kilang kelapa sawit changkat chermin · this month oer & ker dicreased by 0.40% & 0.30%...
TRANSCRIPT
Date 20/7/2012
KILANG KELAPA SAWIT CHANGKAT CHERMIN
.(MOHD HADZRI BIN ARSAD)
Manager
KILANG KELAPA SAWIT CHANGKAT CHERMIN
Progress Report
For the month ofJUNE 2012
KUALA LUMPUR KEPONG BERHAD(No. Syarikat: 15043-V)
PAGE 1
HIGHLIGHTSEstimated percentage of FFB pushed by shovelPercentage FFB pushed due to grading
PRODUCTION
RAINFALL RECORD (mm) Year 2012
Fin Year Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepLast FY 20.00 119.00 163.00 185.00 71.00 699.50 574.00 262.00 359.00 329.00 457.00 766.00This FY 314.75 431.00 431.00 61.25 197.75 242.25 203.25 79.50 20.50
OTHER HIGHLIGHTS
DESCRIPTION OF PROBLEMS / ACHIEVEMENTS
Comments :This month OER & KER dicreased by 0.40% & 0.30% respectively as compared to last month figure.The todate OER was increased by 0.85% to 22.04% as compared to last year same period.
This Month
21.19
4.724.35
22.04
4.61
22.12 22.52
Same Period Last Year
100.0%0.0%
Last Month TodateThis Month
PROGRESS REPORT ON
(9TH MONTH OF FINANCIAL YEAR)FOR THE MONTH OF JUNE 2012
KILANG KELAPA SAWIT CHANGKAT CHERMIN
Todate Current Financial Year
ITEM
4.65
O.E.R %
K.E.R %
20.40
4.04
PAGE 2
1 PRODUCTION REPORT
1.1. FFB STATEMENT
1.1.1. FFB CONTRIBUTION
Estimate for Estimate +/- Estimate +/- EstimateThis Month Todate This Month Todate This Month Todate
KLK Estates MT MT MT MT MT MT- -
5,373.920 45,917.460 7,160.000 56,681.000 -24.95% -18.99%3,272.920 30,039.770 3,498.000 31,415.000 -6.43% -4.38%2,281.750 33,051.610 4,056.000 34,124.000 -43.74% -3.14%1,276.240 10,206.200 1,649.000 12,387.000 -22.61% -17.61%
929.060 7,782.530 1,161.000 8,616.000 -19.98% -9.67%416.610 3,264.440 568.000 4,810.000 -26.65% -32.13%
1,024.270 10,748.040 1,506.000 19,598.000 -31.99% -45.16%415.520 1,970.800 - - - -
- 312.210 - - - -- -- -- -- -- -- -- -
Sub Total 14,990.290 143,293.060 19,598.000 167,631.000 -23.51% -14.52%
Non-KLK Estates- -
- 1,591.280 0.000 0.000 - -971.320 7,145.610 1180.000 4660.000 -17.68% 53.34%
LDG BATU DUA 159.600 1,351.030 210.000 890.000 -24.00% 51.80%LDG. MENGLEMBU 115.400 868.960 130.000 495.000 -11.23% 75.55%LDG BUKIT KATHO - 630.110 0.000 0.000 - -LDG TRONOH MALAY 248.930 535.820 0.000 0.000 - -
- -- -
- #VALUE!- -
Sub Total 1,495.250 12,122.810 1,520.000 6,045.000 -1.63% 100.54%
Outsiders- -
- 299.420 - -- -- -- -- -- -- -- -- -- -- -
Sub Total - 299.420 - - - -
Grand Total 16,485.540 155,715.290 21,118.000 173,676.000 -21.94% -10.34%
Comment :
Total FFB received for the month lowered by 21.94% or 4,632.46 mt as compared to the estimated.
LDG PINJI
LADG. NARBOROUGH
LDG. SENGGANG
LDG. SUBUR
LDG. KAMPAR
LDG. ALLAGARLDG. KUALA KANGSAR
LADANG LEKIRLDG. CHANGKAT CHERMINLDG. RAJA HITAMLDG. SERAPOHLDG. GLENEALY
( No include from Ladang Batu Dua, Ladang Kuala Kangsar, Ladang Subur, non-KLK estates and outsiders ).
PAGE 31.1.2. FFB COMPOSITION
Composition of crop from various years of planting are :-
MT % MT %1977 43.87 0.27 81.15 0.05 1980 18.08 0.11 77.23 0.05
1981 - - - - 1982 92.02 0.56 163.93 0.11 1983 - - 277.30 0.18 1984 120.67 0.73 925.32 0.61 1985 68.01 0.41 616.79 0.41 1986 46.06 0.28 614.21 0.41 1987 97.84 0.59 1,223.20 0.81 1988 - - 1,433.85 0.95 1989 701.56 4.26 5,709.10 3.77 1990 318.31 1.93 2,814.54 1.86 1991 439.06 2.66 3,763.65 2.49 1992 763.87 4.63 5,881.96 3.89 1993 18.82 0.11 159.83 0.11 1994 60.58 0.37 691.19 0.46 1995 44.75 0.27 658.11 0.43 1996 127.89 0.78 1,111.00 0.73 1997 94.59 0.57 817.88 0.54 1998 529.91 3.21 4,471.33 2.95 1999 584.67 3.55 4,924.43 3.25 2000 454.52 2.76 4,147.17 2.74 2001 1,446.19 8.77 13,153.78 8.69 2002 2,580.19 15.65 24,827.53 16.40 2003 1,224.37 7.43 10,905.21 7.20 2004 1,698.61 10.30 16,030.14 10.59 2005 1,060.99 6.44 12,072.16 7.97 2006 1,528.09 9.27 16,288.99 10.76 2007 1,699.66 10.31 15,338.93 10.13 2008 64.98 0.39 561.75 0.37 2009 557.38 3.38 1,637.34 1.08 2010 - -
- - - - - - - - - - - - - - - -
Total 16,485.54 100.00 151,379.00 100.00
Append below the classification of Palms According to Age :-
Category Palm Age (years) %Immature 1st - 3rd 3%Young 4th - 9th 44%Prime 10th - 18th 36%Old 19th and above 17%
Comments :
This Month TodateYear of Planting
Remarks
FFB composition vary from the years 1977 to 2009 with most of the crop come from 2001 till 2007.
1.1.3. FFB QUALITY
CONTRIBUTING This Last This Last This Last This Last This Last This Last This Last This LastESTATES Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month
Total/Average 0 0
1.1.4. % FFB ON FLOOR AND IN LOADING RAMP FOR GRADING
FFB INTAKE (MT) % %
Comments :No grading was conducted by mill.
WEIGHT (MT)LOADING RAMP
WEIGHT (MT)FFB GRADING
PAGE 4
No. of Grading % Black % Underripe % Long Stalk % Pest Damaged % Empty Bunch% Overnight % Rotten
1.1.5. LOOSE FRUIT & TRASH CONTENT
This Last This Last This Last This LastNO ESTATES Month Month Month Month Month Month Month Month
1 Lekir 15.50 14.00 2 C.Chermin 10.38 11.00 3 Raja Hitam 10.00 9.67 4 Glenealy 13.00 13.00 5 Serapoh - 12.50 6 Allagar 15.65 17.00 7 Kuala Kangsar 15.00 14.50 8 Tronoh Malay 11.00 12.50 9
101112
Average 0 0
NO Outsider Estate123
Average 0 0
1.1.6. LOOSE FRUITS TO FFB RATIO
NO ESTATES12345678
1.1.7. STONES & TRASH IN FFB
NO ESTATES1 All Estates2345678
Comments :
manage to reduced the trash content from 17% to 15.65%.Trash contents from Ladang Lekir and Ladang Kuala Kangsar rose to 15%. Ladang Allagar
TrashTonnage (mt) % to FFBStones (kgs) per 100 tn FFB
3.86
This Month Last MonthTotal Tonnage
This Month Last Month% to FFB
Fruit in Load Loose Fruit (%) FFB %
PAGE 4.1
No. of Grading % Loose Trash Content in Trash Content in
PAGE 5
1.2. PRODUCTION QUALITY
1.2.1. PRODUCTION OIL / DESPATCH OIL
X S.D. X S.D. X S.D. X S.D.
FFA %
Moisture (VM) %
Dirt %
Peroxide Value %
DOBI
ANALYSIS RESULT BY (KDC/TQCC)
TaikoSAMPLE Average StandardFFA 3.85 3.0 MaxVM 0.12 0.13 MaxDIRT 0.04 0.03 MaxPEROXIDE VALUE 0.68 0.60 MaxIODINE VALUE 52.15 50 - 54DOBI VALUE 2.51 3.0 MinCAROTENE 582.25 600 MinE233 (1% CORR.) 0.96 1.20 MaxE269 (1% CORR.) 0.24 0.20 MaxIRON 5.0 - 3.0PHOSPHORUS 8.0 - 5.0D.F. (Delta Y) 20.43 20.0 MinQUALITY RATING NIL
Comments :
2.782.79 0.072.88
0.21
The CPO Quality for the month was fair.
