cv farid
TRANSCRIPT
CURRICULUM VITAE
MUHAMMAD FARID BIN AB. WAHIDB.Eng(Civil)(Hons)
Personal Info
Address: A-LG-06 Kondominium Sri Alam, Jalan Kelab Golf 13/1
Seksyen 13, 40100 Shah Alam, Selangor, Malaysia
Nationality: Malaysian
ID/IC No.: 811230-01-6171
Date of Birth: 30th December 1981
Email address: [email protected]
Phone No.: +60123502427
Highest Level of Education
University: Universiti Teknologi Mara (UiTM), Malaysia
Qualification: Bachelor’s Degree in Civil Engineering [B.Eng(Civil)(Hons)]
CGPA: 3.79 out of 4.00
Job Summary
Nine years of experience in oil & gas industry being a structural/project engineer (offshore) and
involved in all types of works in engineering and construction which include design, analysis, drawing
generation, material procurement, site-rep, installation, etc.
Working Experience
Company: PBJV Group Sdn Bhd (Barakah Offshore Petroleum Berhad)
Designation: Snr. Structural Engineer
Period: 2014 – Present
Project: Transportation and Installation of Offshore Facilities for Yr 2014 – 2016 (Package A)
Client: Petronas Carigali Sdn Bhd
Works:
- Riser guards installation engineering and SKO platforms integrity checks.
- Design of davits on board PLB KL101 for pipeline midpoint tie-in purposes.
- Linear/lucker winch tie-down and holdback anchor calculation for “beachpull” at Sipitang
(Dalak linepipes).
- Design of holdback wall and onshore mooring point for nearshore mooring purposes at
Labuan (Dalak linepipes).
- Dalak linepipes transportation analysis -- Voyage #3 & Voyage #5 (MOSES).
- Design of chaser rack and extension beam for riser installation at TKP-A & WLDP-C (PL381).
- Linepipes launcher stability check for Sipitang Rentis Push-Pull (Dalak Linepipes).
- Design of pontoon for nearshore pipeline midpoint tie-in works.
Company: TL Offshore Sdn Bhd (SapuraKencana Petroleum Berhad)
Designation: Structural Engineer (Offshore Installation)
Period: August 2012 – June 2014
Project: Transportation and Installation of Offshore Facilities for Year 2014 – 2016
Client: Sarawak Shell Berhad
Works:
- Pipe handling frame lifting analysis (lift in air and lift through splash zone).
- Wave slam force and snap load calculation in accordance to DNV-RP-H103.
- Underwater (subsea) pipe handling frame in-place analysis.
Project: Transportation and Installation of Offshore Facilities (Year 2014 – 2016)
Client: Murphy Sarawak Oil Company
Works:
- SA-SA jacket pile driveability study.
- SA-SA jacket conductor driveability study.
- SA-SA jacket conductor hang-off study.
Project: Transportation and Installation of Offshore Facilities – F14DR-A Launch
Client: Sarawak Shell Berhad
Works:
- Post-launch barge underdeck strength assessment using finite element analysis (ANSYS).
Project: 2010-2012 Transportation and Installation of EMEPMI Facilities – Damar A
Client: Exxonmobil Exploration and Production Malaysia Inc.
Works:
- Damar-A pile driveability study.
- Damar-A conductor hang-off study.
Project: 2010-2012 Transportation and Installation of EMEPMI Facilities – Tapis R
Client: Exxonmobil Exploration and Production Malaysia Inc.
Works:
- Tapis-R Pile Driveability Study.
- Tapis-R Jacket On-Bottom Stability Analysis.
- Jacket fairlead local check using finite element analysis at sling wrap location during jacket
wet tow.
- Tapis-R offshore installation on-board DB101.
- Lifting capacity calculation for temporary jacket set-down according to DNV specification.
- Calculation on hydraulic jack and its extension beam for jacket launch assist.
- Assessment on jacket leg extension for jacket levelling jack.
Project: G1/48 Manora Field Development
Client: Mubadala Petroleum
Works:
- Supervision and review of pile driveability analysis and jacket on-bottom analysis.
Project: Transportation and Installation of Offshore Facilities
Client: Murphy Sarawak Oil Co. Ltd.
Works:
- Topside local checks for WP-PA Platform rigging preparation.
Project: Pipelines, Structures & FPSO Installation for Berantai Field Development Project,
Block PM309
Client: Petrofac (Malaysia) Limited
Works:
- Local checks (underdeck, etc.) for chain hang-off platform on Kruez Installer.
- Nitrogen tank package seafastening design on board Omni Akira.
Company: Leighton Engineering Consultant Sdn Bhd
Designation: Structural Engineer
Period: March 2012 – August 2012
Project: Crude Oil Export Facility Reconstruction Project
Client: South Oil Company (Iraq)
Works:
- Design and analysis of Module Support Frame for Valve Station platform. Analyses include
inplace, lifting, loadout and transportation.
- Design and analysis of substructure for Valve Station platform. Analyses include inplace,
lifting, pile driveability & on-bottom.
