Page 1: 3.Company Profil Pt Tte
Page 2: 3.Company Profil Pt Tte

Contents

Overview

Quality Policy

Track Record

Member’s Experience

Our Strategic Partner

Page 3: 3.Company Profil Pt Tte

AsiaPacif ic Capital

Management Sdn Bhd

Panglima Capital (M)

Sdn Bhd

Juara Jernih Sdn Bhd

Kontek Abbadi

Sdn Bhd

Pa

ng

lima

Ve

ntu

re C

ap

ital

Sd

n B

hd

Henry Supanni

AsiaPacif ic

BusinessLink Sdn Bhd

26%

16%

26%

30%

16%

16%

PT

Tria

Ta

lan

g E

ma

s

70%

Pt Tria Talang Emas (PTTE) is a private limited

company incorporated in Republic of Indonesia in

September 2005 as a Penanaman Modal Dalam

Negeri (PMDN) in Republic of Indonesia on 8

September 2005 and the company has been

converted into a Penanaman Modal Asing (PMA)

company on 2 February 2007. PTTE has its

registered address in Jalan Senayan No.61 Blocks,

Kebayoran Baru, Jakarta Selatan and corporate

office in Suite 2A-12-1, Block 2A, Level 12, Plaza

Sentral, Jalan Stesen Sentral 5, 50470 Kuala

Lumpur for the purpose to develop, implement,

own and operate 4x25MW Coal Fired Power Plant

exclusively to the utility company, Pt. Pembangunan Kota Batam ("PKB") a wholly owned subsidiary

of the Indonesian Government.

The shareholders of PTTE are Panglima Venture Capital S/B (70%) & Henry Supanni (30%). The

current authorised and paid-up capital is USD 102,933,600 and USD 12,886,799 respectively.

Panglima Venture Capital S/B shareholders are as follows:

AsiaPacific Capital Management Sdn Bhd ("APC")

AsiaPacific BusinessLink Sdn Bhd

("APBiz")

Panglima Capital Sdn Bhd ("PC")

Kontek Abbadi Sdn Bhd ("KA")

Juara Jernih Sdn Bhd ('JJ")

APC, APBiz, PC, KA and JJ are collectively referred to as Malaysian Investors.

The shareholders currently form the members of the Board of Directors and Board of Commissioners.

The daily operational matters are under the stewardship of Malaysian investors which the Senior

Management has wide experience in implementation of power project. More staff with appropriate

technical background and experience will be hired to assist the implementation of the power project.

PTTE is the promoter of the power plant project which was initiated in late 2005. After months of

negotiation the project was eventually approved by the Batam Authority. The Power Purchase

Agreement (“PPA”) and the Implementation Agreement (“IA”) were signed on 18th January 2006 and

27th July 2007 respectively.

OVERVIEW

Page 4: 3.Company Profil Pt Tte

The Commissioners of PTTE are:

Gen ( R ) Tan Sri Dato’ Mohd Ghazali Seth

Tan Sri Dato’ Abu Zahar bin Dato’ Nika Ujang

Muhammad Hafidh

And the Board of Directors are:

Datuk Chris S.W.Low (President Director)

Bala Chandran A/L Vajram

Henry Supanni

Zulkifli Ali

Harizan Mahmud

The commissioners and directors form a team of professionals with vast experience in the field of power

generations.

PTTE places a very high professional commitment to clients and stakeholders in all project

undertakings. The achievement of this goal is supported by a management system that embraces Quality

Performance and Continual Improvement in all aspects of our project implementation cycles by using

the state-of-art software like Microsoft Project and Primavera Project Planner.

Continual Improvement is always on our top agenda. Our Project Management Office is constantly

monitoring the quality of process via objectively measurable Key Performance Indicators (KPIs) by

using the above mentioned softwares and through video-conferencing. These KPIs allow us to ensure

the highest quality work that is always delivered on-time and on-budget. By practicing an Open Door

concept, the project team is able to address changes in the project environment quickly and adapt the

change process to suit the implementation. Coupled with the best people, a conducive team-work

culture and an in depth technology know-how, PTTE is slated to deliver projects with the most

excellent value and cost effective solutions.

