pertubuhan berita nasional malaysia (bernama) … file1 | p a g e isi kandungan bil. perkara muka...

48
0 | Page PERTUBUHAN BERITA NASIONAL MALAYSIA (BERNAMA) DOKUMEN SEBUTHARGA BAGI SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA NOMBOR SEBUT HARGA: BER/SH/02/2019 Tarikh buka sebutharga : 25 Febuari 2019 Taklimat sebutharga : 28 Febuari 2019 Tarikh tutup sebutharga : 07 Mac 2019

Upload: ngohanh

Post on 13-Jun-2019

250 views

Category:

Documents


0 download

TRANSCRIPT

0 | P a g e

PERTUBUHAN BERITA NASIONAL MALAYSIA (BERNAMA)

DOKUMEN SEBUTHARGA

BAGI SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA

NOMBOR SEBUT HARGA:

BER/SH/02/2019

Tarikh buka sebutharga : 25 Febuari 2019 Taklimat sebutharga : 28 Febuari 2019 Tarikh tutup sebutharga : 07 Mac 2019

1 | P a g e

ISI KANDUNGAN

Bil. Perkara Muka Surat

1. LAMPIRAN A SENARAI SEMAK DOKUMEN

2-3

2. LAMPIRAN B ARAHAN DAN SYARAT AM KEPADA PENYEBUTHARGA

4-10

3. LAMPIRAN C

C1 – LAMPIRAN Q C2 – BORANG TAWARAN HARGA C3 – JADUAL PEMATUHAN HARGA C4 – BORANG MAKLUMAT LATAR BELAKANG PENYEBUTHARGA C5 – SURAT AKUAN PEMBIDA C6 – SURAT PERWAKILAN KUASA C7 – DOKUMEN KEWANGAN

12

13

14-28

29-32

33

34

35

4. LAMPIRAN D

D1 – JADUAL PEMATUHAN SPESIFIKASI D2 – SENARAI KERJA SEMASA

D3 - PENGALAMAN-PENGALAMAN

PENYEBUTHARGA (3 TAHUN KEBELAKANG)

37-45

46

47

2 | P a g e

LAMPIRAN A SENARAI SEMAK

Sila tandakan bagi dokumen yang disertakan

Bil Perkara /Dokumen Lampiran Untuk ditanda oleh

Syarikat

Untuk ditanda oleh

Jawatankuasa Pembuka

Sebut Harga

CADANGAN TAWARAN KEWANGAN

1. Borang Tawaran Sebut Harga lampiran Q diisi dengan lengkap

Lampiran C-1

2. Borang Tawaran Harga Lampiran C-2

3. Jadual Pematuhan harga Lampiran C-3

4. Borang Maklumat Latar Belakang Penyebutharga

Lampiran C-4

5. Surat Akuan Pembida Lampiran C-5

6. Surat Perwakilan Kuasa Lampiran C-6

7. Salinan Sijil Akuan Pendaftaran Daripada

Kementerian Kewangan dalam kod

bidang(Wajib)

Lampiran C-7

8. Penyata Bank terkini ( bagi 3 bulan terkini )(Wajib)

9. Sijil CIDB (Jika Ada)

10. Sijil Pendaftaran dengan Jabatan Kastam Diraja Malaysia (Jika Ada)

11. Perakuan Kemudahan Kredit dari Institusi Kewangan ( Jika ada )

12. Borang Kehadiran Taklimat (Wajib)

13. Profil Syarikat

CADANGAN TAWARAN TEKNIKAL

3 | P a g e

14. Jadual pematuhan Spesifikasi

Lampiran D-1

15. Rekod kerja semasa Lampiran D-2

16. Pengalaman-Pengalaman Penyebutharga (3

Tahun Kebelakang)

Lampiran D-3

PENGESAHAN OLEH PENYEBUT HARGA Dengan ini saya mengesahkan bahawa saya telah membaca dan memahami semua syarat – syarat dan terma yang dinyatakan di dalam dokumen sebut harga . Semua maklumat yang dikemukakan adalah benar . Tandatangan : Nama: Jawatan: Tarikh:

UNTUK KEGUNAAN JABATAN Jawatankuasa Pembuka Sebut Harga mengesahkan penerimaan dokumen bertanda kecuali bagi perkara bil…………… (jika ada ) Pegawai Pembuka 1 : Tandatangan: Nama: Jawatan: Tarikh: Pegawai Pembuka 2 : Tandatangan : Nama: Jawatan: Tarikh:

4 | P a g e

DOKUMEN TAWARAN KEWANGAN

1. Dokumen tawaran kewangan wajib di asingkan dengan dokumen tawaran teknikal. 2. Dokumen tawaran harga adalah seperti berikut:-

a) Senarai semak b) Lampiran B : Arahan dan syarat am kepada penyebutharga c) Lampiran C-1 : Lampiran Q Arahan Perbendaharaan 170 d) Lampiran C-2 : Borang Tawaran Harga e) Lampiran C-3 : Jadual Pematuhan Harga f) Lampiran C-4 : Borang Maklumat Latar Belakang Penyebutharga g) Lampiran C-5 : Surat Akuan Pembida h) Lampiran C-6 : Surat Perwakilan Kuasa i) Lampiran C-7 : Dokumen Wajib Kewangan

3. Pastikan dokumen tawaran kewangan di susun dengan kemas dan di failkan. 4. Pastikan fail dokumen tawaran kewangan dipamerkan seperti berikut

DOKUMEN TAWARAN KEWANGAN

(BER/SH/02/2019)

SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI

BERNAMA

5 | P a g e

LAMPIRAN B ARAHAN DAN SYARAT AM KEPADA PENYEBUTHARGA

1. PELAWAAN PENYEBUT HARGA 1.1 Pelawaan ini adalah Penyebut Harga terbuka kepada syarikat-syarikat tempatan yang

BERDAFTAR dengan Kementerian Kewangan Malaysia dan MESTI mempunyai kod bidang seperti berikut: 220301

PENYELENGGARAAN/PEMBAIKAN ALAT HAWA DINGIN

TAJUK SEBUTHARGA : SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA ( BER/SH/02/2019)

1.2 Penyebut harga adalah diwajibkan mematuhi sepenuhnya arahan dan syarat-syarat Am sebut

harga apabila menyertai sebut harga ini. Kegagalan mematuhi mana-mana syarat dibawah ini membolehkan sebut harga yang dikemukakan ditolak.

1.3 Jika ada lantikan rakan kerja penyebut harga ia perlu dibuat dan dinyatakan dalam cadangan Penyebut Harga yang dikemukakan. Maklumat berkaitan Rakan Kerja Penyebut Harga perlu disertakan di dalam cadangan Penyebut Harga.

1.4 Penyebut harga hendaklah mempunyai kedudukan kewangan yang kukuh. 1.5 Penyebut harga mesti mematuhi syarat-syarat sebutharga dan kegagalan mengemukakan

maklumat yang diperlukan boleh menyebabkan tawaran tidak dipertimbangkan.