Company: Tanjung Petroconsult Sdn Bhd (a subsidiary of Tanjung Offshore Berhad)
Designation: Structural / Project Engineer
Period: July 2010 – February 2012
Project: Resak CPP Flare Tip Replacement Project
Client: Petronas Carigali Sdn Bhd
Works:
- Bidding/Proposal, conceptual design, site verification, project management, fabrication and
offshore installation.
- Structural design on the lifting frame, lifting arrangement, constructability.
Project: EPCC of Gas Lift Compressor Package at Cendor MOPU
Client: Petrofac Malaysia Ltd.
Works:
- Structural analysis on existing wireline deck for compressor installation. The wireline deck is
an extension of an originally jack-up rig converted to be a fixed production platform (MOPU).
- Engineering design and drawings on structural modifications for compressor installation.
- Involvement in procurement of materials, fabrications, offshore workpack, hook-up, marine
spread, loadout, and safety studies (FERA, QRA, Noise, etc).
- Liase with the client and subcontractors for documents approval.
Project: Conceptual Design for Gas and Liquid Metering skid at D35 platform
(Manpower supply to DPS Consultant Sdn Bhd)
Client: Petronas Carigali Sdn Bhd
Works:
- Site identification and proposal on metering skid locations on D35PG-A platform.
- Structural analysis on possible deck extensions to house proposed metering skids.
- Existing structure is a Module Support Frame with 3 main modules (Compression, separation
and power generation). Substructure is a 6-legged jacket type.
Project: Punchlist Clearance for Baronia Flare Upgrade Project
Client: Petronas Carigali Sdn Bhd (SKO)
Works:
- Design and site engineer for offshore hook-up during punchlist clearance. Punchlist includes:
Installation of additional boatlanding ladder, installation of additional pipe support, touch-up
painting, pipe markings, and replacement for gasket, blinds, bolts and nuts.
- Procurement of materials and manpower mobilization for the works in Miri, Sarawak,
Malaysia.
Project: Provision of two (2) Units of Waste Heat Recovery Unit (WHRU) – P249 Sakhalin
Project
Client: Citech / Worley Parsons
Works:
- Structural calculations and material checks
- Fabrication monitoring
Project: Design and Supply of Produced Water Treatment Package for F28
Client: Sarawak Shell Berhad
Works:
- Structural analysis for equipment skids
- Installation plan
Project: Egyptian LNG WHRU Retrofit Project
Client: Citech / ELNG
Works:
- Conceptual design of WHRU (conventional type)
- Structural design and analysis for support structures
Project: Provision of Design, Supply, Delivery, Fabrication, Installation, Hook-Up &
Commissioning of a Flare System at Baronia BNV-A Project
Client: Petronas Carigali Sdn Bhd (SKO)
Works:
- Perform loadout of structures and equipment onto material barge at KSB wharf
- Conduct tie-down & seafastening of material barge before prior to sailaway
- Perform and supervise offshore removal, installation and hook-up of BNV-A topside
- Material & manpower procurement
- Structural analysis of existing jacket/topside structures
Project: Engineering, Procurement, Construction & Commissioning for The CO2 Supply to
Mox-Linde Project at GPP-A Kerteh, Terengganu
Client: OGPP Engineering / Petronas Gas Berhad
Works:
- Structural design & analysis of pipe bridge (pinned connection frame)
Company: DPS Consultant Malaysia Sdn Bhd
Designation: Structural Engineer
Period: Dec 2009 – July 2010
Project: Front End Engineering Design for CENDOR Phase-2 Field Development
Client: Petrofac Malaysia Limited
Works:
- Structural design and analysis of FPSO (CDP-A) topside modules and flare tower. Analyses
include inplace, lifting, upending, transportation and vortex induced vibration check
- Wellhead platform (CDW-B) topside floatover feasibility study
- Wellhead platform (CDW-B) topside lifting analysis
Project: Dulang IFDP Study Conceptual Development Plan
Client: PetroMalaysia
Works:
- Structural conceptual design and analysis of Dulang-BX central processing platform topside
(Module support frame). Analysis include inplace analysis and process module design
Company: Tanjung Petroconsult Sdn Bhd (a subsidiary of Tanjung Offshore Berhad)
Designation: Structural Engineer
Period: Dec 2007 – Dec 2009
Project: Conceptual and Detail Design of Stair Tower for CKA – PAC Bintan Gangway
(Mercury Removal Unit Project)
Client: Carigali HESS Operating Company Sdn Bhd
Works:
- Structural inplace and transportation analysis of stair tower on top of work vessel PAC-
BINTAN deck. Analysis include motion of the vessel
- Inplace analysis of 18m gangway from CKA platform to PAC-BINTAN stair tower.
- Design/relocation of gangway kingpost
- Stair tower tie-down
Project: Provision of Engineering and Design Work for Temporary Living Quarters Support
Frame at BROWFIELD RETROFIT TERM CONTRACT (Mercury Removal Unit Project)
Client: Carigali HESS Operating Company Sdn Bhd
Works:
- Structural inplace analysis of the temporary living quarters support frame
- Structural design of the support frame together with the selection on the best containers
arrangement
- Structural check on the relevant existing topside structures at the location of the support
frame
Project: Provision of Design, Supply, Delivery, Fabrication, Installation, Hook-Up &
Commissioning of a Flare System at Baronia BNV-A Project
Client: Petronas Carigali Sdn Bhd (SKO)
Works:
- Structural design on conversion of an offshore vent platform to a flare system platform with
additional new structures (caisson, separator, etc.)