3.92 0.18
0.02
9.655
0.100.0420.70
52.20
3.78
0.034
0.12
--
21.97
1.240.28
--
18.16
2.83620.00
0.100.0380.60
52.001.21
547.00
0.21
0.140.0440.60
52.203.00
585.001.170.23
-
0.130.0410.80
2.99577.00
52.20
1.210.23
--
20.86-
20.73
3.53 3.97 3.76 4.14
0.09
0.038
2.81
0.03
9.396 0.037
0.12
1st Week 2nd Week 3rd Week 4th Week
0.07
Last Month This Month Last Month
< 0.25
> 2.31
0.033
0.14
Marketing
< 5.0
Specification
3.84 0.22 3.57
DESPATCH PRODUCTIONThis Month
PAGE 61.2.2. PRODUCTION / DESPATCH KERNEL
MARKETINGX S.D. X S.D. X S.D. X S.D. SPECIFICATION
5.65 0.38 5.57 5.80 0.43 5.92 6%3.95 0.44 4.12 4.37 0.22 4.48 7%1.12 0.06 1.07 1.14 0.06 1.10
26.54 1.18 25.400.00 1.18
1.2.3. CPO DESPATCHBUYER MILL BUYER'S + / -
NET NET ON MILLWEIGHT WEIGHT NET WEIGHT
tn tn tn1- 1497.090 1500.750 3.660
2- 198.490 198.630 0.140
3- 100.880 101.190 0.310
4- 1494.130 1498.720 4.590
5- 99.160 99.250 0.090
6- 98.650 98.980 0.330
7- 0.000 3488.400 3497.520 9.120
1.2.4. PK DESPATCHBUYER MILL
NETWEIGHT
tn1- 344.1202- 200.960 3- 120.500 4-5-6-7-
Total : 665.580
1.2.5. CXC REPORT
Comments :
DESPATCHTHIS MONTH LAST MONTH
MOISTURE %
THIS MONTH
RAUB OIL MILL (DELIVED TO ISF)LEE OIL MILLCARGILL PALM PRODUCTSOUTHERN EO
HUP LEE OIL MILLSINN HWAT HENG
PGEO LUMUT
ISF
No. of Loads with high differences +/- 80kg)
PRODUCTIONLAST MONTH
DIRT %FFA %TOTAL BROKEN KERNEL %STONE CONTENT %
95
PANGKOR OIL MILL
The buyer net weight have surplus 9.12 mt than mill net weight.
THIS MONTH LAST MONTH
The Kernel quality was fair.
9932
Total number of CPO tankers
PAGE 6.1
LOADS FROM MONTH: June 2012
Ticket No Driver Vehicle Date Mill Buyer G / Loss BuyerA083782 Hairul Nizam b. Hashim BJJ 5684 7.6.2012 40.810 40.700 0.110 Raub Oil Mill (Recovered 90 kg)A084257 Lokman bin Ahmad BLG 775 14.6.2012 40.770 40.690 0.080 Cargill ( Recovered 90 kg)
Total 0.190Comments
EXTRACTED FROM CXC REPORT
Mill already done load test and calibration on weighbridge end of this month.
Weight Details (MT)
CPO Despatch Loads With High Differences
PAGE 6.2
No. Tanker No. *Total
UsageMill Weight
+/-Other Mill Weight +/-
Total Weight +/-
No Go Zone
Excessive Idling
Power Disconnect
Zone Grid Exit Action Taken / Remarks
Total 0 0 0 0
* Represent (TMS) Outside Tankers
GPS PROGRESS REPORT FOR KILANG KELAPA SAWIT CHANGKAT CHERMIN ON June 2012
Violation Report
PAGE 71.3. COST OF PRODUCTION
(Basis : Cost per tonne CPO)
ThisMonth Todate Year ' s
June 2012 9 mths EstimateRM / tn RM / tn RM / tn
Indirect Cost 50.67 49.29 56.30
Depreciation 29.10 28.64 26.11
Manufacturing Cost 142.38 138.77 139.62
Ex-Mill Cost 222.15 216.70 222.03
Cooking Oil Cess - - 0.00
Palm Oil Stabilisation Cess 2.00 2.00 2.00
CPO (Sabah) Sales Tax - - 0.00
Despatch & Selling 22.16 6.80 27.1
TOTAL EXPENDITURE 246.31 225.50 251.13
A/c This Month Estimate
Code RM/ton CPO RM/ton CPO Diff. (%)
IC 08 7.89 6.46 18.1%
IC 12 2.92 0.70 76.0%
IC 20 14.11 12.03 14.7%
PK 44 56.39 38.66 31.4%
PK 46 3.50 1.75 50.0%
PK 47 8.25 5.95 27.9%
PK 51 4.62 1.84 60.2%
PK 57 14.16 9.16 35.3%
PK 58 8.10 6.00 25.9%
Comments :
High cost due to desilting of effluent pond.
Reimbursement claim for auditor stay in hotel.
Relocate office septic tank and install 3 unit flag pole.
Comments
Overhaul one unit of Westfalia separator.
High Diesel usage for diesel Generator due to no TNB supply.
Remove the side zinc of steriliser building to improve ventilation.
High cost due to beautification work in front of the office.
Remove the portion of roof to improve tne ventilation.
Install one unit C.M Conv. At the claybath.
PAGE 82 PROCESS PERFORMANCE
2.1. STERILIZATION
Summary of sterilisation cycle for the month is tabulated as follows :-
Function X (min) S.D.Deaeration 21st. Peak (1.41 Bar / 20 psi) 161st. Peak exhaust 12nd. Peak (1.7 Bar / 25 psi) 122nd. Peak exhaust3rd. Peak (1.7 Bar / 25 psi)3rd. Peak exhaust4th. Peak (1.7 Bar / 25 psi)Holding Time 31Final exhaust 4Steaming cycle 66 0Door Open to Door Shut Time 30
X S.D. X S.D.USB after 1st Threshing (%) 1.21 0.18 -USB after 2nd Threshing (%) 0.64 0.17 0.71Threshing Efficiency (%)
STERILIZER CONDENSATE
This Month Last MonthX S.D. X S.D.
4.86 1.01 5.37
Condensate / FFB Ratio - -
Absolute oil loss (kg/tn FFB) - -
Comments :
The OLWB of Sterilizer Condensate for the month was recorded at 4.86%.The Automatic Condensate Dispenser trial is carried out on Sterilizer No. 4.
Last MonthThis Month
Steriliser condensate (Oil Content in Wet Basis)
PAGE 9.02.2. DIGESTING & PRESSING STATION
2.2.1. DIGESTER TEMPERATURE OC
This Month Last Month DIGESTER X S.D. X S.D. Digester No. 1 98.00 0.80 98.00 0.75 Digester No. 2 97.00 0.79 98.00 0.85 Digester No. 3 97.00 0.54 98.00 0.89 Digester No. 4 99.00 0.59 98.00 1.00 Digester No. 5 Digester No. 6 Digester No. 7 Digester No. 8 Digester No. 9
2.2.2. PRESSING
Press Press Press Press Press Press Press Press Press AverageNo. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9
X 4.55 4.60 4.60 4.70 4.61S.D. 0.16 0.12 0.19 1.20 0.42
X 4.61 4.62 4.61 4.57 4.60S.D. 0.10 0.09 0.10 0.11 0.10
X 7.55 7.61 7.61 7.53 7.58S.D. 0.34 0.19 0.28 0.34 0.29
X 7.65 7.67 7.65 7.58 7.64S.D. 0.18 0.14 0.18 0.16 0.16
X 14.37 12.98 13.41 13.46 13.56S.D. 2.82 1.93 1.33 1.55 1.91
X 14.33 13.41 13.39 14.28 13.85S.D. 2.43 1.88 2.24 2.17 2.18
X 233.59 235.27 189.47 208.30 216.66S.D.
X 233.07 222.68 191.44 203.72 212.73S.D.
Comments :
This Month
Last Month
This Month
Last Month
The digester temperature are maintained above 950C.
This Month
Last Month
This Month
Last Month
OIL LOSS ON WET BASIS (OLWB)
98
OIL LOSS ON DRY BASIS (OLDB)
NUT BREAKAGE (%)
PRESS RUNNING HOURS
The OLDB of press fibre controlled below 7.8%.
98
PAGE 9.12.2.3.