QUALITY POLICY

OVERVIEW

Page 5: 3.Company Profil Pt Tte

PTTE have executed Power Purchase Agreement (PPA)

and Implementation Agreement (IA) with Batam Authority

to develop 4x25MW Coal Fired Power Plant in Batam,

Indonesia. The purchase of land for the project has been

finalized.

As per the PPA the Power Plant commenced operation date

is in 2010.

ASIAPACIFIC BUSINESSLINK SDN BHD (APBIZ)

APBiz was founded in 2005. It is a professional conglomerate with specialization in

the energy and power generation industries.

The team consists of highly qualified personnel that have significant industrial

experience in the following fields:

Project development and Implementation

End-to-end Project Financing Services

Engineering, procurement, construction and commissioning in :

Thermal Power Plant

Hydro-Power Plant

Diesel Power Plant

Cogeneration Plant

Gas Turbines Power Plant

Renewable Energy Power Plant

Transmission and Distribution

Support and management of power plants

Operation and Maintenance

TRACK RECORD

Implementation Agreement

- signing ceremony Project Site

Page 6: 3.Company Profil Pt Tte

Apart from this, APBiz is also involves in the following:

Identifying investment opportunities in power project in the Asia Pacific regions

Project feasibility analysis and conceptual planning

Fund raising for project financing and/investment

Engineering, procurement, construction and commissioning of power plant

Project management

Operations and maintenance of power plants

Management of power plants

To understand this immense mission, APBiz is closely associated with a consortium of international

consultants and contractors to provide a wide range of related services in the energy and power

industries and to establish strategic alliance with regional and international companies in the energy and

power related industries.

Core activities of APBiz are Power Operation, Property development and Biotechnology.

Current APBiz is negotiating with 3 Universities in Thailand on the proposed development of student

dormitory service apartments and retail spaces and a Government Agency to design, built and lease

(“BOT”) an office block for the Agency. APBiz has operations in Bangkok, Qatar, Laos, Batam and

Jakarta.

1. Sepangar Bay Power Corporation

Kota Kinabalu, Sabah, MALAYSIA

Our team members participated as partners to the consortium owner to

undertake the development of a 100MW Combined Cycle gas-fired

power plant at Kota Kinabalu Industrial Park, Sabah, Malaysia.

The power generation facility being built consists of a single combined-

cycle gas turbine (CCGT) block and will be connected to the West Coast

Grid. Under the 21 years concession period, we will design, construct

and commission the power plant including the 132kV substation within

the premise and the necessary inter-connecting 132kV overhead

transmission lines to the substation.

The Power Purchase Agreement was executed on 26 January 2005.

Phase 1 of the project achieved Commercial Operation Date on 15

November 2006 which consists of net generation capacity of 66MW.

Construction works is currently underway for Phase 2 and the plant is

expected to be on full commercial operation by end 2007.

MEMBER’S EXPERIENCE

Page 7: 3.Company Profil Pt Tte

2. Laos :

APBiz was given the mandate to develop 150MW Hydro Power Plant in Lao Pdr. The Nam Pha Hydro

electric project is located in Luang Wan Tha and Bokeo province in Lao Pdr.

Presently APBiz is carrying out Feasibility and EIA study on the

Project. To carry out this study APBiz has appointed consortium

of Fichtner GmbH & Co of Germany and PEC Konsult of

Malaysia to carry out the study.

The APBiz and team at Nam Pha site reconnaissance

The APBiz team during their first reconnaissance trip to Lao

PDR in early 2006 visited the Nam-Ngum Hydro-Electricity

Power Plant.

The finalization of all the tireless efforts culminated with the

signing of the MOU between the Government of Lao PDR and

APBiz on 2nd April 2007 to undertake the l50MW hydro-power

plant at Nampha in the provinces of Bokeo and Luang Namtha in

the north of Lao PDR.

3. Indonesia

2 x 2 x 135 MW Mine mouth Coal Fired Power Plant at Peranap Riau Province Sumatra Island.

APBiz is a consortium owner 70% of PT TME to develop a

Mine mouth Coal Fired Power Plant in Peranap, Sumatra

Island, Indonesia. PT TME is given mandate to develop

2x2x135MW minemouth Coal Fired Power Plant.