2. PENYERAHAN TAWARAN SEBUTHARGA

2.1 Tawaran tersebut hendaklah dikemukakan secara manual ke dalam peti Sebutharga berserta dokumen-dokumen sokongan pada atau sebelum jam 12.00 tengah hari, 07 Mac 2019 di alamat seperti berikut:

Unit Perolehan

Jabatan Kewangan dan Akaun Tingkat 6, Wisma BERNAMA 28, Jalan BERNAMA, Off Jalan Tun Razak 50400 Kuala Lumpur

2.2 Semua dokumen perlu dikemukakan secara manual mengikut bilangan salinan yang

dikehendaki. Tawaran kewangan dan tawaran teknikal termasuk dokumen sokongan berkaitan hendaklah masing-masing disediakan dalam sampul dan berlakri. Penyebutharga perlulah mengasingkan sampul dokumen tawaran kewangan dan tawaran teknikal. Sampul tersebut kemudiannya hendaklah dimasukkan ke dalam satu (1) sampul surat berlakri serta dimasukkan ke dalam peti tawaran Sebutharga sebelum tarikh dan masa

6 | P a g e

Sebutharga ditutup. 2.3 BERNAMA tidak akan bertanggungjawab di atas kehilangan dokumen tawaran Sebutharga

akibat kecuaian dalam penyerahan sebutharga. 2.4 Dokumen tawaran sebutharga yang dihantar lewat selepas tarikh dan waktu tutup tidak layak

dipertimbangkan.

3. PINDAAN DOKUMEN SEBUTHARGA

3.1 BERNAMA berhak pada bila-bila masa sebelum tarikh tutup sebutharga untuk meminda dokumen sebutharga dengan menyediakan Addendum atas sebab-sebab tertentu.

4. PENJELASAN MENGENAI DOKUMEN SEBUTHARGA

4.1 Penyebut harga yang memerlukan sebarang penjelasan lanjut mengenai dokumen

sebutharga bolehlah berhubung secara bertulis melalui surat rasmi yang difaks/pos atau

melalui e-mel kepada alamat berikut:

a) Hal berkaitan dengan dokumen sebutharga dan perolehan

Nama : Nurulhaniiah binti Mohamed Ahya

Telefon : 03-20594685

Emel : [email protected]

b) Hal berkaitan dengan spesifikasi teknikal

Nama : Nur Farrah Hanna binti Ibrahim

Telefon : 03-20594691

Emel : [email protected]

4.2 Sebarang pertanyaan berkaitan dokumen Sebutharga yang dikemukakan oleh

Penyebut Harga mestilah diterima oleh Urus Setia Sebutharga selewat lewatnya

pada 07 Mac 2019

4.3 Surat-menyurat selepas tarikh tutup penyerahan Sebutharga tidak akan dilayan. Maklumat

yang diperoleh secara tidak rasmi iaitu tanpa permohonan bertulis kepada BERNAMA tidak

boleh dijadikan sebagai bahan sokongan bagi tawaran yang dikemukakan.

4.4 Dokumen sebut harga yang lengkap boleh diperoleh daripada Urusetia Sebutharga atau layari

bernama.com mulai 28 Febuari 2019 tarikh pembukaan sebutharga.

4.5 Hanya penyebutharga yang menyertai taklimat sebutharga pada 28 Febuari 2019 sahaja

dibenarkan menyertai sebutharga BERNAMA. Peyebutharga yang tidak menghadiri taklimat

sebutharga tidak layak menyertai sebuthargar BER/SH/02/2019.

7 | P a g e

5. PERBELANJAAN PENYEDIAAN SEBUT HARGA 5.1 Semua perbelanjaan bagi penyediaan sebut harga ini hendaklah ditanggung oleh

Penyebutharga sendiri.

6. TARIKH TUTUP 6.1 Tarikh tutup mengemukakan tawaran bagi sebut harga ini ialah pada 07 Mac 2019 jam

12.00 tengah hari.

6.2 Lampiran dokumen Sebut Harga yang telah lengkap diisi hendaklah dimasukkan ke dalam

sampul surat yang dilakri dan dilabelkan dengan No. Sebut Harga dan Tajuk Sebut

Harga.

6.3 Dokumen sebut harga hendaklah dimasukkan ke dalam sampul surat yang dilabelkan seperti

berikut:

i) Sampul A - Cadangan Kewangan

ii) Sampul B - Cadangan Teknikal

6.4 Sampul tersebut hendahklah dimasukkan ke dalam sampul surat yang lebih besar, berlakri

dan di sebelah kiri (atas) dituliskan seperti berikut:

(BER/SH/02/2019)

SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM

PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA

6.5 Dokumen tersebut hendaklah dihantar ke alamat berikut :

Unit Perolehan Jabatan Kewangan dan Akaun Tingkat 6, Wisma BERNAMA 28, Jalan 1/65A, Off Jalan Tun Razak 50400 Kuala Lumpur

6.6 Penyebutharga bertanggungjawab memastikan penghantaran berjaya dan kegagalan

berbuat demikian adalah bukan tanggungjawab Kerajaan. Penyebut harga dilarang membuat

pindaan ke atas dokumen yang telah diberikan. PENYEBUT HARGA YANG TIDAK

MENGGUNAKAN DOKUMEN DAN FORMAT YANG TELAH DISEDIAKAN TIDAK AKAN

DIPERTIMBANGKAN.

8 | P a g e

7.0 DOKUMEN YANG WAJIB DIKEMUKAKAN 7.1 Penyebutharga adalah dikehendaki mengisi dengan dakwat segala

Maklumat dengan lengkap:-

a) Harga, Tarikh Penyerahan/ Penyempurnaan dan tandatangan beserta cop

Syarikat pada lampiran Q;

b) Penyebut harga hendaklah menulis/menaip harga pada setiap ruang yang

ditetapkan didalam Jadual Harga;

c) Penyebut harga hendaklah melengkapkan Surat Akuan Pembida serta

menandatangani;

d) Penyebut harga yang berdaftar dengan Kementerian Kewangan di bawah

kesemua kod bidang yang telah dinyatakan dalam iklan sebutharga

BER/SH/02/2019. Penyebut harga hendaklah memastikan tempoh

pendaftarannya dengan Kementerian Kewangan Malaysia masih sah dalam

tempoh pengiklanan.