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
XS.D.N
True Nut TrashTrue Mesocarp (ripe) True Mesocarp (unripe)
Oil in Mesocarp OLWB Normal Parthenocarp
Abnormal Partnenocarp
PAGE 9.2
2.2.4. EFB PRESSING
Press Press Press PressNo. 1 No. 2 No. 3 No. 4
PRESS RUNNING This Month 169.57 171.77 211.24 HOURS Last Month 240.16 90.27 282.61 DOWN TIME This Month 2.00
Last Month 0.50
2.2.5. OIL RECOVERED
This Month F F A (%) DOBI
VM (%)OLWB (%)
Press Fibre (OLDB) Ratio EFB Liquor to FFB (%)
2.2.6. SPLITTER
RUNNING HOURSThis Month Last Month
No. 1 No. 2
Comments :
Last Month4.931.7187.777.26
4.761.73
87.767.31
PAGE 10
2.3. CLARIFICATION STATION
2.3.1. CLARIFICATION TANK
This Month Last MonthTank 1 Tank 2 Tank 3 Tank 1 Tank 2 Tank 3
X 96.00 98.00S.D
% Oil in underflow X 5.02 4.93 6.03 6.07 (% OLWB) S.D 0.57 0.11
2.3.2. SLUDGE SEPARATOR (S) / CENTRIFUGE (C)
S1 S2 DA 45 C1 C2 C3 C4 C5 C6 C7X 0.97 0.98 0.96 0.77 0.78 0.78 0.78 0.76 0.82
S.D 0.03 0.07 0.07 0.03 0.07 0.06 0.06 0.03 0.10X 0.98 0.96 0.78 0.79 0.77 0.79 0.77 0.78
S.D.T Mth X 162.18 22.41 247.24 118.41 20.25 118.06 139.19 84.81 131.73L Mth X 207.95 276.13 160.60 40.50 271.61 195.35 81.98 103.70T Mth X 1.40 1.40 1.70 1.70 1.70 1.70 1.70 1.70 1.70L Mth X 1.40 1.40 1.70 1.70 1.70 1.70 1.70 1.70 1.70T Mth XL Mth XT Mth XL Mth X
Comments :
Separate Waste Basculator (mt)
Oil losses on Absolute Terms (Kg/tn FFB)
The temperature of clarification tank maintained above 95oCThe % of underflow of clarification tank 1 & 2 was recorded at 5.02% and 4.93% respectively in OLWB.The OLWB of heavy phase for separator & centrifuge stork was below 1%.
Nozzle size (mm)
Temperature OC
This MonthLast
Month
% Oil loss on wet basis (x)
Operating Hours (hrs)
PAGE 11
2.3.2. DECANTER (D)
Inlet98.0098.00 D1 D2 D1 D2 D1 D2
X 6.88 3.38 0.87S.D 2.47 0.11X 7.55 3.65 0.93
S.D.X 87.80 77.83 95.03
S.DX 86.45 77.92 95.19
S.D.X 5.32 18.79 4.10
S.DX 6.00 18.43 3.88
S.D.T Mth XL Mth X
Comments :
Light Phase
This MonthLast
Month
This Month
This Month
This MonthLast
Month
Last Month
Decanter performance satisfactory.
Temperature (oC)
Oil % (x) Last Month
Solid Phase
VM % (x)
Operating Hours
NOS % (x)
Heavy Phase
PAGE 12
2.3.3. DILUTION RATE & ABSOLUTE OIL LOSS
X S.D. X S.DDILUTION RATE % 24.00 2.77 22.16Separator Waste to FFB ratioDecanter cake to FFB ratioAbsolute Oil loss in Separator/Centrifuge kg/mt FFBAbsolute Oil loss in Decanter Cake kg/mt FFBTotal Oil loss kg/MT FFB 0.00 0.00 0.00 0.00
2.3.4. OIL LOSSES AFTER DEOILING TANK TO EFFLUENT
DescriptionAfter Deoiling tank (OLWB)After Cooling pond
Comments :
This Month Last Month
This Month Last Month
Oil loss after cooling pond below 1%.
0.99 1.00
PAGE 13
2.3.5. PURIFIER & VACUUM DRYER
No: 1 No: 2 No: 1 No: 2 No: 3 No: 4 No: 5X 0.35
S.D 0.05X 0.56
S.D. 0.11X 0.04
S.D 6.93X 0.04
S.D. 7.33X
S.DX
S.D.X
S.DX
S.D.
2.3.6. VACUUM DRYER
X S.D X S.D X S.DThis Month 0.35 0.05 0.09 0.03 47.29Last Month 0.56 0.11 0.12 0.03 78.57This MonthLast MonthThis MonthLast Month
Comments :
% Dirt
This MonthLast
Month
PURIFIER After PurifierBefore Purifier
% VM
This MonthLast
Month
VM Rem. Eff
This MonthLast
Month
Dirt Rem. Eff
This MonthLast
Month
Production oil quality was satisfactory without using purifiers.Performance of Vacuum dryer was satisfactory.
VACUUM DRYER Vacuum (-cm Hg) VM % After DryerVM % Before DryerVM.
Removal Eff.
No: 1
No: 2
No: 3
2.4. NUT & KERNEL STATION PAGE 13.1
2.4.1. NUT SILO & KERNEL SILOS
DESCRIPTION No: 1 No: 2 No: 3 No: 4X
S.DX
S.D.X
S.DX
S.D.X
S.DX
S.D.
2.4.2. KERNEL SILO
1 2 3 4 5 1 2 3 4 5Top 30.40 27.60 27.60 24.80 24.00 30.60 32.40 31.40 24.80 24.50
Middle 33.60 31.60 32.80 28.60 28.80 34.00 39.80 26.80 28.80 26.80Bottom 60.80 56.60 62.80 45.00 42.60 56.00 60.60 64.00 64.80 64.40
% VM Fresh Kernel X 21.30 21.00S.D 12.60X 5.65 5.57
S.D 0.38% Drying Efficiency 73.13 73.48
Comments :
This MonthLast
Month
This Month Last Month
% Drying Efficiency
% Dried Kernel
Temperature oC
The quality of kernel was satisfactory.
% VM Fresh Nut
This MonthLast
Month
% Dried Nut
This MonthLast
Month
2.4.3. NUT CRACKING EFFICIENCY PAGE 13.2
X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Nut (%) 90.54 3.48 90.91 3.80Broken Nut (%) 4.90 2.06 4.93 2.42Whole Kernel (%) 2.50 1.20 2.45 1.37Brokern Kernel (%) 1.38 0.55 1.71 0.11
X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Kernel (%) 26.05 4.78 24.92 3.44Broken Kernel (%) 18.07 4.24 17.32 2.73Uncracked Nut (%)Half cracked Nut (%) 2.10 1.06 2.40 0.41
X SD X SDRipple Mill No: 1 97.80 1.10 96.26 1.12Ripple Mill No: 2 97.50 0.81 96.13 1.08Ripple Mill No: 3Ripple Mill No: 4Ripple Mill No: 5Ripple Mill No: 6Ripple Mill No: 7Ripple Mill No: 8Ripple Mill No: 9
Comments :
No: 6 No: 7 No: 8 No: 9Mixture Composition after Cracker
No: 1 No: 2
R I P P L E M I L L
R I P P L E M I L L
No: 1 No: 2 No: 3 No: 9
No: 3 No: 4 No: 5
Nut Cracking Eff.
Kernel Recovery Eff.
Nut cracking efficiency and kernel recovery for all ripple mills were satisfactory.
Nut Composition before Cracker (INPUT)
No: 4 No: 5 No: 6 No: 7 No: 8
PAGE 142.4.4. KERNEL LOSSES / COST
X SD X SD X SD X SD X SD X SD
0.69 0.69
1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage
0.60 0.55 0.58 0.54
Claybath 0.94 0.92
2.4.5. RUNNING COST
Comments :
This Month
Line 3Line 1 Line 2 Line 3
Last Month Todate
Kernel Produced (mt)Total Kaolin or Calcium Carbonate Cost (RM)
Last MonthThis Month
Cyclone Fibre
LTDS
Hydrocyclone (PK in wet shell)
Line 1 Line 2
716.530 794.060 6265.640
3149.250 22026.250
4.610 3.970 3.520
3300.000
Cost / MT of FFB (RM)
Other Cost e.g Sodium Silicate (RM)
Cost / MT of PK (RM)
0.200 0.180 0.160
All the losses was maintained below 1%.
PAGE 152.5. BOILER / POWER HOUSE
2.5.1. BOILER HOUSE
Description This Month Last Month TodateBoiler Chemical Cost (RM) 2390.12 24482.66 Cost / MT FFB (RM) 0.14 0.18
2.5.2. POWER HOUSE
DescriptionThis Month Last Month This Month Last Month This Month Last Month This Month Last Month This Month Last Month
Turbines > NadrowskiNo. 1 (504 KW) 173.0 21.5 26650.0No. 2 (1200 KW) 295.0 317.4 221640.0 57070.0Diesel Gen Set > CaterpillarNo. 1 (280 KW) 20.4 670.0 214.0No. 2 (150 KW) 291.0 441.0 19844.0 33013.0 12303.0 10574.0 1.61 3.06No. 3 (360 KW) 482.0 509.0 19880.0 62780.0 12347.0 20108.0 1.61 3.12KwHr / mt FFB (Turbine + Genset)
2.5.3. TNB POWER SUPPLY
KwHr RM KwHr RM KwHr RMPalm Oil MillRubber FactoryEcomat PlantTotal 0.00 0.00 0.00 0.00 0.00 0.00
Comments :
Diesel consumption of 3 unit Genset was recorded at 24,650 liter reduced 20%..Cost of boiler chemical was recorded at RM 0.14/MT FFB.
