARGA PERALATAN 0.00 951,263.50

951,260.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,525.00

85,000.00 7,225.00 115,000.00 1,035.00

80,000.00 400.00

JUMLAH HARGA TENAGA 14,185.00

140,000.00 616,000.00 8,000.00 36,000.00

194,100.00 52,407.00 113,400.00 136,080.00

JUMLAH HARGA BAHAN 840,487.00

UMLAH HARGA PERALATAN 0.00 854,672.00

854,670.00

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas IHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 455,000.00 85,000.00 1,785,000.00

115,000.00 241,500.00 80,000.00 28,000.00

JUMLAH HARGA TENAGA 2,509,500.00

6,480,000.00 7,128,000.00 14,040.00 17,550.00 21,600.00 21,600.00

JUMLAH HARGA BAHAN 7,167,150.00

UMLAH HARGA PERALATAN 0.00 9,676,650.00

9,676,650.00

Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas IIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 52,000.00 85,000.00 204,000.00

115,000.00 27,600.00 80,000.00 3,200.00

JUMLAH HARGA TENAGA 286,800.00

5,400,000.00 129,600.00 21,600.00 6,480.00

JUMLAH HARGA BAHAN 136,080.00

UMLAH HARGA PERALATAN 0.00 422,880.00

422,880.00

Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 4,550.00 85,000.00 765.00

115,000.00 690.00 80,000.00 240.00

JUMLAH HARGA TENAGA 6,245.00

21,600.00 4,320.00 54,000.00 8,100.00 54,000.00 9,180.00 54,000.00 14,040.00 15,000.00 150.00

5,400.00 1,080.00 JUMLAH HARGA BAHAN 36,870.00

UMLAH HARGA PERALATAN 0.00 43,115.00

43,110.00

Pemasangan 1 buah engsel pintuHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 975.00 85,000.00 12,750.00

115,000.00 1,725.00 80,000.00 64.00

JUMLAH HARGA TENAGA 15,514.00

10,800.00 10,800.00

JUMLAH HARGA BAHAN 10,800.00

UMLAH HARGA PERALATAN 0.00 26,314.00

26,310.00

Pemasangan 1m2 lantai keramik ukuran 20cm x 20cmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 45,500.00 85,000.00 29,750.00

115,000.00 4,025.00 80,000.00 2,800.00

JUMLAH HARGA TENAGA 82,075.00

3,200.00 84,800.00 1,350.00 14,040.00

162,000.00 7,290.00 2,808.00 4,548.96

JUMLAH HARGA BAHAN 110,678.96

UMLAH HARGA PERALATAN 0.00 192,753.96

192,750.00

Pemasangan 1 M2 Lantai Keramik Ukuran 40 cm x 40 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 16,250.00 85,000.00 10,625.00

115,000.00 1,495.00 80,000.00 1,040.00

JUMLAH HARGA TENAGA 29,410.00

22,400.00 148,512.00 1,350.00 13,230.00

162,000.00 7,290.00 2,808.00 3,650.40

JUMLAH HARGA BAHAN 172,682.40

UMLAH HARGA PERALATAN 0.00 202,092.40

202,090.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 58,500.00 85,000.00 38,250.00

115,000.00 5,175.00 80,000.00 3,600.00

JUMLAH HARGA TENAGA 105,525.00

3,200.00 84,800.00 1,350.00 12,555.00

162,000.00 2,916.00 2,808.00 5,447.52

JUMLAH HARGA BAHAN 105,718.52

UMLAH HARGA PERALATAN 0.00 211,243.52

211,240.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 650.00 85,000.00 34,000.00

115,000.00 4,600.00 80,000.00 400.00

JUMLAH HARGA TENAGA 39,650.00

15,500.00 15,500.00 4,500.00 112.50

JUMLAH HARGA BAHAN 15,612.50

UMLAH HARGA PERALATAN 0.00 55,262.50

55,260.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 650.00 85,000.00 8,500.00

115,000.00 1,150.00 80,000.00 400.00

JUMLAH HARGA TENAGA 10,700.00

14,040.00 14,040.00

JUMLAH HARGA BAHAN 14,040.00

UMLAH HARGA PERALATAN 0.00 24,740.00

24,740.00

1 M2 Rangka kuda - kuda baja aluzing 55 % alumunium untuk metalHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,100.00 85,000.00 34,000.00

115,000.00 4,600.00 80,000.00 5,600.00

JUMLAH HARGA TENAGA 53,300.00

25,000.00 106,500.00 10,000.00 49,300.00

350.00 4,900.00 350.00 3,850.00

JUMLAH HARGA BAHAN 164,550.00

UMLAH HARGA PERALATAN 0.00 217,850.00

217,850.00

Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas IIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 17,000.00

115,000.00 2,300.00 80,000.00 400.00

JUMLAH HARGA TENAGA 26,200.00

5,400,000.00 59,400.00 14,040.00 702.00

JUMLAH HARGA BAHAN 60,102.00

UMLAH HARGA PERALATAN 0.00 86,302.00

86,300.00

Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau IIIHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,750.00 85,000.00 25,500.00

115,000.00 3,450.00 80,000.00 6,000.00

JUMLAH HARGA TENAGA 44,700.00

4,320,000.00 66,528.00 14,040.00 2,808.00

JUMLAH HARGA BAHAN 69,336.00

UMLAH HARGA PERALATAN 0.00 114,036.00

114,030.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,510.00 85,000.00 7,650.00

115,000.00 1,035.00 80,000.00 2,160.00

JUMLAH HARGA TENAGA 14,355.00

35,000.00 42,000.00 35,000.00 12,250.00

JUMLAH HARGA BAHAN 54,250.00

UMLAH HARGA PERALATAN 0.00 68,605.00

68,600.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,510.00 85,000.00 7,650.00

115,000.00 1,035.00 80,000.00 2,160.00

JUMLAH HARGA TENAGA 14,355.00

30,000.00 36,000.00 30,000.00 10,500.00

JUMLAH HARGA BAHAN 46,500.00

UMLAH HARGA PERALATAN 0.00 60,855.00

60,850.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,510.00 85,000.00 7,650.00

115,000.00 1,035.00 80,000.00 240.00

JUMLAH HARGA TENAGA 12,435.00

12,960.00 15,552.00 12,960.00 4,536.00

JUMLAH HARGA BAHAN 20,088.00

UMLAH HARGA PERALATAN 0.00 32,523.00

32,520.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,265.00 85,000.00 11,475.00

115,000.00 1,552.50 80,000.00 320.00

JUMLAH HARGA TENAGA 18,612.50

23,333.33 28,000.00 23,333.33 8,166.67

JUMLAH HARGA BAHAN 36,166.67

UMLAH HARGA PERALATAN 0.00 54,779.17

54,770.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,265.00 85,000.00 11,475.00

115,000.00 1,552.50 80,000.00 320.00

JUMLAH HARGA TENAGA 18,612.50

41,666.67 50,000.00 41,666.67 14,583.33

JUMLAH HARGA BAHAN 64,583.33

UMLAH HARGA PERALATAN 0.00 83,195.83

83,190.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 65,000.00

85,000.00 127,500.00 115,000.00 17,250.00

80,000.00 4,000.00 JUMLAH HARGA TENAGA 213,750.00

146,000.00 146,000.00 1,350.00 8,100.00

162,000.00 1,620.00 730.00 5,110.00

JUMLAH HARGA BAHAN 160,830.00

UMLAH HARGA PERALATAN 0.00 374,580.00

374,580.00

Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 6,500.00 85,000.00 4,250.00

115,000.00 575.00 80,000.00 400.00

JUMLAH HARGA TENAGA 11,725.00

80,000.00 29,120.00 33,400.00 3,674.00

JUMLAH HARGA BAHAN 32,794.00

UMLAH HARGA PERALATAN 0.00 44,519.00

44,510.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 3,900.00 85,000.00 5,100.00

115,000.00 690.00 80,000.00 240.00

JUMLAH HARGA TENAGA 9,930.00

18,000.00 18,900.00 15,000.00 2,250.00

JUMLAH HARGA BAHAN 21,150.00

UMLAH HARGA PERALATAN 0.00 31,080.00

31,080.00

1 M2 Memasang rangka langit-langit Aluminium Profil "C"HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,750.00 85,000.00 42,500.00

115,000.00 5,750.00 80,000.00 640.00

JUMLAH HARGA TENAGA 58,640.00

10,000.00 36,000.00 250.00 2,500.00

5,600.00 5,880.00

JUMLAH HARGA BAHAN 44,380.00

UMLAH HARGA PERALATAN 0.00 103,020.00

103,020.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 58,500.00 85,000.00 38,250.00

115,000.00 5,175.00 80,000.00 3,600.00

JUMLAH HARGA TENAGA 105,525.00

65,000.00 361,140.00 1,350.00 12,555.00

162,000.00 2,916.00 2,808.00 5,447.52

JUMLAH HARGA BAHAN 382,058.52

UMLAH HARGA PERALATAN 0.00 487,583.52

487,580.00

Pemasangan 1 M2 Lantai Granit Ukuran 50 cm x 50 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

160,000.00 640,000.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 664,462.00

UMLAH HARGA PERALATAN 0.00 692,602.00

692,600.00

Pemasangan 1 m’ plint Stepnoshing Granito Tile 10x60cmHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 5,850.00 85,000.00 7,650.00

115,000.00 1,035.00 80,000.00 400.00

JUMLAH HARGA TENAGA 14,935.00

185,500.00 315,350.00 1,350.00 1,539.00

162,000.00 486.00 2,808.00 280.80

JUMLAH HARGA BAHAN 317,655.80

UMLAH HARGA PERALATAN 0.00 332,590.80

332,590.00

Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

90,000.00 279,000.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 303,462.00

UMLAH HARGA PERALATAN 0.00 331,602.00

331,600.00

Pemasangan 1 M2 Lantai Keramik Ukuran 32 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

153,817.60 845,996.80 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 870,458.80

UMLAH HARGA PERALATAN 0.00 898,598.80

898,590.00

Pemasangan 1 M2 Lantai Granit Ukuran 60 cm x 60 cm HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 15,600.00 85,000.00 10,200.00

115,000.00 1,380.00 80,000.00 960.00

JUMLAH HARGA TENAGA 28,140.00

174,500.00 540,950.00 1,350.00 12,960.00

162,000.00 7,290.00 2,808.00 4,212.00

JUMLAH HARGA BAHAN 565,412.00

UMLAH HARGA PERALATAN 0.00 593,552.00

593,550.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 9,750.00 85,000.00 42,500.00

115,000.00 5,750.00 80,000.00 640.00

JUMLAH HARGA TENAGA 58,640.00

15,000.00 30,000.00 12,000.00 12,000.00

9,000.00 21,060.00 7,000.00 28,000.00 6,400.00 25,600.00 6,000.00 15,300.00 4,400.00 17,600.00

450.00 1,800.00

JUMLAH HARGA BAHAN 151,360.00

UMLAH HARGA PERALATAN 0.00 210,000.00

210,000.00

1 M2 Cat Kayu 1/2 Duco, ( 1 x Cat Manie + Dempul + 2 Cat Penutup )HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 4,550.00 85,000.00 765.00

115,000.00 690.00 80,000.00 2,000.00

JUMLAH HARGA TENAGA 8,005.00

21,600.00 4,320.00 19,440.00 5,832.00 54,000.00 21,600.00 54,000.00 9,180.00 16,500.00 3,300.00

5,400.00 2,160.00 18,000.00 18,000.00 60,000.00 37,500.00

JUMLAH HARGA BAHAN 101,892.00

UMLAH HARGA PERALATAN 0.00 109,897.00

109,890.00

HARGA JUMLAHSATUAN HARGA

(Rp) (Rp)

65,000.00 26,000.00 85,000.00 8,500.00

JUMLAH HARGA TENAGA 34,500.00

2,200.00 101,200.00 162,000.00 19,440.00

JUMLAH HARGA BAHAN 120,640.00

UMLAH HARGA PERALATAN 0.00

155,140.00 155,140.00

DAFTAR HARGA UPAH DAN BAHAN BANGUNAN

A. UPAH PEKERJA

No. HARGA SATUAN

SATUAN KETERANGAN Rp.

1 MANDOR 80,000.00 OH

2 KEPALA TUKANG KAYU 115,000.00 OH

3 TUKANG KAYU 85,000.00 OH

4 KEPALA TUKANG BATU 115,000.00 OH

5 TUKANG BATU 75,600.00 OH

6 KEPALA TUKANG BESI 115,000.00 OH

7 TUKANG BESI 85,000.00 OH

8 TUKANG GALI 85,000.00 OH

9 TUKANG LAS 85,000.00 OH

10 KEPALA TUKANG CAT 115,000.00 OH

11 TUKANG CAT 85,000.00 OH

12 PEKERJA 65,000.00 OH

13 OPERATOR TERLATIH 65,000.00 OH

14 MEKANIK 65,000.00 OH

15 SOPIR 65,000.00 OH

16 TUKANG 85,000.00 OH

17 KEPALA TUKANG 115,000.00 OH

B. HARGA BAHAN

No. HARGA SATUAN

SATUAN KETERANGAN Rp.

1 Acustic 30X60 172,800.00 lembar

2 Air 50.00 liter

3 Aluminium Foil 51,200.00 m²

4 Alluminium strip 22,000.00 m'

5 Amplas 51,200.00 m²

6 Baja Profil 28,426.00 kg

7 Baja Ringan 10,000.00 m'

8 Bak kontrol induk pas. 1/2 batu ukuran 50 x 50 cm 550,000.00 unit

9 Bak Mandi Fibre 243,000.00 unit

10 Bata HEBEL Uk. 60x20x10 cm 9,000.00 Bh

11 Batu Bata 730.00 Bh

12 Batu Kali/ Batu Belah (Sungai/ Gunung) 162,000.00 m³

13 Baut reng 250.00 buah

14 Baut truss 350.00 buah

15 Besi Beton Polos 10,800.00 kg

16 Besi Beton Ulir 10,800.00 kg

17 Besi profil 28,426.00 kg

18 Besi strip 18,000.00 kg

19 Beton roster / terawang 8,400.00 Bh

20 Zakering (Kast Lokal 1 Zakering) 135,000.00 buah

21 Bubungan Genteng 37,800.00 m'

22 Bubungan Seng 16,200.00 m'

23 Cat Kayu Dasar 54,000.00 kg

24 Cat Kayu Mengkilat 54,000.00 kg

25 Cat Menie Besi 21,600.00 kg

No. HARGA SATUAN

SATUAN KETERANGAN Rp.

26 Cat Menie Kayu 21,600.00 Kg

27 Cat Tembok 48,600.00 kg

28 Ceiling Batten ( Baja ringan C ) 12,000.00 m'

29 Chipping 8,000.00 m²

30 Connectors Ceiling Batten to Top Cross 7,000.00 Pcs

31 Dempul Kayu 19,440.00 kg

32 Engsel Jendela 16,200.00 pasang

33 Engsel Pintu 21,600.00 pasang

34 Fitting lampu 15,000.00 bh

35 Floor drain 14,040.00 bh

36 Granit Tile uk. 60 x 60 (Polished) 174,500.00 buah

37 Granit Tile uk. 60 x 60 (un-Polished) 185,000.00 buah

38 Granit Tile uk. 50 x 50 (un-Polished) 160,000.00 buah

39 Granit Dinding 30x60 cm Anti Slip, Unpolish 65,000.00 buah

40 Gypsum (120x240)cm tebal 1,2cm 44,280.00 lembar

41 Gypsum board (120x240x9) 80,000.00 lembar

42 Hak Angin 11,000.00 buah

43 Instalasi 149,000.00 ttk

44 Instalasi PDAM 1,500,000.00 unit

45 Jaring kawat baja / wire mesh 6 mm 43,200.00 kg

46 Jendela kawat harmonika lapis plastik PVC 27,000.00 m²

47 Kabel NYM 3 x 2,5 mm² 12,000.00 m¹

48 Kaca Bening uk. 2 mm 64,800.00 lbr

49 Kaca Bening uk. 3 mm 81,000.00 lbr

50 Kaca Bening uk. 5 mm 91,800.00 lbr

51 Kaca Raybend uk. 3 mm 97,200.00 lbr

52 Kaca Raybend uk. 5 mm 113,400.00 m²

53 Kaca Cermin 2 mm 31,350.00 m²

54 Kaca Cermin 3 mm 95,000.00 m²

55 Kaca Cermin 5 mm 135,000.00 m²

56 kaca es 3 mm 95,000.00 m²

57 Kaca warna 5 mm 105,000.00 m²

58 Kawat beton 17,000.00 kg

59 Kawat las listrik 25,000.00 kg

60 Kayu Klas I (Seumantok/ Ulin/ dll) 6,480,000.00 m³

61 Kayu Klas II (Kamper/ Kruing/ dll) 5,400,000.00 m³

62 Kayu Klas III (Borneo/ dll) 4,320,000.00 m³

63 Kayu Klas IV (Sengon/ dll) 3,888,000.00 m³

64 Kayu perancah (dolken) 18,000.00 btg

65 Keramik uk. 16 x 60 cm setara STAR WHITE 96,908.80 buah

66 Keramik Sisi Kulit Jeruk 20 x 20 cm 80,000.00 m²

67 Keramik uk. 20 x 25 cm 65,000.00 m²

68 Keramik uk. 25 x 25 cm 85,000.00 m²

69 Keramik uk. 25 x 33 cm 90,000.00 m²

70 Keramik uk. 30 x 30 cm 64,800.00 m²

71 Keramik uk. 32 x 60 cm setara STAR WHITE 153,817.60 buah

72 Keramik uk. 40 x 40 cm 140,000.00 m²

73 Keramik uk. 40 x 40 cm setara PLATINUM 17,461.00 buah

74 Keramik uk. 60 x 120 cm setara STAR WHITE 466,816.00 buah

75 Keramik uk. 60 x 60 cm 90,000.00 buah

No. HARGA SATUAN

SATUAN KETERANGAN Rp.

76 Kerikil 105,000.00 m³

77 Kertas Amplas 5,400.00 lembar

78 Kloset Duduk Keramik 1,670,900.00 buah

79 Kloset Duduk Keramik setara TOTO 3,090,000.00 bh

80 Kloset Jongkok Keramik 146,000.00 buah

81 Kloset Jongkok Keramik setara TOTO 412,000.00 bh

82 Kloset Jongkok,Setara " TOTO Type CW 421 J 2,600,000.00 bh

83 Kran air setara 3/4 atau 1/2 Lux 15,500.00 bh

84 Kuas cat 15,000.00 bh

85 Kunci gembok 60,000.00 bh

86 Kunci Pintu 120,000.00 buah

87 Kusen Jendela Aluminium 129,600.00 m¹

88 Kusen Pintu Aluminium 75,000.00 m¹

89 Lampu RM 2x20 watt setara PHILIPS 325,000.00 bh

90 Lampu SL 23 watt setara PHILIPS 45,000.00 bh

91 Lampu SL 32 watt setara PHILIPS 56,000.00 bh

92 Lem kayu 21,600.00 kg

93 List profil 10,000.00 m¹

94 List Gypsum Profil 18,000.00 m¹

95 MCB 1 phase stuz 2 s/d 10 Amp 500,000.00 bh

96 Minyak bekisting 5,000.00 ltr

97 Minyak Cat 16,500.00 liter

98 Pelumas/ Oli 46,400.00 ltr

99 Multipleks 3 mm 64,800.00 lembar

100 Multipleks 4 mm 70,200.00 lembar

101 Multipleks 6 mm 90,720.00 lembar

102 Multipleks 9 mm 140,400.00 lembar

103 Nok/ Rabung Seng 0,35 Cat Pabrik 28,080.00 lembar

104 Nok/ Rabung Seng 0,35 Tidak Dicat 64,800.00 lembar

105 Paku Kayu 14,040.00 kg

106 Paku Seng 16,193.00 kg

107 Paku Skrup 33,400.00 kg

108 Paku triplek 31,600.00 kg

109 Paku Ulir Primadek 4,000.00 buah

110 Pasir Beton 140,400.00 m³

111 Pasir Pasang 162,000.00 m³

112 Pasir Urug 80,000.00 m³

113 Paving Block 2,200.00 buah

114 Pemasukan arus 10 A 6,000,000.00 Ls

115 Pengadaan sumur bor 9,000,000.00 unit

116 Pipa Leiding dia. 1" Galvanis Tebal 3,2 mm 210,000.00 batang

117 Pipa Leiding dia. 1/2" Galvanis Tebal 3,2 mm 180,000.00 batang

118 Pipa PVC Ø ½" Kualitas AWE (United) 27,000.00 batang

119 Pipa PVC Ø ¾ inchi 45,000.00 batang

120 Pipa PVC Ø 1 inchi 54,000.00 batang

121 Pipa PVC Ø 1½" 59,400.00 batang

122 Pipa PVC Ø 2 inchi 77,760.00 batang

123 Pipa PVC Ø 3 inchi 140,000.00 batang

124 Pipa PVC Ø 4 inchi 250,000.00 batang

125 Plamir Kayu 54,000.00 kg

No. HARGA SATUAN

SATUAN KETERANGAN Rp.