7.2 Penyebut harga WAJIB menyerahkan Dokumen Cadangan Tawaran Sebutharga seperti di JADUAL 1:

7.3 Penyebut harga WAJIB menyerahkan Dokumen Cadangan Teknikal seperti di JADUAL 2

JADUAL 1

Lampiran C-1 Lampiran Q Arahan Perbendaharaan 170

Lampiran C-2 Borang Tawaran Harga

Lampiran C-3 Jadual Harga

Lampiran C-4 Borang Maklumat Latar Belakang Penyebutharga

Lampiran C-5 Surat Akuan Pembida

Lampiran C-6 Surat Perwakilan Kuasa

Lampiran C-7

• Sijil Pendaftaran dengan Kementerian Kewangan Malaysia

(Wajib);

• Sijil Akuan Pendaftaran Bumiputera (Jika Ada);

• Sijil CIDB (jika ada) • Borang kehadiran taklimat (Wajib)

• Penyata bank Tiga bulan yang terkini (Wajib); dan

• Profil Syarikat (Wajib)

9 | P a g e

JADUAL 2

Lampiran D-1 Jadual pematuhan spesifikasi

Lampiran D-2 Senarai Kerja Semasa

Lampiran D-3 Pengalaman-Pengalaman Penyebutharga (3 Tahun Kebelakang)

7.2 Jika berlaku kesilapan dalam mengisi maklumat-maklumat di atas penyebutharga

hendaklah menandatangani ringkas semua pembetulan. 7.3 Penyebut harga tidak boleh memasukkan apa-apa perbelanjaan berkaitan dengan

penyediaan sebut harga ini dalam sebut harga yang ditawarkan.

8.0 TAWARAN PILIHAN

8.1 Setiap Penyebut harga tidak dibenarkan membuat tawaran pilihan (alternative offer) bagi

mana-mana butiran yang dimasuki. Jika terdapat tawaran pilihan, BERNAMA akan menolak

kesemua tawaran yang dikemukakan.

9.0 TEMPOH SAH SEBUT HARGA

9.1 Sebut harga ini sah selama 90 hari dari tarikh tutup sebut harga. Penyebut harga tidak

boleh menarik balik Sebut harga sebelum tamat tempoh sah sebut harga. Pengesyoran

tindakan tatatertib akan diambil sekiranya penyebutharga menarik balik sebut harganya

sebelum tamat tempoh sah sebut harga.

10.0 PEMBAYARAN

10.1 Sebagai balasan kepada penyempurnaan tugas atau tanggungjawab tuan di bawah kontrak

ini, pembayaran secara berperingkat dibuat oleh BERNAMA apabila penghantaran semua

bekalan dan perkhidmatan berkenaan disempurnakan dan disahkan oleh Jabatan

Pentadbiran dan Harta.

11.0 KEGAGALAN PENYEBUT HARGA MENYEMPURNAKAN TUGAS

11.1 Sekiranya penyebut harga gagal menyempurnakan pembekalan dalam tempoh yang telah

ditetapkan di bawah kontrak ini tanpa sebab-sebab yang munasabah, BERNAMA melalui satu

Notis Bertulis berhak untuk mengenakan suatu ganti rugi kelewatan yang dikenali sebagai

“Liquidated Ascertained Damages / LAD” [selepas ini disebut “Notis LAD”] yang dikira

berdasarkan kadar “Base Lending Rate” (BLR) terkini dengan formula pengiraannya seperti

berikut:

Bilangan Hari Lewat X BLR Terkini (1%) X Nilai Kontrak = LAD 365

10 | P a g e

12.0 PENOLAKAN BARANG OLEH PEGAWAI PENGUASA/ WAKIL

12.1 Pegawai Penguasa atau wakilnya berhak menolak bahan, barang, perkhidmatan dan kerja-

kerja yang tidak menepati spesifikasi dan hendaklah diganti dan sebarang kos tambahan

yang terlibat hendaklah ditanggung oleh penyebut harga sendiri.

13.0 PEMATUHAN KEPADA UNDANG-UNDANG OLEH PENYEBUT HARGA

13.1 Penyebut harga hendaklah mematuhi segala kehendak Undang-undang Kecil dan Undang-

undang Berkanun dalam Malaysia semasa perlaksanaan kerja. Penyebut harga tidak berhak

menuntut sebarang kos dan bayaran tambahan kerana pematuhannya dengan syarat-syarat

ini.

15.0 TEMPOH KONTRAK 15.1 Tempoh kontrak bagi Sebut Harga Perkhidmatan Kerja-Kerja Penyelenggaraan Sistem

Penghawa Dingin Serta Peralatan Yang Berkaitan Di BERNAMA adalah satu tahun selepas penyerahan surat setuju terima daripada BERNAMA.

11 | P a g e

PERINGATAN PENTING

Adalah diingatkan bahawa semua pihak yang terlibat dalam proses perolehan ini adalah tertakluk kepada Akta Pencegahan Rasuah 1997 , yang manan berkenaan seperti berikut : i. Sebarang perbuatan atau percubaan rasuah untuk menawar atau memberi, meminta atau

menerima apa-apa suapan secara rasuah kepada dan daripada mana-mana orang berkaitan perolehan ini merupakan suatu kesalahan jenayah di bawah Akta Pencegahan Rasuah 1997.

ii. Sekiranyan mana-mana pihak ada menawar atau memberi apa-apa suapan kepada mana-

mana anggota pentadbiran awam , maka pihak yang ditawar atau diberi suapan dikehendaki membuat aduan dengan segera ke pejabat Badan Pencegahan Rasuah atau balai polis yang berhampiran. Kegagalan berbuat demikian adalah merupakan suatu kesalahan di bawah Akta Pencegahan Rasuah 1997.

iii. Tanpa prejudis kepada tindakan-tindakan lain, tindakan tatatertib terhadap anggota

perkhidmatan awam dan menyenaraihitam kontraktor atau pembekal boleh diambil sekiranya pihak-pihak yang terlibat dengan kesalahan rasuah di bawah Akta Pencegahan Rasuah 1997.

iv. Mana-mana kontraktor atau pembekal yang membuat tuntutan bayaran berkaitan perolehan

ini walaupun tiada kerja dibuat atau tiada barangan dibekal mengikut spesifikasi ditetapkan atau tiada perkhidmatan diberi mana-mana anggota perkhidmatan awam yang mengesahkan tuntutan berkenaan adalah melakukan kesalahan dibawah Akta Pencegahan Rasuah 1997.

12 | P a g e

LAMPIRAN C-1 LAMPIRAN Q

(ARAHAN PERBENDAHARAAN 170) Bila menjawab, sila nyatakan nombor ini

KERAJAAN MALAYSIA NEGERI WILAYAH PERSEKUTUAN KUALA LUMPUR

SEBUT HARGA UNTUK BEKALAN/PERKHIDMATAN

Dokumen ini hendaklah disifatkan menjadi dan dibaca dan ditaksirkan sebagai sebahagian daripada Perjanjian Sebut Harga.