179.8
This Month Last Month Todate
Steam Consumption per KwHr (Turbine)9.0
Operating Hours Total KwH Generated Kw KwHr / LitDiesel Consumption
(Litres)
PAGE 16
2.6. WATER TREATMENT PLANT
2.6.1. WATER CONSUMPTION
Description This Month Last Month This Month Last Month m3/mt FFBOwn 1030.27 859.99Estate
Mill 23060.00 21230.00 1.40 FCTOTAL 24090.27 22089.99 0.00 0.00 1.40
2.6.2. WATER TREATMENT COST
This Month Last Month TodateChemical Cost (RM) 1081.04 884.70 11391.51Cost /m3 water (cts / m3) 0.04 0.04Cost /mt FFB (cts / mt FFB) 0.07 0.05 0.08Water Consumption (m3 / mt FFB) 1.40 1.24
2.6.3. MONTHLY LICENCE COSTPUMPING RAW WATER FROM RIVER
This Month Last Month TodateTotal Volume of water (m3) consumedTotal Cost (RM)
Comments :
Raw water is pumping from tube well.
Domestic
Water consumed%
Water Consumption was recorded at 1.40 M3 /MT FFB.
PAGE 17
2.7. General (Visitors / Security / Training Programme / Details of Breakdown, etc)
2.7.1. Visitation
Date
2.7.2. Training
Date13.6.2012
2.7.3. Security
Date28.6.2012
2.7.4. OSH Matter
Date20.6.2012
2.7.5. RSPO Matter
Date
2.7.6. Amenities
Date
2.7.7. Water Supply
Date
2.7.8. EFB DISPOSAL
2.7.9. DECANTER CAKE DISPOSAL
- 389.00 302.23 86.77
Remarks
Production (mt) Collected (mt)
Remarks
Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)
2,573.16 47.84 Balance b/f (mt) Balance c/f (mt)
- 2,621.00
Remarks
Mohd Ismadi bin Ismail from OSH Dept. ( Safety Visit).
RemarksPerson
RemarksFirst Aid Traning from HA .
RemarksAP meeting.
Remarks
PAGE 17.1
2.8.0. Effluent Treatment
Date2.6.2012
2.8.1 Mill Downtime
Date Hours Date Hours15.6.2012 2
Total 2 0
2.8.2 Housekeeping / Beautification / Linesite / Compound
Date26.6.2012
15.6.2012
2.8.3. Others
Date
Comments
RemarksDisludging Effluent Pond in progress.
Details DetailsLine 1 Line 2
Diesel genset breakbown.
RemarksOffice removation in progress.
Internal tar road and Concrete road
Remarks
PAGE 17.2
2.8.4. Effluent Result For June 2012
abcdefgh
2.8.5 Trailing Report
Total Solids (mg / l)
DOE LimitpH NABOD (mg / l)
NA
5000 Max
NAAmmonical Nitrogen (mg / l) NA
61
COD (mg / l) NATotal Nitrogen (mg / l)
Oil & Grease (mg / l) NA
7601NA
TQCC Result7.4308
-248186
834Suspended Solids (mg / l)
PAGE 183.0 MANPOWER
3.1. EMPLOYEES
MALAYS CHINESE INDIANS OTHERS TOTAL Executives 2 2 4 Subordinate Staff 14 1 3 18 TOTAL 16 3 3 0 22
3.2. SUBORDINATE STAFF LEAVE STATUS
Leave Leave Leave B/F From Entitlement Taken Leave Year '10 for Year '11 This Taken
No. Position (Days) (Days) Total Month Todate Bal1 ELECTRICAL CH 7 21 28 4 19 92 LAB.SUPERVISO 10 24 34 2 15 193 W/BRIDGE CLERK 24 24 4 14 104 CLERK 24 24 2 8 165 BOILER CHARGEMAN 21 21 3 9 126 SUPERVISOR 24 24 - 7 177 CLERK 18 18 - 3 158 SUPERVISOR 24 24 - 5 199 CHIEF CLERK 24 24 2 9 15
10 CLERK 1 24 25 - 13 1211 STORE CLERK 4 24 28 6 6 2212 BOILERMAN 24 24 1 7 1713 FOREMAN 24 24 - 4 2014 BOILERMAN 24 24 1 7 1715 W/BRIDGE CLERK 18 18 1 8 1016 BOILERMAN 21 21 - 9 1217 ASST. FOREMAN 18 18 1 6 1218 BOILERMAN 18 18 - 5 1319202122232425262728
Comments :
FARIDAH BT TALIBHAJI BURHANUDDIN BIN MRAZALI BIN MAT
AYUB BIN BASRIFAUZIAH BT HAJI MANSUJOHARI BIN ALIZULINA BT MAT JUNOSABDUL RASHID BIN SARMLAI AH FONG
NORHAYATI BT MAT ISAJAMALUDDIN BIN AHMAD ABU HASSAN SHAARI BIN MOHD SAAD BIN BAKARABDUL RAHIM BIN HJ ARS
KUN MARIYATI BT RADIN
DEVADAS A/L MARIAPPANARUMUGAM A/L MUNIYANVELAN A/L SUBRAMANIAM
NAME
PAGE 18.13.3 EMPLOYEE (MILL WORKERS)
(A) CHECKROLL
(1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 28 3 31 - 31 Chinese - - - Indian 16 1 17 - 17 Grand Total 44 4 48 - - - 48
(2) NON-MALAYSIAN Sri Lanka - - - India 14 14 - 14 Indonesia 24 24 - 24 Bangladeshi 7 7 - 7 Thai - - - Filipino - - - Grand Total 45 - 45 - - - 45 Total Checkroll 89 4 93 - - - 93
(B) CONTRACT / TEMPORARY
(1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera - - - Chinese 1 1 - 1 Indian 1 1 - 1 Grand Total 2 - 2 - - - 2
Employees Dependants (Resident)Total
Employees Dependants (Resident)Total
PAGE 19Appendix 1
Unit This Month Last Month Todate1.0 FFB
1.1.1 Weight of FFB processed MT 16,485.540 17,072.250 151,379.000 1.1.2 Estimate MT 19,598.000 17,486.000 160,762.000 1.1.3 Shift Hours Hrs -
2.0 OIL MANUFACTURE2.1.1 Weight of Oil Produced MT 3,647.370 3,844.370 33,361.390 2.1.2 Estimate MT 4,272.000 3,812.000 34,675.000 2.1.3 Oil Extraction Rate % 22.12 22.52 22.04 2.1.4 Estimate % 21.80 21.80 21.57 2.1.5 Press Running Hours Hrs. 866.63 850.91 7,905.68 2.1.6 Production Hours Hrs. 272.25 288.25 2,622.25 2.1.7 Downtime (Line 1) Hrs. 2.00 0.50 36.25 2.1.8 Downtime (Line 2) Hrs. - 2.1.9 Press Capacity per unit MT / hr 19.02 20.06 19.15 2.2.0 F.F.B. Manufactured / Hours MT / hr 60.55 59.23 57.73 2.2.1 Oil Recovered / Hours MT / hr 13.40 13.34 26.74
3.0 KERNEL MANUFACTURE3.1.1 Weight of kernel Produced MT 716.530 794.060 6,982.170 3.1.2 Estimate MT 1,019.000 909.000 8,359.000 3.1.3 Kernel Extraction Rate % 4.35 4.65 4.61
;3.1.4 Estimate % 5.20 5.20 5.20 3.1.5 Production Hours Hrs. 272.25 288.25 2,611.75 3.1.6 Kernel Recovered / Hr MT / hr 2.63 2.75 2.67
4.0 DESPATCH AND STOCK4.1.1 Oil Despatched MT 3,497.520 3,749.080 34,358.570 4.1.2 Oil in Stock MT 957.370 807.520 1,764.890 4.1.3 Kernels Despatched MT 665.580 791.400 6,901.710 4.1.4 Kernels in stock MT 231.610 180.660 412.270
- Packed / Bulk Silo MT 231.610 180.660 412.270 - Kernel in Bag MT -
Remarks :
PROGRESS REPORT FOR THE MONTHOF JUNE 2012
PAGE 20
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION(4) HOISTING / TIPPER AND THRESHING STATION
PAGE 21
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION(8) CLARIFICATION STATION
PAGE 22
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION(12) EFFLUENT STATION
PAGE 23
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL
CoverPageHighlightsProductionReportFFBCompositionFFBQualityLF_TrashContentProductionQualityProdDesKernelCPODesGPSRepCOPProcPerfDigPressStationDigPressStation2EFBPressingClarificationStationDecanterDilutionPurifierNutKernelStationNutCrackingEffKernelLossesBoilerPowerHouseWaterTreatmentGeneralGeneral2General3ManPowerEmployeeAppendix1MajorMaintRep1MajorMaintRep2MajorMaintRep3MajorMaintRep4
Main
KKS Progress Report version 1.3 for June 2012
Please select your desire section by a mouse click
Section ASection B
3
Save
Information for the Progress Report
Co NameKUALA LUMPUR KEPONG BERHAD
Co Reg No.15043-VSetup
OC Code157
OC NameKILANG KELAPA SAWIT CHANGKAT CHERMIN
Co Start of Fin Mth10
Current Year2012Reset
Current Month6June
Current Month, YrJune 2012
Current Fin Mth #9th
Current Fin Mth9th
Current Fin Yr2012
Current Period2011/12
Asst/Manager NameMOHD HADZRI BIN ARSADTitleManager
By: Chan Kok LeongInstalled to:C:\eProgressRep\version 1.3
Sys last updated:30-Mar-2012Set:12-Jun-2012
Title ListYearMonthYesNo
Assistant20111No
Senior Assistant20122Yes
Acting Manager20133
Manager20144
Senior Manager20155
20166
20177
20188
20199
202010
202111
202212
Brief Instructions1. Change the Current Year / Month2. Click to get to desire Worksheet Page3. Enter the necessary data - Use Tab key to move to different fields4. Click Save icon to save your work5. Click Print to preview print out
Notes:1. Click Setup to change system defaults2. Click Reset for default zoom or A4 size
++ means click tab for more pages
11. Process Performance
1. Highlights
2. Production Report
4. FFB Quality
5. LF and Trash Content
6. Production Quality
7. Production and Despatch Kernel
8. High Differences CPO Despatch Loads
9. GPS Progress Report
10. Cost of Production
12. Digesting & Pressing Station ++
13. EFB Pressing
1. Clarification Station
2. Decanter
3. Dilution Rate & Absolute Oil Loss
4. Purifier & Vacuum Dryer
5. Nut & Kernel Station
6. Nut Cracking Efficiency
7. Kernel Losses / Cost
8. Boiler / Power House
9. Water Treatment Plant
10. General (Visitors/Security/Breakdown, etc.) ++
11. Man Power
12. Appendix 1
3. FFB Composition
13. Major Maintenance Report ++
CoverPage
KILANG KELAPA SAWIT CHANGKAT CHERMIN
Progress Report
For the month of
JUNE 2012
Date7/20/12KUALA LUMPUR KEPONG BERHAD
(No. Syarikat: 15043-V)
KILANG KELAPA SAWIT CHANGKAT CHERMIN
.
