LAPORAN KEMAJUAN PROJEK NO.22

‘APRIL 2009’

PROJEK ADTEC TAIPING

KEMENTERIAN SUMBER MANUSIA

JABATAN KERJA RAYA MALAYSIA

KAMALBINA SDN. BHD

PEMILIK

PEGARAH PROJEK

KONTRAKTOR R&B

ADTEC TAIPING

LOKASI PROJEK

BANGUNAN PENTADBIRAN

BENGKEL TEK. MAKLUMAT& JAMIN KUALITI

DEWAN BESAR

PUSAT SUMBER

DEWAN KULIAH

LOBI UTAMA

KAFETERIA

MIKRO ELEKTRONIK

KOMPOSIT PLASTIK

M&E PLANT ROOM

1

TNB SUB

STATION

SERAMIK

M&E PLANT ROOM

2

GARAJ KENDERAAN

ASRAMA LELAKIASRAMA PEREMPUAN

DEWANMAKAN

SURAU

KELAS F

KELAS G

KUARTERSB, C, C&D

PELAN TAPAK ADTEC TAIPING

KEMAJUAN KERJA FIZIKAL

JADUAL : 85.16 %SEBENAR : 87.59 %KESELURUHAN : 2.43 %

TARIKH LAPORAN : 12 JUN 2009

KEMAJUAN KERJA KEWANGAN

JADUAL : 85.09 %SEBENAR : 86.12 %KESELURUHAN : 1.03 %

TARIKH LAPORAN : 12 JUN 2009

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 88.35% 92.38% 4.03%

JUN 09’ 94.21% 96.74% 2.53%

MECHANICAL PLANNED

ACTUAL

AIR COND 94.85% 95.50%

FIRE FIGHTING 81.61% 95.74%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - DEWAN BESAR

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 90.00%

MAIN S/BOARD 100.00% 95.00%

LPS NA NA

PA 94.88% 67.17%

SMATV 83.38% 86.79%

CCTV NA NA

ICT 3.31% 74.25%

DEWAN BESAR

DEWAN BESAR

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 98.92% 94.90% -4.02%

JUN 09’ 99.68% 99.72% 0.04%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – LOBI

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 95.90% 100.00%

SUBMAIN CABLE 94.17% 100.00%

DB 75.00% 100.00%

LUMINAIRE 87.89% 100.00%

MAIN S/BOARD NA NA

LPS NA NA

PA NA NA

SMATV NA NA

CCTV 88.68% 92.58%

ICT NA NA

LOBI UTAMA

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 92.24% 91.71% -0.52%

JUN 09’ 98.54% 98.19% -0.35%

MECHANICAL PLANNED

ACTUAL

AIR COND 96.19% 95.00%

FIRE FIGHTING 81.51% 86.04%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMABANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 75.00% 100.00%

LUMINAIRE 91.65% 95.00%

MAIN S/BOARD 75.00% 95.00%

LPS 90.51% 92.01%

PA 37.88% 65.71%

SMATV NA NA

CCTV NA NA

ICT 0.91% 74.48%

DEWAN KULIAH UTAMA

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 95.30% 95.38% 0.09%

JUN 09’ 97.50% 98.54% 1.04%

MECHANICAL PLANNED

ACTUAL

AIR COND 93.54% 85.18%

FIRE FIGHTING 39.81% 81.59%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 97.53% 97.00%

SUBMAIN CABLE 93.31% 98.00%

DB 85.00% 100.00%

LUMINAIRE 92.27% 98.00%

MAIN S/BOARD 85.00% 95.00%

LPS 91.25% 96.92%

PA 44.70% 69.69%

SMATV 94.54% 88.33%

CCTV NA NA

ICT 18.16% 23.36%

PUSAT SUMBER / PERPUSTAKAAN

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 92.72% 92.73% 0.01%

JUN 09’ 96.42% 96.51% 0.09%

MECHANICAL PLANNED

ACTUAL

AIR COND 91.09% 94.96%

FIRE FIGHTING 47.94% 74.24%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & PENGURUSAN SUMBERBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 99.48% 97.00%