Kepada (Nama Syarikat) :

Alamat :

No. Tel:

Email :

No. Pendaftaran dengan Kementerian

Kewangan :

Kod bidang pendaftaran yang relevan

dengan pembelian ini :

Pelawaan Sebutharga dikeluarkan oleh PERTUBUHAN BERITA NASIONAL MALAYSIA ( BERNAMA ) Jabatan Kewangan & Akaun Tingkat 6, Wisma BERNAMA No 28 Jalan 1/65A , Off jalan Tun Razak 50400 Kuala Lumpur No Tel : 03-20594685 Tarikh : 28 Febuari 2019

1. Sila beri sebut harga untuk bekalan/perkhidmatan yang disenaraikan di bawah tertakluk kepada syarat-syarat yang ditetapkan:

1.1. Tempoh kontrak dikehendaki 1 tahun 1.2. Sebut harga hendaklah dimasukkan ke dalam suatu sampul berlakri dan bertanda nombor sebut harga BER/SH/02/2019. 1.5. Sebut harga hendaklah dimasukkan ke dalam peti tawaran yang berkenaan di alamat di atas tidak lewat pada jam 12.00 tengah hari

pada 7 Mac 2019 1.6. Tempoh sah laku sebut harga hendaklah 90 hari selepas tarikh tutup.

No. Sebut Harga BER/SH/02/2019

13 | P a g e

LAMPIRAN C-2 BORANG TAWARAN HARGA

Bil Perihal bekalan/perkhidmatan dan Syarat-syarat Khas

Item Anuual

premium

Harga (RM)

Untuk diisi oleh BERNAMA

Untuk diisi oleh Penyebut Harga

SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA BER/SH/02/2019 *Pastikan Harga yang ditawarkan seperti dilampiran C-3

JUMLAH HARGA

RINGGIT MALAYSIA (Di Dalam Perkataan):

(i) Harga yang ditawarkan adalah harga bersih dan (ii)Tempoh kontrak ialah ……………………………………… (sila nyatakan) Saya/Kami dengan ini menawarkan untuk membekalkan barang-barang/perkhidmatan di atas dengan harga dan syarat-syarat yang ditunjukkan di atas dengan tertakluk kepada syarat-syarat di atas dan di belakang ini. Tarikh : Tandatangan :

Nama Kontraktor : Cop Syarikat :

14 | P a g e

LAMPIRAN C-3

JADUAL PEMATUHAN HARGA

SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA

BER/SH/02/2019

BIL. DESCRIPTION RM

1. APPENDIX A BERNAMA Centerlize Air-Conditioning System & Cooling Tower Service Sub Total A & B *APPENDIX A

2. APPENDIX B Split Unit/FCU &VRF Servicing Price

TOTAL

15 | P a g e

APPENDIX A

BERNAMA Centerlize Air-Conditioning System & Cooling Tower Service

Sub Total A & B

16 | P a g e

Appendix A

BERNAMA CENTRALIZE AIR-CONDITIONING SYSTEM & COOLING TOWER SERVICE

Item Reference Service Area Brand Model/Btu/H QTY Unit rate/mth

(RM)

A Schedule of servicing equipment AHU & WCPU

1 AHU GF - 1 Ground Floor York YDM 50 x 60 (420,000) 1

2 AHU 1 - 1 Level 1 York YDM 30 x 60 (270,000) 1

3 AHU 1 - 2 Level 1 York YDM 50 x 60 (430,000) 1

4 AHU 2 - 1 Level 2 York EWM 250 (300,000) 1

5 WCPU 3 - 1 Level 3 York EWM 400 (365,000) 1

6 WCPU 4 - 1 Level 4 York EWM 400 (365,000) 1

7 WCPU 5 - 1 Level 5 York EWM 400 (365,000) 1

8 WCPU 6 - 1 Level 6 York EWM 400 (365,000) 1

9 WCPU 7 - 1 Level 7 York EWM 400 (365,000) 1

10 WCPU 8 - 1 Level 8 York EWM 400 (365,000) 1

11 WCPU 9 - 1 Level 9 York EWM 400 (365,000) 1

12 WCPU 10 - 1 Level 10 York EWM 400 (365,000) 1

13 WCPU 11 - 1 Level 11 York EWM 400 (365,000) 1

14 WCPU 12 - 1 Level 12 York EWM 400 (365,000) 1

15 WCPU 13 - 1 Level 13 York EWM 400 (365,000) 1

16 WCPU 14 - 1 Level 14 York EWM 250 (200,000) 1

17 WCPU 14 - 2 Level 14 York EWM 250 (200,000) 1

18 WCPU 15 - 1 Level 15 York EWM 250 (240,000) 1

19 WCPU 15 - 2 Level 15 York EWM 250 (240,000) 1

Sub-Total A

B Schedule of servicing equipment Chilled, Pump & Cooling Tower

1 Chiller WP Ground Floor Ebsray EHS 80 - 370

(15Hp) 2

17 | P a g e

2 CDWP Ground Floor Ebsray EHS 80 - 270

(15Hp) 2

3 Chiller Basement York 125 RT 2

4 Condenser WP Roof Top Ebsray EHS 100 - 310 (

25Hp) 3

5 Cooling Tower Ground Floor JCI CTA 300 UK 2

6 CT Fan Motor Ground Floor 4.0 KW 2

7 Cooling Tower Roof Top JCI CTA 300 UK 2

8 CT Fan Motor Roof Top 4.0 KW 2

Sub-Total B

TOTAL (A + B) per month (RM)

Discount (RM)

TOTAL after discount per month (RM)

TOTAL per annum (RM)

18 | P a g e

APPENDIX B

Split Unit/FCU &VRF Servicing Price

19 | P a g e

Split Unit / FCU & VRF Servicing price

SPLIT UNIT AC EQUIPMENT LIST

Item Reference Location Location Brand Qty Amount

(RM)