126 Plamir Tembok 54,000.00 kg

127 Profil C. 75. 75 25,000.00 m¹

128 Profil Aluminium 140,000.00 m¹

129 Profil Kaca 8,000.00 m¹

130 Ramset 5,600.00 m¹

131 Rangka / bingkai plat strip + kawat kasa 16,600.00 m²

132 Relief timbul 5 cm 150,000.00 m¹

133 Reng U 0.5 10,000.00 m¹

134 Residu 27,000.00 kg

135 Saklar ganda 250 volt, 10 A 21,000.00 bh

136 Saklar tunggal 250 volt, 10 A 21,000.00 bh

137 Seal tape 4,500.00 bh

138 Sekrup 450.00 Bh

139 Semen 1,350.00 kg

140 Semen @ 40 kg 54,000.00 Zak

141 Semen @ 50 kg 59,184.00 Zak

142 Semen Warna @ 50 kg 140,400.00 Zak

143 Semen Warna 2,808.00 kg

144 Seng Gelombang BJLS 30 32,400.00 m²

145 Seng Genteng Metal 0,30 setara Emerald 68,000.00 lbr

146 Septictank dan bidang resapan 4,500,000.00 unit

147 Sewa alat 200,000.00 jam

148 Solar (Industri) 10,868.00 liter

149 Spacer / Formite 18,600.00 Buah

150 Sprring ( Suspension Clips) 6,400.00 Pcs

151 STEPNOSHING TANGGA KERAMIK 10/60 CM 185,500.00 m¹

152 Stop Kontak + arde 120,000.00 titik

153 Stop Kontak + Instalasi 160,300.00 titik

154 Suspension Rods and Nut 6,000.00 m¹

155 Suspension Braccket 4,400.00 buah

156 Sealant 194,100.00 Tube

157 Tanah Timbun 54,000.00 m³

158 Tepung Gypsum 15,000.00 Kg

159 Tiang / pipa galvanis Ø 2 " 300,000.00 m¹

160 Top Crosss Reil ( Baja ringan U) 15,000.00 m¹

161 Urinoir Keramik 1,188,000.00 buah

162 Urinoir setara TOTO 2,280,000.00 Buah

163 Wall Angle ( Baja ringan / rangka pinggir L) 9,000.00 m¹

164 Westafel setara TOTO 950,000.00 Buah

79,300.00

107,700.00

85,200.00

107,700.00

85,200.00

107,700.00

85,200.00

52,100.00

52,000.00

107,700.00

85,200.00

58,400.00 Aceh Besar 2013

149,700.00

85,000.00

89,600.00

85,200.00

107,700.00

HARGA SATUAN

Rp.

184,200.00

100.00

51,200.00

51,200.00

32,900.00

10,000.00

550,000.00

2,224,800.00

9,000.00

700.00

162,500.00

250.00

250.00

15,300.00

28,500.00

15,000.00

18,000.00

8,400.00

149,700.00

64,300.00

28,300.00

31,500.00

45,600.00

26,500.00

26,500.00

31,100.00

12,000.00

8,000.00

7,000.00

27,900.00

24,800.00

32,000.00

15,000.00

24,300.00

174,500.00

185,000.00

160,000.00

65,000.00

76,600.00

80,000.00

17,200.00

149,000.00

1,500,000.00

37,000.00

15,700.00

12,000.00

67,800.00

101,600.00

112,100.00

103,200.00

133,400.00

31,350.00

95,000.00

135,000.00

95,000.00

105,000.00

21,900.00

25,000.00

5,304,200.00

3,986,100.00

3,590,200.00

3,268,900.00

21,500.00

96,908.80

3,200.00

90,000.00

5,312.50

9,000.00

5,459.14

153,817.60

22,400.00

17,461.00

466,816.00

120,000.00 6.25 10,368.00

135,000.00

2,300.00

1,670,900.00

3,090,000.00

146,000.00

412,000.00

4,500,000.00

75,000.00

15,000.00

60,000.00

143,600.00

143,600.00

75,000.00

325,000.00

45,000.00

56,000.00

6,000.00

10,000.00

35,900.00

60,000.00

4,500.00

23,800.00

46,400.00

65,100.00

84,300.00

111,300.00

173,700.00

78,800.00

53,300.00

19,000.00

18,200.00

14,500.00

15,000.00

4,000.00

561,600.00 162,500

648,000.00

340,000.00

6,000,000.00

9,000,000.00

43,200.00

34,000.00

85,900.00

108,700.00

136,900.00

156,200.00

321,300.00

27,500.00

15,100.00

36,000.00 18333.33333

5,600.00

16,600.00

150,000.00

10,000.00

4,400.00

21,000.00

###

4,500.00

500.00

1,306.00

52,100.00

65,300.00

130,000.00

2,600.00

53,500.00

68,000.00

4,500,000.00

200,000.00

8,900.00

18,600.00

6,400.00

185,500.00

120,000.00

160,300.00

6,000.00

4,400.00

216,000.00

15,000.00

300,000.00

15,000.00

1,132,300.00

2,280,000.00

9,000.00

950,000.00

Pek : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO Lok : KECAMATAN MONTASIK KABUPATEN ACEH BESAR Thn : 2015

Sloof induk iperkirakan 18.9 X 311.75 X 4

Sloo Tambahan 20/25 2.2 X 2618.75 X 3

Sloof Bantu 1.7 X 25.8 X 2

Bowplank 18.9 + 23.5 + 4 Luas Atap Dagg 20.7 X 13.55 Luas Dinding Bata 1/2 Luas Dinding Bata 1/4

I. PEKERJAAN PERSIAPAN

1 Pembersihan /Pembongkaran 2 Pasangan Bouwplank / Pengukuran 18.9 + 23.5 + 43 Biaya Air Kerja

II. PEKERJAAN PONDASI.

1 Galian Tanah Pondasi Tapak ==

2 Galian Tanah menerus 0.60 x 0.65 103.70 =0.60 x 0.65 113.45 =0.60 x 0.65 15.04 =

=3 Urungan kembali pondasi 0.25 % x 50.1 =4 Urungan Tanah Bawah Lantai 11.75 x 18.90 x 0.25 =

5 Urungan pasir bawah lantai 18.90 x 11.75 x 0.1 =

### Urungan pasir bawah pondasi menerus 0.05 x 0.40 103.70 =0.05 x 0.40 113.45 =0.05 x 0.40 15.04 =

III. PEKERJAAN PASANGAN :

1 Pas. Batu Kosong 0.10 x 0.40 103.70 =0.10 x 0.40 113.45 =0.10 x 0.40 15.04 =

2 Pas. batu gunung 0.35 x 0.50 103.70 =0.35 x 0.50 113.45 =0.35 x 0.50 15.04 =

IV. PEKERJAAN DINDING DAN PLESTERAN.

1 Pasangan bata Total WC 2.81 x 113.45 =2.81 x 75.60 =

TWDH 1.50 x 19.10 =1.50 x 2.18 =

2.81 x 2.76 =Sal 0.50 x 75.60 =Bak 0.92 0.74 0.7

0.94 0.94 0.91.03 19.10 1.0

Pasangan bata 1 : 4 1.03 2.19 26.01.03 1.56 24.01.03 18.90 1.01.03 x 2.76 =

Luas Pintu dan Ventilasi 1.56 24.0Luas Ventilasi Double 0.00 24.0Ventilasi diatas Pintu 0.63 24.0Lobang Angin 0.23 15.0

Kusen Vent Double 2.24 + 1.44 3.68 x 12.0Kusen Pintu dan Vent 5.44 + 2.64 8.08 x 24.0Luas Pintu 1.40 24.0Luas Ventilasi 1 0.28 + 0.20 0.48 24.0Luas Ventilasi 2 0.20 + 0.20 0.40 12.0

2 Plasteran bata 1: 2 2 x luas dinding =3 Pasangan bata 1 : 4 159.75 x 0.53 = =4 Plasteran bata 1: 4 2 x luas dinding =5 Plasteran kolom 1 : 3 1.1 x 1.1 x 1.8 x 12.0 =6 Plasteran balok 1 : 3 2.0 x 100.0 x =

V. PEK. BETON BERTULANG Ad. 1:2:3

1 Sloof 20/25 0.20 x 0.25 103.70 =2 0.20 x 0.25 113.45 =3 0.20 x 0.25 15.04 =4 5 Balok Anak 20/35 0.20 x 0.35 x 103.7 =

Balok Induk 30/50 0.30 x 0.50 x 73.5 =3 Tapak Pondasi =4 Balok Latai 13/20 =5 Kolom 50x60 0.50 x 0.60 x 1.3 x 12.0 =6 Plat lantai 20.70 x 12.95 x 0.12 =6 Kolom 13x 13 0.13 x 0.13 x 2.9 x 12.0 =

0.13 x 0.13 x 2.9 x 12.0 =

IV PEKERJAAN KERAMIK

1 Pas. Dinding+Keramik Tp Wudhuk (tengah) 0.33 0.13 0.35 0.23 1.4 0.13 2.57 =

Pas. Dinding+Keramik Tp Wudhuk 0.33 0.13 0.35 0.23 1.73 0 2.77 =

Pas. Dinding+Keramik Tp Wudhuk (Kr/Kn) 1.92 0.26 0 2.18 =Pas. Dinding+Keramik KM/WC 2.06 x 1.73 x 2 =

1.44 x 1.73 x 1 =0.83 x 1.73 x 1 =

Pas. Dinding+Keramik Bak KM/WC 1.275 + 0.98 2.26 x 24 =Pas. Dinding+Keramik Tempat duduk 0.06 + 0.5 = 0.56 x 44 =

Jumlah total

Lantai Keramik Koridor KM 35.00Lantai Keramik Tpt Wudhuk 70.26 + 2.0 = 72.26 x 1 =Lantai Keramik KM 0.65 + 1.6 2.28 x 24 =

Jumlah total

### Rabat Beton 5 cm 11.15 x 16.90 x 0.1 m' =### Pasir Urung bawah Lantai 10 cm x m' =

VI. PEK. PLAFOND DAN ATAP

1 Pas. Plafond Gypsum 9 mm +Rangka puring 18.90 x 11.75 =2 List Profil kayu 5/5 =3 Rangka atap baja Ringan =4 Seng Geteng metal 0,3 mm =5 Rabung seng metal =6 Liplang Kayu 2x 20 cm =7 Pas kayu ornamen motif aceh tombak layar =

VII. PEK. Kosen/Daun Jendela,Pintu1 Daun Pintu Alumunium =2 Kosen Pintu Alumunium =3 Daun Pintu panel =4 Daun Pintu panel+ kaca 0.02 x 0.13 x 0.34 x 48.0 =

Kosen pintu kayu =

VIII. PEK. Sanitair1 Septi tanck + bak peresapan =2 Pas. jaringan pipa air bersih =3 Pas. jaringan pipa air kotor =4 Klosed duduk =5 Kran air =6 Floor drain =

IX. Pek. Intalasi Listrik1 Lampu SL 2X36 Watt =1 Lampu Downlight 18 watt =2 Saklar Tunggal =3 Saklar Ganda =

4 Stop Kontak 500 watt =5 Kabel Istalasi =

6 BOX MCB (6amper) =

X. PEKERJAAN PENGECETAN

1 Pengecetan Dinding bata =2 Pengecetan Lisplang kayu =

3 Pengecetan List Profil kayu =4 Pengecetan Kosen dan papan jelusi Ventilasi =5 Pengecetan Plafond =

XI. PEK. ALAT PENGGANTUNG/KUNCI :1 Kunci tanam 2 Slaag KM/WC =2 Engsel Pintu KM/WC =

Septick TankGalian 3.5 2.5 1.5Urugan KembaliUrugan Pasir 3.00 2.00 0.15Bas Bata 1:2 1 Batu 10.00 1.23Plesteran 1:2Kolom 23/23 0.23 0.23 1.43 4Sloff 0.23 0.23 10.00Ring Balok 0.13 0.15 2.00Plat Penutup 3.00 2.00 0.10Pipa HawaBak KontrolGalianUrugan KembaliUrugan PasirPasangan BatuBeton CorPlesteran 1:2ResapanGalian 1.2 5 1.5Urugan KembaliKerkil/Batu berpori 1 5 0.5Pasir Urug 1 5 0.4IjukPipa Berpori 4"

103.7056.70 M'47.00 M'57.20 M'56.25 M'

3.40 M'11.60 M'46.40 M'

280.49 M2

Taksir46.40 M'

Taksir Ls

0.00

0.00

0.0044.25

5.87

50.11

12.53

55.52

22.21

0.002.270.30

2.57

0.00

4.54

0.60

5.14

0.0019.85

2.63

22.49

318.79

212.44

28.65

3.27

M2

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

7.76

37.80

16.34

21.21

19.67

665.92

58.65

38.56

19.47

2.84

119.52

37.44

0.00

15.12

3.45

56.01

44.16

193.92

33.60

11.52

4.80

637.59

84.88

169.76

26.30

200.00

0.005.670.75

6.42

7.26

11.03

0.00

0.00

4.68

32.17

0.59

0.591.19

5.14

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

98.17 5.54 105.81 4.36

7.13

2.49 1.44

11.05265.31

30.11

24.75

528.52 M2

35.00 M2 72.26 M2 54.72 M2

161.98 M2

18.84

0.00

222.08

176.00340.00 M2340.00 M2

44.0014.00 M2

2.00 bh

24.00 bhTaksir M'

0.22

0.04

0.00

2.00 BhTaksir LsTaksir Ls

9.00 bh9.00 bh9.00 bh

5.00 bh52.00 bh20.00 bh

2.00 bh

M2

M2

M2

M2

M2

M2

M2

M'

M'

M3

M3

M3

16.00 LsTaksir Ls

1.00 Unit

#REF!

12.32

8.80

5.90

222.08

4.0 bh8.0 bh

13.133.280.90

12.30

0.300.530.040.601.00

9.002.252.502.00

20.00 Kg4.00 M'

M2

M2

M2

M2

M2

NoDIMENSI (m) Berat Besi Jumlah Berat/m'

b h m2 (kg) Batang Kg/m'

SLOOF

Sloof 25/40

14

0.25 0.40 0.10

1.21 6.00 1.00 7.25

12 0.89 2.00 1.00 1.78

8 - 100 0.39 10.00 1.30 5.13

Sloof 20/25 12

0.20 0.25 0.05 0.89 5.00 1.00 4.44

6 - 100 0.22 10.00 0.90 2.00

Sloof 15/20

0.15 0.20 0.03 12 0.89 4.00 1.00 3.55 8 - 150 0.39 6.67 0.70 1.84

KOLOM Kolom 30/40 16

0.30 0.40 0.12 1.58 10.00 1.00 15.78

8-100 0.39 10.00 1.40 5.52

Kolom 30/30 16

0.60 0.60 0.36 1.58 8.00 1.00 12.63

8-100 0.39 10.00 2.40 9.47

Kolom 25/30 14

0.25 0.30 0.08 1.21 10.00 1.00 12.08

8-100 0.39 10.00 1.10 4.34

Kolom 25/25 14

0.25 0.25 0.06 1.21 8.00 1.00 9.67

8-100 0.39 10.00 1.00 3.95

BALOK

Kolom 50/60 16

0.50 0.60 0.30 1.58 8.00 1.00 12.63

PERHITUNGAN BERAT PEMBESIAN / M3 BETON

Ø BESI Panjang

/m'

NoDIMENSI (m) Berat Besi Jumlah Berat/m'

b h m2 (kg) Batang Kg/m' Ø BESI

Panjang /m'

12 0.50 0.60 0.30 0.62 12.00 1.00 7.40 8-100 0.39 10.00 2.20 8.68

Balok 20/30 13

0.20 0.30 0.06 1.04 5.00 1.00 5.21

12 0.89 2.00 1.00 1.78 8-150 0.39 6.67 1.00 2.63

Balok 30/100 16

0.30 1 0.30 1.58 10.00 1.00 15.78

14 1.21 4.00 1.00 4.83 8-100 0.39 10.00 2.60 10.26

Balok 15/40 14

0.15 0.40 0.06 1.21 5.00 1.00 6.04

12 0.89 2.00 1.00 1.78 8-150 0.39 6.67 1.10 2.89

Balok Bordes 25/30

0.25 0.30 0.08 12 0.89 4.00 1.00 3.55 8-150 0.39 6.67 1.10 2.89

RENG BALOK Reng Balok 20/30 14

0.20 0.30 0.06 1.21 5.00 1.00 6.04

12 0.89 2.00 1.00 1.78 8-150 0.39 6.67 1.00 2.63

Balok Top Gepel 15/20

0.13 0.13 0.02 12 0.89 4.00 1.00 3.55 8-150 0.39 6.67 0.52 1.37

Balok Latai 13/20

0.13 0.20 0.03 12 0.89 4.00 1.00 3.55 8-150 0.39 6.67 0.66 1.74

Plat Lantai T=12cm 10

1.00 0.12 0.12 0.62 20.00 1.00 12.33

10 - 150 0.62 20.00 1.00 12.33

Plat Dack T=10cm 10 - 150

1.00 0.10 0.10 0.62 20.00 1.00 12.33

10 - 150 0.62 20.00 1.00 12.33

NoDIMENSI (m) Berat Besi Jumlah Berat/m'

b h m2 (kg) Batang Kg/m' Ø BESI

Panjang /m'

Pondasi Tapak 140/140 14 - 150

1.40 0.400 0.56 1.21 18.67 1.00 22.56

14 - 150 1.21 18.67 1.00 22.56

Poor Pondasi Tapak 30/40 16

0.30 0.400 0.12 1.58 10.00 1.00 15.78

8 - 100 0.39 10.00 1.40 5.52

Pondasi Tapak dan Poor Pondasi

Pondasi Tapak 120/120 14 - 150

1.20 0.400 0.48 1.21 18.67 1.00 22.56

14 - 150 1.21 18.67 1.00 22.56

Poor Pondasi Tapak 30/30 16

0.30 0.300 0.09 1.58 8.00 1.00 12.63

8 - 100 0.39 6.67 1.20 3.16

Pondasi Tapak dan Poor Pondasi

Plat Lantai Tangga dan Bordes T=10cm 12 - 150

1.00 0.100 0.10 0.89 13.33 1.00 11.84

12 - 150 0.89 13.33 1.00 11.84

Anak Tangga b=30, h=16 10 - 100

0.30 0.160 0.02 0.62 4.00 1.00 2.47

10 - 100 0.62 10.00 0.64 3.95

Plat Tangga, Anak Tangga, Bordes

Jumlah Berat Berat Besi/m3

(Kg) (Kg)

SLOOF

9.03 90.26

5.13 51.30

4.44 88.78

2.00 39.95

5.39 179.75

KOLOM

15.78 131.53 5.52 46.03

12.63 35.07

9.47 26.31

12.08 161.12 4.34 57.87

9.67 154.68 3.95 63.13

12.63 42.09

PERHITUNGAN BERAT PEMBESIAN / M3 BETON

Jumlah Berat Berat Besi/m3

(Kg) (Kg)

16.08 53.60

5.21 86.8290

4.41 73.44

20.62 68.7234

10.26 34.20

7.82 130.29

2.89 48.23

6.44 85.93

6.04 100.70

4.41 73.44

4.92 291.07

5.29 203.36

24.66 205.51

24.66 246.62

Jumlah Berat Berat Besi/m3

(Kg) (Kg)