SUBMAIN CABLE 97.32% 98.00%

DB 85.00% 100.00%

LUMINAIRE 82.78% 95.00%

MAIN S/BOARD 75.00% 95.00%

LPS 87.80% 90.85%

PA 63.70% 58.92%

SMATV 95.99% 88.07%

CCTV 73.69% 70.43%

ICT 24.87% 51.37%

BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 98.36% 98.71% 0.08%

JUN 09’ 99.58% 99.23% -0.35%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING 90.22% 74.56%

KITCHEN EQUIP. 65.55% 69.00%

LPG INSTALL. 40.84% 48.50%

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - KAFETARIA

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD NA NA

LPS 100.00% 88.81%

PA 94.53% 62.91%

SMATV 92.47% 87.44%

CCTV NA NA

ICT 0.00% 75.00%

KAFETERIA

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 93.95% 95.49% 1.54%

JUN 09’ 98.05% 98.01% -0.05%

MECHANICAL PLANNED

ACTUAL

AIR COND 86.90% 91.36%

FIRE FIGHTING 31.85% 63.60%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI MAKLUMATBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 99.23% 96.00%

SUBMAIN CABLE 98.21% 100.00%

DB 97.27% 100.00%

LUMINAIRE 92.51% 100.00%

MAIN S/BOARD 75.00% 95.00%

LPS 100.00% 96.80%

PA 100.00% 73.49%

SMATV 95.09% 89.00%

CCTV 79.13% 291.22%

ICT 8.53% 19.28%

BENGKEL TEKNOLOGI MAKLUMAT

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 96.82% 95.67% -1.14%

JUN 09’ 98.42% 98.30% -0.12%

MECHANICAL PLANNED

ACTUAL

AIR COND 93.36% 93.41%

FIRE FIGHTING 45.37% 72.69%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 87.25% 85.00%

DUST CONTROL NA NA

PROCESS COOLING

41.53% 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 75.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 75.00% 95.00%

LPS 92.90% 96.80%

PA 62.47% 75.48%

SMATV 75.18% 74.39%

CCTV 83.97% 93.08%

ICT 26.23% 23.86%

BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 97.05% 95.65% -1.40%

JUN 09’ 98.46% 98.41% -0.05%

MECHANICAL PLANNED

ACTUAL

AIR COND 80.73% 78.34%

FIRE FIGHTING 43.93% 69.10%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 87.25% 85.00%

DUST CONTROL 31.69% 77.29%

PROCESS COOLING

38.45% 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 95.00%

LPS 97.29% 93.25%

PA 92.78% 72.21%

SMATV 75.26% 75.20%

CCTV 86.10% 92.75%

ICT 21.23% 18.81%

BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 95.12% 94.67% -0.46%

JUN 09’ 97.15% 97.14% -0.02%

MECHANICAL PLANNED

ACTUAL

AIR COND 91.33% 92.19%

FIRE FIGHTING 44.40% 69.54%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 87.25% 85.00%

DUST CONTROL 11.65% 72.95%

PROCESS COOLING

21.79% 0.00%

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 99.29% 100.00%

DB 78.00% 100.00%

LUMINAIRE 96.30% 100.00%

MAIN S/BOARD 85.00% 95.00%

LPS 90.20% 96.49%

PA 96.64% 72.96%

SMATV 73.29% 74.70%

CCTV 90.23% 93.97%

ICT 33.22% 27.44%

BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 94.30% 95.17% -0.87%

JUN 09’ 96.50% 96.99% 0.48%

MECHANICAL PLANNED

ACTUAL

AIR COND 82.68% 59.54%

FIRE FIGHTING 26.16% 63.17%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 87.25% 85.00%