1 DRIVER ROOM (1)

BASEMENT

WALL MOUNTED 1.5HP 1

2 DRIVER ROOM (2) WALL MOUNTED 1.5HP 1

3 CLUB ROOM (KKB) WALL MOUNTED 2.0HP 1

4 BENITA ROOM WALL MOUNTED 2.0HP 1

5 SECURITY REST ROOM MALE WALL MOUNTED 1.0HP 1

6 SECURITY REST ROOM FEMALE WALL MOUNTED 1.0HP 1

7 UNION ROOM WALL MOUNTED 1.5HP 1

8 UNION ROOM WALL MOUNTED 1.5HP 1

9 CLEANER REST ROOM WALL MOUNTED 2.0HP 1

10 FIRE/PA AND SECURITY CONTROL ROOM 1

GROUND FLOOR

WALL MOUNTED 1.5HP 1

11 FIRE/PA AND SECURITY CONTROL ROOM 2 WALL MOUNTED 1.5HP 1

12 GUARD HOUSE 1 WALL MOUNTED 1.5HP 1

13 GUARD HOUSE 2 WALL MOUNTED 1.5HP 1

14 ATM (MAYBANK) CASSETTE 1.0HP 1

15 PABX ROOM 1 WALL MOUNTED 2.5HP 1

16 PABX ROOM 2 WALL MOUNTED 2.5HP 1

17 MDF ROOM 1 WALL MOUNTED 1.5HP 1

18 MDF ROOM 2 WALL MOUNTED 1.5HP 1

19 LV SUBSTATION 1 FAN COIL 5.0HP 1

20 LV SUBSTATION 2 FAN COIL 5.0HP 1

21 LV SUBSTATION 3 FAN COIL 10.0HP 1

22 LV SUBSTATION 4 FAN COIL 10.0HP 1

23 STUDIO 1 (1) FAN COIL UNIT 3.0HP 1

24 STUDIO 1 (2) FAN COIL UNIT 3.0HP 1

26 PCR CONTROL ROOM 1 CEILING TYPE 2.5HP 1

20 | P a g e

27 PCR CONTROL ROOM 2 WALL MOUNTED 2.5HP 1

28 CER ROOM 1 CEILING TYPE 2.0HP 1

29 CER ROOM 2 WALL MOUNTED 1.5HP 1

30 AV STORE 1 WALL MOUNTED 1.5HP 1

31 AV STORE 2 WALL MOUNTED 1.5HP 1

32 CAMERA STORE WALL MOUNTED 1.5HP 1

33 AV IT ROOM CASSETTE 1.5HP 1

34 SERVER ROOM 1 WALL MOUNTED 1.5HP 1

35 SERVER ROOM 2 WALL MOUNTED 1.5HP 1

36 NEW STUDIO 2 1 FAN COIL 6.0HP 1

37 NEW STUDIO 2 2 FAN COIL 8.0HP 1

38 PCR CONTROL ROOM 1 WALL MOUNTED 2.0HP 1

39 PCR CONTROL ROOM 2 WALL MOUNTED 1.0HP 1

40 PCR SERVER ROOM 1 WALL MOUNTED 1.0HP 1

41 PCR SERVER ROOM 2 WALL MOUNTED 1.0HP 1

42 CANTEEN SHOP 2ND FLOOR WALL MOUNTED 1.0HP 1

45 INJEST ROOM VRF FCU 3-05 (15,000 BTU)

3RD FLOOR

WALL MOUNTED 1

46 CONTI ROOM VRF FCU 3-06 (15,000 BTU) WALL MOUNTED 1

47 GRAPHIC ROOM VRF FCU 3-07 (18,000 BTU) CASSETE TYPE 1

50 MCR ROOM VRF FCU 3-14 & 3-15 (25,000 BTU) CASSETTE TYPE 2

51 AUDIO ROOM VRF FCU 3-12 & 3-13 (15,000 BTU) CASSETTE TYPE 2

52 CONTROL ROOM VRF FCU 3-10 & 3-11(25,000 BTU) CASSETTE TYPE 2

54 EDITOR DESK VRF FCU 3-08 (50,000 BTU) CASSETTE TYPE 1

55 EDITOR DESK VRF FCU 3-09 (40,000 BTU) CASSETTE TYPE 1

56 STUDIO VRF FCU DUTY (80,000 BTU) FAN COIL UNIT 10.0HP 1

57 STUDIO VRF FCU STANDBY (80,000 BTU) FAN COIL UNIT 10.0HP 1

58 TMK 4TH FLOOR CASSETTE 3.0HP 1

59 MREM 5TH FLOOR FAN COIL 2.5HP 1

60 AKAUN (PENGURUS KANAN AKAUN) 6TH FLOOR WALL MOUNTED 2.0HP 1

61 StUDIO CONTROL ROOM 9 TH FLOOR CASSETTE TYPE 2.0HP 2

62

MEETING ROOM ( REPLACE BY PCR SERVER ROOM

) 14TH FLOOR

CASSETTE 5.0HP 1

21 | P a g e

63 GM ROOM CASSETTE 2.0HP 1

64 OFFICE AREA 1

15TH FLOOR

WALL MOUNTED 2.0HP 1

65 OFFICE AREA 2 WALL MOUNTED 2.0HP 1

66 KONTI 1 - 1 WALL MOUNTED 1.0HP 1

67 KONTI 2 - 2 WALL MOUNTED 1.0HP 1

68 KONTI 1 & 2 FAN COIL 5.0HP 1

69 SERVER ROOM 1 WALL MOUNTED 1.5HP 1

70 SERVER ROOM 2 WALL MOUNTED 1.5HP 1

71 COMPUTER STORE WALL MOUNTED 2.0HP 1

72 NNN CASSETE 2.5HP 1

70

22 | P a g e

APPENDIX C

PROPOSAL SCHEDULE OF RATE FOR THE SPARE PART FOR THE SYSTEM

23 | P a g e

WATER COOLED PACKAGE UNIT

ITEM PRICE PER UNIT (RM)

Coil Chemical Cleaning

Primary Filter Cleaning ( per WCPU )

Replace Compressor 10 Hp

Replace Compressor 15 Hp

Replace Compressor 20 Hp

Replace Compressor 30 Hp

Top-Up Gas Compressor 10 Hp

Top-Up Gas Compressor 15 Hp

Top-Up Gas Compressor 20 Hp

Top-Up Gas Compressor 30 Hp

Filter Drier

Sight Glass

Thermometer

Pressure Gauge

Automatic Balancing Valve 80mm

Y-Strainer 80mm

Butterfly Valve 80mm ( Exclude for 3-Way type Valve)

Fan Belting

2’ X 2’ 4 Way Diffuser c/w Flexible ( only 10 feet length )

2’ X 2’ Return Grille

AIR HANDLING UNIT ( AHU )

ITEM PRICE PER UNIT (RM)

Coil Chemical Cleaning

Primary Filter Cleaning ( per AHU )

Thermometer

Pressure Gauge

Automatic Balancing Valve 65mm

Y-Strainer 65mm

Butterfly Valve 65mm

3 Way Modulating Valve 50mm

Fan Belting

2’ X 2’ 4 Way Diffuser c/w Flexible ( only 10 feet length )

2’ X 2’ Return Grille

24 | P a g e

WATER PUMP

ITEM PRICE PER UNIT (RM)

Butterfly Valve 125mm ( Exclude for 3-Way type Valve )

Glode Valve 125mm

Y-Strainer

Oil Filled Pressure Gauge

Butterfly Valve 200mm ( Exclude for 3-Way type Valve )

Automatic Air Vent c/w Ball Valve

Flow Switch

Pump Motor 15KW ( for 4 Pole/ Foot Mounted Type )

Pump Motor 18.5 KW ( for 4 Pole/ Foot Mounted Type )

COOLING TOWER

ITEM PRICE PER UNIT (RM)

Fin 150 HRT ( Per Cell )

Fin 300 HRT ( Per Cell )

Laminate Basin

Fan Belting

CONTROL PANEL

ITEM PRICE PER UNIT (RM)

Soft Starter 4 KW

Soft Starter 5.5 KW

Soft Starter 11 KW

Soft Starter 15 KW

Soft Starter 22 KW

Soft Starter 90 KW

Contactor ( Less than 40 Amp )

Relay

Electrical Fuse

Push Button

Indicator Light

Selector Switch

Note: _____________________________________________________________________________________________________________________________________________