- Structural inplace analysis of the new topside structures together with the existing tripod
jacket
- Structural lifting and transportation analysis of the new platform complete with the caisson
and flare stack
- Structural miscellaneous design calculation includes cathodic protection of the caisson, VIV
check on the flare stack and other miscellaneous structural design
- Monitoring and checking of the drawing production
Project: Ruby Field Development FPSO Project
Client: Malaysia Marine and Heavy Engineering Sdn Bhd
Works:
- Structural analysis of the FPSO topside modules. Analyses include in-place, transit & lifting
condition of the topside module
- In-place analysis covers static structural analysis, wind load calculation, FPSO
motion/acceleration and the hull intact/damaged condition
- Dynamic analysis covers structural analysis due to engine vibration on the model of the Ruby
Compression Module which contains two reciprocating high speed compressors
- Involved particularly in design and analysis of modules (Chemical Injection Module and
Compression Module), structural design checks on vendor’s E-House Module and several
miscellaneous design on the Power Generation unit
Project: ANGSI Phase IV Development Project: Compact Manifold – East & West
Client: Petronas Carigali Sdn Bhd
Works:
- Structural analysis of two compact manifolds (East & West) which include inplace,
transportation & lifting analysis
- Engineering drawing drafting/checking
Project: Supply of Emergency Diesel Generator for Package 16 – BE Process & BG Utility
Platform
Client: Synergistic Generation SB / Maersk Oil Qatar AS
Works:
- Inplace & lifting analysis/design for the gen-set structural skid
Project: EPCC of Segamat Compressor Station Expansion Project
Client: Sime Engineering SB / Petronas Gas Berhad
Works:
- Analysis & design of pipe & valve support
Company: Sime Engineering / Sime Darby Engineering Sdn Bhd
Designation: Jr. Engineer - Structural
Period: 2007
Project: EPIC of BH-D05A, BH-M04A and BH-I03A, Wellhead Jackets, Topsides, Pipelines, Tie-
ins and Miscellaneous Flowlines in BH and MM Fields Offshore Along with Topside
Modifications
Client: Qatar Petroleum
Works:
- Analysis of pile drivability and pile make-up design. Design includes study on soil properties
and stratification, hammer selections, decision on length of pile segments and driving
sequence of piles for each new platform
- Design and analysis of underwater valve protection skid. Analyses include in-place, lifting &
on-bottom stability analysis of the structure
- Lifting analysis and trunnions/padeyes design for jackets, piles and boatlanding
- Design of risers/J-tubes clamps and support systems for new and existing platforms.
Performed in-place analysis for existing jackets framing
- Vortex induced vibration calculation/check for J-tube
- Performed manual local member check for topside modifications
Project: EPCC of the Puteri Wellhead Platform for the Puteri Field Development Project
Client: Petronas Carigali Sdn Bhd
Works:
- Review, recheck & verification on structural adequacy of topside subcellar deck, pile &
conductor lifting padeyes for Puteri Platform
Company: Jurutera Perunding Kamil Sdn Bhd
Designation: Apprentice Engineer - Civil & Structural
Period: 2005 – 2006
Project: Civil and structural works (design office and construction site) on various
construction projects with client such as UiTM, UPSI, MRCB, InnoBio, etc.
Languages
Language Spoken Written
Malay Language Excellent Excellent
English Good Excellent
Additional Info
Personal skills: Enthusiastic, quick to learn with good interpersonal and organizational skills. Have a
high sense of responsibility.
Other trainings: MIS-BOSET No.:M-B/227/34617 Cert Date: 2nd Feb 2011
Petronas Smart Card
Computer Literacy
Program Level (out of 5)
SACS 4
GRLWEAP (Pile Drivability Analysis) 4
ESTEEM (Reinforced Concrete Design) 1
AutoCAD 3
StaadPro 2
PDMS 2
ANSYS & SpaceClaim (Finite Element Analysis) 4
Microsoft Words & Excel 4
MOSES 2
Willing to travel: Yes
Possess own transport: Yes
Point of origin: Kuala Lumpur, Malaysia
References:
1) Ir. Abu Bakar Mohd Noor
Engineering Manager,
Newfield
Email: [email protected]
Phone: 012-3026783 / 019-2938993
2) Ir. Mohd Fauzali Mohd Hanif
Lead Structural Engineer,
Tabung Haji Heavy Engineering Berhad
Email: [email protected]
Phone: 013-3637452
3) Mohd Nazim bin Mansor
Lead Marine Engineer,
TL Offshore Sdn Bhd (SapuraKencana Petroleum Berhad)
Email: [email protected]
Phone: 019-2219086
4) Kamarul Hisyam Hashim
Head of Department (T&I Engineering),
PBJV Group Sdn Bhd (Barakah Offshore Petroleum Berhad)
Email: [email protected]
Phone: 012-2921951