DUST CONTROL 38.25% 80.74%

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN KUALITIBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 97.67% 96.00%

SUBMAIN CABLE 95.02% 97.00%

DB 95.02% 95.00%

LUMINAIRE 77.98% 90.00%

MAIN S/BOARD 57.17% 95.00%

LPS 86.74% 96.20%

PA 42.25% 68.68%

SMATV 87.59% 85.36%

CCTV 80.71% 90.90%

ICT 7.17% 18.61%

BENGKEL KEJ. JAMINAN KUALITI

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 92.86% 94.80% 1.94%

JUN 09’ 95.58% 95.59% 0.01%

MECHANICAL PLANNED

ACTUAL

AIR COND 93.43% 91.50%

FIRE FIGHTING 22.33% 59.71%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR 87.25% 85.00%

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO ELEKTRONIKBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 96.00%

SUBMAIN CABLE 96.67% 95.00%

DB 72.68% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 95.00%

LPS 92.34% 96.70%

PA 52.92% 72.02%

SMATV 91.26% 86.86%

CCTV 84.11% 91.21%

ICT 6.84% 22.94%

BENGKEL MIKRO ELEKTRONIK

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 100.00% 100.00% 0.00%

JUN 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 100.00%

LPS 100.00% 95.68%

PA NA NA

SMATV 84.58% 68.14%

CCTV 79.71% 93.15%

ICT 100.00% 90.00%

KUARTERS KELAS ‘B’

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 100.00% 100.00% 0.00%

JUN 09’ 100.00% 100.00% 100.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 90.00%

LPS 100.00% 95.78%

PA NA NA

SMATV 82.56% 46.09%

CCTV NA NA

ICT 100.00% 84.06%

KUARTERS KELAS ‘C’

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 100.00% 100.00% 0.00%

JUN 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 100.00%

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 90.00%

LPS 100.00% 96.33%

PA NA NA

SMATV 84.58% 86.14%

CCTV NA NA

ICT 100.00% 90.00%

KUARTERS KELAS ‘C’ + ‘D’

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 97.14% 98.49% 1.36%

JUN 09’ 98.63% 98.85% 0.12%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 90.00%

LPS 93.30% 96.98%

PA NA NA

SMATV 95.77% 93.31%

CCTV NA NA

ICT 96.04% 92.34%

KUARTERS KELAS ‘F’ ( 4 TINGKAT )

KUARTERS KELAS ‘F’ ( 5 TINGKAT )

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 97.58% 98.48% 0.90%

JUN 09’ 99.57% 99.58% 0.01%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING NA NA

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G

(1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT)BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 90.00%

LPS 100.00% 96.98%

PA NA NA

SMATV 95.77% 93.31%

CCTV NA NA

ICT 100.00% 98.37%

KUARTERS KELAS ‘G’ ( 5 TINGKAT )

KUARTERS KELAS ‘G’ ( 4 TINGKAT )

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 99.42% 99.60% 0.18%

JUN 09’ 99.83% 96.63% 0.01%

MECHANICAL PLANNED

ACTUAL

AIR COND 90.95% 100.00%

FIRE FIGHTING 57.40% 72.89%

KITCHEN EQUIP. 65.55% 69.00%

LPG INSTALL. 40.84% 48.50%

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 98.00%

DB 100.00% 95.00%

LUMINAIRE 100.00% 80.00%

MAIN S/BOARD 100.00% 90.00%

LPS 100.00% 97.32%

PA 56.87% 73.23%

SMATV 92.47% 90.79%

CCTV NA NA

ICT 100.00% 75.35%

DEWAN MAKAN

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 98.70% 99.43% 0.73%

JUN 09’ 99.39% 99.55% 0.16%

MECHANICAL PLANNED

ACTUAL

AIR COND 89.66% 100.00%

FIRE FIGHTING 39.31% 84.41%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & BBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 99.33% 100.00%