25 | P a g e

APPENDIX D

SCHEDULE OF RATES FOR AIR-CONDITIONING SYSTEM MAINTENANCE

26 | P a g e

SCHEDULE OF RATES FOR AIR-CONDITIONING SYSTEM MAINTENANCE

AIRCON TYPE

Item Description 1 Hp 1.5 Hp 2.0 Hp 2.5 Hp 3.0 Hp 4 Hp 5 Hp 6 Hp 8 hp 10 hp

A New Air Cond

Supply new Split Unit AC ( Wall Type

)

Supply new Split Unit AC ( Cassette

Type

To supply labour & tools to dismantle

existing Split unit Indoor AC

To supply labour & tools to dismantle

existing Split unit Out door AC

Total

B Replacement of Compressor

3 To supply labour & tools to dismantle

existing compressor using

scaffolding

4 Supply & install new compressor

5 Supply & replace 1/2" filter drier ( if

available )

6 To leak test, vacuum & top up R-22

refrigerant gas

7 Testing & commissioning

Total

C Chemical Clean Split Unit

Condenser only

1 To clean and flush the condenser

coil with chemical using circuit

pump

2 To leak test and top up R-22

refrigerant gas

3 Testing & commissioning

Total

27 | P a g e

D Chemical Clean Split Unit

Evaporator Coil only

1 To clean the evaporator coil with

chemical using pressure pump c/w

erecting scaffolding

2 To leak test and top up R-22

refrigerant gas

3 Testing & commissioning

Total

E Chemical Clean Water Cooled

Condenser and Evaporator Coil

1 To clean and flush the condenser

coil with chemical using circuit

pump

2 To clean the evaporator coil with

chemical using pressure pump c/w

erecting scaffolding

3 To leak test and top up R-22

refrigerant gas

4 Testing & commissioning

Total

F Top up gas only

1 To top up R-22 refrigerant gas

Total

G Termination Wire

H To supply and install Capasitor

I Capillary Tube

J To supply and insall Fan Motor Blade

K

To supply and install Indoor Fan

blower

L To supply and install Fan Motor

28 | P a g e

M To supply and install Drier

N To supply and install Bearing

O To supply and install Thermostat

P To supply and install Water Pump

Q To supply and install Coil Sensor

R To supply and install Flare Nut

S To supply and install Belting

T To carry out presure test ( leak )

U To vacuum & refill gas

V To supply and replace PC Board

W To supply and install Starter

X To check malfuntion unit

Y To service water pump

Z

To supply and install High/Low

pressure switch

Total

29 | P a g e

LAMPIRAN C-4

MAKLUMAT LATARBELAKANG PENYEBUTHARGA

PANDUAN

1. Semua maklumat yang diperlukan (kecuali dinyatakan sebaliknya) di dalam jadual ini hendaklah diisi dengan terang, jelas dan tepat sama ada secara bertulis atau ditaip.

2. Penggunaan kertas tambahan adalah dibenarkan sekiranya ruang yang disediakan tidak mencukupi.

3. Penyebut Harga dikehendaki menyertakan salinan fotokopi bagi dokumen sokongan jika perlu.

4. Penyebut Harga juga boleh mengemukakan salinan fotokopi bila mana bersesuaian mengikut pertimbangan penyebut harga bagi butiran yang tidak dinyatakan keperluan salinan di dalam jadual ini.

A. AM

Bil. Perkara Butiran

1. Nama

2. Jawatan

3. Nama Syarikat

4. Nombor Pendaftaran Syarikat

5. Tarikh Ditubuhkan

6. Jenis Perniagaan

7. Taraf Syarikat Bumiputera/Bukan Bumiputera*

8. Status Syarikat Syarikat Tempatan/Syarikat Asing*

9. Alamat Syarikat

10. Nombor Telefon Syarikat

11. Nombor Faks Syarikat

30 | P a g e

12. Alamat E-mel Syarikat

*Potong mana yang tidak berkenaan B. PENGESAHAN PENDAFTARAN

Bil. Perkara Butiran

1. No. Rujukan Sijil Akuan Pendaftaran Kontraktor dengan Kementerian Kewangan (sila lampirkan Salinan Sijil)

Tempoh Sah

2. No. Rujukan Sijil Akuan Pendaftaran Kontraktor Bumiputera dengan Kementerian Kewangan - jika ada (sila lampirkan Salinan Sijil)

Tempoh Sah

C. PEGAWAI YANG BOLEH DIHUBUNGI UNTUK URUSAN SEBUT HARGA INI

Bil. Perkara Butiran

1. Nama *

2. Jawatan

3. Alamat Syarikat

4. Nombor Telefon Pejabat

5. Nombor Telefon Bimbit

6. Nombor Faks

7. Alamat E-mel

*Pengawai yang diberi kuasa unutk menguruskan sebutharga ini mestilah mengisi

borang pewakilan kuasa di lampiran C-6

31 | P a g e

D. PEMILIKAN SAHAM D1. Nyatakan Nama-nama Pemilik Saham Syarikat

Bil. Nama Warganegara Jumlah Saham (RM)

1.

2.

3.

4.

5.

D2. Nyatakan Peratusan Pemilikan Saham Syarikat

Bil. Taraf Peratusan (%)

1. Bumiputera

2. Bukan Bumiputera

3. Modal Asing dan Nama Negeri

E. KAKITANGAN

Nyatakan Bilangan Kakitangan Berdasarkan Taraf dan Bidang

Bil. Taraf Bidang Jumlah Peratus (%)

1. Bumiputra Pengurusan

Operasi

2. Bukan Bumiputra Pengurusan

Operasi

3. Bukan Warganegara Pengurusan

Operasi

2.1 Jumlah

32 | P a g e

Bahawasanya, saya mengaku bahawa butir-butir dan keterangan yang diberikan di atas mengenai

perniagaan/syarikat saya adalah betul dan benar. Saya juga faham sekiranya didapati butir-butir yang

diberikan adalah palsu atau tidak benar, maka BERNAMA boleh mengambil apa-apa tindakan terhadap

saya di bawah apa-apa undang-undang berkuatkuasa.

Tandatangan :..............................................................................

Nama Penyebut Harga :..............................................................................

Jawatan :..............................................................................

Tarikh :..............................................................................

Cop Syarikat :……………………………………………………………………........