45.11 80.56

21.31 177.56

Pondasi Tapak dan Poor Pondasi 129.06

45.11 93.99

15.78 175.37

Pondasi Tapak dan Poor Pondasi 134.68

23.68 236.75

6.41 267.17

Plat Tangga, Anak Tangga, Bordes 251.96

Basement Hal. 311 of 498

ENGINEERING ESTIMATE ( EE )PEMBANGUNAN RUMAH TYPE 45

BANDA ACEH

NO URAIAN PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5

A PEKERJAAN PERSIAPAN

1 Pengukuran dan pemasangan Bowplank m' #REF!

2 Administrasi/P3k dan Keamanan Ls Taksir

4 Quality Kontrol Ls Taksir

5 Direksi keet Ls Taksir

6 Barak Kerja + Gudang Ls Taksir

7 Pagar pengaman proyek m' Taksir

B PEKERJAAN TANAH

1 Galian pondasi 62.540 m3 #REF!

2 Urugan kembali bekas galian 15.640 m3

3 Pasir urug bawah lantai dan pondasi 12.500 m3

4 Timbunan tanah bawah lantai m3

C PEKERJAAN PASANGAN

1 Aanstamping 7.530 m3 #REF!

2 Pondasi batu gunung/batu kali 29.440 m3

3 Pasangan bata 1 PC : 2 PS Trasraam 48.590 m2

4 Plasteran 1 PC : 2 PS Trasraam 97.180 m2

5 Pasangan bata 1 PC : 4 PS 241.130 m2

6 Plasteran 1 PC : 4 PS 482.260 m2

D PEKERJAAN BETON BERTULANG

1 Sloof 18/25 3.880 m3 #REF!

2 Kolom 20/30 0.840 m3

3 Kolom praktis 1.730 m3

4 Ring balok 13/15 cm 1.680 m3

5 Balok latai 13/15 cm 0.290 m3

6 Balok plat dag 13/15 cm 0.210 m37 Plat dag dan meja beton T=10 cm 2.010 m3

E PEKERJAAN KOSEN, KAYU DAN KACA

1 Kayu kusen 1.225 m3 #REF!

2 Pintu panel + kaca 80 x 210 cm 2.000 unit Taksir

3 Pintu panel 80 x 210 cm 8.000 unit Taksir

Basement Hal. 312 of 498

1 2 3 4 5

4 Pintu fiber 70 x 210 cm 2.000 unit Taksir

5 Jendela 50 x 115 cm 4.000 unit Taksir

6 Jendela 60 x 115 cm 10.000 unit Taksir

7 Jendela 60 x 160 cm 4.000 unit Taksir

8 Krepyak 1.010 m2 Taksir

9 Kaca mati 0.770 m2 Taksir

F PEKERJAAN LANTAI & PELAPIS DINDING

1 Beton tumbuk t = 7 cm 6.388 m3 #REF!

2 Lantai keramik 40 x 40 cm 66.000 m2 #REF!

3 Lantai keramik 40 x 40 cm anti slip 21.000 m2

4 Lantai keramik 20 x 20 cm anti slip 5.670 m2

5 Dinding keramik 20 x 25 cm 39.670 m2

6 Plin keramik 75.000 m'

7 Bon-bon keramik 50.000 m'

Basement Hal. 313 of 498

1 2 3 4 5

G PEKERJAAN INSTALASI LISTRIK

1 Pemasukan arus listrik 1.000 unit Taksir

2 Box Zekering 1.000 unit Taksir

3 Lampu hemat energi 15 watt 15.000 bh Taksir

4 Lampu hemat energi 10 watt 2.000 bh Taksir

5 Titik lampu + instalasi 17.000 bh Taksir

6 Saklar tunggal 6.000 bh Taksir

7 Saklar ganda 4.000 bh Taksir

8 Stop kontak 10.000 bh Taksir

H PEKERJAAN ATAP, RANGKA DAN PLAFOND

1 Rangka Baja Ringan 163.110 m2 Taksir

2 Atap Genteng Metal 163.110 m2 #REF!

3 Talang 14.000 m2 Taksir

4 Rabung genteng Bulat 51.200 m' #REF!

5 Papan Lisplank 2,5/30cm 57.100 m2

6 Plafond triplek 134.900 m2 #REF!

7 Profil kayu 5/5 178.720 m' Taksir

8 Profil kayu 2/3 61.600 m' Taksir

I PEKERJAAN PENGECATAN

1 Cat tembok dan plafon 665.750 m2 #REF!

2 Cat minyak listplank m2

3 Cat plafond Rider m2

J PEKERJAAN SANITAIR

1 Kloset jongkok 2.000 bh Taksir

2 Titk air + kran 4.000 bh Taksir

3 Tutup bak 2.000 bh Taksir

4 Floor drain 2.000 bh Taksir

5 Wastafel stainless steel 2.000 bh Taksir

6 Pipa air kotor 2" 1.000 Pkt Taksir

7 Pipa air kotor 3" 1.000 Pkt Taksir

8 Pipa air bersih 1" 1.000 Pkt Taksir

9 Septictank + resapan 2.000 unit Taksir

K PEKERJAAN PENGUNCI DAN PENGGANTUNG

1 Kunci pintu double 2 slag Bh Taksir

2 Kunci pintu 2 slag Bh Taksir

3 Engsel pintu Psg Taksir

Basement Hal. 314 of 498

1 2 3 4 5

4 Engsel jendela Psg Taksir

5 Grendel jendela Bh Taksir

6 Hak angin Bh Taksir

7 Tarikan jendela Bh Taksir

L PEKERJAAN LAIN-LAIN

1 Reiling Tangga Galvanis + Fiber m' Taksir

2 Alumunium komposit panel m2 Taksir

3 Tolak angin motif Aceh Tamiang pkt Taksir

4 Kusen Ventilasi Kayu 25x35 cm bh Taksir

5 Crepyak alumunium m2 Taksir

6 Relief Pkt Taksir

Basement Hal. 315 of 498

ENGINEERING ESTIMATE ( EE )PEMBANGUNAN RUMAH TYPE 45

BANDA ACEHRumah Type 40

HARGA JUMLAH

SATUAN HARGA

(Rp) (Rp)

6 7

#REF! #REF!

3,500,000.00 -

3,250,000.00 -

7,500,000.00 -

2,500,000.00 -

85,000.00 -

Jumlah #REF!

#REF! #REF!

Jumlah #REF!

#REF! #REF!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

Jumlah #REF!

#REF! #REF!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE! #VALUE!

Jumlah #REF!

#REF! #REF!

-

-

Basement Hal. 316 of 498

6 7

-

-

-

-

-

-

Jumlah #REF!

#REF! #REF!

#REF! #REF!

#VALUE!

#VALUE!

#VALUE!

-

-

Jumlah #REF!

Basement Hal. 317 of 498

6 7

-

350,000.00 350,000.00

280,000.00 4,200,000.00

140,000.00 280,000.00

120,000.00 2,040,000.00

43.00 258.00

32,000.00 128,000.00

38,000.00 380,000.00

Jumlah 7,378,258.00

135,000.00 22,019,850.00

#REF! #REF!

250,000.00 3,500,000.00

#REF! #REF!

#VALUE!

#REF! #REF!

6,500.00 1,161,680.00

-

Jumlah #REF!

#REF! #REF!

Jumlah #REF!

-

-

-

-

-

-

-

-

-

Jumlah -

180,000.00 -

150,000.00 -

9,000.00 -

Basement Hal. 318 of 498

6 7

7,000.00 -

8,100.00 -

10,800.00 -

13,000.00 -

Jumlah -

550,000.00 -

500,000.00 -

9,000,000.00 -

85,000.00 -

550,000.00 -

6,000,000.00 -

Jumlah -

REKAPITULASI ENGINEERING ESTIMATE (EE)PEMBANGUNAN RUMAH TYPE 40

#REF!

NO URAIAN PEKERJAAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN Rp.B PEKERJAAN TANAH Rp.C PEKERJAAN PASANGAN Rp.D PEKERJAAN BETON BERTULANG Rp.E PEKERJAAN KOSEN, KAYU DAN KACA Rp.F PEKERJAAN LANTAI & PELAPIS DINDING Rp.G PEKERJAAN INSTALASI LISTRIK Rp.H PEKERJAAN ATAP, RANGKA DAN PLAFOND Rp.I PEKERJAAN PENGECATAN Rp.J PEKERJAAN SANITAIR Rp.K PEKERJAAN PENGUNCI DAN PENGGANTUNG Rp.L PEKERJAAN LAIN-LAIN Rp.

Rp.JUMLAH Rp.

PPN 10% Rp.

TOTAL Rp.

DIBULATKAN Rp.

Terbilang : Tiga milyar delapan ratus delapan belas juta lima ratus sembilan puluh satu ribu rupiah

#REF!

#REF!

REKAPITULASI ENGINEERING ESTIMATE (EE)PEMBANGUNAN RUMAH TYPE 40

#REF!

JUMLAH HARGA

#REF!#REF!#REF!#REF!#REF!#REF!

7,378,258.00 #REF!#REF!

- - -

#REF!

#REF!

#REF!

#REF!

Terbilang : Tiga milyar delapan ratus delapan belas juta lima ratus sembilan puluh satu ribu rupiah

ANALISA HARGA SATUAN PEKERJAAN

A. Pekerjaan Tanah

A.2.3.1.1. Menggali 1 m³ tanah biasa sedalam 1 meterKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 0.7500 Rp 65,000.00

Mandor OH 0.0250 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.2. Menggali 1 m³ tanah biasa sedalam 2 meterKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 0.9000 Rp 65,000.00

Mandor OH 0.0450 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.3. Menggali 1 m³ tanah biasa sedalam 3 meterKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 1.0500 Rp 65,000.00

Mandor OH 0.0670 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.4. Menggali 1 m³ tanah keras sedalam 1 meterKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 1.0000 Rp 65,000.00

Mandor OH 0.0320 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.5. Menggali 1 m³ tanah cadas sedalam 1 meterKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 1.5000 Rp 65,000.00

Mandor OH 0.0600 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.6. Menggali 1 m³ tanah lumpur sedalam 1 meterKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 1.2000 Rp 65,000.00

Mandor OH 0.0450 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.7. Menggali 1 m³ stripping tebing setinggi 1 meterKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 0.0500 Rp 65,000.00

Mandor OH 0.0050 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.8. Mengurug kembali 1 m³ galianKebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 0.5000 Rp 65,000.00

Mandor OH 0.0500 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.9. Mengurug kembali 1 m³ galianMengurug kembali 1 m³ galian tanah dihitung dari 1/3 kali indeks pekerjaan galian

A.2.3.1.10. Memadatkan 1 m³ tanah (per 20 cm)Kebutuhan Satuan Indeks Harga Satuan Tenaga Kerja Pekerja OH 0.5000 Rp 65,000.00

Mandor OH 0.0500 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.11. Mengurug 1 m³ pasir urug Kebutuhan Satuan Indeks Harga Satuan

Bahan Pasir Urug (PU) m³ 1.2000 Rp 80,000.00 Tenaga Kerja Pekerja OH 0.3000 Rp 65,000.00

Mandor OH 0.0100 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.11a. Mengurug 1 m³ tanah urug Kebutuhan Satuan Indeks Harga Satuan

Bahan Tanah Urug (TU) m³ 1.2000 Rp 54,000.00 Tenaga Kerja Pekerja OH 0.3000 Rp 65,000.00

Mandor OH 0.0100 Rp 80,000.00 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.12. Memasang 1 m³ lapisan pudel campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah Kebutuhan Satuan Indeks Harga Satuan Bahan Kapur Padam (KP) m³ 0.1350 Rp -

Pasir Pasang (PP) m³ 0.4000 Rp - Tanah Liat (TL) m³ 0.9480 Rp -

Tenaga Kerja Pekerja OH 0.8000 Rp - Tukang batu OH 0.4000 Rp - Kepala Tukang OH 0.0400 Rp - Mandor OH 0.0800 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.12a. Memasang 1 m³ lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi tanah Kebutuhan Satuan Indeks Harga Satuan Bahan Kapur Padam (KP) m³ 0.248 Rp -

Tanah Liat (TL) m³ 1.240 Rp - Tenaga Kerja Pekerja OH 0.800 Rp -

Tukang batu OH 0.400 Rp - Kepala Tukang OH 0.040 Rp - Mandor OH 0.080 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.13. Memasang 1 m³ lapisan ijuk tebal 10 cm, untuk bidang resapan Kebutuhan Satuan Indeks Harga Satuan Bahan Ijuk Kg 6.000 Rp - Tenaga Kerja Pekerja OH 0.150 Rp -

Mandor OH 0.015 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.2.3.1.14. Mengurug 1 m³ sirut padat untuk peninggian lantai bangunanKebutuhan Satuan Indeks Harga Satuan

Bahan Sirtu m³ 1.200 Rp - Tenaga Kerja Pekerja OH 0.250 Rp -

Mandor OH 0.025 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

B. Pekerjaan Pondasi

A.3.2.1.1. Memasang 1 m³ pondasi batu belah, campuran 1 PC : 3 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

Semen Portland (PC) Kg 202.000 Rp - Pasir Pasang (PP) m³ 0.485 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.2. Memasang 1 m³ pondasi batu belah, campuran 1 PC : 4 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

PC Kg 163.000 Rp - PP m³ 0.520 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp -

Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.3. Memasang 1 m³ pondasi batu belah, campuran 1 PC : 5 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

PC Kg 136.000 Rp - PP m³ 0.544 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.4. Memasang 1 m³ pondasi batu belah, campuran 1 PC : 6 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200

PC Kg 117.000 Rp - PP m³ 0.561 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.5. Memasang 1 m³ pondasi batu belah, campuran 1 PC : 8 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

PC Kg 91.000 Rp - PP m³ 0.584 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.6. Memasang 1 m³ pondasi batu belah, campuran 1 KP : 1 SM : 2 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

KP m³ 0.170 Rp - Semen Merah (SM) m³ 0.170 Rp - PP m³ 0.340 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%)

Harga Satuan Pekerjaan

A.3.2.1.7. Memasang 1 m³ pondasi batu belah, campuran 1 PC : 3 KP : 10 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

PC Kg 61.000 Rp - KP m³ 0.147 Rp - PP m³ 0.492 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.8. Memasang 1 m³ pondasi batu belah, campuran ¼ PC : 1 KP : 4 PP Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

PC Kg 61.000 Rp - KP m³ 0.147 Rp - PP m³ 0.492 Rp -

Tenaga Kerja Pekerja OH 1.500 Rp - Tukang batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.9. Memasang 1 m³ batu kosong (aanstamping)Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp -

Pasir Urug m³ 0.432 Rp - Tenaga Kerja Pekerja OH 0.780 Rp -

Tukang batu OH 0.390 Rp - Kepala Tukang OH 0.039 Rp - Mandor OH 0.039 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.10. Memasang 1 m³ pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 0.480 Rp -

PC Kg 194.000 Rp - Pasir beton m³ 0.312 Rp - KR m³ 0.468 Rp - Besi beton Kg 126.000 Rp - Kawat beton Kg 1.800 Rp -

Tenaga Kerja Pekerja OH 3.400 Rp - Tukang batu OH 0.850 Rp -

Kepala Tukang OH 0.085 Rp - Mandor OH 0.170 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.3.2.1.11. Memasang 1 m³ pondasi sumuran, diameter 100 cm Kebutuhan Satuan Indeks Harga Satuan Bahan Batu belah 15 cm/20 cm m³ 0.450 Rp -

PC Kg 194.000 Rp - PB m³ 0.312 Rp - KR m³ 0.468 Rp -

Tenaga Kerja Pekerja OH 2.400 Rp - Tukang batu OH 0.800 Rp - Kepala Tukang OH 0.080 Rp - Mandor OH 0.119 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

C. Pekerjaan Dinding

A.4.4.1.1. Memasang 1 m² dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 140.000 Rp -

PC Kg 43.500 Rp - PP m³ 0.080 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.2. Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 140.000 Rp -

PC Kg 43.500 Rp - PP m³ 0.080 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.3. Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 140.000 Rp -

PC Kg 26.550 Rp - PP m³ 0.093 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.200 Rp -

Kepala Tukang OH 0.020 Rp - Mandor OH 0.030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.4. Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 140.000 Rp -

PC Kg 22.200 Rp - PP m³ 0.102 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.5. Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 140.000 Rp -

PC Kg 18.500 Rp - PP m³ 0.122 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.6. Memasang 1m³ dinding bata merah ukuran(5x11x22)cm tebal 1 bata, campuran spesi 1PC:3KP:10PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 140.000 Rp -

PC Kg 10.080 Rp - PP m³ 0.0925 Rp - KP m³ 0.0275 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.7. Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 2 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

PC Kg 18.950 Rp - PP m³ 0.038 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp -

Mandor OH 0.015 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.8. Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

PC Kg 14.370 Rp - PP m³ 0.040 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.9. Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 4 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

PC Kg 11.500 Rp - PP m³ 0.043 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.10. Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 5 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

PC Kg 9.680 Rp - PP m³ 0.045 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.11. Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 6 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

PC Kg 8.320 Rp - PP m³ 0.049 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp -

Mandor OH 0.015 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.12. Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 8 PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

PC Kg 6.500 Rp - PP m³ 0.050 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.13. Memasang 1m³ dinding bata merah ukuran(5x11x22)cm tebal ½bata, campuran spesi 1PC:3KP:10PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

PC Kg 4.500 Rp - PP m³ 0.050 Rp - KP m³ 0.015 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.14. Memasang 1m³ dinding bata merah ukuran (5x11x22)cm tebal ½bata, campuran spesi 1KP:1SM:1PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

SM m³ 0.018 Rp - PP m³ 0.018 Rp - KP m³ 0.018 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.15. Memasang 1m³ dinding bata merah ukuran (5x11x22)cm tebal ½bata, campuran spesi 1KP:1SM:2PPKebutuhan Satuan Indeks Harga Satuan Bahan Batu merah Buah 70.000 Rp -

SM m³ 0.014 Rp - PP m³ 0.028 Rp -

KP m³ 0.014 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.16. Memasang 1 m³ dinding HB/CB 20, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan HB 20 Buah 12.500 Rp -

PC Kg 30.320 Rp - PP m³ 0.728 Rp - Besi angkur Ø=8 mm Kg 0.280 Rp -

Tenaga Kerja Pekerja OH 0.350 Rp - Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.17. Memasang 1 m³ dinding HB/CB 20, campuran spesi 1 PC : 4 PPKebutuhan Satuan Indeks Harga Satuan Bahan HB 20 Buah 12.500 Rp -

PC Kg 24.260 Rp - PP m³ 0.772 Rp - Besi angkur Ø=8 mm Kg 0.280 Rp -

Tenaga Kerja Pekerja OH 0.350 Rp - Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.18. Memasang 1 m³ dinding HB/CB 15, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan HB 15 Buah 12.500 Rp -

PC Kg 22.740 Rp - PP m³ 0.550 Rp - Besi angkur Ø=8 mm Kg 0.280 Rp -

Tenaga Kerja Pekerja OH 0.350 Rp - Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.19. Memasang 1 m³ dinding HB/CB 15, campuran spesi 1 PC : 4 PPKebutuhan Satuan Indeks Harga Satuan Bahan HB 15 Buah 12.500 Rp -

PC Kg 18.200 Rp - PP m³ 0.582 Rp - Besi angkur Ø=8 mm Kg 0.280 Rp -

Tenaga Kerja Pekerja OH 0.320 Rp - Tukang batu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.016 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.20. Memasang 1 m³ dinding HB/CB 10, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan HB 10 Buah 12.500 Rp -

PC Kg 15.160 Rp - PP m³ 0.364 Rp - Besi angkur Ø=8 mm Kg 0.280 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.21. Memasang 1 m³ dinding HB/CB 10, campuran spesi 1 PC : 4 PPKebutuhan Satuan Indeks Harga Satuan Bahan HB 10 Buah 12.500 Rp -

PC Kg 12.130 Rp - PP m³ 0.388 Rp - Besi angkur Ø=8 mm Kg 0.280 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.22. Memasang 1 m³ dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan Terawang (roster) Buah 30.000 Rp -

PC Kg 14.000 Rp - PP m³ 0.032 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.23. Memasang 1 m³ dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PPKebutuhan Satuan Indeks Harga Satuan Bahan Terawang (roster) Buah 30.000 Rp -

PC Kg 11.000 Rp - PP m³ 0.035 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.1.24. Memasang 1 m³ dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan Bata berongga ekspose Buah 70.000 Rp -

PC Kg 14.000 Rp - PP m³ 0.032 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

D. Pekerjaan Plesteran

A.4.4.2.1. Memasang 1 m³ plesteran 1 PC : 1 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 15.500 Rp -

PP m³ 0.016 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.2. Memasang 1 m³ plesteran 1 PC : 2 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 10.220 Rp -

PP m³ 0.020 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.3. Memasang 1 m³ plesteran 1 PC : 3 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 7.770 Rp -

PP m³ 0.023 Rp -

Tenaga Kerja Pekerja OH 0.300 Rp - Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.4. Memasang 1 m³ plesteran 1 PC : 4 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 6.240 Rp -

PP m³ 0.024 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.5. Memasang 1 m³ plesteran 1 PC : 5 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 5.180 Rp -

PP m³ 0.026 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.6. Memasang 1 m³ plesteran 1 PC : 6 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 4.410 Rp -

PP m³ 0.027 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.7. Memasang 1 m³ plesteran 1 PC : 7 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 3.930 Rp -

PP m³ 0.028 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp -

Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.8. Memasang 1 m³ plesteran 1 PC : 8 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 3.450 Rp -

PP m³ 0.029 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.9. Memasang 1 m³ plesteran 1 PC : ½ KP : 3 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 5.760 Rp -

KP m³ 0.003 Rp - PP m³ 0.013 Rp -

Tenaga Kerja Pekerja OH 0.360 Rp - Tukang batu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.10. Memasang 1 m³ plesteran 1 PC : 2 KP : 8 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 3.000 Rp -

KP m³ 0.005 Rp - PP m³ 0.020 Rp -

Tenaga Kerja Pekerja OH 0.360 Rp - Tukang batu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.11. Memasang 1 m³ plesteran 1 SM : 1 KP : 1 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan SM m³ 0.009 Rp -

KP m³ 0.009 Rp - PP m³ 0.009 Rp -

Tenaga Kerja Pekerja OH 0.360 Rp - Tukang batu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.12. Memasang 1 m³ plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm

Kebutuhan Satuan Indeks Harga Satuan Bahan SM m³ 0.007 Rp -

KP m³ 0.007 Rp - PP m³ 0.015 Rp -

Tenaga Kerja Pekerja OH 0.360 Rp - Tukang batu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.13. Memasang 1 m³ plesteran 1 PC : 2 PP, tebal 20 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 13.630 Rp -

PP m³ 0.027 Rp - Tenaga Kerja Pekerja OH 0.400 Rp -

Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.022 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.14. Memasang 1 m³ plesteran 1 PC : 3 PP, tebal 20 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 10.360 Rp -

PP m³ 0.031 Rp - Tenaga Kerja Pekerja OH 0.260 Rp -

Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.15. Memasang 1 m³ plesteran 1 PC : 4 PP, tebal 20 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 8.320 Rp -

PP m³ 0.032 Rp - Tenaga Kerja Pekerja OH 0.400 Rp -

Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.022 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.16. Memasang 1 m³ plesteran 1 PC : 5 PP, tebal 20 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 6.910 Rp -

PP m³ 0.035 Rp - Tenaga Kerja Pekerja OH 0.400 Rp -

Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.022 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.17. Memasang 1 m³ plesteran 1 PC : 6 PP, tebal 20 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 5.880 Rp -

PP m³ 0.036 Rp - Tenaga Kerja Pekerja OH 0.400 Rp -

Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.022 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.18. Memasang 1 m³ plesteran 1 SM : 1 KP : 2 PP, tebal 20 mmKebutuhan Satuan Indeks Harga Satuan Bahan SM m³ 0.009 Rp -