SUBMAIN CABLE 94.80% 97.00%

DB 100.00% 90.00%

LUMINAIRE 100.00% 95.00%

MAIN S/BOARD 100.00% 90.00%

LPS 98.56% 97.48%

PA 64.19% 76.16%

SMATV 72.72% 89.94%

CCTV 79.47% 92.93%

ICT 97.72% 92.43%

ASRAMA LELAKI A & B

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 98.95% 99.37% 0.52%

JUN 09’ 99.44% 99.50% 0.06%

MECHANICAL PLANNED

ACTUAL

AIR COND 76.12% 100.00%

FIRE FIGHTING 81.16% 85.89%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & DBANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 99.23`% 100.00%

SUBMAIN CABLE 98.85% 97.00%

DB 94.81% 90.00%

LUMINAIRE 92.21% 95.00%

MAIN S/BOARD 100.00% 90.00%

LPS 100.00% 97.64%

PA 60.31% 74.66%

SMATV 72.35% 89.94%

CCTV 84.84% 92.62%

ICT 99.49% 91.62%

ASRAMA PEREMPUAN C & D

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 95.20% 92.10% 0.69%

JUN 09’ 96.94% 96.63% -0.31%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 100.00% 75.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - SURAU

BANGUNAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 76.89% 100.00%

MAIN S/BOARD 85.00% 95.00%

LPS 91.35% 96.24%

PA 30.52% 64.71%

SMATV NA NA

CCTV NA NA

ICT NA NA

SURAU

MONTH PLANNED ACTUAL AHEAD / DELAY

MEI 09’ 99.80% 99.83% 0.04%

JUN 09’ 99.99% 99.83% -0.16%

MECHANICAL PLANNED

ACTUAL

AIR COND NA NA

FIRE FIGHTING 100.00% 75.00%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL - ASTAKA

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 100.00%

SUBMAIN CABLE 100.00% 100.00%

DB 100.00% 100.00%

LUMINAIRE 100.00% 100.00%

MAIN S/BOARD 100.00% 90.00%

LPS 97.85% 93.89%

PA 38.16% 67.38%

SMATV NA NA

CCTV NA NA

ICT NA NA

BANGUNAN SOKONGAN

ASTAKA

MONTH PLANNED ACTUAL AHEAD / DELAY

JUN 09’ 100.00% 100.00% 0.00%

MECHANICAL PLANNED

ACTUAL

AIR COND 100.00% 99.53%

FIRE FIGHTING 32.54% 90.34%

KITCHEN EQUIP. NA NA

LPG INSTALL. NA NA

COMPRES. AIR NA NA

DUST CONTROL NA NA

PROCESS COOLING

NA NA

KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM

BANGUNAN SOKONGAN

ELECTRICAL PLANNED ACTUAL

WIRING 100.00% 97.00%

SUBMAIN CABLE 100.00% 90.00%

DB 100.00% 0.00%

LUMINAIRE 92.72% 90.00%

MAIN S/BOARD 54.00% 100.00%

LPS NA NA

PA NA NA

SMATV NA NA

CCTV NA NA

ICT NA NA

BANGUNAN SOKONGAN

M&E PLANT ROOM – PUSAT SUMBER

BANGUNAN SOKONGAN

M&E PLANT ROOM - BENGKEL

DECORATIVE FENCE

BANGUNAN SOKONGAN

GARAJ KENDERAAN

ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK

RUMAH SAMPAH

LALUAN BERBUMBUNG

OPEN PLAZA

KERJA INFRA – JALAN UTAMA

GELANGGANG PERMAINAN

GELANGGANG PERMAINAN

GELANGGANG PERMAINAN

BENGKEL MIKRO - CLEANROON

M&E : FIRE FIGHTING

STAGE : DEWAN KULIAH

BENGKEL JAMINAN KULITI

KITCHEN HOOD : CAFETERIA

M&E

• SEKIAN TERIMA KASIH