33 | P a g e

LAMPIRAN C-5

Kepala Surat

SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA

BER/SH/02/2019

Saya,………………………………………………………………Nombor K.P:…………………………............... yang mewakili Syarikat ………………………………………………………………… nombor Pendaftaran MOF /ROC ……………………………………………………….. dengan ini mengisytiharkan bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau memberi rasuah kepada mana-mana individu dalam (PERTUBUHAN BERITA NASIONAL MALAYSIA (BERNAMA) atau mana-mana individu lain, sebagai sogokan untuk dipilih dalam sebut harga seperti di atas. Bersama ini dilampirkan Surat Perwakilan Kuasa bagi saya mewakili syarikat seperti tercatat di atas untuk membuat pengisytiharan ini. 1. Sekiranya saya, atau mana-mana individu yang mewakili syarikat ini didapati cuba

menawar atau memberi rasuah kepada mana-mana individu dalam (PERTUBUHAN BERITA

NASIONAL MALAYSIA (BERNAMA) atau mana-mana individu lain sebagai sogokan untuk

dipilih dalam sebut harga seperti di atas, maka saya sebagai wakil syarikat bersetuju tindakan-

tindakan berikut diambil:

2.1 Penarikan balik tawaran kontrak bagi sebut harga di atas; atau 2.2 Penamatan kontrak bagi sebut harga di atas; dan 2.3 Lain-lain tindakan tatatertib mengikut peraturan perolehan Kerajaan yang berkuat

kuasa. Sekiranya terdapat mana-mana individu cuba meminta rasuah daripada saya atau mana-mana individu yang berkaitan dengan syarikat ini sebagai sogokan untuk dipilih dalam sebut harga seperti di atas, maka saya berjanji akan dengan segera melaporkan perbuatan tersebut kepada pejabat Suruhanjaya Pencegahan Rasuah Malaysia (SPRM) atau balai polis yang berhampiran. Yang Benar, (Tandatangan) Nama : No. KP : Cop Syarikat :

Catatan: i) Potong mana yang tidak berkenaan. ii) Surat akuan ini hendaklah dikemukakan bersama Surat Perwakilan Kuasa

SURAT AKUAN PEMBIDA

34 | P a g e

LAMPIRAN C-6

------------------------------------------ Kepala surat syarikat -------------------------------- Pengurus Besar Tarikh:

Pertubuhan Berita Nasional Malaysia

Wisma BERNAMA

No. 28, Jalan 1/65A, Off Jalan Tun Razak

50400 Kuala Lumpur

Tuan,

PERWAKILAN KUASA MENANDATANGANI BAGI PIHAK SYARIKAT

Dengan hormatnya saya merujuk kepada perkara di atas.

2. Dimaklumkan bahawa saya...........................................………………………………………......

No.K.P:……………...............................................selaku pemilik Syarikat

.....…………….............................................................akan menandatangani sendiri semua

dokumen berkaitan dengan urusan perolehan SEBUT HARGA PERKHIDMATAN KERJA-

KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG

BERKAITAN DI BERNAMA (BER/SH/02/2019) dengan BERNAMA atau mewakilkan kuasa

untuk menandatangani bagi pihak syarikat untuk urusan perolehan tersebut iaitu:

Nama : …………………………………………

Alamat : …………………………………………

Jawatan : …………………………………………

No. K.P : …………………………………………

No Telefon : …………………………………………

No Faks : …………………………………………

Emel : …………………………………………

3. Sehubungan itu, dikemukakan untuk makluman/rujukan pihak tuan selanjutnya. Pihak

kami akan memaklumkan kepada pihak tuan sekiranya terdapat perubahan penama bagi perkara

ini secara rasmi.

Sekian, terima kasih.

………( Tandatangan )…........

(NAMA PEMILIK SYARIKAT)

Jawatan:

Cop Syarikat:

* potong yang mana tidak berkenaan.

SURAT PERWAKILAN KUASA

35 | P a g e

Lampiran C-7

1. DOKUMEN KEWANGAN

1.1 Penyebutharga perlulah menyerahkan dan sertakan dokumen seperti berikut :-

i. Salinan Sijil Akuan Pendaftaran daripada Kementerian Kewangan dalam kod bidang yang

telah ditetapkan (Wajib)

ii. Penyata Bank terkini (Bagi 3 bulan terkini) (Wajib)

iii. Sijil Pendaftaran dengan Jabatan Kastam Diraja Malaysia (Jika Ada)

iv. Sijil CIDB (Jika ada)

v. Perakuan Kemudahan Kredit dari Institusi Kewangan (Jika Ada)

vi. Borang kehadiran taklimat (Wajib)

vii. Profil Syarikat

* Kegagalan penyebutharga dalam menyerahkan dokumen wajib seperti diatas, penyertaan

penyebutharga tidak akan dipertimbangkan.

36 | P a g e

DOKUMEN TAWARAN TEKNIKAL

1. Dokumen tawaran teknikal wajib di asingkan dengan dokumen tawaran kewangan. 2. Dilarang mempamerkan nama syarikat penyebutharga. 3. Dokumen tawaran teknikal adalah seperti berikut:-

a) Lampiran D-1 : Jadual pematuhan Spesifikasi b) Lampiran D-2 : Senarai Kerja Semasa

c) Lampiran D-3 : Senarai Rekod Pengalaman kerja

4. Pastikan dokumen tawaran teknikal di susun dengan kemas dan di failkan. 5. Pastikan fail dokumen tawaran teknikal dipamerkan seperti berikut :-

DOKUMEN TAWARAN TEKNIKAL

(BER/SH/02/2019)

SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI

BERNAMA

37 | P a g e

LAMPIRAN D-1

JADUAL PEMATUHAN SPESIFIKASI SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG

BERKAITAN DI BERNAMA

BER/SH/02/2019

Bil. Huraian Kerja Monthly Bi-

Monthly 6

Month Pematuhan (Ya/Tidak)

Keterangan Penyebutharga

1.0 CENTRALIZE AIR CONDITIONING SYSTEM & COOLING TOWER SERVICE

1.1 Chilled Water Pump

1.1.1 Visually check for any leaks

1.1.2 Listen for any un-usual noise or any excessive vibration

1.1.3 Hand tests the bearing for any excessive temperature rise

1.1.4 Push the lamp test button on the MCP to check that all indicators light are in order.

1.1.5 Push the test button of the ELCB to test the operation of the ELCB

1.1.6 Perform the monthly check task above

1.1.7 Check the motor running Ampere against the motor rate Ampere

1.1.8 Check all Gauge and Thermometers are in working order.

38 | P a g e

1.1.9 Check the operation of all Valve

1.1.10 Perform the monthly and Bi-Monthly check tasks above

1.1.11 Check all alignment of the pump and motor

1.1.12 Check the Shaft seal for any excessive leakage

1.1.13 Lubricate the Bearings

1.1.14 Check all moving parts for wear and check wearing clearance

1.1.15 Check the pump Strainers for blockage

1.2 Condenser Water Pump

1.2.1 Visually check for any leaks

1.2.2 Listen for any un-usual noise or any excessive vibration

1.2.3 Hand tests the bearing for any excessive temperature rise

1.2.4

Push the lamp test button on the MCP to check that all indicators light are in order.

1.2.5 Push the test button of the ELCB to test the operation of the ELCB

1.2.6 Perform the monthly check task above

1.2.7 Check the motor running Ampere against the motor rate Ampere

1.2.8

Check all Gauge and Thermometers are in working order.