KP m³ 0.009 Rp - PP m³ 0.018 Rp -

Tenaga Kerja Pekerja OH 0.440 Rp - Tukang batu OH 0.220 Rp - Kepala Tukang OH 0.022 Rp - Mandor OH 0.022 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.19. Memasang 1 m³ Berapen 1 PC : 5 PP, tebal 15 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 5.180 Rp -

PP m³ 0.026 Rp - Tenaga Kerja Pekerja OH 0.150 Rp -

Tukang batu OH 0.075 Rp - Kepala Tukang OH 0.008 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.20. Memasang 1m³ Plesteran Skoning 1PC:2PP, lebar 10mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 0.500 Rp -

PP m³ 0.013 Rp - Tenaga Kerja Pekerja OH 0.080 Rp -

Tukang batu OH 0.400 Rp - Kepala Tukang OH 0.040 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.21. Memasang 1 m³ Plesteran Granit 1 PC : 2 Granit, tebal 10 mmKebutuhan Satuan Indeks Harga Satuan

Bahan PC Kg 10.000 Rp - Batu granit Kg 15.000 Rp -

Tenaga Kerja Pekerja OH 0.450 Rp - Tukang batu OH 0.225 Rp - Kepala Tukang OH 0.023 Rp - Mandor OH 0.023 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.22. Memasang 1 m³ Plesteran Teraso 1 PC : 2 Batu Teraso, tebal 10 mmKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 10.000 Rp -

Batu teraso Kg 15.000 Rp - Tenaga Kerja Pekerja OH 0.450 Rp -

Tukang batu OH 0.225 Rp - Kepala Tukang OH 0.023 Rp - Mandor OH 0.023 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.23. Memasang 1 m³ Plesteran Ciprat 1 PC : 2 PPKebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 4.320 Rp -

PP m³ 0.006 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.24. Memasang 1 m³ Finishing siar pasangan dinding bata merah (=20m')Kebutuhan Satuan Indeks Harga Satuan

Bahan PC Kg 3.100 Rp - Tenaga Kerja Pekerja OH 0.150 Rp -

Tukang batu OH 0.075 Rp - Kepala Tukang OH 0.008 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.25.Kebutuhan Satuan Indeks Harga Satuan

Bahan PC Kg 1.600 Rp - Tenaga Kerja Pekerja OH 0.070 Rp -

Tukang batu OH 0.035 Rp - Kepala Tukang OH 0.004 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.26. Memasang 1 m³ Finishing siar pasangan batu kali adukan 1 PC : 2 PP

Memasang 1 m³ Finishing siar pasangan dinding conblok ekspose (=8 m')

Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 6.340 Rp -

PP m³ 0.012 Rp - Tenaga Kerja Pekerja OH 0.300 Rp -

Tukang batu OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.2.27. Memasang 1 m³ acianKebutuhan Satuan Indeks Harga Satuan

Bahan PC Kg 3.250 Rp - Tenaga Kerja Pekerja OH 0.200 Rp -

Tukang batu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.010 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

E. Pekerjaan Beton

A.4.1.1.1. Membuat 1 m³ beton mutu fc = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 247.000 Rp -

PB Kg 869 Rp - KR (maksimum 30 mm) Kg 999 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.2. Membuat 1 m³ beton mutu fc = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 276.000 Rp -

PB Kg 828 Rp - KR (maksimum 30 mm) Kg 1012 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.3. Membuat 1 m³ beton mutu fc = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0,72Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 299.000 Rp -

PB Kg 799 Rp -

KR (maksimum 30 mm) Kg 1017 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.4. Membuat 1 m³ lantai kerja beton mutu fc = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 230.000 Rp -

PB Kg 893 Rp - KR (maksimum 30 mm) Kg 1027 Rp - Air Liter 200 Rp -

Tenaga Kerja Pekerja OH 1.200 Rp - Tukang batu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.060 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.5. Membuat 1 m³ beton mutu fc = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 236.000 Rp -

PB Kg 760 Rp - KR (maksimum 30 mm) Kg 1029 Rp - Air Liter 200 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.6. Membuat 1 m³ beton mutu fc = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 352.000 Rp -

PB Kg 731 Rp - KR (maksimum 30 mm) Kg 1031 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.7. Membuat 1 m³ beton mutu fc = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 371.000 Rp -

PB Kg 698 Rp - KR (maksimum 30 mm) Kg 1047 Rp -

Air Liter 215 Rp - Tenaga Kerja Pekerja OH 1.650 Rp -

Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.8. Membuat 1 m³ beton mutu fc = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 384.000 Rp -

PB Kg 692 Rp - KR (maksimum 30 mm) Kg 1039 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.9. Membuat 1 m³ beton mutu fc = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 406.000 Rp -

PB Kg 684 Rp - KR (maksimum 30 mm) Kg 1026 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.10. Membuat 1 m³ beton mutu fc = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 413.000 Rp -

PB Kg 681 Rp - KR (maksimum 30 mm) Kg 1021 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 1.650 Rp - Tukang batu OH 0.275 Rp - Kepala Tukang OH 0.028 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.11. Membuat 1 m³ beton mutu fc = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 439.000 Rp -

PB Kg 670 Rp -

KR (maksimum 30 mm) Kg 1006 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 2.100 Rp - Tukang batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.105 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.12. Membuat 1 m³ beton mutu fc = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 448.000 Rp -

PB Kg 667 Rp - KR (maksimum 30 mm) Kg 1000 Rp - Air Liter 215 Rp -

Tenaga Kerja Pekerja OH 2.100 Rp - Tukang batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.105 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.13. Membuat 1 m³ beton kedap air dengan strorox - 100Kebutuhan Satuan Indeks Harga Satuan Bahan PC Kg 400.000 Rp -

PB m³ 0.480 Rp - KR (Kerikil 2cm/3cm) m³ 0.800 Rp - Strorox - 100 Kg 1.200 Rp - Air Liter 210 Rp -

Tenaga Kerja Pekerja OH 2.100 Rp - Tukang batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.105 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.14. Membuat 1 m' PVC Waterstop lebar 150 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Waterstop lebar 150 mm m' 1.050 Rp - Tenaga Kerja Pekerja OH 0.060 Rp -

Tukang batu OH 0.030 Rp - Kepala Tukang OH 0.003 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.15. Membuat 1 m' PVC Waterstop lebar 200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Waterstop lebar 200 mm m' 1.050 Rp - Tenaga Kerja Pekerja OH 0.070 Rp -

Tukang batu OH 0.035 Rp -

Kepala Tukang OH 0.004 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.16. Membuat 1 m' PVC Waterstop lebar 230 mm - 320 mmKebutuhan Satuan Indeks Harga Satuan

Bahan m' 1.050 Rp -

Tenaga Kerja Pekerja OH 0.080 Rp - Tukang batu OH 0.040 Rp - Kepala Tukang OH 0.004 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.17. Pembesian 10 kg dengan besi polosKebutuhan Satuan Indeks Harga Satuan Bahan Besi beton (polos/ulir) Kg 10.500 Rp -

Kawat Beton Kg 0.150Tenaga Kerja Pekerja OH 0.070 Rp -

Tukang batu OH 0.070 Rp - Kepala Tukang OH 0.007 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.17a. Pembesian 10 kg dengan besi ulirKebutuhan Satuan Indeks Harga Satuan Bahan Besi beton (polos/ulir) Kg 10.500 Rp -

Kawat Beton Kg 0.150 Rp - Tenaga Kerja Pekerja OH 0.070 Rp -

Tukang batu OH 0.070 Rp - Kepala Tukang OH 0.007 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.18. Memasang 10 kg kabel presstressed polos/strandsKebutuhan Satuan Indeks Harga Satuan Bahan Besi beton (polos/ulir) Kg 10.500 Rp -

Kawat Beton Kg 0.150 Rp - Tenaga Kerja Pekerja OH 0.050 Rp -

Tukang batu OH 0.050 Rp - Kepala Tukang OH 0.005 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.19.Kebutuhan Satuan Indeks Harga Satuan Bahan Jaring kawat baja dilas Kg 1.020 Rp -

Kawat Beton Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.025 Rp -

Tukang batu OH 0.025 Rp -

Waterstop lebar lebar 230 mm - 320 mm

Memasang 10 kg jaring kawat baja/ wire mesh

Kepala Tukang OH 0.002 Rp - Mandor OH 0.001 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.20. Memasang 1 m² bekisting untuk pondasiKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.040 Rp -

Paku 5 cm - 10 cm Kg 0.300 Rp - Minyak bekisting Liter 0.100 Rp -

Tenaga Kerja Pekerja OH 0.520 Rp - Tukang batu OH 0.260 Rp - Kepala Tukang OH 0.026 Rp - Mandor OH 0.026 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.21. Memasang 1 m² bekisting untuk sloofKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.045 Rp -

Paku 5 cm - 10 cm Kg 0.300 Rp - Minyak bekisting Liter 0.100 Rp -

Tenaga Kerja Pekerja OH 0.520 Rp - Tukang batu OH 0.260 Rp - Kepala Tukang OH 0.026 Rp - Mandor OH 0.026 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.22. Memasang 1 m² bekisting untuk kolomKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.040 Rp -

Paku 5 cm - 12 cm Kg 0.400 Rp - Minyak bekisting Liter 0.200 Rp - Balok kayu kelas II m³ 0.015 Rp - polywood tebal 9 mm Lbr 0.350 Rp -

Batang 2.000 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.330 Rp - Kepala Tukang OH 0.033 Rp - Mandor OH 0.033 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.23. Memasang 1 m² bekisting untuk balokKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.040 Rp -

Paku 5 cm - 12 cm Kg 0.400 Rp - Minyak bekisting Liter 0.200 Rp - Balok kayu kelas II m³ 0.015 Rp - polywood tebal 9 mm Lbr 0.350 Rp -

Batang 2.000 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp -

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Tukang batu OH 0.330 Rp - Kepala Tukang OH 0.033 Rp - Mandor OH 0.033 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.24. Memasang 1 m² bekisting untuk plat lantaiKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.040 Rp -

Paku 5 cm - 12 cm Kg 0.400 Rp - Minyak bekisting Liter 0.200 Rp - Balok kayu kelas II m³ 0.015 Rp - polywood tebal 9 mm Lbr 0.350 Rp -

Batang 6.000 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.330 Rp - Kepala Tukang OH 0.033 Rp - Mandor OH 0.033 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.25. Memasang 1 m² bekisting untuk dindingKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.030 Rp -

Paku 5 cm - 12 cm Kg 0.400 Rp - Minyak bekisting Liter 0.200 Rp - Balok kayu kelas II m³ 0.020 Rp - polywood tebal 9 mm Lbr 0.350 Rp -

Batang 3.000 Rp -

fornite/penjaga jarak bekisting/spac Buah 4.000 Rp - Tenaga Kerja Pekerja OH 0.600 Rp -

Tukang batu OH 0.330 Rp - Kepala Tukang OH 0.033 Rp - Mandor OH 0.033 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.26. Memasang 1 m² bekisting untuk tanggaKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.030 Rp -

Paku 5 cm - 12 cm Kg 0.400 Rp - Minyak bekisting Liter 0.150 Rp - Balok kayu kelas II m³ 0.015 Rp - polywood tebal 9 mm Lbr 0.035 Rp -

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Batang 2.000 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang batu OH 0.330 Rp - Kepala Tukang OH 0.033 Rp - Mandor OH 0.033 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.27. Memasang 1 m² bekisting untuk pengecoran betonKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.0264 Rp -

Paku 5 cm - 12 cm Kg 0.600 Rp -

Batang 0.500 Rp -

Tenaga Kerja Pekerja OH 0.150 Rp - Tukang batu OH 0.050 Rp - Kepala Tukang OH 0.005 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.28. Memasang 1 m³ pondasi beton bertulang (150 kg besi + bekisting)Kebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.2000 Rp -

Paku 5 cm - 12 cm Kg 1.500 Rp - Minyak bekisting Liter 0.400 Rp - Besi beton polos Kg 157.500 Rp - Kawat beton Kg 2.250 Rp - PC Kg 336.000 Rp - PB m³ 0.540 Rp - KR m³ 0.810 Rp -

Tenaga Kerja Pekerja OH 5.300 Rp - Tukang batu OH 0.275 Rp - Tukang kayu OH 1.300 Rp - Tukang besi OH 0.050 Rp - Kepala Tukang OH 0.262 Rp - Mandor OH 0.265 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.29. Memasang 1 m³ sloof beton bertulang (200 kg besi + bekisting)Kebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.270 Rp -

Paku 5 cm - 12 cm Kg 2.000 Rp -

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Minyak bekisting Liter 0.600 Rp - Besi beton polos Kg 210.000 Rp - Kawat beton Kg 3.000 Rp - PC Kg 336.000 Rp - PB m³ 0.540 Rp - KR m³ 0.810 Rp -

Tenaga Kerja Pekerja OH 5.650 Rp - Tukang batu OH 0.275 Rp - Tukang kayu OH 1.560 Rp - Tukang besi OH 1.400 Rp - Kepala Tukang OH 0.323 Rp - Mandor OH 0.283 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.30. Memasang 1 m³ kolom beton bertulang (300 kg besi + bekisting)Kebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.400 Rp -

Paku 5 cm - 12 cm Kg 4.000 Rp - Minyak bekisting Liter 2.000 Rp - Besi beton polos Kg 315.000 Rp - Kawat beton Kg 4.500 Rp - PC Kg 336.000 Rp - PB m³ 0.540 Rp - KR m³ 0.810 Rp - Balok kayu kelas II m³ 0.150 Rp - polywood tebal 9 mm Lbr 3.500 Rp -

Batang 20.000 Rp -

Tenaga Kerja Pekerja OH 7.050 Rp - Tukang batu OH 0.275 Rp - Tukang kayu OH 1.650 Rp - Tukang besi OH 2.100 Rp - Kepala Tukang OH 0.403 Rp - Mandor OH 0.353 Rp -

Jumlah Overhead & Profit (10%)

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Harga Satuan Pekerjaan

A.4.1.1.31. Memasang 1 m³ balok beton bertulang (200 kg besi + bekisting)Kebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.320 Rp -

Paku 5 cm - 12 cm Kg 3.200 Rp - Minyak bekisting Liter 1.600 Rp - Besi beton polos Kg 210.000 Rp - Kawat beton Kg 3.000 Rp - PC Kg 336.000 Rp - PB m³ 0.540 Rp - KR m³ 0.810 Rp - Balok kayu kelas II m³ 0.140 Rp - polywood tebal 9 mm Lbr 2.800 Rp -

Batang 16.000 Rp -

Tenaga Kerja Pekerja OH 6.350 Rp - Tukang batu OH 0.275 Rp - Tukang kayu OH 1.650 Rp - Tukang besi OH 1.400 Rp - Kepala Tukang OH 0.333 Rp - Mandor OH 0.318 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.32. Memasang 1 m³ plat beton bertulang (150 kg besi + bekisting)Kebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.320 Rp -

Paku 5 cm - 12 cm Kg 3.200 Rp - Minyak bekisting Liter 1.600 Rp - Besi beton polos Kg 157.000 Rp - Kawat beton Kg 2.250 Rp - PC Kg 336.000 Rp - PB m³ 0.540 Rp - KR m³ 0.810 Rp - Balok kayu kelas II m³ 0.140 Rp - polywood tebal 9 mm Lbr 2.800 Rp -

Batang 32.000 Rp -

Tenaga Kerja Pekerja OH 5.300 Rp - Tukang batu OH 0.275 Rp - Tukang kayu OH 1.300 Rp - Tukang besi OH 0.050 Rp - Kepala Tukang OH 0.265 Rp - Mandor OH 0.265 Rp -

Jumlah

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.33. Memasang 1 m³ dinding beton bertulang (150 kg besi + bekisting)Kebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.240 Rp -

Paku 5 cm - 12 cm Kg 3.200 Rp - Minyak bekisting Liter 1.600 Rp - Besi beton polos Kg 157.000 Rp - Kawat beton Kg 2.250 Rp - PC Kg 336.000 Rp - PB m³ 0.540 Rp - KR m³ 0.810 Rp - Balok kayu kelas II m³ 0.160 Rp - polywood tebal 9 mm Lbr 2.800 Rp -

Batang 24.000 Rp -

Tenaga Kerja Pekerja OH 5.300 Rp - Tukang batu OH 0.275 Rp - Tukang kayu OH 1.300 Rp - Tukang besi OH 0.050 Rp - Kepala Tukang OH 0.262 Rp - Mandor OH 0.265 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.34. Memasang 1 m³ dinding beton bertulang (200 kg besi + bekisting)Kebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.250 Rp -

Paku 5 cm - 12 cm Kg 3.000 Rp - Minyak bekisting Liter 1.200 Rp - Besi beton polos Kg 210.000 Rp - Kawat beton Kg 3.000 Rp - PC Kg 336.000 Rp - PB m³ 0.540 Rp - KR m³ 0.810 Rp - Balok kayu kelas II m³ 0.105 Rp - polywood tebal 9 mm Lbr 2.500 Rp -

Batang 14.000 Rp -

Tenaga Kerja Pekerja OH 5.650 Rp - Tukang batu OH 0.275 Rp - Tukang kayu OH 1.560 Rp - Tukang besi OH 1.400 Rp - Kepala Tukang OH 0.323 Rp - Mandor OH 0.283 Rp -

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Dolken kayu galam, Ø (8-10) cm, panjang 4 m

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.35. Memasang 1 m' kolom praktis beton bertulang (11 x 11) cmKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.002 Rp -

Paku 5 cm - 12 cm Kg 0.010 Rp - Besi beton polos Kg 3.000 Rp - Kawat beton Kg 0.045 Rp - PC Kg 4.000 Rp - PB m³ 0.006 Rp - KR m³ 0.009 Rp -

Tenaga Kerja Pekerja OH 0.180 Rp - Tukang batu OH 0.020 Rp - Tukang kayu OH 0.020 Rp - Tukang besi OH 0.020 Rp - Kepala Tukang OH 0.006 Rp - Mandor OH 0.009 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.1.1.36. Memasang 1 m' ring balok beton bertulang (10 x 15) cmKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas III m³ 0.003 Rp -

Paku 5 cm - 12 cm Kg 0.020 Rp - Besi beton polos Kg 3.600 Rp - Kawat beton Kg 0.050 Rp - PC Kg 5.500 Rp - PB m³ 0.009 Rp - KR m³ 0.015 Rp -

Tenaga Kerja Pekerja OH 0.297 Rp - Tukang batu OH 0.033 Rp - Tukang kayu OH 0.033 Rp - Tukang besi OH 0.033 Rp - Kepala Tukang OH 0.01 Rp - Mandor OH 0,015, Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SUPLEMEN

SUPL IPEKERJAAN SLOOF 15/20

Beton dengan mutu K 225 m³ 1.0000 Rp - Pekerjaan Besi Polos Kg 242.9160 Rp - Cetakan Beton M² 5.8333 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SUPL IIPEKERJAAN KOLOM 25/25

Beton dengan mutu K 175 m³ 1.0000 Rp - Pekerjaan Besi Polos Kg 60.7092 Rp - Cetakan Beton M² 8.0000 Rp -

Jumlah Overhead & Profit (10%)

Harga Satuan Pekerjaan

SUPL IIIPEKERJAAN BALOK 13/15

Beton dengan mutu K 175 m³ 1.0000 Rp - Pekerjaan Besi Polos Kg 150.3590 Rp - Cetakan Beton M² 7.1795 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SUPL IIIPEKERJAAN KOLOM TIANG 25/25

Beton dengan mutu K 175 m³ 1.0000 Rp - Pekerjaan Besi Polos Kg 60.7092 Rp - Cetakan Beton M² 8.0000 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

F. Pekerjaan Kayu

A.4.6.1.1. Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas IKebutuhan Satuan Indeks Harga Satuan Bahan Balok kayu m³ 1.100 Rp -

Paku 10 cm Kg 1.250 Rp - Lem kayu Kg 1.000 Rp -

Tenaga Kerja Pekerja OH 7.000 Rp - Tukang kayu OH 21.000 Rp - Kepala Tukang OH 2.100 Rp - Mandor OH 0.350 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.2. Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau IIIKebutuhan Satuan Indeks Harga Satuan Bahan Balok kayu m³ 1.200 Rp -

Paku 10 cm Kg 1.250 Rp - Lem kayu Kg 1.000 Rp -

Tenaga Kerja Pekerja OH 6.000 Rp - Tukang kayu OH 18.000 Rp - Kepala Tukang OH 1.800 Rp - Mandor OH 0.300 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.3. Membuat dan memasang 1 m² pintu klamp standar, kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.040 Rp -

Paku 5 cm - 7 cm Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.350 Rp -

Tukang kayu OH 1.050 Rp - Kepala Tukang OH 0.105 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.4. Membuat dan memasang 1 m² pintu klamp standar sederhana, kayu kelas III untuk gudang sementaraKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.040 Rp -

Paku 5 cm - 7 cm Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.350 Rp -

Tukang kayu OH 1.050 Rp - Kepala Tukang OH 0.105 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.5. Membuat dan memasang 1 m² daun pintu panel, kayu kelas I atau IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.040 Rp -

Lem Kayu Kg 0.500 Rp - Tenaga Kerja Pekerja OH 1.000 Rp -

Tukang kayu OH 3.000 Rp - Kepala Tukang OH 0.300 Rp - Mandor OH 0.050 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.6. Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas I atau IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.024 Rp -