(MOHD HADZRI BIN ARSAD)
Manager
Highlights
PROGRESS REPORT ONPAGE 1
KILANG KELAPA SAWIT CHANGKAT CHERMIN
FOR THE MONTH OF JUNE 2012
(9TH MONTH OF FINANCIAL YEAR)
HIGHLIGHTS
Estimated percentage of FFB pushed by shovel100.0%
Percentage FFB pushed due to grading0.0%
PRODUCTION
Current Financial YearSame Period Last Year
This MonthLast MonthTodateThis MonthTodate
O.E.R %22.1222.5222.0420.4021.19
K.E.R %4.354.654.614.044.72
RAINFALL RECORD (mm)Year2012
Fin YearOctNovDecJanFebMarAprMayJunJulAugSep
Last FY20.00119.00163.00185.0071.00699.50574.00262.00359.00329.00457.00766.00
This FY314.75431.00431.0061.25197.75242.25203.2579.5020.50
OTHER HIGHLIGHTS
ITEMDESCRIPTION OF PROBLEMS / ACHIEVEMENTS
Comments :
This month OER & KER dicreased by 0.40% & 0.30% respectively as compared to last month figure.
The todate OER was increased by 0.85% to 22.04% as compared to last year same period.
Main Menu
ProductionReport
PAGE 2
1PRODUCTION REPORT
1.1.FFB STATEMENT
1.1.1.FFB CONTRIBUTION
Estimate forEstimate+/- Estimate+/- Estimate
This MonthTodateThis MonthTodateThis MonthTodate
KLK EstatesMTMTMTMTMTMT
--
LADANG LEKIR5,373.92045,917.4607,160.00056,681.000-24.95%-18.99%
LDG. CHANGKAT CHERMIN3,272.92030,039.7703,498.00031,415.000-6.43%-4.38%
LDG. RAJA HITAM2,281.75033,051.6104,056.00034,124.000-43.74%-3.14%
LDG. SERAPOH1,276.24010,206.2001,649.00012,387.000-22.61%-17.61%
LDG. GLENEALY929.0607,782.5301,161.0008,616.000-19.98%-9.67%
LDG. SENGGANG416.6103,264.440568.0004,810.000-26.65%-32.13%
LDG. ALLAGAR1,024.27010,748.0401,506.00019,598.000-31.99%-45.16%
LDG. KUALA KANGSAR415.5201,970.800- 0- 0--
LDG. SUBUR- 0312.210- 0- 0--
--
--
--
--
--
--
--
Sub Total14,990.290143,293.06019,598.000167,631.000-23.51%-14.52%
Non-KLK Estates
--
LDG. KAMPAR- 01,591.2800.0000.000--
LDG PINJI971.3207,145.6101180.0004660.000-17.68%53.34%
LDG BATU DUA159.6001,351.030210.000890.000-24.00%51.80%
LDG. MENGLEMBU115.400868.960130.000495.000-11.23%75.55%
LDG BUKIT KATHO- 0630.1100.0000.000--
LDG TRONOH MALAY248.930535.8200.0000.000--
--
--
-0.00%
--
Sub Total1,495.25012,122.8101,520.0006,045.000-1.63%100.54%
Outsiders
--
LADG. NARBOROUGH- 0299.420--
--
--
--
--
--
--
--
--
--
--
Sub Total- 0299.420- 0- 0--
Grand Total16,485.540155,715.29021,118.000173,676.000-21.94%-10.34%
Comment :
Total FFB received for the month lowered by 21.94% or 4,632.46 mt as compared to the estimated.
( No include from Ladang Batu Dua, Ladang Kuala Kangsar, Ladang Subur, non-KLK estates and outsiders ).
Main Menu
FFBComposition
PAGE 3
1.1.2.FFB COMPOSITION
Composition of crop from various years of planting are :-
Year of PlantingThis MonthTodate
MT%MT%Palm Age1st-3rd4th-9th10th-18th19th&above
197743.870.2781.150.0535557.387276.75923.292728.17
198018.080.1177.230.0532
1981- 0- 0- 0- 00
198292.020.56163.930.1130
1983- 0- 0277.300.1829
1984120.670.73925.320.6128
198568.010.41616.790.4127
198646.060.28614.210.4126
198797.840.591,223.200.8125
1988- 0- 01,433.850.9524
1989701.564.265,709.103.7723
1990318.311.932,814.541.8622
1991439.062.663,763.652.4921
1992763.874.635,881.963.8920
199318.820.11159.830.1119
199460.580.37691.190.4618
199544.750.27658.110.4317
1996127.890.781,111.000.7316
199794.590.57817.880.5415
1998529.913.214,471.332.9514
1999584.673.554,924.433.2513
2000454.522.764,147.172.7412
20011,446.198.7713,153.788.6911
20022,580.1915.6524,827.5316.4010
20031,224.377.4310,905.217.209
20041,698.6110.3016,030.1410.598
20051,060.996.4412,072.167.977
20061,528.099.2716,288.9910.766
20071,699.6610.3115,338.9310.135
200864.980.39561.750.374
2009557.383.381,637.341.083
2010- 0- 02
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
Total16,485.54100.00151,379.00100.00
Append below the classification of Palms According to Age :-
CategoryPalm Age (years)%Remarks
Immature1st - 3rd3%
Young4th - 9th44%
Prime10th - 18th36%
Old19th and above17%
Comments :
FFB composition vary from the years 1977 to 2009 with most of the crop
come from 2001 till 2007.
Main Menu
FFBQuality
PAGE 4
1.1.3.FFB QUALITY
No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch
CONTRIBUTINGThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast
ESTATESMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth
Total/Average00- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
1.1.4.% FFB ON FLOOR AND IN LOADING RAMP FOR GRADING
LOADING RAMPFFB GRADING
FFB INTAKE (MT)WEIGHT (MT)%WEIGHT (MT)%
Comments :
No grading was conducted by mill.
Main Menu
LF_TrashContent
PAGE 4.1
1.1.5.LOOSE FRUIT & TRASH CONTENT
No. of Grading% LooseTrash Content inTrash Content in
Fruit in LoadLoose Fruit (%)FFB %
ThisLastThisLastThisLastThisLast
NOESTATESMonthMonthMonthMonthMonthMonthMonthMonth
1Lekir15.5014.00
2C.Chermin10.3811.00
3Raja Hitam10.009.67
4Glenealy13.0013.00
5Serapoh-12.50
6Allagar15.6517.00
7Kuala Kangsar15.0014.50
8Tronoh Malay11.0012.50
9
10
11
12
Average00- 0- 0- 0- 0- 0- 0
NOOutsider Estate
1
2
3
Average00- 0- 0- 0- 0- 0- 0
1.1.6.LOOSE FRUITS TO FFB RATIO
Total Tonnage% to FFB
NOESTATESThis MonthLast MonthThis MonthLast Month
1
2
3
4
5
6
7
8
1.1.7.STONES & TRASH IN FFB
Trash
NOESTATESStones (kgs) per 100 tn FFBTonnage (mt)% to FFB
1All Estates3.86
2
3
4
5
6
7
8
Comments :
Trash contents from Ladang Lekir and Ladang Kuala Kangsar rose to 15%. Ladang Allagar
manage to reduced the trash content from 17% to 15.65%.