1.2.9 Check the operation of all Valve

39 | P a g e

1.2.10 Perform the monthly and Bi-Monthly check tasks above

1.2.11 Check all alignment of the pump and motor

1.2.12 Check the Shaft seal for any excessive leakage

1.2.13 Lubricate the Bearings

1.2.14 Check all moving parts for wear and check wearing clearance

1.2.15 Check the pump Strainers for blockage

1.3 Air Handling Unit ( Ahu )

1.3.1 Visually check for any leakage in Pipes and Coil.

1.3.2 Listen for any un-usual noise or any excessive vibration

1.3.3 Hand tests the Blower Bearing for any excessive temperature rise

1.3.4

Push the lamp test button on the MCP to check that all indicators light are in order.

1.3.5 Push the test button of the ELCB to test the operation of the ELCB

1.3.6 Perform the monthly check task above

1.3.7 Check the motor running Ampere against the motor rate Ampere

1.3.8

Check the operation of the Control Valve by adjusting up and down the Temperature set point.

40 | P a g e

1.3.9 Check that all water, air and electrical gauge are in order

1.3.10 Wash the Primary air filter

1.3.11 Perform the monthly and Bi-Monthly check tasks above

1.3.12 Check all alignment and tension of blower belt

1.3.13 Lubricate the Bearings of the blower

1.3.14 Check all moving parts for wear and check wearing clearance

1.4 Cooling Tower

1.4.1 Visually check for any leakage in Pipes and Coil.

1.4.2 Listen for any un-usual noise or any excessive vibration

1.4.3 Perform the monthly check task above

1.4.4 Check the motor running Ampere against the motor rate Ampere

1.4.5 Check the operation of the Valve by adjusting ON and Off and hear sound of running

1.4.6 Perform the monthly and Bi-Monthly check tasks above

1.4.7 Check all moving parts for wear and check wearing clearance

1.5 WATER COOLED PACKAGED SYSTEM

Water Cooled Packaged System ( Wcpu )

41 | P a g e

1.5.1 Visually check for any leakage in Pipes and Coil.

1.5.2 Listen for any un-usual noise or any excessive vibration

1.5.3 Hand tests the blower bearing for any excessive temperature rise

1.5.4 Push the lamp test button on the MCP to check that all indicators light are in order.

1.5.5 Push the test button of the ELCB to test the operation of the ELCB

1.5.6 Perform the monthly check task above

1.5.7 Check the motor running Ampere against the motor rate Ampere

1.5.8 Check the operation of the Control Valve by adjusting up and down the Temperature set point.

1.5.9 Check that all water, air and electrical gauge are in order

1.5.10 Wash the Primary air filter

1.5.11 Perform the monthly and Bi-Monthly check tasks above

1.5.12 Check all alignment and tension of the blower belt

1.5.13 Lubricate the Bearings of the blower.

1.5.14 Check all moving parts for wear and check wearing clearance

1.6 Condenser Water Pump

1.6.1 Visually check for any leaks.

42 | P a g e

1.6.2 Listen for any un-usual noise or any excessive vibration

1.6.3 Hand tests the blower bearing for any excessive temperature rise

1.6.4 Push the lamp test button on the MCP to check that all indicators light are in order.

1.6.5 Push the test button of the ELCB to test the operation of the ELCB

1.6.6 Perform the monthly check task above

1.6.7 Check the motor running Ampere against the motor rate Ampere

1.6.8 Check all Gauge and Thermometers are in working order.

1.6.9 Check the operation of all Valve

1.6.10 Perform the monthly and Bi-Monthly check tasks above

1.6.11 Check all alignment of the pump and motor.

1.6.12 Lubricate the Bearings of the blower.

1.6.13 Check all moving parts for wear and check wearing clearance

1.6.14 Check the pump strainer for blockage.

1.7 Cooling Tower

1.7.1 Visually check for any leakage in Pipes and Coil.

43 | P a g e

1.7.2 Listen for any un-usual noise or any excessive vibration

1.7.3 Perform the monthly check task above

1.7.4 Check the motor running Ampere against the motor rate Ampere

1.7.5 Check the operation of the Valve by adjusting ON and Off and hear sound of running

1.7.6 Perform the monthly and Bi-Monthly check tasks above

1.7.7 Check all moving parts for wear and check wearing clearance

2.0 SERVICING & MAINTENANCE OF SPLIT UNIT/VRV AIR CONDITIONER

2.1 SCOPE OF WORK (EXCLUDING ALL PARTS)

2.1.1

To provide technicial personnel, tool, equipment to carry out Monthly servicing and Maintenance of the Air Conditioning System and equipment :-

2.2 SPLIT UNIT AIRCOND (Wall Mounted & Cassette Type)

2.2.1

To supply labour, tools and equipment to perform general servicing and maintenance once every month for the air-conditioning systems including :

a) Cleaning of indoor cooling oil

b) Cleaning front panel & air filter

44 | P a g e

c) Checking & cleaning of drain pan, drain pipe and blower wheel

d)Checking of refgrigerant gas system & in-outdoor fan speed

e) Checking of condenser oil

f) Report fault found and advise for necessary action

g) Attend to emergency breakdown calls as and when required.

h) Check room temperature reading

i) Job sheet to be submitted to us after each visit or service and to be acknowledged by our representatives in-charged

2.3 FAN COIL UNIT

2.3.1 Inspect all fan oil units (FCU)

a) Check all air filter, and clean as necessary

b) Check all water oils, seals and pipes lines for leaks

c) Ourge air from all water oils

d)Check all fan bearings, and lubricate with grease as necessary

e) Check the tension for all belt drives, and adjust as necessary

f) Check the operation of automatic water regulating valves, and adjust as necessary

g) Clean all the condesate pans, trays and drains

h) Check on air flow & room temperature for level 1st and ground

45 | P a g e

2.4 INSPECT ALL REFRIGENT COMPRESSORS AND REFRIGERANT SYSTEM

a) Check all seals and pipelines for leaks, and rectify as necessary

b) Check all refrigerant and oil levels and top up refrigent and oil system as recommended by manufacturers

c) Check the operation of all refrigent controls and clean, adjust and lubricant as necessary

d) Check the operation of all safety device and clean, adjust and lubricant as nessary

e) Check the suction discharge and oil pressure of all refrigerant compressors, and if abnormal trace the faults and rectify as nescassary.

f) Check all bolts and nuts for tightness, and tightens as necessary.

46 | P a g e

LAMPIRAN D-3

SEBUT HARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN SISTEM PENGHAWA DINGIN SERTA PERALATAN YANG BERKAITAN DI BERNAMA

BER/SH/02/2019

SENARAI KERJA SEMASA

Nama

Kontrak

Agensi

Tempoh

Masa

Harga

Kontrak

Tarikh

Mula

Tarikh

Tamat

Nama & No. Telefon Pegawai Yang Bertanggungjawab Untuk dihubungi

• Mohon sertakan salinan surat atau bukti pengalaman kerja/perkhidmatan/bekalan yang dilakukan

47 | P a g e