Stretch of coal seam outcrop on the right bank of

Sungei Kuantan

MEMBER’S EXPERIENCE

Page 8: 3.Company Profil Pt Tte

The First Phase of the project will be of 2x135MW Independent power plant project with Electricity

Generated will be sold to PLN.

The Coal mining area for this mine mouth is about 112,500

hectors whereby the mines concession is hold by PT TME

Estimate reserves of coal is in excess of 1 billion MTs of

coal with calorific value between 5000 to 6000 kcal.

4. Thailand

Our team is currently exploring the possibility to penetrate into the Thai energy sector. The team had

several meetings with the Ministry of Energy during their recent trips to Bangkok in 2006.

File photo of a meeting in Bangkok, Thailand.

Meeting with senior officials from the Ministry of

Energy, Thailand.

The Director, Ministry of Energy, Thailand,

explaining Thailand’s energy policy.

MEMBER’S EXPERIENCE

Close view of the coal seam outcrop

Page 9: 3.Company Profil Pt Tte

5. Coal Mining Activities

APBiz link is a consortium owner of CV Rida Jaya a coal mine

concession owner in Kalimantan, Indonesia.

The coal mine Concession area is about 7,000 ha and it is located in

Kabupate Kapuan Hulu, Kalimantan, Indonesia.

Based on the initial study it is indicated the total deposits of coal in

the area is approximately 54 million M tones with calorific value of

6000 kcal.

MEMBER’S EXPERIENCE

Page 10: 3.Company Profil Pt Tte

Thailand University Project

Project 1

Build, transfer and lease leaseback

com comprising service-apartments

apartments, dormitory, and

hotels.

Project 2

Service - apartments

and dormitory.

Project 3

Service - apartments

MEMBER’S EXPERIENCE

Page 11: 3.Company Profil Pt Tte

ASIAPACIFIC CAPITAL MANAGEMENT SDN BHD (APC)

AsiaPacific Capital Management Sdn Bhd (“APC”) was incorporated on 18 December 2002 as a

private limited company in Malaysia.

The Company is principally involved in the business of dealing in investment securities, corporate

business services, brokerage services, operation and maintenance of power plants and property

development. APC is also a co-owner of the above mentioned coal mines and has several pieces of land

in Klang Valley for development.

The Company has a team of individuals who have vast knowledge and experiences to offer professional

services.

The company also committed to build and develop dynamic work force equipped with the right

expertise, competence and capabilities.

The Company has 3 wholly owned subsidiaries, namely:

Panglima Development (M) Sdn Bhd

Konsortium Eko Alam Sdn Bhd

Support Symphony Sdn Bhd

.

MEMBER’S EXPERIENCE

A proposed commercial development in Jakarta

Page 12: 3.Company Profil Pt Tte

PANGLIMA DEVELOPMENT (M) DN BHD

The principal activity is to manage and secure privatized contracts and other projects.

KONSORTIUM EKO ALAM SDN BHD

The company is in the final stage of acquiring two coal mines and has secured sales contract for the

sales of 5.5 million M tones per annum of coal to India Power producers.

SUPPORT SYMPHONY SDN BHD

The company is responsible for the operation and maintenance of power plant. Uses knowledge and

experience in operation and maintenance for the benefit of the group of companies and also third

parties. The company is the Operations and Maintenance Operator of a 100MW Gas-fired

Combined Cycle electricity generation facility and related infrastructure, transmission lines,

interconnection facilities and communication facilities in Kota Kinabalu Industrial Park, Kota

Kinabalu, Sabah.

PANGLIMA CAPITAL SDN BHD (PC)

THE GROUP is spearheaded by the Principal Holding Company, PADU PANGLIMA SDN BHD

(“PPSB”). This company was incorporated on 5th April 2001 specifically to bring together FIVE

retired generals in an entrepreneurial undertaking.

The five promoters of PPSB served in various senior capacities in the Armed Forces. Individually they

have performed various onerous and strategic duties at the highest level of military command. It is their

diverse experiential duties that lend the company its inherent strength, particularly in terms of leadership

and general management capabilities that will be useful in ensuring the success of the present

entrepreneurial endeavours.

