new kementerian pengangkutan malaysia - escap · 2020. 1. 30. · 15. lembaga pelabuhan labuan 16....
TRANSCRIPT
LOGISTIC AND LAND TRANSPORT DIVISION
Railway Development in MalaysiaOverview of Railway Industry
November 2019
KEMENTERIAN PENGANGKUTAN MALAYSIA
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 2
Content
Ministry of Transport (MOT)
Railway Industry in Malaysia
Keretapi Tanah Melayu Berhad (KTM)
Urban Rail: Klang Valley Integrated Transit Map
Key Railway Projects
Railway Network in Asia
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 3
Spearheading the transformation of an integrated, efficient
and safe transportation system
Strengthening the transportation system
driven by technology as a catalyst for national
development
Sustainable Transport The Heart of National
Development
The Ministry of Transport is responsible for the following sectors:
Aviation transport sector Land Transport & Logistic Sector Maritime transport sector
Ministry of Transport (MOT)
1. To formulate and implement land transport, maritime, aviation and logisticspolicies.
2. To plan and execute land transport, logistics, maritime and aviationinfrastructure projects.
3. To spearhead the integration of a holistic national transportation system.4. To make available transport services delivery system for land transport,
logistics, maritime and aviation.5. To enforce laws related to land transport, logistics, maritime and aviation.6. To determine fees and charges for services provided by the ministry.7. To regulate compliance to legislation, service and safety standards.8. To facilitate businesses related to land transport, logistics, maritime and
aviation industries.9. To spearhead regional and international cooperation programmes in the field of
transport.
MOT structure:
FUNCTIONS
1. Land Public Transport Agency(APAD)2. Institute Maritime Malaysia (MIMA)3. Malaysia Institute of Road Safety (MIROS)4. Jabatan Keselamatan Jalan Raya(JKJR)5. Jabatan Laut Malaysia(JLM)6. Jabatan Pengangkutan Jalan(JPJ)7. Keretapi Tanah Melayu Berhad (KTMB)8. Lembaga Dius Api9. Lembaga Pelabuhan Bintulu10. Lembaga Pelabuhan Johor11. Lembaga Pelabuhan Johor (Tg Pelepas)12. Lembaga Pelabuhan Kelang13. Lembaga Pelabuhan Kemaman14. Lembaga Pelabuhan Kuantan
27 Departments & Agencies under MOT:15. Lembaga Pelabuhan Labuan16. Lembaga Pelabuhan Melaka17. Lembaga Pelesenan Kenderaan Perdagangan
Sabah (LPKP Sabah)18. Lembaga Pelesenan Kenderaan Perdagangan
Sarawak (LPKP Sarawak)19. Mass Rapid Transit Corporation Sdn Bhd (MRT)20. Malaysia Rail Link Sdn Bhd (MRL)21. Railway Assets Corporation (RAC)22. Perlindungan dan Indemniti Malaysia Sdn Bhd23. Civil Aviation Authority of Malaysia (CAAM)24. Prasarana Malaysia Berhad25. Suruhanjaya Pelabuhan Pulau Pinang26. Suruhanjaya Pelabuhan Pulau Pinang (Teluk Ewa)27. Malaysian Aviation Commission (MAVCOM)
Total
13,413staffs
(depts. & agencies)
Additional10
agenciesin May 2018
Total
27Departments & Agencies
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 4
LRT 1,2,3 KTM Komuter & ETSERLMRT 1, 2
The backbone of public transportation . . .
134
History of
Years
More than2,900 km*
*KTMB, LRT, MRT, ERL, Monorail, JKNS
241 Stations*
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 5
1880 – 1900Early Beginning
1900 – 1950 Great Expansion
1950 – 2000 Modernization
2000 – 2018 Improvement
Building railway tracks in Semenanjung and Sabah: Seberang Prai, Perak, Selangor, Kuala Lumpur, Seremban, Kota Bharu.
Building railway tracks in Semenanjung and Sabah: Seberang Prai, Perak, Selangor, Kuala Lumpur, Seremban, Kota Bharu.