Main Menu
ProductionQuality
PAGE 5
1.2.PRODUCTION QUALITY
1.2.1.PRODUCTION OIL / DESPATCH OIL
PRODUCTIONDESPATCHMarketing
This MonthLast MonthThis MonthLast MonthSpecification
XS.D.XS.D.XS.D.XS.D.
3.840.223.573.920.183.78
FFA %< 5.0
0.090.030.120.120.020.14< 0.25
Moisture (VM) %
0.0389.3960.0370.0349.6550.033
Dirt %
Peroxide Value %
2.810.072.882.790.072.78
DOBI> 2.31
ANALYSIS RESULT BY (KDC/TQCC)
1st Week2nd Week3rd Week4th WeekTaiko
SAMPLEAverageStandard
FFA3.533.973.764.143.853.0 Max
VM0.140.130.100.100.120.13 Max
DIRT0.0440.0410.0420.0380.040.03 Max
PEROXIDE VALUE0.600.800.700.600.680.60 Max
IODINE VALUE52.2052.2052.2052.0052.1550 - 54
DOBI VALUE3.002.992.831.212.513.0 Min
CAROTENE585.00577.00620.00547.00582.25600 Min
E233 (1% CORR.)1.171.211.240.210.961.20 Max
E269 (1% CORR.)0.230.230.280.210.240.20 Max
IRON----0.005.0 - 3.0
PHOSPHORUS----0.008.0 - 5.0
D.F. (Delta Y)20.8620.7318.1621.9720.4320.0 Min
QUALITY RATING0.00NIL
Comments :
The CPO Quality for the month was fair.
Main Menu
ProdDesKernel
PAGE 6
1.2.2.PRODUCTION / DESPATCH KERNEL
PRODUCTIONDESPATCH
THIS MONTHLAST MONTHTHIS MONTHLAST MONTHMARKETING
XS.D.XS.D.XS.D.XS.D.SPECIFICATION
MOISTURE %5.650.385.575.800.435.926%
DIRT %3.950.444.124.370.224.487%
FFA %1.120.061.071.140.061.10
TOTAL BROKEN KERNEL %26.541.1825.40
STONE CONTENT %0.001.18
1.2.3.CPO DESPATCH
BUYERMILLBUYER'S+ / -
NETNETON MILL
WEIGHTWEIGHTNET WEIGHT
tntntn
1-PGEO LUMUT1497.0901500.7503.660
2-RAUB OIL MILL (DELIVED TO ISF)198.490198.6300.140
3-LEE OIL MILL100.880101.1900.310
4-CARGILL PALM PRODUCT1494.1301498.7204.590
5-SOUTHERN EO99.16099.2500.090
6-ISF98.65098.9800.330
7-0.000
3488.4003497.5209.120
1.2.4.PK DESPATCH
BUYERMILL
NET
WEIGHT
tn
1-PANGKOR OIL MILL344.120
2-HUP LEE OIL MILL200.960
3-SINN HWAT HENG120.500
4-
5-
6-
7-
Total :665.580
1.2.5.CXC REPORT
THIS MONTHLAST MONTH
Total number of CPO tankers9599
No. of Loads with high differences +/- 80kg)23
Comments :
The Kernel quality was fair.
The buyer net weight have surplus 9.12 mt than mill net weight.
Main Menu
CPODes
PAGE 6.1
EXTRACTED FROM CXC REPORT
CPO Despatch Loads With High Differences
LOADS FROM MONTH: June 2012
Weight Details (MT)
Ticket NoDriverVehicleDateMillBuyerG / LossBuyer
A083782Hairul Nizam b. HashimBJJ 56847.6.201240.81040.7000.110Raub Oil Mill (Recovered 90 kg)
A084257Lokman bin AhmadBLG 77514.6.201240.77040.6900.080Cargill ( Recovered 90 kg)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Total0.190
Comments
Mill already done load test and calibration on weighbridge end of this month.
Main Menu
GPSRep
PAGE 6.2
GPS PROGRESS REPORT FOR KILANG KELAPA SAWIT CHANGKAT CHERMIN ON June 2012
Violation Report
No.Tanker No.*Total UsageMill Weight +/-Other Mill Weight +/-Total Weight +/-No Go ZoneExcessive IdlingPower DisconnectZone Grid ExitAction Taken / Remarks
Total0000
* Represent (TMS) Outside Tankers
Main Menu
COP
PAGE 7
1.3.COST OF PRODUCTION
(Basis : Cost per tonne CPO)
This
MonthTodateYear ' s
June 20129 mthsEstimate
RM / tnRM / tnRM / tn
Indirect Cost50.6749.2956.30
Depreciation29.1028.6426.11
Manufacturing Cost142.38138.77139.62
Ex-Mill Cost222.15216.70222.03
Cooking Oil Cess--0.00
Palm Oil Stabilisation Cess2.002.002.00
CPO (Sabah) Sales Tax--0.00
Despatch & Selling22.166.8027.1
TOTAL EXPENDITURE246.31225.50251.13
A/cThis MonthEstimateComments
CodeRM/ton CPORM/ton CPODiff. (%)
0.0%
IC 087.896.4618.1%Relocate office septic tank and install 3 unit flag pole.
0.0%
IC 122.920.7076.0%High cost due to beautification work in front of the office.
0.0%
IC 2014.1112.0314.7%Reimbursement claim for auditor stay in hotel.
0.0%
PK 4456.3938.6631.4%High Diesel usage for diesel Generator due to no TNB supply.
0.0%
PK 463.501.7550.0%Remove the side zinc of steriliser building to improve ventilation.
0.0%
PK 478.255.9527.9%High cost due to desilting of effluent pond.
0.0%
PK 514.621.8460.2%Remove the portion of roof to improve tne ventilation.
0.0%
PK 5714.169.1635.3%Overhaul one unit of Westfalia separator.
0.0%
PK 588.106.0025.9%Install one unit C.M Conv. At the claybath.
Comments :
Main Menu
ProcPerf
PAGE 8
2PROCESS PERFORMANCE
2.1.STERILIZATION
Summary of sterilisation cycle for the month is tabulated as follows :-
FunctionX (min)S.D.
Deaeration2BarPsi
1st. Peak(1.41 Bar / 20 psi)161.4120
1st. Peak exhaust1
2nd. Peak(1.7 Bar / 25 psi)121.725
2nd. Peak exhaust
3rd. Peak(1.7 Bar / 25 psi)1.725
3rd. Peak exhaust
4th. Peak(1.7 Bar / 25 psi)1.725
Holding Time31
Final exhaust4
Steaming cycle660
Door Open to Door Shut Time30
This MonthLast Month
XS.D.XS.D.
USB after 1st Threshing (%)1.210.18-
USB after 2nd Threshing (%)0.640.170.71
Threshing Efficiency (%)
STERILIZER CONDENSATE
This MonthLast Month
XS.D.XS.D.
Steriliser condensate (Oil Content in Wet Basis)4.861.015.37
Condensate / FFB Ratio--
Absolute oil loss (kg/tn FFB)--
Comments :
The Automatic Condensate Dispenser trial is carried out on Sterilizer No. 4.
The OLWB of Sterilizer Condensate for the month was recorded at 4.86%.
Main Menu
DigPressStation
PAGE 9.0
2.2.DIGESTING & PRESSING STATION
2.2.1.DIGESTER TEMPERATURE OC
ThisMonthLastMonth
DIGESTERXS.D.XS.D.
Digester No. 198.000.8098.000.75
Digester No. 297.000.7998.000.85
Digester No. 397.000.5498.000.89
Digester No. 499.000.5998.001.00
Digester No. 5
Digester No. 6
Digester No. 7
Digester No. 8
Digester No. 9
2.2.2.PRESSING
PressPressPressPressPressPressPressPressPressAverage
No. 1No. 2No. 3No. 4No. 5No. 6No. 7No. 8No. 9
OIL LOSS ON WET BASIS (OLWB)This MonthX4.554.604.604.704.61
S.D.0.160.120.191.200.42
Last MonthX4.614.624.614.574.60
S.D.0.100.090.100.110.10
OIL LOSS ON DRY BASIS (OLDB)This MonthX7.557.617.617.537.58
S.D.0.340.190.280.340.29
Last MonthX7.657.677.657.587.64
S.D.0.180.140.180.160.16
NUT BREAKAGE (%)This MonthX14.3712.9813.4113.4613.56
S.D.2.821.931.331.551.91
Last MonthX14.3313.4113.3914.2813.85
S.D.2.431.882.242.172.18
PRESS RUNNING HOURSThis MonthX233.59235.27189.47208.30216.66
S.D.0.00
Last MonthX233.07222.68191.44203.72212.73
S.D.0.00
Comments :
The digester temperature are maintained above 950C.