One factor that will facilitate this undertaking is the leadership of the Chairman, YBhg. Gen. (R) Tan

Sri Dato’ Mohd Ghazali Seth, who has served as the Chief of the Armed Forces. The sterling

performance of the Chairman while in service, and his subsequent varied and equally successful

involvement in business, particularly at the highest level of corporate endeavours, will provide the

cornerstone of the company’s forward push in business.

MEMBER’S EXPERIENCE

Page 13: 3.Company Profil Pt Tte

Business Activities

PANGLIMA CAPITAL GROUP has and will involve itself in selected areas of business with good

potentials. While the founders are all from defence background they have decided to principally seek

opportunities further a field, in the non-defence sectors.

Smart Partnership

Aware of the need to focus to only a few selected numbers of business areas, as well as to bridge the

“expertise gap” in the non-defence areas, the GROUP has chosen smart partnership as a key strategy

for the way forward. Thus the group has, and will, link itself and co-operate with other suitable

investors, partners with professional backgrounds, or other corporate entities with experience and/or

expertise in the respective business areas. This way the parties involved will complement each other and

form effective teams to pursue the business together.

Apart from combining resources with partners, through joint-venture undertakings or such other

collaborative arrangements, the GROUP is also ready to link-up with other companies, local or foreign

to pursue mutually beneficial business ventures through non-corporate set-ups. In this respect the Group

will consider proposals to act as agent, representative or consultant to companies looking for such

services.

Fields of Business

The first business initiative for the Group began when it acquired a telecommunication contracting

company, which was not faring well. Not only has the Group now turned-around the company, it is

now developing it into a stronger entity with definite plans for expansion into related areas of the ICT.

The other undertakings that the Group has and will embark on are:

Investment Holdings

Integrated Facilities Management

Oil and Gas (O & M)

Information, Communication and Technology (I.C.T.)

Manpower Management

Facilitative and Support Consultancy

Project Management

Construction

Property Development

MEMBER’S EXPERIENCE

Page 14: 3.Company Profil Pt Tte

Subsidiaries

The Group has since its inception embarked on a number of business endeavours through several

subsidiaries via:

PUSTAKA PANGLIMA (M) SDN BHD

Pustaka Panglima (Malaysia) Sdn Bhd (“PPSB”) is wholly owned by Panglima Capital Sdn Bhd

(PCSB).Currently, its investment consists of Anjung Bahasa Sdn Bhd (100% owned) and

Panglima Urusharta (Malaysia) Sdn Bhd (“PUSB”) (100% owned). The principal business is to

manage and secure Government Privatised Contracts.

PANGLIMA URUSHARTA (M) SDN BHD

Panglima Urusharta (Malaysia) Sdn. Bhd. is a company specialized in management and

maintenance of building. The other business is to manage and secure Government Privatised

Contracts. Currently, it provides maintenance services to the New Office Complex of Dewan

Bahasa dan Pustaka for a 15-year concession period ending 2017.

ANJUNG BAHASA SDN BHD

Anjung Bahasa Sdn Bhd is a single purpose company, which by a concession agreement

executed with the Government and Dewan Bahasa dan Pustaka on 23 August 1996, has

completed the construction of the new Office Complex of Dewan Bahasa dan Pustaka located at

Jalan Dewan Bahasa, Kuala Lumpur for the Federal Government on a deferred payment basis

over 17-years and has also been awarded the management and maintenance contract of the

building for 17 years.

KONTEK ABBADI SDN BHD (KA)

Kontek Abbadi (“KA” or the “Company”) was established on 14 November 1987 under the name of

Kontek Abadi Sdn Bhd. On 24 February 1995, it changed its name to its current name. The Company

is principally a general contractor.

KA consists of a core group of skilled and effective personnel with the technical knowledge and

experience to perform the detailed design and tender process as well as the implementation of the works

as required by the client.

MEMBER’S EXPERIENCE

Page 15: 3.Company Profil Pt Tte

The Company specialises in Engineering, Procurement and Construction Contracts for industrial plants,

bulk supply intake substations (up to 275kV level), and power generating stations and cogeneration

plants.

KA also undertakes Mechanical & Electrical design & build services for building services, industrial

plants, bulk supply intake substations (up to 275kV level), power station and cogeneration /district

cooling plant.