Lem Kayu Kg 0.300 Rp - Tenaga Kerja Pekerja OH 0.800 Rp -

Tukang kayu OH 2.400 Rp - Kepala Tukang OH 0.240 Rp - Mandor OH 0.040 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.7. Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas I atau IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.064 Rp -

Lem Kayu Kg 0.500 Rp - Tenaga Kerja Pekerja OH 1.000 Rp -

Tukang kayu OH 3.000 Rp - Kepala Tukang OH 0.300 Rp - Mandor OH 0.050 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.8. Membuat 1m²daun pintu kayu lapis(polywood)rangkap,rangka tertutup kayu kelas II(lebar sampai 90cm)Kebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.025 Rp -

Paku 1 cm - 2,5 cm Kg 0.030 Rp - Lem Kayu Kg 0.500 Rp -

Lembar 1.000 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang kayu OH 2.100 Rp - Kepala Tukang OH 0.210 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.9. Membuat 1 m² pintu polywood rangkap, rangka ekspose kayu kelas I atau IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.025 Rp -

Paku 1 cm - 2,5 cm Kg 0.030 Rp - Lem Kayu Kg 0.500 Rp -

Lembar 1.000 Rp -

Tenaga Kerja Pekerja OH 0.800 Rp - Tukang kayu OH 2.400 Rp - Kepala Tukang OH 0.240 Rp - Mandor OH 0.240 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.10. Membuat 1 m² jalusi, kayu kelas I atau IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.060 Rp -

Paku 1 cm - 2,5 cm Kg 0.150 Rp - Tenaga Kerja Pekerja OH 0.670 Rp -

Tukang kayu OH 2.000 Rp - Kepala Tukang OH 0.200 Rp - Mandor OH 0.335 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.11. Membuat 1 m² teakwood rangkap, rangka expose kayu kelas IKebutuhan Satuan Indeks Harga Satuan

Polywood tebal 4 mm Ukuran (90 x 220) cm

Polywood tebal 4 mm Ukuran (90 x 220) cm

Bahan Papan kayu m³ 0.025 Rp - Paku 1 cm - 2,5 cm Kg 0.030 Rp - Lem Kayu Kg 0.300 Rp -

Lembar 1.000 Rp -

Tenaga Kerja Pekerja OH 0.800 Rp - Tukang kayu OH 2.400 Rp - Kepala Tukang OH 0.240 Rp - Mandor OH 0.040 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.12. Membuat 1 m² teakwood rangkap lapis fornika, rangka expose kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.025 Rp -

Paku 1 cm - 2,5 cm Kg 0.030 Rp - Lem Kayu Kg 0.800 Rp -

Lembar 1.000 Rp -

Fornika Lembar 0.500 Rp - Tenaga Kerja Pekerja OH 0.850 Rp -

Tukang kayu OH 2.550 Rp - Kepala Tukang OH 0.255 Rp - Mandor OH 0.043 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.13. Membuat 1 m³ konstruksi kuda-kuda konversional, kayu kelas I, II dan III bentang 6 meterKebutuhan Satuan Indeks Harga Satuan Bahan Balok kayu kelas II m³ 1.100 Rp -

Besi strip tebal 5 mm Kg 15.000 Rp - Paku 12 cm Kg 5.600 Rp -

Tenaga Kerja Pekerja OH 4.000 Rp - Tukang kayu OH 12.000 Rp - Kepala Tukang OH 1.200 Rp - Mandor OH 0.200 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.14. Membuat 1 m³ konstruksi kuda-kuda expose, kayu kelas IKebutuhan Satuan Indeks Harga Satuan Bahan Balok kayu m³ 1.200 Rp -

Besi strip tebal 5 mm Kg 15.000 Rp - Paku 12 cm Kg 5.600 Rp -

Tenaga Kerja Pekerja OH 6.700 Rp - Tukang kayu OH 20.100 Rp - Kepala Tukang OH 2.010 Rp - Mandor OH 0.335 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

Taekwood tebal 4 mm Ukuran (90 x 220) cm

Taekwood tebal 4 mm Ukuran (90 x 220) cm

A.4.6.1.15. Membuat 1 m³ konstruksi kuda-kuda expose, kayu kelas IKebutuhan Satuan Indeks Harga Satuan Bahan Balok kayu m³ 1.200 Rp -

Besi strip tebal 5 mm Kg 15.000 Rp - Paku 12 cm Kg 5.600 Rp -

Tenaga Kerja Pekerja OH 6.700 Rp - Tukang kayu OH 20.100 Rp - Kepala Tukang OH 2.010 Rp - Mandor OH 0.335 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.16. Membuat 1 m² rangka atap genteng keramik, kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Kaso-kaso (5 x 7) cm m³ 0.014 Rp -

Reng (3 x 4) cm m³ 0.0036 Rp - Paku 5 cm dan 10 cm Kg 0.250 Rp -

Tenaga Kerja Pekerja OH 0.100 Rp - Tukang kayu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.17. Membuat 1 m² rangka atap genteng beton, kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Kaso-kaso (5 x 7) cm m³ 0.014 Rp -

Reng (3 x 4) cm m³ 0.0072 Rp - Paku 5 cm dan 10 cm Kg 0.250 Rp -

Tenaga Kerja Pekerja OH 0.100 Rp - Tukang kayu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.18. Membuat 1 m² rangka atap sirap, kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Kayu kelas II m³ 0.165 Rp -

Paku 5 cm dan 10 cm Kg 0.200 Rp - Tenaga Kerja Pekerja OH 0.120 Rp -

Tukang kayu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.006 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.19. Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas II atau IIIKebutuhan Satuan Indeks Harga Satuan Bahan Kaso-kaso (5 x 7) cm m³ 0.0154 Rp -

Paku 7 cm - 10 cm Kg 0.200 Rp - Tenaga Kerja Pekerja OH 0.150 Rp -

Tukang kayu OH 0.300 Rp - Kepala Tukang OH 0.030 Rp - Mandor OH 0.075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.20. Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas II atau IIIKebutuhan Satuan Indeks Harga Satuan Bahan Kaso-kaso (5 x 7) cm m³ 0.0163 Rp -

Paku 7 cm - 10 cm Kg 0.250 Rp - Tenaga Kerja Pekerja OH 0.200 Rp -

Tukang kayu OH 0.300 Rp - Kepala Tukang OH 0.030 Rp - Mandor OH 0.010 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.21. Memasang 1 m' listplank ukuran (3 x 20) cm, kayu kelas I atau kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.0108 Rp -

Paku 5 cm dan 7 cm Kg 0.100 Rp - Tenaga Kerja Pekerja OH 0.100 Rp -

Tukang kayu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.22. Memasang 1 m' listplank ukuran (3 x 30) cm, kayu kelas I atau kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.0110 Rp -

Paku 5 cm dan 7 cm Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.100 Rp -

Tukang kayu OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.23. Memasang 1 m² rangka dinding pemisah (60 x 120) cm kayu kelas II atau IIIKebutuhan Satuan Indeks Harga Satuan Bahan Balok Kayu m³ 0.0280 Rp -

Paku 5 cm dan 7 cm Kg 0.150 Rp - Tenaga Kerja Pekerja OH 0.150 Rp -

Tukang kayu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.24. Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Balok Kayu ukuran (6 x 12) cm m³ 0.0280 Rp -

Paku 5 cm dan 10 cm Kg 0.150 Rp -

Lembar 0.860 Rp -

Lem kayu Kg 0.560 Rp - Tenaga Kerja Pekerja OH 0.150 Rp -

Tukang kayu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.25. Memasang 1 m² dinding pemisah polywood rangkap, rangka kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Balok Kayu ukuran (6 x 12) cm m³ 0.0280 Rp -

Paku 5 cm dan 10 cm Kg 0.150 Rp -

Lembar 0.860 Rp -

Lem kayu Kg 0.560 Rp - Tenaga Kerja Pekerja OH 0.200 Rp -

Tukang kayu OH 0.600 Rp - Kepala Tukang OH 0.060 Rp - Mandor OH 0.010 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.26. Memasang 1 m² dinding lambrizing dari papan kayu kelas IIKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu m³ 0.0070 Rp -

Paku 5 cm dan 10 cm Kg 0.100 Rp - Paku skrup 10 cm Kg 0.150 Rp -

Tenaga Kerja Pekerja OH 0.600 Rp - Tukang kayu OH 1.800 Rp - Kepala Tukang OH 0.180 Rp - Mandor OH 0.030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.1.27. Memasang 1 m² dinding lambrizing dari polywood ukuran (120 x 240) cmKebutuhan Satuan Indeks Harga Satuan Bahan Polywood tebal 4 mm Lembar 0.400 Rp -

Paku 1 cm dan 2,5 cm Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.025 Rp -

Tukang kayu OH 0.075 Rp - Kepala Tukang OH 0.008 Rp - Mandor OH 0.001 Rp -

Jumlah Overhead & Profit (10%)

Teakwood tebal 4 mm Ukuran (120 x 240) cm

Teakwood tebal 4 mm Ukuran (120 x 240) cm

Harga Satuan Pekerjaan

A.4.6.1.28. Memasang 1 m² dinding bilik, rangka kayu kelas III atau IVKebutuhan Satuan Indeks Harga Satuan Bahan Bilik bambu m³ 1.500 Rp -

Kaso-kaso (5 x 7) cm m³ 0.014 Rp - Paku Kg 0.012 Rp - List kayu 2/4 m³ 0.003 Rp -

Tenaga Kerja Pekerja OH 0.100 Rp - Tukang kayu OH 0.050 Rp - Kepala Tukang OH 0.005 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

G. Pekerjaan Besi dan AluminiumA.4.2.1.1. Memasang 1 kg besi profilKebutuhan Satuan Indeks Harga Satuan

Bahan Besi profil Kg 1.150 Rp - Tenaga Kerja Pekerja OH 0.060 Rp -

Tukang Las Konstruksi OH 0.060 Rp - Kepala Tukang OH 0.006 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.2. Memasang 1 kg rangka kuda-kuda baja IWFKebutuhan Satuan Indeks Harga Satuan

Bahan Besi baja IWF Kg 1.150 Rp - Tenaga Kerja Pekerja OH 0.060 Rp -

Tukang Las Konstruksi OH 0.060 Rp - Kepala Tukang OH 0.006 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.3. Mengerjakan 100 kg pekerjaan perakitanKebutuhan Satuan Indeks Harga Satuan Bahan Solar Liter 1.000 Rp -

Minyak pelumas Liter 0.100Tenaga Kerja Pekerja OH 0.100 Rp -

Tukang Las Konstruksi OH 0.100 Rp - Kepala Tukang OH 0.001 Rp - Mandor OH 0.005 Rp -

Alat Sewa alat Jam 0.800 Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.4. Membuat 1 m² pintu besi plat baja tebal 2 mm rangkap, rangkap baja sikuKebutuhan Satuan Indeks Harga Satuan Bahan Besi siku L 30.30.3 Kg 15.000 Rp -

Besi plat baja Kg 32.800 Rp - Kawat las Kg 0.050 Rp -

Tenaga Kerja Pekerja OH 1.050 Rp - Tukang Las biasa OH 1.050 Rp - Kepala Tukang OH 0.105 Rp -

Mandor OH 0.052 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.5. Mengerjakan 10 cm pengelasan dengan las listrikKebutuhan Satuan Indeks Harga Satuan Bahan Kawat las listrik Kg 0.400 Rp -

Solar Liter 0.300 Rp - Minyak pelumas Liter 0.040 Rp -

Tenaga Kerja Pekerja OH 0.040 Rp - Tukang besi Konstruksi OH 0.020 Rp - Kepala Tukang OH 0.002 Rp - Mandor OH 0.002 Rp -

Alat Sewa alat Jam 0.170 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.6.Kebutuhan Satuan Indeks Harga Satuan Bahan M 4.760 Rp -

Besi lis kaca (1 x 1) cm M 4.550 Rp - Pengelasan Cm 20.000 Rp -

Tenaga Kerja Pekerja OH 0.650 Rp - Tukang Las Biasa OH 0.650 Rp - Kepala Tukang OH 0.065 Rp - Mandor OH 0.032 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.7. Memasang 1 m² pintu rolling door besiKebutuhan Satuan Indeks Harga Satuan

Bahan Pintu gulung besi M² 1.000 Rp - Tenaga Kerja Pekerja OH 1.200 Rp -

Tukang Las Biasa OH 1.200 Rp - Kepala Tukang OH 0.120 Rp - Mandor OH 0.006 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.8.Kebutuhan Satuan Indeks Harga Satuan

Bahan Pintu lipat M² 1.000 Rp - Tenaga Kerja Pekerja OH 0.440 Rp -

Tukang OH 0.440 Rp - Kepala Tukang OH 0.044 Rp - Mandor OH 0.022 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.9. Memasang 1 m² sunscreen alluminiumKebutuhan Satuan Indeks Harga Satuan

Bahan Sunscreen alluminium M² 1.000 Rp - Tenaga Kerja Pekerja OH 0.080 Rp -

Tukang OH 0.800 Rp - Kepala Tukang OH 0.080 Rp -

Membuat 1 m² rangka jendela besi scuare tube (25 x 5) cm

Besi scuare tube

Memasang 1 m² pintu lipat (Folding door) bahan plastik/PVC

Mandor OH 0.004 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.10. Memasang 1 m² rolling door alluminiumKebutuhan Satuan Indeks Harga Satuan

Bahan Rolling door alluminium M² 1.000 Rp - Tenaga Kerja Pekerja OH 1.000 Rp -

Tukang Khusus Alluminium OH 1.000 Rp - Kepala Tukang OH 0.100 Rp - Mandor OH 0.050 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.11. Memasang 1 m kusen pintu alluminiumKebutuhan Satuan Indeks Harga Satuan Bahan Profil alluminium m 1.100 Rp -

Skrup fixer Buah 2.000 Rp - Sealant Tube 0.060 Rp -

Tenaga Kerja Pekerja OH 0.043 Rp - Tukang Khusus Alluminium OH 0.800 Rp - Kepala Tukang OH 0.080 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.12. Memasang 1 m² pintu alluminium strip lebar 8 cmKebutuhan Satuan Indeks Harga Satuan Bahan Profil alluminium m 4.400 Rp -

Alluminium strip m 14.600 Rp - Tenaga Kerja Pekerja OH 0.085 Rp -

Tukang Khusus Alluminium OH 0.085 Rp - Kepala Tukang OH 0.0085 Rp - Mandor OH 0.0042 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.13. Memasang 1 m² pintu kaca rangka alluminiumKebutuhan Satuan Indeks Harga Satuan Bahan Pintu alliminium m 4.400 Rp -

Profil kaca m 4.500 Rp - Sealant Tube 0.270 Rp -

Tenaga Kerja Pekerja OH 0.085 Rp - Tukang Alluminium/Kaca OH 0.085 Rp - Kepala Tukang OH 0.0090 Rp - Mandor OH 0.0050 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.14.Kebutuhan Satuan Indeks Harga Satuan

Bahan m² 1.000 Rp -

Memasang 1 m² venetions blinds dan vertikal blinds

Venetions blinds dan vertikal blinds (tirai)

Tenaga Kerja Pekerja OH 0.350 Rp - Tukang OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.15. Memasang 1 m² terali besi strip (2 x 3) mmKebutuhan Satuan Indeks Harga Satuan Bahan Besi strip Kg 6.170 Rp -

Pengelasan cm 27.080Tenaga Kerja Pekerja OH 1.670 Rp -

Tukang Las OH 1.670 Rp - Kepala Tukang OH 0.167 Rp - Mandor OH 0.083 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.16. Memasang 1 m² kawat nyamukKebutuhan Satuan Indeks Harga Satuan Bahan Kawat nyamuk m² 1.100 Rp -

Pengelasan Cm 11.100 Rp - Baja strip (0,2 x 2) cm Kg 1.710 Rp -

Tenaga Kerja Pekerja OH 0.100 Rp - Tukang OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.17. Memasang 1 m² jendela nako & ralisKebutuhan Satuan Indeks Harga Satuan Bahan m² 1.100 Rp -

Paku skrup 1 cm - 2,5 cm Buah 10.000 Rp - Besi strip m 7.000 Rp -

Tenaga Kerja Pekerja OH 0.200 Rp - Tukang OH 0.200 Rp - Kepala Tukang OH 0.020 Rp - Mandor OH 0.001 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.18. Memasang 1 m' talang datar/jurai seng bjls 28 lebar 90 cmKebutuhan Satuan Indeks Harga Satuan Bahan Seng plat m' 1.050 Rp -

Paku 1 cm - 2,5 cm Buah 0.015 Rp - Papan kayu kelas II atau III m³ 0.019 Rp -

Tenaga Kerja Pekerja OH 0.200 Rp - Tukang OH 0.400 Rp - Kepala Tukang OH 0.025 Rp - Mandor OH 0.010 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.2.1.19. Memasang 1 m' talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cmKebutuhan Satuan Indeks Harga Satuan

Jendela nako (rangka + kaca 5 mm)

Bahan Seng plat m' 1.050 Rp - Paku 1 cm - 2,5 cm Kg 0.010 Rp - Besi strip Kg 0.500 Rp -

Tenaga Kerja Pekerja OH 0.150 Rp - Tukang OH 0.300 Rp - Kepala Tukang OH 0.030 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

H. Pekerjaan Langit-langit

A.4.5.1.1. Memasang 1 m² langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mmKebutuhan Satuan Indeks Harga Satuan Bahan Asbes semen m² 1.100 Rp -

Paku tripleks Kg 0.010 Rp - Tenaga Kerja Pekerja OH 0.030 Rp -

Tukang kayu OH 0.070 Rp - Kepala Tukang OH 0.007 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.2. Memasang 1 m² langit-langit akustik ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Akustik Lembar 12.000 Rp -

Paku tripleks Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.120 Rp -

Tukang kayu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.006 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.3. Memasang 1 m² langit-langit akustik ukuran (30 x 60) cmKebutuhan Satuan Indeks Harga Satuan Bahan Akustik Lembar 5.800 Rp -

Paku tripleks Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.100 Rp -

Tukang kayu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.4. Memasang 1 m² langit-langit akustik ukuran (60 x 120) cmKebutuhan Satuan Indeks Harga Satuan Bahan Akustik Lembar 1.500 Rp -

Paku tripleks Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.100 Rp -

Tukang kayu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.5. Memasang 1 m² langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mmKebutuhan Satuan Indeks Harga Satuan Bahan Tripleks Lembar 0.375 Rp -

Paku tripleks Kg 0.030 Rp - Tenaga Kerja Pekerja OH 0.100 Rp -

Tukang kayu OH 0.100 Rp - Kepala Tukang OH 0.010 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.6. Memasang 1 m² langit-langit lambrizing kayu, tebal 9 mmKebutuhan Satuan Indeks Harga Satuan Bahan Kayu papan m³ 0.015 Rp -

Paku tripleks Kg 0.010 Rp - Tenaga Kerja Pekerja OH 0.800 Rp -

Tukang kayu OH 0.800 Rp - Kepala Tukang OH 0.080 Rp - Mandor OH 0.040 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.7. Memasang 1 m² langit-langit gypsum board ukuran (1200 x 2400 x 9) mmKebutuhan Satuan Indeks Harga Satuan Bahan Gypsum board Lembar 0.364 Rp -

Paku skrup Kg 0.110 Rp - Tenaga Kerja Pekerja OH 0.100 Rp -

Tukang kayu OH 0.050 Rp - Kepala Tukang OH 0.005 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.7a. Memasang 1 m' list plafond gypsum profilKebutuhan Satuan Indeks Harga Satuan Bahan List gypsum profil m' 1.050 Rp -

Tepung gypsum Kg 0.150 Rp - Tenaga Kerja Pekerja OH 0.060 Rp -

Tukang kayu OH 0.060 Rp - Kepala Tukang OH 0.006 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.8. Memasang 1 m² langit-langit akustik ukuran (60 x 120) cm + rangka alluminiumKebutuhan Satuan Indeks Harga Satuan Bahan Profil alluminium "T" m' 3.600 Rp -

Kawat diameter 4 mm Kg 0.150 Rp - Ramset Buah 1.050 Rp - Akustik 60 cm x 120 cm Lembar 1.500 Rp -

Tenaga Kerja Pekerja OH 0.500 Rp - Tukang kayu OH 0.500 Rp - Kepala Tukang OH 0.050 Rp - Mandor OH 0.025 Rp -

Jumlah Overhead & Profit (10%)

Harga Satuan Pekerjaan A.4.5.1.9. Memasang 1 m' list langit-langit kayu profilKebutuhan Satuan Indeks Harga Satuan Bahan List kayu profil m' 1.050 Rp -

Paku Kg 0.010 Rp - Tenaga Kerja Pekerja OH 0.050 Rp -

Tukang kayu OH 0.050 Rp - Kepala Tukang OH 0.005 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.1.10. Pemasangan 1 m² Rangka Langit-langit besi hollow 40,40(Lihat pada kelompom pekerjaan besi dan alluminium A.9.2.1.)