The OLDB of press fibre controlled below 7.8%.
98
98
Main Menu
DigPressStation2
PAGE 9.1
2.2.3.
True Mesocarp (ripe)True Mesocarp (unripe)Oil in MesocarpOLWBNormal ParthenocarpAbnormal PartnenocarpTrue NutTrash
This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month
X
S.D.
N
Main Menu
EFBPressing
PAGE 9.2
2.2.4.EFB PRESSING
PressPressPressPress
No. 1No. 2No. 3No. 4
PRESS RUNNINGThis Month169.57171.77211.24
HOURSLast Month240.1690.27282.61
DOWN TIMEThis Month2.00
Last Month0.50
2.2.5.
OIL RECOVERED
This MonthLast Month
F F A(%)4.764.93
DOBI1.731.71
VM(%)87.7687.77
OLWB(%)7.317.26
Press Fibre (OLDB)
Ratio EFB Liquor to FFB (%)
2.2.6.SPLITTER
Running HoursRUNNING HOURS
This MonthLast Month
No. 1
No. 2
Comments :
Main Menu
ClarificationStation
PAGE 10
2.3.CLARIFICATION STATION
2.3.1.CLARIFICATION TANK
This MonthLast Month
Tank 1Tank 2Tank 3Tank 1Tank 2Tank 3
Temperature OCX96.0098.00
S.D
% Oil in underflowX5.024.936.036.07
(% OLWB)S.D0.570.11
2.3.2.SLUDGE SEPARATOR (S) / CENTRIFUGE (C)
S1S2DA 45C1C2C3C4C5C6C7
% Oil loss on wet basis (x)This MonthX0.970.980.960.770.780.780.780.760.82
S.D0.030.070.070.030.070.060.060.030.10
Last MonthX0.980.960.780.790.770.790.770.78
S.D.
Operating Hours (hrs)T MthX162.1822.41247.24118.4120.25118.06139.1984.81131.73
L MthX207.95276.13160.6040.50271.61195.3581.98103.70
Nozzle size (mm)T MthX1.401.401.701.701.701.701.701.701.70
L MthX1.401.401.701.701.701.701.701.701.70
Separate Waste Basculator (mt)T MthX
L MthX
Oil losses on Absolute Terms (Kg/tn FFB)T MthX
L MthX
Comments :
The temperature of clarification tank maintained above 95oC
The % of underflow of clarification tank 1 & 2 was recorded at 5.02% and 4.93% respectively in OLWB.
The OLWB of heavy phase for separator & centrifuge stork was below 1%.
Main Menu
Decanter
PAGE 11
2.3.2.DECANTER (D)
InletSolid PhaseLight PhaseHeavy Phase
Temperature (oC)This Month98.00
Last Month98.00D1D2D1D2D1D2
Oil % (x)This MonthX6.883.380.87
S.D2.470.11
Last MonthX7.553.650.93
S.D.
VM % (x)This MonthX87.8077.8395.03
S.D
Last MonthX86.4577.9295.19
S.D.
NOS % (x)This MonthX5.3218.794.10
S.D
Last MonthX6.0018.433.88
S.D.
Operating HoursT MthX
L MthX
Comments :
Decanter performance satisfactory.
Main Menu
Dilution
PAGE 12
2.3.3.DILUTION RATE & ABSOLUTE OIL LOSS
This MonthLast Month
XS.D.XS.D
DILUTION RATE %24.002.7722.16
Separator Waste to FFB ratio
Decanter cake to FFB ratio
Absolute Oil loss in Separator/Centrifuge kg/mt FFB
Absolute Oil loss in Decanter Cake kg/mt FFB
Total Oil loss kg/MT FFB0.000.000.000.00
2.3.4.OIL LOSSES AFTER DEOILING TANK TO EFFLUENT
DescriptionThis MonthLast Month
After Deoiling tank (OLWB)
After Cooling pond0.991.00
Comments :
Oil loss after cooling pond below 1%.
Main Menu
Purifier
PAGE 13
2.3.5.PURIFIER & VACUUM DRYER
PURIFIERBefore PurifierAfter Purifier
No: 1No: 2No: 1No: 2No: 3No: 4No: 5
% VMThis MonthX0.35
S.D0.05
Last MonthX0.56
S.D.0.11
% DirtThis MonthX0.04
S.D6.93
Last MonthX0.04
S.D.7.33
VM Rem. EffThis MonthX
S.D
Last MonthX
S.D.
Dirt Rem. EffThis MonthX
S.D
Last MonthX
S.D.
2.3.6.VACUUM DRYER
VACUUM DRYERVacuum (-cm Hg)VM % Before DryerVM % After DryerVM. Removal Eff.
XS.DXS.DXS.D
No: 1This Month0.350.050.090.0347.29
Last Month0.560.110.120.0378.57
No: 2This Month
Last Month
No: 3This Month
Last Month
Comments :
Production oil quality was satisfactory without using purifiers.
Performance of Vacuum dryer was satisfactory.
Main Menu
NutKernelStation
2.4.NUT & KERNEL STATIONPAGE 13.1
2.4.1.NUT SILO & KERNEL SILOS
DESCRIPTIONNo: 1No: 2No: 3No: 4
% VM Fresh NutThis MonthX
S.D
Last MonthX
S.D.
% Dried NutThis MonthX
S.D
Last MonthX
S.D.
% Drying EfficiencyThis MonthX
S.D
Last MonthX
S.D.
2.4.2.KERNEL SILO
This MonthLast Month
1234512345
Temperature oCTop30.4027.6027.6024.8024.0030.6032.4031.4024.8024.50
Middle33.6031.6032.8028.6028.8034.0039.8026.8028.8026.80
Bottom60.8056.6062.8045.0042.6056.0060.6064.0064.8064.40
% VM Fresh KernelX21.3021.00
S.D12.60
% Dried KernelX5.655.57
S.D0.38
% Drying Efficiency73.1373.48
Comments :
The quality of kernel was satisfactory.
Main Menu
NutCrackingEff
2.4.3.NUT CRACKING EFFICIENCYPAGE 13.2
R I P P L E M I L L
Nut Composition before Cracker (INPUT)No: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9
XSDXSDXSDXSDXSDXSDXSDXSDXSD
Whole Nut (%)90.543.4890.913.80
Broken Nut (%)4.902.064.932.42
Whole Kernel (%)2.501.202.451.37
Brokern Kernel (%)1.380.551.710.11
R I P P L E M I L L
Mixture Composition after CrackerNo: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9
XSDXSDXSDXSDXSDXSDXSDXSDXSD
Whole Kernel (%)26.054.7824.923.44
Broken Kernel (%)18.074.2417.322.73
Uncracked Nut (%)
Half cracked Nut (%)2.101.062.400.41
Nut Cracking Eff.Kernel Recovery Eff.
XSDXSD
Ripple Mill No: 197.801.1096.261.12
Ripple Mill No: 297.500.8196.131.08
Ripple Mill No: 3
Ripple Mill No: 4
Ripple Mill No: 5
Ripple Mill No: 6
Ripple Mill No: 7
Ripple Mill No: 8
Ripple Mill No: 9
Comments :
Nut cracking efficiency and kernel recovery for all ripple mills were satisfactory.
Main Menu
KernelLosses
PAGE 14
2.4.4.KERNEL LOSSES / COST
This MonthLast Month
Line 1Line 2Line 3Line 1Line 2Line 3
XSDXSDXSDXSDXSDXSD
Cyclone Fibre0.690.69
LTDS1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage
0.600.550.580.54
Hydrocyclone (PK in wet shell)
Claybath0.940.92
2.4.5.RUNNING COST
This MonthLast MonthTodate
Kernel Produced (mt)716.530794.0606265.640
Total Kaolin or Calcium Carbonate Cost (RM)3300.0003149.25022026.250
Other Cost e.g Sodium Silicate (RM)
Cost / MT of PK (RM)4.6103.9703.520
Cost / MT of FFB (RM)0.2000.1800.160
Comments :
All the losses was maintained below 1%.
Main Menu
BoilerPowerHouse
PAGE 15
2.5.BOILER / POWER HOUSE
2.5.1.BOILER HOUSE
DescriptionThis MonthLast MonthTodate
Boiler Chemical Cost (RM)2390.1224482.66
Cost / MT FFB (RM)0.140.18
2.5.2.POWER HOUSE
DescriptionOperating HoursTotal KwH GeneratedDiesel Consumption (Litres)KwKwHr / LitTurbine / Dieset Gen Set Kw
This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month
Turbines>NadrowskiAllan KKKDresser RandElliotShinkoTurbodyneNadrowskiOthers
No. 1 (504 KW)173.021.526650.0504
No. 2 (1200 KW)295.0317.4221640.057070.01200
Diesel Gen Set >CaterpillarCaterpillarCumminsListerOthers
No. 1 (280 KW)20.4670.0214.0280
No. 2 (150 KW)291.0441.019844.033013.012303.010574.01.613.06150
No. 3 (360 KW)482.0509.019880.062780.012347.020108.01.613.12360
KwHr / mt FFB (Turbine + Genset)9.0Steam Consumption per KwHr (Turbine)179.8
2.5.3.TNB POWER SUPPLY
This MonthLast MonthTodate
KwHrRMKwHrRMKwHrRM
Palm Oil Mill
Rubber Factory
Ecomat Plant
Total0.000.000.000.000.000.00
Comments :
Cost of boiler chemical was recorded at RM 0.14/MT FFB.