Kontek Abbadi Sdn Bhd has since its inception embarked on a number of business endeavors as

follows:

Project : Tawau Power Station Extension

Project Description : Complete Turnkey Design and Installation (GTG

supplied by client) of a 20 MW Gas Turbine Generato

(LM 2500 PE) for Tawau Power Station

Client : Lembaga Letrik Sabah

Involvement in this project includes:-

Design of the civil/structural, mechanical and civil

works.

Principal consultancy and co-ordination of civil

design with respect to the requirement of the power

station extension.

In-house design and specification of electrical

system packages consisting of Gas Turbine

Generator, switchgears, current limiting reactor,

standby (black start) generator and synchronising

panels to form a functional generating system.

In-house design and specification of mechanical

interface for the respective packages comprising of

the Gas Turbine Generator, auxiliary skids,

pipework, fuel pump skids and fuel bulk storage

tank.

Turnkey construction of the power plant.

MEMBER’S EXPERIENCE

Page 16: 3.Company Profil Pt Tte

Project : 200 MW IPP for Tanir Bavi Power

Project Description : 200 MW Barge Mounted Combined Cycle Power Plant

for an IPP situated in Mangalore, India

Client : Tanir Bavi Power Company

KA’s involvement in this project includes:-

Conceptual Design Studies for selection of equipment.

Detailed analysis of existing ambient conditions/river water analysis to determine the ambient

conditions for equipment guarantees.

Designing and selection of equipment

Equipment selection depends on plant requirements such as power output and heat rate, project

delivery schedule the economic benefit of using the selected configuration.

Preparation of specifications for the following packages

Gas Turbine Generators

Combined Cycle Barge

Miscellaneous auxiliaries such as cooling towers and pumps

Preparation of detailed engineering drawings. These drawings are good enough to be used for

construction as a lot of thought had been put into the process of making the drawings as practical as

possible.

Unlike a land based power plant, a barge mounted power plant has tremendous space constraints and the

design engineer has to maximize the space utilization while not neglecting the maintainability of the

machines.

Project : 100 MW IPP for West Coast Grid

Project Description : 100 MW Combined Cycle Power Plant for an IPP

situated in Sabah

KA’s involvement in this project includes being part of a consortium of shareholders of the IPP Power

Plant.

Project : SSAAPS, Kapar (2 x 30MW Gas Turbine Package D1)

Project Description : Installation of the 2 x 30MW Gas Turbine Package

Client : TNB

KA’s involvement in this project includes overall plant erection and installation works.

MEMBER’S EXPERIENCE

Page 17: 3.Company Profil Pt Tte

Project : Cogeneration Plant for Tanjung Langsat

Industrial Park

Project Description : Complete Turnkey Design and installation of a

7MW cogeneration plant for GDC(M) Sdn. Bhd.

Client : Gas district Cooling (M) Sdn. Bhd. (a Petronas

subsidiary company)

KA’s involvement in this project includes:-

Design of the mechanical / electrical

services in a joint venture with OGP

Technical Services

Plant design & construction with respect

to the requirement of the power station

extension.

In-house design and specification of

electrical system packages consisting of

Gas Turbine Generator, switchgears,

current limiting reactor, standby (black

start) generator and synchronising panels

to form a functional generating system.

Collaboration with OGP Technical Services for the design and specification of mechanical interface

for the respective packages comprising of the Gas Turbine Generator, auxiliary skids, pipework,

fuel pump skids and fuel bulk storage tank.

Turnkey design and construction of power plant.

JUARA JERNIH SDN BHD(JJ)

JJ is currently part of the consortium owner of a 100MW Combined Cycle gas-fired power plant at Kota

Kinabalu Industrial Park, Sabah, Malaysia.

The power generation facility being built consists of a single combined-cycle gas turbine (CCGT) block

and will be connected to the West Coast Grid. Under the 21 years concession period, we will design,

construct and commission the power plant including the 132kV substation within the premise and the

necessary inter-connecting 132kV overhead transmission lines to the substation.

MEMBER’S EXPERIENCE

Page 18: 3.Company Profil Pt Tte

Salam International Investment Limited

Connell Wagner

China National Electric Equipment Corporation

OUR STRATEGIC PARTNER