More railway tracks expansion in Semenanjung until Singapore and in Sabah
More railway tracks expansion in Semenanjung until Singapore and in Sabah
Rail track on Malaysia-Singapore CausewayRail track on Malaysia-Singapore Causeway
Class 20 diesel locomotive built by English Electric Co, England (1957)Class 20 diesel locomotive built by English Electric Co, England (1957)
KTMB Class 23 locomotive built by Hitachi, Japan (1983)
KTMB Class 23 locomotive built by Hitachi, Japan (1983)
STAR LRT: 2 car set of PUTRA LRT (1998)
STAR LRT: 2 car set of PUTRA LRT (1998)
PRASARANA introduced 4-car LRT (2009)PRASARANA introduced 4-car LRT (2009)
KTMB introduced SCS Class 92 (2012)KTMB introduced SCS Class 92 (2012)
ERL start service to KLIA2 on 2nd
May 2014ERL start service to KLIA2 on 2nd
May 2014
July 2017: MRT line 1 fully operated from Sungai Buloh to KajangJuly 2017: MRT line 1 fully operated from Sungai Buloh to Kajang
ERL service commence operation to the public on 14 April 2002ERL service commence operation to the public on 14 April 2002
Rail Journey in Malaysia
2018: KTM Subang – Skypark service started 2018: KTM Subang – Skypark service started
First railway track opened:- Semenanjung:Taiping to Port Weld on 1st
Feb 1885- Sabah: Weston to Beaufort in 1896
First railway track opened:- Semenanjung:Taiping to Port Weld on 1st
Feb 1885- Sabah: Weston to Beaufort in 1896
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 6
Keretapi Tanah Melayu Berhad (KTM)
• Keretapi Tanah Melayu Berhad (KTM) or Malayan Railways Limited is the main rail operator in Peninsular Malaysia.
• The railway system dates back to the British colonial era, when it was first built to transport tin.
• Previously known as the Federated Malay States Railways (FMSR) and the Malayan Railway Administration (MRA), Keretapi Tanah Melayuacquired its current name in 1962.The organisation was corporatised in 1992, but remains wholly owned by the Malaysian government.
• Unit/Subsidiaries:• KTM Intercity• KTM ETS• KTM Komuter• KTM Cargo• KTM Distribution (KTMD)• Skypark Link
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 7
Urban Rail: Klang Valley Integrated Transit Map
• Under construction
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 8
MRT 2 Sg Buloh- Putrajaya Line Gemas-Johor Bahru Electrified Double Track
PulauPinang
Melaka
Selangor
Negeri Sembilan
Perak
Johor
TerengganuKelantan
Kedah
Pahang
Perlis
Completion Date: 2021Completion Date: 2022
Completion Date: 2020
Completion Date: 2021
Halogilat-Tenom Track Upgrading
Completion Date: 2019
Sabah
Kuala Lumpur
Key Railway Projects
East Coast Track Rehabilitation
Klang Valley Double Track Upgrading
LRT 3 Bandar Utama- Klang
Completion Date: 2021
Future Project
Ongoing Projects
Legend:
East Coast Rail Link (ECRL)
High Speed Rail (HSR)
Rapid Transit System (RTS)
Completion Date: 2019
Padang Besar Container Terminal
FS Stage
Bukit Kayu Hitam Spur Line VE Stage
ROLLINGSTOCK: 10 Set 6-Car ETS
FS Stage
Serendah Bypass
Budget Request
Penang Port Siding Expansion
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 9
Railway Network in Asia
On-going development: Lao PDR – People Republic of
China Malaysia Upgrade: Gemas – Johor
Bahru Thailand Double Track Upgrade Vietnam Rehabilitation & Upgrade
Planning stage:Cambodia – Vietnam: New
alignmentMyanmar – Thailand: New
alignmentLao PDR: New alignmentCambodia: Upgrade &
RehabilitationVietnam: Upgrade & Planning
STATUSSingapore-Kunming Rail Link• Distance = 6,617 km• Alignment = Meter Gauge
(1,000 mm)• Proposed during 5th ASEAN
Summit, Bangkok 1995• To facilitate trade, tourism
& inter-border movement• To be linked with Trans-
Asian Railway Network• Members:
• Cambodia• Lao PDR• Malaysia• Myanmar• Thailand• Viet Nam• People’s Republic of
China
LOGISTIC AND LAND TRANSPORT DIVISIONLOGISTIC AND LAND TRANSPORT DIVISION 10
THANK YOU