Diesel consumption of 3 unit Genset was recorded at 24,650 liter reduced 20%..
Main Menu
WaterTreatment
PAGE 16
2.6.WATER TREATMENT PLANT
2.6.1.WATER CONSUMPTION
Water consumed
%
DescriptionThis MonthLast MonthThis MonthLast Monthm3/mt FFB
DomesticOwn1030.27859.99
Estate
Mill23060.0021230.001.40
FC
TOTAL24090.2722089.990.000.001.40
2.6.2.WATER TREATMENT COST
This MonthLast MonthTodate
Chemical Cost (RM)1081.04884.7011391.51
Cost /m3 water (cts / m3)0.040.04
Cost /mt FFB (cts / mt FFB)0.070.050.08
Water Consumption (m3 / mt FFB)1.401.24
2.6.3.MONTHLY LICENCE COST
PUMPING RAW WATER FROM RIVER
This MonthLast MonthTodate
Total Volume of water (m3) consumed
Total Cost (RM)
Comments :
Water Consumption was recorded at 1.40 M3 /MT FFB.
Raw water is pumping from tube well.
Main Menu
General
PAGE 17
2.7.General (Visitors / Security / Training Programme / Details of Breakdown, etc)
2.7.1.Visitation
DatePersonRemarks
2.7.2.Training
DateRemarks
13.6.2012First Aid Traning from HA .
2.7.3.Security
DateRemarks
28.6.2012AP meeting.
2.7.4.OSH Matter
DateRemarks
20.6.2012Mohd Ismadi bin Ismail from OSH Dept. ( Safety Visit).
2.7.5.RSPO Matter
DateRemarks
2.7.6.Amenities
DateRemarks
2.7.7.Water Supply
DateRemarks
2.7.8.EFB DISPOSAL
Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)
-2,621.002,573.1647.84
2.7.9.DECANTER CAKE DISPOSAL
Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)
-389.00302.2386.77
Main Menu
General2
PAGE 17.1
2.8.0.Effluent Treatment
DateRemarks
2.6.2012Disludging Effluent Pond in progress.
2.8.1Mill Downtime
Line 1Line 2
DateHoursDetailsDateHoursDetails
15.6.20122Diesel genset breakbown.
Total20
2.8.2Housekeeping / Beautification / Linesite / Compound
DateRemarks
26.6.2012Office removation in progress.
15.6.2012Internal tar road and Concrete road
2.8.3.Others
DateRemarks
Comments
Main Menu
General3
PAGE 17.2
2.8.4.Effluent Result For June 2012
DOE LimitTQCC Result
apHNA7.4
bBOD (mg / l)5000 Max308
cCOD (mg / l)NA-
dTotal Nitrogen (mg / l)NA248
eAmmonical Nitrogen (mg / l)NA186
fTotal Solids (mg / l)NA7601
gSuspended Solids (mg / l)NA834
hOil & Grease (mg / l)NA61
2.8.5Trailing Report
Main Menu
ManPower
PAGE 18
3.0MANPOWER
3.1.EMPLOYEES
MALAYSCHINESEINDIANSOTHERSTOTAL
Executives224
Subordinate Staff141318
TOTAL1633022
3.2.SUBORDINATE STAFF LEAVE STATUS
LeaveLeaveLeave
B/F FromEntitlementTakenLeave
Year '10for Year '11ThisTaken
No.NAMEPosition(Days)(Days)TotalMonthTodateBal
1RAZALI BIN MATELECTRICAL CHARGEMAN721284199
2HAJI BURHANUDDIN BIN MOHDLAB.SUPERVISOR10243421519
3FARIDAH BT TALIBW/BRIDGE CLERK242441410
4KUN MARIYATI BT RADINCLERK24242816
5LAI AH FONGBOILER CHARGEMAN21213912
6ABDUL RASHID BIN SARMONSUPERVISOR2424-717
7ZULINA BT MAT JUNOSCLERK1818-315
8JOHARI BIN ALISUPERVISOR2424-519
9FAUZIAH BT HAJI MANSURCHIEF CLERK24242915
10AYUB BIN BASRICLERK12425-1312
11ABDUL RAHIM BIN HJ ARSHADSTORE CLERK424286622
12MOHD SAAD BIN BAKARBOILERMAN24241717
13ABU HASSAN SHAARI BIN MOHD RAMLIFOREMAN2424-420
14JAMALUDDIN BIN AHMAD MANSURBOILERMAN24241717
15NORHAYATI BT MAT ISAW/BRIDGE CLERK18181810
16VELAN A/L SUBRAMANIAMBOILERMAN2121-912
17ARUMUGAM A/L MUNIYANDIASST. FOREMAN18181612
18DEVADAS A/L MARIAPPANBOILERMAN1818-513
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
Comments :
Main Menu
Employee
PAGE 18.1
3.3EMPLOYEE (MILL WORKERS)
(A)CHECKROLL
EmployeesDependants (Resident)Total
(1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total
Bumiputera28331- 031
Chinese- 0- 0- 0
Indian16117- 017
Grand Total44448- 0- 0- 048
(2) NON-MALAYSIAN
Sri Lanka- 0- 0- 0
India1414- 014
Indonesia2424- 024
Bangladeshi77- 07
Thai- 0- 0- 0
Filipino- 0- 0- 0
Grand Total45- 045- 0- 0- 045
Total Checkroll89493- 0- 0- 093
(B)CONTRACT / TEMPORARY
EmployeesDependants (Resident)Total
(1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total
Bumiputera- 0- 0- 0
Chinese11- 01
Indian11- 01
Grand Total2- 02- 0- 0- 02
Main Menu
Appendix1
PAGE 19
Appendix 1
PROGRESS REPORT FOR THE MONTH
OF JUNE 2012
UnitThis MonthLast MonthTodatePrevious Todate
1.0FFB
1.1.1Weight of FFB processedMT16,485.54017,072.250151,379.000134,893.460
1.1.2EstimateMT19,598.00017,486.000160,762.000141,164.000
1.1.3Shift HoursHrs- 0- 0
2.0OIL MANUFACTURE
2.1.1Weight of Oil ProducedMT3,647.3703,844.37033,361.39029,714.020
2.1.2EstimateMT4,272.0003,812.00034,675.00030,403.000
2.1.3Oil Extraction Rate%22.1222.5222.04
2.1.4Estimate%21.8021.8021.57
2.1.5Press Running HoursHrs.866.63850.917,905.687,039.05
2.1.6Production HoursHrs.272.25288.252,622.252,350.00
2.1.7Downtime (Line 1)Hrs.2.000.5036.2534.25
2.1.8Downtime (Line 2)Hrs.- 0- 0
2.1.9Press Capacity per unitMT / hr19.0220.0619.15
2.2.0F.F.B. Manufactured / HoursMT / hr60.5559.2357.73
2.2.1Oil Recovered / HoursMT / hr13.4013.3426.7413.34
3.0KERNEL MANUFACTURE
3.1.1Weight of kernel ProducedMT716.530794.0606,982.1706,265.640
3.1.2EstimateMT1,019.000909.0008,359.0007,340.000
3.1.3Kernel Extraction Rate%4.354.654.61
;3.1.4Estimate%5.205.205.20
3.1.5Production HoursHrs.272.25288.252,611.752,339.50
3.1.6Kernel Recovered / HrMT / hr2.632.752.67
4.0DESPATCH AND STOCK
4.1.1Oil DespatchedMT3,497.5203,749.08034,358.57030,861.050
4.1.2Oil in StockMT957.370807.5201,764.890807.520
4.1.3Kernels DespatchedMT665.580791.4006,901.7106,236.130
4.1.4Kernels in stockMT231.610180.660412.270180.660
- Packed / Bulk SiloMT231.610180.660412.270180.660
- Kernel in BagMT- 0- 0
Remarks :
Main Menu
MajorMaintRep1
PAGE 20
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION
(4) HOISTING / TIPPER AND THRESHING STATION
Main Menu
MajorMaintRep2
PAGE 21
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION
(8) CLARIFICATION STATION
Main Menu
MajorMaintRep3
PAGE 22
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION
(12) EFFLUENT STATION
Main Menu
MajorMaintRep4
PAGE 23
MAJOR MAINTENANCE REPORT FOR THE MONTH OF JUNE 2012
(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL
Main Menu
Sheet1