I. Pekerjaan Penutup Lantai dan Dinding

A.4.4.3.1. Memasang 1 m² lantai ubin PC abu-abu ukuran (40 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin abu-abu Buah 6.630 Rp -

PC Kg 9.800 Rp - PP m³ 0.045 Rp -

Tenaga Kerja Pekerja OH 0.250 Rp - Tukang Batu OH 0.125 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.2. Memasang 1 m² lantai ubin PC abu-abu ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin abu-abu Buah 11.870 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp -

Tenaga Kerja Pekerja OH 0.260 Rp - Tukang Batu OH 0.130 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.3. Memasang 1 m² lantai ubin PC abu-abu ukuran (20 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin abu-abu Buah 26.500 Rp -

PC Kg 10.400 Rp - PP m³ 0.045 Rp -

Tenaga Kerja Pekerja OH 0.270 Rp - Tukang Batu OH 0.135 Rp - Kepala Tukang OH 0.014 Rp - Mandor OH 0.014 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.4. Memasang 1 m² lantai ubin warna ukuran (40 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin warna Buah 6.630 Rp -

PC Kg 9.800 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.300 Rp -

Tenaga Kerja Pekerja OH 0.250 Rp - Tukang Batu OH 0.125 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.5. Memasang 1 m² lantai ubin warna ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin warna Buah 11.870 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 0.260 Rp - Tukang Batu OH 0.130 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.6. Memasang 1 m² lantai ubin warna ukuran (20 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin warna Buah 26.500 Rp -

PC Kg 10.400 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.620 Rp -

Tenaga Kerja Pekerja OH 0.270 Rp - Tukang Batu OH 0.135 Rp - Kepala Tukang OH 0.014 Rp - Mandor OH 0.014 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.7. Memasang 1 m² lantai ubin teraso ukuran (40 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin teraso Buah 6.630 Rp -

PC Kg 9.800 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.300 Rp -

Tenaga Kerja Pekerja OH 0.250 Rp - Tukang Batu OH 0.125 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%)

Harga Satuan Pekerjaan Keterangan : Harga Bahan sudah termasuk ongkos poles

A.4.4.3.8. Memasang 1 m² lantai ubin teraso ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin teraso Buah 11.870 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 0.260 Rp - Tukang Batu OH 0.130 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

Keterangan : Harga Bahan sudah termasuk ongkos poles

A.4.4.3.9. Memasang 1 m² lantai ubin granit ukuran (40 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin granit Buah 6.630 Rp -

PC Kg 9.800 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.300 Rp -

Tenaga Kerja Pekerja OH 0.250 Rp - Tukang Batu OH 0.125 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.10. Memasang 1 m² lantai ubin granit ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin granit Buah 11.870 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 0.260 Rp - Tukang Batu OH 0.130 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.11. Memasang 1 m² lantai ubin teralux kerang ukuran (40 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin teralux kerang Buah 6.630 Rp -

PC Kg 9.800 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.300 Rp -

Tenaga Kerja Pekerja OH 0.250 Rp - Tukang Batu OH 0.125 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.12. Memasang 1 m² lantai ubin teralux kerang ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin teralux kerang Buah 11.870 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 0.260 Rp - Tukang Batu OH 0.130 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.13. Memasang 1 m² lantai ubin teralux marmer ukuran (60 x 60) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin teralux marmer Buah 3.100 Rp -

PC Kg 9.600 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 0.240 Rp - Tukang Batu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.012 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.14. Memasang 1 m² lantai ubin teralux marmer ukuran (40 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin teralux marmer Buah 6.630 Rp -

PC Kg 9.800 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.300 Rp -

Tenaga Kerja Pekerja OH 0.250 Rp - Tukang Batu OH 0.125 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.15. Memasang 1 m² lantai ubin teralux marmer ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin teralux marmer Buah 11.870 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 0.260 Rp - Tukang Batu OH 0.130 Rp - Kepala Tukang OH 0.013 Rp - Mandor OH 0.013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.16. Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin Buah 5.300 Rp -

PC Kg 1.650 Rp - PP m³ 0.004 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.17. Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin Buah 3.530 Rp -

PC Kg 1.240 Rp - PP m³ 0.003 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.18. Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin Buah 2.650 Rp -

PC Kg 1.240 Rp - PP m³ 0.003 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.19. Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin warna Buah 5.300 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%)

Harga Satuan Pekerjaan

A.4.4.3.20. Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin warna Buah 3.530 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.21. Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin warna Buah 2.650 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.22. Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin teraso Buah 3.530 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

Keterangan : Harga Bahan sudah termasuk ongkos poles

A.4.4.3.24. Memasang 1 m plint ubin granit ukuran (10 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin granit Buah 2.650 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp -

Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.25. Memasang 1 m plint ubin granit ukuran (10 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin granit Buah 3.530 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.26. Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin teralux kerang Buah 2.650 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.27. Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin teralux kerang Buah 3.530 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.28. Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin teralux marmer Buah 1.700 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp -

Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.29. Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin teralux marmer Buah 2.650 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.30. Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint ubin teralux marmer Buah 3.530 Rp -

PC Kg 1.140 Rp - PP m³ 0.003 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.31. Memasang 1 m² lantai teraso cor ditempat, tebal 3 cmKebutuhan Satuan Indeks Harga Satuan

Bahan Bahan teraso cor m³ 0.036 Rp - Tenaga Kerja Pekerja OH 0.360 Rp -

Tukang Batu OH 0.180 Rp - Kepala Tukang OH 0.018 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.32. Memasang 1 m² lantai keramik artistik ukuran (10 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin keramik artistik Buah 53.000 Rp -

PC Kg 8.190 Rp - PP m³ 0.045 Rp - Semen warna Kg 2.750 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp -

Mandor OH 0.035 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.33. Memasang 1 m² lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin keramik artistik Buah 106.000 Rp -

PC Kg 8.190 Rp - PP m³ 0.045 Rp - Semen warna Kg 3.200 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.34. Memasang 1 m² lantai keramik ukuran (33 x 33) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin keramik Buah 10.000 Rp -

PC Kg 8.190 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.620 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.35. Memasang 1 m² lantai keramik ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin keramik Buah 11.870 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.35a. Memasang 1 m² lantai keramik ukuran (40 x 40) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin keramik Buah 6.000 Rp -

PC Kg 10.000 Rp - PP m³ 0.045 Rp -

Semen warna Kg 1.500 Rp - Tenaga Kerja Pekerja OH 0.700 Rp -

Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.36. Memasang 1 m² lantai keramik ukuran (20 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Ubin keramik Buah 26.500 Rp -

PC Kg 10.400 Rp - PP m³ 0.045 Rp - Semen warna Kg 1.620 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.37. Memasang 1 m² lantai keramik ukuran (10 x 33) cm, variasi/borderKebutuhan Satuan Indeks Harga Satuan Bahan Ubin keramik Buah 33.000 Rp -

PC Kg 9.800 Rp - PP m³ 0.045 Rp - Semen warna Kg 4.870 Rp -

Tenaga Kerja Pekerja OH 1.050 Rp - Tukang Batu OH 0.252 Rp - Kepala Tukang OH 0.053 Rp - Mandor OH 0.053 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.38. Memasang 1 m² lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PPKebutuhan Satuan Indeks Harga Satuan Bahan Mosaik Buah 11.870 Rp -

PC Kg 14.150 Rp - PP m³ 0.039 Rp - Semen warna Kg 2.000 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.39. Memasang 1 m plint keramik ukuran (10 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint keramik artistik Buah 5.300 Rp -

PC Kg 1.140 Rp -

PP m³ 0.030 Rp - Semen warna Kg 0.025 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.40. Memasang 1 m plint keramik ukuran (10 x 10) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint keramik artistik Buah 10.600 Rp -

PC Kg 1.140 Rp - PP m³ 0.030 Rp - Semen warna Kg 0.025 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.41. Memasang 1 m plint keramik ukuran (5 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Plint keramik artistik Buah 5.300 Rp -

PC Kg 0.570 Rp - PP m³ 0.0015 Rp - Semen warna Kg 0.013 Rp -

Tenaga Kerja Pekerja OH 0.090 Rp - Tukang Batu OH 0.090 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.42.Kebutuhan Satuan Indeks Harga Satuan Bahan Internal cove Buah 5.300 Rp -

PC Kg 1.140 Rp - PP m³ 0.0030 Rp - Semen warna Kg 0.100 Rp -

Tenaga Kerja Pekerja OH 0.750 Rp - Tukang Batu OH 0.750 Rp - Kepala Tukang OH 0.075 Rp - Mandor OH 0.038 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.43. Memasang 1 m² lantai marmer ukuran ( 100 x 100) cmKebutuhan Satuan Indeks Harga Satuan Bahan Marmer Buah 1.060 Rp -

Memasang 1 m plint internal cove artistik ukuran (5 x 5 x 20) cm

PC Kg 8.190 Rp - PP m³ 0.0450 Rp - Semen warna Kg 0.650 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.44. Memasang 1 m² lantai karpetKebutuhan Satuan Indeks Harga Satuan Bahan Karpet m² 1.050 Rp -

Lem Kg 0.350 Rp - Tenaga Kerja Pekerja OH 0.170 Rp -

Tukang Batu OH 0.170 Rp - Kepala Tukang OH 0.017 Rp - Mandor OH 0.009 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.45.Kebutuhan Satuan Indeks Harga Satuan Bahan Underlayer / rubber corrugated m² 1.050 Rp -

Lem Kg 0.350 Rp - Tenaga Kerja Pekerja OH 0.120 Rp -

Tukang Batu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.006 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.46. Memasang 1 m² lantai parquet kayuKebutuhan Satuan Indeks Harga Satuan Bahan Parquet m² 1.050 Rp -

Lem Kg 0.600 Rp - Tenaga Kerja Pekerja OH 0.700 Rp -

Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.47.Kebutuhan Satuan Indeks Harga Satuan Bahan Gymfloor m² 1.050 Rp -

Lem Kg 0.600 Rp - Tenaga Kerja Pekerja OH 0.700 Rp -

Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%)

Memasang 1 m² lantai underlayer / pelapis bawah karpet

Memasang 1 m² lantai kayu (gymfloor)

Harga Satuan Pekerjaan A.4.4.3.48. Memasang 1 m² dinding porselin ukuran (11 x 11) cmKebutuhan Satuan Indeks Harga Satuan Bahan Porselin Buah 86.000 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 1.500 Rp -

Tenaga Kerja Pekerja OH 1.000 Rp - Tukang Batu OH 0.500 Rp - Kepala Tukang OH 0.050 Rp - Mandor OH 0.050 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.49. Memasang 1 m² dinding porselin ukuran (10 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Porselin Buah 53.000 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 2.750 Rp -

Tenaga Kerja Pekerja OH 0.900 Rp - Tukang Batu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.045 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.50. Memasang 1 m² dinding porselin ukuran (20 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Porselin Buah 26.500 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 1.940 Rp -

Tenaga Kerja Pekerja OH 0.900 Rp - Tukang Batu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.045 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.51. Memasang 1 m² dinding keramik artistik ukuran (10 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Keramik artistik Buah 53.000 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 2.750 Rp -

Tenaga Kerja Pekerja OH 0.900 Rp - Tukang Batu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.045 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.52. Memasang 1 m² dinding keramik artistik ukuran (5 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Keramik artistik Buah 106.000 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 2.900 Rp -

Tenaga Kerja Pekerja OH 0.900 Rp - Tukang Batu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.045 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.53. Memasang 1 m² dinding keramik ukuran (10 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Keramik Buah 53.000 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 2.750 Rp -

Tenaga Kerja Pekerja OH 0.900 Rp - Tukang Batu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.045 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.54. Memasang 1 m² dinding keramik ukuran (20 x 20) cmKebutuhan Satuan Indeks Harga Satuan Bahan Keramik Buah 26.500 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 1.940 Rp -

Tenaga Kerja Pekerja OH 0.900 Rp - Tukang Batu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.045 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SNI 2008.55 Memasang 1 m² dinding keramik ukuran (20 x 25) cmKebutuhan Satuan Indeks Harga Satuan Bahan Keramik Buah 20.000 Rp -

PC Kg 9.300 Rp - PP m³ 0.018 Rp - Semen warna Kg 1.940 Rp -

Tenaga Kerja Pekerja OH 0.900 Rp - Tukang Batu OH 0.450 Rp - Kepala Tukang OH 0.045 Rp - Mandor OH 0.045 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.55. Memasang 1 m² dinding marmer ukuran (100 x 100) cmKebutuhan Satuan Indeks Harga Satuan Bahan Marmer m² 1.060 Rp -

Paku 12 cm Buah 3.000 Rp - PC Kg 12.440 Rp - PP m³ 0.025 Rp - Semen warna Kg 0.650 Rp -

Tenaga Kerja Pekerja OH 1.300 Rp - Tukang Batu OH 0.650 Rp - Kepala Tukang OH 0.065 Rp - Mandor OH 0.065 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.56. Memasang 1 m² dinding bata pelapis ukuran (3 x 7 x 24) cmKebutuhan Satuan Indeks Harga Satuan Bahan Bata pelapis dinding Buah 63.000 Rp -

PC Kg 12.440 Rp - PP m³ 0.025 Rp - Semen warna Kg 2.750 Rp -

Tenaga Kerja Pekerja OH 1.000 Rp - Tukang Batu OH 0.500 Rp - Kepala Tukang OH 0.050 Rp - Mandor OH 0.050 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.57. Memasang 1 m² dinding bata parasKebutuhan Satuan Indeks Harga Satuan Bahan Batu paras m² 1.100 Rp -

PC Kg 11.750 Rp - PP m³ 0.035 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.58. Memasang 1 m² dinding batu tempel hitamKebutuhan Satuan Indeks Harga Satuan Bahan Batu tempel hitam m² 1.100 Rp -

PC Kg 11.750 Rp - PP m³ 0.035 Rp -

Tenaga Kerja Pekerja OH 0.700 Rp - Tukang Batu OH 0.350 Rp - Kepala Tukang OH 0.035 Rp - Mandor OH 0.035 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.59. Memasang 1 m² lantai vinyl ukuran (30 x 30) cmKebutuhan Satuan Indeks Harga Satuan Bahan Vinyl Buah 11.870 Rp -

Lem vinyl Kg 0.350 Rp - Tenaga Kerja Pekerja OH 0.150 Rp -

Tukang OH 0.150 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.60. Memasang 1 m² wall paper, lebar 50 cmKebutuhan Satuan Indeks Harga Satuan Bahan Wall paper m 2.200 Rp -

Lem Kg 0.250 Rp - Tenaga Kerja Pekerja OH 0.350 Rp -

Tukang OH 0.175 Rp - Kepala Tukang OH 0.017 Rp - Mandor OH 0.002 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.61.Kebutuhan Satuan Indeks Harga Satuan

Bahan Floor hardener Kg 5.000 Rp - Tenaga Kerja Pekerja OH 0.120 Rp -

Tukang OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.006 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.62. Memasang 1 m plint vinyl karet ukuran (15 x 30) cm dengan perekatKebutuhan Satuan Indeks Harga Satuan Bahan Vinyl karet Buah 1.760 Rp -

Lem vinyl Kg 0.080 Rp - Tenaga Kerja Pekerja OH 0.080 Rp -

Tukang OH 0.080 Rp - Kepala Tukang OH 0.008 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.4.3.63. Memasang 1 m plint kayu kelas II tebal 2 cm, lebar 10 cmKebutuhan Satuan Indeks Harga Satuan Bahan Papan kayu kelas II m³ 0.003 Rp -

Paku / Skrup 5 cm Kg 0.050 Rp - Tenaga Kerja Pekerja OH 0.120 Rp -

Memasang 1 m² floor hardener

Tukang Kayu OH 0.120 Rp - Kepala Tukang OH 0.012 Rp - Mandor OH 0.006 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

J. Pekerjaan Pengecetan

A.4.7.1.16. Pengecatan 1 m² permukaan baja dengan menie besiKebutuhan Satuan Indeks Harga Satuan Bahan Menie besi Kg 1.0000 Rp -

Kuas Bh 0.0100 Rp - Tenaga Kerja Pekerja OH 0.0200 Rp -

Tukang cat OH 0.2000 Rp - Kepala Tukang OH 0.0200 Rp - Mandor OH 0.0025 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.7.1.10. Mengecat 1 m² dinding 3 xKebutuhan Satuan Indeks Harga Satuan Bahan Plamur Kg 1.0000 Rp -

Cat dasar Kg 0.1000 Rp - Cat tembok Kg 0.2600 Rp -

Tenaga Kerja Pekerja OH 0.0200 Rp - Tukang OH 0.0630 Rp - Kepala Tukang OH 0.0063 Rp - Mandor OH 0.0025 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.7.1.1.4. 1 m² Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)Kebutuhan Satuan Indeks Harga Satuan Bahan Cat menie Kg 0.2000 Rp -

Plamuur Kg 0.1500 Rp - Cat dasar Kg 0.1700 Rp - Cat penutup Kg 0.2600 Rp - Kuas Bh 0.0100 Rp - Pengencer L 0.0300 Rp - Ampelas Lbr 0.2000 Rp -

Tenaga Kerja Pekerja OH 0.0700 Rp - Tukang Cat OH 0.0090 Rp - Kepala Tukang OH 0.0060 Rp - Mandor OH 0.0030 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

J. Pekerjaan Atap

A.4.5.2.32. Memasang 1 m² atap genteng metalKebutuhan Satuan Indeks Harga Satuan Bahan Genteng Metal Lbr 1.0200 Rp -

Paku Biasa 2" - 5" Kg 0.2000 Rp - Tenaga Kerja Pekerja OH 0.2000 Rp -

Tukang OH 0.1000 Rp -

Kepala Tukang OH 0.0100 Rp - Mandor OH 0.0010 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.2.38. Memasang 1 m² atap seng gelombang BJLS 0,30Kebutuhan Satuan Indeks Harga Satuan Bahan Seng Gelombang Lbr 0.7000 Rp -

Paku Biasa ½" - 1" Kg 0.0200 Rp - Tenaga Kerja Pekerja OH 0.1200 Rp -

Tukang OH 0.0600 Rp - Kepala Tukang OH 0.0060 Rp - Mandor OH 0.0060 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.5.2.38a. Memasang 1 m² atap seng gelombang BJLS 0,20Kebutuhan Satuan Indeks Harga Satuan Bahan Seng Gelombang Lbr 1.0200 Rp -

Paku Biasa ½" - 1" Kg 0.2000 Rp - Tenaga Kerja Pekerja OH 0.2000 Rp -

Tukang OH 0.1000 Rp - Kepala Tukang OH 0.0100 Rp - Mandor OH 0.0010 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SNI.ATAP2 Memasang 1 m' rabung genteng metalKebutuhan Satuan Indeks Harga Satuan Bahan Non Seng Genteng Lbr 1.1000 Rp -

Paku Biasa ½" - 1" Kg 0.0500 Rp - Tenaga Kerja Pekerja OH 0.2500 Rp -

Tukang OH 0.1200 Rp - Kepala Tukang OH 0.0150 Rp - Mandor OH 0.0130 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SNI.ATAP2A Memasang 1 m' rabung SengKebutuhan Satuan Indeks Harga Satuan Bahan Rabung Seng Lbr 0.5000 Rp -

Paku Biasa ½" - 1" Kg 0.0500 Rp - Tenaga Kerja Pekerja OH 0.2500 Rp -

Tukang OH 0.1500 Rp - Kepala Tukang OH 0.0150 Rp - Mandor OH 0.0130 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SNI.03 3436 Memasang 1 m² Atap SpandekKebutuhan Satuan Indeks Harga Satuan Bahan Atap spandek m² 1.1000 Rp -

Paku Kg 0.0200 Rp - Tenaga Kerja Pekerja OH 0.1200 Rp -

Tukang OH 0.0600 Rp - Kepala Tukang OH 0.0060 Rp - Mandor OH 0.0060 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SNI - Cat - 6.8. 1 m² Pengecatan kayu 1 plamur, 1 cat dasar dan 2 cat penutup dengan cat minyakKebutuhan Satuan Indeks Harga Satuan Bahan Cat kilat minyak Kg 0.2000 Rp -

Plamur Kg 0.1500 Rp - Cat dasar Kg 0.1700 Rp - Cat Minyak Kg 0.2600 Rp -

Tenaga Kerja Pekerja OH 0.0700 Rp - Tukang OH 0.0090 Rp - Kepala Tukang OH 0.0060 Rp - Mandor OH 0.0025 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

SNI - Cat - 6.14 1 m² Pengecatan tembok 1 plamur, 1 cat dasar dan 2 cat penutup (Cat Air)Kebutuhan Satuan Indeks Harga Satuan Bahan Plamur Kg 0.1000 Rp -

Cat dasar Kg 0.1000 Rp - Cat tembok Kg 0.2600 Rp -

Tenaga Kerja Pekerja OH 0.0200 Rp - Tukang OH 0.0630 Rp - Kepala Tukang OH 0.0630 Rp - Mandor OH 0.0025 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.12. Pemasangan 1 buah kloset jongkokKebutuhan Satuan Indeks Harga Satuan Bahan Kloset jongkok Bh 1.0000 Rp -

Batu bata Bh 7.0000 Rp - Semen portland Kg 6.0000 Rp - Pasir pasang m³ 0.0100 Rp -

Tenaga Kerja Pekerja OH 1.0000 Rp - Tukang OH 1.5000 Rp - Kepala Tukang OH 0.3000 Rp - Mandor OH 0.1100 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.17. 1 m² Pasang Kaca tebal 5 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca Tebal 5 mm m² 1.10000 Rp - Tenaga Kerja Pekerja OH 0.01500 Rp -

Tukang OH 0.15000 Rp - Kepala Tukang OH 0.01500 Rp - Mandor OH 0.00075 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

N. Pekerjaan Pemasangan Pipa

A.8.4.1.1. Memasang 1 m² pipa PVC Φ 63 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 63 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.0810 Rp -

Tukang Pipa OH 0.0410 Rp - Mandor OH 0.0080 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0060 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.2. Memasang 1 m² pipa PVC Φ 90 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 90 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.0940 Rp -

Tukang Pipa OH 0.0470 Rp - Mandor OH 0.0090 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0080 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.3. Memasang 1 m² pipa PVC Φ 110 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 110 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.1050 Rp -

Tukang Pipa OH 0.0530 Rp - Mandor OH 0.0110 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0100 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.4. Memasang 1 m² pipa PVC Φ 150 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 150 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.1180 Rp -

Tukang Pipa OH 0.0539 Rp - Mandor OH 0.0120 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0120 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.5. Memasang 1 m² pipa PVC Φ 200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.1180 Rp -

Tukang Pipa OH 0.0539 Rp - Mandor OH 0.0120 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0120 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.6. Memasang 1 m² pipa PVC Φ 250 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 250 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.2560 Rp -

Tukang Pipa OH 0.1280 Rp - Mandor OH 0.0260 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0340 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.7. Memasang 1 m² pipa PVC Φ 300 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 300 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.2940 Rp -

Tukang Pipa OH 0.1470 Rp - Mandor OH 0.0290 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0400 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.8. Memasang 1 m² pipa PVC Φ 400 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 400 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.5440 Rp -

Tukang Pipa OH 0.2720 Rp - Mandor OH 0.0540 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0800 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.9. Memasang 1 m² pipa PVC Φ 450 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 450 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.2940 Rp -

Tukang Pipa OH 0.1470 Rp - Mandor OH 0.0290 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0400 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.10. Memasang 1 m² pipa PVC Φ 500 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 500 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.8090 Rp -

Tukang Pipa OH 0.4050 Rp - Mandor OH 0.0810 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.1220 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.11. Memasang 1 m² pipa PVC Φ 600 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 600 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.9570 Rp -

Tukang Pipa OH 0.4790 Rp - Mandor OH 0.0960 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.1450 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.12. Memasang 1 m² pipa PVC Φ 800 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 800 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.6180 Rp -

Tukang Pipa OH 0.8090 Rp - Mandor OH 0.1620 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.2500 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.13. Memasang 1 m² pipa PVC Φ 900 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 900 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.6910 Rp -

Tukang Pipa OH 0.8460 Rp - Mandor OH 0.1690 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.2620 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.14. Memasang 1 m² pipa PVC Φ 1000 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 1000 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.8950 Rp -

Tukang Pipa OH 0.9480 Rp - Mandor OH 0.1900 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.2940 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.15. Memasang 1 m² pipa PVC Φ 1100 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 1100 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.0990 Rp -

Tukang Pipa OH 1.0500 Rp - Mandor OH 0.2100 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.3270 Rp - Jumlah

Overhead & Profit (10%)

Harga Satuan Pekerjaan

A.8.4.1.16. Memasang 1 m² pipa PVC Φ 1200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC Φ 1200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.3030 Rp -

Tukang Pipa OH 1.1250 Rp - Mandor OH 0.2300 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.3590 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.17. Memasang 1 m² pipa HDPE Φ 63 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 63 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.0350 Rp -

Tukang Pipa OH 0.0170 Rp - Mandor OH 0.0030 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0190 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.18. Memasang 1 m² pipa HDPE Φ 100 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 100 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.0400 Rp -

Tukang Pipa OH 0.0200 Rp - Mandor OH 0.0040 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0190 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.19. Memasang 1 m² pipa HDPE Φ 125 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 125 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.0450 Rp -

Tukang Pipa OH 0.0230 Rp - Mandor OH 0.0050 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0190 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.20. Memasang 1 m² pipa HDPE Φ 150 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 150 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.0620 Rp -

Tukang Pipa OH 0.0310 Rp - Mandor OH 0.0060 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0190 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.21. Memasang 1 m² pipa HDPE Φ 200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.1020 Rp -

Tukang Pipa OH 0.0510 Rp - Mandor OH 0.0100 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0190 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.26. Memasang 1 m² pipa HDPE Φ 500 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 500 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.4330 Rp -

Tukang Pipa OH 0.2160 Rp - Mandor OH 0.0430 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.2510 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.27. Memasang 1 m² pipa HDPE Φ 600 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 600 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.5120 Rp -

Tukang Pipa OH 0.2560 Rp - Mandor OH 0.0510 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.3070 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.28. Memasang 1 m² pipa HDPE Φ 800 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 800 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.8930 Rp -

Tukang Pipa OH 0.4460 Rp - Mandor OH 0.0890 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.5730 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.29. Memasang 1 m² pipa HDPE Φ 900 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 900 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.3530 Rp -

Tukang Pipa OH 0.6770 Rp -

Mandor OH 0.1350 Rp - Peralatan Sewa Tripot/Tricket & handle crane Hari 0.8830 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.30. Memasang 1 m² pipa HDPE Φ 1000 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 1000 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.6590 Rp -

Tukang Pipa OH 0.8030 Rp - Mandor OH 0.1660 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 1.0930 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.32. Memasang 1 m² pipa HDPE Φ 1200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa HDPE Φ 1200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.3700 Rp -

Tukang Pipa OH 1.1850 Rp - Mandor OH 0.2370 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 1.5840 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.33. Memasang 1 m² pipa GIP Φ 63 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 63 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.3450 Rp -

Tukang Pipa OH 0.1720 Rp - Mandor OH 0.0340 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.34. Memasang 1 m² pipa GIP Φ 100 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 100 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.4000 Rp -

Tukang Pipa OH 0.2000 Rp - Mandor OH 0.0400 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.36. Memasang 1 m² pipa GIP Φ 150 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 150 mm m 1.0000 Rp -

Tenaga Kerja Pekerja OH 0.5060 Rp - Tukang Pipa OH 0.2530 Rp - Mandor OH 0.0510 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.37. Memasang 1 m² pipa GIP Φ 200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.5060 Rp -

Tukang Pipa OH 0.2530 Rp - Mandor OH 0.0510 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.39. Memasang 1 m² pipa GIP Φ 300 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 300 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.9580 Rp -

Tukang Pipa OH 0.4790 Rp - Mandor OH 0.0960 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.40. Memasang 1 m² pipa GIP Φ 400 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 400 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.2120 Rp -

Tukang Pipa OH 0.6060 Rp - Mandor OH 0.1210 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.42. Memasang 1 m² pipa GIP Φ 500 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 500 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.4690 Rp -

Tukang Pipa OH 0.7350 Rp - Mandor OH 0.1470 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.43. Memasang 1 m² pipa GIP Φ 600 mm

Kebutuhan Satuan Indeks Harga Satuan Bahan Pipa GIP Φ 600 mm m 1.0000 Rp -

Tenaga Kerja Pekerja OH 1.3270 Rp - Tukang Pipa OH 0.6640 Rp - Mandor OH 0.1330 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.44. Memasang 1 m² pipa GIP Φ 800 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 800 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.3270 Rp -

Tukang Pipa OH 1.1630 Rp - Mandor OH 0.2330 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.45. Memasang 1 m² pipa GIP Φ 900 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 900 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.6230 Rp -

Tukang Pipa OH 1.3120 Rp - Mandor OH 0.2620 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.46. Memasang 1 m² pipa GIP Φ 1000 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 1000 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.9110 Rp -

Tukang Pipa OH 1.4560 Rp - Mandor OH 0.2910 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.48. Memasang 1 m² pipa GIP Φ 1200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa GIP Φ 1200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 3.4880 Rp -

Tukang Pipa OH 1.7440 Rp - Mandor OH 0.3490 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0000 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.49. Memasang 1 m² pipa DCL Φ 100 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 100 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.4890 Rp -

Tukang Pipa OH 0.0980 Rp - Mandor OH 0.0490 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.3800 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.51. Memasang 1 m² pipa DCL Φ 150 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 150 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.6130 Rp -

Tukang Pipa OH 0.1230 Rp - Mandor OH 0.0610 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.3800 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.52. Memasang 1 m² pipa DCL Φ 200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.8550 Rp -

Tukang Pipa OH 0.1710 Rp - Mandor OH 0.0850 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.3800 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.54. Memasang 1 m² pipa DCL Φ 300 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 300 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.9730 Rp -

Tukang Pipa OH 0.1950 Rp - Mandor OH 0.0970 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0710 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.57. Memasang 1 m² pipa DCL Φ 500 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 500 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.0470 Rp -

Tukang Pipa OH 0.4090 Rp - operator Alat Berat OH 0.1930 Rp - Mandor OH 0.2050 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0450 Rp - Sewa Exavator type 225 Hari 0.0340 Rp -

Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.59. Memasang 1 m² pipa DCL Φ 800 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 800 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 3.8590 Rp -

Tukang Pipa OH 0.7720 Rp - operator Alat Berat OH 0.4930 Rp - Mandor OH 0.3860 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.2250 Rp - Sewa Exavator type 225 Hari 0.0840 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.60. Memasang 1 m² pipa DCL Φ 900 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 900 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 4.9950 Rp -

Tukang Pipa OH 0.9990 Rp - operator Alat Berat OH 0.5930 Rp - Mandor OH 0.4990 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.2180 Rp - Sewa Exavator type 225 Hari 0.0930 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.61. Memasang 1 m² pipa DCL Φ 1000 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 1000 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 5.9310 Rp -

Tukang Pipa OH 1.1860 Rp - operator Alat Berat OH 0.7930 Rp - Mandor OH 0.6930 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.1120 Rp - Sewa Exavator type 225 Hari 0.2980 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.63. Memasang 1 m² pipa DCL Φ 1200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa DCL Φ 1200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 8.0560 Rp -

Tukang Pipa OH 1.6110 Rp - operator Alat Berat OH 0.8930 Rp - Mandor OH 0.8060 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.3600 Rp - Sewa Exavator type 225 Hari 0.1800 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.65. Memasang 1 m² pipa baja Φ 100 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 100 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.5790 Rp -

Tukang Pipa OH 0.1160 Rp -

Mandor OH 0.0580 Rp - Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0040 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.67. Memasang 1 m² pipa baja Φ 150 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 150 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 0.7080 Rp -

Tukang Pipa OH 0.1420 Rp - Mandor OH 0.0710 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0040 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.68. Memasang 1 m² pipa baja Φ 200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.1130 Rp -

Tukang Pipa OH 0.2230 Rp - Mandor OH 0.1110 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0040 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.70. Memasang 1 m² pipa baja Φ 300 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 300 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 1.4150 Rp -

Tukang Pipa OH 0.2830 Rp - Mandor OH 0.1410 Rp -

Peralatan Sewa Tripot/Tricket & handle crane Hari 0.0040 Rp - Jumlah

Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.71. Memasang 1 m² pipa baja Φ 400 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 400 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.3660 Rp -

Tukang Pipa OH 0.4730 Rp - Mandor OH 0.2370 Rp -

Peralatan Sewa Exavator type 225 Hari 0.0270 Rp - Sewa Tripot/Tricket & handle crane Hari 0.0390 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.73. Memasang 1 m² pipa baja Φ 500 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 500 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 2.4320 Rp -

Tukang Pipa OH 0.4860 Rp - Mandor OH 0.2430 Rp -

Peralatan Sewa Exavator type 225 Hari 0.0290 Rp - Sewa Tripot/Tricket & handle crane Hari 0.0450 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.75. Memasang 1 m² pipa baja Φ 800 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 800 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 3.8970 Rp -

Tukang Pipa OH 0.7790 Rp - Mandor OH 0.3900 Rp -

Peralatan Sewa Exavator type 225 Hari 0.0460 Rp - Sewa Tripot/Tricket & handle crane Hari 0.0980 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.76. Memasang 1 m² pipa baja Φ 900 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 900 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 4.4030 Rp -

Tukang Pipa OH 0.0810 Rp - Mandor OH 0.4400 Rp -

Peralatan Sewa Exavator type 225 Hari 0.0520 Rp - Sewa Tripot/Tricket & handle crane Hari 0.1150 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.77. Memasang 1 m² pipa baja Φ 1000 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 1000 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 4.8950 Rp -

Tukang Pipa OH 0.9790 Rp - Mandor OH 0.4890 Rp -

Peralatan Sewa Exavator type 225 Hari 0.0580 Rp - Sewa Tripot/Tricket & handle crane Hari 0.1330 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.8.4.1.79. Memasang 1 m² pipa baja Φ 1200 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Pipa baja Φ 1200 mm m 1.0000 Rp - Tenaga Kerja Pekerja OH 5.8970 Rp -

Tukang Pipa OH 1.1760 Rp - Mandor OH 0.5880 Rp -

Peralatan Sewa Exavator type 225 Hari 0.0700 Rp - Sewa Tripot/Tricket & handle crane Hari 0.1670 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

Pekerjaan Kunci dan Kaca

A.4.6.2.1. Pemasangan 1 buah kunci tanam antikKebutuhan Satuan Indeks Harga Satuan

Bahan Kunci tanam antik Bh 1.0000 Rp - Tenaga Kerja Pekerja OH 0.0600 Rp -

Tukang OH 0.6000 Rp - Kepala Tukang OH 0.06 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasaKebutuhan Satuan Indeks Harga Satuan

Bahan Kunci tanam biasa Bh 1 Rp - Tenaga Kerja Pekerja OH 0.01 Rp -

Tukang OH 0.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.3. Pemasangan 1 buah kunci Kamar mandiKebutuhan Satuan Indeks Harga Satuan

Bahan Kunci tanam Kamar mandi Bh 1 Rp - Tenaga Kerja Pekerja OH 0.005 Rp -

Tukang OH 0.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.4. Pemasangan 1 buah kunci silinderKebutuhan Satuan Indeks Harga Satuan

Bahan Kunci silinder Bh 1 Rp - Tenaga Kerja Pekerja OH 0.015 Rp -

Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.0008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.5. Pemasangan 1 buah engsel pintuKebutuhan Satuan Indeks Harga Satuan

Bahan Engsel pintu Bh 1 Rp - Tenaga Kerja Pekerja OH 0.015 Rp -

Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.0008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.6. Pemasangan 1 buah engsel jendela

Kebutuhan Satuan Indeks Harga Satuan Bahan Engsel jendela Bh 1 Rp -

Tenaga Kerja Pekerja OH 0.01 Rp - Tukang OH 0.1 Rp - Kepala Tukang OH 0.01 Rp - Mandor OH 0.0005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.7. Pemasangan 1 buah engsel anginKebutuhan Satuan Indeks Harga Satuan

Bahan Engsel angin Bh 1 Rp - Tenaga Kerja Pekerja OH 0.01 Rp -

Tukang OH 0.2 Rp - Kepala Tukang OH 0.02 Rp - Mandor OH 0.0005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.8. Pemasangan 1 buah grensel jendelaKebutuhan Satuan Indeks Harga Satuan

Bahan Grendel Jendela Bh 1 Rp - Tenaga Kerja Pekerja OH 0.015 Rp -

Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.9. Pemasangan 1 buah Kait anginKebutuhan Satuan Indeks Harga Satuan

Bahan Kait angin Bh 1 Rp - Tenaga Kerja Pekerja OH 0.015 Rp -

Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.10. Pemasangan 1 buah Door clooserKebutuhan Satuan Indeks Harga Satuan

Bahan Door closer Set 1 Rp - Tenaga Kerja Pekerja OH 0.05 Rp -

Tukang OH 0.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.11. Pemasangan 1 buah kunci slotKebutuhan Satuan Indeks Harga Satuan

Bahan Kunci slot Bh 1 Rp - Tenaga Kerja Pekerja OH 0.02 Rp -

Tukang OH 0.2 Rp - Kepala Tukang OH 0.02 Rp - Mandor OH 0.001 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.12. Pemasangan 1 buah door holderKebutuhan Satuan Indeks Harga Satuan

Bahan Door holder Bh 1 Rp - Tenaga Kerja Pekerja OH 0.05 Rp -

Tukang OH 0.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.13. Pemasangan 1 buah door stopKebutuhan Satuan Indeks Harga Satuan

Bahan Door stop Bh 1 Rp - Tenaga Kerja Pekerja OH 0.01 Rp -

Tukang OH 0.1 Rp - Kepala Tukang OH 0.01 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.14. Pemasangan 1 buah rel pintu sorongKebutuhan Satuan Indeks Harga Satuan

Bahan Rel pintu sorong Set 1 Rp - Tenaga Kerja Pekerja OH 0.06 Rp -

Tukang OH 0.6 Rp - Kepala Tukang OH 0.06 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.15. Pemasangan 1 buah kunci lemariKebutuhan Satuan Indeks Harga Satuan

Bahan Kunci lemari Bh 1 Rp - Tenaga Kerja Pekerja OH 0.025 Rp -

Tukang OH 0.25 Rp - Kepala Tukang OH 0.025 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%)

Harga Satuan Pekerjaan

A.4.6.2.16. Pemasangan 1 buah kaca tebal 3 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca tebal 3 mm M² 1.1 Rp - Sealant Kg 0.05 Rp -

Tenaga Kerja Pekerja OH 0.015 Rp - Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.0008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.17. Pemasangan 1 buah kaca tebal 5 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca tebal 5 mm M² 1.1 Rp - Sealant Kg 0.05 Rp -

Tenaga Kerja Pekerja OH 0.015 Rp - Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.0008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.18. Pemasangan 1 buah kaca tebal 8 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca tebal 8 mm M² 1.1 Rp - Sealant Kg 0.07 Rp -

Tenaga Kerja Pekerja OH 0.017 Rp - Tukang OH 0.17 Rp - Kepala Tukang OH 0.017 Rp - Mandor OH 0.0009 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.19. Pemasangan 1 buah kaca buram 12 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca buram 12 mm M² 1.1 Rp - Sealant Kg 0.07 Rp -

Tenaga Kerja Pekerja OH 0.025 Rp - Tukang OH 0.25 Rp - Kepala Tukang OH 0.025 Rp - Mandor OH 0.0013 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.20. Pemasangan 1 buah cermin tebal 5 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca cermin tebal 5 mm M² 1.1 Rp - Tenaga Kerja Pekerja OH 0.015 Rp -

Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.21. Pemasangan 1 buah cermin tebal 8 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca cermin tebal 8 mm M² 1.1 Rp - Tenaga Kerja Pekerja OH 0.017 Rp -

Tukang OH 0.17 Rp - Kepala Tukang OH 0.017 Rp - Mandor OH 0.009 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.22. Pemasangan 1 M² wiredglass tebal 5 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca Wiredglass M² 1.1 Rp - Tenaga Kerja Pekerja OH 0.015 Rp -

Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.008 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.4.6.2.23. Pemasangan 1 m² kaca patri tebal 5 mmKebutuhan Satuan Indeks Harga Satuan

Bahan Kaca Wiredglass m² 1.1 Rp - Sealant Kg 0.05

Tenaga Kerja Pekerja OH 0.075 Rp - Tukang OH 0.15 Rp - Kepala Tukang OH 0.015 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

Pekerjaan Sanitasi Dalam Gedung

A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblokKebutuhan Satuan Indeks Harga Satuan

Bahan Closet duduk Unit 1 Rp - Perlengkapan Ls 6% x Closet Rp -

Tenaga Kerja Pekerja OH 3.3 Rp - Tukang OH 1.1 Rp - Kepala Tukang OH 0.1 Rp - Mandor OH 0.16 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.2. Pemasangan 1 buah closet jongkok keramik/porselenKebutuhan Satuan Indeks Harga Satuan

Bahan Closet jongkok Unit 1 Rp - Semen Portland Kg 6 Rp - Pasir pasang m³ 0.01 Rp -

Tenaga Kerja Pekerja OH 1 Rp - Tukang OH 1.5 Rp - Kepala Tukang OH 0.15 Rp - Mandor OH 0.05 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.3. Pemasangan 1 buah closet jongkok terasoKebutuhan Satuan Indeks Harga Satuan

Bahan Closet jongkok Unit 1 Rp - Semen Portland Kg 6 Rp - Pasir pasang m³ 0.01 Rp - Bata Merah Bh 7 Rp -

Tenaga Kerja Pekerja OH 1 Rp - Tukang OH 1.5 Rp - Kepala Tukang OH 0.15 Rp - Mandor OH 0.05 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.4. Pemasangan 1 buah UrinoirKebutuhan Satuan Indeks Harga Satuan

Bahan Urinoir Unit 1 Rp - Semen Portland Kg 6 Rp - Pasir pasang m³ 0.01 Rp - Perlengkapan Ls 30% x urinoir Rp -

Tenaga Kerja Pekerja OH 1 Rp - Tukang OH 1 Rp - Kepala Tukang OH 0.1 Rp - Mandor OH 0.05 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.5. Pemasangan 1 buah WestafelKebutuhan Satuan Indeks Harga Satuan

Bahan Westafel Unit 1 Rp - Semen Portland Kg 6 Rp - Pasir pasang m³ 0.01 Rp - Perlengkapan Ls 12% x Westa Rp -

Tenaga Kerja Pekerja OH 1.2 Rp - Tukang OH 1.45 Rp - Kepala Tukang OH 0.15 Rp - Mandor OH 0.06 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.6. Pemasangan 1 buah Bathup PorselenKebutuhan Satuan Indeks Harga Satuan

Bahan Bathup Unit 1 Rp - Perlengkapan Ls 20% x Bathu Rp -

Tenaga Kerja Pekerja OH 3 Rp - Tukang OH 4.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.9 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.7. Pemasangan 1 buah bak mandi fiberglass Vol 1 m³Kebutuhan Satuan Indeks Harga Satuan

Bahan Bak mandi fiberglass Vol 1 m³ Unit 1 Rp - Perlengkapan Ls 12% x Bak Rp -

Tenaga Kerja Pekerja OH 3 Rp - Tukang OH 4.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.9 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.8. Pemasangan 1 buah bak mandi batu bata Vol 0.3 m³Kebutuhan Satuan Indeks Harga Satuan

Bahan Bata merah Unit 150 Rp - Semen Portland Ls 120 Rp - Pasir Pasang m³ 0.3 Rp - Porselen 11 x 11 Bh 360 Rp - Semen warna Kg 6 Rp -

Tenaga Kerja Pekerja OH 6 Rp - Tukang OH 3 Rp - Kepala Tukang OH 0.3 Rp - Mandor OH 0.03 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.9. Pemasangan 1 buah bak mandi terasoKebutuhan Satuan Indeks Harga Satuan

Bahan Bak teraso Unit 1 Rp - Perlengkapan Ls 12 x Bak Rp -

Tenaga Kerja Pekerja OH 3 Rp - Tukang OH 4.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.9 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.10. Pemasangan 1 buah bak mandi fiberglassKebutuhan Satuan Indeks Harga Satuan

Bahan Bak fiberglass Unit 1 Rp -

Perlengkapan Ls 12 x Bak Rp - Tenaga Kerja Pekerja OH 3 Rp -

Tukang OH 4.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.9 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.11. Pemasangan 1 buah bak beton vol 1 m³Kebutuhan Satuan Indeks Harga Satuan

Bahan beton 1:2:3 m³ 0.9 Rp - Baja tulangan Kg 180 Rp - Kayu bekisting m² 8 Rp - Ubin porselen bh 500 Rp - Perlengkapan Ls 10% x Rp -

Tenaga Kerja Pekerja OH 3.5 Rp - Tukang OH 4.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.018 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteelKebutuhan Satuan Indeks Harga Satuan

Bahan Bak cuci piring Unit 1 Rp - Water Drain Bh 1 Rp -

Tenaga Kerja Pekerja OH 0.03 Rp - Tukang OH 0.3 Rp - Kepala Tukang OH 0.03 Rp - Mandor OH 0.015 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.13. Pemasangan 1 buah bak cuci piring terasoKebutuhan Satuan Indeks Harga Satuan

Bahan Bak cuci piring Unit 1 Rp - Water Drain Bh 1 Rp - Semen portland Kg 20 Rp - Pasir pasang m³ 0.05 Rp -

Tenaga Kerja Pekerja OH 0.05 Rp - Tukang OH 0.5 Rp - Kepala Tukang OH 0.05 Rp - Mandor OH 0.025 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.14. Pemasangan 1 buah floor drainKebutuhan Satuan Indeks Harga Satuan

Bahan Floor drain Unit 1 Rp - Tenaga Kerja Pekerja OH 0.01 Rp -

Tukang OH 0.1 Rp - Kepala Tukang OH 0.01 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 t=35 cmKebutuhan Satuan Indeks Harga Satuan

Bahan Bata merah Bh 40 Rp - Semen Portland Kg 44 Rp - Pasir pasang m³ 0.07 Rp - Pasir beton m³ 0.06 Rp - Kerikil m³ 0.07 Rp - Baja tulangan Kg 1.6 Rp -

Tenaga Kerja kepala Tukang OH 2.16 Rp - Tukang OH 0.72 Rp - Kepala Tukang OH 0.072 Rp - Mandor OH 0.011 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45 x 45 t=50 cmKebutuhan Satuan Indeks Harga Satuan

Bahan Bata merah Bh 70 Rp - Semen Portland Kg 77 Rp - Pasir pasang m³ 0.013 Rp - Pasir beton m³ 0.09 Rp - Kerikil m³ 0.02 Rp - Baja tulangan Kg 2.6 Rp -

Tenaga Kerja kepala Tukang OH 3.20 Rp - Tukang OH 1.15 Rp - Kepala Tukang OH 0.011 Rp - Mandor OH 0.016 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60 x 60 t=65 cmKebutuhan Satuan Indeks Harga Satuan

Bahan Bata merah Bh 123 Rp - Semen Portland Kg 114 Rp - Pasir pasang m³ 0.184 Rp - Pasir beton m³ 0.12 Rp - Kerikil m³ 0.033 Rp - Baja tulangan Kg 4.85 Rp -

Tenaga Kerja kepala Tukang OH 3.2 Rp - Tukang OH 1.15 Rp - Kepala Tukang OH 0.011 Rp - Mandor OH 0.016 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.18. Pemasangan 1 buah pipa galvanis diameter 1/2"

Kebutuhan Satuan Indeks Harga Satuan Bahan Pipa galvanis diameter 1/2" m 1.2 Rp -

Perlengkapan Ls 35% x Pipa Rp - Tenaga Kerja kepala Tukang OH 0.054 Rp -

Tukang OH 0.09 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.027 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.19. Pemasangan 1 buah kran air diameter 1/2" atau 3/4"Kebutuhan Satuan Indeks Harga Satuan

Bahan Kran air m 1 Rp - Sealtape Bh 0.025 Rp -

Tenaga Kerja kepala Tukang OH 0.01 Rp - Tukang OH 0.4 Rp - Kepala Tukang OH 0.04 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.20. Pemasangan 1 buah kran air diameter 3/4"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa galvanis diameter 3/4" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.054 Rp - Tukang OH 0.09 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.027 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.21. Pemasangan 1 buah pipa galvanis diameter 1"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa galvanis diameter 1" m 1.2000 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.054 Rp - Tukang OH 0.09 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.027 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.22. Pemasangan 1 buah pipa galvanis diameter 1 1/2"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa galvanis diameter 1 1/2" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.108 Rp - Tukang OH 0.18 Rp - Kepala Tukang OH 0.018 Rp - Mandor OH 0.005 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.23. Pemasangan 1 buah pipa galvanis diameter 3"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa galvanis diameter 3" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.135 Rp - Tukang OH 0.23 Rp - Kepala Tukang OH 0.0225 Rp - Mandor OH 0.007 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.24. Pemasangan 1 buah pipa galvanis diameter 4"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa galvanis diameter 4" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.135 Rp - Tukang OH 0.23 Rp - Kepala Tukang OH 0.0225 Rp - Mandor OH 0.007 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 1/2" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.036 Rp - Tukang OH 0.06 Rp - Kepala Tukang OH 0.006 Rp - Mandor OH 0.002 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 3/4" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.036 Rp - Tukang OH 0.06 Rp - Kepala Tukang OH 0.006 Rp - Mandor OH 0.002 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 1" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.036 Rp - Tukang OH 0.06 Rp - Kepala Tukang OH 0.006 Rp - Mandor OH 0.002 Rp -

Jumlah Overhead & Profit (10%)

Harga Satuan Pekerjaan A.5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 1 1/2" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.054 Rp - Tukang OH 0.09 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 2" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.054 Rp - Tukang OH 0.09 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.30. Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 2 1/2" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.054 Rp - Tukang OH 0.09 Rp - Kepala Tukang OH 0.009 Rp - Mandor OH 0.003 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 3" m 1.2 Rp 666,000.00 Perlengkapan Ls 35% x Pipa Rp 79,920.00

Tenaga Kerja kepala Tukang OH 0.081 Rp - Tukang OH 0.135 Rp - Kepala Tukang OH 0.0135 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

A.5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"Kebutuhan Satuan Indeks Harga Satuan

Bahan Pipa PVC 4" m 1.2 Rp - Perlengkapan Ls 35% x Pipa Rp -

Tenaga Kerja kepala Tukang OH 0.081 Rp - Tukang OH 0.135 Rp - Kepala Tukang OH 0.0135 Rp - Mandor OH 0.004 Rp -

Jumlah Overhead & Profit (10%) Harga Satuan Pekerjaan

ANALISA HARGA SATUAN PEKERJAAN

Jumlah Harga Rp 48,750.00 Rp 2,000.00 Rp 50,750.00

5,075.00 55,825.00

Jumlah Harga Rp 58,500.00 Rp 3,600.00 Rp 62,100.00

6,210.00 68,310.00

Jumlah Harga Rp 68,250.00 Rp 5,360.00 Rp 73,610.00

7,361.00 80,971.00

Jumlah Harga Rp 65,000.00 Rp 2,560.00 Rp 67,560.00

6,756.00 74,316.00

Jumlah Harga Rp 97,500.00 Rp 4,800.00 Rp 102,300.00

10,230.00 112,530.00

Jumlah Harga Rp 78,000.00 Rp 3,600.00 Rp 81,600.00

8,160.00 89,760.00

Jumlah Harga Rp 3,250.00 Rp 400.00 Rp 3,650.00

365.00 4,015.00

Jumlah Harga Rp 32,500.00 Rp 4,000.00 Rp 36,500.00

3,650.00 40,150.00

Mengurug kembali 1 m³ galian tanah dihitung dari 1/3 kali indeks pekerjaan galian

Jumlah Harga Rp 32,500.00 Rp 4,000.00 Rp 36,500.00

3,650.00 40,150.00

Jumlah Harga Rp 96,000.00 Rp 19,500.00 Rp 800.00 Rp 116,300.00

11,630.00 127,930.00

Jumlah Harga Rp 64,800.00 Rp 19,500.00 Rp 800.00 Rp 85,100.00

8,510.00 93,610.00

Memasang 1 m³ lapisan pudel campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah Jumlah Harga

Memasang 1 m³ lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi tanah Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Memasang 1 m³ pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Jumlah Harga

Jumlah Harga

Memasang 1 m² dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP Jumlah Harga

Memasang 1m³ dinding bata merah ukuran(5x11x22)cm tebal 1 bata, campuran spesi 1PC:3KP:10PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 6 PP Jumlah Harga

Memasang 1 m³ dinding bata merah ukuran (5x11x22) cm tebal ½ bata, campuran spesi 1 PC : 8 PP Jumlah Harga

Memasang 1m³ dinding bata merah ukuran(5x11x22)cm tebal ½bata, campuran spesi 1PC:3KP:10PP Jumlah Harga

Memasang 1m³ dinding bata merah ukuran (5x11x22)cm tebal ½bata, campuran spesi 1KP:1SM:1PP Jumlah Harga

Memasang 1m³ dinding bata merah ukuran (5x11x22)cm tebal ½bata, campuran spesi 1KP:1SM:2PP Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Memasang 1 m³ dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Jumlah Harga

Memasang 1 m³ dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP Jumlah Harga

Memasang 1 m³ dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Membuat 1 m³ beton mutu fc = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 Jumlah Harga

Membuat 1 m³ beton mutu fc = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78 Jumlah Harga

Membuat 1 m³ beton mutu fc = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0,72 Jumlah Harga

Membuat 1 m³ lantai kerja beton mutu fc = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 Jumlah Harga

Membuat 1 m³ beton mutu fc = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 Jumlah Harga

Membuat 1 m³ beton mutu fc = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 Jumlah Harga

Membuat 1 m³ beton mutu fc = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 Jumlah Harga

Membuat 1 m³ beton mutu fc = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 Jumlah Harga

Membuat 1 m³ beton mutu fc = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53 Jumlah Harga

Membuat 1 m³ beton mutu fc = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 Jumlah Harga

Membuat 1 m³ beton mutu fc = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 Jumlah Harga

Membuat 1 m³ beton mutu fc = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau III Jumlah Harga

Jumlah Harga

Membuat dan memasang 1 m² pintu klamp standar sederhana, kayu kelas III untuk gudang sementara Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Membuat 1m²daun pintu kayu lapis(polywood)rangkap,rangka tertutup kayu kelas II(lebar sampai 90cm) Jumlah Harga

Membuat 1 m² pintu polywood rangkap, rangka ekspose kayu kelas I atau II Jumlah Harga

Jumlah Harga

Jumlah Harga

Membuat 1 m² teakwood rangkap lapis fornika, rangka expose kayu kelas II Jumlah Harga

Membuat 1 m³ konstruksi kuda-kuda konversional, kayu kelas I, II dan III bentang 6 meter Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Memasang 1 m² rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Memasang 1 m² langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Memasang 1 m² langit-langit akustik ukuran (60 x 120) cm + rangka alluminium Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Memasang 1 m² lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Memasang 1 m² lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

1 m² Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

1 m² Pengecatan kayu 1 plamur, 1 cat dasar dan 2 cat penutup dengan cat minyak Jumlah Harga

1 m² Pengecatan tembok 1 plamur, 1 cat dasar dan 2 cat penutup (Cat Air) Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

Jumlah Harga

JADWAL KEMAJUAN PEKERJAAN

PEKERJAAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA MESJID JAMIK BUKIT BARO LOKASI : KECAMATAN MONTASIK KABUPATEN ACEH BESAR

NO URAIAN PEKERJAAN VOLUME SAT JUMLAH TOTAL BOBOT

BULAN - I BULAN - II BULAN - III PEKERJAAN

(%) 1 2 3 4 1 2 3 4 1A. PEKERJAAN TEMPAT WUDHUK I. PEKERJAAN PERSIAPAN 1 Pengukuran dan Pemasangan Bouwplank 51.00 M' 107,636.98 5,489,485.98 0.572 0.572

2 Pembersihan Akhir 1.00 unit 1,500,000.00 1,500,000.00 0.156

II. PEKERJAAN TANAH 1 Galian Tanah Pondasi 34.80 m3 54,796.50 1,906,918.20 0.199 0.099 0.099

2 Timbunan Tanah Bawah Lantai 55.52 m3 87,918.60 4,881,130.77 0.508

3 Urungan Kembali Bekas Galian 8.70 m3 18,265.50 158,909.85 0.017 0.017

4 Urungan Pasir Bawah Lantai Dan Pondasi 25.83 m3 135,438.60 3,497,769.56 0.364 0.091 0.091

III. PEKERJAAN PASANGAN/BETON 1 Pas. Batu Gunung 30.45 m3 789,916.60 24,052,960.47 2.506 0.835 0.835 0.835

2 Pas. Batu Kosong / Astamping 6.96 m3 350,313.28 2,438,180.44 0.254 0.254

3 Sloof Beton 20/25 cm 8.70 m3 4,712,704.12 41,000,525.88 4.271 1.424 1.424 1.424

4 Kolom 50/60 cm 2.45 m3 4,949,685.65 12,116,830.47 1.262 0.631 0.631

5 Kolom Praktis 13/13 121.00 m' 76,040.76 9,200,931.48 0.958 0.240

6 Plat Lantai T = 12 cm 25.29 m3 6,494,152.08 164,225,416.53 17.107

7 Balok Lantai 20/30 cm 4.28 m3 7,026,306.33 30,037,459.56 3.129

8 Balok Lantai 30/100 cm 30.39 m3 4,685,263.81 142,385,167.23 14.832

IV. PEKERJAAN PASANGAN & PLESTERAN 1 Pasangan Dinding Bata 1 : 2 255.60 m2 125,203.16 32,001,926.42 3.334 0.667 0.667 0.667

2 Pasangan Dinding Bata 1 : 4 84.88 m2 114,828.78 9,746,666.85 1.015 0.203 0.203

3 Plesteran Dinding 1 : 2 511.20 m2 55,804.32 28,527,168.38 2.972

4 Plesteran Dinding 1 : 4 169.76 m2 50,499.57 8,572,807.00 0.893

5 Plesteran Kolom 1 : 3 26.30 m2 52,634.95 1,384,299.05 0.144

6 Plesteran Balok dan Plat Lantai 1 : 3 200.00 m2 52,634.95 10,526,989.00 1.097

V. PEKERJAAN LANTAI DAN KERAMIK 1 Rabat Beton Lantai 18.84 m2 701,514.19 13,218,982.58 1.377

2 Lantai Keramik 25 x 25 anti slip 157.80 m2 207,089.08 32,677,621.38 3.404

3 Keramik Dinding 25 x 40 232.32 m2 262,312.60 60,940,463.23 6.348

VI. PEKERJAAN KOSEN, PINTU & JENDELA 1 Kosen Pintu dan Ventilasi Aluminium 67.20 m' 111,841.33 7,515,737.64 0.783

2 Daun Pintu Aluminium 33.60 m2 440,390.14 14,797,108.60 1.541

3 Daun Ventilasi Aluminium + Kaca 5.04 m2 334,152.85 1,684,130.37 0.175

4 Memasang Engsel Pintu 96.00 bh 27,326.38 2,623,332.10 0.273

VII. PEKERJAAN ELEKTRIKAL 1 Lampu Hemat Energi 11 Watt 24.00 bh 85,000.00 2,040,000.00 0.212

2 Lampu Hemat Energi 45 Watt 11.00 bh 125,000.00 1,375,000.00 0.143

3 Saklar Ganda 6.00 bh 55,000.00 55,000.00 0.006

4 Saklar Tunggal 24.00 bh 45,000.00 1,080,000.00 0.112

5 Stop Kontak + Istalasi 3.00 ttk 160,300.00 480,900.00 0.050

6 Pekerjaan Titik Api + Instalasi 41.00 ttk 160,300.00 6,572,300.00 0.685

VIII. PEKERJAAN SANITASI 1 Septictank, Peresapan, Bak Kontrol Dan Instalasi Air Koto 2.00 Unit 3,500,000.00 7,000,000.00 0.729

2 Memasang 1 M' Pipa Galvanis 1" 105.00 m' 74,905.75 7,865,104.17 0.819

3 Memasang 1 M' Pipa Galvanis 1/2" 91.00 m' 57,855.75 5,264,873.61 0.548

HARGA SATUAN

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

RENCANA

4 Memasang 1 M' Pipa PVC tipe AW Ø 3" 60.00 m' 65,546.89 3,932,813.28 0.410

5 Kloset jongkok Teraso 24.00 bh 687,865.20 16,508,764.80 1.720

6 Memasang 1 Buah Kran Ø ¾" Setara SAN-EI 106.00 bh 122,035.65 12,935,778.90 1.347

7 Floor Drain 44.00 bh 26,219.16 1,153,643.04 0.120

8 Pembuatan Saluran Pembuang 24.00 m' 120,000.00 2,880,000.00 0.300

9 Bak Kontrol 50/50 cm 2.00 bh 550,000.00 1,100,000.00 0.115

10 Plat Griel L 50 x 50 Penutup Saluran 19.00 m' 425,000.00 8,075,000.00 0.841

IX. PEKERJAAN PENGECATAN 1 Mengecat Dinding Tembok 396.06 m2 28,631.03 11,339,606.14 1.181

B. PEKERJAAN LANSCAPING I. PEKERJAAN TANAH 1 DIVISI 1. - MOBILISASI 1.00 Ls 8,150,000.00 8,150,000.00 0.849 0.424 0.424

2 DIVISI 2. PEKERJAAN TANAH 891.15 m3 23,509.00 20,950,045.35 2.182 0.727 0.727 0.727

3 Galian Pondasi Penahan Tanah 17.82 m3 54,796.50 976,473.63 0.102 0.051 0.051

4 Urungan Kembali Bekas Galian 4.46 m3 18,265.50 81,372.80 0.008

5 Urugan pasir dibawah paving block T. 10 cm 78.86 m3 135,438.60 10,680,891.15 1.113 0.278 0.278

II. PEKERJAAN PASANGAN DAN PAVING BLOCK 1 Pas. Batu Kosong / Astamping 3.24 m3 350,313.28 1,135,015.03 0.118 0.030 0.030 0.030

2 Pas. Batu Gunung Penahan Tanah 45.32 m3 789,916.60 35,795,070.73 3.729 0.932 0.932

3 Plesteran Campuran 1 : 4 83.58 m2 50,499.57 4,220,814.66 0.440

4 Pasangan paving block T. 8 cm 704.55 m2 158,765.20 111,858,021.66 11.652

5 Cor Beton jalan Masuk 10.74 m2 873,871.91 9,385,384.32 0.978

Jumlah Rp 960,000,792.33 100.00

Dibulatkan Rp 960,000,000.00

Rencana Progress Mingguan 0.671 0.099 2.332 1.654 3.037 1.491 3.175 2.741 2.349

Komulatif Rencana Progress Mingguan - 0.671 0.770 3.103 4.756 7.793 9.284 ### ### ###

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

RENCANA

JADWAL KEMAJUAN PEKERJAAN

BULAN - III BULAN - IV BULAN - VKETERANGAN

2 3 4 1 2 3 4 1 2 3 4

0.156

0.254 0.254

0.091 0.091

0.240 0.240 0.240

###

0.782 0.782 0.782 0.782

3.708 3.708 3.708 3.708

0.667 0.667

0.203 0.203 0.203

0.594 0.594 0.594 0.594 0.594

0.128 0.128 0.128 0.128 0.128 0.128 0.128

0.048 0.048 0.048

0.366 0.366 0.366

1.377

1.135 1.135 1.135

1.587 1.587 1.587 1.587

0.391 0.391

0.771 0.771

0.088 0.088

0.137 0.137

0.212

0.143

0.006

0.112

0.017 0.017 0.017

0.342 0.342

0.365 0.365

0.410 0.410

0.137 0.137 0.137 0.137

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

RENCANA

0.205 0.205

0.430 0.430 0.430 0.430

0.674 0.674

0.060 0.060

0.100 0.100 0.100

0.057 0.057

0.841

0.591 0.591

0.008

0.278 0.278

0.030

0.932 0.932

0.147 0.147 0.147

2.330 2.330 2.330 2.330 2.330

0.326 0.326 0.326

4.680 4.913 8.805 8.327 8.310 ### 6.488 5.031 4.405 6.074 1.742

### ### ### ### ### ### ### ### ### ### ###

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

RENCANA

27000